Loading...
HomeMy Public PortalAboutORD15428 BILL NO. 2015-36 SPONSORED BY COUNCILMAN Scrivner ORDINANCE NO. I acli-gg AN ORDINANCE OF THE CITY OF JEFFERSON, MISSOURI, AUTHORIZING THE MAYOR AND CITY CLERK TO EXECUTE AN AGREEMENT WITH TWEHOUS EXCAVATING CO., INC., IN THE AMOUNT OF $199,229.00 FOR THE BELMONT STORMWATER (600BIk) PROJECT. WHEREAS, Twehous Excavating Co., Inc.. has become the apparent lowest and best bidder on the Belmont Stormwater (600BIk) project/ NOW, THEREFORE, BE IT ENACTED BY THE COUNCIL OF THE CITY OF JEFFERSON, MISSOURI, AS FOLLOWS: Section 1. The bid of Twehous Excavating Co., Inc., is declared to be the lowest and best bid and is hereby accepted. Section 2. The Mayor and City Clerk are hereby authorized to execute an agreement with Twehous Excavating Co., Inc., for the Belmont Stormwater (600Blk) project. Section 3. The agreement shall be substantially the same in form and content as that agreement attached hereto as Exhibit A. Section 4. This Ordinance shall be in full force and effect from and after the date of its passage and approval. c> 9 Passed /(i,(J b� �/� Approved: & . /20/.5 CoAxi Torgsr,vt cm/kJ,: —re A t i,,A Presiding Officer Mayor Carrie Tergin 1• 1 ATTEST: /' ---"\- - APPROVED AS TO FORM: - dy Clerk.... ' - Counselor %co IrIh rtegrO Department of Public Works Memorandum 320 E. McCarty Street •Jefferson City, Missouri 65101 • P 573-634-6410 • F 573-634-6562 • wewv.ieffcitvmo.orq Date: August 11, 2015 To: City Council From: David Bange, P.E., City Engineer Subject: Belmont Stormwater Project Staff has selected Twehous Excavating as the bidder submitting the bid that is in the best interest of the City and is recommending them as the contractor to construct the Belmont Stormwater Project. Upon receiving and tabulating the bids staff noticed a number of items submitted by the low bidder were significantly lower than what was expected. We contacted the low bidder and discussed this issue with him. He acknowledged that he had made an error and that his concrete prices were only one ninth of what he had intended them to be. This mistake equates to approximately $50,000. In subsequent conversations with the lower bidder he voiced a desire to withdraw his bid, but this being the first time he submitted a bid for work with the City he felt that doing so would reflect poorly on him, and after reflection decided not to withdraw. While the low bidder's references gave positive reviews it does not appear as if he has done work that is the same as what is require for this contact. Given this reality, the bidder's stated desire to get out of the contract and the knowledge that the contractor will start the project in financial difficulty, it does not seem prudent to recommend the low bidder. In addition the second low bidder submitted a bid that is less than the engineer's estimate and is a contractor that is known to do produce a quality product in a timely and orderly fashion. It is for these reasons that Staff is recommending the bid from Twehous Excavating. DB:db FINANCE DEPARTMENT PURCHASING DIVISION SUBJECT: Bid 2818— Project 33083— Belmont Dr. Stormwater (600 BIk) Public Works, Engineering —Opened August 4, 2015 RECOMMENDATION: Staff recommends award of the bid to the lowest and best bid meeting specifications as submitted by Twehous Excavating Co., Inc. of Jefferson City, MO in the amount of$199,229.99. BIDS RECEIVED: GWH Landscape Contacting, LLC, Jefferson City, MO $186,111.09 Twehous Excavating Co., Inc., Jefferson City, MO $199,229.00 Mera Excavating, LLC, Bonnots Mill, MO $224,776.00 Strait-Line Construction, Lake Ozark, MO $230,012.75 Don Schnieders Excavating Co., Inc., Jefferson City, MO $230,845.00 B & P Patterson, LLC, Linn, MO $261,413.75 M&M Landscaping & Construction, LLC, Eugene, MO $245,174.00 Stockman Construction Corp., Jefferson City, MO $249,042.00 The bid was advertised in News Tribune, posted on the city web site, sent to seven plan houses. Two additional firms purchased plans but did not respond. FISCAL NOTE: 44-990-576015 Belmont Stormwater 2014-2015 Budget $199,229.00 Bid 2818 $199,229.00 Balance -0- Funds were transferred into this account from Misc. Neighborhood Improvements to complete this project. PAST PERFORMANCE: The City has awarded to this bidder in the past and staff believes the contractor will complete the work as specified and bid. ATTACHMENTS - SUPPORTING DOCUMENTATION • r •I • Signature A h. ' L ' Purch'sin"'gent Director of Public Works tt¶1 11 1 q vti r iaR311)I�tCu i S' eir-OWn Department of Public Works Memorandum 320 E. McCarty Street •Jefferson City, Missouri 65101 • P 573-634-6410 • F 573-634-6562 • www.jeffcitymo.org Date: August 11, 2015 To: Terry Stephenson, Purchasing Director, Finance From: David Bange, City Engineer t Subject: Project No. 33083; Belmont Dr. Stormwater (600BIk) Bid No. 2818 Public Works has completed a review of the bids opened at 1:30 p.m. on August 04, 2015 for the above noted project. As part of the review all the bids were tabulated to check for math errors and to compare unit price quotes of the various contractors. Attached to this memo is the tabulation of the eight (8) bids received for the project, as well as a listing of the registered plan holders. • Based on our review, we recommend acceptance of the bid from the lowest and best bidder, Twehous Excavating Co. Inc., 8514 Liberty Road, Jefferson City, MO 65101. The total amount of the contract will be $199,229.00. The project will be expensed as follows: Twehous Excavating Co. Inc. ($199,229.00): Account Number: Amount Available: Required: Remaining: 44-990-576015 $199,229.00 $199,229.00 $0.00 If you need any other information, please feel free to contact me at extension 6433. Attachments: Bid Tabulation Sheet, Plan Holders List • cc: Project file Writer's file CITY OF JEFFERSON ($ .;}� . :_. BUDGET ADJUSTMENT FORM City Hall FY 15 BUDGET ADJUSTMENT320E McCarty Street Jefferson City, MO 65101 l FROM ACCOUNT# TO ACCOUNT# TOTAL AMOUNT DESCRIPTION OF TRANSFER I 44-990-576007 44-990-576015 $199,229.00 To correct negative account balance Misc Neighbrhd lmpr Belmont Stormwater Dept Director Approval/70Date $/r (�� Entered By Date Division Director Approval Initial Date Page 1 of 3 CITY OF JEFFERSON Date: Aug 04, 2015 BID TABULATION Bid No. 2818 BELMONT STORMWATE (600BLK) • PROJECT NO. 33083 ENGINEER'S ESTIMATE GWH Landscape Contracting Twehous Excavating Company ITEM DESCRIPTION UNIT APPROX UNIT PRICE AMOUNT UNIT PRICE AMOUNT UNIT PRICE AMOUNT • NO. QTY 1 Mobilization LS 1 $4,000.00 $4,000.00 $1,551.50 $1,551.50 $7,000.00 $7,000.00 2 Removals LS 1 $5,000.00 $5,000.00 $867.50 $867.50 $5,000.00 $5,000.00 3 Earthwork LS 1 $6,000.00 $6,000.00 $8,776.50 $8,776.50 $3,200.00 $3,200.00 4 Final Site Restoration LS 1 $4,500.00 $4,500.00 $10,776.50 $10,776.50 $5,000.00 $5,000.00 5 Temporary Site Stabilization SY 700 $4.00 $2,800.00 $3.95 $2,765.00 $0.75 $525.00 6 Sediment Barrier LF 300 $4.50 $1,350.00 $4.58 $1,374.00 $6.50 $1,950.00 7 Inlet Protection EA 7 $200.00 $1,400.00 $218.07 $1,526.49 $200.00 $1,400.00 8 Construction Signage/Traffic Control EA 2 $2,500.00 $5,000.00 $1,876.50 $3,753.00 $1,950.00 $3,900.00 9 Tie into Existing Culvert EA 1 $3,000.00 $3,000.00 $3,276.50 $3,276.50 $1,500.00 $1,500.00 10 Type A Inlet (6'x 4') EA 1 $4,500.00 $4,500.00 $7,204.50 $7,204.50 $3,800.00 $3,800.00 11 Type C Inlet(6'x 4') EA 5 $4,500.00 $22,500.00 $6,583.30 $32,916.50 $4,000.00 $20,000.00 12 Type C Inlet(8'x 4') EA 1 $6,000.00 $6,000.00 $7,804.50 $7,804.50 $5,000.00 $5,000.00 13 Junction Box(4'x 4') EA 1 ' $3,500.00 $3,500.00 $6,704.50 $6,704.50 $3,400.00 $3,400.00 14 Junction Box(4' x 5') EA 1 $4,250.00 $4,250.00 $7,104.50 $7,104.50 $3,500.00 $3,500.00 15 15"dia RCP Class III LF 120 $70.00 $8,400.00 $54.97 $6,596.40 $63.00 $7,560.00 16 24" dia RCP Class III LF 422 $80.00 $33,760.00 $71.24 $30,063.28 $87.00 $36,714.00 17 30"dia RCP Class III LF 97 $87.00 $8,439.00 $114.86 $11,141.42 $115.00 $11,155.00 18 Curb & Gutter(Remove & Replace) LF 740 $30.00 $22,200.00 $26.04 $19,269.60 $35.00 $25,900.00 19 Concrete Driveway; 6"thick(Remove & SY 155 $80.00 $12,400.00 $11.50 $1,782.50 $70.00 $10,850.00 Replace) 20 Concrete Street; 8"thick (Remove & SY 525 $60.00 $31,500.00 $9.72 $5,103.00 $57.00 $29,925.00 Replace) 21 Asphalt Street; 4"thick (Remove & SY 75 $40.00 $3,000.00 $97.12 $7,284.00 $45.00 $3,375.00 Replace) 22 Rock Excavation CY 15 $150.00 $2,250.00 $211.76 $3,176.40 $135.00 $2,025.00 23 Subgrade Stabilization Ton 25 $50.00 $1,250.00 $83.86 $2,096.50 $36.00 $900.00 24 Duel Cleanout EA 1 $250.00 $250.00 $180.00 $180.00 $550.00 $550.00 25 4" SS Lateral LF 20 $50.00 $1,000.00 $12.00 $240.00 $65.00 $1,300.00 . 26 Tree Removal LS 1 $1,500.00 $1,500.00 $2,776.50 $2,776.50 $3,800.00 $3;800.00 TOTAL BASE BID $199,749.00 $186,111.09 $199,229.00 % OVER/UNDER ENGINEER'S EST. -6.8% -0.3% ERROR Page 2 of 3 CITY OF JEFFERSON Date: Aug 04, 2015 BID TABULATION ' • Bid No. 2818 BELMONT STORMWATE(600BLK) PROJECT NO. 33083 Mera Excavating, LLC Strait-Line Construction Don Schneider's Excavating Company ITEM DESCRIPTION UNIT APPROX UNIT PRICE AMOUNT UNIT PRICE AMOUNT UNIT PRICE AMOUNT NO. QTY 1 Mobilization LS 1 $5,400.00 $5,400.00 $18,600.00 $18,600.00 $3,500.00 $3,500.00 2 Removals LS 1 $5,500.00 $5,500.00 $29,500.00 $29,500.00 $3,960.00 $3,960.00 3 Earthwork LS 1 $6,100.00 $6,100.00 $14,500.00 $14,500.00 $4,400.00 $4,400.00 4 Final Site Restoration LS 1 $2,550.00 $2,550.00 $6,890.00 $6,890.00 $3,000.00 $3,000.00 5 Temporary Site Stabilization SY 700 $2.50 $1,750.00 $6.00 $4,200.00 $4.00 $2,800.00 6 Sediment Barrier LF 300 $3.00 $900.00 $3.75 $1,125.00 $4.00 $1,200.00 7 Inlet Protection EA 7 $200.00 $1,400.00 $175.00 $1,225.00 $100.00 $700.00 8 Construction Signage/Traffic Control EA 2 $1,955.00 $3,910.00 $825.00 $1,650.00 $1,500.00 $3,000.00 9 Tie into Existing Culvert EA 1 $2,020.00 $2,020.00 $2,100.00 $2,100.00 $4,000.00 $4,000.00 10 Type A Inlet(6'x 4') EA 1 $4,750.00 $4,750.00 $3,150.00 $3,150.00 $4,200.00 $4,200.00 11 Type C Inlet(6'x 4') EA 5 $6,735.00 $33,675.00 $3,150.00 $15,750.00 $4,240.00 $21,200.00 12 Type C Inlet (8'x 4') EA 1 $7,650.00 $7,650.00 $3,900.00 $3,900.00 $4,400.00 $4,400.00 13 Junction Box(4'x 4') EA 1 $3,300.00 $3,300.00 $3,150.00 $3,150.00 $3,900.00 $3,900.00 14 Junction Box (4'x 5') EA 1 $3,170.00 $3,170.00 $3,350.00 $3,350.00 $3,950.00 $3,950.00 15 15" dia RCP Class III LF 120 $59.00 $7,080.00 $58.25 $6,990.00 $67.00 $8,040.00 16 24" dia RCP Class III LF 422 $68.00 $28,696.00 $64.50 $27,219.00 , $89.00 $37,558.00 17 30"dia RCP Class III LF 97 $100.00 $9,700.00 $71.25 $6,911.25 $119.00 $11,543.00 18 Curb & Gutter(Remove & Replace) LF 740 $40.00 $29,600:00 $32.50 $24,050.00 $45.65 $33,781.00 19 Concrete Driveway; 6"thick(Remove & SY 155 $95.00 $14,725.00 $67.00 $10,385.00 $85.85 $13,306.75 Replace) 20 Concrete Street; 8"thick (Remove& SY 525 $75.00 $39,375.00 $70.00 $36,750.00 $88.25 $46,331.25 Replace) 21 Asphalt Street; 4"thick(Remove & SY 75 $100.00 $7,500.00 $60.00 $4,500.00 $75.00 $5,625.00 Replace) 22 Rock Excavation CY 15 $155.00 $2,325.00 $100.00 $1,500.00 $250.00 $3,750.00 23 Subgrade Stabilization Ton 25 $30.00 $750.00 $21.50 $537.50 $40.00 $1,000.00 24 Duel Cleanout EA 1 $600.00 $600.00 $100.00 $100.00 $1,000.00 $1,000.00 25 4" SS Lateral LF 20 $55.00 $1,100.00 $11.50 $230.00 $35.00 $700.00 26 Tree Removal LS 1 $1,250.00 $1,250.00 $1,750.00 $1,750.00 $4,000.00 $4,000.00 TOTAL BASE BID $224,776.00 $230,012.75 $230,845.00 % OVER/UNDER ENGINEER'S EST. 12.5% 15.2% 15.6% Page 3 of 3 CITY OF JEFFERSON Date: Aug 04, 2015 BID TABULATION Bid No. 2818 BELMONT STORMWATE (600BLK) PROJECT NO. 33083 B&P Patterson Concrete M&M Landscaping Const. Stockman Construction Corp. LLC _ ITEM DESCRIPTION . UNIT APPROX UNIT PRICE AMOUNT UNIT PRICE AMOUNT UNIT PRICE AMOUNT NO. QTY 1 Mobilization LS 1 $8,000.00 $8,000.00 $8,000.00 $8,000.00 $5,000.00 $5,000.00 2 Removals LS 1 $20,000.00 $20,000.00 $10,000.00 $10,000.00 $3,500.00 $3,500.00 3 Earthwork LS 1 $4,200.00 $4,200.00 $5,000.00 $5,000.00 $9,000.00 $9,000.00 4 Final Site Restoration LS 1 $4,500.00 $4,500.00 $3,000.00 $3,000.00 $8,000.00 $8,000.00 5 Temporary Site Stabilization SY 700 $4.30 $3,010.00 $14.00 $9,800.00 $2.25 $1,575.00 6 Sediment Barrier LF 300 $6.00 $1,800.00 $2.50 $750.00 $4.35 $1,305.00 7 Inlet Protection EA 7 $175.00 $1,225.00 $175.00 $1,225.00 $150.00 $1,050.00 8 Construction Signage/Traffic Control EA 2 $1,100.00 $2,200.00 $2,500.00 $5,000.00 $2,500.00 $5,000.00 9 Tie into Existing Culvert EA 1 $1,700.00 $1,700.00 $1,800.00 $1,800.00 $4,000.00 $4,000.00 10 Type A Inlet(6'x 4') EA 1 $4,000.00 $4,000.00 $4,250.00 $4,250.00 $3,950.00 $3,950.00 11 Type C Inlet(6' x 4') EA 5 $6,500.00 $32,500.00 $5,980.00 $29,900.00 $4,750.00 $23,750.00 12 Type C Inlet(8'x 4') EA 1 $7,000.00 $7,000.00 $6,735.00 $6,735.00 $4,875.00 $4,875.00 13 Junction Box (4' x 4') EA 1 $5,000.00 $5,000.00 $3,210.00 $3,210.00 I $3,800.00 $3,800.00 14 Junction Box (4'x 5') EA 1 $5,500.00 $5,500.00 $3,100.00 $3,100.00 $3,575.00 $3,575.00 15 15" dia RCP Class III LF 120 $60.00 $7,200.00 $95.00 $11,400.00 $86.50 $10,380.00 • 16 24"dia RCP Class III LF 422 $73.00 $30,806.00 $112.00 $47,264.00 $97.00 $40,934.00 17 30"dia RCP Class III LF 97 $150.00 $14,550.00 $170.00 $16,490.00 $174.00 $16,878.00 18 Curb& Gutter(Remove& Replace) LF 740 $35.00 $25,900.00 $34.00 $25,160.00 $42.25 $31,265.00 19 Concrete Driveway; 6"thick(Remove & SY 155 $93.00 $14,415.00 $68.00 $10,540.00 $72.00 $11,160.00 Replace) 20 Concrete Street; 8"thick (Remove & SY 525 $105.00 $55,125.00 $64.00 $33,600.00 $90.00 $47,250.00 Replace) 21 Asphalt Street; 4"thick (Remove& SY 75 $86.77 $6,507.75 $12.00 $900.00 $79.00 $5,925.00 Replace) 22 Rock Excavation CY 15 $150.00 $2,250.00 $80.00 $1,200.00 $75.00 $1,125.00 23 Subgrade Stabilization Ton 25 $45.00 $1,125.00 . $28.00 $700.00 $45.00 $1,125.00 24 Duel Cleanout EA 1 $800.00 $800.00 $250.00 $250.00 ; $200.00 $200.00 25 4"SS Lateral LF 20 $70.00 $1,400.00 $20.00 $400.00 $76.00 $1,520.00 26 Tree Removal LS 1 $700.00 $700.00 $5,500.00 $5,500.00 $2,900.00 $2,900.00 TOTAL BASE BID $261,413.75 $245,174.00 $249,042.00 % OVER/UNDER ENGINEER'S EST. 30.9% 22.7% 24.7%I ERROR