Loading...
HomeMy Public PortalAbout03-21-22 Agenda Budget Retreat FY2022-23 Budget Retreat Town of Hillsborough, North Carolina 919‐732‐1270 |    www.hillsboroughnc.gov  101 E. Orange St., PO Box 429, Hillsborough, NC 27278 919-732-1270 | www.hillsboroughnc.gov | @HillsboroughGov Agenda Board of Commissioners Budget Retreat 7 p.m. March 21, 2022 Board Meeting Room of Town Hall Annex, 105 E. Corbin St. Please use the bookmark feature to navigate and view the item attachments. 1. Introduction 2. Agenda changes 3. Community survey results 4. Staff financial forecast/overview Revenue and expenditure discussion 5. Requests Feedback on requests included/not included in budget 6. Discussion topics A. Assistant finance director B. Affordable housing Community Survey 2 3/16/2022 1 2021 Community Survey Results FY23 Budget Retreat Presentation  Agenda Purpose & Methodology Findings Perceptions, Trends, Benchmarks Questions 1 2 3 3/16/2022 2 Purpose •To  assess resident satisfaction with the delivery of town services •To  help determine priorities for the community •To  measure trends from previous surveys •To  compare town’s performance with other communities regionally and nationally Methodology •Survey Description o 6‐page survey o Third survey conducted by ETC Institute for the town (‘17, ‘19, ‘21) •Method of Administration o By mail and online to all in‐town households •Sample Size and Sampling Goals o Goal – 400 surveys o 501 completed survey •Confidence Interval – 95% level of confidence •Margin of Error ‐+/‐4.3% 3 4 4 3/16/2022 3 Location of Survey Respondents •Good representation throughout the town •Demographics of survey respondents reflects population of the town o Race/ethnicity o Age o Gender Perceptions How do residents feel about town services and the community? 5 6 5 3/16/2022 4 Key  Highlights •Residents continue to have a very positive perception of Hillsborough o 95% of residents rated Hillsborough as “excellent” or “good” place to live o 88% of residents surveyed satisfied with the quality of services provided by the town o 87% satisfied with quality of life in the town o 87% satisfied with quality of life in neighborhood o 84% satisfied with appearance of Hillsborough •Satisfaction ratings  overall are similar to previous years 7 8 6 3/16/2022 5 9 10 7 3/16/2022 6 Trends How do the results compare to past years? 2021 vs 2019 37 Areas 8 Areas 44 Areas 11 12 8 3/16/2022 7 2021 vs 2019 8 Areas 10 Areas 1. Ease of paying water and sewer bill 2. Quality of water and sewer services 3. Quality of drinking water 4. As a place to work 5. Ease of travel by driving to key destinations 6. Quality of town parks 7. Water and sewer billing & collections 8. Ease of travel within Hillsborough Significant Change1. Solid Waste/Public Works 2. Visibility of police in  neighborhoods 3. Ease of travel by biking to key  destinations 4. Town’s efforts to prevent  crime 5. Amount of trees/shrubs  retained and/or replaced on  new development 6. Police 7. Quality of social media outlets 8. Quality of recent residential  development 9. Ability to find housing you can  afford 10. Quality of recent commercial  development 13 14 9 3/16/2022 8 15 16 10 3/16/2022 9 Benchmarks How do we compare to other communities?  Hillsborough Exceeds Averages •Regionally (Atlantic Region –NC, VA, WV, DE, MD, DC, NJ) o Rated above the average for 45 of 46 areas assessed. o Rated the same as the regional average in one area. “Hillsborough as a place to work” •Nationally •Rated above the average in all 46 areas assessed. •Rated significantly higher (more than 5%) in 45 of the areas. 17 18 11 3/16/2022 10 Comparative Advantages Regionally •Residential bulk trash collection  (49%) •Quality of customer service from  town employees (45%) •Quality of town parks (42%) •As a place to live (35%) •Quality of services provided by  the town (34%) Nationally •Residential bulk trash collection  (46%) •As a place to live (45%) •Quality of customer service from  town employees (42%) •Quality of town parks (41%) •Effectiveness of communication  with the public (41%) Key  Survey Questions •As a place to live •95% satisfaction •+35% with regional average and +45% with US average •Quality of services provided by the town o 88% satisfaction o +34% with regional average and +37% with US average  •Value  received for local taxes and fees o 57% satisfaction o +23% with regional and US averages 19 20 12 3/16/2022 11 21 22 13 3/16/2022 12 Additional Findings Anything else to point out? 1. 2. 3. 23 24 14 3/16/2022 13 25 26 15 3/16/2022 14 Summary •Residents have a very positive perception of Hillsborough. •Satisfaction ratings  overall are similar to previous years. •Satisfaction with town services is much higher than other cities. •Top  3 Priorities o Maintenance of town streets o Quality of town services o Condition of sidewalks in neighborhoods Questions? Thank you! 27 28 16 Budget Requests 17 General Fund Operating Requests Department Expense Category Request Description FY23 FY24 FY25 FY23. FY24. FY25. Administration Operating Photography Equipment Current camera up for refresh and could be  used as a spare to loan out to departments.  Includes accessories and a professional  backdrop for taking headshots.1,599               ‐                   ‐                   1,599               ‐                   ‐                    Accounting Personnel Assistant Finance Director To address growing complexity and increased  workload 133,456          130,453          131,048          133,456          130,453          131,048           Town Hall Campus Operating Flags & Flag Poles Replace old NC and US flags and find  alternative way to fly flags in town as current  method is no longer allowed by Duke Energy.10,000             2,500               ‐                   10,000             2,500               ‐                    Town Hall Campus Operating Replace Roof of Main Town Hall  Building Last replaced around 1996.20,000             ‐                   ‐                   20,000             ‐                   ‐                    Public Space Operating Interpretive Signs Install 3 signs in FY23, design 4 signs in FY24  and install them in FY25 12,000             3,000               12,000             12,000             3,000               12,000              Public Space Operating Pedestrian Amenities Benches, trash and recycling receptacles, bike  racks, etc. for parks and cemeteries.20,000             20,000             20,000             10,000             10,000             10,000              Public Space Operating Seal Coat Bridges and Boardwalks Pressure wash and seal bridges and board  walks along Riverwalk, Calvin St Greenway and  in Gold Park.60,000             ‐                   ‐                   60,000             ‐                   ‐                    Public Space Capital Greenway South System Feasibility study, design and construction of  greenway  between the future train station and  Cates Creek Park, including construction of a  bridge over I‐85. FY23 ‐ Feasibility study, FY24 ‐  Design. 30,000             80,000             ‐                   30,000             80,000             ‐                    Public Space Capital Skate Park Small scale "skate spot" at Cates Creek Park 20,000             200,000          ‐                   ‐                   20,000             200,000           Safety & Risk Mgmt. Operating Replace 12 AEDs AEDs are at end of life and had to find  replacement parts.13,000             ‐                   ‐                   13,000             ‐                   ‐                    Information Services Operating Unified Security System Replace non‐compliant building access and  security camera  systems with a centralized  system.35,500             75,000             25,000             35,500             75,000             25,000              Police Operating Radio Software Updates Update radio software ‐                   14,700             14,700             ‐                   14,700             14,700              Police Operating Replace Handheld Radios Phase in replacement ‐                   23,000             23,000             ‐                   23,000             23,000              Police Operating Replace In‐Car Cameras Phase in replacement ‐                   49,085             44,247             ‐                   49,085             44,247              Police Capital Replace Vehicle #242 2008 Impala w/65k miles (CID)45,000             ‐                   ‐                   45,000             ‐                   ‐                    Police Capital Replace Vehicle #981 2002 Ford Explorer  w/137k miles (CID)45,000             ‐                   ‐                   45,000             ‐                   ‐                    Police Capital Replace Vehicle #194 2010 Charger w/120k miles (Patrol)‐                   50,000             ‐                   ‐                   50,000             ‐                    Police Operating Senior Management Training Send an officer to advanced leadership and  administrative training as part of succession  planning.8,000               8,000               ‐                   8,000               8,000               ‐                    Police Personnel Police Re‐Organization Re‐org will likely result in addition of 1 position  and create capacity to focus on emergency  management.  This is a placeholder until re‐org  finalized.75,000             75,000             75,000             75,000             75,000             75,000              Police Transfer Police Station Ramp‐up $50k/year ramp up for police station debt  service 50,000             100,000          150,000          50,000             100,000          150,000           Streets Personnel Equipment Operator I Add position to meet growth demands ‐                   68,992             69,425              ‐                   68,992             69,425              Streets Debt Service NC86 Renovation FY23‐Construction Docs; FY25‐$3.3M @ 5% for  20 yrs = $265k/yr 100,000          ‐                   265,000          100,000          ‐                   265,000           Streets Capital Bucket Truck Replacement Replacement of 1999 Ford F‐350 Versalift  bucket truck with 30ft  boom. Replacement  would have 45 ft boom for easier access when  trimming trees, hanging banners, etc.‐                   125,000          ‐                   ‐                   125,000          ‐                    Streets Capital South Churton Street  Improvements Cost Share Construction of bicycle and pedestrian  improvements along S. Churton St. from the  Eno River to I‐40 interchange.50,000             ‐                   ‐                   50,000             ‐                   ‐                    Cemetery Operating Stone Wall Repair Repair stone wall at Old Town Cemetery ‐                   10,000             ‐                   ‐                   10,000             ‐                    Special Appropriations Personnel Pay Study Adjustments Estimate will be available in May. Assume  $2,500 per employee for now.162,500          162,500          162,500          162,500          162,500          162,500           Special Appropriations Operating Veteran's Memorial Contribution Continuation of $7,500 contributed in FY22.7,500               ‐                   ‐                   7,500               ‐                   ‐                    Special Appropriations Operating Passenger Rail/Multi‐Modal  Station FY25‐ $80k‐ furniture, $10k ‐ building  maintenance ‐                   ‐                   90,000             ‐                   ‐                   90,000              898,555$        1,197,230$    1,081,920$    868,555$        1,007,230$    1,271,920$     Requested Recommended 18 General FundCapital Improvement PlanDepartmentRequestDescriptionFY23 FY24FY25FY26 FY27 FY28 FY29 FY23. FY24. FY25. FY26. FY27. FY28. FY29.Public SpaceGreenway South SystemFeasibility study, design and construction of greenway  between the future train station and Cates Creek Park, including construction of a bridge over I‐85.150,000          400,000          4,000,000              2,000,000       ‐                   ‐                   ‐                   150,000          400,000          4,000,000       2,000,000       ‐                   ‐                   Public SpaceSkate ParkSmall scale "skate spot" at Cates Creek Park20,000             200,000          ‐                          ‐                   ‐                   ‐                   ‐                   20,000             200,000                 ‐                   ‐                   ‐                   ‐                   StreetsBucket Truck ReplacementReplacement of 1999 Ford F‐350 Versalift bucket truck with 30ft  boom. Replacement would have 45 ft boom for easier access when trimming trees, hanging banners, etc.‐                   125,000          ‐                          ‐                   ‐                   ‐                   ‐                   ‐                   125,000          ‐                          ‐                   ‐                   ‐                   ‐                   StreetsNC86 Facility RenovationRenovate facility to include offices and storage for Public Works staff, vehicles and equipment.3,400,000       ‐                   ‐                          ‐                   ‐                   ‐                   ‐                   100,000          3,300,000       ‐                          ‐                   ‐                   ‐                   ‐                   StreetsSouth Churton Street Improvements Cost ShareConstruction of bicycle and pedestrian improvements along S. Churton St. from the Eno River to I‐40 interchange.50,000             ‐                   ‐                          ‐                   ‐                   100,000          ‐                   50,000             ‐                   ‐                          ‐                   ‐                   100,000          ‐                   Special AppropriationsPassenger Rail/Multi‐Modal StationConstruct a train station and parking lot that will be used as  a park and ride lot.716,000          5,600,000       690,000                 30,000            30,000             30,000             30,000             716,000          5,600,000       690,000                 30,000            30,000             30,000             30,000             4,336,000$    6,325,000$    4,690,000$           2,030,000$    30,000$          130,000$        30,000$          1,016,000$    9,445,000$    890,000$              4,030,000$    2,030,000$    130,000$        30,000$          RequestedRecommended19 Water and Sewer Fund Operating Requests Department Expense  Category Request Description FY23 FY24 FY25 FY23. FY24. FY25. Administration of  Enterprise Personnel Pay Study Adjustments Estimate will be available in May. Assume  $2,500 per employee for now.90,000             90,000             90,000             90,000             90,000                 90,000              Utilities Administration Operating Water Capacity Modeling Model water capacity through 2040. 100,000          ‐                   ‐                   100,000          ‐                       ‐                    Utilities Administration Operating Water System Redundancy Model Looping recommendations and fire flow for fire  department ISO.15,000             ‐                   ‐                   15,000             ‐                       ‐                    Utilities Administration Operating Cost of Service Analysis N/A.30,000             ‐                   ‐                   ‐                   30,000                 ‐                    Utilities Administration Operating Public Outreach Specialist Contract with company to help with outreach  efforts and crisis communication. 30,000             30,000             30,000             ‐                   ‐                       ‐                    Utilities Administration Operating Engineering and Survey Assistance Perform spec and detail updates used by  engineers and contractors. 15,000             ‐                   ‐                   15,000             ‐                       ‐                    Utilities Administration Operating GIS Services Increase for entry of new infrastructure into  mapping system and checking accuracy of  location data. Including service line data for  upcoming lead and copper rule. 10,000             ‐                   ‐                   10,000             ‐                       ‐                    Water Treatment Plant Capital Filter SCADA Operations Update SCADA system to automate  backwashing to prevent filter damage.50,000             ‐                   ‐                   50,000             ‐                       ‐                    Water Treatment Plant Operating Chemical Feed Pumps No additional information.10,000             10,000             10,000             10,000             10,000                 10,000              Water Treatment Plant Capital Paving and Curbing Paving and curbing repair, which has  deteriorated and causing operational and  environmental issues.  ‐                   90,000             ‐                   ‐                   90,000                 ‐                    West Fork Eno Reservoir Operating Flow Transmitter Update flow transmitter.12,000             ‐                   ‐                   12,000             ‐                       ‐                    Water Distribution Operating Leak Detection Services Perform leak detection.20,000             20,000             20,000             20,000             20,000                 20,000              Water Distribution Capital Water Line Replacements Lead and Copper mains need to be replaced. 20,000             30,000             40,000             20,000             30,000                 40,000              Water Distribution Capital Backhoe Replace 11‐yr old Cat backhoe.35,000             ‐                   ‐                   35,000             ‐                       ‐                    Water Distribution Capital Adron Thompson Facility Reno &  Expansion Upgrade shop and offices. $1.25m at 5% for 20  yrs= $100k/yr ‐                   100,303          100,303          ‐                   50,151                 100,303           Water Distribution Capital OWASA Booster Pump Station Build booster pump station to receive water  from OWASA in times of need. $1,450,680 @  5% for 10 yrs = $187k 483,560          483,560          483,560          92,935             187,870              187,870           Water Distribution Capital US 70 Business Water  Improvements Replace 12" AC water main with 16" ductile iron  water main. $2.9M @ 5% for 20 yrs 50,000             232,703          232,703          50,000             ‐                       ‐                    Wastewater Collection Personnel Utility Mechanic ITo assist with daily workload 132,282          72,026             72,449             ‐                   ‐                       132,859           Wastewater Collection Operating Manhole Relining Miscellaneous maintenance.15,000             15,000             15,000             15,000             15,000                 15,000              Wastewater Collection Operating Replace Pump Station Panel Boxes Replace old and dangerous panel boxes and  backboards. 26 stations. Will systematically  replace panels in future years. 60,000             60,000             60,000             60,000             60,000                 60,000              Wastewater Collection Operating Resurface PS Driveway Resurface driveway for Churton Grove Pump  Station.12,000             ‐                   ‐                   12,000             ‐                       ‐                    Wastewater Collection Capital Backhoe Replace 11‐yr old Cat backhoe 35,000             ‐                   ‐                   35,000             ‐                       ‐                    Wastewater Collection Capital Adron Thompson Facility Reno &  Expansion Upgrade shop and offices. . $1.25m at 5% for 20  yrs= $100k/yr ‐                   100,303          100,303          ‐                   50,151                 100,303           Wastewater Treatment  Plant Personnel Plant Mechanic ITo assist w/ plant maint, ops, repairs 59,913             59,796             59,970             29,957             59,796                 59,970              Wastewater Treatment  Plant Capital Master Plan Completion of master plan that includes study  of alt tech to comply w/ Falls Lake Rules ‐                   ‐                   100,000          ‐                   ‐                       100,000           Wastewater Treatment  Plant Capital Tertiary Filter Flocculators Install new flocculators to maximize the Total  Phosphorous removal needed to meet Falls Lake  Rules and reduce chemical usage. ‐                   10,000             180,000          ‐                   10,000                 180,000           1,284,755$    1,403,691$    1,594,288$    671,892$        702,968$            1,096,305$     Requested Recommended 20 Water and Sewer FundCapital Improvement PlanDepartmentRequest Description FY23 FY24 FY25 FY26 FY27 FY28 FY29 FY23.0 FY24.0 FY25.0 FY26.0 FY27.0 FY28.0 FY29.0Water Distribution Hydrant & Valve ProjectReplace old hydrants & install watch valves on the hydrant legs where needed. Install new valves and piping per study.400,000          270,000          275,000          ‐                   ‐                  ‐                  ‐                  300,000          300,000          200,000          145,000          ‐                    ‐                  ‐                  Water DistributionAdron Thompson Facility Reno & ExpansionUpgrade shop and offices. Stock yard improvements included.‐                  1,000,000       ‐                  ‐                   ‐                  ‐                  ‐                  ‐                  1,250,000       ‐                  ‐                  ‐                    ‐                  ‐                  Water DistributionGovernor Burke Road Water Main ReplacementReplace 1,400 ft of 6" PVC water line with ductile iron water main between HWY 86 and HWY 57.200,000          ‐                  ‐                   ‐                  ‐                  ‐                  200,000          ‐                  ‐                  ‐                  ‐                    ‐                  ‐                  Water Distribution McAdams Road Main ReplacementReplace 700 lf of 2" water main with 6" water main, adding fire hydrant, valves and resetting water services. Serves 10 homes, repetitive water leaks and repair water shutoffs.350,000          ‐                  ‐                   ‐‐‐‐350,000          ‐                  ‐                  ‐                  ‐                    ‐                  ‐                  Water Distribution OWASA Booster Pump StationBuild booster pump station to receive water from OWASA in times of need. Provides system redundancy. Can send water to OWASA by gravity.483,560          483,560          483,560          ‐                  ‐                  ‐                  1,450,680       ‐                  ‐                  ‐                  ‐                    ‐                  ‐                  Water DistributionUS 70 Business Water ImprovementsReplace 12" AC water main with 16" ductile iron water main (4,900 lf btw HWY 86 to HWY 70A and 4,320 lf btw Churton St and HWY 86)50,000            400,000          1,250,000       1,250,000       ‐                  ‐                  ‐                  50,000            ‐                  ‐                  400,000          1,250,000        1,250,000       ‐                  Water DistributionGalvanized Water Main ReplacementReplace 2" galvanized mains and upsize to 6" main, and fire protection. 1.45 miles of galvanized main.60,000            100,000          100,000          100,000           ‐                  ‐                  ‐                  60,000            100,000          100,000          100,000          ‐                  ‐                  Water Distribution Hassell Water Tank ReplacementReplace elevated water tank (1930s) with new elevated water tank. Tank size ideally increased to 500k gallons. Would help Central Pressure Zone.‐                  ‐                  400,000          2,600,000       ‐                  ‐                  ‐                  ‐                  ‐                  ‐                  400,000          2,600,000        ‐                  ‐                  Wastewater CollectionCollection System Infrastructure Rehab/ReplacementReplace outdated infrastructure to meet committed and project growth. 750,000          150,000          1,250,000       10,000,000     4,000,000       2,000,000       2,000,000       750,000          150,000          ‐                  1,250,000       10,000,000      4,000,000       2,000,000       Wastewater CollectionRiver Pump Station UpgradeRelocate pump station, which is approaching capacity limitations, from out of the floodplain. Stations receives wastewater from over 75% of town.3,015,000       2,765,000       2,765,000       ‐                   ‐                  ‐                  ‐                  3,015,000       2,765,000       2,765,000       ‐                  ‐                    ‐                  ‐                  Wastewater CollectionAdron Thompson Facility Reno & ExpansionUpgrade shop and offices. Stock yard improvements included.‐                  1,000,000       ‐                  ‐                   ‐                  ‐                  ‐                  ‐                  1,250,000       ‐                  ‐                  ‐                    ‐                  ‐                  Wastewater Treatment PlantClarifier CoatingsNew coating needs to be applied to clarifiers as the current protective coatings has failed. Coating prevents deterioration of the infrastructure.190,000          ‐                  ‐                  ‐                   ‐                  ‐                  ‐                  190,000          ‐                  ‐                  ‐                  ‐                    ‐                  ‐                  Wastewater Treatment PlantTertiary Filter FlocculatorsInstall new flocculators to maximize the Total Phosphorous removal needed to meet Falls Lake Rules and reduce chemical usage.‐                  10,000            180,000          ‐                  10,000            180,000          ‐                  ‐                    ‐                  ‐                  5,498,560$    6,178,560$    6,703,560$    13,950,000$   4,000,000$    2,000,000$    2,000,000$    6,365,680$    5,825,000$    3,245,000$    2,295,000$    13,850,000$   5,250,000$    2,000,000$    Requested Recommended 21 Stormwater Fund Operating Requests Department Expense  Category Request Description FY23 FY24 FY25 FY23. FY24. FY25. Stormwater Operating Pay Study Adjustments Estimate will be available in May. Assume  $2,500 per employee for now.7,500               7,500               7,500               7,500               7,500               7,500                Stormwater Operating Increase in Engineering Allow for add'l assessments of stormwater  infrastructure as well as design for retrofits to  meet Falls Lake Rule requirements. 12,000            12,000            12,000            12,000            12,000            12,000             19,500            19,500            19,500            19,500            19,500            19,500             Requested Recommended 22 Assistant Finance Director 23 24 25 26 Affordable Housing 27 28 29 30 31 32 33 34 35 36 37 38 39