HomeMy Public PortalAbout1984_10_10_R181The Town of Leesburg in Virginia
RESOLUTION NO.
A RESOLUTION:
PRESENTED October 10~ 1984
84-181 ADOPTED October 10~ 1984
INITIATING AMENDMENT OF THE SUBDIVISION AND LAND DEVELOPMENT
REGULATIONS TO AUTHORIZE THE PREPARATION OF SUBDIVISION AND SITE
PLANS BY LICENSED 3(b) LAND SURVEYORS
WHEREAS, the Code of Virginia (1950), as amended, permits licensed 3(b)
land surveyors to prepare plats, plans and profiles for subdivisions, site plans
and development plans:
THEREFORE RESOLVED by the Council of the Town of Leesburg in Virginia as
follows:
SECTION I. The amendment of the Subdivision and Land Development
Regulations is initiated to amend Sections 13-78, 13-79, 13-80, 13-81, 13-82,
13-97, and 13-99 to read as follows:
Sec. 13-78. Streets~ Street curb and gutter.
(a) No change.
(b) Insert or a licensed 3(b) land surveyor after "registered
professional engineer".
Sec. 13-79. Sidewalks.
(a) No change.
(b) Insert or a licensed 3(b) land .surveyor after "registered
professional engineer".
Sec. 13-80. Water Suppl~.
(a) No change.
(b) The water system and all service lines and appurtenances except
the water meter shall be completed in accordance with the plans and
profiles prepared for the subdivision or development by ~ registered
professional engineer or licensed 3(b) land surveyor and approved by
the Director of Engineering as meeting the required specifications for
water systems; provided, however~ ~ licensed 3(b) land surveyor may
not design pressure hydraulic systems.
Sec. 13-81. Sanitary Sewers
(a) No change.
(b) Insert or a licensed 3(b) land surveyor after "registered profes-
sional engineer"; add new sentence at end to read: However~ ~
licensed 3(b) land surveyor may not design pressure hydraulic systems.
Amendment to Subdivision and
Land Development Regulations
RE Land Surveyor
Page 2
Sec. 13-82. Storm drainage; erosion and sedimentation control; flood
zone management and control.
(a) No change.
(b) No change
(c) No change.
(d) Insert or a licensed 3(b) land surveyor after "registered
professional engineer"; add new sentence at end to read: However;
a licensed 3(b) land surveyor may not design pressure hydraulic
systems.
Sec. 13-97. Required approvals of final plan and final plat.
The following approvals shall accompany or be shown on a final plat
and shall be necessary for its approval.
(a) No change.
(b) Insert or a licensed 3(b) land surveyo~ after "registered
engineer".
(c) No change.
(d) No change.
(e) No change.
(f) No change.
Sec. 13-99. Definitions and rules of construction.
(a) No change.
(b) No change.
(c) Add a new definition to read as follows:
"Licensed 3(b) land surveyor" shall mean ~ !and surveyor
licensed by the Commonwealth of Virginia to perform the work
described under Section 54-17.1(3)(b) of the Code of Virginia
(1950) as amended.
SECTION II. A public hearing at which persons may appear and present their
views shall be held on the Subdivision and Land Development Regulations amend-
ments proposed above beginning at 7:30 p.m., or as soon thereafter as the matter
is reached, on November 14j984, in the Council Chambers, 10 West Loudoun Street
Leesburg, VA and in line with Section 15.1-431 of the Code of Virginia, as
amended, this hearing shall be a joint public hearing of both the Planning
Commission and the Council. The Clerk shall give notice of this hearing and the
Council's intention to consider the amendments on October 2~ 1984 and November 1,
1984 and shall advise the Planning Commission of the purpose, intent and date of
the hearing.
Amendment to Subdivision and
Land Development Regulations
RE Land Surveyor
Page 3
SECTION III. The Planning Commission shall report its recommendation to
the Town Council on the proposed amendments within 60-days of the hearing.
PASSED this 10th day of October , 1984.
ATTE ST:
Clerk of C
Robert E. S~vila, Mayor
Town of Leesburg
LANDSURI.1, 1.2, 1.3