Loading...
HomeMy Public PortalAbout1497th Board Agenda 2-10-2011 revREVISED PAGES 6, 7 & 19 2/10/11 A G E N D A 1497th MEETING OF THE BOARD OF TRUSTEES THE METROPOLITAN ST. LOUIS SEWER DISTRICT February 10, 2011 – 3:00 P.M. MSD OFFICES 2350 MARKET STREET ROOM 109 ROLL CALL THE BOARD OF TRUSTEES WILL BE IN CLOSED SESSION BETWEEN 3:00 P.M. AND 5:00 P.M. 1 CLOSED SESSION TO DISCUSS LEGAL, CONFIDENTIAL OR PRIVILEGED MATTERS UNDER §610.021(1), RSMO 1988 SUPP. 2 APPROVAL OF JOURNAL OF PRECEDING MEETINGS January 13, 2011 (1496th) 3 COMMENTS BY THE CHAIR 4 REPORT OF BOARD COMMITTEES 5 REPORT OF EXECUTIVE DIRECTOR 6 COMMENTS FROM THE PUBLIC 7 SUBMISSION OF PUBLIC HEARING REPORTS – None 8 COMMUNICATIONS – None 9 CONSENT AGENDA – Item Nos. 10 through 37 2 of 2/10/11 Ordinances 10 Adoption of proposed Ord. No. 79-11 appropriating $132,000.00 from the Operation, Maintenance and Construction Improvement Fund of Coldwater Creek to be used for project costs for the construction of storm sewers in CC-013 Storm Sewer System Replacement (10291), in the City of Florissant, Missouri; and authorizing the Executive Director and Secretary-Treasurer on behalf of The Metropolitan St. Louis Sewer District to enter into a contract with J. H. Berra Const. Co., Inc. for the aforesaid storm sewer construction. (Intro. 1/13/11) 11 Adoption of proposed Ord. No. 80-11 making a supplemental appropriation of $1,500,000.00 from the Sanitary Replacement Fund for CCTV Inspection and Physical Inspection of Sewers - North (FY2011) (10376) and authorizing the Executive Director and Secretary-Treasurer on behalf of The Metropolitan St. Louis Sewer District to enter into Amendment No. 5 to Contract No. 10615 with ADS Environmental Services, LLC for the aforesaid services. (Intro. 1/13/11) 12 Adoption of proposed Ord. No. 81-11 making a supplemental appropriation of $1,500,000.00 from the Sanitary Replacement Fund for CCTV Inspection and Physical Inspection of Sewers - South (FY2011) (10377) and authorizing the Executive Director and Secretary-Treasurer on behalf of The Metropolitan St. Louis Sewer District to enter into Amendment No. 3 to Contract No. 10616 with Ace Pipe Cleaning, Inc. for the aforesaid services. (Intro. 1/13/11) 13 Adoption of proposed Ord. No. 82-11 appropriating $110,000.00 from the Sanitary Replacement Fund to be used for project costs for the rehabilitation of sanitary sewers in Capilia Sanitary Relief (SKME-511) (Rehabilitation) (10115), in the Cities of Crestwood and Grantwood Village, Missouri; and authorizing the Executive Director and Secretary-Treasurer on behalf of The Metropolitan St. Louis Sewer District to enter into a contract with Gaehle Grading LLC for the aforesaid rehabilitation. (Intro. 1/13/11) 14 Adoption of proposed Ord. No. 83-11 appropriating $1,240,000.00 from the Sanitary Replacement Fund to be used for project costs for the construction of sanitary sewers in CC-15 Seven Pines to Bennington Place Sanitary Relief Phase II (SKME-033) (10406), in the Cities of Maryland Heights and Unincorporated St. Louis County, Missouri; and authorizing the Executive Director and Secretary-Treasurer on behalf of The Metropolitan St. Louis Sewer District to enter into a contract with Unnerstall Contracting Co., Ltd. for the aforesaid sanitary sewer construction. (Intro. 1/13/11) 15 Adoption of proposed Ord. No. 84-11 appropriating $540,000.00 from the Sanitary Replacement Fund to be used for project costs for the public and private inflow/infiltration removal and sanitary sewer construction in Fallbrook - Devondale I/I Reduction (SKME-644 & 645) (10381), in the Cities of Creve Coeur, Frontenac, Town and Country, and the Village of Westwood, Missouri; and authorizing the Executive Director and Secretary-Treasurer on behalf of The Metropolitan St. Louis Sewer District to enter into a contract with Insituform Technologies USA, Inc. for the aforesaid rehabilitation. 16 Adoption of proposed Ord. No. 85-11 appropriating $690,000.00 from the Sanitary Replacement Fund to be used for sanitary sewer construction at Glendale Section D Sanitary Relief (SKME- 624) (10162), in the City of Glendale, Missouri; and authorizing the Executive Director and Secretary-Treasurer on behalf of The Metropolitan St. Louis Sewer District to enter into a contract with Bates Utility Company, Inc. for the construction of the aforesaid sewers. 3 of 2/10/11 17 Adoption of proposed Ord. No. 86-11 appropriating $2,600,000.00 from the Sanitary Replacement Fund to be used for project costs for the construction of sanitary sewers in Tower Grove - Manchester Combined Sewer System Phase II (Utah & Humphrey Storm Relief Sewers) (10778), in the City of St. Louis, Missouri; and authorizing the Executive Director and Secretary- Treasurer on behalf of The Metropolitan St. Louis Sewer District to enter into a contract with Gershenson Const. Co., Inc. for the aforesaid sanitary sewer construction. 18 Adoption of proposed Ord. No. 87-11 appropriating $71,000.00 from the Operation, Maintenance and Construction Improvement Fund of Creve Coeur Frontenac to be used for project costs for the construction of storm sewers in Chalet Court Storm Sewer (10280), in the City of Frontenac, Missouri; and authorizing the Executive Director and Secretary-Treasurer on behalf of The Metropolitan St. Louis Sewer District to enter into a contract with Wehmeyer Farms, Inc. for the aforesaid storm sewer construction. 19 Adoption of proposed Ord. No. 88-11 appropriating $38,000.00 from the Operation, Maintenance and Construction Improvement Fund of Black Jack – Dellwood to be used for project costs for the construction of storm sewers in Count Drive #10556 Storm Sewer (10560), in Unincorporated St. Louis County, Missouri; and authorizing the Executive Director and Secretary-Treasurer on behalf of The Metropolitan Unincorporated St. Louis Sewer District to enter into a contract with Denney, Gaines & Rogers LLC, for the construction of the aforesaid storm sewers. 20 Adoption of proposed Ord. No. 89-11 appropriating $63,000.00 from the Operation, Maintenance and Construction Improvement Fund of Sugar Creek to be used for project costs for creek stabilization in Iris Lane Bank Stabilization (10668), in the City of Kirkwood, Missouri; and authorizing the Executive Director and Secretary-Treasurer on behalf of The Metropolitan St. Louis Sewer District to enter into a contract with Dizdar Bros. Sewer & Const. for the aforesaid creek stabilization. 21 Adoption of proposed Ord. No. 90-11 appropriating $460,000.00 from the Operation, Maintenance and Construction Improvement Fund of Gravois Creek to be used for project costs for channel stabilization in Malus & Green Park Storm Sewer (10252), in Unincorporated St. Louis County, Missouri; and authorizing the Executive Director and Secretary-Treasurer on behalf of The Metropolitan St. Louis Sewer District to enter into a contract with Ideal Landscape Group for the aforesaid construction. 22 Adoption of proposed Ord. No. 91-11 appropriating $893,000.00 from the Sanitary Replacement Fund for engineering services for the final/preliminary design of GC-06 Gravois Creek to Briarstone and Gates Sanitary Relief (10611); and authorizing the Executive Director and Secretary-Treasurer on behalf of The Metropolitan St. Louis Sewer District to enter in to Contract No. 10613 with George Butler Associates, Inc. for the aforesaid engineering services. 23 Adoption of proposed Ord. No. 92-11 appropriating $643,000.00 from the Sanitary Replacement Fund for engineering services for the final design of Old Mill Creek Sewer Rehabilitation Phase III – 14th to 2nd Street (10722); and authorizing the Executive Director and Secretary-Treasurer on behalf of The Metropolitan St. Louis Sewer District to enter into Contract No. 10614 with Parsons Water & Infrastructure, Inc., for the aforesaid engineering services. 4 of 2/10/11 24 Adoption of proposed Ord. No. 93-11 appropriating $3,700,000.00 from the Sanitary Replacement Fund for engineering services for the Missouri WWTP Secondary Treatment Expansion and Disinfection at Various Treatment Plants (10710), and authorizing the Executive Director and Secretary-Treasurer on behalf of The Metropolitan St. Louis Sewer District to enter into Contract Amendment No. 7 with Black & Veatch Corporation, for the aforesaid engineering services. 25 Adoption of proposed Ord. No. 94-11 declaring the necessity for the acquisition of easements and temporary easements in certain real property within The Metropolitan St. Louis Sewer District for the purpose of construction of sewers and related appurtenances in the project known as Valley Sanitary Relief (SKME-014) Phase II (2006052 – 10147) to serve the needs of residents of the area, and authorizing the acquisition of said easements and temporary construction licenses by purchase or by the institution of condemnation proceedings. 26 Adoption of proposed Ord. No. 95-11 authorizing the Executive Director and Secretary-Treasurer to lease certain real property of The Metropolitan St. Louis Sewer District, lying in the City of St. Louis, Missouri, to the Walgreen Company for use as a parking lot and to execute a Lease Agreement upon the conditions hereinafter set out. 27 Adoption of proposed Ord. No. 96-11 authorizing the Executive Director and Secretary-Treasurer on behalf of The Metropolitan St. Louis Sewer District to enter into a contract with Gusdorf Law Firm, LLC whereby Gusdorf Law Firm, LLC will provide Collection Litigation Services for the District. 28 Adoption of proposed Ord. No. 97-11 authorizing the Executive Director and Secretary-Treasurer on behalf of The Metropolitan St. Louis Sewer District to enter into a contract with Kramer & Frank, P.C., whereby said Kramer & Frank, P.C. will provide debt collection services for the District. 29 Adoption of proposed Ord. No. 98-11 authorizing the Executive Director and Secretary-Treasurer on behalf of The Metropolitan St. Louis Sewer District to enter into a contract with John G. Heimos, P.C. whereby John G. Heimos, P.C. will provide Collection Litigation Services for the District. 30 Adoption of proposed Ord. No. 99-11 amending Ordinance No. 8304, as adopted February 13, 1991, and renaming the Emergency Fund the "Wastewater Emergency Fund,” and creating a new “Stormwater Emergency Fund,” and establishing a minimum balance for each. 31 Adoption of proposed Ord. No. 100-11 amending Ordinance No. 10561, as adopted June 10, 1999, by repealing Section Three and enacting a new Section Three in lieu thereof, pertaining to the transfer of Wastewater Backup Insurance and Reimbursement Fund and establishing a minimum balance. Plan Approval 32 Fountain/Anthony Lateral Sanitary Relief (SKME-236) (10118) This project, located North of Lindbergh Boulevard, southerly, to West of New Florissant Road in the City of Florissant, is to alleviate basement backups and overcharged sanitary sewers . This project is in the Fiscal Year 2011 Budget and the estimated construction cost is $5,700,000. 5 of 2/10/11 33 Creve Coeur Creek Sanitary Trunk Sewer Phase IIA (10427) This project located north of Olive Boulevard and east of North Woods Mill Road (Hwy. 141) in the cities of Chesterfield and Town & Country, is to alleviate overcharging of the trunk sewer due to growth and wet weather infiltration and inflow. This project is in the Fiscal Year 2011 Budget and the estimated construction cost is $5,539,000. 34 Florence #503 Storm Sewer Improvements (10213) This project, located west of Laclede Station Road and south of Interstate 44 in the City of Webster Groves, is to relieve street flooding, and yard and basement flooding at #515 and #521 Florence Avenue. This project is in the Fiscal Year 2011 Budget and the estimated construction cost is $459,000. 35 Alpine & Rambler Storm Sewer (10522) This project, located south of Gravois Road (Highway 30) and east of Mackenzie Road in Unincorporated St. Louis County, is to eliminate a storm water connection to the sanitary sewer. This project is in the Fiscal Year 2011 Budget and the estimated construction cost is $132,000. 36 Conway Road #11632 Storm Sewer (10301) This project, located north of Interstate 64 and west of Lindbergh Boulevard in the City of Westwood, is to alleviate structure and yard flooding. This project is in the Fiscal Year 2011 Budget and the estimated construction cost is $115,000. 37 Grand Glaize WWTP Improvements - Medium Voltage Switchgear (Installation) (10423) This project, located north of I-44 and east of Highway 141 in the City of Valley Park, is to provide new main electrical switchgear for the Grand Glaize Wastewater Treatment Plant. This project is in the Fiscal Year 2011 Budget and the estimated construction cost is $35,000. UNFINISHED BUSINESS Ordinances None Resolutions None 6 of 2/10/11 REVISED 2/7/11 New Business Agenda Item Number Name Page Number Ordinances 38 – Proposed Ord. No. 101-11 Bristow and Ann Storm Sewer (10206) 10 Introduction of proposed Ord. No. 101-11 appropriating $420,000.00 from the Operation, Maintenance and Construction Improvement Fund of Maline Creek to be used for project costs for the construction of storm sewers in Bristow and Ann Storm Sewer (10206) in the City of Charlack, Missouri; and authorizing the Executive Director and Secretary-Treasurer on behalf of The Metropolitan St. Louis Sewer District to enter into a contract with XL Contracting, Inc. for the aforesaid storm sewer construction. 39 – Proposed Ord. No. 102-11 Bopp Sanitary Relief I/I Reduction 11 (SKME-611) (10298) Introduction of proposed Ord. No. 102-11 appropriating $1,050,000.00 from the Sanitary Replacement Fund to be used for project costs for the Bopp Sanitary Relief I/I Reduction (SKME-611) (10298) in the City of Des Peres, Missouri; and authorizing the Executive Director and Secretary-Treasurer on behalf of The Metropolitan St. Louis Sewer District to enter into a contract with Insituform Technologies USA, Inc. for the rehabilitation of the aforesaid sanitary sewers. 40 – Proposed Ord. No. 103-11 Easement Acquisition for Combined/Sanitary 12 Projects (FY2011) (10584) Introduction of proposed Ord. No. 103-11 appropriating $1,350,000.00 from the Sanitary Replacement Fund to be used for costs associated with the acquisition of necessary property rights from Easement Acquisition for Combined/Sanitary Projects (FY0211) (10584) throughout the entire District. 41 – Proposed Ord. No. 104-11 Burning Tree and Fox Run Drive Storm 13 Sewer (10543) Introduction of proposed Ord. No. 104-11 appropriating $88,000.00 from the Operation, Maintenance and Construction Improvement Fund of Paddock Creek to be used for project costs for the construction of storm sewers in Burning Tree and Fox Run Drive Storm Sewer (10543), in the City of Florissant, Missouri; and authorizing the Executive Director and Secretary-Treasurer on behalf of The Metropolitan St. Louis Sewer District to enter into a contract with Karsten Equipment Co. for the construction of the aforesaid storm sewers. 7 of 2/10/11 REVISED 2/10/11 Agenda Item Number Name Page Number 42 – Proposed Ord. No. 105-11 Gallant Fox Drive Storm Sewer (10343) 14 Introduction of proposed Ord. No. 105-11 appropriating $147,000.00 from the Operation, Maintenance and Construction Improvement Fund of Paddock Creek to be used for project costs for the construction of storm sewers in Gallant Fox Drive Storm Sewer (10343) in the City of Florissant, Missouri; and authorizing the Executive Director and Secretary-Treasurer on behalf of The Metropolitan St. Louis Sewer District to enter into a contract with J. H. Berra Const. Co., Inc. for the construction of the aforesaid storm sewers. 43 – Proposed Ord. No. 106-11 Real Property Fund 15 Introduction of proposed Ord. No. 106-11 authorizing reimbursement to The Metropolitan St. Louis Sewer District of sums advanced to the Reserve for Real Property, Purchase, Improvement and Alteration Fund and transferring any monies received or to be received by said Fund to the General Fund, and dissolving the Reserve for Real Property, Purchase, Improvement and Alteration Fund. 44 – Proposed Ord. No. 107-11 Fountain/Anthony Lateral Sanitary Relief 16 (SKME-236) (10118) Introduction and adoption of proposed Ord. No. 107-11 appropriating $4,600,000.00 from the Sanitary Replacement Fund to be used for project costs for the construction of storm sewers in Fountain/Anthony Lateral Sanitary Relief (SKME-236) (10118) in the City of Florissant, Missouri; and authorizing the Executive Director and Secretary-Treasurer on behalf of The Metropolitan St. Louis Sewer District to enter into a contract with Unnerstall Contracting Co., Ltd. for the aforesaid construction. 45 – Proposed Ord. No. 108-11 Missouri River WWTP Secondary Treatment 17 Expansion and Disinfection Facilities (10710) Introduction and adoption of proposed Ord. No. 108-11 appropriating $37,000,000.00 from the Sanitary Replacement Fund for Missouri River WWTP Secondary Treatment Expansion and Disinfection Facilities (10710); and authorizing the Executive Director and Secretary-Treasurer on behalf of The Metropolitan St. Louis Sewer District to enter into Contract No. 10597 with Goodwin Bros. Const. Co. for the aforesaid construction phase services. 46 – Proposed Ord. No. 109-11 FY 2011 Revised Budget Appropriation 19 Introduction and adoption of proposed Ord. No. 109-11 repealing and superseding Ordinance No. 13145 adopted October 14, 2010, and making appropriations for current expenses of the District, in the General Fund, the Water Backup Insurance & Reimbursement Fund, the Wastewater Emergency Fund, the Stormwater Emergency Fund and the Wastewater Revenue Bond Service Fund for the fiscal year beginning July 1, 2010 and ending June 30, 2011, amounting in the aggregate $220, 895,249 to pay interest falling due on bonds issued, the costs of support, operation, and maintenance of the District and its various Subdistricts, and emergencies. 8 of 2/10/11 Agenda Item Number Name Page Number Resolutions 47 Adoption of Resolution No. 2956 transferring the remaining balance and all future 21 surcharges from the Williams Creek Construction Fund 6620 into the Meramec River Basin Subdistrict No.449 OMCI Fund 5591 and the Caulks Creek Construction Fund 6610 into the Sanitary Replacement Fund 6660. 48 Adoption of Resolution No. 2953 expressing the Board of Trustees’ appreciation to Peter L. Weigle for his 20 years of exemplary service to The Metropolitan St. Louis Sewer District from January 7, 1991, to his retirement effective February 1, 2011. 49 Adoption of Resolution No. 2957 expressing the Board of Trustees’ appreciation to Sammie L. Anthony for his 43 years of exemplary service to The Metropolitan St. Louis Sewer District from November 6, 1967, to his retirement effective February 1, 2011. 50 Adoption of Resolution No. 2958 expressing the Board of Trustees’ appreciation to Maurice L. Parker for his 44 years of exemplary service to The Metropolitan St. Louis Sewer District from May 2, 1966, to his retirement effective February 1, 2011. 51 Adoption of Resolution No. 2959 expressing the Board of Trustees’ appreciation to Daniel P. Snelling for his 36 years of exemplary service to The Metropolitan St. Louis Sewer District from November 14, 1974, to his retirement effective February 1, 2011. 52 Adoption of Resolution No. 2960 expressing the Board of Trustees’ appreciation to Gregory D. Willson for his 24 years of exemplary service to The Metropolitan St. Louis Sewer District from September 8, 1986, to his retirement effective February 1, 2011. 53 Adoption of Resolution No. 2961 expressing the Board of Trustees’ appreciation to Marilyn R. Szigeti for her 13 years of exemplary service to The Metropolitan St. Louis Sewer District from July 21, 1997, to her retirement effective February 1, 2011. 54 ITEMS PROPOSED FOR INTRODUCTION & ADOPTION AT THE NEXT BOARD MEETING 54 - Grand Glaize WWTP Improvements – Medium Voltage Switchgear 22 (Installation) (10423) 55 ANY OTHER BUSINESS THAT MAY PROPERLY BE BROUGHT BEFORE THE BOARD 9 of 2/10/11 Agenda Item Number Name Page Number 56 CLOSED SESSION The Metropolitan St. Louis Sewer District Board of Trustees may go into closed session at this meeting if such action is approved by a majority vote of the Board members who constitute a quorum, to discuss legal, confidential, or privileged matters under §610.021(1), RSMo 1988 Supp.; leasing, purchase or sale of real estate under §610.021(2); personnel actions under §610.021(3); discussions regarding negotiations with employee groups under §610.021(9); personnel records or applications under §610.021(13); or records under §610.021(14) which are otherwise protected from disclosure by law; or confidential or privileged communications with the District’s auditor, including auditor work products under §610.021(17). 57 ADJOURNMENT 10 of 2/10/11 AGENDA ITEM NUMBER: 38 – Proposed Ord. No. 101-11 NAME OF PROJECT: Bristow and Ann Storm Sewer (10206) LOCATION: South of St. Charles Rock Road and east of Lackland Road in the City of Charlack, Missouri TYPE OF PROJECT: Storm Sewer Construction (015.0 Construction Costs) DEPARTMENT REQUESTING ACTION: Engineering REQUESTED ACTION: Why is this action necessary?: Appropriates funds and authorizes staff to enter into a construction contract What does action accomplish?: Implements the construction of a CIP project SUMMARY EXPLANATION/BACKGROUND: Contractor: XL Contracting, Inc. Previous District Contract: Yes 20 Mid Rivers Trade Court, Suite 100 St. Peters, MO 63376 Consultant: N/A Agency: N/A Number of bidders: 7 Low Bid: $374,868.00 High Bid: $432,005.00 Appropriation Amount: $420,000.00 Designer’s Estimate: $482,000.00 MBE/WBE Participation: MBE/WBE Participation: 100% J.D. Kutter Insurance Assoc., Inc. – 1.45% - WBE AJ’s Trucking – 5.12% - WBE XL Contracting, Inc. – 93.43% - MBE Plan Approval Date: January 13, 2011 Type of Contract: Unit Cost Properties Affected: 13 Properties Benefiting: 20 Designed by: District staff The work to be done under Contract #10610 consists of the construction of approximately 1,758 lineal feet of pipe sewers varying in size from 6-inches to 36-inches in diameter, 150 lineal feet of channel stabilization, and appurtenances. The purpose of this project is to alleviate street and yard flooding, and streambank erosion. This project is scheduled to be completed in 150 days. FUNDING/COST SUMMARY: Budgeted: Capital Improvement Program Budget Year: FY2010, Pg. 142 Amount: $375,000 Fund Name: #576 – Maline Creek OMCI Additional Comments: The appropriation includes $8,000 to reimburse a property owner’s expense of redirecting a basement floor drain from the storm sewer being replaced to the sanitary sewer. Contracted planning resources utilized: Stormwater Facility Planning PREVIOUS BOARD ACTION RELATED TO THIS ACTION: N/A 11 of 2/10/11 AGENDA ITEM NUMBER: 39 – Proposed Ord. No. 102-11 NAME OF PROJECT: Bopp Sanitary Relief I/I Reduction (SKME-611) (10298) LOCATION: North of Manchester Road and east of Interstate 270 in the City of Des Peres, Missouri TYPE OF PROJECT: Public and Private I/I Removal (015.0 Construction Costs) DEPARTMENT REQUESTING ACTION: Engineering REQUESTED ACTION: Why is this action necessary?: Appropriates funds and authorizes staff to enter into a construction contract What does action accomplish?: Implements the construction of a CIP project SUMMARY EXPLANATION/BACKGROUND: Contractor: Insituform Technologies USA, Inc. Previous District Contract: Yes 17988 Edison Avenue Chesterfield, MO 63005 Consultant: N/A Agency: N/A Number of bidders: 4 Low Bid: $981,521.10 High Bid: $1,182,840.20 Appropriation Amount: $1,050,000.00 Designer’s Estimate: $1,260,000.00 MBE/WBE Participation: 10.50% - A.L.L. Construction – MBE Plan Approval Date: December 9, 2010 Type of Contract: Unit Cost Properties Affected: 41 Properties Benefiting: 375 Designed by: Kowelman Engineering, Inc. The work to be done under Contract #10607 consists of the rehabilitation of approximately 29,180 lineal feet of 8-inch to 12- inch diameter sanitary sewers using CIPP, the construction of 590 feet of 8-inch to 10-inch diameter sanitary sewers, and the removal of private inflow sources at 29 properties. The purpose of this project is to alleviate sanitary sewer overflows and basement backups. This project will eliminate one sanitary bypass. This project is scheduled to be completed in 230 days. FUNDING/COST SUMMARY: Budgeted: Capital Improvement Program Budget Year: FY2011, Pg. 42 Amount: $1,070,000 Fund Name: #660 – Sanitary Replacement Fund Additional Comments: Contracted planning resources utilized: Watershed Facility Planning, Combine Sewer Area I/I Assessment, Combine Sewer Area Flow Metering & Monitoring, Modeling, CCTV Inspection, and Radar Rainfall Data. PREVIOUS BOARD ACTION RELATED TO THIS ACTION: 01/08/09 – Ord. No. 12799 – Amount: $144,000 – Kowelman Engineering, Inc. – Design contract 12 of 2/10/11 AGENDA ITEM NUMBER: 40 – Proposed Ord. No. 103-11 NAME OF PROJECT: Easement Acquisition for Combined/Sanitary Projects (FY2011) (10584) LOCATION: Entire District TYPE OF PROJECT: Easement acquisition DEPARTMENT REQUESTING ACTION: Engineering REQUESTED ACTION: Why is this action necessary?: Appropriates additional funds to acquire necessary easement and property rights in order to construct combined and sanitary sewer projects What does action accomplish?: Allows for acquisition of property rights required to implement the District’s CIRP SUMMARY EXPLANATION/BACKGROUND: Contractor: N/A Previous District Contract: N/A Consultant: N/A Agency: N/A Number of bidders: N/A Low Bid: N/A High Bid: N/A Appropriation Amount: $1,350,000.00 District’s Estimate: N/A MBE/WBE Participation: N/A Plan Approval Date: N/A Type of Contract: N/A Properties Affected: N/A Properties Benefiting: Entire District Designed by: N/A This ordinance appropriates additional funds for staff to acquire necessary property rights in order to construct combined and sanitary sewer projects related to the CIRP. FUNDING/COST SUMMARY: Budgeted: Capital Improvement Program Budget Year: FY2011, Pg. 49 Amount: $2,000,000.00 Fund Name: #660 – Sanitary Replacement Fund Additional Comments: Of the original $2,000,000 appropriation, $1,600,000 has been spent obtaining easements on various projects. The remaining $400,000 will be spent throughout the remainder of FY2011 to obtain two outstanding easements on a FY2011 project and various easements for FY2012 projects that are in right-of-way for acquisition. The $1,350,000 additional appropriation is needed to fund the settlement agreement for the easement rights on a golf course and to purchase one property. PREVIOUS BOARD ACTION RELATED TO THIS ACTION: 07/08/2010 – Ord. No. 13108 – Amount: $2,000,000.00 – Easement acquisition for Combined/Sanitary Projects (FY2011) – Original Contract 13 of 2/10/11 AGENDA ITEM NUMBER: 41 – Proposed Ord.No. 104-11 NAME OF PROJECT: Burning Tree and Fox Run Drive Storm Sewer (10543) LOCATION: South of No. Lindbergh Boulevard and east of So. New Florissant Road in the City of Florissant, Missouri TYPE OF PROJECT: Storm Sewer Construction (015.0 Construction Costs) DEPARTMENT REQUESTING ACTION: Engineering REQUESTED ACTION: Why is this action necessary?: Appropriates funds and authorizes staff to enter into a construction contract What does action accomplish?: Implements the construction of a CIP project SUMMARY EXPLANATION/BACKGROUND: Contractor: Karsten Equipment Co. Previous District Contract: Yes 3955 Industrial Drive St. Ann, MO 63074 Consultant: N/A Agency: N/A Number of bidders: 6 Low Bid: $79,923.00 High Bid: $101,699.00 Appropriation Amount: $88,000.00 Designer’s Estimate: $98,000.00 MBE/WBE Participation: N/A – The above bid, less utility relocation, is less than $50,000 and therefore does not have a goal under the MBE/WBE policy. Plan Approval Date: January 13, 2011 Type of Contract: Unit Cost Properties Affected: 4 Properties Benefiting: 4 Designed by: District staff The work to be done under Contract #10619 consists of the construction of approximately 354 lineal feet of 12-inch diameter pipe sewers and appurtenances. The purpose of this project is to alleviate yard flooding. This project is scheduled to be completed in 90 days. FUNDING/COST SUMMARY: Budgeted: Capital Improvement Program Budget Year: FY2011, Pg. 130 Amount: $100,000 Fund Name: #581 – Paddock Creek OMCI Additional Comments: Contracted planning resources utilized: Stormwater Facility Planning PREVIOUS BOARD ACTION RELATED TO THIS ACTION: N/A 14 of 2/10/11 AGENDA ITEM NUMBER: 42 – Proposed Ord. No. 105-11 NAME OF PROJECT: Gallant Fox Drive Storm Sewer (10343) LOCATION: South of Highway 67 and west of New Halls Ferry Road in the City of Florissant, Missouri TYPE OF PROJECT: Storm Sewer Construction (015.0 Construction Costs) DEPARTMENT REQUESTING ACTION: Engineering REQUESTED ACTION: Why is this action necessary?: Appropriates funds and authorizes staff to enter into a construction contract What does action accomplish?: Implements the construction of a CIP project SUMMARY EXPLANATION/BACKGROUND: Contractor: J. H. Berra Const. Co., Inc. Previous District Contract: Yes 5091 New Baumgartner Road St. Louis, MO 63129 Consultant: N/A Agency: N/A Number of bidders: 8 Low Bid: $133,871.00 High Bid: $171,787.00 Appropriation Amount: $147,000.00 Designer’s Estimate: $150,000.00 MBE/WBE Participation: MBE/WBE Participation: 10.37% Supplied Industrial Solutions – 7.39% - MBE Taylor Trucking – 2.98% - MBE Plan Approval Date: January 13, 2011 Type of Contract: Unit Cost Properties Affected: 18 Properties Benefiting: 5 Designed by: District staff The work to be done under Contract #10617 consists of the construction of approximately 709 lineal feet of pipe sewers varying in size from 12-inches to 24-inches in diameter, and appurtenances. The purpose of this project is to alleviate yard flooding. This project is scheduled to be completed in 60 days. FUNDING/COST SUMMARY: Budgeted: Capital Improvement Program Budget Year: FY2011, Pg. 139 Amount: $163,000 Fund Name: #581 – Paddock Creek OMCI Additional Comments: Contracted planning resources utilized: Stormwater Facility Planning PREVIOUS BOARD ACTION RELATED TO THIS ACTION: N/A 15 of 2/10/11 AGENDA ITEM NUMBER: 43 – Proposed Ord. No. 106-11 NAME OF PROJECT: Real Property Fund LOCATION: N/A TYPE OF PROJECT: N/A DEPARTMENT REQUESTING ACTION: Finance REQUESTED ACTION: Why is this action necessary? This ordinance is necessary to allow the District to account for revenues and expenses in a manner consistent with the District’s current operations. What does action accomplish? This ordinance accomplishes the transfer of any remaining balances in the Real Property Fund to the General Fund, and it eliminated the Real Property Fund. SUMMARY EXPLANATION/BACKGROUND: Contractor: N/A Previous District Contract: N/A Consultants: N/A Agency: N/A Number of bidders: N/A Low Bid: N/A High Bid: N/A Appropriation Amount: N/A District Estimate: N/A MBE/WBE Participation: N/A Plan Approval Date: N/A Type of Contract: N/A Properties Affected: N/A Properties Benefiting: N/A Designed by: N/A FUNDING/COST SUMMARY: N/A Budgeted: N/A Budget Year: N/A Amount: N/A Fund Name: Real Property Fund Additional Comments The current use of the Real Property Fund is for operating expenditures related to the 2350 Market Street building. Accounting for these expenses can be effectively accomplished within the General Fund, making the Real Property Fund unnecessary. PREVIOUS BOARD ACTION RELATED TO THIS ACTION: Ordinance 8160 16 of 2/10/11 AGENDA ITEM NUMBER: 44 – Proposed Ord. No. 107-11 NAME OF PROJECT: Fountain/Anthony Lateral Sanitary Relief (SKME-236) (10118) LOCATION: North of Lindbergh Boulevard southerly to west of New Florissant Road in the City of Florissant, Missouri TYPE OF PROJECT: Sanitary Sewer Construction (015.0 Construction Costs) DEPARTMENT REQUESTING ACTION: Engineering REQUESTED ACTION: Why is this action necessary?: Appropriates funds and authorizes staff to enter into a construction contract What does action accomplish?: Implements the construction of a CIP project SUMMARY EXPLANATION/BACKGROUND: Contractor: Unnerstall Contracting Co., Ltd. Previous District Contract: Yes 2803 West Osage Pacific, MO 63069 Consultant: N/A Agency: N/A Number of bidders: 4 Low Bid: $4,263,414.05 High Bid: $6,077,214.00 Appropriation Amount: $4,600,000.00 Designer’s Estimate: $5,700,000.00 MBE/WBE Participation: 10.00% Luther Supply Co. – 5.32% - MBE Roden’s Landscaping – 2.02% - WBE Freedom Fence, LLC – 2.34% - WBE Select Steel Services - .32% - WBE Plan Approval Date: February 10, 2011 Type of Contract: Unit Cost Properties Affected: 42 Properties Benefiting: 3,600 Designed by: Horner & Shifrin, Inc. The work to be done under Contract #10622 consists of the construction of approximately 10,100 lineal feet of 8-inch to 36- inch diameter sanitary sewer and appurtenances. The purpose of this project is to alleviate basement backups, overcharged sewer mains, and sanitary sewer overflows. This project will also eliminate five (5) SSOs. This project is scheduled to be completed in 500 days. FUNDING/COST SUMMARY: Budgeted: Capital Improvement Program Budget Year: FY2011, Pg. 52 Amount: $5,300,000 Fund Name: #660 – Sanitary Replacement Fund Additional Comments: Contracted planning resources utilized: Watershed Facility Planning, Separate Sewer Area I/I Assessment, Separate Sewer Area Flow Metering & Monitoring, Modeling, CCTV Inspection, and Radar Rainfall Data. PREVIOUS BOARD ACTION RELATED TO THIS ACTION: 11/10/05 – Ord. No. 12113 – Amount: $773,000 – Horner & Shifrin, Inc. – Design Contract 17 of 2/10/11 AGENDA ITEM NUMBER: 45 – Proposed Ord. No. 108-11 NAME OF PROJECT: Missouri River WWTP Secondary Treatment Expansion and Disinfection Facilities (10710) LOCATION: Missouri River WWTP, south of Interstate 70 and west of Maryland Heights Expressway in the City of Maryland Heights, Missouri TYPE OF PROJECT: Wastewater Treatment Plant Construction (015.0 Construction Costs) DEPARTMENT REQUESTING ACTION: Engineering REQUESTED ACTION: Why is this action necessary?: Appropriates funds and authorizes staff to enter into a construction contract What does action accomplish?: Implements the construction of a CIP project SUMMARY EXPLANATION/BACKGROUND: Contractor: Goodwin Bros. Const. Co. Previous District Contract: Yes 1766 Highway 61 South Crystal City, MO 63019 Consultant: N/A Agency: N/A Number of bidders: 6 Low Bid: $88,890,000.00 High Bid: $100,540,811.00 Appropriation Amount: $37,000,000.00 Designer’s Estimate: $120,508,601.00 MBE/WBE Participation: 18.21% K.A. Pazdera - .72% - WBE City Design - .07% - MBE WW Petroleum - .13% - WBE Harlem Anderson Trucking - .91% - MBE Williams Marble & Tile - .02% - WBE Sabur Surveying - .06% - MBE JRH Enterprises – 1.46% - WBE Windstar Trucking - .07% - MBE Commercial Bathwares - .02% - WBE Supplied Industrial Solutions – 9.00% - MBE Massey Tuckpointing – 3.37% - WBE Gateway Roofing - .38% - MBE TD4 Electrical – 2.0% - MBE Plan Approval Date: November 10, 2010 Type of Contract: Lump Sum Properties Affected: 1 Properties Benefiting: The Entire Missouri River Service Area Designed by: Black & Veatch Corporation The work to be done under Contract #10597 consists of the construction of a low lift pump station, aeration basins, a blower building, six final clarifiers, a sludge pumping station, a solids handling building, an ultraviolet radiation disinfection facility, a new primary digester, demolition of existing buildings, trickling filters and final clarifiers, and other miscellaneous items including yard piping and structures associated with this work. This construction is the second phase of a two-phase improvement program. The purpose of this project is to increase wet weather peak flow capacity and to meet more stringent MDNR discharge requirements for secondary treatment and disinfection of effluent. This project is scheduled to be completed in 1,214 days. FUNDING/COST SUMMARY: Budgeted: Capital Improvement Program Budget Year: FY2011, Pg. 86 Amount: $42,000,000 (Partial funding) Fund Name: #660 – Sanitary Replacement Fund 18 of 2/10/11 Additional Comments: The design contract included funding for the design of the Missouri River WWTP digester rehabilitation and Coldwater WWTP disinfection projects. Contracted planning resources utilized: Watershed Facility Planning PREVIOUS BOARD ACTION RELATED TO THIS ACTION: 08/31/06 – Ord. No. 12286 – Amount: $795,000 – Black & Veatch Corporation – Design contract 04/10/08 – Ord. No. 12610 – Amount: $5,700,000 – Black & Veatch Corporation – Amendment No. 2 11/12/09 – Ord. No. 12976 – Amount: $3,339,000 – Mitico, LLC – Wetland Mitigation Procurement 12/10/09 – Ord. No. 13002 – Amount: $2,080,000 – Black & Veatch Corporation – Amendment No. 4 02/02/10 – Ord. No. 13035 – Amount: $13,500,000 – Missouri River WWTP Secondary Treatment Expansion (Digester Rehabilitation (2006168B) – Construction contract 19 of 2/10/11 REVISED 2/10/11 AGENDA ITEM NUMBER: 46 – Proposed Ord. No. 109-11 NAME OF PROJECT: FY 2011 Revised Budget Appropriation LOCATION: N/A TYPE OF PROJECT: N/A DEPARTMENT REQUESTING ACTION: Finance REQUESTED ACTION: Why is this action necessary?: To revise the budget of the District in order to allocate tax revenues and transfer certain balances between OMCI Funds What does action accomplish?: Authorizes the various District departments to expend funds during FY2011 for wastewater and stormwater operation of the District. SUMMARY EXPLANATION/BACKGROUND: Contractor: N/A Previous District Contract: N/A Consultant: N/A Agency: N/A Number of bidders: N/A Low Bid: N/A High Bid: N/A Appropriation Amount: $220,895,249 District’s Estimate: N/A MBE/WBE Participation: N/A Plan Approval Date: N/A Type of Contract: N/A Properties Affected: N/A Properties Benefiting: N/A Designed by: N/A FUNDING/COST SUMMARY: Budgeted: N/A Budget Year: 2010-2011 Amount: $220,895,249 Fund Name: Budget Appropriation: General Fund $151,067,447 Real Property Improvements & Alterations Fund $ 0 Water Backup Insurance & Reimbursement Fund $ 4,000,000 Total Operating Budget $155,067,447 Wastewater Emergency Fund $ 250, 000 Stormwater Emergency Fund $ 250, 000 Debt Service Fund $ 42,234,000 District-Wide Stormwater Fund $ 13,077,649 Stormwater and Maintenance, Operations and Construction Improvement Fund $ 6,120,810 Black Creek $ 463,481 Black Jack-Dellwood $ 212,038 Clayton Central $ 45,620 Coldwater $ 585,822 Creve Coeur $ 132,564 Deer Creek $ 493,080 Fountain Creek $ 87,931 Gravois Creek $ 445,187 Loretta-Joplin $ 3,940 Maline Creek $ 307,621 20 of 2/10/11 Marlborough $ 1,862 North Affton $ 12,280 Paddock Creek $ 88,960 Seminary Branch of RDP $ 76,357 Shrewsbury Branch of RDP $ 18,399 Sugar Creek $ 52,345 University City Branch of RDP $ 741,909 Upper Paddock Creek $ 14,567 Watkins Creek $ 80,491 Wedgewood Creek $ 7,557 Wellston $ 23,332 Total Stormwater Funds $ 23,093,802 Total Budget Ordinance $220,895,249 Additional Comments: This action revises the FY2011 Revised Budget adopted October 14, 2010 due to the collection of tax revenue and transfer of monies from certain OMCI funds. PREVIOUS BOARD ACTION RELATED TO THIS ACTION: 10/14/10 – Ordinance No. 13145 – Amount $197,551,447 – 2010-2011 Revised Budget Ordinance 06/10/10 – Ordinance No. 13090 – Amount $205,515,385 – 2010-2011 Budget Ordinance 06/11/09 – Ordinance No. 12896 – Amount $191,829,726 – 2009-2010 Budget Ordinance 06/08/08 – Ordinance No. 12660 – Amount $186,478,554 – 2008-2009 Budget Ordinance 12/13/07 – Ordinance No. 12562 – Amount $174,440,980 – 2007-2008 Revised Budget Ordinance 06/01/07 – Ordinance No. 12466 – Amount $166,241,847 – 2007-2008 Budget Ordinance 06/08/06 – Ordinance No. 12221 – Amount $169,861,611 – 2006-2007 Budget Ordinance 21 of 2/10/11 AGENDA ITEM NUMBER: 47 – Resolution No. 2956 NAME OF PROJECT: Transfer of Fund Balance LOCATION: TYPE OF PROJECT: DEPARTMENT REQUESTING ACTION: Finance REQUESTED ACTION: Why is this action necessary? This resolution is necessary to allow the District to account for revenues and expenses in a manner consistent with the District’s current operations. What does action accomplish? This resolution accomplishes the transfer of any remaining balances in these Funds to other District Funds specified below and outlines how any future collected surcharges are to be credited. SUMMARY EXPLANATION/BACKGROUND: Contractor: N/A Previous District Contract: N/A Consultants: N/A Agency: N/A Number of bidders: N/A Low Bid: N/A High Bid: N/A Appropriation Amount: N/A District Estimate: N/A MBE/WBE Participation: N/A Plan Approval Date: N/A Type of Contract: N/A Properties Affected: N/A Properties Benefiting: N/A Designed by: The William’s Creek and Caulk’s Creek Construction Funds were established to provide a funding source to extend and upgrade the existing sanitary system in these watersheds in order to accommodate future development. Monies for these funds come from a per acre surcharge on all newly developed property within those watersheds. Because improvements were needed before sufficient surcharge funds were collected, these projects were paid for from other appropriate funds. This ordinance will provide for the transfer of any existing construction fund balances into those other appropriate funds and provide that all future surcharges collected and due are credited to those other appropriate funds (as shown in the chart below). FUNDING/COST SUMMARY: Budgeted: N/A Budget Year: N/A Amount: N/A Fund Name: Caulks Creek Construction Fund and Williams Creek Construction Fund Additional Comments: Fund to be reduced Fund to receive any remaining balance 6610 Caulks Creek Construction Fund 6660 Sanitary Replacement Fund 6620 Williams Creek Construction Fund 5591 Meramec River Basin Subd #449 OMCI Fund All future surcharges collected and due to the Caulks Creek Construction Fund will be credited to the 6660 Sanitary Replacement Fund and all future surcharges collected and due to the Williams Creek Construction Fund will be credited to the Meramec River Basin Subdistrict #449 OMCI Fund. PREVIOUS BOARD ACTION RELATED TO THIS ACTION: 06/08/1994- Ord. No. 09249- Caulks Creek Construction Fund 12/12/1996- Ord. No. 10007- Williams Creek Construction Fund 22 of 2/10/11 AGENDA ITEM NUMBER: 54 – INTRODUCTION & ADOPTION AT THE MARCH BOARD MEETING NAME OF PROJECT: Grand Glaize WWTP Improvements – Medium Voltage Switchgear (Installation) (10423) LOCATION: North of I-44 and east of Highway 141 in the City of Valley Park, Missouri TYPE OF PROJECT: Wastewater Treatment Plant Construction (015.0 Construction Costs) DEPARTMENT REQUESTING ACTION: Engineering REQUESTED ACTION: Why is this action necessary?: Appropriates funds and authorizes staff to enter into a construction contract What does action accomplish?: Implements the construction of a CIP project SUMMARY EXPLANATION/BACKGROUND: Contractor: Previous District Contract: Consultant: Agency: Number of bidders: Low Bid: High Bid: Appropriation Amount: Designer’s Estimate: $35,000 MBE/WBE Participation: Plan Approval Date: February 10, 2011 Type of Contract: Lump Sum Properties Affected: 1 Properties Benefiting: All properties in Grand Glaize Service Area Designed by: HDR Engineering, Inc. The work to be done under Contract #10629 consists of the construction of the installation of the new procured electrical switchgear and appurtenances. The purpose of this project is to install the procured main electrical switchgear equipment at the Grand Glaize Wastewater Treatment Plant. This project is scheduled to be completed in 120 days. FUNDING/COST SUMMARY: Budgeted: Capital Improvement Program Budget Year: FY 2011, Pg. 55 Amount: $250,000 Fund Name: #660 – Sanitary Replacement Fund Additional Comments: The Grand Glaize WWTP and the maintenance yard facilities will need to be powered by the two on site generators while the switchgear is being installed. The generators operate on diesel fuel (consume about 3 gallons per minute) and will need to operate continuously until the new replacement switchgear is (completely installed, tested, inspected and accepted by Ameren and) fully operational. The new switchgear is being installed in the same location as the existing switchgear because of limited space at the site and to make use of the existing infrastructure and power supply conduits. A contingency allowance of $35,000 is included in the appropriation for diesel fuel and other possible miscellaneous costs. Direct payment will be made to the supply vendor currently providing fuel under agreement for the Grand Glaize WWTP. PREVIOUS BOARD ACTION RELATED TO THIS ACTION: 07/10/03 – Ord. No. 11541 – Amount: $510,000 – HDR Engineering, Inc – Design contract 04/22/04 – Ord. No. 11709 – Amount: $2,400,000 – HDR Engineering, Inc. – Amendment No. 3 08/11/05 – Ord. No. 12045 – Amount: $2,300,000 – HDR Engineering, Inc. – Amendment No. 8 08/10/06 – Ord. No. 12268 – Amount: $29,450,000 – KCI Construction Company – Construction contract 06/10/10 – Ord. No. 13080 – Amount: $125,000 – Central Electric Company – Procurement contract 06/10/10 – Ord. No. 13081 – Amount: $250,000 – Haberberger, Inc. – Redundant Washer Compactor 06/10/10 – Ord. No. 13082 – Amount: $275,000 – Haberberger, Inc. – Splitter Box Modifications