AGENDA
1562nd MEETING OF THE BOARD OF TRUSTEES
THE METROPOLITAN ST. LOUIS SEWER DISTRICT
June 11, 2015 - 4:00 P.M.
MSD OFFICES
2350 MARKET STREET
ROOM 109
1 ROLL CALL
THE BOARD OF TRUSTEES WILL BE IN CLOSED SESSION FROM 4:00P.M. TO 5:00P.M.
2 CLOSED SESSION TO DISCUSS LEGAL, CONFIDENTIAL, OR PRIVILEGED MATTERS
UNDER § 610.021(1), RSMO 1988 SUPP
3. APPROVAL OF JOURNAL OF PRECEDING MEETING May 14, 2015 (1561st)
4 COMMENTS BY THE CHAIR-
5 REPORT OF BOARD COMMITTEES-
6 REPORT OF EXECUTIVE DIRECTOR –
7 COMMENTS FROM THE PUBLIC –
8 SUBMISSION OF PUBLIC HEARING REPORTS – Finding of Fact Committee
9 COMMUNICATIONS
10 NEW BUSINESS – Item Nos. 11 through 21
Page 2 ~ June 11, 2015
Agenda Item No. New Business Name Page No.
ORDINANCES
11 Proposed Ord. No. 14119 Brinwood I/I Reduction (11719) 5
INTRODUCTION OF AN ORDINANCE, appropriating Four Hundred Twenty-Seven
Thousand Dollars ($427,000.00) from the Coldwater Creek Operation, Maintenance,
Construction Improvement Fund and Nine Hundred Seventy-Three Thousand Dollars
($973,000.00) from the Sanitary Replacement Fund to be used for project costs for
sanitary sewer construction and private I/I removal in the Brinwood I/I Reduction (11719)
project in the City of Florissant, Missouri; and authorizing the Executive Director and
Secretary-Treasurer on behalf of The Metropolitan St. Louis Sewer District to enter into
Contract No. 20278 with Gershenson Construction Co., Inc., for the aforesaid sanitary
sewer construction and private I/I removal.
12 Proposed Ord. No. 14120 Easement Acquisition for Combined/Sanitary
Projects (FY2016) (11744)
6
INTRODUCTION OF AN ORDINANCE, appropriating Three Million Dollars
($3,000,000.00) from the Sanitary Replacement Fund to be used for costs associated
with acquiring the necessary property rights by means of negotiation and/or eminent
domain for the Easement Acquisition for Combined/Sanitary Projects (FY2016) (11744)
throughout the entire District.
13 Proposed Ord. No. 14121 Forest Brook Sanitary Relief (SKME-003 and SKME-
016) Public Rehabilitation and I/I Reduction (11944)
7
INTRODUCTION OF AN ORDINANCE, appropriating Three Million Five Hundred
Thousand Dollars ($3,500,000.00) from the Sanitary Replacement Fund to be used for
project costs for sanitary sewer rehabilitation in the Forest Brook Sanitary Relief (SKME-
003 and SKME-016) Public Rehabilitation and I/I Reduction (11944) project, in the Cities
of Bridgeton, Creve Coeur, Maryland Heights, St. Ann, and Unincorporated St. Louis
County, Missouri; and authorizing the Executive Director and Secretary-Treasurer on
behalf of The Metropolitan St. Louis Sewer District to enter into Contract No. 20259 with
SAK Construction, LLC, for the aforesaid sanitary sewer rehabilitation.
14 Proposed Ord. No. 14122 Gravois Trunk Sanitary Storage Facility
(Pardee Ln and Pardee Rd) (12569)
9
INTRODUCTION OF AN ORDINANCE, appropriating Eight Million Dollars
($8,000,000.00) from the Sanitary Replacement Fund to be used for property
acquisition, demolition, and related activities for construction of a sanitary storage facility
for the Gravois Trunk Sanitary Storage Facility (Pardee Ln and Pardee Rd) (12569)
project, in the City of Crestwood, Missouri; and authorizing the Executive Director and
Secretary-Treasurer on behalf of The Metropolitan St. Louis Sewer District to acquire
property without additional board action.
Page 3 ~ June 11, 2015
Agenda Item No. New Business Name Page No.
15 Proposed Ord. No. 14123 Midland Sanitary Relief – Public and Private I/I
Reduction (11663)
10
INTRODUCTION OF AN ORDINANCE, appropriating Seven Hundred Sixty-Two
Thousand Dollars ($762,000.00) from the Coldwater Creek Operation, Maintenance,
Construction Improvement Fund and Eight Hundred Eighty-Eight Thousand Dollars
($888,000.00) from the Sanitary Replacement Fund to be used for project costs for
sanitary sewer construction and private I/I removal in the Midland Sanitary Relief—Public
and Private I/I Reduction (11663) project in the Cities of Overland and Breckenridge
Hills, Missouri;
and authorizing the Executive Director and Secretary-Treasurer on behalf of The
Metropolitan St. Louis Sewer District to enter into Contract No. 20280 with Bates Utility
Company, Inc. for the aforesaid sanitary sewer construction and private I/I removal.
16 Proposed Ord. No. 14124 Powell Ave and Annalee Sewer Separation (10737) 12
INTRODUCTION OF AN ORDINANCE, appropriating Six Hundred Thirty-Five Thousand
Dollars ($635,000.00) from the Sanitary Replacement Fund to be used for project costs
for sanitary sewer construction in the Powell Ave and Annalee Sewer Separation
(10737) project, in the City of Brentwood, Missouri; and authorizing the Executive
Director and Secretary-Treasurer on behalf of The Metropolitan St. Louis Sewer District
to enter into Contract No. 20279 with Fred M. Luth & Sons, Inc., for the aforesaid
sanitary sewer construction.
17 Proposed Ord. No. 14125 Sub-Trunk #2 Lateral Sanitary Relief (11668) 13
INTRODUCTION OF AN ORDINANCE, appropriating One Hundred Ninety Thousand
Dollars ($190,000.00) from the Sanitary Replacement Fund to be used for project costs
for private I/I removal in the Sub-Trunk #2 Lateral Sanitary Relief (11668) project, in
Unincorporated St. Louis County, Missouri; and authorizing the Executive Director and
Secretary-Treasurer on behalf of The Metropolitan St. Louis Sewer District to enter into
Contract No. 20275 with Fred M. Luth & Sons, Inc., for the aforesaid private I/I removal.
18 Proposed Ord. No. 14126 Deer Creek Watershed Initiative (11065) 14
INTRODUCTION OF AN ORDINANCE, making a supplemental appropriation of Two
Hundred Seven Thousand Five Hundred Dollars ($207,500.00) from the Deer Creek
Operation, Maintenance, Construction, Improvement Fund to be used for cost sharing
with the Missouri Botanical Garden under Contract No. 11006 for green infrastructure
construction in the Deer Creek Watershed Initiative (11065) project, in the Deer Creek
Watershed, and authorizing the Executive Director and Secretary-Treasurer on behalf of
The Metropolitan St. Louis Sewer District to enter into an agreement with the Missouri
Botanical Gardens for cost sharing of Green Infrastructure Construction.
19 Proposed Ord. No. 14127 Manda Lane #8901 Storm Sewer (11105) 16
INTRODUCTION OF AN ORDINANCE, appropriating Sixty Five Thousand Dollars
($65,000.00) from the Gravois Creek Operation, Maintenance, Construction
Improvement Fund to be used for project costs for storm sewer construction in the
Manda Lane #8901 Storm Sewer (11105) project, in the City of Crestwood, Missouri;
and authorizing the Executive Director and Secretary-Treasurer on behalf of The
Metropolitan St. Louis Sewer District to enter into Contract No. 20271 with Gaehle
Grading, LLC for the aforesaid storm sewer construction.
Page 4 ~ June 11, 2015
Agenda Item No. New Business Name Page No.
20 Proposed Ord. No. 14128 Maline Creek CSO BP 051 & 052 Local Storage
Facility (Chain of Rocks Dr to Church Dr) (11656)
17
INTRODUCTION OF AN ORDINANCE, declaring the necessity for the acquisition of real
property within The Metropolitan St. Louis Sewer District for the purpose of purchasing
property due to inadequate storm and sanitary sewers for the project known as Maline
Creek CSO BP 051 & 052 Local Storage Facility (Chain of Rocks Dr to Church Dr)
(11656) to serve the needs of residents of the area, and authorizing the acquisition of
said real property by purchase or by the institution of eminent domain proceedings.
21 Proposed Ord. No. 14129 Addendum to Sewerage System Agreement with the
City of Arnold and Missouri American Water
18
INTRODUCTION OF AN ORDINANCE, with an emergency clause, authorizing the
Executive Director and Secretary-Treasurer on behalf of The Metropolitan St. Louis
Sewer District to enter into an Addendum to the Sewerage System Agreement with the
City of Arnold and Missouri American Water Company to govern their relationship after
the transfer of the sewerage system from the City to Missouri American Water Company.
RESOLUTIONS
None
22 ANY OTHER BUSINESS THAT MAY PROPERLY BE BROUGHT BEFORE THE BOARD
23 ADJOURNMENT
Page 5 ~ June 11, 2015
AGENDA ITEM NUMBER: Item # 11 Proposed Ord. No. 14119
NAME OF PROJECT: Brinwood I/I Reduction (11719)
LOCATION: South of Stein Road and west of Florissant Avenue in the City of Florissant, Missouri
TYPE OF PROJECT: Sanitary Sewer Construction and Private I/I Removal (015.0 Construction Costs)
DEPARTMENT REQUESTING ACTION: Engineering
REQUESTED ACTION:
Why is this action necessary?: Appropriates funds and authorizes staff to enter into a construction contract.
What does action accomplish?: Implements the construction of a CIP project, as required by Consent Decree.
SUMMARY EXPLANATION/BACKGROUND:
Contractor: Gershenson Construction Co., Inc. Previous District Contract: Yes
#2 Truitt Drive
Eureka, MO 63025
Consultant: N/A
Agency: N/A
Number of bidders: 2 Low Bid: $1,256,635.00 High Bid: $1,394,344.00
Appropriation Amount: $1,400,000.00 Designer’s Estimate: $779,000.00
Total MWBE Participation: 17.17% (MBE Goal is 17% - African American)
Westfall Hauling, Inc. (African American) – 17.17% - MBE
Type of Contract: Unit Cost
Properties Affected: 56 Properties Benefiting: 1,418
Designed by: AMEC Foster Wheeler Environment & Infrastructure, Inc.
The work to be done under Contract #20278 consists of the construction of approximately 1,956 lineal feet of pipe sewers
varying in size from 8-inches to 18-inches in diameter and the removal of private inflow sources at 56 properties. The
purpose of this project is to reduce inflow/infiltration (I/I) in the Coldwater Creek watershed, reduce building backups, and
relieve overcharged sanitary sewers. This project is scheduled to be completed in 365 days.
FUNDING/COST SUMMARY:
Budgeted: Capital Improvement Program Budget Year: FY2016, Pg. 94 Amount: $300,000
FY2016, Pg. 95 $650,000
$950,000
Fund Name: #5564 – Coldwater Creek OMCI Fund $427,000
#6660 – Sanitary Replacement Fund $973,000
Additional Comments: An additional contingency of $81,600 for utility relocation (Electric - $31,600, Gas - $20,000 &
Water - $30,000) is included in the appropriation. This appropriation includes $427,000 for storm sewer work. The
remaining work on this project is expected to be funded by Bond proceeds.
Contracted planning resources utilized: Watershed Facility Planning, Separate Sewer Area I/I Assessment, Separate
Sewer Area Flow Metering & Monitoring, Modeling, CCTV Inspection, and Radar Rainfall Data.
PREVIOUS BOARD ACTION RELATED TO THIS ACTION: 10/11/12 – Ord. No. 13501 – Amount: $330,000 – AMEC
Foster Wheeler Environment & Infrastructure – Design Contract No. 11011 – Amendment
Page 6 ~ June 11, 2015
AGENDA ITEM NUMBER: Item # 12 Proposed Ord. No. 14120
NAME OF PROJECT: Easement Acquisition for Combined/Sanitary Projects (FY2016) (11744)
LOCATION: Entire District
TYPE OF PROJECT: Property Rights Acquisition (013.0 Property Rights Acquisition)
DEPARTMENT REQUESTING ACTION: Engineering
REQUESTED ACTION:
Why is this action necessary?: Appropriates funds to take further efforts to acquire necessary property rights in
order to construct combined and sanitary sewer projects.
What does action accomplish?: Allows for property rights acquisition required to build or acquire property for
combined and/or sanitary sewer projects, as required by the Consent
Decree.
SUMMARY EXPLANATION/BACKGROUND:
Contractor: N/A Previous District Contract: N/A
Consultant: N/A
Agency: N/A
Number of bidders: N/A Low Bid: N/A High Bid: N/A
Appropriation Amount: $3,000,000.00 District’s Estimate: N/A
Total MWBE Participation: N/A
Type of Contract: N/A
Properties Affected: N/A Properties Benefiting: Entire District
Designed by: N/A
This ordinance appropriates funds for staff to take further efforts to acquire necessary property rights by means of
donation, purchase, contract, lease, or by the exercise of the power of eminent domain in order to construct combined and
sanitary sewer projects.
FUNDING/COST SUMMARY:
Budgeted: Capital Improvement Program Budget Year: FY2016, Pg. 110 Amount: $3,000,000
Fund Name: #6660 – Sanitary Replacement Fund
Additional Comments: This project is expected to be funded by Bond proceeds.
PREVIOUS BOARD ACTION RELATED TO THIS ACTION: N/A
Page 7 ~ June 11, 2015
AGENDA ITEM NUMBER: Item # 13 Proposed Ord. No. 14121
NAME OF PROJECT: Forest Brook Sanitary Relief (SKME-003 and SKME-016) Public Rehabilitation and I/I Reduction
(11944)
LOCATION: Various sites in the Cities of Bridgeton, Creve Coeur, Maryland Heights, St. Ann, and unincorporated
St. Louis County, Missouri
TYPE OF PROJECT: Sewer Rehabilitation (015.0 Construction Costs)
DEPARTMENT REQUESTING ACTION: Engineering
REQUESTED ACTION:
Why is this action necessary?: Appropriates funds and authorizes staff to enter into a construction contract.
What does action accomplish?: Implements the construction of a CIP project, as required by Consent Decree.
SUMMARY EXPLANATION/BACKGROUND:
Contractor: SAK Construction, LLC Previous District Contract: Yes
864 Hoff Road
O’Fallon, MO 63366
Consultant: N/A
Agency: N/A
Number of bidders: 3 Low Bid: $3,322,714.50 High Bid: $3,793,722.15
Appropriation Amount: $3,500,000.00 Designer’s Estimate: $3,616,000.00
Total MWBE Participation: 22.23% (MBE Goal is 10% - WBE Goal is 5%)
David Mason & Associates, Inc. (African American) – 5.63% - MBE
ABNA Engineering, Inc. – 11.96% - WBE
Luther’s Supply, LLC (African American) – 4.64% - MBE
Type of Contract: Unit Cost
Properties Affected: 236 Properties Benefiting: 1,889
Designed by: AMEC Foster Wheeler Environment & Infrastructure, Inc.
The work to be done under Contract #20259 consists of the rehabilitation of approximately 70,887 lineal feet of pipe
sewers varying in size from 6-inches to 48-inches in diameter using cured-in-place pipe (CIPP) methods, 274 manholes,
and 671 service connections. The purpose of this project is to reduce inflow/infiltration (I/I) in the Fee Fee Creek
watershed. This project will provide for the future elimination of two (2) constructed SSOs (BP-069 & BP-076) after
additional project construction and post construction monitoring. This project is scheduled to be completed in 680 days.
FUNDING/COST SUMMARY:
Budgeted: Capital Improvement Program Budget Year: FY2016, Pg. 118 Amount: $3,840,000
Fund Name: #6660 – Sanitary Replacement Fund
Additional Comments: An additional contingency of $10,000 for utility relocation (Water - $10,000) is included in the
appropriation. This project includes public I/I that was separated from the Forest Brook Sanitary Relief (SKME-003 and
SKME-016) Rehabilitation and I/I Reduction (10456) project. This project is expected to be funded by a low interest loan
from the State of Missouri, under the State Revolving Loan Fund (SRF).
Contracted planning resources utilized: Watershed Facility Planning, Separate Sewer Area I/I Assessment, Separate
Sewer Area Flow Metering & Monitoring, Modeling, CCTV Inspection, and Radar Rainfall Data.
PREVIOUS BOARD ACTION RELATED TO THIS ACTION:
Page 8 ~ June 11, 2015
08/08/13 – Ord. No. 13665 – Amount: $358,000 – AMEC Foster Wheeler Environment & Infrastructure – Design Contract
No. 11011 – Amendment
Page 9 ~ June 11, 2015
AGENDA ITEM NUMBER: Item # 14 Proposed Ord. No. 14122
NAME OF PROJECT: Gravois Trunk Sanitary Storage Facility (Pardee Ln and Pardee Rd) (12569)
LOCATION: Pardee Lane and Pardee Road in the City of Crestwood, Missouri
TYPE OF PROJECT: Property Acquisition, Demolition, and related activities of real property for construction of a
sanitary storage facility (013.2 Land Purchase)
DEPARTMENT REQUESTING ACTION: Engineering
REQUESTED ACTION:
Why is this action necessary?: Appropriates funds related to the purchase of properties, demolition, and related
activities and authorizes District staff to acquire property without additional
board action.
What does action accomplish?: Purchase of property will allow improvements of the area for a wet weather
storage facility, as required by Consent Decree.
SUMMARY EXPLANATION/BACKGROUND:
Contractor: N/A Previous District Contract: N/A
Consultant: N/A
Agency: N/A
Number of bidders: N/A Low Bid: N/A High Bid: N/A
Appropriation Amount: $8,000,000.00 Designer’s Estimate: N/A
Total MWBE Participation: N/A
Type of Contract: N/A
Properties Affected: To Be Determined Properties Benefiting: Entire Watershed
Designed by: N/A
The buyout/acquisition of properties in the area of Pardee Lane and Pardee Road in the City of Crestwood, Missouri to
allow for the area necessary to accommodate the construction of a sanitary storage facility. The effort will include the
acquisition of the property through negotiation and/or condemnation, if necessary, and securing the site. Through the
approval of this Board action, District staff will be authorized to negotiate with the property owner and purchase the
property included in the scope without further Board action. A real property acquisition consultant will perform all
negotiations and management of the property acquisition from the first contact with the owners through the closing. The
consultant will perform all services in accordance with the Code of Federal Regulations Uniform Relocations and Real
Property Assistance Act (49CFR Part 24, amended). The District will contract for any demolition, securing of the site, and
final restoration of the site under separate contracts through the Purchasing Division. All of these activities will be funded
from this appropriation. The development of the wet weather storage facility would be funded by a separate Board action.
FUNDING/COST SUMMARY:
Budgeted: Capital Improvement Program Budget Year: FY2016, Pg. 126 Amount: $8,000,000
Fund Name: #6660 – Sanitary Replacement Fund
Additional Comments: This project is expected to be funded by Bond proceeds.
PREVIOUS BOARD ACTION RELATED TO THIS ACTION: N/A
Page 10 ~ June 11, 2015
AGENDA ITEM NUMBER: Item # 15 Proposed Ord. No. 14123
NAME OF PROJECT: Midland Sanitary Relief – Public and Private I/I Reduction (11663)
LOCATION: North of Lackland Road and east of Lindbergh Boulevard in the Cities of Overland and Breckenridge Hills,
Missouri
TYPE OF PROJECT: Sanitary Sewer Construction and Private I/I Removal (015.0 Construction Costs)
DEPARTMENT REQUESTING ACTION: Engineering
REQUESTED ACTION:
Why is this action necessary?: Appropriates funds and authorizes staff to enter into a construction contract.
What does action accomplish?: Implements the construction of a CIP project, as required by Consent Decree.
SUMMARY EXPLANATION/BACKGROUND:
Contractor: Bates Utility Company, Inc. Previous District Contract: Yes
841 Westwood Industrial Park Dr.
Weldon Springs, MO 63304
Consultant: N/A
Agency: N/A
Number of bidders: 2 Low Bid: $1,512,545.00 High Bid: $1,736,631.00
Appropriation Amount: $1,650,000.00 Designer’s Estimate: $1,172,000.00
Total MWBE Participation: 17.00% (MBE Goal is 17% - African American)
A.L.L. Construction, LLC (African American) – 17.00% - MBE
Type of Contract: Unit Cost
Properties Affected: 207 Properties Benefiting: 2,002
Designed by: AMEC Foster Wheeler Environment & Infrastructure, Inc.
The work to be done under Contract #20280 consists of the construction of approximately 2,202 lineal feet of pipe sewers
varying in size from 12-inches to 30-inches in diameter, and the removal of private inflow sources on 207 properties. The
purpose of this project is to reduce inflow/infiltration (I/I) in the Coldwater Creek watershed. This project will provide for
the elimination of two (2) constructed SSOs (BP-095 & BP-145) after construction of additional public I/I removal and post
construction monitoring. This project is scheduled to be completed in 415 days.
FUNDING/COST SUMMARY:
Budgeted: Capital Improvement Program Budget Year: FY2016, Pg. 150 Amount: $ 350,000
FY2016, Pg. 151 $ 810,000
$1,160,000
Fund Name: #5564 – Coldwater Creek OMCI Fund $762,000
#6660 – Sanitary Replacement Fund $888,000
Additional Comments: An additional contingency of $55,000 for utility relocation (Electric - $8,000, Gas - $17,000 &
Water - $30,000) is included in the appropriation. A second phase will be performed at a later date to remove private I/I
from 61 additional homes. This appropriation includes $762,000 for storm sewer work. The remaining work on this
project is expected to be funded by Bond proceeds.
Contracted planning resources utilized: Watershed Facility Planning, Separate Sewer Area I/I Assessment, Separate
Sewer Area Flow Metering & Monitoring, Modeling, CCTV Inspection, and Radar Rainfall Data.
Page 11 ~ June 11, 2015
PREVIOUS BOARD ACTION RELATED TO THIS ACTION:
10/11/12 – Ord. No. 13516 – Amount: $622,000 – AMEC Foster Wheeler Environment & Infrastructure – Design Contract
No. 11011 – Amendment
Page 12 ~ June 11, 2015
AGENDA ITEM NUMBER: Item # 16 Proposed Ord. No. 14124
NAME OF PROJECT: Powell Ave and Annalee Sewer Separation (10737)
LOCATION: North of Manchester Road and west of Brentwood Boulevard in the City of Brentwood, Missouri
TYPE OF PROJECT: Sanitary Sewer Construction (015.0 Construction Costs)
DEPARTMENT REQUESTING ACTION: Engineering
REQUESTED ACTION:
Why is this action necessary?: Appropriates funds and authorizes staff to enter into a construction contract.
What does action accomplish?: Implements the construction of a CIP project, as required by Consent Decree.
SUMMARY EXPLANATION/BACKGROUND:
Contractor: Fred M. Luth & Sons, Inc. Previous District Contract: Yes
4516 McRee Avenue
St. Louis, MO 63110
Consultant: N/A
Agency: N/A
Number of bidders: 2 Low Bid: $580,321.00 High Bid: $954,989.00
Appropriation Amount: $635,000.00 Designer’s Estimate: $430,000.00
Total MWBE Participation: 17.09% (MBE Goal is 17% - African American)
Davidson & Sons Hauling, LLC (African American) – 6.32% - MBE
BRK Electrical Contractor, LLC (African American) – 0.65% - MBE
B & P Construction, Inc. (African American) – 10.12% - MBE
Type of Contract: Unit Cost
Properties Affected: 22 Properties Benefiting: 22
Designed by: District staff
The work to be done under Contract #20279 consists of the construction of approximately 893 lineal feet of pipe sewers
varying in size from 8-inches to 48-inches in diameter, removal of sanitary flow to a sinkhole from 3 private properties, and
appurtenances. The purpose of this project is to remove sanitary flows from a sinkhole and alleviate sanitary sewer
basement backups due to deteriorated sewers. This project is scheduled to be completed in 365 days.
FUNDING/COST SUMMARY:
Budgeted: Capital Improvement Program Budget Year: FY2016, Pg. 161 Amount: $430,000
Fund Name: #6660 – Sanitary Replacement Fund
Additional Comments: An additional contingency of $25,000 for utility relocation (Electric - $25,000) is included in the
appropriation. This project is expected to be funded by Bond proceeds.
Contracted planning resources utilized: Watershed Facility Planning, Combine Sewer Area I/I Assessment, Separate
Sewer Area Flow Metering & Monitoring, Modeling, CCTV Inspection, and Radar Rainfall Data.
PREVIOUS BOARD ACTION RELATED TO THIS ACTION: N/A
Page 13 ~ June 11, 2015
AGENDA ITEM NUMBER: Item # 17 Proposed Ord. No. 14125
NAME OF PROJECT: Sub-Trunk #2 Lateral Sanitary Relief (11668)
LOCATION: North of Interstate 270 and east of Bellefontaine Road in unincorporated St. Louis County, Missouri
TYPE OF PROJECT: Private I/I Removal (015.0 Construction Costs)
DEPARTMENT REQUESTING ACTION: Engineering
REQUESTED ACTION:
Why is this action necessary?: Appropriates funds and authorizes staff to enter into a construction contract.
What does action accomplish?: Implements the construction of a CIP project, as required by Consent Decree.
SUMMARY EXPLANATION/BACKGROUND:
Contractor: Fred M. Luth & Sons, Inc. Previous District Contract: Yes
4516 McRee Avenue
St. Louis, MO 63110
Consultant: N/A
Agency: N/A
Number of bidders: 1 Low Bid: $153,700.00 High Bid: $153,700.00
Appropriation Amount: $190,000.00 Designer’s Estimate: $183,000.00
Total MWBE Participation: 17.04% (MBE Goal is 17% - African American)
Empire Mechanical, Inc. (African American) – 3.90% - MBE
Midwestern Construction & Development, LLC (African American) – 13.14% - MBE
Type of Contract: Lump Sum
Properties Affected: 23 Properties Benefiting: 125
Designed by: AMEC Foster Wheeler Environment & Infrastructure, Inc.
The work to be done under Contract #20275 consists of the removal of private inflow sources on 23 properties. The
purpose of this project is to reduce inflow/infiltration (I/I) in the Watkins Creek watershed. This project will provide for the
elimination of three (3) constructed SSO’s (BP-210, BP-211 & BP-213) after construction of additional public I/I removal
and post construction monitoring. This project is scheduled to be completed in 210 days.
FUNDING/COST SUMMARY:
Budgeted: Capital Improvement Program Budget Year: FY2016, Pg. 169 Amount: $230,000
Fund Name: #6660 – Sanitary Replacement Fund
Additional Comments: An additional contingency is included in the appropriation in order to remove additional private
inflow sources that may be agreed to during construction. This project is expected to be funded by Bond proceeds.
Contracted planning resources utilized: Watershed Facility Planning, Separate Sewer Area I/I Assessment, Separate
Sewer Area Flow Metering & Monitoring, Modeling, CCTV Inspection, and Radar Rainfall Data.
PREVIOUS BOARD ACTION RELATED TO THIS ACTION:
08/08/13 – Ord. No. 13674 – Amount: $337,000 – AMEC Foster Wheeler Environment & Infrastructure – Design Contract
No. 11011 – Amendment
Page 14 ~ June 11, 2015
AGENDA ITEM NUMBER: Item # 18 Proposed Ord. No. 14126
NAME OF PROJECT: Deer Creek Watershed Initiative (11065)
LOCATION: Various locations in the Deer Creek Watershed
TYPE OF PROJECT: Cost Share for Green Infrastructure Construction (015.0 Construction Costs)
DEPARTMENT REQUESTING ACTION: Engineering
REQUESTED ACTION:
Why is this action necessary?: Appropriates additional funds and authorizes staff to enter into an agreement with
the Missouri Botanical Garden
What does action accomplish?: Provides a portion of local cost-share matching funds to the Missouri
BotanicalGarden for construction of green infrastructure.
SUMMARY EXPLANATION/BACKGROUND:
Contractor: N/A Previous District Contract: N/A
Consultant: N/A
Agency: Missouri Botanical Garden
Number of bidders: N/A Low Bid: N/A High Bid: N/A
Appropriation Amount: $207,500.00 Designer’s Estimate: N/A
Total MWBE Participation: N/A
Type of Contract: N/A
Properties Affected: N/A Properties Benefiting: N/A
Designed by: N/A
The Missouri Botanical Garden has received a Nonpoint Source Implementation Grant from the Missouri Department of
Natural Resources under Section 319 of the Clean Water Act. The Botanical Garden will partner with MSD, under
Contract #11006, and Deer Creek watershed municipalities to continue a homeowner cost-share program to install plant-
based green infrastructure management practices. In addition, MSD will provide an estimated $160,000 in in-kind green
infrastructure-related improvements in the Denny, Pebble, and/or Monsanto-Sunswept Creek watersheds. Said
improvements are to be constructed as part of the Conway – Clerbrook Storm Channel (10348) project and/or the
Tealwood Drive & Beaver Drive Bank Stabilization (11222) project. This agreement provides reimbursement of up to
$207,500 to the Missouri Botanical Garden for costs related to the construction of green infrastructure. Section 319 funds
provided by the EPA amount to $687,042; nonfederal matching funds amount to $507,940; and other federal matching
funds of $20,000 for a total project cost of $1,214,982.
FUNDING/COST SUMMARY:
Budgeted: Capital Improvement Program Budget Year: FY2016, Pg. 217 Amount: $207,500
Fund Name: #5566 – Deer Creek OMCI Fund
Page 15 ~ June 11, 2015
Additional Comments: The main goal of the Missouri Botanical Garden Deer Creek Watershed Initiative project is to
reduce impacts in the Deer Creek watershed by implementing green infrastructure technologies to improve water quality
stemming from nonpoint source pollution, with a focus on plant-based solutions. The project will use various techniques
to achieve the overall goal through implementation, demonstration, education, and planning efforts. The following
techniques will be utilized to achieve the overall objectives: decrease erosion, sedimentation and other nonpoint source
pollutants by capturing and infiltrating stormwater runoff on-site by utilizing volume-based hydrology approaches;
protection of streams and groundwater from chloride; reduce bacteria pollution in the watershed related to animal waste;
and reduce water pollution caused by yard waste and organic debris. In addition, this project will aid the District in gaining
performance effectiveness of green infrastructure.
Contracted planning resources utilized: Stormwater Facility Planning.
PREVIOUS BOARD ACTION RELATED TO THIS ACTION:
06/14/12 – Ord. No. 13397 – Amount: $200,000 – Missouri Botanical Garden – Original Contract No. 11006
Page 16 ~ June 11, 2015
AGENDA ITEM NUMBER: Item # 19 Proposed Ord. No. 14127
NAME OF PROJECT: Manda Lane #8901 Storm Sewer (11105)
LOCATION: East of Lindbergh Boulevard and north of Eddie and Park Road in the City of Crestwood, Missouri
TYPE OF PROJECT: Storm Sewer Construction (015.0 Construction Costs)
DEPARTMENT REQUESTING ACTION: Engineering
REQUESTED ACTION:
Why is this action necessary?: Appropriates funds and authorizes staff to enter into a construction contract.
What does action accomplish?: Implements the construction of a CIP project.
SUMMARY EXPLANATION/BACKGROUND:
Contractor: Gaehle Grading, LLC Previous District Contract: Yes
4362 Little Tavern Road
Pacific, MO 63069
Consultant: N/A
Agency: N/A
Number of bidders: 3 Low Bid: $44,222.00 High Bid: $90,024.00
Appropriation Amount: $65,000.00 Designer’s Estimate: $39,000.00
Total MWBE Participation: 0.0% (No MBE Goal)
N/A – The above bid is less than $50,000 and therefore does not have a goal under the
MWBE policy.
Type of Contract: Unit Cost
Properties Affected: 1 Properties Benefiting: 1
Designed by: Thouvenot, Wade & Moerchen, Inc.
The work to be done under Contract #20271 consists of the construction of approximately 93 lineal feet of storm sewers
18-inches in diameter and appurtenances. The purpose of this project is to alleviate building and yard flooding. This
project is scheduled to be completed in 90 days.
FUNDING/COST SUMMARY:
Budgeted: Capital Improvement Program Budget Year: FY2016, Pg. 228 Amount: $55,000
Fund Name: #5571 – Gravois Creek OMCI Fund
Additional Comments: An additional contingency of $15,000 for utility relocation (Electric - $2,000 & Telephone -
$13,000) is included in the appropriation. This project is one of four design projects included in Gravois Creek OMCI
Stormwater Design (Contract C) (11901).
Contracted planning resources utilized: Stormwater Facility Planning.
PREVIOUS BOARD ACTION RELATED TO THIS ACTION:
01/09/14 – Ord. No. 13777 – Amount: $245,000 – Thouvenot, Wade & Moerchen, Inc. – Design Contract No. 20121
Page 17 ~ June 11, 2015
AGENDA ITEM NUMBER: Item # 20 Proposed Ord. No. 14128
NAME OF PROJECT: Maline Creek CSO BP 051 & 052 Local Storage Facility (Chain of Rocks Dr to Church Dr)
(11656)
LOCATION: Riverview Drive & Hall Street in the City of St. Louis, Missouri
TYPE OF PROJECT: Property Condemnation
DEPARTMENT REQUESTING ACTION: Engineering
REQUESTED ACTION:
Why is this action necessary?: Authorizes staff to enter into condemnation proceedings.
What does action accomplish?: Purchase of property will allow improvements of the area for a wet weather
storage facility, as required by Consent Decree.
SUMMARY EXPLANATION/BACKGROUND:
Contractor: N/A Previous District Contract: N/A
Consultant: N/A
Agency: N/A
Number of bidders: N/A Low Bid: N/A High Bid: N/A
Appropriation Amount: N/A District’s Estimate: N/A
Total MWBE Participation: N/A
Type of Contract: N/A
Properties Affected: 1 Properties Benefiting: Entire Watershed
Designed by: N/A
This ordinance authorizes the staff to enter into condemnation proceedings for property acquisition of one (1) parcel of
ground located in Riverview Dr. & Hall Street in the City of St. Louis, Missouri. Acquisition of properties in the Riverview
Drive and Hall Street area to enable construction of the Maline Creek CSO BP 051 & 052 Local Storage Facility (Chain of
Rocks Dr to Church Dr) (11656) project for control of combined sewer overflows at CSO-052. The District’s real property
acquisition consultant is handling all acquisitions with the property owners. This project is a non-voluntary relocation of
the residents in this area. Condemnation is necessary to resolve unsuccessful negotiations. This property has been
appraised and a final offer has been m ade.
FUNDING/COST SUMMARY:
Budgeted: Capital Improvement Program Budget Year: FY2016, Pg. 142 Amount: $1,050,000
Fund Name: #6660 – Sanitary Replacement Fund
Additional Comments: None.
PREVIOUS BOARD ACTION RELATED TO THIS ACTION:
08/11/11 – Ord. No. 13292 – General Services Agreement – O.R. Colan Associates, Inc.
08/05/14 – Ord. No. 13877 – Amount: $2,000,000 – Maline Creek CSO BP 051 & 052 Local Storage Facility (Chain of
Rocks Dr to Church Dr) (11656) – Land Acquisition
AGENDA ITEM NUMBER: Item # 21 Proposed Ord. No. 14129
Page 18 ~ June 11, 2015
NAME OF PROJECT: Addendum to Sewerage System Agreement with the City of Arnold and
Missouri American Water
LOCATION: District-Wide
TYPE OF PROJECT:
DEPARTMENT REQUESTING ACTION:
REQUESTED ACTION:
Why is this action necessary?: Authorizes staff to enter into an Agreement with the City of Arnold and
Missouri American Water.
What does action accomplish?: Memorializes the relationship between the entities after the transfer of
the sewerage system from the City of Arnold to Missouri American
Water.
SUMMARY EXPLANATION/BACKGROUND:
Contractor: N/A Previous District Contract: N/A
Consultant: N/A
Agency:
Number of proposers: N/A
Appropriation Amount: N/A Designer’s Estimate: N/A
MBE/WBE Participation: N/A
Plan Approval Date: N/A Type of Contract: Addendum to Sewerage System Agreement
Properties Affected: N/A Properties Benefiting: N/A
Designed by: N/A
The addendum memorializes the relationship between the entities once the transfer of the sewerage system is complete.
Missouri American Water bought the City of Arnold's sewerage system on May 22,2015.
FUNDING/COST SUMMARY:
Budgeted: N/A Budget Year: FY2015 Amount: NA
Fund Name: N/A
Additional Comments: N/A
PREVIOUS BOARD ACTION RELATED TO THIS ACTION:
02/08/2007 - Ordinance No. 12393: Authorized execution of Intergovernmental Agreement with the City of Arnold.