Loading...
HomeMy Public PortalAbout1511th Board Agenda 1-12-2012 A G E N D A 1511th MEETING OF THE BOARD OF TRUSTEES THE METROPOLITAN ST. LOUIS SEWER DISTRICT January 12, 2012 – 4:00 P.M. MSD OFFICES 2350 MARKET STREET ROOM 109 ROLL CALL THE BOARD OF TRUSTEES WILL BE IN CLOSED SESSION BETWEEN 4:00 P.M. AND 5:00 P.M. 1 CLOSED SESSION TO DISCUSS LEGAL, CONFIDENTIAL OR PRIVILEGED MATTERS UNDER §610.021(1), RSMO 1988 SUPP.; LEASING, PURCHASE OR SALE OF REAL ESTATE UNDER §610.021(2) 2 APPROVAL OF JOURNAL OF PRECEDING MEETINGS December 8, 2011 (1510th) 3 COMMENTS BY THE CHAIR 4 REPORT OF BOARD COMMITTEES 5 REPORT OF EXECUTIVE DIRECTOR 6 COMMENTS FROM THE PUBLIC 7 SUBMISSION OF PUBLIC HEARING REPORTS – None 8 COMMUNICATIONS – None 9 CONSENT AGENDA – Item Nos. 10 through 19 2 of 1/12/12 Ordinances 10 Adoption of proposed Ord. No. 13350 appropriating $171,000.00 from the Operation, Maintenance and Construction Improvement Fund of North Kinloch to be used for project costs for the construction of storm sewers in Mable Ave. and Carson Road Storm Sewer (10698), in the City of Kinloch, Missouri; and authorizing the Executive Director and Secretary-Treasurer on behalf of The Metropolitan St. Louis Sewer District to enter into a contract with J.H. Berra Const. Co., Inc. for the construction of the aforesaid storm sewers. (Intro. 12/08/11) 11 Adoption of proposed Ord. No. 13351 appropriating $125,000.00 from the Operation, Maintenance and Construction Improvement Fund of Coldwater Creek to be used for project costs for the construction of storm sewers in White Birch Way – Queen Ann Drive Storm Sewer (10797), in the City of Hazelwood, Missouri; and authorizing the Executive Director and Secretary-Treasurer on behalf of The Metropolitan St. Louis Sewer District to enter into a contract with J.H. Berra Const. Co., Inc. for the aforesaid storm sewer construction. (Intro. 12/08/11) 12 Adoption of proposed Ord. No. 13352 transferring $110,000.00 from the Sanitary Replacement Fund to the General Fund and appropriating $110,000.00 from the General Fund for engineering services for the final design of Radar Rainfall Data (FY2012) (10743) and authorizing the Executive Director and Secretary-Treasurer on behalf of The Metropolitan St. Louis Sewer District to enter in Contract 10603 with Vieux and Associates, Inc. for the aforesaid engineering services. (Intro. 12/08/11) 13 Adoption of proposed Ord. No. 13353 appropriating $700,000.00 from the Sanitary Replacement Fund to be used for project costs for the rehabilitation of sanitary sewers in Dellwood Sanitary Trunk Sewer Rehabilitation (11055) in St. Louis County, Missouri; and authorizing the Executive Director and Secretary-Treasurer on behalf of The Metropolitan St. Louis Sewer District to enter into a contract with Insituform Technologies USA, Inc. for the rehabilitation of the aforesaid sanitary sewers. (Intro. 12/08/11) 14 Adoption of proposed Ord. No. 13354 appropriating $210,000.00 from the Sanitary Replacement Fund to be used for project costs for the construction of sanitary sewers in Grand Glaize Lagoon Wet Weather Storage Improvements (11113), in the City of Valley Park, Missouri; and authorizing the Executive Director and Secretary-Treasurer on behalf of The Metropolitan St. Louis Sewer District to enter into a contract with Essex Contracting, Inc. for the aforesaid sanitary sewer construction. (Intro. 12/08/11) 15 Adoption of proposed Ord. No. 13355 appropriating $400,000.00 from the Sanitary Replacement Fund to be used for project costs for the Lemay WWTP Maintenance Building Structural Repair (10682), in Unincorporated St. Louis County, Missouri; and authorizing the Executive Director and Secretary-Treasurer on behalf of The Metropolitan St. Louis Sewer District to enter into a contract with Tarlton Corporation for the aforesaid sanitary sewer construction. (Intro. 12/08/11) 16 Adoption of proposed Ord. No. 13356 appropriating $600,000.00 from the Operation, Maintenance and Construction Improvement Fund of Coldwater Creek to be used for project costs for bank stabilization in Coldwater Creek at Lynn Town Bank Stabilization (10284), in the City of Breckenridge Hills, Missouri; and authorizing the Executive Director and Secretary- Treasurer on behalf of The Metropolitan St. Louis Sewer District to enter into a contract with Ideal Landscape Group for the aforesaid bank stabilization. (Intro. 12/08/11) 3 of 1/12/12 17 Adoption of proposed Ord. No. 13357 authorizing the Executive Director and Secretary-Treasurer on behalf of The Metropolitan St. Louis Sewer District to enter into an agreement with the United States Army Corps of Engineers to provide the District with Aerial LiDAR data acquisition and processing services for an area of St. Louis County and City, Missouri. (Intro. 12/08/11) Commission of The Metropolitan St. Louis Sewer District. (Intro. 3/10/11) Plan Approval 18 Clayridge - Brandy Sanitary Relief (11099) This project, located east of Interstate 55 and north of Butler Hill Road in unincorporated St. Louis County, is to alleviate sanitary sewer backups due to insufficient sewer capacity. This project is in the Fiscal Year 2012 Budget and the estimated construction cost is $228,000. 19 Coldwater Treatment Plant Disinfection Facilities (10558) This project, located Old Halls Ferry Road south of Lindbergh Boulevard in Unincorporated St. Louis County, is to meet EPA and MDNR regulatory mandates requiring disinfection of effluent. This project is in the Fiscal Year 2012 Budget and the estimated construction cost is $6,387,000. UNFINISHED BUSINESS Ordinances 20 Amendment and adoption of proposed Ord. No. 13330 calling a bond election to be held on June 5, 2012 in the Metropolitan St. Louis Sewer District on the proposition whether to issue $945,000,000.00 principal amount of sewer revenue bonds. (Intro. 10/27/2011) Resolutions None 4 of 1/12/12 New Business Agenda Item Number Name Page Number Ordinances 21 – Proposed Ord. No. 13358 CCTV Inspection and Physical Inspection 8 of Sewers – North (FY2012) (10376) Introduction of proposed Ord. No. 13358 transferring $1,500,000.00 from the Sanitary Replacement Fund to the General Fund, and appropriating $1,500,000.00 from the General Fund to be used for CCTV Inspection and Physical Inspection of Sewers – North (FY2012) (10376), authorizing the Director of Finance to make transfers between the Sanitary Replacement Fund and the General Fund to accommodate the appropriate accounting, and authorizing the Executive Director and Secretary-Treasurer on behalf of The Metropolitan St. Louis Sewer District to enter into Amendment No. 7 to Contract No. 10615 with ADS Environmental Services, LLC for CCTV Inspection and Physical Inspection of Sewers - North (FY2012) (10376). 22 – Proposed Ord. No. 13359 CCTV Inspection and Physical Inspection 10 of Sewers – South (FY2012) (10377) Introduction of proposed Ord. No. 13359 transferring $1,500,000.00 from the Sanitary Replacement Fund to the General Fund, and appropriating $1,500,000.00 from the General Fund to be used for CCTV Inspection and Physical Inspection of Sewers – South (FY2012) (10377), authorizing the Director of Finance to make transfers between the Sanitary Replacement Fund and the General Fund to accommodate the appropriate accounting, and authorizing the Executive Director and Secretary-Treasurer on behalf of The Metropolitan St. Louis Sewer District to enter into Amendment No. 4 to Contract No. 10616 with Ace Pipe Cleaning, Inc. for CCTV Inspection and Physical Inspection of Sewers - South (FY2012) (10377). 23 – Proposed Ord. No. 13360 Bissell WWTP Disinfection Facilities (10325) 12 Introduction of proposed Ord. No. 13360 appropriating $17,000,000.00 from the Sanitary Replacement Fund to be used for wastewater treatment plant construction at Bissell WWTP Disinfection Facilities (10325), in the City of St. Louis, Missouri; and authorizing the Executive Director and Secretary-Treasurer on behalf of The Metropolitan St. Louis Sewer District to enter into a contract with Goodwin Bros. Const. Co. for the aforesaid sanitary sewer construction. 24 – Proposed Ord. No. 13361 Infrastructure Repairs (Rehabilitation) 13 (FY2012 Contract A) (10665) Introduction of proposed Ord. No. 13361 appropriating $7,900,000.00 from the Sanitary Replacement Fund to be used for project costs for the rehabilitation of sanitary sewers in Infrastructure Repairs (Rehabilitation) (FY2012 Contract A) (10665) in the County of St. Louis, Missouri; and authorizing the Executive Director and Secretary-Treasurer on behalf of The Metropolitan St. Louis Sewer District to enter into a contract with SAK Construction, LLC for the aforesaid rehabilitation. 5 of 1/12/12 Agenda Item Number Name Page Number 25 – Proposed Ord. No. 13362 Missouri River WWTP Secondary Treatment 14 Expansion and Disinfection Facilities (10710) Introduction of proposed Ord. No. 13362 appropriating $39,769,300.00 from the Sanitary Replacement Fund to be used for project costs for the construction of the Missouri River WWTP Secondary Treatment Expansion and Disinfection Facilities (10710), in the City of Maryland Heights, Missouri under Contract No. 10597 as approved by Ordinance No. 13220, adopted March 10, 2011. 26 – Proposed Ord. No. 13363 Bon Oak #10074 – 10078 Flood Mitigation (11104) 16 Introduction of proposed Ord. No. 13363 appropriating $50,000.00 from the Operations, Maintenance and Construction Improvement Fund of Maline Creek to provide matching funds for Bon Oak #10074 - 10078 Flood Mitigation (11104) and authorizing the Executive Director and Secretary-Treasurer on behalf of the Metropolitan St. Louis Sewer District to enter into an Inter-governmental Agreement with St. Louis County, Missouri. 27 – Proposed Ord. No. 13364 Magnet Drive Storm Sewer (10699) 17 Introduction of proposed Ord. No. 13364 appropriating $50,000.00 from the University City OMCI Fund to be used for project costs for the construction of storm sewers in Magnet Drive Storm Sewer (10699), in the City of Olivette, Missouri; and authorizing the Executive Director and Secretary-Treasurer on behalf of The Metropolitan St. Louis Sewer District to enter into a contract with Heartland Construction & Excavating for the aforesaid storm sewer construction. 28 – Proposed Ord. No. 13365 CSO – Macklind Outfall L-062 Separation (10159) 18 Introduction of proposed Ord. No. 13365 appropriating an additional $100,000.00 from the Sanitary Replacement Fund to be used for project costs for sewer separation in the CSO - Macklind Outfall L-062 Separation (10159), in the City of St. Louis, Missouri; and authorizing the Executive Director and Secretary-Treasurer on behalf of The Metropolitan St. Louis Sewer District to enter into an amendment to Contract No. 10637 with MB Mitchell, LLC for the aforesaid sewer separation. 29 – Proposed Ord. No. 13366 Deer Creek Sanitary System Improvements (11110) 20 Introduction of proposed Ord. No. 13366 transferring $556,733.15 from the Sanitary Replacement Fund to the General Fund, appropriating $556,733.15 from the General Fund, and appropriating $43,266.85 from the Sanitary Replacement Fund of the District for Deer Creek Sanitary System Improvements (11110), and authorizing the Executive Director and Secretary-Treasurer on behalf of The Metropolitan St. Louis Sewer District to enter into Contract No. 10733 with the Parsons Water & Infrastructure, Inc. for the aforesaid services. 6 of 1/12/12 Agenda Item Number Name Page Number 30 – Proposed Ord. No. 13367 DC-06 Deer Creek Sanitary Relief Phase III 23 and I/I Reduction (10576) Introduction of proposed Ord. No. 13367 appropriating $400,000.00 from the Sanitary Replacement Fund for engineering services for the design of DC-06 Deer Creek Sanitary Relief Phase III and I/I Reduction (10576). 31 – Proposed Ord. No. 13368 Lower & Middle RDP CSO Controls System 25 Improvements (11109) Introduction of proposed Ord. No. 13368 transferring $384,161.39 from the Sanitary Replacement Fund to the General Fund, appropriating $384,161.39 from the General Fund, and appropriating $1,615,838.61 from the Sanitary Replacement Fund of the District for Lower & Middle RDP CSO Controls System Improvements (11109); and authorizing the Executive Director and Secretary-Treasurer on behalf of The Metropolitan St. Louis Sewer District to enter into Contract No. 10734 with the Jacobs Engineering Group, Inc. for the aforesaid services. 32 – Proposed Ord. No. 13369 Bissell WWTP Disinfection Facilities 28 (E-1265 & 10325) Introduction of proposed Ord. No. 13369 appropriating $554,000.00 from the Sanitary Replacement Fund for engineering services for the design of Bissell WWTP Disinfection Facilities (E-1265 & 10325) and authorizing the Executive Director and Secretary- Treasurer on behalf of The Metropolitan St. Louis Sewer District to enter into Amendment No. 10 to Contract E-1265 with HDR Engineering, Inc. for the aforesaid engineering services. 33 – Proposed Ord. No. 13370 McKelvey Project “A” and “B” Sanitary Relief 29 (SKME-005) (10163) Introduction of proposed Ord. No. 13370 declaring the necessity for the acquisition of easements and temporary easements in certain real property within The Metropolitan St. Louis Sewer District for the purpose of construction of sewers and related appurtenances in the project known as McKelvey Project “A” & “B” Sanitary Relief (SKME-005) 10163 – 2006122 to serve the needs of residents of the area, and authorizing the acquisition of said easements and temporary construction easements by purchase or by the institution of condemnation proceedings. 34 – Proposed Ord. No. 13371 Energize Missouri Water Loan Program 30 Introduction and adoption of proposed Ord. No. 13371 authorizing the participation of The Metropolitan St. Louis Sewer District in the Energize Missouri Water Loan Program of the Missouri Department of Natural Resources and the State Environmental Improvement and Energy Resources Authority, and the execution of a loan agreement and promissory note to provide funds to finance the installation or construction of energy conservation measures; such funds to be repaid from energy cost savings realized by the District as a result of implementation of such energy conservation measures. 7 of 1/12/12 Agenda Item Number Name Page Number Resolutions 35 Adoption of Resolution No. 3009 whereas the Board of Trustees of the Metropolitan 31 St. Louis Sewer District adopted Ordinance No. 12010 on June 9, 2005, which specifies a Public Funds Investment Policy for the District, a copy of which is attached hereto As Exhibit “A”. 36 Adoption of Resolution No. 3008 expressing the Board of Trustees’ appreciation to Carolyn L. Johnson for her 18 years of exemplary service to The Metropolitan St. Louis Sewer District from January 3, 1995, to her retirement effective January 1, 2012. 37 Adoption of Resolution No. 3007 whereas Valerie E. Patton has faithfully served as a member of the Civil Service Commission of The Metropolitan St. Louis Sewer District from July 22, 2005 to December 7, 2011. 38 ITEMS PROPOSED FOR INTRODUCTION & ADOPTION AT THE NEXT BOARD MEETING 39 ANY OTHER BUSINESS THAT MAY PROPERLY BE BROUGHT BEFORE THE BOARD 40 CLOSED SESSION The Metropolitan St. Louis Sewer District Board of Trustees may go into closed session at this meeting if such action is approved by a majority vote of the Board members who constitute a quorum, to discuss legal, confidential, or privileged matters under §610.021(1), RSMo 1988 Supp.; leasing, purchase or sale of real estate under §610.021(2); personnel actions under §610.021(3); discussions regarding negotiations with employee groups under §610.021(9); personnel records or applications under §610.021(13); or records under §610.021(14) which are otherwise protected from disclosure by law; or confidential or privileged communications with the District’s auditor, including auditor work products under §610.021(17). 41 ADJOURNMENT 8 of 1/12/12 AGENDA ITEM NUMBER: 21 – Proposed Ord. No. 13358 NAME OF PROJECT: CCTV Inspection and Physical Inspection of Sewers – North (FY2012) (10376) LOCATION: From the Mississippi River north of Highway 40 to Interstate 270, north to Interstate 70 to the Missouri River TYPE OF PROJECT: CCTV and Physical Inspection of Sewers, Sewer Cleaning, and Locating and Raising of Manholes (016.2 Vendor Services) DEPARTMENT REQUESTING ACTION: Engineering REQUESTED ACTION: Why is this action necessary?: Transfers funds, appropriates additional funds, and authorizes staff to enter into a contract amendment and exercise the second option year for this existing contract. What does action accomplish?: Provides investigations necessary to locate sewer system defects, remove debris and roots when encountered, and raise manholes for access SUMMARY EXPLANATION/BACKGROUND: Contractor: ADS Environmental Services, LLC Previous District Contract: Yes 13266 Lakefront Drive Earth City, MO 63045 Consultant: N/A Agency: N/A Number of bidders: N/A Low Bid: N/A High Bid: N/A Appropriation Amount: $1,500,000.00 Designer’s Estimate: N/A MBE/WBE Participation: 10.0% - Civil Design Group, Inc. – WBE Plan Approval Date: N/A Type of Contract: Unit Cost Properties Affected: N/A Properties Benefiting: N/A Designed by: N/A The work to be done under Contract #10615 authorizes the District to enter into contract Amendment No. 7 for the second option year with ADS Environmental Services, LLC. The purpose of this contract is to provide District staff with information regarding sewer conditions by the use of Closed Circuit Television (CCTV) and physical inspection. These inspections will determine sewer conditions and system defects and will form the basis for preventative maintenance activities, inflow/infiltration investigations, and sewer system models. This contract amendment for CCTV Inspection and Physical Inspection of Sewers – North is for $1,500,000. Approximately 80% of the CCTV investigations will provide support data for the Watershed Planning efforts and the remaining 20% will support specific design projects and miscellaneous requests. It is anticipated that the existing contract balance will be expended by March 2012. Currently, there is a backlog of unassigned work tasks totaling 950,000 feet to be addressed by this and future actions. FUNDING/COST SUMMARY: Budgeted: Capital Improvement Program Budget Year: FY2012, Pg. 19 Amount: $1,500,000 Fund Name: #1101 – General Fund (Make transfer from #6660 – Sanitary Replacement Fund to support this appropriation from #1101 – General Fund.) Additional Comments: A production objective of 42,000 feet per month of CCTV Inspection and light cleaning has been established for this project to achieve inspections of 500,000 lineal feet of sewer per year. ADS Environmental Services has averaged 45,000 feet per month of CCTV and light cleaning exceeding the production objective and it is estimated they will CCTV and light clean approximately 540,000 feet of sewer for the year. ADS has shown a willingness to adjust crew 9 of 1/12/12 assignments and priorities as the needs of the District have changed. CCTV data collected may be utilized to meet the requirements of the Consent Decree. Contracted planning resources utilized: Watershed Facility Planning, Stormwater Facility Planning, Combine Sewer Area I/I Assessment, Separate Sewer Area I/I Assessment, and Modeling PREVIOUS BOARD ACTION RELATED TO THIS ACTION: 02/10/11 – Ord. No. 13191 – Amount: $1,500,000 – ADS Environmental Services, LLC – Contract Amendment No. 5 10 of 1/12/12 AGENDA ITEM NUMBER: 22 – Proposed Ord. No. 13359 NAME OF PROJECT: CCTV Inspection and Physical Inspection of Sewers – South (FY2012) (10377) LOCATION: From the Mississippi River and south of Highway 40, west to Interstate 270, and north to Interstate 70 to the Missouri River TYPE OF PROJECT: CCTV and Physical Inspection of Sewers, Sewer Cleaning, Locating and Raising of Manholes (016.2 Vendor Services) DEPARTMENT REQUESTING ACTION: Engineering REQUESTED ACTION: Why is this action necessary?: Transfers funds, appropriates additional funds, and authorizes staff to enter into a contract amendment and exercise the second option year for the existing contract. What does action accomplish?: Provides investigations necessary to locate sewer system defects, remove debris and roots when encountered, and raise manholes for access SUMMARY EXPLANATION/BACKGROUND: Contractor: Ace Pipe Cleaning, Inc. Previous District Contract: Yes 4410 Hunt Avenue St. Louis, MO 63110 Consultant: N/A Agency: N/A Number of bidders: N/A Low Bid: N/A High Bid: N/A Appropriation Amount: $1,500,000.00 Designer’s Estimate: N/A MBE/WBE Participation: 10.0% Gonzales Companies, LLC – 7.0% - MBE DFW Infrastructure, Inc. – 3.0% - WBE Plan Approval Date: N/A Type of Contract: Unit Cost Properties Affected: N/A Properties Benefiting: N/A Designed by: N/A The work to be done under Contract #10616 authorizes the District to enter into contract Amendment No. 4 for the second option year with Ace Pipe Cleaning, Inc. The purpose of this contract is to provide District staff with information regarding sewer conditions by the use of Closed Circuit Television (CCTV) and physical inspection. These inspections will determine sewer conditions and system defects and will form the basis for preventive maintenance activities, inflow/infiltration investigations, and sewer system models. This contract amendment for CCTV Inspection and Physical Inspection of Sewers – South is for $1,500,000. Approximately 80% of the CCTV investigations will provide support data for the Watershed Planning efforts and the remaining 20% will support specific design projects and miscellaneous requests. The remaining existing contract balance has been assigned to work tasks. It is anticipated that the balance will be expended by May 2012. Currently, there is a backlog of unassigned work totaling 900,000 feet that will be addressed by this and future actions. FUNDING/COST SUMMARY: Budgeted: Capital Improvement Program Budget Year: FY2012, Pg. 20 Amount: $1,500,000 Fund Name: #1101 – General Fund (Make transfer from #6660 – Sanitary Replacement Fund to support this appropriation from #1101 – General Fund.) 11 of 1/12/12 Additional Comments: A production objective of 42,000 feet per month of CCTV Inspection and light cleaning has been established for this project to achieve inspections of 500,000 lineal feet of sewer per year. Ace Pipe Cleaning has averaged 46,000 feet per month of CCTV and light cleaning which exceeds the production objective and it is estimated they will CCTV and light clean approximately 560,000 feet of sewer for the year. Ace Pipe has shown a willingness to adjust crew assignments and priorities as the needs of the District have changed. CCTV data collected may be utilized to meet the requirements of the Consent Decree. Contracted planning resources utilized: Watershed Facility Planning, Stormwater Facility Planning, Combine Sewer Area I/I Assessment, Separate Sewer Area I/I Assessment, and Modeling. PREVIOUS BOARD ACTION RELATED TO THIS ACTION: 02/10/11 – Ord. No. 13192 – Amount: $1,500,000 – Ace Pipe Cleaning, Inc. – Contract Amendment No. 3 12 of 1/12/12 AGENDA ITEM NUMBER: 23 – Proposed Ord. No. 13360 NAME OF PROJECT: Bissell WWTP Disinfection Facilities (10325) LOCATION: East Grand Avenue and Hall Street in the City of St. Louis, Missouri TYPE OF PROJECT: Wastewater Treatment Plant Construction (015.0 Construction Costs) DEPARTMENT REQUESTING ACTION: Engineering REQUESTED ACTION: Why is this action necessary?: Appropriates funds and authorizes staff to enter into a construction contract What does action accomplish?: Implements the construction of a CIP project SUMMARY EXPLANATION/BACKGROUND: Contractor: Goodwin Bros. Const. Co. Previous District Contract: Yes 1766 Highway 61 South Crystal City, MO 63019 Consultant: N/A Agency: N/A Number of bidders: 5 Low Bid: $15,989,000.00 High Bid: $18,189,000.00 Appropriation Amount: $17,000,000.00 Designer’s Estimate: $20,385,500.00 MBE/WBE Participation: MBE/WBE Participation: 10.55% Fletcher Mechanical – 5.63% - MBE Supplied Industrial Solutions – 3.25% - MBE City Design – 0.16% - MBE Windstar – 1.16% - MBE KA Pazdera – 0.26% - WBE Zumwalt – 0.09% - WBE Plan Approval Date: December 8, 2011 Type of Contract: Lump Sum Properties Affected: 1 Properties Benefiting: Entire Bissell WWTP Service Area Designed by: HDR Engineering, Inc. The work to be done under Contract #10726 consists of the construction of chlorination and dechlorination facilities, effluent pump VFD system, and all associated civil, structural, mechanical, electrical, and instrumentation installations. The purpose of this project is to meet EPA and MDNR regulatory mandates requiring disinfection of effluent. This project is scheduled to be completed in 470 days. FUNDING/COST SUMMARY: Budgeted: Capital Improvement Program Budget Year: FY2012, Pg. 43 Amount: $23,000,000 Fund Name: #6660 – Sanitary Replacement Fund Additional Comments: An additional contingency of $125,000 for permits is included in the appropriation. Design for the Lemay WWTP Disinfection Facilities project was also included in the design contract for this project. Contracted planning resources utilized: Watershed Facility Planning. PREVIOUS BOARD ACTION RELATED TO THIS ACTION: 12/10/09 – Ord. No. 12994 – Amount: $6,000,000 – HDR Engineering, Inc. – Design Contract No. E-1265 13 of 1/12/12 AGENDA ITEM NUMBER: 24 – Proposed Ord. No. 13361 NAME OF PROJECT: Infrastructure Repairs (Rehabilitation) (FY2012 Contract A) (10665) LOCATION: Service Areas 4 and 5 in the northern and western portions of St. Louis County, Missouri TYPE OF PROJECT: Sanitary Sewer Rehabilitation (015.0 Construction Costs) DEPARTMENT REQUESTING ACTION: Engineering REQUESTED ACTION: Why is this action necessary?: Appropriates funds and authorizes staff to enter into a construction contract What does action accomplish?: Implements the construction of a CIP project SUMMARY EXPLANATION/BACKGROUND: Contractor: SAK Construction, LLC Previous District Contract: Yes 103 North Cool Springs Road O’Fallon, MO 63366 Consultant: N/A Agency: N/A Number of bidders: 2 Low Bid: $7,577,720.75 High Bid: $7,981,895.75 Appropriation Amount: $7,900,000.00 Designer’s Estimate: $7,431,000.00 MBE/WBE Participation: 11.02% - Luther’s Supply – MBE Plan Approval Date: December 8, 2011 Type of Contract: Unit Cost Properties Affected: 3,000 Properties Benefiting: 6,000 Designed by: District staff The work to be done under Contract #10728 consists of the construction of the rehabilitation of approximately 231,424 lineal feet of sewers using cured-in-place pipe (CIPP) methods, varying in size from 6-inches to 42-inches in diameter. The purpose of this project is to rehabilitate older, damaged, and deteriorated sewers to reduce pipe collapses, blocked mains, and inflow/infiltration. This project is scheduled to be completed in 365 days. FUNDING/COST SUMMARY: Budgeted: Capital Improvement Program Budget Year: FY2012, Pg. 59 Amount: $15,000,000 (Partial Funding) Fund Name: #6660 – Sanitary Replacement Fund Additional Comments: An additional contingency of $50,000 for utility relocation is included in the appropriation. Two companion projects, Infrastructure Repairs (Rehabilitation) (FY2012 Contract B) and Infrastructure Repairs (Rehabilitation) (FY2012 Contract C), encompassing the remainder of the District’s boundaries will bid later this fiscal year. Contracted planning resources utilized: Watershed Facility Planning, Combine Sewer Area I/I Assessment, Separate Sewer Area I/I Assessment, and CCTV Inspection. PREVIOUS BOARD ACTION RELATED TO THIS ACTION: N/A 14 of 1/12/12 AGENDA ITEM NUMBER: 25 – Proposed Ord. No. 13362 NAME OF PROJECT: Missouri River WWTP Secondary Treatment Expansion and Disinfection Facilities (10710) LOCATION: Missouri River WWTP, south of Interstate 70 and west of Maryland Heights Expressway in the City of Maryland Heights, Missouri TYPE OF PROJECT: Wastewater Treatment Plant Construction (015.0 Construction Costs) DEPARTMENT REQUESTING ACTION: Engineering REQUESTED ACTION: Why is this action necessary?: Appropriates partial funding for scheduled supplemental funds to complete a construction project What does action accomplish?: Implements the construction of a CIP project SUMMARY EXPLANATION/BACKGROUND: Contractor: Goodwin Bros. Const. Co. Previous District Contract: Yes 1766 Highway 61 South Crystal City, MO 63019 Consultant: N/A Agency: N/A Number of bidders: N/A Low Bid: N/A High Bid: N/A Appropriation Amount: $39,769,300.00 Designer’s Estimate: N/A MBE/WBE Participation: 18.21% K.A. Pazdera - .72% - WBE City Design - .07% - MBE WW Petroleum - .13% - WBE Harlem Anderson Trucking - .91% - MBE Williams Marble & Tile - .02% - WBE Sabur Surveying - .06% - MBE JRH Enterprises – 1.46% - WBE Windstar Trucking - .07% - MBE Commercial Bathwares - .02% - WBE Supplied Industrial Solutions – 9.00% - MBE Massey Tuckpointing – 3.37% - WBE Gateway Roofing - .38% - MBE TD4 Electrical – 2.0% - MBE Plan Approval Date: November 10, 2010 Type of Contract: Lump Sum Properties Affected: 1 Properties Benefiting: The Entire Missouri River Service Area Designed by: Black & Veatch Corporation The work to be done under Contract #10597 consists of the construction of a low lift pump station, aeration basins, a blower building, six final clarifiers, a sludge pumping station, a solids handling building, an ultraviolet radiation disinfection facility, a new primary digester, demolition of existing buildings, trickling filters and final clarifiers, and other miscellaneous items including yard piping and structures associated with this work. This construction is the second phase of a two-phase improvement program. The purpose of this project is to increase wet weather peak flow capacity and to meet more stringent MDNR discharge requirements for secondary treatment and disinfection of effluent. This project is scheduled to be completed in 1,214 days. FUNDING/COST SUMMARY: Budgeted: Capital Improvement Program Budget Year: FY2012, Pg. 64 Amount: $40,000,000 (Partial funding) Fund Name: #6660 – Sanitary Replacement Fund 15 of 1/12/12 Additional Comments: The bid for this contract was $88,890,000.00. The FY2013 budget includes $17,000,000 for the remaining appropriation. Contracted planning resources utilized: Watershed Facility Planning PREVIOUS BOARD ACTION RELATED TO THIS ACTION: 03/10/11 – Ord. No. 13220 – Amount: $37,000,000 – Missouri River WWTP Secondary Treatment Expansion and Disinfection Facilities – Original Construction Contract No. 10710 16 of 1/12/12 AGENDA ITEM NUMBER: 26 – Proposed Ord. No. 13363 NAME OF PROJECT: Bon Oak #10074 – 10078 Flood Mitigation (11104) LOCATION: Bon Oak Drive North of Chambers Road in unincorporated St. Louis County, Missouri TYPE OF PROJECT: Flood Mitigation (Buyout) DEPARTMENT REQUESTING ACTION: Engineering REQUESTED ACTION: Why is this action necessary?: Appropriates funds and authorizes staff to enter into an agreement with St. Louis County, Missouri to provide matching funds for Pre-Disaster Mitigation grant awarded from the Federal Emergency Management Agency (FEMA). What does action accomplish?: In cooperation with St. Louis County and FEMA, provides the local matching funds for the buyout of flood-prone properties. SUMMARY EXPLANATION/BACKGROUND: Contractor: N/A Previous District Contract: N/A Consultant: N/A Agency: St. Louis County, Missouri Number of bidders: N/A Low Bid: N/A High Bid: N/A Appropriation Amount: $50,000.00 Designer’s Estimate: N/A MBE/WBE Participation: Plan Approval Date: N/A Type of Contract: N/A Properties Affected: N/A Properties Benefiting: N/A Designed by: N/A The work to be done under this agreement provides for the reimbursement of funds to St. Louis County as matching funds for a Pre-Disaster Mitigation (PDM) grant from FEMA to allow for the purchase of three (3) flood-prone properties at #10074, #10076, and #10078 Bon Oak Drive in unincorporated St. Louis County, Missouri. The affected properties are located within the floodplain of Dellwood Creek and qualified for buyout based on FEMA established criteria and application for funds made by St. Louis County. All work associated with the buyout, relocation, and demolition for the properties will be managed by St. Louis County. FUNDING/COST SUMMARY: Budgeted: Capital Improvement Program Budget Year: FY2012, Pg. 103 Amount: $50,000 Fund Name: #5576 – Maline Creek OMCI Additional Comments: Total estimated project cost is $182,900 with a local match of $45,725.00. PREVIOUS BOARD ACTION RELATED TO THIS ACTION: N/A 17 of 1/12/12 AGENDA ITEM NUMBER: 27 – Proposed Ord. No. 13364 NAME OF PROJECT: Magnet Drive Storm Sewer (10699) LOCATION: West of Interstate 170 and north of Olive Boulevard in the City of Olivette, Missouri TYPE OF PROJECT: Storm Sewer Construction (015.0 Construction Costs) DEPARTMENT REQUESTING ACTION: Engineering REQUESTED ACTION: Why is this action necessary?: Appropriates funds and authorizes staff to enter into a construction contract What does action accomplish?: Implements the construction of a CIP project SUMMARY EXPLANATION/BACKGROUND: Contractor: Heartland Construction & Excavating Previous District Contract: Yes 1920 Cherokee Trail Florissant, MO 63031 Consultant: N/A Agency: N/A Number of bidders: 7 Low Bid: $31,940.50 High Bid: $45,435.00 Appropriation Amount: $50,000.00 Designer’s Estimate: $38,000.00 MBE/WBE Participation: N/A – The above bid, less utility relocation, is less than $50,000 and therefore does not have a goal under the MBE/WBE policy. Plan Approval Date: December 8, 2011 Type of Contract: Unit Cost Properties Affected: 3 Properties Benefiting: 2 Designed by: District Staff The work to be done under Contract #10725 consists of the construction of approximately 235 lineal feet of pipe sewers 12- inches in diameter and appurtenances. The purpose of this project is to alleviate yard flooding and erosion. This project is scheduled to be completed in 90 days. FUNDING/COST SUMMARY: Budgeted: Capital Improvement Program Budget Year: FY2012, Pg. 110 Amount: $50,000 Fund Name: #5584 – University City OMCI Additional Comments: An additional contingency of $15,000 for utility relocation is included in the appropriation. Contracted planning resources utilized: Stormwater Facility Planning. PREVIOUS BOARD ACTION RELATED TO THIS ACTION: N/A 18 of 1/12/12 AGENDA ITEM NUMBER: 28 – Proposed Ord. No. 13365 NAME OF PROJECT: CSO – Macklind Outfall L-062 Separation (10159) LOCATION: South of Manchester Road and east of Macklind Avenue in the City of St. Louis, Missouri TYPE OF PROJECT: Sewer Separation (015.0 Construction Costs) DEPARTMENT REQUESTING ACTION: Engineering REQUESTED ACTION: Why is this action necessary?: Appropriates additional funds and authorizes staff to amend a construction contract What does action accomplish?: Provides additional funding for the construction of a CIP project SUMMARY EXPLANATION/BACKGROUND: Contractor: MB Mitchell, LLC Previous District Contract: Yes 601 Fountain Lakes Blvd. St. Charles, MO 63301 Consultant: N/A Agency: N/A Number of bidders: N/A Low Bid: N/A High Bid: N/A Appropriation Amount: $100,000.00 Designer’s Estimate: $963,000.00 MBE/WBE Participation: 33.37% J & J Boring – 27.92% - WBE Riley Ready Mix – 1.36% - MBE Brandt Contracting – 4.09% - MBE Plan Approval Date: April 20, 2011 Type of Contract: Unit Cost Properties Affected: 3 Properties Benefiting: Entire Watershed Designed by: District staff The work to be done under Contract #10637 consists of the construction of approximately 153 lineal feet of pipe sewers varying in size from 15-inches to 21-inches in diameter, 208 lineal feet of 20-inch pipe-in-tunnel, and appurtenances. The purpose of this project is to separate a reach of combined sewer and eliminate a CSO. This project will eliminate one (1) CSO. This project is scheduled to be completed in 180 days. FUNDING/COST SUMMARY: Budgeted: Capital Improvement Program Budget Year: FY2008, Pg. 36 Amount: $320,000 (FY2011, Pg. 74) ($280,000) Fund Name: #660 – Sanitary Replacement Fund Additional Comments: The designer’s estimate includes $600,000 for Special Waste Disposal related to lead contaminated soils and water. Soil handling quantities are included in the contractor’s bid; water handling was established as an allowance. Contracted planning resources utilized: Watershed Facility Planning, Combine Sewer Area I/I Assessment, Modeling, and CCTV Inspection. 19 of 1/12/12 This project contains Special Waste Disposal Allowance for handling and treating lead contaminated ground water of $100,000 and a dewatering allowance of $50,000. The project also included a contingency of $51,253. Prior to beginning construction, the District requested a dewatering plan and a plan for handling contaminated ground water. The District also requested, reviewed, and agreed with the contractor on time and material costs for both these items along with an estimated time frame to complete this work. After reviewing this proposal, it is estimated that this work will cost approximately $200,000 to complete leaving the project no contingency for unforeseen conditions prior to beginning construction. We are requesting an additional $100,000 to cover unforeseen conditions while constructing this project. If the additional funding is needed, the work will be tracked on a time and material basis. PREVIOUS BOARD ACTION RELATED TO THIS ACTION: 06/09/11 – Ord. No. 13247 – Amount: $740,000 – CSO – Macklind Outfall L-062 Separation – Original Construction Contract No. 10159 20 of 1/12/12 AGENDA ITEM NUMBER: 29 – Proposed Ord. No. 13366 NAME OF PROJECT: Deer Creek Sanitary System Improvements (11110) LOCATION: Deer Creek Watershed TYPE OF PROJECT: Design (016.1 Professional Services and 011.0 Design Phase Project Costs) DEPARTMENT REQUESTING ACTION: Engineering REQUESTED ACTION: Why is this action necessary?: Transfers funds, appropriates funds, and authorizes staff to enter into a design contract What does action accomplish?: Provides for a multi-year Watershed Consultant contract to implement the design of projects to meet regulatory requirements. SUMMARY EXPLANATION/BACKGROUND: Contractor: N/A Previous District Contract: Yes Consultant: Parsons Water & Infrastructure, Inc. 400 Woods Mill Road South, Suite 330 Chesterfield, MO 63017 Corporate Headquarters: Pasadena, California Agency: N/A Number of proposers: (3) CDG Engineers Architects Planners, Inc., Cole & Associates, Inc., and Parsons Water & Infrastructure, Inc. Appropriation Amount: $600,000.00 Designer’s Estimate: N/A MBE/WBE Participation: 10.42% (25.00% Overall – See Additional Comments) ABNA Engineering, Inc. – 0.00% - MBE Civil Design, Inc. – 4.11% - WBE David Mason & Associates, Inc. – 0.00% - MBE Engineering Design Source, Inc. – 0.00% - MBE M3 Engineering Group – 5.82% - MBE Tech Service, Inc. – 0.00% - MBE Vector Communications – 0.49% - MBE Plan Approval Date: N/A Type of Contract: Cost Plus with Lump Sum Work Orders Properties Affected: N/A Properties Benefiting: The entire Deer Creek Watershed Designed by: N/A This ordinance authorizes the District to enter into Contract #10733, with Parsons Water & Infrastructure, Inc. for one year with annual extensions based on acceptable performance to provide Watershed Consultant services for all projects included in the Deer Creek Sanitary System Improvements project. The preliminary construction cost estimate for the entire Deer Creek Sanitary program is $420,000,000. The estimated design contract range for the entire program contract is between $30 to $38 million. Specific project appropriations associated with this contract in this fiscal year being appropriated separately include: Project Name Estimated Construction Cost DC-06 Deer Creek Sanitary Relief Phase III and I/I Reduction (10576) $4,300,000 21 of 1/12/12 FUNDING/COST SUMMARY: Budgeted: Capital Improvement Program Budget Year: FY 2012, Pg. 24 Amount: $600,000 Fund Name: #6660 – Sanitary Replacement Fund (Board action includes a transfer of $556,733.15 of the $600,000 from #6660 – Sanitary Replacement Fund to #1101 – General Fund for non-capital work before appropriation to comply with new GASB accounting requirements.) Additional Comments: There were two other proposals considered on this project. The appropriation for design services is equal to the proposed funding presented in the CIP Budget Supplement. The District is initiating a program to use Watershed Consultants to expedite project delivery of infrastructure/capital improvement projects. The Watershed Consultant will be responsible for leading a design team for the delivery of construction documents for sewers, tunnels, storage tanks, pump stations, public and private I/I reduction, and other improvements to meet the requirements of the Sanitary Sewer Overflow (SSO) Control Master Plan and regulatory requirements for the Deer Creek sanitary sewer areas. They will also be responsible for providing input into the CIRP development process and making recommendations for project sequencing and funding as necessary for the program to succeed. There are a total of twelve (12) firms including the prime on the Watershed Consultant team. The total project MWBE commitment for the project duration per the proposal is 25.00%, which includes the following minimum participation from ABNA Engineering, Inc. (MBE) 3.00%, Civil Design, Inc. (WBE) 6.00%, David Mason & Associates, Inc. (MBE) 5.00%, Engineering Design Source, Inc. (MBE) 6.00%, M3 Engineering Group (MBE) 2.50%, Tech Services, Inc. (MBE) 2.00%, and Vector Communications (MBE) 0.50%. This appropriation includes $556,733.15 for the Deer Creek Sanitary System Improvements (11110) project for cost plus fee work order tasks to manage the multi-year contract starting in FY2012. The appropriation also includes $43,266.85 for lump sum preliminary study work order tasks, which results in a total appropriation of $600,000. Future appropriations will be required annually to continue managing work order tasks for this contract. The Deer Creek Sanitary System Improvements (11110) cost plus fee work orders and lump sum work orders for expenses from February 2012 through approximately September 2012 include the following: Non-Capital Costs Project Management (Work Order 1 & 2) $392,874.44 Field Investigations (Work Order 5) $ 30,000.00 Watershed Assistance (Work Order 6) $ 97,235.10 Contingency $ 36,623.61 Total Non-Capital Costs $556,733.15 Capital Costs Preliminary Studies (Work Order 3)* $ 43,266.85 Pre-designs (Reserved WO 4 for future FY’s) $ 0.00 Total Capital Costs $ 43,266.85 *Preliminary Study – Black Creek – Haddington Court Storage Facility (11688) Support Information ($24,228.73) and Preliminary Study – Black Creek Trunk Sewer Relief (SKME-567)($19,038.12) Work Order No. 1 and 2 are work for project management including startup, reporting and tracking, scheduling, budgeting, invoicing, establishing procedures for reporting, quality control, communications, document delivery procedures, administrating project meetings, preparing agenda and meeting minutes, watershed training and workshops, and documentation. This work also includes project scoping, recommendations for project sequencing and funding, public participation, developing and maintaining a shared project website, and overall contract management and participation. Work Order No. 3 is for preparing preliminary studies identified as a result of the design activities or other planning efforts. Work Order No. 4 is for preparing pre-designs identified as a result of the design activities or other planning efforts. 22 of 1/12/12 Work Order No. 5 is for special services or required field investigations that might arise during preliminary studies, pre- designs or designs such as determining sewer connectivity, locating manholes, survey, geotechnical investigations, wetlands delineations, dye/dye flood testing, smoke testing, flow monitoring, water quality monitoring, flood plain investigations, confirming field features, and other special investigations not included in a specific project or for future phases of work that may include activities such as site environmental investigations or other studies. Work Order No. 6 is work associated with additional planning effort as required, to review the Deer Creek GIS maps and models, create functional databases, review current and planned projects in the watershed, assist in prioritizing studies and projects to meet schedule and budget, evaluate and making recommendations for project and funding sequencing enhancements, plot and study complaint maps, defect maps and aerials, and attend workshops to assist in development and evaluation of required storage and pumping facilities versus larger replacement trunk sewers. Contracted planning resources utilized: Watershed Facility Planning, Stormwater Facility Planning, Combine Sewer Area I/I Assessment, Separate Sewer Area I/I Assessment, Combine Sewer Area Flow Metering & Monitoring, Separate Sewer Area Flow Metering & Monitoring, Modeling, CCTV Inspection, Radar Rainfall Data, and General Services Surveying. PREVIOUS BOARD ACTION RELATED TO THIS ACTION: 04/20/12 – Res. No. 2969 – Approving a list of proposed expenditures that included this project for the Capital Improvement and Replacement Program as a result of the Program Planning efforts. 23 of 1/12/12 AGENDA ITEM NUMBER: 30 – Proposed Ord. No. 13367 NAME OF PROJECT: DC-06 Deer Creek Sanitary Relief Phase III and I/I Reduction (10576) LOCATION: South of Olive Boulevard and east of New Ballas Road TYPE OF PROJECT: Design (011.0 Design Phase Project Costs) DEPARTMENT REQUESTING ACTION: Engineering REQUESTED ACTION: Why is this action necessary?: Appropriates funds What does action accomplish?: Implements the design of a CIP project SUMMARY EXPLANATION/BACKGROUND: Contractor: N/A Previous District Contract: Yes Consultant: Parsons Water & Infrastructure, Inc. 400 Woods Mill Road South, Suite 330 Chesterfield, MO 63017 Corporate Headquarters: Pasadena, California Agency: N/A Number of proposers: Previous Watershed Consultant Selection Appropriation Amount: $400,000.00 Designer’s Estimate: N/A MBE/WBE Participation: 58.27% ABNA Engineering, Inc. – 0.00% - MBE Civil Design, Inc. – 36.38% - WBE David Mason & Associates, Inc. – 10.87% - MBE Engineering Design Source, Inc. – 8.09% - MBE M3 Engineering Group – 2.93% - MBE Tech Service, Inc. – 0.00% - MBE Vector Communications – 0.00% - MBE Plan Approval Date: N/A Type of Contract: Lump Sum Properties Affected: N/A Properties Benefiting: 668 Designed by: N/A This ordinance appropriates funds for the design of the DC-06 Deer Creek Sanitary Relief Phase III and I/I Reduction (10576) as part of the Watershed Consultant services for all projects included in the Deer Creek Sanitary System Improvements project. The DC-06 Deer Creek Sanitary Relief Phase III and I/I Reduction (10576) is a lump sum cost project for design of approximately 2,950 linear feet of 8-inch to 15-inch sanitary sewer, and 140 linear feet of storm sewer, rehabilitating approximately 24,450 linear feet of 8-inch to 15-inch sanitary sewers, 765 linear feet of 12-inch to 72” x 36” storm sewers, 264 manholes, 333 service connections, and private I/I reduction in an area benefiting approximately 668 properties consisting of 35 properties with downspout and drain connections to the sanitary sewer, 32 properties with suspect downspouts and drain connections to the sanitary sewer, and 21 properties with defective cross connection laterals. The project will provide for the elimination of 96 private inflow sources from approximately 60 properties, three sanitary bypasses, and alleviate basement backups for approximately four properties. The construction cost estimate for this project is $4,300,000. 24 of 1/12/12 Funding for services during construction is currently estimated to be $30,000. Funding for these services will be included in a future annual extension of this contract to coordinate with funding for construction. FUNDING/COST SUMMARY: Budgeted: Capital Improvement Program Budget Year: FY 2012, Pg. 23 Amount: $400,000 Fund Name: #6660 – Sanitary Replacement Fund Additional Comments: This project is being designed as part of the Deer Creek Sanitary System Improvements (11110) Watershed Consultant contract. Contracted planning resources utilized: Watershed Facility Planning, Combine Sewer Area I/I Assessment, Separate Sewer Area I/I Assessment, Combine Sewer Area Flow Metering & Monitoring, Separate Sewer Area Flow Metering & Monitoring, Modeling, CCTV Inspection, and Radar Rainfall Data. PREVIOUS BOARD ACTION RELATED TO THIS ACTION: 04/20/12 – Res. No. 2969 – Approving a list of proposed expenditures that included this project for the Capital Improvement and Replacement Program as a result of the Program Planning efforts. 25 of 1/12/12 AGENDA ITEM NUMBER: 31 – Proposed Ord. No. 13368 NAME OF PROJECT: Lower & Middle RDP CSO Controls System Improvements (11109) LOCATION: District-Wide TYPE OF PROJECT: Design (016.1 Professional Services and 011.0 Design Phase Project Costs) DEPARTMENT REQUESTING ACTION: Engineering REQUESTED ACTION: Why is this action necessary?: Transfers funds, appropriates funds, and authorizes staff to enter into a design contract What does action accomplish?: Provides for a multi-year Watershed Consultant contract to implement the design of projects to meet regulatory requirements. SUMMARY EXPLANATION/BACKGROUND: Contractor: N/A Previous District Contract: Yes Consultant: Jacobs Engineering Group Inc. 501 No. Broadway St. Louis, MO 63102 Corporate Headquarters: Pasadena, California Agency: N/A Number of proposers: (2) Black & Veatch Corporation and Jacobs Engineering Group Inc. Appropriation Amount: $2,000,000.00 Designer’s Estimate: N/A MBE/WBE Participation: 17.2% (22.00% Overall – See Additional Comments) ABNA Engineering, Inc. – 9.0% - MBE Civil Design, Inc. – 0.6% - WBE David Mason & Associates, Inc. – 1.4% - MBE Engineering Design Source, Inc. – 0.00% - MBE Intelligent Design & Construction Solutions – 2.2% - WBE Kowelman Engineering, Inc. – 0.2% - WBE Losli Engineering – 0.00% - WBE M3 Engineering Group – 2.5% - MBE Tech Service, Inc. – 1.3% - MBE Plan Approval Date: N/A Type of Contract: Cost Plus with Lump Sum Work Orders Properties Affected: N/A Properties Benefiting: The entire Lemay, Martigney, and Maline Creek Watersheds Designed by: N/A This ordinance authorizes the District to enter into Contract #10734 with Jacobs Engineering Group Inc. for one year with annual extensions based on acceptable performance to provide Watershed Consultant services for all projects included in the Lower and Middle RDP CSO Controls System Improvements project. The preliminary construction cost estimate for the entire Lower and Middle RDP program is $1,225,000,000. The estimated design contract range for the entire program contract is between $90 to $110 million. Initial funding for the final design for the Lemay Pump Station No. 1 Redundant Force Main (11123) project is included in the first year contract with an estimated construction cost estimate of $14,375,000. FUNDING/COST SUMMARY: Budgeted: Capital Improvement Program Budget Year: FY2012, Pg. 33 Amount: $2,000,000 26 of 1/12/12 Fund Name: #6660 – Sanitary Replacement Fund (Board action includes a transfer of $384,161.39 of the $2,000,000 from #6660 – Sanitary Replacement Fund to #1101 – General Fund for non-capital work before appropriation to comply with new GASB accounting requirements.) Additional Comments: There was one other proposal considered on this project. The appropriation for design services is equal to the proposed funding presented in the CIP Budget Supplement. The District is initiating a program to use Watershed Consultants to expedite project delivery of infrastructure/capital improvement projects. The Watershed Consultant will be responsible for leading a design team for the delivery of construction documents for sewer, in-sewer storage, tunnel storage, storage tanks, high rate treatment facilities, pump stations, and other improvements to meet the requirements of the CSO Long Term Control Plan for the Lemay and Maline Creek areas. They will also be responsible for providing input into the CIRP development process and making recommendations for project sequencing and funding as necessary for the program to succeed. There are a total of fourteen (14) firms including the prime on the Watershed Consultant team. The total project MWBE commitment for the project duration is 22.00%, which includes participation from ABNA Engineering, Inc. (MBE) for 8.00%, and 14% from the following eight firms that will each have less than 5% of the work: Civil Design, Inc. (WBE), David Mason & Associates, Inc. (MBE), Engineering Design Source, Inc. (MBE), IDCS (WBE), Kowelman Engineering, Inc. (WBE), Losli Engineering(WBE), M3 Engineering Group (MBE), and Tech Services, Inc. (MBE). This appropriation includes $903,500 for the Lower and Middle RDP CSO Controls System Improvements (11109) project for cost plus fee work order tasks to manage the multi-year contract in FY2012. Future appropriations will be required annually to continue managing work order tasks for this contract. The Lower and Middle RDP CSO Controls System Improvements (11109) cost plus fee work orders for FY 2012 include the following: Non-Capital Costs Project Management (Work Order 1) $368,033.00 Field Investigations (Work Order 4) $ 16,128.39 Total Non-Capital Cost $384,161.39 Capital Costs Lemay Pump Station No. 1 Redundant Force Main (Work Order 2) $1,096,500.00 Maline Creek and Lemay Outfall 063 Investigations (Work Order 3) $ 390,000.00 Preliminary Studies (Work Order 5) $ 82,185.31 Contingency $ 47,153.30 Total Capital Cost $1,615,838.61 Work Order No. 1 is for project management including establishing procedures for reporting, quality control, communications, invoicing, scheduling, and documentation. This work also includes project scoping, recommendations for project sequencing and funding, public participation, modeling support, and overall contract management and participation. Work Order No. 2 is for final design of the Lemay Pump Station No. 1 Redundant Force Main (11123) project, which consists of approximately 3,400 feet of 96-inch diameter force main installed in a tunnel between Lemay Pump Station No. 1 and the Lemay Wastewater Treatment Plant. The total design fee for this project is $1,258,780. Only $1,096,500 is being requested for this work in FY12 with the remainder of the design fee and construction phase services, amounting to an estimated $800,000, is scheduled to be requested in FY13. Work Order No. 3 is for initial Maline Creek and Lemay Outfall 063 storage, treatment, and pump station investigations and analyses. The total fee for this work order is $519,071. Only $390,000 is being requested in FY12 with the remaining $129,071 to be requested in FY13. Work Order No. 4 is for special services such as determining sewer connectivity, locating manholes, and confirming field features. Other Special investigations for future phases of the work (not included in the fees for FY12) may include activities such as site environmental investigations, floodplain, or other studies. Work Order No. 5 is for preparing preliminary studies for projects, which are identified as a result of the design activities, or for work associated with additional planning effort as required for regulatory projects within this project area. 27 of 1/12/12 Contracted planning resources utilized: Watershed Facility Planning, Stormwater Facility Planning, Combine Sewer Area I/I Assessment, Separate Sewer Area I/I Assessment, Combine Sewer Area Flow Metering & Monitoring, Separate Sewer Area Flow Metering & Monitoring, Modeling, CCTV Inspection, Radar Rainfall Data, and General Services Surveying. PREVIOUS BOARD ACTION RELATED TO THIS ACTION: 4/20/11 – Res. No. 2969 – Approving a list of proposed expenditures that included this project for the Capital Improvement and Replacement Program as a result of the Program Planning efforts. 28 of 1/12/12 AGENDA ITEM NUMBER: 32 – Proposed Ord. No. 13369 NAME OF PROJECT: Bissell WWTP Disinfection Facilities (E-1265 & 10325) LOCATION: The Bissell Point and Lemay Wastewater Treatment Plants TYPE OF PROJECT: Design of Wastewater Treatment Plant Facilities (011.0 Design Phase Project Costs) DEPARTMENT REQUESTING ACTION: Engineering REQUESTED ACTION: Why is this action necessary?: Appropriates additional funds and authorizes staff to amend a design contract What does action accomplish?: Provides additional funds for the design of a CIP project SUMMARY EXPLANATION/BACKGROUND: Contractor: N/A Previous District Contract: Yes Consultant: HDR Engineering, Inc. 326 So. 21st Street, Suite 400 St. Louis, MO 63103 Corporate Headquarters: Omaha, Nebraska Agency: N/A Number of proposers: N/A Appropriation Amount: $554,000.00 Designer’s Estimate: N/A MBE/WBE Participation: 16.60% (21.0% for total project) Engineering Design Source, Inc. – 6.50% - MBE (This amendment only) David Mason & Associates, Inc. – 2.20% - MBE (This amendment only) Intelligent Design & Construction Solutions, LLC – 7.40% - WBE (This amendment only) Tech Service, Inc. – 0.50% - MBE (This amendment only) Plan Approval Date: N/A Type of Contract: Lump Sum Properties Affected: 1 Wastewater Treatment Plant Properties Benefiting: Bissell WWTP Service Area Designed by: N/A The work to be done under Contract E-1265 authorizes the District to enter into Amendment No. 10 with HDR Engineering, Inc. This amendment provides for the engineering construction phase services for the Bissell WWTP Disinfection Facilities (10325) project. The low bid for this project is to be determined. The amended design appropriation is $6,854,000.00. FUNDING/COST SUMMARY: Budgeted: Capital Improvement Program Budget Year: FY2012, Pg. 18 Amount: $1,150,000 Fund Name: #6660 – Sanitary Replacement Fund Additional Comments: The cost of this additional work is approximately $1,012,000. Contracted planning resources utilized: Watershed Facility Planning. PREVIOUS BOARD ACTION RELATED TO THIS ACTION: 4/20/11 – Res. No. 2969 – Approving a list of proposed expenditures that included this project for the Capital Improvement and Replacement Program as a result of the Program Planning efforts. 12/10/09 – Ord. No. 12994 – Amount: $6,000,000 – HDR Engineering, Inc. – Design Contract No. E-1265 29 of 1/12/12 AGENDA ITEM NUMBER: 33 – Proposed Ord. No. 13370 NAME OF PROJECT: McKelvey Project “A” and “B” Sanitary Relief (SKME-005) (10163) LOCATION: East and west of Lindbergh Boulevard (U.S. Highway 67) and north of Page Avenue in Fee Fee Creek Watershed in the Missouri River service area TYPE OF PROJECT: Easement Condemnation DEPARTMENT REQUESTING ACTION: Engineering REQUESTED ACTION: Why is this action necessary?: Authorizes staff to enter into condemnation proceedings What does action accomplish?: Acquires permanent easements and temporary construction easements to construct a sanitary sewer project with appurtenances SUMMARY EXPLANATION/BACKGROUND: Contractor: N/A Previous District Contract: N/A Consultant: N/A Agency: N/A Number of bidders: N/A Low Bid: N/A High Bid: N/A Appropriation Amount: N/A District’s Estimate: N/A MBE/WBE Participation: N/A Plan Approval Date: N/A Type of Contract: N/A Properties Affected: 6 Properties Benefiting: 1,180 Designed by: N/A This ordinance authorizes the staff to enter into condemnation proceedings for permanent sewer easements and temporary construction easements on six (6) parcels of ground located in St. Louis, Missouri. These easements are needed to construct this project, which consists of approximately 7500 feet of 18-inch to 21-inch diameter sanitary relief sewers from east and west of Lindbergh Boulevard (U.S. Highway 67) and north of Page Avenue. This project is for sanitary sewer overflows and basement backups due to an overcharged sanitary sewer. Also, three (3) SSO bypasses will be eliminated. These easements have been appraised. Currently, the District has been unable to negotiate a settlement with the owners. This project is now tentatively scheduled to begin construction in Fiscal Year 2013. FUNDING/COST SUMMARY: Budgeted: Capital Improvement Program Budget Year: FY 2012 Amount: N/A Fund Name: #6660 – Sanitary Replacement Fund Additional Comments: None PREVIOUS BOARD ACTION RELATED TO THIS ACTION: N/A 30 of 1/12/12 AGENDA ITEM NUMBER: 34 – Proposed Ord. No. 13371 NAME OF PROJECT: Energize Missouri Water Loan Program LOCATION: N/A TYPE OF PROJECT: Energy Efficient Cost savings DEPARTMENT REQUESTING ACTION: Secretary-Treasurer Why is this action necessary: This action is necessary because MDNR requires Board Authorization to lend funds under the Energize Missouri Water Loan Program. What does action accomplish: This Ordinance authorizes the District to participate in the Energize Missouri Water Loan Program to fund energy efficient cost savings projects in an aggregate borrowing not to exceed $242,700. SUMMARY EXPLANATION/BACKGROUND: Contractor: N/A Previous District Contract: Yes in 2004 Consultant: Agency: N/A Number of bidders: N/A Low Bid: N/A High Bid: N/A Appropriation Amount: N/A District’s Estimate: N/A MBE/WBE Participation: N/A Plan Approval Date: N/A Type of Contract: N/A Properties Affected: N/A Properties Benefiting: N/A Designed by: N/A FUNDING/COST SUMMARY: Budgeted: No impact Budget Year: None Amount: None Fund Name: N/A Additional Comments: This Ordinance authorizes the District to participate in the Energize Missouri Water Loan Program to fund energy efficient cost savings projects in an aggregate borrowing not to exceed $242,700. This loan is being authorized on an annual appropriation basis with the repayment coming from projected energy savings in future years. The proceeds will fund the replacement of lights, add insulation, upgrade the weather tightness of the vestibule and upgrade motion sensors principally at the 2350 Market Street facility. The loan will be for a seven (7) year term and carries a 2.5% interest rate. PREVIOUS BOARD ACTION RELATED TO THIS ACTION: 1/08/04 - Ord. No. 11667 - Authorized a $124,860 annual appropriation loan at 3.15% for 9 years for energy cost savings projects 31 of 1/12/12 AGENDA ITEM NUMBER: 35 – Resolution No. 3009 NAME OF PROJECT: Public Funds Investment Policy Amendment LOCATION: N/A TYPE OF PROJECT: Treasury & Investments DEPARTMENT REQUESTING ACTION: Secretary-Treasurer Why is this action necessary: This resolution is necessary to assure compliance with the District’s governing Charter and covers the investment of public funds. What does action accomplish: This resolution memorializes the Board of Trustees parameters for the investment of public funds. SUMMARY EXPLANATION/BACKGROUND: Contractor: N/A Previous District Contract: No contract Policy approved 2001 Consultant: Agency: N/A Number of bidders: N/A Low Bid: N/A High Bid: N/A Appropriation Amount: N/A District’s Estimate: N/A MBE/WBE Participation: N/A Plan Approval Date: N/A Type of Contract: N/A Properties Affected: N/A Properties Benefiting: N/A Designed by: N/A FUNDING/COST SUMMARY: Budgeted: No impact Budget Year: None Amount: None Fund Name: N/A Additional Comments: This resolution codifies the various statues associated with the investment of public funds that are not immediately need for their intended purpose. It does include bond funds but does not cover pension investments. This resolution will amend the existing policy so that the District’s policy will conform to the model investment policy being sponsored by the Missouri State Treasurer. PREVIOUS BOARD ACTION RELATED TO THIS ACTION: 2/08/01 - Res. No. 2389 - Authorizes the existing Investment Policy 6/09/05 - Ord. No. 12010- Codification of various Treasury and Investment related statutes and procedures.