1563rd MEETING OF THE BOARD OF TRUSTEES
THE METROPOLITAN ST. LOUIS SEWER DISTRICT
June 16, 2015
7:30 A.M.
MSD OFFICES
2350 MARKET STREET
ROOM 109
1 ROLL CALL
2 COMMENTS FROM THE PUBLIC –
3 CONSENT AGENDA – Item Nos. 4 through 38
Revised 6/10/15 Page 2 ~ June 16, 2015
ORDINANCES
4 Adoption of proposed Ord. No. 14084, authorizing the Executive Director and Secretary-
Treasurer on behalf of The Metropolitan St. Louis Sewer District to enter into Contract No.
20269 with ABNA Engineering, Inc. for the construction of storm sewers in Frederick Lane 82
(North) Storm Sewer (IR) (11962), in the City of Glendale, Missouri.(Intro. 5/14/2015)
5 Adoption of proposed Ord. No. 14085, appropriating Six Million Six Hundred Thousand Dollars
($6,600,000.00) from the Sanitary Replacement Fund to be used for project costs for sanitary
sewer rehabilitation in Bissell - Coldwater - Missouri - Meramec Public I/I Reduction (2015)
Contract G (11926), in the Cities of Berkeley, Breckenridge Hills, Edmundson, Florissant,
Hazelwood, Overland, St. Ann, St. John, Woodson Terrance, and Unincorporated St. Louis
County, Missouri; and authorizing the Executive Director and Secretary-Treasurer on behalf of
The Metropolitan St. Louis Sewer District to enter into Contract No. 20194 with Insituform
Technologies USA, LLC, for the aforesaid sanitary sewer rehabilitation. (Intro. 5/14/2015)
6 Adoption of proposed Ord. No. 14086, appropriating One Million Six Hundred Thousand Dollars
($1,600,000.00) from the Sanitary Replacement Fund to be used for site work for future storage
tank at Coldwater Sanitary Relief Section B, C & D Wet Weather Storage Facility Tank C
(11726), in the City of Hazelwood, Missouri; and authorizing the Executive Director and
Secretary-Treasurer on behalf of The Metropolitan St. Louis Sewer District to enter into
Contract No. 20169 with Goodwin Brothers Construction Co. for the aforesaid site work for
future storage tank. (Intro. 5/14/2015)
7 Adoption of proposed Ord. No. 14087, appropriating One Million Dollars ($1,000,000.00) from
the Sanitary Replacement Fund to be used for project costs for sanitary sewer construction in
Coldwater Sanitary Trunk Sewer Section A Rehabilitation (SKME-240) (10557) in the City of
Florissant and Unincorporated St. Louis County, Missouri; and authorizing the Executive
Director and Secretary-Treasurer on behalf of The Metropolitan St. Louis Sewer District to enter
into Contract No. 20167 with Fred M. Luth & Sons, Inc., for the aforesaid sanitary sewer
construction services. (Intro. 5/14/2015)
8 Adoption of proposed Ord. No. 14088, authorizing the Executive Director and Secretary-
Treasurer on behalf of The Metropolitan St. Louis Sewer District to enter into Contract No.
20270 with Ideal Landscape Group for green infrastructure construction in Lee #4212-4214
Bioretention Cell (CB 4427) CSO VR GI (11813), in the City of St. Louis, Missouri. (Intro.
5/14/2015)
9
Adoption of proposed Ord. No. 14089, authorizing the Executive Director and Secretary-
Treasurer on behalf of The Metropolitan St. Louis Sewer District to enter into Contract No.
20258 with Two Alpha Contracting, LLC for green infrastructure construction in Prairie #4229-
4231 & Linton #4318-4320 Bioretention (CB 3354 & 3356) CSO VR GI (11812), in the City of
St. Louis, Missouri. (Intro. 5/14/2015)
10 Adoption of proposed Ord. No. 14090, appropriating Five Million Eight Hundred Thousand
Dollars ($5,800,000.00) from the Sanitary Replacement Fund to be used for project costs for
storm sewer and detention basin construction in Harlem - Baden Relief Phase IV (Hebert)
(Detention Basin) (11768), in the City of St. Louis, Missouri; and authorizing the Executive
Director and Secretary-Treasurer on behalf of The Metropolitan St. Louis Sewer District to enter
into Contract No. 20264 with Goodwin Brothers Construction Co. for the aforesaid storm sewer
and detention basin construction. (Intro. 5/14/2015)
Revised 6/10/15 Page 3 ~ June 16, 2015
11 Adoption of proposed Ord. No. 14091, appropriating Three Hundred Eighty Thousand Dollars
($380,000.00) from the Sanitary Replacement Fund to be used for site work construction at
Prospect Hill Landfill Vertical Expansion (11094), in The City of St. Louis and Village of
Riverview, Missouri; and authorizing the Executive Director and Secretary-Treasurer on behalf
of The Metropolitan St. Louis Sewer District to enter into Contract No. 20268 with Above and
Below Contracting, LLC, for the aforesaid site work construction. (Intro. 5/14/2015)
12 Adoption of proposed Ord. No. 14092, appropriating One Hundred Forty Thousand Dollars
($140,000.00) from the General Fund to be used for project costs for the construction of storm
sewers in Telegraph Road #2928 I/I Reduction (11918), in Unincorporated St. Louis County,
Missouri; and authorizing the Executive Director and Secretary-Treasurer on behalf of The
Metropolitan St. Louis Sewer District to enter into Contract No. 20261 with J.H. Berra
Construction Co., Inc. for the aforesaid construction of storm sewers. (Intro. 5/14/2015)
13
14
15
16
Adoption of proposed Ord. No. 14093, appropriating Six Million Seven Hundred Fifty Thousand
Dollars ($6,750,000.00) from the Sanitary Replacement Fund and Three Hundred Fifty
Thousand Dollars ($350,000.00) from the Operations, Maintenance, Construction Improvement
Fund of University City to be used for project costs for sanitary sewer construction and private
I/I removal in UR-10 Mendell and Wolter Sanitary Relief (SKME-595) (10027), in the Cities of
Vinita Park and University City, Missouri; and authorizing the Executive Director and Secretary-
Treasurer on behalf of The Metropolitan St. Louis Sewer District to enter into Contract
No. 20263 with J.H. Berra Construction Co., Inc. for the aforesaid sanitary sewer construction
and private I/I removal. (Intro. 5/14/2015)
Adoption of proposed Ord. No. 14094, appropriating One Million Three Hundred Thirty
Thousand Dollars ($1,330,000.00) from the Sanitary Replacement Fund to be used for project
costs for sanitary sewer construction and private I/I removal in Webster Acres Sanitary Sewer
Replacement (11086), in the City of Webster Groves, Missouri; and authorizing the Executive
Director and Secretary-Treasurer on behalf of The Metropolitan St. Louis Sewer District to enter
into Contract No. 20265 with Fred M. Luth & Sons, Inc., for the aforesaid sanitary sewer
construction and private I/I removal. (Intro. 5/14/2015)
Adoption of proposed Ord. No. 14095, appropriating Five Million Dollars ($5,000,000.00) from
the Sanitary Replacement Fund to be used for sanitary sewer construction at Infrastructure
Repair #087P Caulks Creek A (P-750) Phase VI (10656), in the Cities of Chesterfield and
Maryland Heights, Missouri; and authorizing the Executive Director and Secretary-Treasurer on
behalf of The Metropolitan St. Louis Sewer District to enter into Contract No. 20272 with Bates
Utility Company, Inc., for the construction of the aforesaid sanitary sewers. (Intro. 5/14/2015)
Adoption of proposed Ord. No. 14096, appropriating Two Hundred Forty Thousand Dollars
($240,000.00) from the Operations, Maintenance, Construction Improvement Fund of Deer
Creek to be used for project costs for the construction of storm sewers in Frontenac Forest to
Portland Drive Storm Sewer (11219) in the City of Frontenac, Missouri; and authorizing the
Executive Director and Secretary-Treasurer on behalf of The Metropolitan St. Louis Sewer
District to enter into Contract No. 20267 with Above and Below Contracting, LLC for the
aforesaid construction of storm sewers. (Intro. 5/14/2015)
Revised 6/10/15 Page 4 ~ June 16, 2015
17
18
19
20
21
22
23
24
25
26
27
Adoption of proposed Ord. No. 14097, repealing Ordinance No.13876, as adopted July 10,
2014, and enacting a new Ordinance prescribing the Classification Plan for all employees in the
Classified Service of The Metropolitan St. Louis Sewer District, and designating those
classifications which are eligible for payment of overtime compensation. (Intro. 5/14/2015)
Adoption of proposed Ord. No. 14098, authorizing the Executive Director and Secretary-
Treasurer on behalf of The Metropolitan St. Louis Sewer District to enter into a contract with
Cardinal Point Partners, LLC, whereby Cardinal Point Partners, LLC will provide federal
legislative services for the District, with an emergency clause. (Intro. 5/14/2015)
Adoption of proposed Ord. No. 14099, authorizing the Executive Director and Secretary-
Treasurer on behalf of The Metropolitan St. Louis Sewer District to enter into a contract with the
law firm of Armstrong Teasdale L.L.P. whereby Armstrong Teasdale L.L.P., will provide General
Legal Services to the District. (Intro. 5/14/2015)
Adoption of proposed Ord. No. 14100, authorizing the Executive Director and Secretary-
Treasurer on behalf of The Metropolitan St. Louis Sewer District to enter into a contract with
The Hale Law Firm whereby The Hale Law Firm, will provide General Legal Services to the
District. (Intro. 5/14/2015)
Adoption of proposed Adoption of proposed Ord. No. 14101, authorizing the Executive Director
and Secretary-Treasurer on behalf of The Metropolitan St. Louis Sewer District to enter into a
contract with the law firm of Rynearson, Suess, Schnurbusch & Champion L.L.C. whereby
Rynearson, Suess, Schnurbusch & Champion L.L.C., will provide General Legal Services to the
District. (Intro. 5/14/2015)
Adoption of proposed Ord. No. 14102, authorizing the Executive Director and Secretary-
Treasurer on behalf of The Metropolitan St. Louis Sewer District to enter into a contract with the
law firm of Thompson Coburn L.L.P. whereby Thompson Coburn L.L.P., will provide General
Legal Services to the District.
Adoption of proposed Ord. No. 14103, awarding a contract to Travelers Insurance Companies
(McGriff, Seibels & Williams of Missouri, Inc., agent) for the District’s Auto Liability Insurance
Program coverage from July 1, 2015 to June 30, 2016. (Intro. 5/14/2015)
Adoption of proposed Ord. No. 14104, awarding a contract to Zurich (Steadfast) Insurance
Company (McGriff, Seibels & Williams of Missouri, Inc., agent) for the District's Blocked Main
and Overcharged Sewer Line Backup Insurance coverage from July 1, 2015 to June 30, 2016.
(Intro. 5/14/2015)
Adoption of proposed Ord. No. 14105, awarding a contract to Federal (Chubb) Insurance
Company (McGriff, Seibels & Williams, of Missouri Inc., agent) for the District’s Commercial
Crime Insurance coverage from July 1, 2015 to June 30, 2016. (Intro. 5/14/2015)
Adoption of proposed Ord. No. 14106, awarding a contract to RLI Insurance Company (McGriff,
Seibels & Williams, of Missouri Inc., agent) for the District’s Contractors Equipment (Inland
Marine) Insurance Program from July 1, 2015 to June 30, 2016. (Intro. 5/14/2015)
Adoption of proposed Ord. No. 14107, awarding a contract to National Union Fire Insurance
Company (Chartis) (McGriff, Seibels & Williams, of Missouri Inc., agent) for the District’s Cyber
Liability Insurance Program from July 1, 2015 to June 30, 2016 (Intro. 5/14/2015)
Revised 6/10/15 Page 5 ~ June 16, 2015
28
29
30
31
32
33
34
35
36
Adoption of proposed Ord. No. 14108, awarding a contract to F.M. Global Insurance Company
(McGriff, Seibels & Williams, of Missouri Inc., agent) for the District’s Excess Flood & Earth
Movement Insurance coverage from July 1, 2015 to June 30, 2016. (Intro. 5/14/2015)
Adoption of proposed Ord. No. 14109, awarding a contract to Arch Insurance Group Inc.
(McGriff, Seibels & Williams, of Missouri Inc., agent) for the District’s Excess Workers’
Compensation Insurance coverage from July 1, 2015 to June 30, 2016. (Intro. 5/14/2015)
Adoption of proposed Ord. No. 14110, awarding a contract to Federal (Chubb) Insurance
Company (McGriff, Seibels & Williams, of Missouri Inc., agent) for the District’s Fiduciary
Liability Insurance from July 1, 2015, June 30, 2016. (Intro. 5/14/2015)
Adoption of proposed Ord. No. 14111, awarding a contract to Zurich (Steadfast) Insurance
Company (McGriff, Seibels & Williams, of Missouri Inc., agents) for the District’s Major Facility
Pollution Liability Insurance from July 1, 2015 to June 30, 2016. (Intro. 5/14/2015)
Adoption of proposed Ord. No. 14112, authorizing the Executive Director and Secretary-
Treasurer on behalf of The Metropolitan St. Louis Sewer District to execute all documents
necessary in order to procure flood insurance from the National Flood Insurance Program
(Federal Emergency Management Agency) during the period of July 1, 2015 to June 30, 2016,
for the buildings and contents at certain specified District locations. (Intro. 5/14/2015)
Adoption of proposed Ord. No. 14113, awarding a contract to American International Surplus
Lines Insurance Company (McGriff, Seibels & Williams, of Missouri Inc., agent) for the District’s
Owners Pollution Protective Insurance Program coverage from July 1, 2015 to June 30, 2016.
(Intro. 5/14/2015)
Adoption of proposed Ord. No. 14114, awarding a contract to F.M. Global Insurance Company
(McGriff, Seibels & Williams, of Missouri Inc., agent) for the District’s Primary Property, Boiler
and Machinery Insurance Coverage from July 1, 2015 to June 30, 2016. (Intro. 5/14/2015)
Adoption of proposed Ord. No. 14115, awarding a contract to Missouri Underground Storage
Tank Insurance Fund for the District’s Underground Storage Tank Insurance coverage from
July 1, 2015, June 30, 2016. (Intro. 5/14/2015)
Adoption of proposed Ord. No. 14116, authorizing the Executive Director and Secretary-
Treasurer on behalf of The Metropolitan St. Louis Sewer District to enter into a contract with
Corporate Claims Management, Inc. (CCMI) to provide third party claims administrative
services for the District's water back-up, workers' compensation, general liability, auto, errors
and omissions claims and any other claim against the District, Board of Trustees, Civil Service
Commission, Rate Commission or District staff as may be assigned by the office of Risk
Management. (Intro. 5/14/2015)
Revised 6/10/15 Page 6 ~ June 16, 2015
37
38
Adoption of proposed Ord. No. 14117, repealing and superseding Ordinance No. 13855
adopted June 12, 2014, and making appropriations for the current expenses of the District in
the General Fund, the Water Backup Insurance and Reimbursement Fund, the General
Insurance Fund, the Sanitary Replacement Fund, the Stormwater Operations, Maintenance
and Construction Improvement Funds, the Emergency Funds, the Debt Service Funds, and the
Wastewater Revenue Bond Service Funds for the fiscal year beginning July 1, 2015 and ending
June 30, 2016, amounting in the aggregate to Two Hundred Eighty-four Million Fifty-two
Thousand Four Hundred Fifty-five Dollars ($284,052,455) to pay interest falling due on bonds
issued, the costs of support, operation, and maintenance of the District and its various
subdistricts, and emergencies in accordance with the requirements of this Proposed Ordinance
to be introduced May 14, 2015. (Intro. 5/14/2015)
Adoption of proposed Ord. No. 14118, repealing Ordinance No. 13979, adopted September 30,
2014, and enacting a new Ordinance in lieu thereof, determining the amount of taxes which
shall be levied, assessed, and collected in the year 2015 on all taxable tangible property in the
District within the corporate limits of the City of St. Louis and St. Louis County, respectively, and
in Subdistricts within the corporate limits of St. Louis County as follows: Coldwater Creek Trunk
Subdistrict, Gravois Creek Trunk Subdistrict, Maline Creek Trunk Subdistrict, Watkins Creek
Trunk Subdistrict, Subdistrict No. 88 (Fountain Creek), Subdistrict No. 89 (Loretta-Joplin),
Subdistrict No. 342 (Clayton-Central), Subdistrict No. 366 (University City Branch of River des
Peres Stormwater Subdistrict), Subdistrict No. 367 (Deer Creek Stormwater Subdistrict),
Subdistrict No. 369 (Sugar Creek), Subdistrict No. 448 (Missouri River - Bonfils), Subdistrict No.
449 (Meramec River Basin - M.S.D. Southwest), Subdistrict No. 453 (Shrewsbury Branch of
River des Peres), Subdistrict No. 454 (Seminary Branch of River des Peres), Subdistrict No.
455 (Black Creek), Subdistrict No. 1 of the River des Peres Watershed (Creve Coeur-Frontenac
Area), Subdistrict No. 4 of the River des Peres Watershed (North Affton Area) and Subdistrict
No. 7 of the River des Peres Watershed (Wellston Area); and the Board of Trustees, in
accordance with Charter Section 7.310 authorizes the Director of Finance to certify as to the
amount of taxes which shall be levied, assessed and collected for the aforementioned
Subdistricts with an emergency clause. (Intro. 5/14/2015)
UNFINISHED BUSINESS
ORDINANCES
39 Adoption of proposed Ord. No. 14073, authorizing the Executive Director and Secretary-
Treasurer on behalf of The Metropolitan St. Louis Sewer District to enter into Contract
No. 20254 with Ideal Landscape Group for the construction of Green Infrastructure
Bioretention at N Spring #2723-2735 Bioretention Cell (CB 4872) CSO VR GI (11814) in the
City of St. Louis, Missouri. (Intro. 4/9/2015)
40 Adoption of proposed Ord. No. 14082, declaring the necessity for the acquisition of easements
and temporary easements in certain real property within The Metropolitan St. Louis Sewer
District for the purpose of construction of sewers and related appurtenances in the project
known as Sherwyn Sanitary Relief (SKME-651) & I/I Reduction (10754) in the City of Creve
Coeur, Missouri to serve the needs of residents of the area, and authorizing staff to proceed
with further condemnation efforts related to the project, including but not limited to the
purchase &/or the filing of all necessary court pleadings or documents to commence and
prosecute formal legal proceedings for the acquisition of said easements and temporary
construction easements. (Intro. 4/9/2015)
Revised 6/10/15 Page 7 ~ June 16, 2015
RESOLUTIONS #45 REVISED
None
Agenda Item No. New Business Name Page No.
41
Proposed Ord. No. 14131
Salary of the Secretary-Treasurer
12
Introduction & Adoption repealing Ordinance No. 13859 adopted May 8, 2014, and
enacting a new ordinance in lieu thereof prescribing the salary of the Secretary-
Treasurer of The Metropolitan St. Louis Sewer District.
RESOLUTIONS
42 Adoption of Resolution No. 3212 will extend the contract previously authorized by
Ordinance No. 13590, adopted May 22, 2013, which authorized the Executive Director
and Secretary-Treasurer on behalf of The Metropolitan St. Louis Sewer District to enter
into a contract with Black & Veatch Corporation whereby Black & Veatch Corporation
would provide Engineering Services associated with the design of small projects
throughout the District.
13
43 Adoption of Resolution No. 3213 will exercise option year three (3) of the contract
previously authorized by Ordinance No. 13597, adopted May 9, 2013, which authorized
the Executive Director and Secretary-Treasurer on behalf of The Metropolitan St. Louis
Sewer District to enter into a contract with Gallagher Benefit Services whereby Gallagher
Benefit Services would provide professional benefit services for the District's employees
and family members.
15
44 Adoption of Resolution No. 3214, will authorize the Secretary-Treasurer of the
Metropolitan St. Louis Sewer District to make changes to the District’s Defined Benefit
Plan and Pension Plan Investment Policy. These changes fully comply with the criteria
in the District’s Pension Plan as described in Ordinance 13796.
16
45 Adoption of Resolution No. 3215, transfers funds totaling One Million Four Hundred
Thousand Dollars ($1,400,000.00) from Debt Service Fund 2819 and into the following
three funds: Debt Service Fund 2810 in the amount of Four Hundred Thousand Dollars
($400,000.00), Debt Service Fund 2816 in the amount of Eight Hundred Thousand
Dollars ($800,000.00), and Debt Service Fund 2817 in the amount of Two Hundred
Thousand Dollars ($200,000.00) and transferring Five Hundred Thousand Dollars
($500,000.00) from Debt Service Fund 2812 and into Debt Service Fund 2804 and
transferring Two Million Dollars ($2,000,000.00) from Debt Service Fund 2819 to the
General Fund 1101 and Two Million Dollars ($2,000,000.00) from Debt Service Fund
2820 to the General Fund 1101. These transfers are based on an internal review and
adjusts for differences in actual and budgeted debt payments due to the timing of the
issuance of senior bonds. This will be an annual process.
18
46 Adoption of Resolution No. 3221, will authorize the Secretary-Treasurer of the
Metropolitan St. Louis Sewer District to liquidate assets held in the GMO Asset
Allocation Fund, who was appointed District pension fund managers by Resolution No.
3068, adopted January 10, 2013; and to allocate assets to the EnTrust Capital
Diversified Fund and to Lighthouse Global Long/Short Fund as recommended by the
District’s pension investment consultant, Pavilion Advisory Group, Inc.
20
Revised 6/10/15 Page 8 ~ June 16, 2015
Agenda Item No. New Business Name Page No.
47
Adoption of Resolution No. 3222, will authorize the District's fourth (4th) option for a six
(6) month term, from July 1, 2015 through December 31, 2015 of a contract previously
authorized by Ordinance No. 13405, adopted June 14, 2012; authorizing the Secretary-
Treasurer of the Metropolitan St. Louis Sewer District to exercise its option to renew its
contract with Bank of America N.A., to provide general banking and safekeeping
services, and said contract renewal shall provide for a fee consisting of a series of unit
prices, and shall be comprised of such other terms and conditions as are approved by
the Office of the Secretary-Treasurer of the District.
22
48 ITEMS PROPOSED FOR INTRODUCTION & ADOPTION AT THE NEXT BOARD
MEETING
49
ANY OTHER BUSINESS THAT MAY PROPERLY BE BROUGHT BEFORE THE BOARD
50 ADJOURNMENT
Revised 6/10/15 Page 9 ~ June 16, 2015
AGENDA ITEM NUMBER: Item # 39 Proposed Ord. No. 14073
NAME OF PROJECT: N Spring #2723-2735 Bioretention Cell (CB 4872) CSO VR GI (11814)
LOCATION: North of Martin Luther King Drive and west of Grand Boulevard in the City of St. Louis,
Missouri
TYPE OF PROJECT: Green Infrastructure Construction (015.0 Construction Costs)
DEPARTMENT REQUESTING ACTION: Engineering
REQUESTED ACTION:
Why is this action necessary?: Authorizes staff to enter into a construction contract.
What does action accomplish?: Implements the construction of a CIP project, as required by
Consent Decree.
SUMMARY EXPLANATION/BACKGROUND:
Contractor: Ideal Landscape Group Previous District Contract: Yes
6264 Lemay Ferry Road
St. Louis, MO 63129
Consultant: N/A
Agency: N/A
Number of bidders: 3 Low Bid: $171,686.00 High Bid: $218,594.00
Appropriation Amount: N/A Designer’s Estimate: $190,000.00
Total MWBE Participation: 17.00% (MBE Goal is 17% - African American)
McKay’s Hauling (African American) – 11.59% - MBE
Greenseasons Landscaping, LLC (African American) – 1.92% - MBE
Riley Ready Mix (African American) – 3.49% - MBE
Type of Contract: Lump Sum
Properties Affected: 3 Properties Benefiting: 32
Designed by: District staff
The work to be done under Contract #20254 consists of the construction of approximately 2,514 square
feet of bioretention and appurtenances. The purpose of this project is to reduce combined sewer
overflows into the Mississippi River per the CSO Long Term Control Plan. This project is part of the CSO
Volume Reduction Green infrastructure (11146) program. This project is scheduled to be completed in
180 days.
FUNDING/COST SUMMARY:
Budgeted: Capital Improvement Program Budget Year: FY2015, Pg. 111 Amount:
$5,000,000*
Fund Name: #1101 – General Fund
Additional Comments: An additional contingency of $10,000 for utility relocation (Other - $10,000) is
included in the encumbered amount. Contracted planning resources utilized: Watershed Facility
Planning.
Revised 6/10/15 Page 10 ~ June 16, 2015
PREVIOUS BOARD ACTION RELATED TO THIS ACTION:
09/12/13 – Ord. No. 13709 – Amount: $8,700,000 – CSO Volume Reduction Green Infrastructure
(11146) – Original
Appropriation
06/12/14 – Ord. No. 13839 – Amount: $90,000 – GSA – Sewer Design – Tetra Tech, Inc. – Design
Contract No. 20026 –
Amendment No. 2
10/09/14 – Ord. No. 13957 – Amount: $5,000,000 – CSO Volume Reduction Green Infrastructure
(11146) –Supplemental
*Requesting Board approval of a contract with Ideal Landscape Group for which $200,000.00 is being
encumbered from Ordinance No. 13957.
Revised 6/10/15 Page 11 ~ June 16, 2015
AGENDA ITEM NUMBER: Item # 40 Proposed Ord. No. 14082
NAME OF PROJECT: Sherwyn Sanitary Relief (SKME-651) & I/I Reduction (10754)
LOCATION: South of Olive Boulevard and west of Lindbergh Boulevard in the City of Creve
Coeur, Missouri
TYPE OF PROJECT: Easement Condemnation
DEPARTMENT REQUESTING ACTION: Engineering
REQUESTED ACTION:
Why is this action necessary?: Authorizes staff to proceed with further condemnation efforts
including the filing of all necessary court pleadings or
documents.
What does action accomplish?: Acquires permanent easements and temporary construction
easements to construct a sanitary sewer project with
appurtenances, as required by Consent Decree.
SUMMARY EXPLANATION/BACKGROUND:
Contractor: N/A Previous District Contract: N/A
Consultant: N/A
Agency: N/A
Number of bidders: N/A Low Bid: N/A High Bid: N/A
Appropriation Amount: N/A District’s Estimate: N/A
Total MWBE Participation: N/A
Type of Contract: N/A
Properties Affected: 2 Properties Benefiting: 658
Designed by: N/A
This ordinance authorizes the staff to proceed with further condemnation efforts including the filing of all
necessary court pleadings or documents leading to the acquisition of permanent sewer easements and
temporary construction easements on two (2) parcels of ground located in the City of Creve Coeur,
Missouri. These easements are needed to construct this project, which consists of the construction of
approximately 1,700 lineal feet of 15-inch diameter sanitary sewers, and performing private I/I reduction in
an area benefitting approximately 658 private properties. This project will provide for the elimination of
113 private inflow sources, two (2) sanitary bypasses (BP-199 and BP-203) and alleviate wet weather
sewer surcharging and building backups. These easements have been appraised. Currently, the District
has been unable to negotiate a settlement with the owners.
FUNDING/COST SUMMARY:
Budgeted: Capital Improvement Program Budget Year: FY2016 Amount: $1,200,000
Fund Name: #6660 – Sanitary Replacement Fund
Ad ditional Comments: None.
PREVIOUS BOARD ACTION RELATED TO THIS ACTION: N/A
Revised 6/10/15 Page 12 ~ June 16, 2015
AGENDA ITEM NUMBER: Item # 41 Proposed Ord. No. 14131
NAME OF PROJECT: Salary of the Secretary-Treasurer
LOCATION: N/A
TYPE OF PROJECT: N/A
DEPARTMENT REQUESTING ACTION: N/A
REQUESTED ACTION:
Why is this action necessary? District Charter requires that the Secretary-Treasurer’s
salary be set by Ordinance.
What does action accomplish? Enacts ordinance to set Secretary-Treasurer’s
salary.
SUMMARY EXPLANATION/BACKGROUND:
Contractor: N/A Previous District Contract: N/A
Consultant: N/A
Agency: N/A
Number of bidders: N/A Low Bid: N/A High Bid: N/A
Appropriation Amount: N/A District’s
Estimate: N/A
MBE/WBE Participation: N/A
Plan Approval Date: N/A Type of Contract: N/A
Properties Affected: N/A Properties Benefiting: N/A
Designed by: N/A
FUNDING/COST SUMMARY: N/A
Budgeted: N/A Budget Year: N/A Amount: N/A
Fund Name: N/A
Additional Comments: Section 8.070 of the District Charter requires that the salary of the
Secretary-Treasurer be set by Ordinance. This Ordinance increases the salary for the position of
Secretary-Treasurer to $154,500.00, per annum, payable in bi-weekly installments, on and after June 13,
2015.
PREVIOUS BOARD ACTION RELATED TO THIS ACTION:
05/08/2014 - Ordinance No. 13859: Set Secretary-Treasurer's salary
Revised 6/10/15 Page 13 ~ June 16, 2015
AGENDA ITEM NUMBER: Item #42 - Resolution No. 3212
NAME OF PROJECT: General Services Agreement – Engineering Services
LOCATION: Various locations within the District
TYPE OF PROJECT: General Engineering Services (011.0 Design Phase Project Costs)
DEPARTMENT REQUESTING ACTION: Operations
REQUESTED ACTION:
Why is this action necessary?: Authorizes the District to exercise option year two (2) of a
contract.
What does action accomplish?: Renewal of a contract.
SUMMARY EXPLANATION/BACKGROUND:
Contractor: N/A Previous District Contract: N/A
Consultant: Black & Veatch Corporation
16305 Swingley Ridge Rd, Suite 230
Chesterfield, MO 63017
Agency: N/A
Number of proposers: N/A
Appropriation Amount: N/A Designer’s Estimate: N/A
Total MWBE Participation: 30.00% (MWBE Goal is 30%)
Intelligent Design Solutions – 10.00% - WBE
Lion CSG LLC – 8.50% - WBE
Taliaferro & Browne, Inc. (African American) – 9.50% - MBE
Gateway Land Surveying Services, Inc. – 1.0% - WBE
Document Imaging (African American) – 1.0% - MBE
Type of Contract: Hourly Billing Rate Plus Reimbursables
Properties Affected: N/A Properties Benefitting: N/A
Designed by: N/A
This resolution authorizes the District to exercise option year two (2) of a one-year contract with two (2)
one year options with Black & Veatch Corporation for engineering services associated with the design of
small projects and tasks as needed throughout the District as defined in RFP2732. Services provided
may include electrical, controls, mechanical, structural, process, and regulatory. Projects will be issued
by letter agreement per individual scopes of service.
FUNDING/COST SUMMARY:
Budgeted: Unencumbered Funds Budget Year: FY2016/17 Amount:
$100,000
Fund Name: N/A
Additional Comments: None
Revised 6/10/15 Page 14 ~ June 16, 2015
PREVIOUS BOARD ACTION RELATED TO THIS ACTION:
06/12/2014 - Resolution No. 3154: Exercise option year one (1) with Black & Veatch for the design
of small projects.
04/23/2013 - Ordinance No. 13590: Original contract with Black & Veatch Corporation for the design
of small projects
Revised 6/10/15 Page 15 ~ June 16, 2015
AGENDA ITEM NUMBER: Item # 43 Resolution No. 3213
NAME OF PROJECT: Employee Benefit Consulting Services
LOCATION: District-wide
TYPE OF PROJECT: Professional consulting services for the District’s group medical plan,
dental plan, life and AD&D, legal plan and long-term disability.
DEPARTMENT REQUESTING ACTION: Human Resources Department
REQUESTED ACTION:
Why is this action necessary?: The District's third year of the current contract with
Gallagher Benefit Services for consulting services will
expire June 30, 2015.
What does action accomplish?: The District utilizes Gallagher Benefits Services to
provide comprehensive benefit consulting services. This
action authorizes MSD to exercise its option to renew
the current Contract Agreement for a third one-year term
at the same annual fee.
SUMMARY EXPLANATION/BACKGROUND:
Contractor: N/A Previous District Contract: Yes
Consultant: Arthur J. Gallagher & Co.
Gallagher Benefit Services
12444 Powerscourt Dr., Ste. 500
St. Louis, Missouri63131
Agency: N/A Type of Contract: Professional Services
Number of bidders: N/A Low Bid: N/A High Bid: N/A
Appropriation Amount: N/A District’s Estimate: N/A
MBE/WBE Participation: N/A
FUNDING/COST SUMMARY:
Budgeted: Human Resources Department Budget Year: 2015-2016 Amount:
$39,500
Fund Name: General Fund
Additional Comments: The District currently utilizes the professional consulting services of
Gallagher Benefit Services to ensure the most cost effective management of the District’s employee
benefit programs; provide comprehensive benefit survey information; provide guidance on compliance
with IRS and DOL regulations, etc.
PREVIOUS BOARD ACTION RELATED TO THIS ACTION:
06/12/2014 - Resolution No. 3159: Employee Group Benefit Plan Consultant
05/09/2013 - Ordinance No. 13597: Employee Group Benefit Plan Consultant
07/09/2009 - Ordinance No. 12918: Employee Group Benefit Plan Consultant
Revised 6/10/15 Page 16 ~ June 16, 2015
AGENDA ITEM NUMBER: Item # 44 Resolution No. 3214
NAME OF PROJECT: Pension Investment Policy Statement
LOCATION: N/A
TYPE OF PROJECT: Review and improvements to the Pension Investment Policy
DEPARTMENT REQUESTING ACTION: Secretary-Treasurer
REQUESTED ACTION:
Why is this action necessary?: The Policy calls for an annual review for relevance to and
consistency with governing law and the financial objectives
of the Fund.
What does action accomplish?: The changes made to the Policy clarify inconsistent
references, clarify the Board of Trustees role as one of
governance, strategic oversight and authority and
eliminated inconsistent references to action items and tasks
that the Board relies upon management and staff to
complete. The changes clarify the definition of “prohibited
transactions” and use of derivatives under the derivatives
policy. The changes clarify investment goals and objectives,
investment manager guidelines, and performance
benchmarks.
SUMMARY EXPLANATION/BACKGROUND:
Contractor: N/A Previous District Contract: N/A
Consultant: Pavilion Advisory Group Inc.
227 W. Monroe Street
STE 2020
Chicago, IL 60606
Agency: N/A
Number of bidders: N/A Low Bid: N/A High Bid: N/A
Appropriation Amount: N/A District Estimate: N/A
MBE/WBE Participation: N/A
Plan Approval Date: N/A Type of Contract: None Policy
Decision
Properties Affected: N/A Properties Benefiting: N/A
Designed by: N/A
FUNDING/COST SUMMARY:
Budgeted: N/A Amount: N/A
Revised 6/10/15 Page 17 ~ June 16, 2015
Additional Comments: With the assistance of our Consultant, Pavilion Advisory Group, the District
seeks to clarify many points within the statement and make improvements that will be more in line with
the objectives of the fund and similar public pension plans.
PREVIOUS BOARD ACTION RELATED TO THIS ACTION:
5/10/2012 – Resolution 3030 – Statement of Investment Policy, Objectives and Operating Guidelines
2/13/2014 - Resolution 3138 - set new asset allocation targets and allowable ranges
Revised 6/10/15 Page 18 ~ June 16, 2015
AGENDA ITEM NUMBER: Item # 45 Resolution No. 3215
NAME OF PROJECT: Transfer fund balances from Debt Service Funds 2010B, 2013A & 2013B to other
Debt Service Funds and the General Fund.
LOCATION: N/A
TYPE OF PROJECT: N/A
DEPARTMENT REQUESTING ACTION: Finance
REQUESTED ACTION:
Why is this action necessary? 1) To review and adjust for differences in actual and budgeted
debt payments due to the timing of the issuance of senior bonds.
This will be an annual process.
What does action accomplish? 1) Complies with audit recommendations.
SUMMARY EXPLANATION/BACKGROUND:
Contractor: N/A Previous District Contract: N/A
Consultants: N/A Agency: N/A
Number of bidders: N/A Low Bid: N/A High Bid: N/A
Appropriation Amount: N/A District Estimate: N/A
MBE/WBE Participation: N/A
Plan Approval Date: N/A Type of Contract: N/A
Properties Affected: N/A Properties Benefiting: N/A
Designed by: N/A
FUNDING/COST SUMMARY:
Budgeted: N/A Budget Year: 2014-2015 Amount:
Fund Name: Debt Service Funds and General Fund
Additional Comments:
1) Actual senior bond debt payment schedules are not known during the budget process as actual
issuance of the bond has not taken place; therefore, a budgeted amount is created. Funds are
transferred based on this budgeted amount. This results in budgeted transfers differing from
actual payments. This imbalance is adjusted in future budgets as the actual debt payment
schedule is known and accounted for. This leaves the initial imbalance in need of review and
adjustment.
2) Audit recommendations are to review the actual and budgeted debt payment schedules,
acknowledge differences arising due to the timing of issuance, and adjust accordingly before
each fiscal year end.
Revised 6/10/15 Page 19 ~ June 16, 2015
From: Fund and Amount To: Fund and Amount
2819-Debt 2013B $1,400,000.00 2810-Debt 2008A $400,000.00
2816-Debt 2011B $800,000.00
2817-Debt 2012A $200,000.00
2812-Debt 2010B $500,000.00 2804-Debt 2004A $500,000.00
2819-Debt 2013B $2,000,000.00 1101-General Fund $2,000,000.00
2820-Debt 2013A $2,000,000.00 1101-General Fund $2,000,000.00
PREVIOUS BOARD ACTION RELATED TO THIS ACTION: N/A
Revised 6/10/15 Page 20 ~ June 16, 2015
AGENDA ITEM NUMBER: Item # 46 Resolution No. 3221
NAME OF PROJECT: Employees’ Pension Plan - Investment Manager Change
LOCATION: District-wide
TYPE OF PROJECT: Pension Investments
DEPARTMENT REQUESTING ACTION: Secretary-Treasurer
REQUESTED ACTION:
Why is this action necessary?: This action is necessary to allow the Secretary-
Treasurer’s Department to reallocate assets within the
Defined Benefit Plan to achieve investment allocation
targets approved by the Board in February, 2014.
What does action accomplish?: This action formally authorizes the District to liquidate
assets held in the GMO Asset Allocation Fund; and to
allocate assets to the EnTrust Capital Diversified Fund
and to Lighthouse Global Long/Short Fund as
recommended by the District’s pension investment
consultant, Pavilion.
SUMMARY EXPLANATION/BACKGROUND:
Contractor: N/A Previous District Contract: Yes
Consultant: Pavilion Advisory Group Inc.
500 W. Madison Street, Suite 2740
Chicago, IL 60661
Agency: N/A
Number of bidders: N/A Low Bid: N/A High Bid: N/A
Appropriation Amount: N/A District’s Estimate: N/A
MBE/WBE Participation: 0% (there are no goals)
Plan Approval Date: N/A Type of Contract: N/A
Properties Affected: N/A Properties Benefitting: N/A
Designed by: Pavilion Advisory Group Inc.
FUNDING/COST SUMMARY: Pension Plan
Budgeted: N/A Budget Year: N/A
Amount: Based on AUM of $25.1 million as of March 31, 2015. Approximately-$17.7 million will be
allocated to Entrust and $7.4 million to Lighthouse.
Fund Name: N/A
Additional Comments: The District’s target allocation for Hedge Funds is 15%. The District currently
has 4% invested in Hedge Funds. This action will bring the allocation to hedge funds to approximately
14%.
Revised 6/10/15 Page 21 ~ June 16, 2015
PREVIOUS BOARD ACTION RELATED TO THIS ACTION:
02/13/2014 Resolution No. 3138: Specified the manner in which the assets of the Pension Fund of
the District are to be invested.
09/12/2013 Ordinance No. 13719: Selected Pavilion to advise District as to how Pension assets
should be invested.
01/10/2013 Resolution No. 3068: Appointed Loomis Sayles, Pictet, Penn, and GMO as Investment
Managers in the Plan.
Revised 6/10/15 Page 22 ~ June 16, 2015
AGENDA ITEM NUMBER: Item # 47 Resolution No. 3222
NAME OF PROJECT: Banking and Safekeeping Services
LOCATION: District Wide
TYPE OF PROJECT: District Banking Services
DEPARTMENT REQUESTING ACTION: Office of Secretary Treasurer
REQUESTED ACTION: Renews contract for a six-month period with Bank of
America to provide day-to-day banking services to the
District
Why is this action necessary?: Enables the District to exercise a contract extension
option for a six month period from 07/01/2015 to
12/31/2015
What does action accomplish?: This resolution allows Bank of America to continue to
provide banking services until the completion of the
Banking Services Request for Proposal process.
SUMMARY EXPLANATION/BACKGROUND:
Contractor: N/A Previous District Contract: Yes
Consultant: Bank of America N.A.
800 Market Street
St. Louis, Missouri 63101
Agency: N/A
Number of bidders: N/A Low Bid: N/A High Bid:
N/A
Appropriation Amount: N/A District’s Estimate:
$50,000
MBE/WBE Participation:
Plan Approval Date: N/A Type of Contract: Unit Price
Properties Affected: N/A Properties Benefiting: N/A
Designed by: N/A
FUNDING/COST SUMMARY:
Budgeted: Secretary-Treasurer Budget Year: 2016 Amount: $50,000
Fund Name:
Additional Comments: Bank of America’s current contract expires on June 30, 2015. Bank of
America presented the District with a proposed increase in net service fees that will be implemented with
the 7/1/15 12-month contract extension. In lieu of this proposed increase, MSD went out to bid for
banking services and the selection process is not yet complete.
Revised 6/10/15 Page 23 ~ June 16, 2015
PREVIOUS BOARD ACTION RELATED TO THIS ACTION:
05/08/2014 - Resolution No. 3146: Exercise one-year option renewal with Bank of America
05/09/2013 - Resolution No. 3089: Exercise one-year option renewal with Bank of America
06/14/2012 - Ordinance No. 13405: Contract Authorization with Bank of America