A G E N D A
1517th MEETING OF THE BOARD OF TRUSTEES
THE METROPOLITAN ST. LOUIS SEWER DISTRICT
May 10, 2012 – 4:00 P.M.
MSD OFFICES
2350 MARKET STREET
ROOM 109
NEW TRUSTEE OATH OF OFFICE
ROLL CALL
THE BOARD OF TRUSTEES WILL BE IN CLOSED SESSION BETWEEN 4:30 P.M. AND 5:00 P.M.
1 CLOSED SESSION TO DISCUSS LEGAL, CONFIDENTIAL OR PRIVILEGED MATTERS
UNDER §610.021(1), RSMO 1988 SUPP.; LEASING, PURCHASE OR SALE OF REAL ESTATE
UNDER §610.021(2)
2 APPROVAL OF JOURNAL OF PRECEDING MEETINGS April 12, 2012 (1516th)
3 COMMENTS BY THE CHAIR
4 REPORT OF BOARD COMMITTEES
5 REPORT OF EXECUTIVE DIRECTOR
6 COMMENTS FROM THE PUBLIC
7 SUBMISSION OF PUBLIC HEARING REPORTS – None
8 COMMUNICATIONS – None
9 CONSENT AGENDA – Item Nos. 10 through 21
2 of 4/12/12
Ordinances
10 Adoption of proposed Ord. No. 13385 appropriating $500,000.00 from the Operation,
Maintenance and Construction Improvement Fund of Deer Creek for flood mitigation purposes in
Mary Avenue Flood Mitigation (10701) in the City of Brentwood, Missouri; and authorizing the
Executive Director and Secretary-Treasurer on behalf of The Metropolitan St. Louis Sewer
District to enter into an intergovernmental agreement with the City of Brentwood, Missouri to
provide financial assistance for demolition of structures on flood-prone properties. (Intro.
04/12/12)
11 Adoption of proposed Ord. No. 13386 appropriating $1,700,000.00 from the Sanitary
Replacement Fund to be used for project costs for the rehabilitation of sanitary sewers in
Infrastructure Repairs (Rehabilitation) (FY2012 Contract B) (11806) in the City of St. Louis,
Missouri; and authorizing the Executive Director and Secretary-Treasurer on behalf of The
Metropolitan St. Louis Sewer District to enter into a contract with Insituform Technologies USA,
LLC for the aforesaid rehabilitation. (Intro. 04/12/12)
12 Adoption of proposed Ord. No. 13387 appropriating $180,000.00 from the Operation,
Maintenance and Construction Improvement Fund of Clayton Central to be used for project costs
for the construction of sanitary sewers in Meramec and Forest Park Parkway Sanitary Sewer
Improvements (10704), in the City of Clayton, Missouri; and authorizing the Executive Director
and Secretary-Treasurer on behalf of The Metropolitan St. Louis Sewer District to enter into a
contract with Bates Utility Company for the construction of the aforesaid sanitary sewers. (Intro.
04/12/12)
13 Adoption of proposed Ord. No. 13388 appropriating $2,300,000.00 from the Operation,
Maintenance and Construction Improvement Fund of Missouri River Bonfils to be used for project
costs for the rehabilitation of sanitary sewers in Missouri River Bonfils Sanitary Sewer
Rehabilitation (10708), in the Cities of Bridgeton and St. Louis, Missouri; and authorizing the
Executive Director and Secretary-Treasurer on behalf of The Metropolitan St. Louis Sewer
District to enter into a contract with SAK Construction, LLC, Inc., for the aforesaid sanitary sewer
construction. (Intro. 04/12/12)
14 Adoption of proposed Ord. No. 13389 authorizing the Executive Director and Secretary-Treasurer
on behalf of The Metropolitan St. Louis Sewer District to enter into a contract with The Hardwick
Law Firm, LLC whereby The Hardwick Law Firm, LLC will serve as either the Bond Counsel or
Disclosure Counsel for the District as deemed by the District in a transaction by transaction basis.
(Intro. 04/12/12)
15 Adoption of proposed Ord. No. 13390 authorizing the Executive Director and Secretary-Treasurer
on behalf of The Metropolitan St. Louis Sewer District to enter into a contract with Gilmore & Bell,
P.C., whereby Gilmore & Bell, P.C. will serve as either the Bond Counsel or Disclosure Counsel
for the District as deemed by the District in a transaction by transaction basis. (Intro. 04/12/12)
16 Adoption of proposed Ord. No. 13391 authorizing the Executive Director and Secretary-Treasurer
on behalf of The Metropolitan St. Louis Sewer District to enter into a contract with White Coleman
& Associates, LLC whereby White Coleman & Associates, LLC will serve as either the Bond
Counsel or Disclosure Counsel for the District as deemed by the District in a transaction by
transaction basis. (Intro. 04/12/12)
3 of 4/12/12
17 Adoption of proposed Ord. No. 13392 authorizing the Executive Director and Secretary-Treasurer
on behalf of The Metropolitan St. Louis Sewer District to enter into a contract with Thompson
Coburn, LLP whereby Thompson Coburn, LLP will serve as either the Bond Counsel or
Disclosure Counsel for the District as deemed by the District in a transaction by transaction basis.
(Intro. 04/12/12)
Plan Approval
18 Portis #3242 Combined Sewer Improvements (10145)
This project, located north of Fyler Avenue and east of Kinsghighway in the City of St.
Louis, is to alleviate localized property and street flooding in the 3200 block of Portis
Avenue. This project is in the Fiscal Year 2013 Budget and the estimated construction
cost is $245,000.
19 Romaine Ave. #9449 Storm Sewer (10747)
This project, located west of Interstate 170 and north of Page Avenue in the City of
Overland, is to alleviate ponding in rear yards of 9447 and 9449 Romaine Avenue. This
project is in the Fiscal Year 2012 Budget and the estimated construction cost is $85,000.
20 Wabash Ave #8555 Storm Sewer (10357)
This project, located north of Airport Road and east of Interstate 170 in the City of
Berkeley, is to alleviate structure and yard flooding. This project is in the Fiscal Year 2013
Budget and the estimated construction cost is $89,000.
21 Windom #8721 Sewer Rehabilitation (10229)
This project, located south of St. Charles Rock Road and west of Interstate 170 in the City
of Charlack and the City of St. John, is to relieve yard flooding at #8721 Windom Avenue.
This project is in the Fiscal Year 2012 Budget and the estimated construction cost is $
158,000.
UNFINISHED BUSINESS
Ordinances
None
Resolutions
None
4 of 4/12/12
New Business
Agenda Item Number Name Page Number
Ordinances
22– Proposed Ord. No. 13394 Clinton St. #1323 Bioretention (CB632) 11
CSO VR GIPLT (11157)
Introduction of proposed Ord. No. 13394 authorizing the Executive Director and
Secretary-Treasurer on behalf of The Metropolitan St. Louis Sewer District to enter
into a contract with Landesign, LLC for the construction of Green Infrastructure
Bioretention at Clinton St. #1323 Bioretention (CB632) - CSO VR GIPLT (11157)
in the City of St. Louis, Missouri.
23 – Proposed Ord. No. 13395 Bond Place Sanitary Sewers 12
(S.D. #2010094) (11067)
Introduction of proposed Ord. No. 13395 creating a new fund to be known as the
#5401- Bond Place Special Taxing Subdistrict to fund projects in the Bond Place
Special Taxing Subdistrict; transferring $70,000.00 from the Improvement Fund and
$10,000.00 from the Lower Meramec River Basin OMCI to the Bond Place Special
Taxing Subdistrict and appropriating Eighty Thousand Dollars ($80,000.00) from the
Bond Place Special Taxing Subdistrict to be used for project costs for the construction
of sanitary sewers in Bond Place Sanitary Sewers (S.D. #2010094) (11067), in the
City of Sunset Hills, Missouri; and authorizing the Executive Director and Secretary-
Treasurer on behalf of The Metropolitan St. Louis Sewer District to enter into a
contract with Heartland Construction & Excavating for the construction of the
aforesaid sanitary sewers.
24 – Proposed Ord. No. 13396 Hermitage I/I Reduction (SKME-615) (10645) 14
Introduction of proposed Ord. No. 13396 appropriating $1,300,000.00 from the
Sanitary Replacement Fund to be used for project costs for the rehabilitation
of sewers in Hermitage I/I Reduction (SKME-615) (10645), in the City of Frontenac,
Missouri; and authorizing the Executive Director and Secretary-Treasurer on behalf
of The Metropolitan St. Louis Sewer District to enter into a contract with SAK
Construction, LLC for the aforesaid sewer rehabilitation.
25 – Proposed Ord. No. 13397 Deer Creek Watershed Initiative (11065) 15
Introduction of proposed Ord. No. 13397 appropriating $200,000.00 from the Operation,
Maintenance and Construction Improvement Fund of Deer Creek for cost sharing with
the Missouri Botanical Gardens for Green Infrastructure Construction - Deer Creek
Watershed Initiative (11065) and authorizing the Executive Director and Secretary-
Treasurer on behalf of The Metropolitan St. Louis Sewer District to enter into an
agreement with the Missouri Botanical Gardens for cost sharing of Green Infrastructure
Construction.
5 of 4/12/12
Agenda Item Number Name Page Number
26 – Proposed Ord. No. 13398 Diamond Head Dr. Storm Sewer 16
(GCUC-110) (10248)
Introduction of proposed Ord. No. 13398 appropriating $580,000.00 from the Gravois
Creek OMCI fund to be used for project costs for the construction of storm sewers and
creekbank stabilization in Diamond Head Drive Storm Sewer (GCUC-110) (10248) in
St. Louis County, Missouri; and authorizing the Executive Director and Secretary-
Treasurer on behalf of The Metropolitan St. Louis Sewer District to enter into a
contract with Ideal Landscape Group for the aforesaid construction.
27 – Proposed Ord. No. 13399 Fawnvalley Storm Channel Improvements (10192) 17
Introduction of proposed Ord. No. 13399 appropriating $990,000.00 from the Operation,
Maintenance and Construction Improvement Fund of Deer Creek to be used for project
costs for creekbank stabilization in Fawnvalley Storm Channel Improvements (10192),
in the City of Des Peres, Missouri; and authorizing the Executive Director and Secretary-
Treasurer on behalf of The Metropolitan St. Louis Sewer District to enter into a contract
with Wehmeyer Farms, Inc. for the aforesaid creekbank stabilization.
28 – Proposed Ord. No. 13400 Ruth – Helen – Cecelia Storm Sewer 18
Replacement (10132)
Introduction of proposed Ord. No. 13400 appropriating $480,000.00 from the Operation,
Maintenance and Construction Improvement Fund of Deer Creek to be used for project
costs for the construction of storm sewers in Ruth - Helen - Cecelia Storm Sewer
Replacement (10132), in the City of Brentwood, Missouri; and authorizing the Executive
Director and Secretary-Treasurer on behalf of The Metropolitan St. Louis Sewer District
to enter into a contract with J.H. Berra Const. Co., Inc. for the construction of the
aforesaid storm sewers.
29 – Proposed Ord. No. 13401 Argyle #8800 Storm Sewer (10283) 19
Introduction of proposed Ord. No. 13401 appropriating $735,000.00 from the Operation,
Maintenance and Construction Improvement Fund of Coldwater Creek to be used for
project costs for the construction of storm sewers in Argyle #8800 Storm Sewer (10283),
in the City of Overland, Missouri; and authorizing the Executive Director and Secretary-
Treasurer on behalf of The Metropolitan St. Louis Sewer District to enter into a contract
with XL Contracting, Inc. for the aforesaid storm sewer construction.
30 – Proposed Ord. No. 13402 Wastewater User Charge 20
Introduction of proposed Ord. No. 13402 repealing and superseding Ordinance
No. 13021 adopted January 14, 2010, and enacting a new ordinance in lieu
thereof establishing a new Section Ten, Remedies, and a new Appendix 1
pertaining to new Wastewater User Charges pending the outcome of the
June 5, 2012 Special Election of Proposition Y.
6 of 4/12/12
Agenda Item Number Name Page Number
31 – Proposed Ord. No. 13403 FY 2013 Budget Appropriations 23
Introduction of proposed Ord. No. 13403 repealing and superseding Ordinance No.
13273 adopted June 9, 2011, and making appropriations for the current expenses
of the District in the General Fund, the Water Backup Insurance & Reimbursement
Fund, the Sanitary Replacement Fund, the Stormwater Operations, Maintenance
and Construction Improvement Funds, the Emergency Funds, the Debt Service
Funds, and the Wastewater Revenue Bond Service Funds for the fiscal year
beginning July 1, 2012 and ending June 30, 2013, amounting in the aggregate
commitment of $223,503,459 to pay interest falling due on bonds issued, the
costs of support, operation, and maintenance of the District and its various
subdistricts, and emergencies in accordance with the requirements of this
Proposed Ordinance introduced May 10, 2012.
32 – Proposed Ord. No. 13404 Tax Ordinance 2012 24
Introduction of proposed Ord. No. 13404 repealing Ordinance No. 13316, adopted
September 28, 2011, and enacting a new Ordinance in lieu thereof, determining the
amount of taxes which shall be levied, assessed, and collected in the year 2012 on
all taxable tangible property in the District within the corporate limits of the City of
St. Louis and St. Louis County, respectively, and in Subdistricts within the corporate
limits of St. Louis County as follows: Coldwater Creek Trunk Subdistrict, Gravois
Creek Trunk Subdistrict, Maline Creek Trunk Subdistrict, Watkins Creek Trunk
Subdistrict, Subdistrict No. 88 (Fountain Creek), Subdistrict No. 89 (Loretta-Joplin),
Subdistrict No. 342 (Clayton-Central), Subdistrict No. 366 (University City Branch
of River des Peres Stormwater Subdistrict), Subdistrict No. 367 (Deer Creek
Stormwater Subdistrict), Subdistrict No. 369 (Sugar Creek), Subdistrict No. 448
(Missouri River - Bonfils), Subdistrict No. 449 (Meramec River Basin - M.S.D.
Southwest), Subdistrict No. 453 (Shrewsbury Branch of River des Peres), Subdistrict
No. 454 (Seminary Branch of River des Peres), Subdistrict No. 455 (Black Creek),
Subdistrict No. 1 of the River des Peres Watershed (Creve Coeur-Frontenac Area),
Subdistrict No. 4 of the River des Peres Watershed (North Affton Area) and Subdistrict
No. 7 of the River des Peres Watershed (Wellston Area); and the Board of Trustees,
in accordance with Charter Section 7.310 authorizes the Director of Finance to certify
as to the amount of taxes which shall be levied, assessed and collected for the
aforementioned Subdistricts with an emergency clause.
33 – Proposed Ord. No. 13405 Banking and Safekeeping Services 25
Introduction of proposed Ord. No. 13405 authorizing the Executive Director and
Secretary-Treasurer on behalf of The Metropolitan St. Louis Sewer District to enter
into a contract with Bank of America N.A. for banking and safekeeping services for
the District.
7 of 4/12/12
Agenda Item Number Name Page Number
34 – Proposed Ord. No. 13406 Boxes Inc. Lease 26
Introduction of proposed Ord. No. 13406 authorizing and directing the Executive
Director and Secretary-Treasurer on behalf of The Metropolitan St. Louis Sewer
District to lease certain real property of The Metropolitan St. Louis Sewer District,
lying in the City of St. Louis, Missouri, to Boxes, Inc. for use as a parking lot and
to execute and deliver a Lease Agreement upon the conditions hereinafter set out.
35 – Proposed Ord. No. 13407 Kadima Properties Lease 27
Introduction of proposed Ord. No. 13407 authorizing the Executive Director and
Secretary-Treasurer to lease certain real property of The Metropolitan St. Louis
Sewer District, lying in St. Louis County, Missouri, to Kadima Properties, LLC,
and to execute a Lease Agreement upon the conditions hereinafter set out.
36 – Proposed Ord. No. 13408 Property and Boiler & Machinery 28
Insurance Coverage
Introduction of proposed Ord. No. 13408 awarding a contract to F.M. Global
Insurance Company (McGriff, Seibels & Williams, of Missouri Inc., agent) for
the District’s Primary Property, Boiler and Machinery Insurance Coverage from
July 1, 2012 to June 30, 2013.
37 – Proposed Ord. No. 13409 Excess Flood & Earth Movement 29
Insurance Coverage
Introduction of proposed Ord. No. 13409 awarding a contract to F.M. Global
Insurance Company (McGriff, Seibels & Williams, of Missouri Inc., agent)
for the District’s Excess Flood & Earth Movement Insurance coverage from
July 1, 2012 to June 30, 2013.
38 – Proposed Ord. No. 13410 National Flood Insurance Program (NFIP) 30
Introduction of proposed Ord. No. 13410 authorizing the Executive Director and
Secretary-Treasurer on behalf of The Metropolitan St. Louis Sewer District to
execute all documents necessary in order to procure flood insurance from the
National Flood Insurance Program (Federal Emergency Management Agency)
during the period of July 1, 2012 to June 30, 2013, for the buildings and contents
at certain specified District locations.
39 – Proposed Ord. No. 13411 Excess Workers’ Compensation 31
Insurance Coverage
Introduction of proposed Ord. No. 13411 awarding a contract to Midwest Employers
Casualty Company (McGriff, Seibels & Williams, of Missouri Inc., agent) for the
District’s Excess Workers’ Compensation Insurance coverage from July 1, 2012 to
June 30, 2013.
8 of 4/12/12
Agenda Item Number Name Page Number
40 – Proposed Ord. No. 13412 Fiduciary Liability Insurance Coverage 32
Introduction of proposed Ord. No. 13412 awarding a contract to Federal (Chubb)
Insurance Company (McGriff, Seibels & Williams, of Missouri Inc., agent) for the
District’s Fiduciary Liability Insurance from July 1, 2012, June 30, 2013.
41 – Proposed Ord. No. 13413 Commercial Crime Insurance Coverage 33
Introduction of proposed Ord. No. 13413 awarding a contract to Federal (Chubb)
Insurance Company (McGriff, Seibels & Williams, of Missouri Inc., agent) for the
District’s Commercial Crime Insurance coverage from July 1, 2012 to June 30, 2013.
42 – Proposed Ord. No. 13414 Underground Storage Tank Insurance 34
Introduction of proposed Ord. No. 13414 awarding a contract to Missouri
Underground Storage Tank Insurance Fund for the District’s Underground
Storage Tank Insurance coverage from July 1, 2012, June 30, 2013.
43 – Proposed Ord. No. 13415 Major Facility Pollution Liability 35
Insurance Coverage
Introduction of proposed Ord. No. 13415 awarding a contract to Zurich (Steadfast)
Insurance Company (McGriff, Seibels & Williams, of Missouri Inc., agents) for the
District’s Major Facility Pollution Liability Insurance from July 1, 2012 to June 30, 2013.
44 – Proposed Ord. No. 13416 Blocked Main and Overcharged Line 36
Back-Up Insurance Program
Introduction of proposed Ord. No. 13416 awarding a contract to Zurich (Steadfast)
Insurance Company (McGriff, Seibels & Williams of Missouri, Inc., agent) for the
District's Blocked Main and Overcharged Sewer Line Backup Insurance coverage
from July 1, 2012 to June 30, 2013.
45 – Proposed Ord. No. 13417 Auto Liability Insurance Program 37
Introduction of proposed Ord. No. 13417 awarding a contract to Travelers Insurance
Companies (McGriff, Seibels & Williams of Missouri, Inc., agent) for the District’s Auto
Liability Insurance Program coverage from July 1, 2012 to June 30, 2013.
46 – Proposed Ord. No. 13418 Contractors Equipment (Inland Marine) 38
Insurance Program
Introduction of proposed Ord. No. 13418 awarding a contract to RLI Insurance
Company (McGriff, Seibels & Williams, of Missouri Inc., agent) for the District’s
Contractors Equipment (Inland Marine) Insurance Program from July 1, 2012 to
June 30, 2013.
9 of 4/12/12
Agenda Item Number Name Page Number
Resolutions
47 Adoption of Resolution No. 3028 whereas Ordinance No. 13093, adopted June 10, 39
2010, authorized the Executive Director and Secretary-Treasurer on behalf of The
Metropolitan St. Louis Sewer District to enter into a contract with Corporate Claims
Management, Inc. (CCMI) whereby Corporate Claims Management, Inc. (CCMI) will
provide third party administrative services for the District's water back-up, workers'
compensation, general liability, auto, errors and omissions claims and any other claim
against the District, Board of Trustees, Civil Service Commission, Rate Commission
or District staff as may be assigned by the office of Risk Management.
48 Adoption of Resolution No. 3029 whereas under provisions of Ordinance No. 12010, 40
Section Two adopted on June 9, 2005, the list of Approved Depositary Banks may
be modified from time to time by resolution of the Board of Trustees of the District.
49 Adoption of Resolution No. 3030 whereas this resolution will supersede Resolution 41
No. 2749 that was adopted on November 8, 2007 and revises the Employees’ Pension
plan actuarial return target and asset allocation mix, Resolution 2563 that was adopted
on June 10, 2004 and establishes the Employees’ Pension Plan asset allocation mix,
Resolution No. 2193 that was adopted on August 10, 1995 and documents the Proxy
Voting Policy for the investment managers serving the Employees’ Pension Plan, and
Resolution No. 2177 that was adopted on April 20, 1995 and documents the brokerage
guidelines for the investment managers serving the Employees’ Pension Plan.
50 Adoption of Resolution No. 3024 expressing the Board of Trustees’ appreciation to
Edward A. Gabrisch for his 35 years of exemplary service to The Metropolitan St. Louis
Sewer District from March 14, 1977, to his retirement effective May1, 2012.
51 Adoption of Resolution No. 3025 expressing the Board of Trustees’ appreciation to
Alvin Henderson for his 31 years of exemplary service to The Metropolitan St. Louis
Sewer District from November 3, 1980, to his retirement effective May1, 2012.
52 Adoption of Resolution No. 3026 expressing the Board of Trustees’ appreciation to
Mark Waters for his 25 years of exemplary service to The Metropolitan St. Louis
Sewer District from December 1, 1986, to his retirement effective May1, 2012.
53 Adoption of Resolution No. 3027 David Visintainer served on the Board of Trustees of
The Metropolitan St. Louis Sewer District from May 1, 2009 to April 12, 2012, having
held the position of Chairman of the Program Management Committee from May 2009
through April 2012.
54 ITEMS PROPOSED FOR INTRODUCTION & ADOPTION AT THE NEXT BOARD MEETING
55 ANY OTHER BUSINESS THAT MAY PROPERLY BE BROUGHT BEFORE THE BOARD
10 of 4/12/12
Agenda Item Number Name Page Number
56 CLOSED SESSION
The Metropolitan St. Louis Sewer District Board of Trustees may go into closed
session at this meeting if such action is approved by a majority vote of the Board
members who constitute a quorum, to discuss legal, confidential, or privileged
matters under §610.021(1), RSMo 1988 Supp.; leasing, purchase or sale of real
estate under §610.021(2); personnel actions under §610.021(3); discussions
regarding negotiations with employee groups under §610.021(9); personnel
records or applications under §610.021(13); or records under §610.021(14)
which are otherwise protected from disclosure by law; or confidential or privileged
communications with the District’s auditor, including auditor work products under
§610.021(17).
57 ADJOURNMENT
11 of 4/12/12
AGENDA ITEM NUMBER: 22 – Proposed Ord. No. 13394
NAME OF PROJECT: Clinton St. #1323 Bioretention (CB632) – CSO VR GIPLT (11157)
LOCATION: West of Interstate 70 and south of St. Louis Avenue in the City of St. Louis, Missouri
TYPE OF PROJECT: Green Infrastructure (015.0 Construction Costs)
DEPARTMENT REQUESTING ACTION: Engineering
REQUESTED ACTION:
Why is this action necessary?: Authorizes staff to enter into a construction contract
What does action accomplish?: Implements the construction of a CIP project
SUMMARY EXPLANATION/BACKGROUND:
Contractor: Landesign, LLC Previous District Contract: Yes
809 E. Pearce Blvd.
Wentzville, MO 63385
Consultant: N/A
Agency: N/A
Number of bidders: 7 Low Bid: $164,346.00 High Bid: $275,000.00
Appropriation Amount: N/A Designer’s Estimate: $234,000.00
MBE/WBE Participation: 10.34% - McKay’s Hauling – MBE
Plan Approval Date: April 12, 2012 Type of Contract: Lump Sum
Properties Affected: 2 Properties Benefiting: 14
Designed by: District staff
The work to be done under Contract #10744 consists of the construction of approximately 2,140 square feet of bioretention
and appurtenances. The purpose of this project is to reduce combined sewer overflows into the Mississippi River per the
Long Term Control Plan. This project is part of the CSO Volume Reduction – Green Infrastructure (Pilot Program), Project
No. 11048. This project is scheduled to be completed in 180 days.
FUNDING/COST SUMMARY:
Budgeted: Capital Improvement Program Budget Year: FY2011, Pg. 48 Amount: $3,000,000*
Fund Name: #6660 – Sanitary Replacement Fund
Additional Comments: An additional $20,000 for utility relocation (Electric - $10,000 & Other - $10,000) is included in the
contingency.
Contracted planning resources utilized: Watershed Facility Planning
PREVIOUS BOARD ACTION RELATED TO THIS ACTION:
09/16/10 – Ord. No. 13129 – Amount: $3,000,000 – CSO Volume Reduction – Green Infrastructure (11048)
08/11/11 – Ord. No. 13281 – GSA – M3 Engineering Group PC – Engineering Services – Contract No. 10678
*Requesting Board approval of a construction contract with Landesign, LLC for which $200,000.00 is being encumbered from
Ordinance No. 13129.
12 of 4/12/12
AGENDA ITEM NUMBER: 23 – Proposed Ord. No. 13395
NAME OF PROJECT: Bond Place Sanitary Sewers (S.D. #2010094) (11067)
LOCATION: North of Highway 30 and west of Interstate 270 in the City of Sunset Hills, Missouri
TYPE OF PROJECT: Sanitary Sewer Construction (015.0 Construction Costs)
DEPARTMENT REQUESTING ACTION: Engineering
REQUESTED ACTION:
Why is this action necessary?: Creates a fund, transfers monies to that fund, appropriates funds, and authorizes staff to
enter into a construction contract
What does action accomplish?: Implements the construction of a CIP project
SUMMARY EXPLANATION/BACKGROUND:
Contractor: Heartland Construction & Excavating Previous District Contract: Yes
1920 Cherokee Trail
Florissant, MO 63031
Consultant: N/A
Agency: N/A
Number of bidders: 7 Low Bid: $52,900.00 High Bid: $67,553.00
Appropriation Amount: $80,000.00 Designer’s Estimate: $58,000.00
MBE/WBE Participation: 10.00%
Taylor Trucking – 5.0% - MBE
K & P Precast – 5.0% - WBE
Plan Approval Date: April 12, 2012 Type of Contract: Unit Cost
Properties Affected: 13 Properties Benefiting: 12
Designed by: District staff
The work to be done under Contract #10743 consists of the construction of approximately 48 lineal feet of 8-inch diameter
pipe sewers, six manholes, and appurtenances. The purpose of this project is to make improvements to the existing sewer
system in Subdistrict #2010094 so it can be accepted as a District asset. This project is scheduled to be completed in 200
days.
FUNDING/COST SUMMARY:
Budgeted: Capital Improvement Program Budget Year: FY2012, Pg. 44 Amount: $94,000
Fund Name: #5401 – Bond Place Special Taxing Subdistrict (Make transfer of $70,000 from #4102 – Improvement Fund
and $10,000 from #5591 – Lower Meramec River Basin OMCI to new fund #5401 – Bond Place Special Taxing Subdistrict to
support this appropriation.)
Additional Comments: An additional contingency of $20,000 for utility relocation (Gas - $15,000 & Other - $5,000) is
included in the appropriation. The existing sewers will be lined under a separate contract. The construction of the project is
funded by the property owners within the subdistrict through Special Tax Bill assessment.
Tax revenues collected by the Bond Place Special Taxing Subdistrict will be refunded to fund #4102 in the year received up
to the amount of the transfer. Once the transfer has been repaid to fund #4102, future collections will be allocated to fund
#1101 – General Fund to reimburse that fund for internal labor costs.
13 of 4/12/12
Contracted planning resources utilized: Watershed Facility Planning, Combine Sewer Area I/I Assessment, and CCTV
Inspection.
PREVIOUS BOARD ACTION RELATED TO THIS ACTION:
05/12/11 – Ord. No. 13237 – Established the tax bill boundary for the Bond Place Sanitary Sewers (S.D. #2010094) (11067)
subdistrict, within which improvements could be made at the expense of the subdistrict.
02/09/12 – Res. No. 3013 – Determined it is in the public’s interest to proceed with improvements in the subdistrict.
14 of 4/12/12
AGENDA ITEM NUMBER: 24 – Proposed Ord. No. 13396
NAME OF PROJECT: Hermitage I/I Reduction (SKME-615) (10645)
LOCATION: South of Clayton Road and west of Lindbergh Boulevard in the City of Frontenac, Missouri
TYPE OF PROJECT: Public and Private I/I Removal (015.0 Construction Costs)
DEPARTMENT REQUESTING ACTION: Engineering
REQUESTED ACTION:
Why is this action necessary?: Appropriates funds and authorizes staff to enter into a construction contract
What does action accomplish?: Implements the construction of a CIP project
SUMMARY EXPLANATION/BACKGROUND:
Contractor: SAK Construction, LLC Previous District Contract: Yes
103 North Cool Springs Road
O’Fallon, Missouri 63366
Consultant: N/A
Agency: N/A
Number of bidders: 2 Low Bid: $1,171,843.75 High Bid: $1,266,993.50
Appropriation Amount: $1,300,000.00 Designer’s Estimate: $1,277,000.00
MBE/WBE Participation: 10.40% - Luther’s Supply Co., Inc. – MBE
Plan Approval Date: April 12, 2012 Type of Contract: Unit Cost
Properties Affected: 95 Properties Benefiting: 255
Designed by: Oates Associates, Inc.
The work to be done under Contract #10745 consists of the rehabilitation of approximately 11,764 lineal feet of sanitary
sewers varying in size from 8-inches to 12-inches in diameter, 2,103 lineal feet of storm sewers varying in size from 12-
inches to 60-inches in diameter utilizing CIPP methods, replacement of approximately 1,183 lineal feet of 8-inch sanitary pipe
sewers and appurtenances, and rehabilitation of 148 manholes and removal of inflow sources from 38 private properties.
The purpose of this project is to alleviate sanitary sewer surcharging and sanitary sewer overflows during wet weather. It is
anticipated that this project may allow for the future elimination of two constructed SSOs (BP-181 and BP-343) after post-
construction monitoring. This project is scheduled to be completed in 199 days.
FUNDING/COST SUMMARY:
Budgeted: Capital Improvement Program Budget Year: FY2012, Pg. 57 Amount: $2,000,000
Fund Name: #6660 – Sanitary Replacement Fund
Additional Comments: An additional contingency of $30,000 for water and gas utility relocation is included in the
appropriation. This project is eligible for 2011B Bond funding.
Contracted planning resources utilized: Watershed Facility Planning, Combine Sewer Area I/I Assessment, Combine Sewer
Area Flow Metering & Monitoring, Modeling, CCTV Inspection, and Radar Rainfall Data.
PREVIOUS BOARD ACTION RELATED TO THIS ACTION:
12/09/10 – Ord. No. 13173 – Amount: $178,000 – Oates Associates, Inc. – Design Contract No. 10590
15 of 4/12/12
AGENDA ITEM NUMBER: 25 – Proposed Ord. No. 13397
NAME OF PROJECT: Deer Creek Watershed Initiative (11065)
LOCATION: Various locations in the Deer Creek Watershed
TYPE OF PROJECT: Cost Share for Green Infrastructure Construction (015.0 Construction Costs)
DEPARTMENT REQUESTING ACTION: Engineering
REQUESTED ACTION:
Why is this action necessary?: Appropriates funds and authorizes staff to enter into an agreement with the
Missouri Botanical Gardens
What does action accomplish?: Provides a portion of local cost-share matching funds to the Missouri Botanical
Gardens for construction and monitoring of green infrastructure.
SUMMARY EXPLANATION/BACKGROUND:
Contractor: N/A Previous District Contract: N/A
Consultant: N/A
Agency: Missouri Botanical Garden
Number of bidders: N/A Low Bid: N/A High Bid: N/A
Appropriation Amount: $200,000.00 Designer’s Estimate: N/A
MBE/WBE Participation: N/A
Plan Approval Date: N/A Type of Contract: N/A
Properties Affected: N/A Properties Benefiting: N/A
Designed by: N/A
The Missouri Botanical Garden has received a Nonpoint Source Implementation Grant from the Missouri Department of
Natural Resources under Section 319 of the Clean Water Act. The Botanical Garden will partner with MSD and Deer Creek
watershed municipalities to develop a homeowner cost-share program to install plant-based green infrastructure
management practices. The project will include a water quality monitoring component to measure project effectiveness. The
Botanical Garden will partner with the Litzsinger Ecology Center, MSD, and Washington University to collect or share water
quality data related to the Deer Creek watershed and document green infrastructure efficiencies at demonstration sites. This
agreement provides reimbursement of up to $200,000 to the Missouri Botanical Garden for costs related to the construction
and monitoring of green infrastructure. Section 319 funds provided by the EPA amount to $706,724; nonfederal matching
funds amount to $471,957, for a total project cost of $1,178,681.
FUNDING/COST SUMMARY:
Budgeted: Capital Improvement Program Budget Year: FY2012, Pg. 105 Amount: $200,000
Fund Name: #5566 – Deer Creek OMCI
Additional Comments: The main goal of the Missouri Botanical Garden Deer Creek Watershed Initiative project is to
reduce impacts in the Deer Creek watershed by implementing green infrastructure technologies to improve water quality
stemming from nonpoint source pollution, with a focus on plant-based solutions. The project will use various techniques to
achieve the overall goal through implementation, demonstration, education, and planning efforts. The following techniques
will be utilized to achieve the overall objectives: decrease erosion, sedimentation and other nonpoint source pollutants by
capturing and infiltrating stormwater runoff on-site by utilizing volume-based hydrology approaches; protection of streams
and groundwater from chloride; reduce bacteria pollution in the watershed related to animal waste; and reduce water
pollution caused by yard waste and organic debris. In addition, this project will aid the District in gaining performance
effectiveness of green infrastructure.
PREVIOUS BOARD ACTION RELATED TO THIS ACTION: N/A
16 of 4/12/12
AGENDA ITEM NUMBER: 26 – Proposed Ord. No. 13398
NAME OF PROJECT: Diamond Head Dr. Storm Sewer (GCUC-110) (10248)
LOCATION: North of Lindbergh Blvd. and east of Union Road in unincorporated St. Louis County, Missouri
TYPE OF PROJECT: Storm Sewer and Creekbank Stabilization (015.0 Construction Costs)
DEPARTMENT REQUESTING ACTION: Engineering
REQUESTED ACTION:
Why is this action necessary?: Appropriates funds and authorizes staff to enter into a construction contract
What does action accomplish?: Implements the construction of a CIP project
SUMMARY EXPLANATION/BACKGROUND:
Contractor: Ideal Landscape Group Previous District Contract: Yes
6264 Lemay Ferry Road
St. Louis, MO 63129
Consultant: N/A
Agency: N/A
Number of bidders: 10 Low Bid: $507,555.00 High Bid: $862,485.00
Appropriation Amount: $580,000.00 Designer’s Estimate: $670,000.00
MBE/WBE Participation: 10.56%
Home Turf – 3.15% - MBE
Valley Material – 0.89% - WBE
McKay’s Hauling – 1.97% - MBE
Pazdera Trucking – 3.94% - WBE
K & P Precast – 0.61% - WBE
Plan Approval Date: April 12, 2012 Type of Contract: Unit Cost
Properties Affected: 20 Properties Benefiting: 12
Designed by: EFK Moen, LLC
The work to be done under Contract #10740 consists of the construction of approximately 1,290 lineal feet of natural channel
stabilization, 93 lineal feet of pipe sewers 21-inches in diameter, 400 lineal feet of new modular block wall construction, 53
cubic yards of grade control and appurtenances. The purpose of this project is to prevent further erosion threatening 12
homes on Diamond Head Dr. and Lois Rd. This project is scheduled to be completed in 327 days.
FUNDING/COST SUMMARY:
Budgeted: Capital Improvement Program Budget Year: FY2012, Pg. 106 Amount: $960,000
Fund Name: #5571 – Gravois Creek OMCI
Additional Comments: An additional contingency of $30,000 for water and gas utility relocation utility relocation (Other -
$30,000) is included in the appropriation. Contracted planning resources utilized: Stormwater Facility Planning.
PREVIOUS BOARD ACTION RELATED TO THIS ACTION:
12/10/09 – Ord. No. 13000 – Amount: $165,000 – EFK Moen, LLC – Design Contract No. E-1272
17 of 4/12/12
AGENDA ITEM NUMBER: 27 – Proposed Ord. No. 13399
NAME OF PROJECT: Fawnvalley Storm Channel Improvements (10192)
LOCATION: North of Manchester Road and east of Ballas Road in the City of Des Peres, Missouri
TYPE OF PROJECT: Creekbank Stabilization (015.0 Construction Costs)
DEPARTMENT REQUESTING ACTION: Engineering
REQUESTED ACTION:
Why is this action necessary?: Appropriates funds and authorizes staff to enter into a construction contract
What does action accomplish?: Implements the construction of a CIP project
SUMMARY EXPLANATION/BACKGROUND:
Contractor: Wehmeyer Farms, Inc. Previous District Contract: Yes
680 Himmel Road
Moscow Mills, MO 63362
Consultant: N/A
Agency: N/A
Number of bidders: 6 Low Bid: $824,000.00 High Bid: $983,632.60
Appropriation Amount: $990,000.00 Designer’s Estimate: $945,000.00
MBE/WBE Participation: 10.07%
Taylor Trucking – 6.55% - MBE
A.J.’s Trucking – 3.52% - WBE
Plan Approval Date: April 12, 2012 Type of Contract: Unit Cost
Properties Affected: 30 Properties Benefiting: 30
Designed by: Stantec Consulting Services, Inc.
The work to be done under Contract #10748 consists of the construction of approximately 18,500 square feet of Modular
Block Wall and 5 step pools. The purpose of this project is to alleviate creek erosion. This project is scheduled to be
completed in 218 days.
FUNDING/COST SUMMARY:
Budgeted: Capital Improvement Program Budget Year: FY2012, Pg. 108 Amount: $996,000
Fund Name: #5566 – Deer Creek OMCI
Additional Comments: An additional contingency of $50,000 for utility relocation (Electric - $20,000 and Water - $30,000),
and a contingency allowance of $75,000 are included in the appropriation for United States Army Corps of Engineers (COE)
404 Permit restoration requirements and mitigation credits.
Contracted planning resources utilized: Stormwater Facility Planning
PREVIOUS BOARD ACTION RELATED TO THIS ACTION:
01/08/09 – Ord. No. 12803 – Amount: $387,000 – Stantec Consulting Services, Inc. – Design Contract No. E-1251
18 of 4/12/12
AGENDA ITEM NUMBER: 28 – Proposed Ord. No. 13400
NAME OF PROJECT: Ruth – Helen – Cecelia Storm Sewer Replacement (10132)
LOCATION: North of Manchester Road and west of Hanley Road in the City of Brentwood, Missouri
TYPE OF PROJECT: Storm Sewer Construction (015.0 Construction Costs)
DEPARTMENT REQUESTING ACTION: Engineering
REQUESTED ACTION:
Why is this action necessary?: Appropriates funds and authorizes staff to enter into a construction contract
What does action accomplish?: Implements the construction of a CIP project
SUMMARY EXPLANATION/BACKGROUND:
Contractor: J. H. Berra Const. Co., Inc. Previous District Contract: Yes
5091 New Baumgartner Road
St. Louis, MO 63129
Consultant: N/A
Agency: N/A
Number of bidders: 9 Low Bid: $323,961.00 High Bid: $629,545.00
Appropriation Amount: $480,000.00 Designer’s Estimate: $515,000.00
MBE/WBE Participation: 10.65%
Windstar Transportation – 5.40% - MBE
Roden’s Landscaping – 5.25% - WBE
Plan Approval Date: April 12, 2012 Type of Contract: Unit Cost
Properties Affected: 30 Properties Benefiting: 40
Designed by: EFK Moen, LLC
The work to be done under Contract #10773 consists of the construction of approximately 1,053 lineal feet of storm sewers
varying in size from 12-inches in diameter to 45-inch x 29-inch elliptical pipe, 452 lineal feet of 8-inch diameter sanitary
sewers, and appurtenances. The purpose of this project is to alleviate inadequate storm sewer capacity, and localized
flooding of yards and streets. This project is scheduled to be completed in 325 days.
FUNDING/COST SUMMARY:
Budgeted: Capital Improvement Program Budget Year: FY2012, Pg. 111 Amount: $665,000
Fund Name: #5566 – Deer Creek OMCI
Additional Comments: An additional contingency of $120,000 for utility relocation (Gas - $40,000, Water - $40,000, and
Other - $40,000) is included in the appropriation.
Contracted planning resources utilized: Stormwater Facility Planning
PREVIOUS BOARD ACTION RELATED TO THIS ACTION:
11/10/05 – Ord. No. 12129 – Amount: $178,198 – EFK Moen, LLC – Design Contract No. E-1146
19 of 4/12/12
AGENDA ITEM NUMBER: 29 – Proposed Ord. No. 13401
NAME OF PROJECT: Argyle #8800 Storm Sewer (10283)
LOCATION: West of Interstate 170 and south of St. Charles Rock Road in the City of Overland, Missouri
TYPE OF PROJECT: Storm Sewer Construction (015.0 Construction Costs)
DEPARTMENT REQUESTING ACTION: Engineering
REQUESTED ACTION:
Why is this action necessary?: Appropriates funds and authorizes staff to enter into a construction contract
What does action accomplish?: Implements the construction of a CIP project
SUMMARY EXPLANATION/BACKGROUND:
Contractor: XL Contracting, Inc. Previous District Contract: Yes
20 Mid Rivers Trade Court
St. Peters, MO 63376
Consultant: N/A
Agency: N/A
Number of bidders: 10 Low Bid: $518,458.75 High Bid: $876,390.00
Appropriation Amount: $735,000.00 Designer’s Estimate: $611,000.00
MBE/WBE Participation: 100%
J.D. Kutter – 1.42% - WBE
TGB, Inc. – 3.68% - WBE
XL Contracting, Inc. – 94.9% - MBE
Plan Approval Date: April 12, 2012 Type of Contract: Unit Cost
Properties Affected: 60 Properties Benefiting: 12
Designed by: Engineering Design Source Inc.
The work to be done under Contract #10742 consists of the construction of approximately 2,080 lineal feet of pipe sewers
varying in size from 12-inches to 54-inches in diameter and appurtenances. The purpose of this project is to alleviate
basement, yard, and street flooding. This project is scheduled to be completed in 534 days.
FUNDING/COST SUMMARY:
Budgeted: Capital Improvement Program Budget Year: FY2012, Pg.119 Amount: $780,000
Fund Name: #5564 – Coldwater Creek OMCI
Additional Comments: An additional contingency of $165,000 for utility relocation (Gas - $25,000, Water - $100,000,
Electric - $10,000, and Other - $30,000) is included in the appropriation. The design appropriation provided for the design of
three projects: Argyle #8800 Storm Sewer (10283); Lynn Town Apartment Channel Improvements (CLD-19) (10220); and
Coldwater Creek at Lynn Town Bank Stabilization (10284).
Contracted planning resources utilized: Stormwater Facility Planning
PREVIOUS BOARD ACTION RELATED TO THIS ACTION:
12/10/09 – Ord. No. 12999 – Amount: $333,000 – Engineering Design Source Inc. – Design Contract No. E-1271
20 of 4/12/12
AGENDA ITEM NUMBER: 30 – Proposed Ord. No. 13402
NAME OF PROJECT: Wastewater User Charge
LOCATION: N/A
TYPE OF PROJECT: N/A
DEPARTMENT REQUESTING ACTION: Finance
REQUESTED ACTION:
Why is this action necessary?: Approve new wastewater user charge rates based upon the outcome of the June 5, 2012
referendum seeking authorization to issue $945 million of wastewater revenue bonds.
What does action accomplish?: Enacts new wastewater user charge rate schedule as recommended by the Rate
Commission to support wastewater capital improvement, operational and maintenance
requirements for fiscal years 2012/2013 through 2015/2016 based upon the outcome of
the June 5, 2012 election. In addition, it enacts revised language in Section 10
pertaining to collection remedies to allow all charges, including late fees and attorney
fees, accrued and accruing on the account to be collected.
SUMMARY EXPLANATION/BACKGROUND:
Contractor: N/A Previous District Contract: N/A
Consultant: N/A
Agency: N/A
Number of bidders: N/A Low Bid: N/A High Bid: N/A
Appropriation Amount: N/A District’s Estimate: N/A
MBE/WBE Participation: N/A
Plan Approval Date: N/A Type of Contract: N/A
Properties Affected: N/A Properties Benefiting: N/A
Designed by: N/A
FUNDING/COST SUMMARY:
Budgeted: N/A Budget Year: N/A Amount: N/A
Fund Name: N/A
Additional Comments: Detail of wastewater user charge rate schedule based upon the outcome of the June 5, 2012
election is detailed in Appendix I attached.
PREVIOUS BOARD ACTION RELATED TO THIS ACTION:
1/14/10 – Ord. No. 13021 – Wastewater User Charges
21 of 4/12/12
APPENDIX I
WASTEWATER USER CHARGES
(BASED ON SUCCESSFUL JUNE 5, 2012 BOND ELECTION)
July 1,
2012
July 1,
2013
July 1,
2014
July 1,
2015
Charge Charge Charge Charge
METERED PROPERTY
(per Month/per User Account)
Base Charge $13.15 $14.85 $16.25 $18.25
Volume Charge $2.28/100 $2.50/100 $2.82/100 $3.21/100
All Volume Cubic
Feet
Cubic
Feet
Cubic
Feet
Cubic
Feet
UNMETERED RESIDENTIAL
PROPERTY
(per Month/per User Account)
Base Charge $13.15 $14.85 $16.25 $18.25
Room/Fixture Charge:
Room (each room) $ 1.48 $1.63 $1.83 $2.09
Water Closet (each fixture) $ 5.56 $6.10 $6.88 $7.83
Bath (each fixture) $ 4.64 $5.08 $5.73 $6.53
Separate Shower (each fixture) $ 4.64 $5.08 $5.73 $6.53
NON-RESIDENTIAL PROPERTY
(per Month/per User Account)
Extra Strength Surcharges
(if water usage equals or exceeds
8000 cubic feet per month):
Suspended Solids (SS) * $231.35 $231.35 $244.03 $251.88
Over 300 mg/liter (Milligrams per
liter)
Biochemical Oxygen Demand (BOD)
*
$620.14 $620.14 $620.14 $632.38
Over 300mg/liter (Milligrams per
liter)
Chemical oxygen Demand (COD)* $310.07 $310.07 $310.07 $316.19
Over 600 mg/liter (Milligrams per
liter)
* Per Ton
Base Charge $ 13.15 $14.85 $16.25 $18.25
Volume Charge $2.28/100 $2.50/100 $2.82/100 $3.21/100
All Volume Cubic
Feet
Cubic
Feet
Cubic
Feet
Cubic
Feet
Compliance Charge/per Month
Tier 1: 0 Inspection/0 Sample Point $ 23.00 $ 16.00 $ 9.00 $ 2.15
Tier 2: 1 Inspection/0 Sample Point $ 39.80 $ 41.85 $ 43.55 $ 44.50
Tier 3: 1 Inspection/1 Sample Points $ 84.75 $ 89.15 $ 92.75 $ 94.80
Tier 4: 1 Inspection/2 Sample Points $124.25 $130.70 $136.00 $139.00
Tier 5: 1 Inspection/More Than
2 Sample Points
$163.75 $172.25 $179.25 $183.15
22 of 4/12/12
APPENDIX I
WASTEWATER USER CHARGES
(BASED ON UNSUCCESSFUL JUNE 25, 2012 ELECTION )
July 1,
2012
July 1,
2013
July 1,
2014
July 1,
2015
Charge Charge Charge Charge
METERED PROPERTY
(per Month/per User Account)
Base Charge $25.75 $25.75 $26.50 $26.75
Volume Charge $4.80/100 $4.80/100 $4.80/100 $4.80/100
All Volume Cubic
Feet
Cubic
Feet
Cubic
Feet
Cubic
Feet
UNMETERED RESIDENTIAL
PROPERTY
(per Month/per User Account)
Base Charge $25.75 $25.75 $26.50 $26.75
Room/Fixture Charge:
Room (each room) $ 3.12 $ 3.12 $ 3.12 $ 3.12
Water Closet (each fixture) $11.71 $11.71 $11.71 $11.71
Bath (each fixture) $ 9.76 $ 9.76 $ 9.76 $ 9.76
Separate Shower (each fixture) $ 9.76 $ 9.76 $ 9.76 $ 9.76
NON-RESIDENTIAL
PROPERTY
(per Month/per User Account)
Extra Strength Surcharges
(if water usage equals or exceeds
8000 cubic feet per month):
Suspended Solids (SS) * $267.35 $267.35 $267.35 $267.35
Over 300 mg/liter (Milligrams per
liter)
Biochemical Oxygen Demand (BOD)
*
$685.94 $685.94 $685.94 $685.94
Over 300mg/liter (Milligrams per
liter)
Chemical oxygen Demand (COD)* $342.97 $342.97 $342.97 $342.97
Over 600 mg/liter (Milligrams per
liter)
* Per Ton
Base Charge $ 25.75 $25.75 $26.50 $26.75
Volume Charge $4.80/100 $4.80/100 $4.80/100 $4.80/100
All Volume Cubic
Feet
Cubic
Feet
Cubic
Feet
Cubic
Feet
Compliance Charge/per Month
Tier 1: 0 Inspection/0 Sample Point $ 23.00 $ 16.00 $ 9.00 $ 2.35
Tier 2: 1 Inspection/0 Sample Point $ 39.80 $ 41.95 $ 43.70 $ 44.70
Tier 3: 1 Inspection/1 Sample Points $ 84.80 $ 89.30 $ 93.05 $ 95.15
Tier 4: 1 Inspection/2 Sample Points $124.35 $130.95 $136.40 $139.50
Tier 5: 1 Inspection/More Than
2 Sample Points
$163.85 $172.55 $179.75 $183.80
23 of 4/12/12
AGENDA ITEM NUMBER: 31 – Proposed Ord. No. 13403
NAME OF PROJECT: FY 2013 Budget Appropriations
LOCATION: N/A
TYPE OF PROJECT: N/A
DEPARTMENT REQUESTING ACTION: Finance
REQUESTED ACTION:
Why is this action necessary?: Annual requirement of the Plan of the District
What does action accomplish?: Authorizes the District to expend funds during FY 2013 for wastewater and stormwater
operations of the District.
SUMMARY EXPLANATION/BACKGROUND:
Contractor: N/A Previous District Contract: N/A
Consultant: N/A
Agency: N/A
Number of bidders: N/A Low Bid: N/A High Bid: N/A
Appropriation Amount: N/A District’s Estimate: N/A
MBE/WBE Participation: N/A
Plan Approval Date: N/A Type of Contract: N/A
Properties Affected: N/A Properties Benefiting: N/A
Designed by: N/A
FUNDING/COST SUMMARY:
Budgeted: N/A Budget Year: 2012-2013 Amount: N/A
Fund Name: Budget Appropriation:
General Fund $156,745,459
Water Backup Insurance & Reimbursement Fund $ 4,500,000
Operation, Maintenance, Construction Improvement Fd $ 16,077,469
Total Operating Budget $177,322,928
Emergency Funds $ 500,000
Improvement Fund $ 0
Debt Service Fund $ 61,258,000
Total District Appropriations $239,080,928
Less: Inter-fund Services for Stormwater Operations ($ 15,577,469)*
Total Budget Ordinance $223,503,459
Additional Comments: * Reported as required per General Accounting Standards Board (GASB) Statement #34
PREVIOUS BOARD ACTION RELATED TO THIS ACTION:
06/09/11 – Ordinance No. 13273 – Amount $208,253,663 – Fiscal Year 2011-2012
24 of 4/12/12
AGENDA ITEM NUMBER: 32 – Proposed Ord. No. 13404
NAME OF PROJECT: 2012 Tax Levy for the Metropolitan St. Louis Sewer District and its various Sub Districts
LOCATION: N/A
TYPE OF PROJECT: N/A
DEPARTMENT REQUESTING ACTION: Finance & Secretary/Treasurer
REQUESTED ACTION:
Why is this action necessary?: This is an annual requirement of the Plan of the District as part of the Budget
Process.
What does action accomplish?: Levies tax rates to be applied to customers’ Real and Personal Property
Assessed Values to produce required revenues for operation and
infrastructure projects.
SUMMARY EXPLANATION/BACKGROUND:
Contractor: N/A Previous District Contract: N/A
Consultant: N/A
Agency: N/A
Number of bidders: N/A Low Bid: N/A High Bid: N/A
Appropriation Amount: N/A District’s Estimate: N/A
MBE/WBE Participation: N/A
Plan Approval Date: N/A Type of Contract: N/A
Properties Affected: N/A Properties Benefiting: N/A
Designed by: N/A
FUNDING/COST SUMMARY:
Budgeted: N/A Budget Year: 2012-2013 Amount: N/A
Fund Name: N/A
Additional Comments: The action determines the amount of taxes which shall be levied, assessed and collected in the
year 2012 on all taxable tangible property in the District within the corporate limits of the City of St. Louis and St. County,
respectively, and in its Various Subdistricts. See attached for detail.
PREVIOUS BOARD ACTION RELATED TO THIS ACTION:
10/13/11 – Ordinance No. 13329 – 2011 Tax Ordinance - Revised
09/28/11 – Ordinance No. 13316 – 2011 Tax Ordinance - Revised
06/09/11 – Ordinance No. 13274 – 2011 Tax Ordinance
25 of 4/12/12
AGENDA ITEM NUMBER: 33 – Proposed Ord. No. 13405
NAME OF PROJECT: Banking and Safekeeping Services
LOCATION: District Wide
TYPE OF PROJECT: District Banking Services
DEPARTMENT REQUESTING ACTION: Office of Secretary Treasurer
REQUESTED ACTION: Approval to extend Banking Contract with Bank of America
Why is this action necessary?: This ordinance is needed to authorize a new contract with Bank of America. The
new contract will be a one year contract with four one year options, not to exceed
five years.
What does action accomplish?: This ordinance allows Bank of America to continue to provide banking services.
SUMMARY EXPLANATION/BACKGROUND:
Contractor: N/A Previous District Contract: Yes
Consultant: N/A
Agency: N/A
Number of bidders: N/A Low Bid: N/A High Bid: N/A
Appropriation Amount: N/A District’s Estimate: $132,000
MBE/WBE Participation: N/A
Plan Approval Date: N/A Type of Contract: Unit Price
Properties Affected: N/A Properties Benefiting: N/A
Designed by: N/A
FUNDING/COST SUMMARY:
Budgeted: Banking Services Budget Year: 2012-2013 Amount: $124,282
Secretary Treasurer Budget
Fund Name:
Additional Comments: The current contract expires on June 30, 2012. Services were evaluated based on a 2012 RFP
proposal 2152 as a one year contract with four-one year renewals, not to exceed five years.
PREVIOUS BOARD ACTION RELATED TO THIS ACTION:
03/08/2012 Res. 3015 Exercise additional 6-month option with Bank of America
10/14/2010 Res. 2936 Exercise additional one-year option with Bank of America
12/11/2008 Ord. 12788 Contract authorization with Bank of America
26 of 4/12/12
AGENDA ITEM NUMBER: 34 – Proposed Ord. No. 13406
NAME OF PROJECT: Boxes Inc. Lease
LOCATION: River Des Peres at Knox Ave.
TYPE OF PROJECT: Lease of strip of District-owned property for use as a parking lot
DEPARTMENT REQUESTING ACTION: Legal & Right of Way
REQUESTED ACTION:
Why is this action necessary?: To continue to lease the District-owned property at RDP & Knox Ave. for use as a
parking lot.
What does action accomplish?: Authorizes the District to enter into a renewed lease with Boxes, Inc. for a term of
five years with a five-year renewal option. Boxes Inc. has used the strip for a
number of years for visitor and employee parking.
SUMMARY EXPLANATION/BACKGROUND:
Contractor: N/A Previous District Contract: Yes
Consultant: N/A
Agency: N/A
Number of bidders: N/A Low Bid: N/A High Bid: N/A
Appropriation Amount: N/A District’s Estimate: $0
MBE/WBE Participation: N/A
Plan Approval Date: N/A Type of Contract: Lease
Properties Affected: N/A Properties Benefitting: N/A
Designed by: N/A
FUNDING/COST SUMMARY:
Budgeted: N/A Budget Year: N/A Amount: $0
Fund Name: N/A
Additional Comments:
This Ordinance authorizes the District to enter into a lease agreement with Boxes Inc. for a term of five (5) years with one,
five-year renewal option. Boxes Inc. uses the property as a parking lot, and has leased the property from the District since
1997. The prior lease expired and by its terms could not simply be renewed, so a new lease is necessary. Terms are
identical to prior lease except insurance limits increased to District’s current requirements. Boxes Inc. will pay the District
monthly rent at a rate of $150.00 per month.
PREVIOUS BOARD ACTION RELATED TO THIS ACTION:
05/08/1997 – Ordinance 10086
27 of 4/12/12
AGENDA ITEM NUMBER: 35 – Proposed Ord. No. 13407
NAME OF PROJECT: Kadima Properties Lease
LOCATION: 2670 Union Road
TYPE OF PROJECT: Lease of District-owned property.
DEPARTMENT REQUESTING ACTION: Legal & Right of Way
REQUESTED ACTION:
Why is this action necessary?: To continue to lease the District-owned property at 2670 Union Road.
What does action accomplish?: Authorizes the District to enter into a lease with Kadima Properties LLC for an
initial term of three (3) years with additional one (1) year renewal options. District
has right of termination at any time upon sixty (60) days prior notice. Prior tenant
was Pro-Am South; Pro-Am elected not to renew. Kadima owns the adjacent
property and is stepping into Pro-Am’s shoes to take over the driving range.
SUMMARY EXPLANATION/BACKGROUND:
Contractor: N/A Previous District Contract: Yes (related)
Consultant: N/A
Agency: N/A
Number of bidders: N/A Low Bid: N/A High Bid: N/A
Appropriation Amount: N/A District’s Estimate: $0
MBE/WBE Participation: N/A
Plan Approval Date: N/A Type of Contract: Lease
Properties Affected: N/A Properties Benefitting: N/A
Designed by: N/A
FUNDING/COST SUMMARY:
Budgeted: N/A Budget Year: N/A Amount: $0
Fund Name: N/A
Additional Comments:
This ordinance authorizes the District to enter into a lease with Kadima Properties LLC for an initial term of three (3) years
with additional one-year renewal options. Kadima will pay the District monthly rent at a rate of $325.00 per month (same rate
as prior tenant Pro-Am South). The District has leased this same property as a driving range consecutively since the 1970s.
PREVIOUS BOARD ACTION RELATED TO THIS ACTION:
04/08/2010 – Ordinance 13066
04/18/1996 – Ordinance 9849
28 of 4/12/12
AGENDA ITEM NUMBER: 38 – Proposed Ord. No. 13408
NAME OF PROJECT: Property and Boiler & Machinery Insurance Coverage
LOCATION: District wide
TYPE OF PROJECT: Purchase of Insurance
DEPARTMENT REQUESTING ACTION: Risk Management
REQUESTED ACTION:
Why is this action necessary?: To provide an element of loss control for the District’s Property and Boiler &
Machinery Insurance Program.
What does action accomplish?: This ordinance puts a cap on the amount of claims cost MSD could absorb
from incidents qualifying within the coverage summary definitions detailed
under its Property and Boiler & Machinery Insurance coverage.
SUMMARY EXPLANATION/BACKGROUND:
Contractor: N/A Previous District Contract: Yes
Consultant: McGriff, Seibels & Williams of Missouri Inc.
Agency: F.M. Global Insurance Company
Number of bidders: N/A Low Bid: N/A High Bid: N/A
Appropriation Amount: N/A District’s Estimate: N/A
MBE/WBE Participation: N/A
Plan Approval Date: N/A Type of Contract: Lump Sum
Properties Affected: N/A Properties Benefitting: N/A
Designed by: N/A
This insurance provides replacement cost coverage for real and personal property in excess of the deductible and subject to
policy limits. This ordinance will authorize the District to enter into a contract with FM Global Insurance Company from July
1, 2012 to June 30, 2013.
FUNDING/COST SUMMARY:
Budgeted: Risk Management Department’s Budget Budget Year: FY2013 Amount: $718,347
Fund Name: N/A
Additional Comments: N/A
PREVIOUS BOARD ACTION RELATED TO THIS ACTION:
6/09/11 – Ord. No, 13263 – Amount: $716,298–-FM Global Insurance Co.--Property and Boiler & Machinery Coverage
6/10/10 – Ord. No, 13094 – Amount: $786,521–-FM Global Insurance Co.--Property and Boiler & Machinery Coverage
6/11/09 -- Ord. No. 12880 – Amount: $882,697–-FM Global Insurance Co.--Property and Boiler & Machinery Coverage
6/12/08 -- Ord. No. 12662 – Amount: $1,217,742–-FM Global Insurance Co.--Property and Boiler & Machinery Coverage
29 of 4/12/12
AGENDA ITEM NUMBER: 37 – Proposed Ord. No. 13409
NAME OF PROJECT: Excess Flood & Earth Movement Insurance Coverage
LOCATION: District wide
TYPE OF PROJECT: Purchase of Insurance
DEPARTMENT REQUESTING ACTION: Risk Management
REQUESTED ACTION:
Why is this action necessary?: To provide an element of loss control for Flood & Earth Movement in excess of
the amount of coverage provided by the District’s property and FEMA coverage.
What does action accomplish?: This ordinance increases the amount of the District’s insurance coverage for
incidents of Flood and Earth Movement.
SUMMARY EXPLANATION/BACKGROUND:
Contractor: N/A Previous District Contract: Yes
Consultant: McGriff, Seibels & Williams of Missouri Inc.
Agency: F.M. Global Insurance Company
Number of bidders: N/A Low Bid: N/A High Bid: N/A
Appropriation Amount: N/A District’s Estimate: N/A
MBE/WBE Participation: N/A
Plan Approval Date: N/A Type of Contract: Lump Sum
Properties Affected: N/A Properties Benefitting: N/A
Designed by: N/A
This insurance provides $30,000,000 replacement cost coverage for flood for real and personal property in excess of the
policy limits provided under the NFIP through FEMA. The insurance provides $50,000,000 replacement cost coverage for
real and personal property for earth movement. This ordinance will authorize the District to enter into a contract with FM
Global Insurance Company from July 1, 2012 to June 30, 2013.
FUNDING/COST SUMMARY:
Budgeted: Risk Management Department’s Budget Budget Year: FY2013 Amount: $831,598.00
Fund Name: N/A
Additional Comments: N/A
PREVIOUS BOARD ACTION RELATED TO THIS ACTION:
6/09/11 -- Ord. No. 13264 – Amount: $829,143–-FM Global Insurance Co.—Excess Flood Coverage
6/10/10 -- Ord. No. 13095 – Amount: $801,583–-FM Global Insurance Co.—Excess Flood Coverage
6/11/09 -- Ord. No. 12881 – Amount: $846,600–-FM Global Insurance Co.—Excess Flood Coverage
6/12/08 -- Ord. No. 12663 – Amount: $512,625–-FM Global Insurance Co.—Excess Flood Coverage
30 of 4/12/12
AGENDA ITEM NUMBER: 38 – Proposed Ord. No. 13410
NAME OF PROJECT: National Flood Insurance Program (NFIP)
LOCATION: Specified District locations: Missouri River, Grand Glaize, Sulphur, Bissell, Meramec Bottoms, Master Lift.
TYPE OF PROJECT: Purchase of Insurance
DEPARTMENT REQUESTING ACTION: Risk Management
REQUESTED ACTION:
Why is this action necessary?: The FEMA policies provide first dollar flood insurance coverage for those
facilities that are situated within Zone A, B & C Floodways.
What does action accomplish?: This ordinance provides first dollar insurance coverage for properties
located in the flood plain, and is required as part of our insurance coverage.
SUMMARY EXPLANATION/BACKGROUND:
Contractor: N/A Previous District Contract: Yes
Consultant: R. T. Thomas Company
Agency: National Flood Insurance Program (Selective Insurance Company)
Number of bidders: N/A Low Bid: N/A High Bid: N/A
Appropriation Amount: N/A District’s Estimate: N/A
MBE/WBE Participation: N/A
Plan Approval Date: N/A Type of Contract: Lump Sum
Properties Affected: N/A Properties Benefitting: N/A
Designed by: N/A
This insurance provides actual cash value coverage for real and personal property in excess of the deductible, and subject to
policy limits. This ordinance will authorize the District to enter into a contract with National Flood Insurance Program (FEMA
and Selective Insurance Company) from July 1, 2012 to June 30, 2013.
FUNDING/COST SUMMARY:
Budgeted: Risk Management Department’s Budget Budget Year: FY2013 Amount: $145,000.00
Fund Name: N/A
Additional Comments: N/A
PREVIOUS BOARD ACTION RELATED TO THIS ACTION:
6/09/11 -- Ord. No. 13265 – Amount: $135,000 -- Federal Emergency Management Agency
6/10/10 -- Ord. No. 13096 – Amount: $135,000 -- Federal Emergency Management Agency
6/11/09 -- Ord. No. 12882 – Amount: $135,000 -- Federal Emergency Management Agency
6/12/08 -- Ord. No. 12664 – Amount: $135,000 -- Federal Emergency Management Agency
31 of 4/12/12
AGENDA ITEM NUMBER: 39 – Proposed Ord. No. 13411
NAME OF PROJECT: Excess Workers’ Compensation Insurance Coverage
LOCATION: District wide
TYPE OF PROJECT: Purchase of Insurance
DEPARTMENT REQUESTING ACTION: Risk Management
REQUESTED ACTION:
Why is this action necessary?: To provide an element of loss control for the District’s Workers’
Compensation insurance program.
What does action accomplish?: This ordinance puts a cap on the amount of claims cost MSD could absorb
from its Workers’ Compensation insurance program.
SUMMARY EXPLANATION/BACKGROUND:
Contractor: N/A Previous District Contract: Yes
Consultant: McGriff, Seibels & Williams of Missouri Inc.
Agency: Midwest Employers Casualty Company
Number of bidders: N/A Low Bid: N/A High Bid: N/A
Appropriation Amount: N/A District’s Estimate: N/A
MBE/WBE Participation: N/A
Plan Approval Date: N/A Type of Contract: Lump Sum
Properties Affected: N/A Properties Benefitting: N/A
Designed by: N/A
This insurance coverage indemnifies MSD against loss claim expense in excess of the retention level as a result of Workers’
Compensation of Employers Liability, subject to policy limits. This ordinance will authorize the District to enter into a contract
with Midwest Employers Casualty Company from July 1, 2012 to June 30, 2013.
FUNDING/COST SUMMARY:
Budgeted: Risk Management Department’s Budget Budget Year: FY2013 Amount: $316,053.00
Fund Name: N/A
Additional Comments: N/A
PREVIOUS BOARD ACTION RELATED TO THIS ACTION:
5/12/11 -- Res. No. 2974 – Amount: $280,802 -- Midwest Employers Casualty Company
6/10/10 -- Ord. No. 13097 – Amount: $280,802 -- Midwest Employers Casualty Company
6/11/09 -- Ord. No. 12884 – Amount: $268,877 -- Midwest Employers Casualty Company
6/12/08 -- Ord. No. 12666 – Amount: $268,877 -- Midwest Employers Casualty Company
32 of 4/12/12
AGENDA ITEM NUMBER: 40 – Proposed Ord. No. 13412
NAME OF PROJECT: Fiduciary Liability Insurance Coverage
LOCATION: District wide
TYPE OF PROJECT: Purchase of Insurance
DEPARTMENT REQUESTING ACTION: Risk Management
REQUESTED ACTION:
Why is this action necessary?: To provide an element of loss control for the District’s Fiduciary Liability
insurance program.
What does action accomplish?: This ordinance puts a cap on the amount of claims cost MSD could absorb
from an incident falling within the definition of Fiduciary Liability.
SUMMARY EXPLANATION/BACKGROUND:
Contractor: N/A Previous District Contract: Yes
Consultant: McGriff, Seibels & Williams of Missouri Inc.
Agency: Federal (Chubb) Insurance Company
Number of bidders: N/A Low Bid: N/A High Bid: N/A
Appropriation Amount: N/A District’s Estimate: N/A
MBE/WBE Participation: N/A
Plan Approval Date: N/A Type of Contract: Lump Sum
Properties Affected: N/A Properties Benefitting: N/A
Designed by: N/A
This insurance coverage pays, on behalf of MSD, all sums in excess of the deductible, that the District becomes legally
obligated to pay as a result of Breach of Fiduciary Duty, subject to policy limits. This ordinance will authorize the District to
enter into a contract with Federal (Chubb) Insurance Company from July 1, 2012 to June 30, 2013.
FUNDING/COST SUMMARY:
Budgeted: Risk Management Department’s Budget Budget Year: FY2013 Amount: $88,203.00
Fund Name: N/A
Additional Comments: N/A
PREVIOUS BOARD ACTION RELATED TO THIS ACTION:
6/09/11 – Ord. No. 13266 – Amount: $80,550-- Federal (Chubb) Insurance Company
6/10/10 – Ord. No. 13098 – Amount: $73,227-- Federal (Chubb) Insurance Company
6/11/09 – Ord. No. 12886 – Amount: $66,570-- Federal (Chubb) Insurance Company
6/12/08 – Ord. No. 12668 – Amount: $63,400-- Federal (Chubb) Insurance Company
33 of 4/12/12
AGENDA ITEM NUMBER: 41 – Proposed Ord. No. 13413
NAME OF PROJECT: Commercial Crime Insurance Coverage
LOCATION: District wide
TYPE OF PROJECT: Purchase of Insurance
DEPARTMENT REQUESTING ACTION: Risk Management
REQUESTED ACTION:
Why is this action necessary?: To provide an element of loss control for the District’s Crime insurance
program.
What does action accomplish?: This ordinance puts a cap on the amount of claims cost MSD could absorb
from an incident falling within the definition of Commercial Crime.
SUMMARY EXPLANATION/BACKGROUND:
Contractor: N/A Previous District Contract: Yes
Consultant: McGriff, Seibels & Williams of Missouri Inc.
Agency: Federal (Chubb) Insurance Company
Number of bidders: N/A Low Bid: N/A High Bid: N/A
Appropriation Amount: N/A District’s Estimate: N/A
MBE/WBE Participation: N/A
Plan Approval Date: N/A Type of Contract: Lump Sum
Properties Affected: N/A Properties Benefitting: N/A
Designed by: N/A
This insurance coverage indemnifies MSD against loss and claim expense in excess of the deductible level as a result of a
Commercial Crime event, subject to policy limits. This ordinance will authorize the District to enter into a contract with
Federal (Chubb) Insurance Company from July 1, 2012 to June 30, 2013.
FUNDING/COST SUMMARY:
Budgeted: Risk Management Department’s Budget Budget Year: FY2013 Amount: $45,337.00
Fund Name: N/A
Additional Comments: N/A
PREVIOUS BOARD ACTION RELATED TO THIS ACTION:
6/09/11 – Ord. No. 13267 – Amount: $41,215 – Federal Insurance Company
6/10/10 – Ord. No. 13099 – Amount: $41,215 – Federal Insurance Company
6/11/09 – Ord. No. 12887 – Amount: $41,215 – Federal Insurance Company
6/12/08 – Ord. No. 12669 – Amount: $39,630 – Federal Insurance Company
34 of 4/12/12
AGENDA ITEM NUMBER: 42 – Proposed Ord. No. 13414
NAME OF PROJECT: Underground Storage Tank Insurance
LOCATION: Specified District Locations – Plants and Maintenance Yards
TYPE OF PROJECT: Purchase of Insurance
DEPARTMENT REQUESTING ACTION: Risk Management
REQUESTED ACTION:
Why is this action necessary?: This insurance contract provides coverage for claims arising from leaking.
What does action accomplish?: This policy limits the District’s exposure for remediation and damages
arising from leaking underground storage tanks.
SUMMARY EXPLANATION/BACKGROUND:
Contractor: N/A Previous District Contract: Yes
Consultant: N/A
Agency: Missouri Underground Storage Tank Fund
Number of bidders: N/A Low Bid: N/A High Bid: N/A
Appropriation Amount: N/A District’s Estimate: N/A
MBE/WBE Participation: N/A
Plan Approval Date: N/A Type of Contract: Lump Sum
Properties Affected: N/A Properties Benefitting: N/A
Designed by: N/A
This ordinance will authorize the District to enter into a contract with Missouri Underground Storage Tank Fund from July 1,
2012 to June 30, 2013.
FUNDING/COST SUMMARY:
Budgeted: Risk Management Department’s Budget Budget Year: FY2013 Amount: $3,000.00
Fund Name: N/A
Additional Comments: The District maintains approximately 20 underground storage tanks that contain primarily
petroleum products, and to a lesser extent, certain chemicals used in the treatment process.
PREVIOUS BOARD ACTION RELATED TO THIS ACTION:
6/09/11 – Ord. No. 13268 – Amount: $3,000 -- Missouri Underground Storage Tank Fund
6/10/10 – Ord. No. 13100 – Amount: $3,000 -- Missouri Underground Storage Tank Fund
6/11/09 – Ord. No. 12888 – Amount: $3,000 -- Missouri Underground Storage Tank Fund
6/12/08 – Ord. No. 12670 – Amount: $3,000 -- Missouri Underground Storage Tank Fund
35 of 4/12/12
AGENDA ITEM NUMBER: 43 – Proposed Ord. No. 13415
NAME OF PROJECT: Major Facility Pollution Liability Insurance Coverage
LOCATION: Various Treatment Plants
TYPE OF PROJECT: Purchase of Insurance
DEPARTMENT REQUESTING ACTION: Risk Management
REQUESTED ACTION:
Why is this action necessary?: This program provides coverage for pollution losses emanating from the
treatment plants.
What does action accomplish?: This coverage limits the exposure to the District from claims arising from
pollution losses at the plants.
SUMMARY EXPLANATION/BACKGROUND:
Contractor: N/A Previous District Contract: Yes
Consultant: McGriff, Seibels & Williams of Missouri Inc.
Agency: Zurich (Steadfast) Insurance Company
Number of bidders: N/A Low Bid: N/A High Bid: N/A
Appropriation Amount: N/A District’s Estimate: N/A
MBE/WBE Participation: N/A
Plan Approval Date: N/A Type of Contract: Lump Sum
Properties Affected: N/A Properties Benefitting: N/A
Designed by: N/A
This ordinance will authorize the District to enter into a contract with Zurich (Steadfast) Insurance Company
from July 1, 2012 to June 30, 2013 for the District’s Facility Pollution Liability coverage. This policy provides $10 million of
coverage above a $500,000 self-insured retention for pollution environmental claims.
FUNDING/COST SUMMARY:
Budgeted: Risk Management Department’s Budget Budget Year: FY2013 Amount: $88,372.00
Fund Name: N/A
Additional Comments: N/A
PREVIOUS BOARD ACTION RELATED TO THIS ACTION:
6/09/11 – Ord. No. 13269 – Amount: $93,023 – Zurich (Steadfast) Insurance Company
6/10/10 – Ord. No. 13101 – Amount: $93,285 – Zurich (Steadfast) Insurance Company
6/11/09 – Ord. No. 12889 – Amount: $95,562 – Zurich (Steadfast) Insurance Company
6/12/08 – Ord. No. 12677 – Amount: $95,562 – Zurich (Steadfast) Insurance Company
36 of 4/12/12
AGENDA ITEM NUMBER: 44 – Proposed Ord. No. 13416
NAME OF PROJECT: Blocked Main and Overcharged Line Back-Up Insurance Program
LOCATION: District wide
TYPE OF PROJECT: Purchase of Insurance
DEPARTMENT REQUESTING ACTION: Risk Management
REQUESTED ACTION:
Why is this action necessary?: To provide an element of loss control for the District’s Blocked Main and
Overcharged Line back-up insurance program.
What does action accomplish?: This ordinance provides financial protection from catastrophic losses on the
amount of claims cost MSD could absorb
from its blocked sewer and over system capacity programs.
SUMMARY EXPLANATION/BACKGROUND:
Contractor: N/A Previous District Contract: Yes
Consultant: McGriff, Seibels & Williams of Missouri Inc.
Agency: Zurich (Steadfast) Insurance Company
Number of bidders: N/A Low Bid: N/A High Bid: N/A
Appropriation Amount: N/A District’s Estimate: N/A
MBE/WBE Participation: N/A
Plan Approval Date: N/A Type of Contract: Lump Sum
Properties Affected: N/A Properties Benefiting: N/A
Designed by: N/A
Since 1995, MSD has sponsored an insurance program that compensates customers for damage arising from sewer
backups that were caused by blocked sewer mains. This ordinance will authorize the District to enter into a contract with
Zurich (Steadfast) Insurance Company from July 1, 2012 to June 30, 2013. The policy provides $10,000,000 of coverage
above a deductible of $8,500,000.
FUNDING/COST SUMMARY:
Budgeted: Water Backup Insurance and Budget Year: FY2013 Amount: $351,501.00
Reimbursement Fund
Fund Name: Wastewater Revenue Fund
Additional Comments: N/A
PREVIOUS BOARD ACTION RELATED TO THIS ACTION:
6/09/11 -- Ord. No. 13270 – Amount: $370,001 – Zurich (Steadfast) Insurance
6/10/10 -- Ord. No. 13102 – Amount: $370,985 – Zurich (Steadfast) Insurance
6/11/09 -- Ord. No. 12891 – Amount: $373,485 – Zurich (Steadfast) Insurance
6/12/08 -- Ord. No. 12678 – Amount: $585,000 – Zurich (Steadfast) Insurance
37 of 4/12/12
AGENDA ITEM NUMBER: 45 – Proposed Ord. No. 13417
NAME OF PROJECT: Auto Liability Insurance Program
LOCATION: District wide
TYPE OF PROJECT: Purchase of Insurance
DEPARTMENT REQUESTING ACTION: Risk Management
REQUESTED ACTION:
Why is this action necessary?: To provide auto liability and auto physical damage coverage for the District and
Trustees/District staff.
What does action accomplish?: This action provides coverage for liability type claims including defense
Costs.
SUMMARY EXPLANATION/BACKGROUND:
Contractor: N/A Previous District Contract: Yes
Consultant: McGriff, Seibels & Williams of Missouri, Inc.
Agency: Travelers Insurance Companies
Number of bidders: N/A Low Bid: N/A High Bid: N/A
Appropriation Amount: N/A District’s Estimate: N/A
MBE/WBE Participation: N/A
Plan Approval Date: N/A Type of Contract: Lump Sum
Properties Affected: N/A Properties Benefiting: N/A
Designed by: N/A
This insurance provides coverage for liability claims and defense costs. This ordinance will authorize the District to enter into
a contract with Travelers Insurance Company from July 1, 2012 to June 30, 2013. The policy provides $2,000,000 of auto
liability coverage above a $100,000 deductible and auto physical damage above a $3,000 deductible.
FUNDING/COST SUMMARY:
Budgeted: Risk Management Department’s Budget Budget Year: FY2013 Amount: $99,985.00
Fund Name: N/A
Additional Comments: N/A
PREVIOUS BOARD ACTION RELATED TO THIS ACTION:
6/09/11 -- Ord. No. 13271 – Amount: $81,066 -- Travelers Insurance Companies
6/10/10 -- Ord. No. 13107 – Amount: $65,429 -- Travelers Insurance Companies
6/11/09 -- Ord. No. 12890 – Amount: $567,746 -- Travelers Insurance Companies
6/12/08 -- Ord. No. 12671 – Amount: $536,102 -- Travelers Insurance Companies
38 of 4/12/12
AGENDA ITEM NUMBER: 46 – Proposed Ord. No. 13418
NAME OF PROJECT: Contractors Equipment (Inland Marine) Insurance Program
LOCATION: District wide
TYPE OF PROJECT: Purchase of Insurance
DEPARTMENT REQUESTING ACTION: Risk Management
REQUESTED ACTION:
Why is this action necessary?: To provide physical damage coverage for equipment owned or leased by the
District that is not on District property.
What does action accomplish?: This action provides coverage for the loss of and/or damage to any equipment
owned or leased by the District listed on the policy.
SUMMARY EXPLANATION/BACKGROUND:
Contractor: N/A Previous District Contract: Yes
Consultant: McGriff, Seibels & Williams of Missouri, Inc.
Agency: RLI Insurance Company
Number of bidders: N/A Low Bid: N/A High Bid: N/A
Appropriation Amount: N/A District’s Estimate: N/A
MBE/WBE Participation: N/A
Plan Approval Date: N/A Type of Contract: Lump Sum
Properties Affected: N/A Properties Benefiting: N/A
Designed by: N/A
This insurance provides coverage for loss of and /or damage to listed equipment. This ordinance will authorize the District to
enter into a contract with RLI Insurance Company from July 1, 2012 to June 30, 2013. The policy provides $250,000 of loss
and damage coverage per piece of equipment above a $5,000 deductible per piece of equipment (unlicensed vehicles and
equipment) listed on the policy. The District will cover $5,327,428 of equipment under this policy, which is the policy limit.
Equipment is excluded under the auto physical damage policy and is subject to a $100,000 deductible under the property
policy if located on District property.
FUNDING/COST SUMMARY:
Budgeted: Risk Management Department’s Budget Budget Year: FY2013 Amount: $11,711.00
Fund Name: N/A
Additional Comments: N/A
PREVIOUS BOARD ACTION RELATED TO THIS ACTION:
6/09/11 -- Ord. No. 13272 – Amount: $11,081 -- RLI Insurance Company
39 of 4/12/12
AGENDA ITEM NUMBER: 47 – Resolution No. 3028
NAME OF PROJECT: Third Party Claims Administration Services
LOCATION: District wide
TYPE OF PROJECT: Professional Service
DEPARTMENT REQUESTING ACTION: Risk Management
REQUESTED ACTION:
Why is this action necessary?: To provide claims administration services for water back-up, worker
compensation general liability, auto, errors & omissions, and any other claim
against the District and Trustees/District staff.
What does action accomplish?: This action provides an administrator for claims against the District including
adjustment costs.
SUMMARY EXPLANATION/BACKGROUND:
Contractor: Corporate Claims Management Inc. Previous District Contract: Yes
Consultant: N/A
Agency: N/A
Number of bidders: N/A Low Bid: N/A High Bid: N/A
Appropriation Amount: N/A District’s Estimate: N/A
MBE/WBE Participation: 20% R. T. Thomas & Co
Plan Approval Date: N/A Type of Contract: Installment
Properties Affected: N/A Properties Benefitting: N/A
Designed by: N/A
This contract provides claims administration for claims and adjustment costs. This resolution will authorize the District to
exercise the second one-year option and enter into a contract with Corporate Claims Management Inc from July 1, 2012 to
June 30, 2013. The original contract provided for an initial term of one (1) year with four (4) additional one-year renewal
terms at the option of the District.
FUNDING/COST SUMMARY:
Budgeted: Risk Management Department’s Budget Budget Year: FY2013 Amount: $875,000.00
Fund Name: Water Back-Up Fund
Additional Comments: N/A
PREVIOUS BOARD ACTION RELATED TO THIS ACTION:
5/12/11 – Res. No. 2973 – Amount: $875,000-- Corporate Claims Management Inc
6/10/10 – Ord. No. 13093 – Amount: $875,000-- Corporate Claims Management Inc.
6/11/09 – Res. No. 2836 – Amount: $730,000-- Corporate Claims Management Inc.
4/10/08 – Res. No. 2775 – Amount: $730,000-- Corporate Claims Management Inc.
40 of 4/12/12
AGENDA ITEM NUMBER: 48 – Resolution No. 3029
NAME OF PROJECT: Banking – Update List of Approved Banking Institutions and Primary Dealers
LOCATION: N/A
TYPE OF PROJECT: N/A
DEPARTMENT REQUESTING ACTION: Secretary-Treasurer
REQUESTED ACTION:
Why is this action necessary?: Periodically the District updates the list of approved banking institutions, primary
dealers, and acceptable bank collateral so that it can conduct business with for
routine investment transactions and deposits.
What does action accomplish?: Enables the District to effectively transact investment transactions.
SUMMARY EXPLANATION/BACKGROUND:
Contractor: N/A Previous District Contract: Yes
Consultant: N/A
Agency: N/A
Number of bidders: N/A Low Bid: N/A High Bid: N/A
Appropriation Amount: N/A District’s Estimate: N/A
MBE/WBE Participation: N/A
Plan Approval Date: N/A Type of Contract: Time deposit
Properties Affected: N/A Properties Benefiting: N/A
Designed by: N/A
FUNDING/COST SUMMARY:
Budgeted: N/A Budget Year: N/A Amount: N/A
Fund Name: N/A
Additional Comments: Periodically, the District updates the list of approved banking institutions which it may deposit funds
with. Typically, the District will invest in collateralized certificates of deposit, collateralized money market funds and
collateralized time deposits with local banking institutions. This resolution authorizes a list of institutions that have been pre-
qualified by the District. Financial institutions that have been issued a Cease and Desist order or are under a written
agreement with the Federal Reserve Bank or the Office of the Comptroller of the Currency have been removed from the list.
It also authorizes a list of security dealers that may execute investment transactions on the District’s behalf. In this instance
the firms of FTN Financial Capital Markets and Blaylock Robert Van, LLC a minority brokerage firm are being added to list of
eligible securities dealers.
PREVIOUS BOARD ACTION RELATED TO THIS ACTION:
10/14/2010 Res. No. 2938 – Update list of approved banking institutions and dealers
09/16/2010 Res. No. 2931 - Update list of approved banking institutions and dealers
11/13/2008 Res. No. 2820 - Update list of approved banking institutions and dealers
41 of 4/12/12
AGENDA ITEM NUMBER: 49 – Resolution No. 3030
NAME OF PROJECT: Pension Investments
LOCATION: District-wide
TYPE OF PROJECT: Long Term Earnings Rate Assumption
DEPARTMENT REQUESTING ACTION: Secretary-Treasurer
REQUESTED ACTION:
Why is this action necessary?: The resolution provides the Board of trustees approval for the reduction of the long
term investment earnings assumption from 7½% to 7¼%for the Employees’
Pension Plan.
What does action accomplish?: This action provides conceptual guidance to staff regarding the asset allocation
assumptions associated with a lower projected earnings rate.
SUMMARY EXPLANATION/BACKGROUND:
Contractor: N/A Previous District Contract: N/A
Consultant: Milliman Actuaries NEPC, LLC
One Financial Plaza One Main Street
501 N. Broadway, suite 550 Cambridge MA 02142
St. Louis MO 63102
Agency: N/A
Number of bidders: N/A Low Bid: N/A High Bid: N/A
Appropriation Amount: N/A District’s Estimate: N/A
MBE/WBE Participation: N/A
Plan Approval Date: N/A Type of Contract: None Policy Decision
Properties Affected: N/A Properties Benefiting: N/A
Designed by: N/A
FUNDING/COST SUMMARY:
Budgeted: General Fund Budget Year: FY 2013 Amount: $500,000
Additional Comments:
PREVIOUS BOARD ACTION RELATED TO THIS ACTION:
11/08/2007 – Res. No. 2749 – Authorizes Pension Investment asset allocation to support projected earnings assumption
of 7½%.