Loading...
HomeMy Public PortalAboutTOL PR 2010-10-25 revised fall milling & paving Town of Leesburg News Release For Immediate Release Contact: Chuck Welsh Public Works Assistant Superintendent cwelsh@leesburgva.gov 703-737-2159 Revised Fall 2010 Milling and Paving Schedule Leesburg, VA (October 25, 2010) – Due to contractor availability, the Town of Leesburg’s Public Works Department has revised the schedule for milling and paving work to be conducted in the coming weeks, with work now scheduled to begin on Wednesday, October 27, 2010. The updated schedule, subject to inclement weather delays, is below with revisions highlighted in red. Part of the Town’s regular streets maintenance program, milling and paving is a surface replacement process that eliminates existing pot holes and creates a smooth new road surface. Milling and paving extends the life of the Town’s streets and is done on any particular street about once every ten to fifteen years. The road surface replacement process takes place in two steps. First, the top 1 to 1½ inches of asphalt is milled or ground off the street. Then, a new overlay of hot-mix asphalt is applied to the street, creating the new pavement surface. Typically, milling will be done on one day and paving will be done on the next day. During milling and paving operations, crews will close one lane of the street at a time, so motorists should expect delays. In addition, no on-street parking will be allowed during the scheduled milling and paving operations. The following night work is scheduled: 1. Route 15 Bypass, from Edwards Ferry Road to Fort Evans Road (southbound lanes) • Milling: Sunday, October 31 – Monday, November 1, 9 pm – 5 am • Paving: Tuesday, November 2 – Wednesday, November 3, 9 pm – 5 am 2. Edwards Ferry Road, from Heritage Way to Sheetz/WalMart Entrances • Milling: Sunday, October 31 – Monday, November 1, 9 pm – 6 am • Paving: Tuesday, November 2 – Wednesday, November 3, 9 pm – 6 am (more) TOL PR 2010-10-25 revised fall milling & paving Page 2 In addition to the night work listed above, the following daytime work is scheduled: A. Heritage Way, from Edwards Ferry Road to north end • Milling: Wednesday, October 27, 8 am – 5 pm • Paving: Thursday, October 28, 8 am – 5 pm B. Cedar Walk Circle (entire street) • Milling: Wednesday, November 3, 8 am – 5 pm • Paving: Friday, November 5, 8 am – 5 pm C. Meadows Lane (entire street) • Milling: Thursday, November 4, 8 am – 5 pm • Paving: Monday, November 8, 8 am – 5 pm D. Kincaid Boulevard, from Battlefield Parkway to Patrice Drive • Milling: Monday, November 8, 8 am – 5 pm • Paving: Tuesday, November 9 and Wednesday, November 10, 8 am – 5 pm E. Oakcrest Manor Drive, from Georgetown Court to Catoctin Circle • Milling: Tuesday, November 9, 8 am – 5 pm • Paving: Friday, November 12, 8 am – 5 pm F. Daniels Street, from Ayr Street to end • Milling: Wednesday, November 10, 8 am – 5 pm • Paving: Thursday, November 11, 8 am – 5 pm G. Ayr Street, from Old Waterford Road to Daniels Street • Milling: Wednesday, November 10, 8 am – 5 pm • Paving: Thursday, November 11, 8 am – 5 pm Any changes to the above schedule will be advertised via notices to the Town’s website (www.leesburgva.gov), message boards and/or flyer handouts delivered to residents’ homes. For more information, please contact the Leesburg Public Works Department’s Streets Division at 703-737-2159 or 703-737-7071. On the map below, the numbers red segments represent scheduled night work. The lettered blue segments represent the daytime work. (more) TOL PR 2010-10-25 revised fall milling & paving Page 3 Fall 2010 Milling & Paving Operations Map The following nighttime milling and paving work, originally scheduled for this Fall, has been postponed until Spring 2011: • Route 15 Bypass, from the Route 7 overpass to Edwards Ferry Road (northbound lanes) • Fort Evans Road, from the Route 15 Bypass to Potomac Station Drive • Edwards Ferry Road, from the Route 15 Bypass to the Sheetz/WalMart entrances # # #