Loading...
3 Pace Site Plan 070620 Rev2PACE BUS GARAGEPROPOSED NEW OFFICE/REPAIR& STORAGE FACILITY FOR:PLAINFIELD, ILLINOISA1.1 OFFICE/PLANT PROPOSED ONE STORY A1.1 DEPOT DRIVE (CONTEMPLATED ROAD EXTENTION)D.I.D.DETENTION574.09'612.52'688.67' 891.67' TWO STORY OFF.HIGH SPEEDGATEHIGH SPEEDGATE59 CAR PARKING FUT. PKG.FUTURE PARKINGTDRIVE INDRIVE INDRIVE INDRIVE INDRIVE INDRIVE INDRIVE INEXT. DOCKGEN. D.I.D. FUTURE PARKING 44 CAR PARKING 102 CAR PARKING RECYLING/ TRASH D.I.D. D.I.D. FUEL 14 DRIVE IN DOORS 30' REAR YARD BUILDING SETBACK 30' FRONT YARD BUILDING SETBACK 15' SIDE YARD BUILDING SETBACK15' SIDE YARD BUILDING SETBACKSITE AREA (±12.41 AC)±540,583 S.F. BUILDING AREA OFFSITEDETENTION PARKING ONSITE PARKING 205 STALLS STORED BUSES 130 BUSES OFFICE 13,140 S.F. 232,853 S.F. REPAIR AREA 37,796 S.F. TOTAL BUILDING AREA 245,993 S.F. FUTURE SEC. FL. OFFICE 13,140 S.F. TOTAL FUT.BLDG AREA CLEAR HEIGHT 18'-0"-24'-0" MAINTENANCE 11,496 S.F. BUS STORAGE 136,680 S.F. SERVICE AREA 26,829 S.F. MECHANICAL 6,912 S.F. 18,408 S.F.MEZZANINES FUTURE PARKING 85 STALLS TOTAL FUTURE PARKING 290 STALLS DRIVE IN OVERHEAD DOORS 25 DOORS EXTERIOR DOCK 1 DOCK SITE DATA