A G E N D A
1486th MEETING OF THE BOARD OF TRUSTEES
THE METROPOLITAN ST. LOUIS SEWER DISTRICT
May 13, 2010 – 4:00 P.M.
MSD OFFICES
2350 MARKET STREET
ROOM 109
ROLL CALL
THE BOARD OF TRUSTEES WILL BE IN CLOSED SESSION BETWEEN 4:00 P.M. AND 5:00 P.M.
1 CLOSED SESSION TO DISCUSS LEGAL, CONFIDENTIAL OR PRIVILEGED MATTERS
UNDER §610.021(1), RSMO 1988 SUPP.; DISCUSSIONS REGARDING NEGOTIATIONS WITH
EMPLOYEE GROUPS UNDER §610.021(9)
2 APPROVAL OF JOURNAL OF PRECEDING MEETING April 8, 2010 (1485th)
3 COMMENTS BY THE CHAIR
4 REPORT OF BOARD COMMITTEES
5 REPORT OF EXECUTIVE DIRECTOR
6 COMMENTS FROM THE PUBLIC
7 SUBMISSION OF PUBLIC HEARING REPORTS – None
8 COMMUNICATIONS – Quarterly Pension Report – Dion Stevens
9 CONSENT AGENDA – Item Nos. 10 through 17
2 of 5/13/10
Ordinances
10 Adoption of proposed Ord. No. 153-10 appropriating $1,000,000.00 from the Sanitary
Replacement Fund to be used for project costs for the construction of sanitary sewers in FF-02
Fee Fee - Alan Shepard I-270 Sanitary Relief Phase IV (88088A) in the City of Maryland Heights,
Missouri; and authorizing the Executive Director and Secretary-Treasurer on behalf of The
Metropolitan St. Louis Sewer District to enter into a contract with XL Contracting, Inc. for the
construction of the aforesaid sanitary sewers. (Intro. 04/08/10)
11 Adoption of proposed Ord. No. 154-10 appropriating $713,000.00 from the Sanitary Replacement
Fund to be used for project costs for the construction of the Lemay WWTP SCADA Equipment
Replacement and Upgrade (2009212), in Unincorporated St. Louis County, Missouri; and
authorizing the Executive Director and Secretary-Treasurer on behalf of The Metropolitan St.
Louis Sewer District to enter into a contract with R.E. Pedrotti Co., Inc. for the aforesaid
construction. (Intro. 04/08/10)
12 Adoption of proposed Ord. No. 155-10 appropriating $790,000.00 from the Sanitary Replacement
Fund to be used for the Power Supply Improvements at Various Sanitary Pump Stations Phase II
(2007240A) in St. Louis County, Missouri; and authorizing the Executive Director and Secretary-
Treasurer on behalf of The Metropolitan St. Louis Sewer District to enter into a contract with R.V.
Wagner, Inc., for the construction of the aforesaid improvements. (Intro. 04/08/10)
13 Adoption of proposed Ord. No. 156-10 appropriating $5,150,000.00 from the Sanitary
Replacement Fund to be used for project costs for the rehabilitation of sanitary sewers in
Webster Groves Trunk “E” Sanitary Rehabilitation and I/I Reduction Phase I (2003095A) in the
City of Webster Groves, Missouri; and authorizing the Executive Director and Secretary-
Treasurer on behalf of The Metropolitan St. Louis Sewer District to enter into a contract with
Insituform Technologies USA, Inc. for the rehabilitation of the aforesaid sanitary sewers. (Intro.
04/08/10)
14 Adoption of proposed Ord. No. 157-10 appropriating $123,000.00 from the Operation,
Maintenance and Construction Improvement Fund of University City to be used for project costs
for construction of storm sewers in Forsythia - Grandview Storm Sewer (2007096), in the City of
Olivette, Missouri; and authorizing the Executive Director and Secretary-Treasurer on behalf of
The Metropolitan St. Louis Sewer District to enter into a contract with Southern Ditching &
Excavating Company for the aforesaid construction of storm sewers. (Intro. 3/11/10)
15 Adoption of proposed Ord. No. 158-10 appropriating $80,000.00 from the Operation,
Maintenance and Construction Improvement Fund of Coldwater Creek to be used for project
costs for the construction of storm sewers in Lusher Road to Cathedral Hill Drive Storm Sewer
(2008223), in Unincorporated St. Louis County, Missouri; and authorizing the Executive Director
and Secretary-Treasurer on behalf of The Metropolitan St. Louis Sewer District to enter into a
contract with Southern Ditching & Excavating Company for the aforesaid storm sewer
construction. (Intro. 04/08/10)
3 of 5/13/10
16 Adoption of proposed Ord. No. 159-10 appropriating $250,000.00 from the General Fund for the
procurement and implementation of the Oracle Security features, software licenses, training and
technical support, hardware and operating systems, and Oracle software, and authorizing the
Executive Director and Secretary-Treasurer on behalf of The Metropolitan St. Louis Sewer
District to enter into a purchase agreement with Oracle Corporation and a contract for
implementation services with Computer Services Corporation for the aforementioned services
and equipment. The combined total for procurement of hardware, software and implementation
services shall not exceed $390,000.00, with any difference from the appropriation being
absorbed in the appropriate departmental budget (Intro. 04/08/10)
Plan Approval
17 Infrastructure Repair #015P Burncoate (P-321) (90044)
This project, located south of Highway 255 and east of Telegraph Road in unincorporated
St. Louis County, is to eliminate an existing pump station. This project is in the Fiscal Year
2010 Budget and the estimated construction cost is $235,000.
UNFINISHED BUSINESS
Ordinances
None
Resolutions
None
4 of 5/13/10
New Business
Agenda Item Number Name Page Number
Ordinances
18 – Proposed Ord. No. 162-10 Aline Ave. Storm Channel (2007077) 11
Introduction of proposed Ord. No. 162-10 appropriating $320,000.00 from the Operation,
Maintenance and Construction Improvement Fund of Coldwater Creek to be used for the
construction of a storm channel in Aline Ave. Storm Channel (2007077), in the City of
Berkeley, Missouri; and authorizing the Executive Director and Secretary-Treasurer on
behalf of The Metropolitan St. Louis Sewer District to enter into a contract with XL
Contracting, Inc. for the construction of the aforesaid storm channel.
19 – Proposed Ord. No. 163-10 Bissell Point WWTP Chimney Repairs Phase II 12
(2005097A)
Introduction of proposed Ord. No. 163-10 appropriating $405,000.00 from the Sanitary
Replacement Fund to be used for project costs for the Bissell Point WWTP Chimney
Repairs Phase II (2005097A), in the City of St. Louis Missouri, and authorizing the
Executive Director and Secretary-Treasurer on behalf of The Metropolitan St. Louis
Sewer District to enter into a contract with Gerard Chimney Company for the
aforesaid construction.
20 – Proposed Ord. No. 164-10 CC-14 Creve Coeur Creek Sanitary Relief 13
(SKME-026) Phase I (89132A)
Introduction of proposed Ord. No. 164-10 appropriating $3,300,000.00 from the Sanitary
Replacement Fund to be used for project costs for the construction of sanitary sewers in
CC-14 Creve Coeur Creek Sanitary Relief (SKME-026) Phase I (89132A), in the City of
Creve Coeur, Missouri; and authorizing the Executive Director and Secretary-Treasurer
on behalf of The Metropolitan St. Louis Sewer District to enter into a contract with XL
Contracting, Inc. for the aforesaid construction.
21 – Proposed Ord. No. 165-10 Coldwater Wet Weather Storage Facility Tank A 14
(Site Preloading) (2003083C)
Introduction of proposed Ord. No. 165-10 appropriating $600,000.00 from the Sanitary
Replacement Fund to be used for project costs for the construction of Coldwater Wet
Weather Storage Facility Tank A (Site Preloading) (2003083C), in the City of St. Ann
Missouri, and authorizing the Executive Director and Secretary-Treasurer on behalf
of The Metropolitan St. Louis Sewer District to enter into a contract with Castle
Contracting, LLC, Inc. for the aforesaid construction.
5 of 5/13/10
Agenda Item Number Name Page Number
22 – Proposed Ord. No. 166-10 Grand Glaize WWTP Improvements 15
Medium Voltage Switchgear (2003061E)
Introduction of proposed Ord. No. 166-10 appropriating $125,000.00 from the Sanitary
Replacement Fund to be used for project costs for the construction of the Grand Glaize
WWTP Improvements - Medium Voltage Switchgear (2003061E), in the City of Valley
Park, Missouri; and authorizing the Executive Director and Secretary-Treasurer on behalf
of The Metropolitan St. Louis Sewer District to enter into a contract with Central Electric
Co. for the construction of the aforesaid treatment plant improvements.
23 – Proposed Ord. No. 167-10 Grand Glaize WWTP Improvements 16
Redundant Washer Compactor (2003061C)
Introduction of proposed Ord. No. 167-10 appropriating $250,000.00 from the Sanitary
Replacement Fund to be used for project costs for the construction of the Grand Glaize
WWTP Improvements - Redundant Washer Compactor (2003061C), in the City of
Valley Park, Missouri; and authorizing the Executive Director and Secretary-Treasurer
on behalf of The Metropolitan St. Louis Sewer District to enter into a contract with
Haberberger, Inc. for the construction of the aforesaid treatment plant improvements.
24 – Proposed Ord. No. 168-10 Grand Glaize WWTP Improvements 17
Splitter Box Modifications (2003061D)
Introduction of proposed Ord. No. 168-10 appropriating $275,000.00 from the Sanitary
Replacement Fund to be used for project costs for the construction of the Grand Glaize
WWTP Improvements - Splitter Box Modifications (2003061D), in the City of Valley Park,
Missouri; and authorizing the Executive Director and Secretary-Treasurer on behalf of
The Metropolitan St. Louis Sewer District to enter into a contract with Haberberger, Inc.
for the construction of the aforesaid treatment plant improvements.
25 – Proposed Ord. No. 169-10 Lemay WWTP Grit Dragout Rehabilitation 18
(2008184)
Introduction of proposed Ord. No. 169-10 appropriating $720,000.00 from the Sanitary
Replacement Fund to be used for the Lemay WWTP Grit Dragout Rehabilitation
(2008184) in unincorporated St. Louis County, Missouri; and authorizing the Executive
Director and Secretary-Treasurer on behalf of The Metropolitan St. Louis Sewer District
to enter into a contract with Essex Contracting, Inc. for the aforesaid rehabilitation.
26– Proposed Ord. No. 170-10 Mason Valley Sanitary Relief (Lower) 19
(SKME-420) (2006046B)
Introduction of proposed Ord. No. 170-10 appropriating $740,000.00 from the Operation,
Maintenance and Construction Improvement Fund of Lower Meramec River Basin to be
used for project costs for the construction of sanitary sewers in Mason Valley Sanitary
Relief (Lower) (SKME-420) (2006046B), in the City of Town & Country and Unincorporated
St. Louis County, Missouri; and authorizing the Executive Director and Secretary-Treasurer
on behalf of The Metropolitan St. Louis Sewer District to enter into a contract with Essex
Contracting, Inc., for the construction of the aforesaid sanitary sewers.
6 of 5/13/10
Agenda Item Number Name Page Number
27 – Proposed Ord. No. 171-10 Sewer Improvements in St. Louis City Parks 20
Phase IV (2007169)
Introduction of proposed Ord. No. 171-10 appropriating $55,000.00 from the Sanitary
Replacement Fund to be used for project costs for the rehabilitation of combined sewers
in Sewer Improvements in St. Louis City Parks Phase IV (2007169), in the City of St. Louis,
Missouri; and authorizing the Executive Director and Secretary-Treasurer on behalf of The
Metropolitan St. Louis Sewer District to enter into a contract with Southern Ditching &
Excavating Company for the rehabilitation of the aforesaid combined sewers.
28 – Proposed Ord. No. 172-10 Infrastructure Repair #015P Burncoate 21
(P-321) (90044)
Introduction of proposed Ord. No. 172-10 appropriating $210,000.00 from the Sanitary
Replacement Fund to be used for project costs for the construction of sanitary sewers
in Infrastructure Repair #015P Burncoate (P-321) (90044), in Unincorporated St. Louis
County, Missouri, and authorizing the Executive Director and Secretary-Treasurer on
behalf of The Metropolitan St. Louis Sewer District to enter into a contract with B & G
Utilities, LLC for the construction of the aforesaid sanitary sewers.
29 – Proposed Ord. No. 173-10 Schoettler Sanitary Relief (SKME-018) (2003115) 22
Introduction of proposed Ord. No. 173-10 appropriating $570,000.00 from the Sanitary
Replacement Fund to be used for project costs for the construction of sanitary sewers
in Schoettler Sanitary Relief (SKME-018) (2003115), in the City of Chesterfield, Missouri;
and authorizing the Executive Director and Secretary-Treasurer on behalf of The
Metropolitan St. Louis Sewer District to enter into a contract with Metro Utilities, LLC for
the aforesaid construction.
30 – Proposed Ord. No. 174-10 Lower Meramec River WWTP Phase II 23
(Disinfection) (E-1213-5 & 2006167)
Introduction of proposed Ord. No. 174-10 making a supplemental appropriation of
$470,000.00 from the Sanitary Replacement Fund for additional construction phase
services for the Lower Meramec River WWTP Phase II (Disinfection) (2006167); and
authorizing the Executive Director and Secretary-Treasurer on behalf of The Metropolitan
St. Louis Sewer District to enter into Amendment No. 5 of Contract E-1213 with HDR
Engineering, Inc. for the aforesaid additional construction phase services.
31 – Proposed Ord. No. 175-10 Howard Bend Levy District 24
Introduction of proposed Ord. No. 175-10 authorizing the Executive Director and
Secretary-Treasurer to execute an agreement conveying easement rights across
certain real property of the District in Maryland Heights, Missouri known as the
Missouri River Wastewater Treatment Plant site to the Howard Bend Levee District
for the construction of a Flank Levee flood protection system along the interior creeks
on MSD property.
7 of 5/13/10
Agenda Item Number Name Page Number
32 – Proposed Ord. No. 176-10 FY 2011 Budget Appropriation 25
Introduction of proposed Ord. No. 176-10 making appropriations for current expenses
of the District, in the General Fund, the Real Property Improvements & Alterations
Fund, the Water Backup Insurance & Reimbursement Fund, the Emergency Fund,
the Wastewater Revenue Bond Service Fund for the fiscal year beginning July 1, 2010
and ending June 30, 2011, amounting in the aggregate of $205,515,385, to pay interest
falling due on bonds issued, the costs of support, operation, and maintenance of the
District and its various Subdistricts, and emergencies.
33 – Proposed Ord. No. 177-10 2010 Tax Levy for the Metropolitan St. Louis Sewer 26
District and its Various Subdistricts
Introduction of proposed Ord. No. 177-10 determining the amount of taxes which shall
be levied, assessed, and collected in the year 2010 on all taxable tangible property in
the District within the corporate limits of the City of St. Louis and St. Louis County,
respectively, and in Subdistricts within the corporate limits of St. Louis County as follows:
Coldwater Creek Trunk Subdistrict, Gravois Creek Trunk Subdistrict, Maline Creek Trunk
Subdistrict, Watkins Creek Trunk Subdistrict, Subdistrict No. 88 (Fountain Creek),
Subdistrict No. 89 (Loretta-Joplin), Benefit Subdistrict No. 111 (Marlborough), Subdistrict
No. 325 (Paddock Creek), Subdistrict No. 342 (Clayton-Central), Subdistrict No. 366
(University City Branch of River des Peres Stormwater Subdistrict), Subdistrict No. 367
(Deer Creek Stormwater Subdistrict), Subdistrict No. 369 (Sugar Creek), Subdistrict No.
374 (Wedgewood Creek), Subdistrict No. 376 (Black Jack-Dellwood Creek), Subdistrict
No. 380 (Upper Paddock Creek), Subdistrict No. 448 (Missouri River - Bonfils), Subdistrict
No. 449 (Meramec River Basin - M.S.D. Southwest), Subdistrict No. 453 (Shrewsbury
Branch of River des Peres), Subdistrict No. 454 (Seminary Branch of River des Peres),
Subdistrict No. 455 (Black Creek), Subdistrict No. 1 of the River des Peres Watershed
(Creve Coeur-Frontenac Area), Subdistrict No. 4 of the River des Peres Watershed
(North Affton Area), and Subdistrict No. 7 of the River des Peres Watershed (Wellston
Area), with an emergency clause.
34 – Proposed Ord. No. 178-10 District Rate Modeling & Expert Testimony 27
Introduction of proposed Ord. No. 178-10 authorizing the Executive Director and
Secretary-Treasurer on behalf of The Metropolitan St. Louis Sewer District to enter
into a contract with Black & Veatch Corporation (B&V), whereby Black & Veatch
Corporation (B&V) will provide rate design development, rate report preparation
and expert testimony services required during anticipated future Rate Commission
proceedings.
35 – Proposed Ord. No. 179-10 Third Party Claims Administration Services 28
Introduction of proposed Ord. No. 179-10 authorizing the Executive Director and
Secretary-Treasurer on behalf of The Metropolitan St. Louis Sewer District to enter into
a contract with Corporate Claims Management, Inc. (CCMI) to provide third party claims
administrative services for the District's water back-up, workers' compensation, general
liability, auto, errors and omissions claims and any other claim against the District, Board
of Trustees, Civil Service Commission, Rate Commission or District staff as may be
assigned by the office of Risk Management.
8 of 5/13/10
Agenda Item Number Name Page Number
36 – Proposed Ord. No. 180-10 Property and Boiler & Machinery 29
Insurance Coverage
Introduction of proposed Ord. No. 180-10 awarding a contract to F.M. Global Insurance
Company (McGriff, Seibels & Williams, of Missouri Inc., agent) for the District’s Primary
Property, Boiler and Machinery Insurance coverage from July 1, 2010 to June 30, 2011.
37 – Proposed Ord. No. 181-10 Excess Flood & Earth Movement 30
Insurance Coverage
Introduction of proposed Ord. No. 181-10 awarding a contract to F.M. Global Insurance
Company (McGriff, Seibels & Williams, of Missouri Inc., agent) for the District’s Excess
Flood & Earth Movement Insurance coverage from July 1, 2010 to June 30, 2011.
38 – Proposed Ord. No. 182-10 National Flood Insurance Program (NFIP) 31
Introduction of proposed Ord. No. 182-10 authorizing the Executive Director and
Secretary-Treasurer on behalf of The Metropolitan St. Louis Sewer District to execute
all documents necessary in order to procure flood insurance from the National Flood
Insurance Program (Federal Emergency Management Agency) during the period of
July 1, 2010 to June 30, 2011, for the buildings and contents at certain specified District
locations.
39 – Proposed Ord. No. 183-10 Excess Workers’ Compensation 32
Insurance Coverage
Introduction of proposed Ord. No. 183-10 awarding a contract to Midwest Employers
Casualty Company (McGriff, Seibels & Williams, of Missouri Inc., agent) for the District’s
Excess Workers’ Compensation Insurance coverage from July 1, 2010 to June 30, 2011.
40 – Proposed Ord. No. 184-10 Fiduciary Liability Insurance Coverage 33
Introduction of proposed Ord. No. 184-10 awarding a contract to Federal (Chubb)
Insurance Company (McGriff, Seibels & Williams, of Missouri Inc., agent) for the
District’s Fiduciary Liability Insurance from July 1, 2010 to June 30, 2011.
41 – Proposed Ord. No. 185-10 Commercial Crime Insurance Coverage 34
Introduction of proposed Ord. No. 185-10 awarding a contract to Federal (Chubb)
Insurance Company (McGriff, Seibels & Williams, of Missouri Inc., agent) for the
District’s Commercial Crime Insurance coverage from July 1, 2010 to June 30, 2011.
42 – Proposed Ord. No. 186-10 Underground Storage Tank Insurance 35
Introduction of proposed Ord. No. 186-10 awarding a contract to Missouri Underground
Storage Tank Insurance Fund for the District’s Underground Storage Tank Insurance
coverage from July 1, 2010 to June 30, 2011.
9 of 5/13/10
Agenda Item Number Name Page Number
43 – Proposed Ord. No. 187-10 Major Facility Pollution Liability Insurance Coverage 36
Introduction of proposed Ord. No. 187-10 awarding a contract to Zurich (Steadfast)
Insurance Company (McGriff, Seibels & Williams, of Missouri Inc., agents) for the
District’s Major Facility Pollution Liability Insurance from July 1, 2010 to June 30, 2011.
44 – Proposed Ord. No. 188-10 Blocked Main and Overcharged Line Back-Up 37
Insurance Program
Introduction of proposed Ord. No. 188-10 awarding a contract to Zurich (Steadfast)
Insurance Company (McGriff, Seibels & Williams of Missouri, Inc., agent) for the
District's Blocked Main and Overcharged Sewer Line Backup Insurance coverage
from July 1, 2010 to June 30, 2011.
45 – Proposed Ord. No. 189-10 Independent Audit for the Fiscal Year 38
Ending June 30, 2011
Introduction of proposed Ord. No. 189-10 authorizing the Executive Director and
Secretary-Treasurer on behalf of the Board of Trustees of The Metropolitan St.
Louis Sewer District to enter into a contract with Schmersahl Treloar & Co., for
an independent audit of the accounting records of the District.
Resolutions
46 Adoption of Resolution No. 2905 whereas Ordinance No. 12740, adopted September 39
11, 2008, authorized the Executive Director and Secretary-Treasurer on behalf of The
Metropolitan St. Louis Sewer District to enter into a contract with Stantec Consulting
Services Inc. whereby Stantec Consulting Services Inc. would provide general
geotechnical services pursuant to the General Services Agreement – Geotechnical
Services (FY2009) (E – 1241-1 & 2009041).
47 Adoption of Resolution No. 2906 whereas ordinance No. 12741, adopted September 40
11, 2008, authorized the Executive Director and Secretary-Treasurer on behalf of The
Metropolitan St. Louis Sewer District to enter into a contract with Gonzalez Companies,
LLC whereby Gonzalez Companies, LLC would provide general construction
management services pursuant to the General Services Agreement – Construction
Management (FY2009) (E – 1242-1 & 2009042).
48 ITEMS PROPOSED FOR INTRODUCTION & ADOPTION AT THE NEXT BOARD MEETING
48a – Excess (Umbrella) Liability Program 41
48b – Combined Liability Insurance Program 42
49 ANY OTHER BUSINESS THAT MAY PROPERLY BE BROUGHT BEFORE THE BOARD
10 of 5/13/10
Agenda Item Number Name Page Number
50 CLOSED SESSION
The Metropolitan St. Louis Sewer District Board of Trustees may go into closed
session at this meeting if such action is approved by a majority vote of the Board
members who constitute a quorum, to discuss legal, confidential, or privileged
matters under §610.021(1), RSMo 1988 Supp.; leasing, purchase or sale of real
estate under §610.021(2); personnel actions under §610.021(3); discussions
regarding negotiations with employee groups under §610.021(9); personnel
records or applications under §610.021(13); or records under §610.021(14)
which are otherwise protected from disclosure by law; or confidential or privileged
communications with the District’s auditor, including auditor work products under
§610.021(17).
51 ADJOURNMENT
11 of 5/13/10
AGENDA ITEM NUMBER: 18 – Proposed Ord. No. 162-10
NAME OF PROJECT: Aline Ave. Storm Channel (2007077)
LOCATION: North of Airport Road and west of North Florissant Road in the City of Berkeley, Missouri
TYPE OF PROJECT: Storm channel construction
DEPARTMENT REQUESTING ACTION: Engineering
REQUESTED ACTION:
Why is this action necessary?: Appropriates funds and authorizes staff to enter into a construction contract
What does action accomplish?: Implements the construction of a CIP project
SUMMARY EXPLANATION/BACKGROUND:
Contractor: XL Contracting, Inc. Previous District Contract: Yes
20 Mid Rivers Trade Court, Suite 100
St. Peters, MO 63376
Consultant: N/A
Agency: N/A
Number of bidders: 7 Low Bid: $291,075.10 High Bid: $392,122.00
Appropriation Amount: $320,000.00 Designer’s Estimate: $319,500.00
MBE/WBE Participation: 100.0%
J.D. Kutter Insurance – 1.49% - WBE
AJ’s Hauling – 3.62% - WBE
XL Contracting – 94.89% - MBE
Plan Approval Date: March 11, 2010 Type of Contract: Unit Cost
Properties Affected: 21 Properties Benefiting: 26
Designed by: District staff
The work to be done under this contract consists of the construction of approximately 1,087 lineal feet of articulated concrete
block lined channel and appurtenances. The purpose of this project is to relieve yard flooding for 26 properties. This project
is scheduled to be completed in 90 days.
FUNDING/COST SUMMARY:
Budgeted: Capital Improvement Program Budget Year: FY2009, Pg. 122 Amount: $300,000
Fund Name: #564 – Coldwater Creek OMCI
Additional Comments: Contracted planning resources utilized: Stormwater Facility Planning
PREVIOUS BOARD ACTION RELATED TO THIS ACTION: N/A
12 of 5/13/10
AGENDA ITEM NUMBER: 19 – Proposed Ord. No. 163-10
NAME OF PROJECT: Bissell Point WWTP Chimney Repairs Phase II (2005097A)
LOCATION: The Bissell Point WWTP Chimney at 10 East Grand in the City of St. Louis, Missouri
TYPE OF PROJECT: Wastewater treatment plant construction
DEPARTMENT REQUESTING ACTION: Engineering
REQUESTED ACTION:
Why is this action necessary?: Appropriates funds and authorizes staff to enter into a construction contract
What does action accomplish?: Implements the construction of a CIP project
SUMMARY EXPLANATION/BACKGROUND:
Contractor: Gerard Chimney Company Previous District Contract: Yes
4607 Beck Avenue
St. Louis, MO 63116
Consultant: N/A
Agency: N/A
Number of bidders: 2 Low Bid: $325,900.00 High Bid: $408,150.00
Appropriation Amount: $405,000.00 Designer’s Estimate: $405,000.00
MBE/WBE Participation: 10.13% - Noir & Ocram, LLC – MBE
Plan Approval Date: April 8, 2010 Type of Contract: Lump Sum
Properties Affected: 1 Properties Benefiting: All properties in the
Bissell service area
Designed by: CDG Engineers Architects Planners, Inc.
The work to be done under this contract is the repair of the exterior surface of the Bissell Point WWTP Chimney in the City of
St. Louis, Missouri. This is the second phase of a two-phase project to repair this chimney and will prohibit moisture from
leaking through the deteriorating brick and mortar. This project is scheduled to be completed in 160 days.
FUNDING/COST SUMMARY:
Budgeted: Capital Improvement Program Budget Year: FY2010, Pg. 53 Amount: $400,000
Fund Name: #660 – Sanitary Replacement Fund
Additional Comments: A special prequalification was performed for contractors who would be eligible to submit bids for
this specialty work. Four contractors were prequalified to bid. Since the work involves uncovering concealed defects during
construction, an additional $80,000 contingency is included in the appropriation to cover the likely additional costs for brick
replacement and repairs, tuck pointing, surface repairs, and appurtenances. Accurate quantities will be available after the
contractor completes the grout scraping and cleaning.
Contracted planning resources utilized: Watershed Facility Planning
PREVIOUS BOARD ACTION RELATED TO THIS ACTION:
11/13/08 – Ord. No. 12769 – Amount: $169,000 – CDG Engineers Architects Planners, Inc. – Design contract
13 of 5/13/10
AGENDA ITEM NUMBER: 20 – Proposed Ord. No. 164-10
NAME OF PROJECT: CC-14 Creve Coeur Creek Sanitary Relief (SKME-026) Phase I (89132A)
LOCATION: North of Interstate 64 and east of Mason Road in the City of Creve Coeur, Missouri
TYPE OF PROJECT: Sanitary sewer construction
DEPARTMENT REQUESTING ACTION: Engineering
REQUESTED ACTION:
Why is this action necessary?: Appropriates funds and authorizes staff to enter into a construction contract
What does action accomplish?: Implements the construction of a CIP project
SUMMARY EXPLANATION/BACKGROUND:
Contractor: XL Contracting, Inc. Previous District Contract: Yes
20 Mid Rivers Trade Court, Suite 100
St. Peters, MO 63376
Consultant: N/A
Agency: N/A
Number of bidders: 7 Low Bid: $3,085,000.00 High Bid: $3,983,715.00
Appropriation Amount: $3,300,000.00 Designer’s Estimate: $4,142,000.00
MBE/WBE Participation: 100.00%
Midwest Turf Contractors, Inc. – 3.64% - WBE
J.D. Kutter Associates – 1.60% - WBE
XL Contracting, Inc. – 94.76% - MBE
Plan Approval Date: April 8, 2010 Type of Contract: Unit Cost
Properties Affected: 25 Properties Benefiting: 1,000
Designed by: Farnsworth Group, Inc. and Basilico Engineering Incorporated
The work to be done under this contract consists of the construction of approximately 7,255 lineal feet of pipe sewers varying
in size from 8-inches to 36-inches in diameter and appurtenances. This construction is the first phase of a multiple phase
Capital project. The purpose of this project is to alleviate property loss and damage due to basement backups and
overcharged sanitary sewers. This project will also eliminate one SSO. This project is scheduled to be completed in 505
days.
FUNDING/COST SUMMARY:
Budgeted: Capital Improvement Program Budget Year: FY2010, Pg. 56 Amount: $2,800,000
Fund Name: #660 – Sanitary Replacement Fund
Additional Comments: The second phase of CC-18 Smith Creek Branch Sanitary Relief (SKME-028) (90012) was added
to the first phase of this project to avoid disrupting properties multiple times. The estimated cost for the CC-18 work added to
this project was $750,000.
Contracted planning resources utilized: Watershed Facility Planning, Separate Sewer Area I/I Assessment, Separate Sewer
Area Flow Metering & Monitoring, Modeling, CCTV Inspection, and Radar Rainfall Data.
PREVIOUS BOARD ACTION RELATED TO THIS ACTION:
11/13/03 – Ord. No. 11626 – Amount: $400,000 – Basilico Engineering Incorporated – Design contract
09/09/04 – Ord. No. 11831 – Amount: $598,000 – Farnsworth Group, Inc. – Design contract
04/09/09 – Ord. No. 12843 – Condemnation authorization.
14 of 5/13/10
AGENDA ITEM NUMBER: 21 – Proposed Ord. No. 165-10
NAME OF PROJECT: Coldwater Wet Weather Storage Facility Tank A (Site Preloading) (2003083C)
LOCATION: East of Cypress Road and south of Interstate 70 in the City of St. Ann, Missouri
TYPE OF PROJECT: Site preloading for future Storage Tank A
DEPARTMENT REQUESTING ACTION: Engineering
REQUESTED ACTION:
Why is this action necessary?: Appropriates funds and authorizes staff to enter into a construction contract
What does action accomplish?: Implements the construction of a CIP project
SUMMARY EXPLANATION/BACKGROUND:
Contractor: Castle Contracting, LLC Previous District Contract: No*
760 So. 2nd Street
St. Louis, MO 63102
Consultant: N/A
Agency: N/A
Number of bidders: 5 Low Bid: $541,880.00 High Bid: $1,019,510.72
Appropriation Amount: $600,000.00 Designer’s Estimate: $897,000.00
MBE/WBE Participation: 100%
R & TD Hauling – 7.02% - MBE
McKay’s Hauling – 7.02% - MBE
Castle Contracting, LLC – 85.96% - WBE
Plan Approval Date: April 8, 2010 Type of Contract: Lump Sum
Properties Affected: 12 Properties Benefiting: 55,000
Designed by: Crawford Murphy & Tilly Inc.
The work to be done under this contract consists of preloading the site with earth, including the construction of a temporary
entrance, sedimentation basin, 148 lineal feet of 30-inch diameter culvert, a secondary construction entrance, security fence
and gates, and clearing and grubbing of trees and brush from site. The purpose of this project is to raise the site above the
100-year flood elevation and to preload the site for future Storage Tank A. This project is scheduled to be completed in 240
days.
FUNDING/COST SUMMARY:
Budgeted: Capital Improvement Program Budget Year: FY2010, Pg. 57 Amount: $1,200,000
Fund Name: #660 – Sanitary Replacement Fund
Additional Comments: Contracted planning resources utilized: Watershed Facility Planning, Separate Sewer Area I/I
Assessment, Separate Sewer Area Flow Metering & Monitoring, Modeling, CCTV Inspection, and Radar Rainfall Data.
PREVIOUS BOARD ACTION RELATED TO THIS ACTION:
09/11/03 – Ord. No. 11589 – Amount: $2,000,000 – Crawford Murphy & Tilly Inc. – Pre-design contract
09/11/08 – Ord. No. 12724 – Amount: $3,650,000 – Property acquisition, demolition and related activities
*Castle Contracting, LLC is a heavy civil construction company bonded for $20 million and above and located in St. Louis,
Missouri. Castle Contracting was organized in 1995. The company has performed sewer, boring, earthwork, and flatwork
construction projects for 15 years.
15 of 5/13/10
AGENDA ITEM NUMBER: 22 – Proposed Ord. No. 166-10
NAME OF PROJECT: Grand Glaize WWTP Improvements – Medium Voltage Switchgear (2003061E)
LOCATION: At the Grand Glaize WWTP, 1000 Grand Glaize Parkway in the City of Valley Park, Missouri
TYPE OF PROJECT: Wastewater treatment plant construction
DEPARTMENT REQUESTING ACTION: Engineering
REQUESTED ACTION:
Why is this action necessary?: Appropriates funds and authorizes staff to enter into a procurement contract
What does action accomplish?: Implements the equipment procurement for a CIP project
SUMMARY EXPLANATION/BACKGROUND:
Contractor: Central Electric Co. Previous District Contract: N/A
7900 U.S. Highway 53
Fulton, MO 65251
Consultant: N/A
Agency: N/A
Number of bidders: 1 Low Bid: $117,412.00 High Bid: $117,412.00
Appropriation Amount: $125,000.00 Designer’s Estimate: $130,000.00
MBE/WBE Participation: N/A – The above bid is a self-perform procurement contract and therefore, the MBE/WBE goals
have been waived for this project.
Plan Approval Date: N/A Type of Contract: Lump Sum
Properties Affected: 1 Properties Benefiting: All properties in the Grand
Glaize service area
Designed by: HDR Engineering, Inc.
The work to be done under this contract consists of the switchgear procurement to replace the existing medium voltage
switchgear and appurtenances. The purpose of this project is to provide adequate and reliable power supply for the recently
expanded wastewater treatment facilities. This project is scheduled to be completed in 168 days.
FUNDING/COST SUMMARY:
Budgeted: Capital Improvement Program Budget Year: FY2010, Pg. 63 Amount: $100,000
Fund Name: #660 – Sanitary Replacement Fund
Additional Comments: A separate installation contract will be bid in FY2011 after the switchgear equipment is
manufactured. The procurement equipment will be transferred to the installing contractor by contract.
PREVIOUS BOARD ACTION RELATED TO THIS ACTION:
04/22/04 – Ord. No. 11709 – Amount: $2,400,000 – HDR Engineering, Inc. – Amendment No. 3
08/10/06 – Ord. No. 12268 – Amount: $29,450,000 – Grand Glaize WWTP Improvements (2003061)
16 of 5/13/10
AGENDA ITEM NUMBER: 23 – Proposed Ord. No. 167-10
NAME OF PROJECT: Grand Glaize WWTP Improvements – Redundant Washer Compactor (2003061C)
LOCATION: At the Grand Glaize WWTP, 1000 Grand Glaize Parkway in the City of Valley Park, Missouri
TYPE OF PROJECT: Wastewater treatment plant construction
DEPARTMENT REQUESTING ACTION: Engineering
REQUESTED ACTION:
Why is this action necessary?: Appropriates funds and authorizes staff to enter into a construction contract
What does action accomplish?: Implements the construction of a CIP project
SUMMARY EXPLANATION/BACKGROUND:
Contractor: Haberberger, Inc. Previous District Contract: No*
9744 Pauline Place
St. Louis, MO 63123
Consultant: N/A
Agency: N/A
Number of bidders: 2 Low Bid: $236,816.00 High Bid: $279,152.00
Appropriation Amount: $250,000.00 Designer’s Estimate: $287,000.00
MBE/WBE Participation: 10.02%
Centrex Electrical (Sachs Elec.) – 1.06% - MBE
J.D. Kutter – 1.06% - WBE
Taylormade Construction – 7.90% - MBE
Plan Approval Date: April 8, 2010 Type of Contract: Lump Sum
Properties Affected: 1 Properties Benefiting: All properties in the Grand
Glaize service area
Designed by: HDR Engineering, Inc.
The work to be done under this contract consists of the installation of a second washer compactor and appurtenances. The
purpose of this project is to provide a redundant washer compactor to allow normal maintenance and operation of the facility.
This project is scheduled to be completed in 215 days.
FUNDING/COST SUMMARY:
Budgeted: Capital Improvement Program Budget Year: FY2010, Pg. 64 Amount: $250,000
Fund Name: #660 – Sanitary Replacement Fund
Additional Comments: None
PREVIOUS BOARD ACTION RELATED TO THIS ACTION:
04/22/04 – Ord. No. 11709 – Amount: $2,400,000 – HDR Engineering, Inc. – Amendment No. 3
08/10/06 – Ord. No. 12268 – Amount: $29,450,000 – Grand Glaize WWTP Improvements (2003061)
*Haberberger, Inc. is a mechanical, electrical, and plumbing company bonded for $30 million and located in St. Louis,
Missouri. The company was organized in 1964. The firm has performed mechanical, electrical, and plumbing projects for
forty-four years.
17 of 5/13/10
AGENDA ITEM NUMBER: 24 – Proposed Ord. No. 168-10
NAME OF PROJECT: Grand Glaize WWTP Improvements – Splitter Box Modifications (2003061D)
LOCATION: At the Grand Glaize WWTP, 1000 Grand Glaize Parkway in the City of Valley Park, Missouri
TYPE OF PROJECT: Wastewater treatment plant construction
DEPARTMENT REQUESTING ACTION: Engineering
REQUESTED ACTION:
Why is this action necessary?: Appropriates funds and authorizes staff to enter into a construction contract
What does action accomplish?: Implements the construction of a CIP project
SUMMARY EXPLANATION/BACKGROUND:
Contractor: Haberberger, Inc. Previous District Contract: No*
9744 Pauline Place
St. Louis, MO 63123
Consultant: N/A
Agency: N/A
Number of bidders: 3 Low Bid: $249,974.00 High Bid: $339,373.00
Appropriation Amount: $275,000.00 Designer’s Estimate: $309,200.00
MBE/WBE Participation: 11.60% - Taylormade Construction – MBE
Plan Approval Date: March 11, 2010 Type of Contract: Lump Sum
Properties Affected: 1 Properties Benefiting: All properties in the Grand
Glaize service area
Designed by: HDR Engineering, Inc.
The work to be done under this contract consists of the installation of four slide gates and appurtenances. The purpose of
this project is to replace four gates to allow isolation of the secondary clarifiers for routine maintenance and operation. This
project is scheduled to be completed in 320 days.
FUNDING/COST SUMMARY:
Budgeted: Capital Improvement Program Budget Year: FY2010, Pg. 65 Amount: $500,000
Fund Name: #660 – Sanitary Replacement Fund
Additional Comments: The existing gates are currently inoperable and a diver must be contracted to install a balloon in
the pipe to isolate the secondary clarifiers for maintenance.
PREVIOUS BOARD ACTION RELATED TO THIS ACTION:
04/22/04 – Ord. No. 11709 – Amount: $2,400,000 – HDR Engineering, Inc. – Amendment No. 3
08/10/06 – Ord. No. 12268 – Amount: $29,450,000 – Grand Glaize WWTP Improvements (2003061)
*Haberberger, Inc. is a mechanical, electrical, and plumbing company bonded for $30 million and located in St. Louis,
Missouri. The company was organized in 1964. The firm has performed mechanical, electrical, and plumbing projects for
forty-four years.
18 of 5/13/10
AGENDA ITEM NUMBER: 25 – Proposed Ord. No. 169-10
NAME OF PROJECT: Lemay WWTP Grit Dragout Rehabilitation (2008184)
LOCATION: At the Lemay WWTP in unincorporated St. Louis County, Missouri
TYPE OF PROJECT: Wastewater treatment plant construction
DEPARTMENT REQUESTING ACTION: Engineering
REQUESTED ACTION:
Why is this action necessary?: Appropriates funds and authorizes staff to enter into a construction contract
What does action accomplish?: Implements the construction of a CIP project
SUMMARY EXPLANATION/BACKGROUND:
Contractor: Essex Contracting, Inc. Previous District Contract: Yes
1519 McNutt Road
Herculaneum, MO 63048
Consultant: N/A
Agency: N/A
Number of bidders: 7 Low Bid: $682,000.00 High Bid: $964,000.00
Appropriation Amount: $720,000.00 Designer’s Estimate: $685,000.00
MBE/WBE Participation: 10.41% - Supplied Industrial Solutions – MBE
Plan Approval Date: March 11, 2010 Type of Contract: Lump Sum
Properties Affected: 1 Properties Benefiting: 1
Designed by: Horner & Shifrin, Inc.
The work to be done under this contract consists of the rehabilitation of the four (4) Grit Dragout units at the Lemay WWTP in
unincorporated St. Louis County, Missouri. The work for this project is being performed due to the corrosion of these units.
This project is scheduled to be completed in 360 days.
FUNDING/COST SUMMARY:
Budgeted: Capital Improvement Program Budget Year: FY2010, Pg. 68 Amount: $500,000
Fund Name: #660 – Sanitary Replacement Fund
Additional Comments: Contracted planning resources utilized: Watershed Facility Planning
PREVIOUS BOARD ACTION RELATED TO THIS ACTION:
09/11/08 – Ord. No. 12736 – Horner & Shifrin, Inc. – General Services Agreement contract
19 of 5/13/10
AGENDA ITEM NUMBER: 26 – Proposed Ord. No. 170-10
NAME OF PROJECT: Mason Valley Sanitary Relief (Lower) (SKME-420) (2006046B)
LOCATION: West of Barrett Station Road and north of Manchester Road in the City of Town and Country and
unincorporated St. Louis County, Missouri
TYPE OF PROJECT: Sanitary sewer construction
DEPARTMENT REQUESTING ACTION: Engineering
REQUESTED ACTION:
Why is this action necessary?: Appropriates funds and authorizes staff to enter into a construction contract
What does action accomplish?: Implements the construction of a CIP project
SUMMARY EXPLANATION/BACKGROUND:
Contractor: Essex Contracting, Inc. Previous District Contract: Yes
1519 McNutt Road
Herculaneum, MO 63048
Consultant: N/A
Agency: N/A
Number of bidders: 8 Low Bid: $674,316.00 High Bid: $860,919.98
Appropriation Amount: $740,000.00 Designer’s Estimate: $1,268,000.00
MBE/WBE Participation: 12.68%
Roden’s Landscaping – 3.12% - WBE
McKay’s Hauling – 5.19% - MBE
TC Precast – 4.37% - WBE
Plan Approval Date: April 8, 2010 Type of Contract: Unit Cost
Properties Affected: 10 Properties Benefiting: 400
Designed by: Crawford Murphy & Tilly Inc.
The work to be done under this contract consists of the construction of approximately 3,900 lineal feet of pipe sewers varying
in size from 8-inches to 24-inches in diameter and appurtenances. The purpose of this project is to alleviate property loss
and damage due to basement backups and overcharged sewer mains and the elimination of one sanitary sewer overflow.
This project is scheduled to be completed in 314 days.
FUNDING/COST SUMMARY:
Budgeted: Capital Improvement Program Budget Year: FY2010, Pg. 71 Amount: $1,300,000
Fund Name: #591 – Lower Meramec River Basin OMCI
Additional Comments: Contracted planning resources utilized: Watershed Facility Planning, Separate Sewer Area I/I
Assessment, Separate Sewer Area Flow Metering & Monitoring, Modeling, CCTV Inspection, and Radar Rainfall Data.
PREVIOUS BOARD ACTION RELATED TO THIS ACTION:
04/26/07 – Ord. No. 12411 – Amount: $622,000 – Crawford Murphy & Tilly Inc. – Design contract
03/11/10 – Ord. No. 13052 – Amount: $910,000 – Mason Valley Sanitary Relief (Upper) (SKME-420A) (2006046A)
20 of 5/13/10
AGENDA ITEM NUMBER: 27 – Proposed Ord. No. 171-10
NAME OF PROJECT: Sewer Improvements in St. Louis City Parks Phase IV (2007169)
LOCATION: South of Forest Park Parkway and west of S. Kingshighway Boulevard in the City of St. Louis, Missouri
TYPE OF PROJECT: Combined sewer construction
DEPARTMENT REQUESTING ACTION: Engineering
REQUESTED ACTION:
Why is this action necessary?: Appropriates funds and authorizes staff to enter into a construction contract
What does action accomplish?: Implements the construction of a CIP project
SUMMARY EXPLANATION/BACKGROUND:
Contractor: Southern Ditching & Excavating Company Previous District Contract: Yes
320 Jungerman Road
St. Peters, MO 63376
Consultant: N/A
Agency: N/A
Number of bidders: 5 Low Bid: $49,999.99 High Bid: $81,500.00
Appropriation Amount: $55,000.00 Designer’s Estimate: $62,000.00
MBE/WBE Participation: N/A – The above bid, less utility relocation, is less than $50,000 and therefore does not have a
goal under the MBE/WBE policy.
Plan Approval Date: March 11, 2010 Type of Contract: Unit Cost
Properties Affected: 1 Properties Benefiting: 1
Designed by: District staff
The work to be done under this contract consists of the removal and replacement of three manholes and appurtenances.
The purpose of this project is to make improvements to deteriorated manholes in Forest Park. This project is scheduled to
be completed in 90 days.
FUNDING/COST SUMMARY:
Budgeted: Capital Improvement Program Budget Year: FY2010, Pg. 81 Amount: $120,000
Fund Name: #660 – Sanitary Replacement Fund
Additional Comments: This construction is the fourth phase of a multi-phase sewer improvement program. There is
$34,100 in Federal funding in the FY2010 Budget for this project. Phase IA, IB, IIB, and IIA projects have been constructed.
PREVIOUS BOARD ACTION RELATED TO THIS ACTION: N/A
21 of 5/13/10
AGENDA ITEM NUMBER: 28 – Proposed Ord. No. 172-10
NAME OF PROJECT: Infrastructure Repair #015P Burncoate (P-321) (90044)
LOCATION: South of Highway 255 and east of Telegraph Road in unincorporated St. Louis County, Missouri
TYPE OF PROJECT: Sanitary sewer construction
DEPARTMENT REQUESTING ACTION: Engineering
REQUESTED ACTION:
Why is this action necessary?: Appropriates funds and authorizes staff to enter into a construction contract
What does action accomplish?: Implements the construction of a CIP project
SUMMARY EXPLANATION/BACKGROUND:
Contractor: B & G Utilities, LLC Previous District Contract: Yes
329 Josephville Road
Wentzville, MO 63385
Consultant: N/A
Agency: N/A
Number of bidders: 5 Low Bid: $189,000.00 High Bid: $237,004.20
Appropriation Amount: $210,000.00 Designer’s Estimate: $235,000.00
MBE/WBE Participation: 10.98%
Rainbow Connection – 6.10% - MBE
Midwest Turf Contractors – 4.88% - WBE
Plan Approval Date: May 13, 2010 Type of Contract: Unit Cost
Properties Affected: 10 Properties Benefiting: 2
Designed by: District staff
The work to be done under this contract consists of the construction of approximately 727 lineal feet of sanitary sewers
varying in size from 8-inches to 12-inches in diameter and appurtenances. The purpose of this project is to eliminate an
existing pump station. This project is scheduled to be completed in 150 days.
FUNDING/COST SUMMARY:
Budgeted: Capital Improvement Program Budget Year: FY2010, Pg. 100 Amount: $250,000.00
Fund Name: #660 – Sanitary Replacement Fund
Additional Comments: Contracted planning resources utilized: Watershed Facility Planning. This is a FY2010
Contingency Project.
PREVIOUS BOARD ACTION RELATED TO THIS ACTION: N/A
22 of 5/13/10
AGENDA ITEM NUMBER: 29 – Proposed Ord. No. 173-10
NAME OF PROJECT: Schoettler Sanitary Relief (SKME-018) (2003115)
LOCATION: North of Clayton Road and east of Clarkson Road in the City of Chesterfield, Missouri
TYPE OF PROJECT: Sanitary sewer construction
DEPARTMENT REQUESTING ACTION: Engineering
REQUESTED ACTION:
Why is this action necessary?: Appropriates funds and authorizes staff to enter into a construction contract
What does action accomplish?: Implements the construction of a CIP project
SUMMARY EXPLANATION/BACKGROUND:
Contractor: Metro Utilities, LLC Previous District Contract: Yes
4884 Mette Road
Moscow Mills, MO 63362
Consultant: N/A
Agency: N/A
Number of bidders: 9 Low Bid: $519,722.00 High Bid: $832,985.00
Appropriation Amount: $570,000.00 Designer’s Estimate: $923,000.00
MBE/WBE Participation: 10.52%
Midwest Turf – 5.30% - WBE
Taylor Trucking LLC – 4.47% - MBE
Luther Supply Co. - .75% - MBE
Plan Approval Date: April 8, 2010 Type of Contract: Unit Cost
Properties Affected: 20 Properties Benefiting: 300
Designed by: Cole & Associates, Inc.
The work to be done under this contract consists of the construction of approximately 5,600 lineal feet of pipe sewers varying
in size from 8-inches to 18-inches in diameter and appurtenances. The purpose of this project is to alleviate basement
backups and overcharged sewer mains and the elimination of one sanitary sewer overflow. This project is scheduled to be
completed in 346 days.
FUNDING/COST SUMMARY:
Budgeted: Capital Improvement Program Budget Year: FY2010, Pg. 110 Amount: $1,400,000
Fund Name: #660 – Sanitary Replacement Fund
Additional Comments: The scope of this project was reduced during design when it was determined that one SSO could
be eliminated without constructing part of the relief sewer. This is a FY2010 Contingency Project.
Contracted planning resources utilized: Watershed Facility Planning, Separate Sewer Area I/I Assessment, Separate Sewer
Area Flow Metering & Monitoring, Modeling, CCTV Inspection, and Radar Rainfall Data.
PREVIOUS BOARD ACTION RELATED TO THIS ACTION:
10/14/04 – Ord. No. 11868 – Amount: $310,000 – Cole & Associates, Inc. – Design contract
23 of 5/13/10
AGENDA ITEM NUMBER: 30 – Proposed Ord. No. 174-10
NAME OF PROJECT: Lower Meramec River WWTP Phase II (Disinfection) (E-1213-5 & 2006167)
LOCATION: South of Telegraph Road and west of Fine Road in unincorporated St. Louis County, Missouri
TYPE OF PROJECT: Construction phase services for disinfection
DEPARTMENT REQUESTING ACTION: Engineering
REQUESTED ACTION:
Why is this action necessary?: Appropriates additional funds and authorizes staff to amend a design contract
What does action accomplish?: Provides additional funds for the design of a CIP project
SUMMARY EXPLANATION/BACKGROUND:
Contractor: N/A Previous District Contract: Yes
Consultant: HDR Engineering, Inc.
326 S. 21st Street, Suite 400
St. Louis, MO 63103
Agency: N/A
Number of proposers: N/A
Appropriation Amount: $470,000.00 Designer’s Estimate: N/A
MBE/WBE Participation: 26.04% (16.80% for the total project)
David Mason & Associates, Inc. – 8.93% - MBE (This amendment only)
Engineering Design Source, Inc. – 3.54% - MBE (This amendment only)
ERM Technologies, Inc. – 4.76% - MBE (This amendment only)
Intelligent Design & Construction Solutions – 8.07% - WBE (This amendment only)
Tech Service, Inc. – 0.74% - MBE (This amendment only)
Plan Approval Date: N/A Type of Contract: Lump Sum
Properties Affected: 1 Properties Benefiting: All property owners in the
Meramec River Watershed
Designed by: N/A
This ordinance appropriates supplemental funds and authorizes the District to enter into Amendment No. 5 with HDR
Engineering, Inc. This amendment provides for the engineering construction phase services for Lower Meramec River
WWTP Phase II (Disinfection) (2006167A). The current construction budget for this project is $7,150,000. The amended
design appropriation is $2,970,000.00.
FUNDING/COST SUMMARY:
Budgeted: Capital Improvement Program Budget Year: FY2010, Pg. 35 Amount: $750,000
Fund Name: #660 – Sanitary Replacement Fund
Additional Comments: The engineering services during construction include construction field surveys, review of shop
drawings and submittals, responding to design questions and changes during construction, as-built surveys, preparation of
as-built record drawings, O & M manuals, training, and startup services.
PREVIOUS BOARD ACTION RELATED TO THIS ACTION:
06/14/07 – Ord. No. 12449 – Amount: $2,500,000 – HDR Engineering, Inc. – Design contract
24 of 5/13/10
AGENDA ITEM NUMBER: 31 – Proposed Ord. No. 175-10
NAME OF PROJECT: Howard Bend Levee District
LOCATION Maryland Heights
TYPE OF PROJECT: Granting by the District to the Howard Bend Levee District a Flank Levee Easement, Temporary
Construction Easement and Road Levee Easement across District owned property for the
construction of a Flank Levee System
DEPARTMENT REQUESTING ACTION: Legal & Right of Way
REQUESTED ACTION:
Why is this action necessary?: To allow the Howard Bend Levee District to construct a Flank Levee flood
protection system along the interior creeks on MSD property.
What does action accomplish?: Authorizes the District to grant an easement to the Howard Bend Levee District a
Temporary Construction Easement to construct and install a flank levee system
and ingress and egress across such additional ground adjacent to the
Temporary Construction Easement Area as may be necessary for the Flank
Levee Improvements.
SUMMARY EXPLANATION/BACKGROUND:
Contractor: N/A Previous District Contract: Yes
Consultant: N/A
Agency: N/A
Number of bidders: N/A Low Bid: N/A High Bid: N/A
Appropriation Amount: N/A District’s Estimate: $0
MBE/WBE Participation: N/A
Plan Approval Date: N/A Type of Contract:
Properties Affected: N/A Properties Benefitting: N/A
Designed by: N/A
FUNDING/COST SUMMARY:
Budgeted: N/A Budget Year: N/A Amount: $0
Fund Name: N/A
Additional Comments: This ordinance authorizes the District to enter into an agreement with the Howard Bend Levee
District whereby the District will grant the Levee District a Temporary Construction Easement, Road Levee Easement and
Flank Levee Easement across District property.
PREVIOUS BOARD ACTION RELATED TO THIS ACTION:
25 of 5/13/10
AGENDA ITEM NUMBER: 32 – Proposed Ord. No. 176-10
NAME OF PROJECT: FY 2011 Budget Appropriation
LOCATION: N/A
TYPE OF PROJECT: N/A
DEPARTMENT REQUESTING ACTION: Finance
REQUESTED ACTION:
Why is this action necessary?: Annual requirement of the Plan of the District
What does action accomplish?: Authorizes the various District departments to expend funds during FY 2011 for
wastewater and stormwater operation of the District.
SUMMARY EXPLANATION/BACKGROUND:
Contractor: N/A Previous District Contract: N/A
Consultant: N/A
Agency: N/A
Number of bidders: N/A Low Bid: N/A High Bid: N/A
Appropriation Amount: $205,515,385 District’s Estimate: N/A
MBE/WBE Participation: N/A
Plan Approval Date: N/A Type of Contract: N/A
Properties Affected: N/A Properties Benefiting: N/A
Designed by: N/A
FUNDING/COST SUMMARY:
Budgeted: N/A Budget Year: 2010-2011 Amount: 205,515,385
Fund Name: Budget Appropriation:
General Fund $158,169,385
Real Property Improvements & Alterations Fund $ 1,081,000
Water Backup Insurance & Reimbursement Fund $ 4,000,000
Total Operating Budget $163,250,385
Emergency Fund $ 250,000
Debt Service Fund $ 42,015,000
Total Budget Ordinance $205,515,385
Additional Comments: N/A
PREVIOUS BOARD ACTION RELATED TO THIS ACTION:
06/11/09 – Ordinance No. 12896 – Amount $191,829,726 – 2009-2010 Budget Ordinance
06/08/08 – Ordinance No. 12660 – Amount $186,478,554 – 2008-2009 Budget Ordinance
12/13/07 – Ordinance No. 12562 – Amount $174,440,980 – 2007-2008 Revised Budget Ordinance
06/01/07 – Ordinance No. 12466 – Amount $166,241,847 – 2007-2008 Budget Ordinance
06/08/06 – Ordinance No. 12221 – Amount $169,861,611 – 2006-2007 Budget Ordinance
26 of 5/13/10
AGENDA ITEM NUMBER: 33 – Proposed Ord. No. 177-10
NAME OF PROJECT: 2010 Tax Levy for the Metropolitan St. Louis Sewer District and its Various Subdistricts
LOCATION: N/A
TYPE OF PROJECT: N/A
DEPARTMENT REQUESTING ACTION: Secretary/ Treasurer and Finance
REQUESTED ACTION:
Why is this action necessary?: Annual requirement of The Plan of the District
What does action accomplish?: Levies tax rates to be applied to customers’ Real and Personal Property Assessed
Values to produce required revenues for operation and infrastructure projects.
SUMMARY EXPLANATION/BACKGROUND:
Contractor: N/A Previous District Contract: N/A
Consultant: N/A
Agency: N/A
Number of bidders: N/A Low Bid: N/A High Bid: N/A
Appropriation Amount: N/A District’s Estimate: N/A
MBE/WBE Participation: N/A
Plan Approval Date: N/A Type of Contract: N/A
Properties Affected: N/A Properties Benefiting: N/A
Designed by: N/A
FUNDING/COST SUMMARY:
Budgeted: N/A Budget Year: 2010-2011 Amount: N/A
Fund Name: N/A
Additional Comments: This action reduces the MSD customer tax levies and maintain them at zero with the associated
revenue replaced, as of March 1, 2008 by the District’s stormwater impervious area based rate.
PREVIOUS BOARD ACTION RELATED TO THIS ACTION:
03/12/09 – Ordinance No. 12834 – 2009 Tax Ordinance
06/02/08 – Ordinance No. 12661 – 2008 Tax Ordinance
10/11/07 – Ordinance No. 12526 – 2007 Tax Ordinance
06/08/06 – Ordinance No. 12222 – 2006 Tax Ordinance
06/09/05 – Ordinance No. 11990 – 2005 Tax Ordinance
27 of 5/13/10
AGENDA ITEM NUMBER: 34 – Proposed Ord. No. 178-10
NAME OF PROJECT: District Rate Modeling & Expert Testimony
LOCATION: Finance
TYPE OF PROJECT: Professional Services
DEPARTMENT REQUESTING ACTION: Finance
REQUESTED ACTION:
Why is this action necessary?: To execute a contract agreement for professional services with Black & Veatch
Corporation
What does action accomplish?: This action provides the District rate design development and expert testimony
required during the District’s anticipated FY11 Rate Commission deliberations.
SUMMARY EXPLANATION/BACKGROUND:
Contractor: Black & Veatch Corporation Previous District Contract: Yes
11401 Lamar Avenue
Overland Park Kansas 66211
Consultant: N/A
Agency: N/A
Number of bidders: N/A Low Bid: N/A High Bid: N/A
Appropriation Amount: $150,000 District’s Estimate: N/A
MBE/WBE Participation: N/A
Plan Approval Date: N/A Type of Contract: Professional – Sole Source
Properties Affected: N/A Properties Benefiting: N/A
Designed by: N/A
FUNDING/COST SUMMARY:
Budgeted: Finance Division Budget Budget Year: FY11 Amount: $150,000
Fund Name: General Fund
Additional Comments: Black & Veatch (B&V) is the developer of the comprehensive Rate model software used by the
District to develop it Rate Strategies and Rate Change Submittals. This software is highly customized for District use and
support by any other vendor is unavailable. B & V would also provide expert testimony for the District during anticipated
Rate Commission Deliberations.
PREVIOUS BOARD ACTION RELATED TO THIS ACTION:
02/14/2008 Ordinance No. 12595 – Amount: $50,000, Rate Model Support and Expert Testimony
11/10/2004 Ordinance No. 11896 – Amount: $20,000, Support and Review for District’s Rate Model
01/08/2004 Ordinance No. 11670 – Amount: $30,000, Reconstruct District Rate Model
28 of 5/13/10
AGENDA ITEM NUMBER: 35 – Proposed Ord. No. 179-10
NAME OF PROJECT: Third Party Claims Administration Services
LOCATION: District wide
TYPE OF PROJECT: Professional Service
DEPARTMENT REQUESTING ACTION: Risk Management
REQUESTED ACTION:
Why is this action necessary?: To provide claims administration services for water back-up, workers
compensation general liability, auto, errors & omissions, and any other claim
against the District and Trustees/District staff.
What does action accomplish?: This action provides an administrator for claims against the District including
adjustment costs.
SUMMARY EXPLANATION/BACKGROUND:
Contractor: Corporate Claims Management Inc. Previous District Contract: Yes
Consultant: N/A
Agency: N/A
Number of bidders: N/A Low Bid: N/A High Bid: N/A
Appropriation Amount: N/A District’s Estimate: N/A
MBE/WBE Participation: 20% R. T. Thomas & Co
Plan Approval Date: N/A Type of Contract: Installment
Properties Affected: N/A Properties Benefitting: N/A
Designed by: N/A
This contract provides claims administration for claims and adjustment costs. This ordinance will authorize the District to
enter into a contract with Corporate Claims Management Inc from July 1, 2010 to June 30, 2011. The contract provides for
an initial term of one (1) year with four (4) additional one-year renewal terms at the option of the District.
FUNDING/COST SUMMARY:
Budgeted: Risk Management Department’s Budget Budget Year: FY2011 Amount: $875,000.00
Fund Name: Water Back-Up Fund
Additional Comments: N/A
PREVIOUS BOARD ACTION RELATED TO THIS ACTION:
6/11/09 – Res. No. 2836 – Amount: $730,000-- Corporate Claims Management Inc.
4/10/08 – Res. No. 2775 – Amount: $730,000-- Corporate Claims Management Inc.
5/10/07 – Res. No. 2707 -- Amount: $730,000-- Corporate Claims Management Inc.
5/11/06 – Res. No. 2642 -- Amount: $730,000-- Corporate Claims Management Inc.
6/09/05 – Ord. No. 12008 – Amount: $730,000-- Corporate Claims Management Inc.
29 of 5/13/10
AGENDA ITEM NUMBER: 36 – Proposed Ord. No. 180-10
NAME OF PROJECT: Property and Boiler & Machinery Insurance Coverage
LOCATION: District wide
TYPE OF PROJECT: Purchase of Insurance
DEPARTMENT REQUESTING ACTION: Risk Management
REQUESTED ACTION:
Why is this action necessary?: To provide an element of loss control for the District’s Property and Boiler &
Machinery Insurance Program.
What does action accomplish?: This ordinance puts a cap on the amount of claims cost MSD could absorb from
incidents qualifying within the coverage summary definitions detailed under its
Property and Boiler & Machinery Insurance coverage.
SUMMARY EXPLANATION/BACKGROUND:
Contractor: N/A Previous District Contract: Yes
Consultant: N/A
Agency: F.M. Global Insurance Company, McGriff, Seibels & Williams of Missouri Inc., agent.
Number of bidders: N/A Low Bid: N/A High Bid: N/A
Appropriation Amount: N/A District’s Estimate: N/A
MBE/WBE Participation: N/A
Plan Approval Date: N/A Type of Contract: Lump Sum
Properties Affected: N/A Properties Benefitting: N/A
Designed by: N/A
This insurance provides replacement cost coverage for real and personal property in excess of the deductible and subject to
policy limits. This ordinance will authorize the District to enter into a contract with FM Global Insurance Company from July
1, 2010 to June 30, 2011.
FUNDING/COST SUMMARY:
Budgeted: Risk Management Department’s Budget Budget Year: FY2011 Amount: $786,521
Fund Name: N/A
Additional Comments: N/A
PREVIOUS BOARD ACTION RELATED TO THIS ACTION:
6/11/09 -- Ord. No. 12880 – Amount: $882,697–-FM Global Insurance Co.--Property and Boiler & Machinery Coverage
6/12/08 -- Ord. No. 12662 – Amount: $1,217,742–-FM Global Insurance Co.--Property and Boiler & Machinery Coverage
6/14/07 -- Ord. No. 12454 – Amount: $1,434,636–-FM Global Insurance Co.--Property and Boiler & Machinery Coverage
6/08/06 -- Ord. No. 12231 – Amount: $1,238,518–-FM Global Insurance Co.--Property and Boiler & Machinery Coverage
6/09/05 -- Ord. No. 11998 – Amount: $1,057,647–-FM Global Insurance Co.--Property and Boiler & Machinery Coverage
6/10/04 – Ord. No. 11753 – Amount: $1,085,924–-FM Global Insurance Co.--Property and Boiler & Machinery Coverage
30 of 5/13/10
AGENDA ITEM NUMBER: 37 – Proposed Ord. No. 181-10
NAME OF PROJECT: Excess Flood & Earth Movement Insurance Coverage
LOCATION: District wide
TYPE OF PROJECT: Purchase of Insurance
DEPARTMENT REQUESTING ACTION: Risk Management
REQUESTED ACTION:
Why is this action necessary?: To provide an element of loss control for Flood & Earth Movement in excess of
the amount of coverage provided by the District’s property and FEMA coverage.
What does action accomplish?: This ordinance increases the amount of the District’s insurance coverage for
incidents of Flood and Earth Movement.
SUMMARY EXPLANATION/BACKGROUND:
Contractor: N/A Previous District Contract: Yes
Consultant: N/A
Agency: F.M. Global Insurance Company, McGriff, Seibels & Williams of Missouri Inc., agent.
Number of bidders: N/A Low Bid: N/A High Bid: N/A
Appropriation Amount: N/A District’s Estimate: N/A
MBE/WBE Participation: N/A
Plan Approval Date: N/A Type of Contract: Lump Sum
Properties Affected: N/A Properties Benefitting: N/A
Designed by: N/A
This insurance provides $22,750,000 replacement cost coverage for flood for real and personal property in excess of the
policy limits provided under the NFIP through FEMA. The insurance provides $50,000,000 replacement cost coverage for
real and personal property for earth movement. This ordinance will authorize the District to enter into a contract with FM
Global Insurance Company from July 1, 2010 to June 30, 2011.
FUNDING/COST SUMMARY:
Budgeted: Risk Management Department’s Budget Budget Year: FY2011 Amount: $781,583.00
Fund Name: N/A
Additional Comments: N/A
PREVIOUS BOARD ACTION RELATED TO THIS ACTION:
6/11/09 -- Ord. No. 12881 – Amount: $846,600–-FM Global Insurance Co.—Excess Flood Coverage
6/12/08 -- Ord. No. 12663 – Amount: $512,625–-FM Global Insurance Co.—Excess Flood Coverage
6/14/07 -- Ord. No. 12455 – Amount: $415,000–-FM Global Insurance Co.—Excess Flood Coverage
6/08/06 -- Ord. No. 12232 – Amount: $430,000–-FM Global Insurance Co.—Excess Flood Coverage
6/09/05 – Ord. No. 11999 – Amount: $484,300-- Lexington/Great American Insurance Companies
6/10/04 – Ord. No. 11754 – Amount: $465,535-- Lexington/Great American Insurance Companies
31 of 5/13/10
AGENDA ITEM NUMBER: 38 – Proposed Ord. No. 182-10
NAME OF PROJECT: National Flood Insurance Program (NFIP)
LOCATION: Specified District locations: Missouri River, Grand Glaize, Sulphur, Bissell, Meramec Bottoms, Master Lift.
TYPE OF PROJECT: Purchase of Insurance
DEPARTMENT REQUESTING ACTION: Risk Management
REQUESTED ACTION:
Why is this action necessary?: The FEMA policies provide first dollar flood insurance coverage for those
facilities that are situated within Zone A, B & C Floodways.
What does action accomplish?: This ordinance provides first dollar insurance coverage for properties located in
the flood plain, and is required as part of our insurance coverage.
SUMMARY EXPLANATION/BACKGROUND:
Contractor: N/A Previous District Contract: Yes
Consultant: N/A
Agency: National Flood Insurance Program (Selective Insurance Company) R. T. Thomas Company, agent.
Number of bidders: N/A Low Bid: N/A High Bid: N/A
Appropriation Amount: N/A District’s Estimate: N/A
MBE/WBE Participation: N/A
Plan Approval Date: N/A Type of Contract: Lump Sum
Properties Affected: N/A Properties Benefitting: N/A
Designed by: N/A
This insurance provides actual cash value coverage for real and personal property in excess of the deductible, and subject to
policy limits. This ordinance will authorize the District to enter into a contract with National Flood Insurance Program (FEMA
and Selective Insurance Company) from July 1, 2010 to June 30, 2011.
FUNDING/COST SUMMARY:
Budgeted: Risk Management Department’s Budget Budget Year: FY2011 Amount: $135,000.00
Fund Name: N/A
Additional Comments: N/A
PREVIOUS BOARD ACTION RELATED TO THIS ACTION:
6/11/09 -- Ord. No. 12882 – Amount: $135,000 -- Federal Emergency Management Agency
6/12/08 -- Ord. No. 12664 – Amount: $135,000 -- Federal Emergency Management Agency
6/14/07 -- Ord. No. 12456 – Amount: $99,500 -- Federal Emergency Management Agency
6/08/06 – Ord. No. 12233 – Amount: $99,509 -- Federal Emergency Management Agency
6/09/05 – Ord. No. 12000 – Amount: $89,000 -- Federal Emergency Management Agency
6/10/04 – Ord. No. 11755 – Amount: $89,000 -- Federal Emergency Management Agency
32 of 5/13/10
AGENDA ITEM NUMBER: 39 – Proposed Ord. No. 183-10
NAME OF PROJECT: Excess Workers’ Compensation Insurance Coverage
LOCATION: District wide
TYPE OF PROJECT: Purchase of Insurance
DEPARTMENT REQUESTING ACTION: Risk Management
REQUESTED ACTION:
Why is this action necessary?: To provide an element of loss control for the District’s Workers’ Compensation
insurance program.
What does action accomplish?: This ordinance puts a cap on the amount of claims cost MSD could absorb
from its Workers’ Compensation insurance program.
SUMMARY EXPLANATION/BACKGROUND:
Contractor: N/A Previous District Contract: Yes
Consultant: N/A
Agency: Midwest Employers Casualty Company, McGriff, Seibels & Williams of Missouri, Inc., agent.
Number of bidders: N/A Low Bid: N/A High Bid: N/A
Appropriation Amount: N/A District’s Estimate: N/A
MBE/WBE Participation: N/A
Plan Approval Date: N/A Type of Contract: Lump Sum
Properties Affected: N/A Properties Benefitting: N/A
Designed by: N/A
This insurance coverage indemnifies MSD against loss claim expense in excess of the retention level as a result of Workers’
Compensation of Employers Liability, subject to policy limits. This ordinance will authorize the District to enter into a contract
with Midwest Employers Casualty Company from July 1, 2010 to June 30, 2011. The contract provides for an initial term of
one (1) year with one (1) additional one-year renewal term at the same rate.
FUNDING/COST SUMMARY:
Budgeted: Risk Management Department’s Budget Budget Year: FY2011 Amount: $280,802.00
Fund Name: N/A
Additional Comments: N/A
PREVIOUS BOARD ACTION RELATED TO THIS ACTION:
6/11/09 -- Ord. No. 12884 – Amount: $268,877 -- Midwest Employers Casualty Company
6/12/08 -- Ord. No. 12666 – Amount: $268,877 -- Midwest Employers Casualty Company
6/14/07 -- Ord. No. 12458 – Amount: $234,343 -- Midwest Employers Casualty Company
6/08/06 -- Ord. No. 12236 – Amount: $218,091 -- Midwest Employers Casualty Company
6/09/05 -- Ord. No. 12002 – Amount: $203,273 -- Midwest Employers Casualty Company
6/10/04 -- Ord. No. 11759 – Amount: $207,015 -- Midwest Employers Casualty Company
33 of 5/13/10
AGENDA ITEM NUMBER: 40 – Proposed Ord. No. 184-10
NAME OF PROJECT: Fiduciary Liability Insurance Coverage
LOCATION: District wide
TYPE OF PROJECT: Purchase of Insurance
DEPARTMENT REQUESTING ACTION: Risk Management
REQUESTED ACTION:
Why is this action necessary?: To provide an element of loss control for the District’s Fiduciary Liability
insurance program.
What does action accomplish?: This ordinance puts a cap on the amount of claims cost MSD could absorb from
an incident falling within the definition of Fiduciary Liability.
SUMMARY EXPLANATION/BACKGROUND:
Contractor: N/A Previous District Contract: Yes
Consultant: N/A
Agency: Federal (Chubb) Insurance Company, McGriff, Seibels & Williams of Missouri, Inc., agent.
Number of bidders: N/A Low Bid: N/A High Bid: N/A
Appropriation Amount: N/A District’s Estimate: N/A
MBE/WBE Participation: N/A
Plan Approval Date: N/A Type of Contract: Lump Sum
Properties Affected: N/A Properties Benefitting: N/A
Designed by: N/A
This insurance coverage pays, on behalf of MSD, all sums in excess of the deductible, that the District becomes legally
obligated to pay as a result of Breach of Fiduciary Duty, subject to policy limits. This ordinance will authorize the District to
enter into a contract with Federal (Chubb) Insurance Company from July 1, 2010 to June 30, 2011.
FUNDING/COST SUMMARY:
Budgeted: Risk Management Department’s Budget Budget Year: FY2011 Amount: $73,227.00
Fund Name: N/A
Additional Comments: N/A
PREVIOUS BOARD ACTION RELATED TO THIS ACTION:
6/11/09 – Ord. No. 12886 – Amount: $66,570-- Federal (Chubb) Insurance Company
6/12/08 – Ord. No. 12668 – Amount: $63,400-- Federal (Chubb) Insurance Company
6/14/07 – Ord. No. 12460 – Amount: $60,385-- Federal (Chubb) Insurance Company
6/08/06 – Ord. No. 12238 – Amount: $56,438-- Federal (Chubb) Insurance Company
6/09/05 – Ord. No. 12004 – Amount: $52,500-- Federal (Chubb) Insurance Company
6/10/04 – Ord. No. 11761 – Amount: $53,955 -- Federal (Chubb) Insurance Company
34 of 5/13/10
AGENDA ITEM NUMBER: 41 – Proposed Ord. No. 185-10
NAME OF PROJECT: Commercial Crime Insurance Coverage
LOCATION: District wide
TYPE OF PROJECT: Purchase of Insurance
DEPARTMENT REQUESTING ACTION: Risk Management
REQUESTED ACTION:
Why is this action necessary?: To provide an element of loss control for the District’s Crime insurance program.
What does action accomplish?: This ordinance puts a cap on the amount of claims cost MSD could absorb from
an incident falling within the definition of Commercial Crime.
SUMMARY EXPLANATION/BACKGROUND:
Contractor: N/A Previous District Contract: Yes
Consultant: N/A
Agency: Federal (Chubb) Insurance Company, McGriff, Seibels & Williams of Missouri, Inc., agent.
Number of bidders: N/A Low Bid: N/A High Bid: N/A
Appropriation Amount: N/A District’s Estimate: N/A
MBE/WBE Participation: N/A
Plan Approval Date: N/A Type of Contract: Lump Sum
Properties Affected: N/A Properties Benefitting: N/A
Designed by: N/A
This insurance coverage indemnifies MSD against loss and claim expense in excess of the deductible level as a result of a
Commercial Crime event, subject to policy limits. This ordinance will authorize the District to enter into a contract with
Federal (Chubb) Insurance Company from July 1, 2010 to June 30, 2011.
FUNDING/COST SUMMARY:
Budgeted: Risk Management Department’s Budget Budget Year: FY2011 Amount: $41,215.00
Fund Name: N/A
Additional Comments: N/A
PREVIOUS BOARD ACTION RELATED TO THIS ACTION:
6/11/09 – Ord. No. 12887 – Amount: $41,215 – Federal Insurance Company
6/12/08 – Ord. No. 12669 – Amount: $39,630 – Federal Insurance Company
6/14/07 – Ord. No. 12461 – Amount: $39,630 – Federal Insurance Company
6/08/06 – Ord. No. 12239 – Amount: $36,860 – Federal Insurance Company
6/09/05 – Ord. No. 12005 – Amount: $34,288 – Federal Insurance Company
6/10/04 – Ord. No. 11762 – Amount: $31,185 – Federal (Chubb) Insurance Company
35 of 5/13/10
AGENDA ITEM NUMBER: 42 – Proposed Ord. No. 186-10
NAME OF PROJECT: Underground Storage Tank Insurance
LOCATION: Specified District Locations – Plants and Maintenance Yards
TYPE OF PROJECT: Purchase of Insurance
DEPARTMENT REQUESTING ACTION: Risk Management
REQUESTED ACTION:
Why is this action necessary?: This insurance contract provides coverage for claims arising from leaking.
What does action accomplish?: This policy limits the District’s exposure for remediation and damages arising
from leaking underground storage tanks.
SUMMARY EXPLANATION/BACKGROUND:
Contractor: N/A Previous District Contract: Yes
Consultant: N/A
Agency: Missouri Underground Storage Tank Fund
Number of bidders: N/A Low Bid: N/A High Bid: N/A
Appropriation Amount: N/A District’s Estimate: N/A
MBE/WBE Participation: N/A
Plan Approval Date: N/A Type of Contract: Lump Sum
Properties Affected: N/A Properties Benefitting: N/A
Designed by: N/A
This ordinance will authorize the District to enter into a contract with Missouri Underground Storage Tank Fund from July 1,
2010 to June 30, 2011.
FUNDING/COST SUMMARY:
Budgeted: Risk Management Department’s Budget Budget Year: FY2011 Amount: $3,000.00
Fund Name: N/A
Additional Comments: The District maintains approximately 20 underground storage tanks that contain primarily
petroleum products, and to a lesser extent, certain chemicals used in the treatment process.
PREVIOUS BOARD ACTION RELATED TO THIS ACTION:
6/11/09 – Ord. No. 12888 – Amount: $3,000 -- Missouri Underground Storage Tank Fund
6/12/08 – Ord. No. 12670 – Amount: $3,000 -- Missouri Underground Storage Tank Fund
6/14/07 – Ord. No. 12462 – Amount: $3,000 -- Missouri Underground Storage Tank Fund
6/08/06 – Ord. No. 12240 – Amount: $3,000 -- Missouri Underground Storage Tank Fund
6/09/05 – Ord. No. 12006 – Amount: $3,000 -- Missouri Underground Storage Tank Fund
6/10/04 – Ord. No. 11763 – Amount: $3,000 -- Missouri Underground Storage Tank Fund
36 of 5/13/10
AGENDA ITEM NUMBER: 43 – Proposed Ord. No. 187-10
NAME OF PROJECT: Major Facility Pollution Liability Insurance Coverage
LOCATION: Various Treatment Plants
TYPE OF PROJECT: Purchase of Insurance
DEPARTMENT REQUESTING ACTION: Risk Management
REQUESTED ACTION:
Why is this action necessary?: This program provides coverage for pollution losses emanating from the
treatment plants.
What does action accomplish?: This coverage limits the exposure to the District from claims arising from
pollution losses at the plants.
SUMMARY EXPLANATION/BACKGROUND:
Contractor: N/A Previous District Contract: Yes
Consultant: N/A
Agency: Zurich (Steadfast) Insurance Company, McGriff, Seibels & Williams of Missouri, Inc., agent.
Number of bidders: N/A Low Bid: N/A High Bid: N/A
Appropriation Amount: N/A District’s Estimate: N/A
MBE/WBE Participation: N/A
Plan Approval Date: N/A Type of Contract: Lump Sum
Properties Affected: N/A Properties Benefitting: N/A
Designed by: N/A
This ordinance will authorize the District to enter into a contract with Zurich (Steadfast) Insurance Company
from July 1, 2010 to June 30, 2011 for the District’s Facility Pollution Liability coverage. This policy provides $10 million of
coverage above a $500,000 self-insured retention for pollution environmental claims.
FUNDING/COST SUMMARY:
Budgeted: Risk Management Department’s Budget Budget Year: FY2011 Amount: $93,285.00
Fund Name: N/A
Additional Comments: N/A
PREVIOUS BOARD ACTION RELATED TO THIS ACTION:
6/11/09 – Ord. No. 12889 – Amount: $95,562 – Zurich (Steadfast) Insurance Company
6/12/08 – Ord. No. 12677 – Amount: $95,562 – Zurich (Steadfast) Insurance Company
6/14/07 – Ord. No. 12463 – Amount: $111,912 – American International Group Insurance Company
6/08/06 – Ord. No. 12241 – Amount: $139,610 – American International Group Insurance Company
6/09/05 – Ord. No. 12007 – Amount: $156,619 – Steadfast Insurance Company
6/10/04 – Ord. No. 11764 – Amount: $177,876 – XL Environmental Insurance Company
37 of 5/13/10
AGENDA ITEM NUMBER: 44 – Proposed Ord. No. 188-10
NAME OF PROJECT: Blocked Main and Overcharged Line Back-Up Insurance Program
LOCATION: District wide
TYPE OF PROJECT: Purchase of Insurance
DEPARTMENT REQUESTING ACTION: Risk Management
REQUESTED ACTION:
Why is this action necessary?: To provide an element of loss control for the District’s Blocked Main and
Overcharged Line back-up insurance program.
What does action accomplish?: This ordinance provides financial protection from catastrophic losses on the
amount of claims cost MSD could absorb from its blocked sewer and over
system capacity programs.
SUMMARY EXPLANATION/BACKGROUND:
Contractor: N/A Previous District Contract: Yes
Consultant: N/A
Agency: Zurich (Steadfast) Insurance Company, McGriff, Seibels & Williams of Missouri, Inc., agent.
Number of bidders: N/A Low Bid: N/A High Bid: N/A
Appropriation Amount: N/A District’s Estimate: N/A
MBE/WBE Participation: N/A
Plan Approval Date: N/A Type of Contract: Lump Sum
Properties Affected: N/A Properties Benefiting: N/A
Designed by: N/A
Since 1995 MSD has sponsored an insurance program that compensates customers for damage arising from sewer backups
that were caused by blocked sewer mains. This ordinance will authorize the District to enter into a contract with Zurich
(Steadfast) Insurance Company from July 1, 2010 to June 30, 2011. The policy provides $10,000,000 of coverage above a
deductible of $8,500,000.
FUNDING/COST SUMMARY:
Budgeted: Water Backup Insurance and Budget Year: FY2011 Amount: $370,985.00
Reimbursement Fund
Fund Name: Wastewater Revenue Fund
Additional Comments: N/A
PREVIOUS BOARD ACTION RELATED TO THIS ACTION:
6/11/09 -- Ord. No. 12891 – Amount: $373,485 – Zurich (Steadfast) Insurance
6/12/08 -- Ord. No. 12678 – Amount: $585,000 – Zurich (Steadfast) Insurance
6/14/07 -- Ord. No. 12465 – Amount: $650,000 – American International Group Insurance
11/10/05 – Ord. No. 12124 – Amount: $1,137,500 – American International Group Insurance
11/10/04 -- Ord. No. 11889 – Amount: $797,387 -- Zurich Insurance Company
6/10/04 – Ord. No. 11758 – Amount: $809,236 – Indian Harbor Insurance
38 of 5/13/10
AGENDA ITEM NUMBER: 45 – Proposed Ord. No. 189-10
NAME OF PROJECT: Independent Audit for the Fiscal Year Ending June 30, 2011
LOCATION: N/A
TYPE OF PROJECT: Annual Independent Audit
DEPARTMENT REQUESTING ACTION: Board of Trustees
Why is this action necessary: To select a Certified Public Accountant to perform the Annual Independent Audit as
required by Section 7.080 of the Plan.
What does action accomplish: Authorizes the District to enter into a professional services contract for the Annual
Independent Audit of the Fiscal Year ending June 30, 2011.
SUMMARY EXPLANATION/BACKGROUND:
Contractor: N/A Previous District Contract: yes Performed Annual
Independent Audit for the District for the Fiscal year ending 2009 and a special review as of the new system conversion on
April 1, 2010.
Consultant: Schmersahl Treloar & Co., PC
3660 S. Geyer Road
St. Louis, Missouri 63127
Agency: N/A
Number of bidders: N/A Low Bid: $ N/A High Bid: N/A
Appropriation Amount: $ N/A District’s Estimate: $ 130,000
MBE/WBE Participation: 25%
Plan Approval Date: N/A Type of Contract: Lump Sum
Properties Affected: N/A Properties Benefiting: N/A
Designed by: N/A
FUNDING/COST SUMMARY:
Budgeted: Secretary-Treasurer Budget Year: 2011 Amount: $ 130,000
Fund Name: N/A
Additional Comments: This is the second year of a two-year engagement. The term of the external auditor is renewed
annually and the fee is set through a multi-year proposal process.
PREVIOUS BOARD ACTION RELATED TO THIS ACTION:
7/9/09 - Ord. No. 12907 - Amount: $ 112,500 - Schmersahl Treloar & Co.
39 of 5/13/10
AGENDA ITEM NUMBER: 46 – Resolution No. 2905
NAME OF PROJECT: General Services Agreement – Geotechnical Services (FY2009) (E-1241-1 & 2009041)
LOCATION: Various locations within the District
TYPE OF PROJECT: General geotechnical services
DEPARTMENT REQUESTING ACTION: Engineering
REQUESTED ACTION:
Why is this action necessary?: Authorizes staff to amend a geotechnical contract
What does action accomplish?: Supplements District staff during peak workloads
SUMMARY EXPLANATION/BACKGROUND:
Contractor: N/A Previous District Contract: Yes
Consultant: Stantec Consulting Services Inc. Corporate Headquarters: Edmonton, Alberta, Canada
1859 Bowles Avenue, Suite 250
St. Louis, MO 63026
Agency: N/A
Number of proposers: N/A
Appropriation Amount: N/A Designer’s Estimate: N/A
MBE/WBE Participation: 22% - Tech Service, Inc. – MBE
Plan Approval Date: N/A Type of Contract: Hourly Billing Rate
Properties Affected: N/A Properties Benefiting: N/A
Designed by: N/A
This resolution authorizes the District to enter into Amendment No. 1 with Stantec Consulting Services Inc. for geotechnical
services associated with the design of sanitary, combined, storm sewer, and treatment plant projects as needed throughout
the District. Services provided include rock and soil analysis, testing, recommendations and evaluation of foundations,
slopes, and bedding for projects to be completed either in-house or by design consultants. Projects will be issued by letter
agreement per individual scopes of services. Stantec Consulting Services Inc. was previously chosen as lead consultant
through the regular consultant review and selection process. This project has staff recommendation of Stantec Consulting
Services Inc. to continue as lead Geotechnical Consultant for all projects under this General Services Agreement. This
contract amendment for $35,000 is included in the FY2010 Engineering Department’s Operating Budget for a total contract
of $85,000. This will be the only amendment for this contract. This project is scheduled to be competitively selected in
FY2012.
FUNDING/COST SUMMARY:
Budgeted: Engineering Department’s Operating Budget Budget Year: FY2010 Amount: $35,000
Fund Name: N/A
Additional Comments: None.
PREVIOUS BOARD ACTION RELATED TO THIS ACTION:
09/11/08 – Ord. No. 12740 – Stantec Consulting Services Inc. – Original contract
06/11/09 – Ord. No. 12896 – FY2009-2010 Budget Appropriation
40 of 5/13/10
AGENDA ITEM NUMBER: 47 – Resolution No. 2906
NAME OF PROJECT: General Services Agreement – Construction Management (FY2009) (E-1242-1 & 2009042)
LOCATION: Various locations within the District
TYPE OF PROJECT: General construction management services
DEPARTMENT REQUESTING ACTION: Engineering
REQUESTED ACTION:
Why is this action necessary?: Authorizes staff to amend a contract
What does action accomplish?: Provides construction management services for contract or development projects
SUMMARY EXPLANATION/BACKGROUND:
Contractor: N/A Previous District Contract: Yes
Consultant: Gonzalez Companies, LLC
3830 Washington Blvd., Suite 128
St. Louis, MO 63108
Agency: N/A
Number of proposers: N/A
Appropriation Amount: N/A Designer’s Estimate: N/A
MBE/WBE Participation: 100% - MBE
Plan Approval Date: N/A Type of Contract: Hourly Billing Rate
Properties Affected: To be determined Properties Benefiting: To be determined
Designed by: N/A
This resolution authorizes the District to enter into Amendment No. 1 with Gonzalez Companies, LLC for various construction
management services on an as needed basis to supplement the District’s work force. The projects are located throughout
the District in various cities and the County. The estimated construction cost varies. Projects will be issued by letter
agreement per individual scopes of services. Gonzalez Companies was previously chosen as lead consultant through the
regular consultant review and selection process. This project has staff recommendation of Gonzalez Companies to continue
as lead consultant for all projects under this General Services Agreement. This contract amendment for $100,000 is
included in the FY2010 Engineering Department’s Operating Budget for a total contract amount of $200,000.00. This will be
the only amendment for this contract. This project is scheduled to be competitively selected in FY2012.
FUNDING/COST SUMMARY:
Budgeted: Engineering Department’s Operating Budget Budget Year: FY2010 Amount: $100,000
Fund Name: N/A
Additional Comments: None.
PREVIOUS BOARD ACTION RELATED TO THIS ACTION:
09/11/08 – Ord. No. 12741 – Gonzalez Companies, LLC – Original contract
06/11/09 – Ord. No. 12896 – FY2009-2010 Budget Appropriation
41 of 5/13/10
AGENDA ITEM NUMBER: 48A – INTRO & ADOPT AT NEXT BOARD MEETING
NAME OF PROJECT: Excess (Umbrella) Liability Program
LOCATION: District wide
TYPE OF PROJECT: Purchase of Insurance
DEPARTMENT REQUESTING ACTION: Risk Management
REQUESTED ACTION:
Why is this action necessary?: This line of insurance provides additional liability limits coverage included in the
combined liability program.
What does action accomplish?: This action authorizes an insurance contract for an additional $15,000,000 of
liability coverage above the $2,000,000 limit under our Combined Liability
Program.
SUMMARY EXPLANATION/BACKGROUND:
Contractor: N/A Previous District Contract: Yes
Consultant: N/A
Agency: _______________________________ Insurance Company, McGriff, Seibels & Williams of Missouri, Inc., agent.
Number of bidders: N/A Low Bid: N/A High Bid: N/A
Appropriation Amount: N/A District’s Estimate: N/A
MBE/WBE Participation: N/A
Plan Approval Date: N/A Type of Contract: Lump Sum
Properties Affected: N/A Properties Benefitting: N/A
Designed by: N/A
This insurance provides coverage for liability claims and defense costs. This ordinance will authorize the District to enter into
a contract with __________________________ Insurance Company from July 1, 2010 to June 30, 2011.
FUNDING/COST SUMMARY:
Budgeted: Risk Management Department’s Budget Budget Year: FY2011 Amount: $________.00
Fund Name: N/A
Additional Comments: N/A
PREVIOUS BOARD ACTION RELATED TO THIS ACTION:
6/11/09 -- Ord. No. 12883 – Amount: $162,500 – Travelers Insurance Company
6/12/08 -- Ord. No. 12665 – Amount: $155,000 – Travelers Insurance Company
6/14/07 -- Ord. No. 12457 – Amount: $190,883 – Travelers Insurance Company
6/08/06 -- Ord. No. 12235 – Amount: $212,000 – St Paul-Travelers Insurance Company
6/09/05 -- Ord. No. 12001 – Amount: $330,000 -- Clarendon America Insurance Co/Princeton Excess Insurance Co
6/10/04 -- Ord. No. 11757 – Amount: $328,000 -- Clarendon America Insurance Co/American Reinsurance
42 of 5/13/10
AGENDA ITEM NUMBER: 48B – INTRO AND ADOPT AT THE NEXT BOARD MEETING
NAME OF PROJECT: Combined Liability Insurance Program
LOCATION: District wide
TYPE OF PROJECT: Purchase of Insurance
DEPARTMENT REQUESTING ACTION: Risk Management
REQUESTED ACTION:
Why is this action necessary?: To provide general liability, auto, management errors & omissions, and
employment practices liability coverage for the District and Trustees/District staff.
What does action accomplish?: This action provides coverage for liability type claims including defense Costs.
SUMMARY EXPLANATION/BACKGROUND:
Contractor: N/A Previous District Contract: Yes
Consultant: N/A
Agency: _________________________________________ Insurance Company, McGriff, Seibels & Williams of Missouri,
Inc., agent.
Number of bidders: N/A Low Bid: N/A High Bid: N/A
Appropriation Amount: N/A District’s Estimate: N/A
MBE/WBE Participation: N/A
Plan Approval Date: N/A Type of Contract: Lump Sum
Properties Affected: N/A Properties Benefiting: N/A
Designed by: N/A
This insurance provides coverage for liability claims and defense costs. This ordinance will authorize the District to enter into
a contract with ______________________________ Insurance Company from July 1, 2010 to June 30, 2011. The policy
provides $2,000,000 of coverage above a $100,000 deductible.
FUNDING/COST SUMMARY:
Budgeted: Risk Management Department’s Budget Budget Year: FY2011 Amount: $_________.00
Fund Name: N/A
Additional Comments: N/A
PREVIOUS BOARD ACTION RELATED TO THIS ACTION:
6/11/09 -- Ord. No. 12890 – Amount: $567,746 -- Travelers Insurance Companies
6/12/08 -- Ord. No. 12671 – Amount: $536,102 -- Travelers Insurance Companies
6/14/07 -- Ord. No. 12464 – Amount: $464,775 -- Travelers Insurance Companies
6/08/06 – Ord. No. 12234 – Amount: $448,605 -- St Paul Travelers Insurance Companies
12/8/05 – Ord. No. 12141 – Amount: $435,434 -- MOPERM
12/9/04 – Ord. No. 11906 – Amount: $418,051 -- MOPERM