HomeMy Public PortalAbout1518th Board Agenda 6-14-2012REVISED 6/13/12 PAGE 1 A G E N D A 1518th MEETING OF THE BOARD OF TRUSTEES THE METROPOLITAN ST. LOUIS SEWER DISTRICT June 14, 2012 – 4:00 P.M. MSD OFFICES 2350 MARKET STREET ROOM 109 ROLL CALL THE BOARD OF TRUSTEES WILL BE IN CLOSED SESSION BETWEEN 4:00 P.M. AND 5:00 P.M. 1 CLOSED SESSION TO DISCUSS LEGAL, CONFIDENTIAL OR PRIVILEGED MATTERS UNDER §610.021(1), RSMO 1988 SUPP.; LEASING, PURCHASE OR SALE OF REAL ESTATE UNDER §610.021(2); PERSONNEL ACTIONS UNDER §610.021(3) 2 APPROVAL OF JOURNAL OF PRECEDING MEETINGS May 10, 2012 (1517th) 3 COMMENTS BY THE CHAIR 4 REPORT OF BOARD COMMITTEES 5 REPORT OF EXECUTIVE DIRECTOR 6 COMMENTS FROM THE PUBLIC 7 SUBMISSION OF PUBLIC HEARING REPORTS – Finding of Facts 8 COMMUNICATIONS – None 9 CONSENT AGENDA – Item Nos. 10 through 39 2 of 6/14/12 Ordinances 10 Adoption of proposed Ord. No. 13394 authorizing the Executive Director and Secretary-Treasurer on behalf of The Metropolitan St. Louis Sewer District to enter into a contract with Landesign, LLC for the construction of Green Infrastructure Bioretention at Clinton St. #1323 Bioretention (CB632) - CSO VR GIPLT (11157) in the City of St. Louis, Missouri. (Intro. 05/10/12) 11 Adoption of proposed Ord. No. 13395 creating a new fund to be known as the #5401- Bond Place Special Taxing Subdistrict to fund projects in the Bond Place Special Taxing Subdistrict; transferring $70,000.00 from the Improvement Fund and $10,000.00 from the Lower Meramec River Basin OMCI to the Bond Place Special Taxing Subdistrict and appropriating $80,000.00 from the Bond Place Special Taxing Subdistrict to be used for project costs for the construction of sanitary sewers in Bond Place Sanitary Sewers (S.D. #2010094) (11067), in the City of Sunset Hills, Missouri; and authorizing the Executive Director and Secretary-Treasurer on behalf of The Metropolitan St. Louis Sewer District to enter into a contract with Heartland Construction & Excavating for the construction of the aforesaid sanitary sewers. (Intro. 05/10/12) 12 Adoption of proposed Ord. No. 13396 appropriating $1,300,000.00 from the Sanitary Replacement Fund to be used for project costs for the rehabilitation of sewers in Hermitage I/I Reduction (SKME-615) (10645), in the City of Frontenac, Missouri; and authorizing the Executive Director and Secretary-Treasurer on behalf of The Metropolitan St. Louis Sewer District to enter into a contract with SAK Construction, LLC for the aforesaid sewer rehabilitation. (Intro. 05/10/12) 13 Adoption of proposed Ord. No. 13397 appropriating $200,000.00 from the Operation, Maintenance and Construction Improvement Fund of Deer Creek for cost sharing with the Missouri Botanical Gardens for Green Infrastructure Construction - Deer Creek Watershed Initiative (11065) and authorizing the Executive Director and Secretary-Treasurer on behalf of The Metropolitan St. Louis Sewer District to enter into an agreement with the Missouri Botanical Gardens for cost sharing of Green Infrastructure Construction. (Intro. 05/10/12) 14 Adoption of proposed Ord. No. 13398 appropriating $580,000.00 from the Gravois Creek OMCI fund to be used for project costs for the construction of storm sewers and creekbank stabilization in Diamond Head Drive Storm Sewer (GCUC-110) (10248) in St. Louis County, Missouri; and authorizing the Executive Director and Secretary-Treasurer on behalf of The Metropolitan St. Louis Sewer District to enter into a contract with Ideal Landscape Group for the aforesaid construction. (Intro. 05/10/12) 15 Adoption of proposed Ord. No. 13399 appropriating $990,000.00 from the Operation, Maintenance and Construction Improvement Fund of Deer Creek to be used for project costs for creekbank stabilization in Fawnvalley Storm Channel Improvements (10192), in the City of Des Peres, Missouri; and authorizing the Executive Director and Secretary-Treasurer on behalf of The Metropolitan St. Louis Sewer District to enter into a contract with Wehmeyer Farms, Inc. for the aforesaid creekbank stabilization. (Intro. 05/10/12) 16 Adoption of proposed Ord. No. 13400 appropriating $480,000.00 from the Operation, Maintenance and Construction Improvement Fund of Deer Creek to be used for project costs for the construction of storm sewers in Ruth - Helen - Cecelia Storm Sewer Replacement (10132), in the City of Brentwood, Missouri; and authorizing the Executive Director and Secretary-Treasurer on behalf of The Metropolitan St. Louis Sewer District to enter into a contract with J.H. Berra Const. Co., Inc. for the construction of the aforesaid storm sewers. (Intro. 05/10/12) 3 of 6/14/12 17 Adoption of proposed Ord. No. 13401 appropriating $735,000.00 from the Operation, Maintenance and Construction Improvement Fund of Coldwater Creek to be used for project costs for the construction of storm sewers in Argyle #8800 Storm Sewer (10283), in the City of Overland, Missouri; and authorizing the Executive Director and Secretary-Treasurer on behalf of The Metropolitan St. Louis Sewer District to enter into a contract with XL Contracting, Inc. for the aforesaid storm sewer construction. (Intro. 05/10/12) 18 Adoption of proposed Ord. No. 13403 repealing and superseding Ordinance No. 13273 adopted June 9, 2011, and making appropriations for the current expenses of the District in the General Fund, the Water Backup Insurance & Reimbursement Fund, the Sanitary Replacement Fund, the Stormwater Operations, Maintenance and Construction Improvement Funds, the Emergency Funds, the Debt Service Funds, and the Wastewater Revenue Bond Service Funds for the fiscal year beginning July 1, 2012 and ending June 30, 2013, amounting in the aggregate commitment of $223,503,459 to pay interest falling due on bonds issued, the costs of support, operation, and maintenance of the District and its various subdistricts, and emergencies in accordance with the requirements of this Proposed Ordinance introduced May 10, 2012. (Intro. 05/10/12) 19 Adoption of proposed Ord. No. 13404 repealing Ordinance No. 13316, adopted September 28, 2011, and enacting a new Ordinance in lieu thereof, determining the amount of taxes which shall be levied, assessed, and collected in the year 2012 on all taxable tangible property in the District within the corporate limits of the City of St. Louis and St. Louis County, respectively, and in Subdistricts within the corporate limits of St. Louis County as follows: Coldwater Creek Trunk Subdistrict, Gravois Creek Trunk Subdistrict, Maline Creek Trunk Subdistrict, Watkins Creek Trunk Subdistrict, Subdistrict No. 88 (Fountain Creek), Subdistrict No. 89 (Loretta-Joplin), Subdistrict No. 342 (Clayton-Central), Subdistrict No. 366 (University City Branch of River des Peres Stormwater Subdistrict), Subdistrict No. 367 (Deer Creek Stormwater Subdistrict), Subdistrict No. 369 (Sugar Creek), Subdistrict No. 448 (Missouri River - Bonfils), Subdistrict No. 449 (Meramec River Basin - M.S.D. Southwest), Subdistrict No. 453 (Shrewsbury Branch of River des Peres), Subdistrict No. 454 (Seminary Branch of River des Peres), Subdistrict No. 455 (Black Creek), Subdistrict No. 1 of the River des Peres Watershed (Creve Coeur-Frontenac Area), Subdistrict No. 4 of the River des Peres Watershed (North Affton Area) and Subdistrict No. 7 of the River des Peres Watershed (Wellston Area); and the Board of Trustees, in accordance with Charter Section 7.310 authorizes the Director of Finance to certify as to the amount of taxes which shall be levied, assessed and collected for the aforementioned Subdistricts with an emergency clause. (Intro. 05/10/12) 20 Adoption of proposed Ord. No. 13405 authorizing the Executive Director and Secretary-Treasurer on behalf of The Metropolitan St. Louis Sewer District to enter into a contract with Bank of America N.A. for banking and safekeeping services for the District. (Intro. 05/10/12) 21 Adoption of proposed Ord. No. 13406 authorizing and directing the Executive Director and Secretary-Treasurer on behalf of The Metropolitan St. Louis Sewer District to lease certain real property of The Metropolitan St. Louis Sewer District, lying in the City of St. Louis, Missouri, to Boxes, Inc. for use as a parking lot and to execute and deliver a Lease Agreement upon the conditions hereinafter set out. (Intro. 05/10/12) 22 Adoption of proposed Ord. No. 13407 authorizing the Executive Director and Secretary-Treasurer to lease certain real property of The Metropolitan St. Louis Sewer District, lying in St. Louis County, Missouri, to Kadima Properties, LLC, and to execute a Lease Agreement upon the conditions hereinafter set out. (Intro. 05/10/12) 4 of 6/14/12 23 Adoption of proposed Ord. No. 13408 awarding a contract to F.M. GlobalInsurance Company (McGriff, Seibels & Williams, of Missouri Inc., agent) for the District’s Primary Property, Boiler and Machinery Insurance Coverage from July 1, 2012 to June 30, 2013. (Intro. 05/10/12) 24 Adoption of proposed Ord. No. 13409 awarding a contract to F.M. GlobalInsurance Company (McGriff, Seibels & Williams, of Missouri Inc., agent) for the District’s Excess Flood & Earth Movement Insurance coverage from July 1, 2012 to June 30, 2013. (Intro. 05/10/12) 25 Adoption of proposed Ord. No. 13410 authorizing the Executive Director and Secretary-Treasurer on behalf of The Metropolitan St. Louis Sewer District to execute all documents necessary in order to procure flood insurance from the National Flood Insurance Program (Federal Emergency Management Agency) during the period of July 1, 2012 to June 30, 2013, for the buildings and contents at certain specified District locations. (Intro. 05/10/12) 26 Adoption of proposed Ord. No. 13411 awarding a contract to Midwest Employers Casualty Company (McGriff, Seibels & Williams, of Missouri Inc., agent) for the District’s Excess Workers’ Compensation Insurance coverage from July 1, 2012 to June 30, 2013. (Intro. 05/10/12) 27 Adoption of proposed Ord. No. 13412 awarding a contract to Federal (Chubb) Insurance Company (McGriff, Seibels & Williams, of Missouri Inc., agent) for the District’s Fiduciary Liability Insurance from July 1, 2012, June 30, 2013. (Intro. 05/10/12) 28 Adoption of proposed Ord. No. 13413 awarding a contract to Federal (Chubb) Insurance Company (McGriff, Seibels & Williams, of Missouri Inc., agent) for the District’s Commercial Crime Insurance coverage from July 1, 2012 to June 30, 2013. (Intro. 05/10/12) 29 Adoption of proposed Ord. No. 13414 awarding a contract to Missouri Underground Storage Tank Insurance Fund for the District’s Underground Storage Tank Insurance coverage from July 1, 2012, June 30, 2013. (Intro. 05/10/12) 30 Adoption of proposed Ord. No. 13415 awarding a contract to Zurich (Steadfast) Insurance Company (McGriff, Seibels & Williams, of Missouri Inc., agents) for the District’s Major Facility Pollution Liability Insurance from July 1, 2012 to June 30, 2013. (Intro. 05/10/12) 31 Adoption of proposed Ord. No. 13416 awarding a contract to Zurich (Steadfast) Insurance Company (McGriff, Seibels & Williams of Missouri, Inc., agent) for the District's Blocked Main and Overcharged Sewer Line Backup Insurance coverage from July 1, 2012 to June 30, 2013. (Intro. 05/10/12) 32 Adoption of proposed Ord. No. 13417 awarding a contract to Travelers Insurance Companies (McGriff, Seibels & Williams of Missouri, Inc., agent) for the District’s Auto Liability Insurance Program coverage from July 1, 2012 to June 30, 2013. (Intro. 05/10/12) 33 Adoption of proposed Ord. No. 13418 awarding a contract to RLI Insurance Company (McGriff, Seibels & Williams, of Missouri Inc., agent) for the District’s Contractors Equipment (Inland Marine) Insurance Program from July 1, 2012 to June 30, 2013. (Intro. 05/10/12) 5 of 6/14/12 Plan Approval 34 Palm Sewer Repair/Replacement (10727) This project, located the terminus of Branch Street on the west bank of the Mississippi River in the City of St. Louis, is to repair multiple structural failures of a reinforced concrete horseshoe sewer and outfall structure located downstream of the flood protection emergency closure structure. This project is in the Fiscal Year 2013 Budget and the estimated construction cost is $5,720,000. 35 Creve Coeur Creek Sanitary Trunk Sewer Relief Phase III (SKME-021) (10428) This project, located west of North Woods Mill Road and south of Ladue Road in the City of Chesterfield, is to alleviate overcharging of the sanitary trunk sewer due to growth and wet weather infiltration and inflow occuring within the watershed. This project is in the Fiscal Year 2013 Budget and the estimated construction cost is $1,815,000. 36 Coldwater Treatment Plant Improvements (Sludge Pump Station) (10518) This project, located on Old Halls Ferry Road south of Lindbergh Boulevard in Unincorporated St. Louis County, is to improve the existing inadequate gravity sludge conveyance system. This project is in the Fiscal Year 2013 Budget and the estimated construction cost is $302,000. 37 Infrastructure Repairs (Rehabilitation) (FY 2012 Contract C) (11836) This project, located District Boundries in the City of St. Louis City and County, is to rehabilitate older, damaged and deteriorated sewers to reduce pipe collapses, blocked mains and inflow/infiltration. This project is in the Fiscal Year 2012 Budget and the estimated construction cost is $5,131,000. 38 Blancha Dr. to Olive Blvd. Sewer Separation (10393) This project, located south of Olive Boulevard and east of Interstate 170 in the City of University City, is to disconnect a 21-inch storm sewer from the sanitary system. This project is in the Fiscal Year 2013 Budget and the estimated construction cost is $ 84,000. 39 Ashby Road 3000 Block Storm Sewer (10371) This project, located west of Ashby Road and north of Page Avenue in the City of St. Ann and unincorporated St. Louis County, is to alleviate yard flooding and erosion. This project is in the Fiscal Year 2013 Budget and the estimated construction cost is $263,000. 6 of 6/14/12 UNFINISHED BUSINESS Ordinances 40 Amendment and adoption of proposed Ord. No. 13402 repealing and superseding Ordinance No. 13021 adopted January 14, 2010, and enacting a new ordinance in lieu thereof establishing a new Section Ten, Remedies, and a new Appendix 1 pertaining to new Wastewater User Charges pending the outcome of the June 5, 2012 Special Election of Proposition Y. (Intro. 05/10/12) Resolutions None 7 of 6/14/12 New Business Agenda Item Number Name Page Number Ordinances 41 – Proposed Ord. No. 13419 Windom #8721 Sewer Rehabilitation (10229) 12 Introduction of proposed Ord. No. 13419 appropriating $240,000.00 from the Operation, Maintenance and Construction Improvement Fund of Coldwater Creek to be used for project costs for the construction of storm sewers in Windom #8721 Sewer Rehabilitation (10229), in the Cities of Charlack and St. John, Missouri; and authorizing the Executive Director and Secretary-Treasurer on behalf of The Metropolitan St. Louis Sewer District to enter into a contract with Gershenson Const. Co., Inc. for the aforesaid storm sewer construction. 42 – Proposed Ord. No. 13420 Lemay WWTP Outfall 002 Elimination 13 (Equipment Procurement) (11132) Introduction of proposed Ord. No. 13420 appropriating $1,300,000.00 from the Sanitary Replacement Fund to be used for project costs for the equipment procurement of the Lemay WWTP Outfall 002 Elimination (Equipment Procurement) (11132), in Unincorporated St. Louis County, Missouri; and authorizing the Executive Director and Secretary-Treasurer on behalf of The Metropolitan St. Louis Sewer District to enter into a contract with United Conveyor Corporation for the equipment procurement of the aforesaid treatment plant improvements. 43 – Proposed Ord. No. 13421 Calvary Cemetery Storage Basin 14 (Property Acquisition) (11121) Introduction of proposed Ord. No. 13421 appropriating $500,000.00 from the Sanitary Replacement Fund for the acquisition, demolition and related activities of real property for flood mitigation purposes and for the Calvary Cemetery Storage Basin (Property Acquisition) (11121) in the City of St. Louis, Missouri; and authorizing the Executive Director and Secretary-Treasurer on behalf of The Metropolitan St. Louis Sewer District to acquire, demolish, and perform related activities for real property necessary for the above project. 44 – Proposed Ord. No. 13422 Creve Coeur Creek Sanitary Trunk Sewer 15 Relief Phase III (SKME-021) (10428) Introduction of proposed Ord. No. 13422 appropriating $1,500,000.00 from the Sanitary Replacement Fund to be used for project costs for the construction of sanitary sewers in Creve Coeur Creek Sanitary Trunk Sewer Relief Phase III (SKME-021) (10428), in the City of Chesterfield, Missouri; and authorizing the Executive Director and Secretary- Treasurer on behalf of The Metropolitan St. Louis Sewer District to enter into a contract with Bates Utility Company, Inc. for the aforesaid sanitary sewer construction. 8 of 6/14/12 Agenda Item Number Name Page Number 45 – Proposed Ord. No. 13423 Lemay WWTP Disinfection Facilities (10681) 16 Introduction of proposed Ord. No. 13423 making a supplemental appropriation of $7,700,000.00 from the Sanitary Replacement Fund for scheduled supplemental funds to complete wastewater treatment plant construction of the Lemay WWTP Disinfection Facilities (10681). 46 – Proposed Ord. No. 13424 Palm Sewer Repair/Replacement (10727) 17 Introduction of proposed Ord. No. 13424 appropriating $2,700,000.00 from the Sanitary Replacement Fund to be used for project costs for the combined sewer construction – Palm Sewer Repair/Replacement (10727), in the City of St. Louis, Missouri; and authorizing the Executive Director and Secretary-Treasurer on behalf of The Metropolitan St. Louis Sewer District to enter into a contract with KCI Construction Company for the aforesaid sanitary sewer construction. 47 – Proposed Ord. No. 13425 Portis #3242 Combined Sewer Improvements 18 (10145) Introduction of proposed Ord. No. 13425 appropriating $280,000.00 from the Sanitary Replacement Fund to be used for project costs for the combined sewer construction – Portis #3242 Combined Sewer Improvements (10145), in the City of St. Louis, Missouri; and authorizing the Executive Director and Secretary-Treasurer on behalf of The Metropolitan St. Louis Sewer District to enter into a contract with Unnerstall Contracting Co., Ltd. for the aforesaid sanitary sewer construction. 48 – Proposed Ord. No. 13426 Romaine Ave. #9449 Storm Sewer (10747) 19 Introduction of proposed Ord. No. 13426 appropriating $97,000.00 from the University City OMCI Fund to be used for project costs for the construction of storm sewers in Romaine Ave. #9449 Storm Sewer (10747), in the City of Overland, Missouri; and authorizing the Executive Director and Secretary-Treasurer on behalf of The Metropolitan St. Louis Sewer District to enter into a contract with Gershenson Const. Co., Inc. for the aforesaid storm sewer construction. 49 – Proposed Ord. No. 13427 Wabash Ave. #8555 Storm Sewer (10357) 20 Introduction of proposed Ord. No. 13427 appropriating $115,000.00 from the Operation, Maintenance and Construction Improvement Fund of Coldwater Creek to be used for project costs for the construction of storm sewers in Wabash Ave. #8555 Storm Sewer (10357), in the City of Berkeley, Missouri; and authorizing the Executive Director and Secretary-Treasurer on behalf of The Metropolitan St. Louis Sewer District to enter into a contract with Tap Utilities, LLC for the aforesaid storm sewer construction. 9 of 6/14/12 Agenda Item Number Name Page Number 50 – Proposed Ord. No. 13428 Combined Sewer Area – Inflow/Infiltration 21 Assessment (FY2008) (E-1215 & 10232) Introduction of proposed Ord. No. 13428 making a supplemental appropriation of $3,200,000.00 from the General Fund of the District for additional engineering services for Combined Sewer Area - Inflow/Infiltration Assessment (FY2008) (E 1215) (10232); and authorizing the Executive Director and Secretary-Treasurer on behalf of The Metropolitan St. Louis Sewer District to enter into Amendment No. 6 of Contract 10402 with RJN Group, Inc. for the aforesaid engineering services. 51 – Proposed Ord. No. 13429 General Services Agreement – Sewer & Process 23 Design (FY2011) (10623) Introduction of proposed Ord. No. 13429 making a supplemental appropriation of $300,000.00 from the Sanitary Replacement Fund of the District for additional engineering services for General Services Agreement - Sewer & Process Design (FY2011) (10623); and authorizing the Executive Director and Secretary-Treasurer on behalf of The Metropolitan St. Louis Sewer District to enter into Amendment No. 1 of Contract 10408 with Horner & Shifrin, Inc. for the aforesaid engineering services. 52 – Proposed Ord. No. 13430 General Services Agreement – Survey Services 24 (FY2011) Contract A (10626) Introduction of proposed Ord. No. 13430 making a supplemental appropriation of $50,000.00 from the General Fund of the District for additional surveying services for General Services Agreement - Survey Services (FY2011) Contract A (10626); and authorizing the Executive Director and Secretary-Treasurer on behalf of The Metropolitan St. Louis Sewer District to enter into Amendment No. 2 of Contract 10410 with Engineering Design Source, Inc. for the aforesaid surveying services. 53 – Proposed Ord. No. 13431 General Services Agreement – Survey Services 25 (FY2011) Contract D (10629) Introduction of proposed Ord. No. 13431 making a supplemental appropriation of $50,000.00 from the General Fund of the District for additional surveying services for General Services Agreement - Survey Services (FY2011) Contract D (10629); and authorizing the Executive Director and Secretary-Treasurer on behalf of The Metropolitan St. Louis Sewer District to enter into Amendment No. 2 of Contract 10413 with The Sterling Company for the aforesaid surveying services. 54 – Proposed Ord. No. 13432 Lemay WWTP Secondary Improvements (11649) 26 Introduction of proposed Ord. No. 13432 making a supplemental appropriation of $1,580,000.00 from the Sanitary Replacement Fund for engineering services for Lemay WWTP Secondary Improvements (11649), and authorizing the Executive Director and Secretary-Treasurer on behalf of The Metropolitan St. Louis Sewer District to enter into Contract 10968 with Black & Veatch Corporation, for the aforesaid additional engineering services. 10 of 6/14/12 Agenda Item Number Name Page Number 55 – Proposed Ord. No. 13433 Separate Sewer Area – Inflow/Infiltration 28 Assessment (FY2008) (E-1214 & 10231) Introduction of proposed Ord. No. 13433 making a supplemental appropriation $1,200,000.00 from the General Fund of the District for additional engineering services for Separate Sewer Area - Inflow/Infiltration Assessment (FY2008) (E-1214) (10231); and authorizing the Executive Director and Secretary-Treasurer on behalf of The Metropolitan St. Louis Sewer District to enter into Amendment No. 6 to Contract 10403 with Woolpert Consultants, Inc. for the aforesaid engineering services. 56 – Proposed Ord. No. 13434 Watershed Facility Planning Phase II 30 (E-1216 & 10230) Introduction of proposed Ord. No. 13434 making a supplemental appropriation of $4,500,000.00 from the Sanitary Replacement Fund and $500,000.00 from the General Fund for Watershed Facility Planning Phase II (E-1216) (10230); and authorizing the Executive Director and Secretary-Treasurer on behalf of The Metropolitan St. Louis Sewer District to enter into Amendment No. 11 to Contract 10404 with Jacobs Engineering Group, Inc. for the aforesaid engineering services. 57 – Proposed Ord. No. 13435 General Services Agreement – Stormwater 32 Planning (FY2011) (10624) Introduction of proposed Ord. No. 13435 making a supplemental appropriation of $100,000.00 from the Coldwater Creek OMCI and $200,000.00 from the Gravois Creek OMCI for General Services Agreement - Stormwater Planning (FY2011) (10624); and authorizing the Executive Director and Secretary-Treasurer on behalf of The Metropolitan St. Louis Sewer District to enter into Amendment No. 1 of Contract 10409 with Parsons Water & Infrastructure, Inc. for the aforesaid engineering services. Resolutions 58 Adoption of Resolution No. 3031 whereas Ordinance No. 13281, adopted August 11, 34 2011, authorized the Executive Director and Secretary-Treasurer on behalf of The Metropolitan St. Louis Sewer District to enter into Contract #10678 with M3 Engineering Group, P.C. whereby M3 Engineering Group, P.C. would provide design, geotechnical investigation, planting plan, and other engineering services for CSO Volume Reduction - Green Infrastructure (Pilot Program) (11048). 59 Adoption of Resolution No. 3033 whereas the Executive Director of the Metropolitan 36 St. Louis Sewer District (the District) has recommended to the Board of Trustees that certain parcels of real property the District acquired as part of the Harlem - Baden Relief Phase IV (Hebert) Acquisition (10641) project shall be transferred to the neighboring property owner. 11 of 6/14/12 Agenda Item Number Name Page Number 60 Adoption of Resolution No. 3034 whereas Ordinance No. 13275, adopted June 9, 37 2011, authorized the Executive Director and Secretary-Treasurer on behalf of The Metropolitan St. Louis Sewer District to enter into a contract with Cardinal Point Partners, LLC whereby Cardinal Point Partners, LLC would provide Federal Legislative Services for the District. 61 Adoption of Resolution No. 3035 whereas Section 5.110 of the Charter of The 38 Metropolitan St. Louis Sewer District states: A continuing five-year strategic and operating plan for the District shall be adopted on an annual basis by the Board. The strategic and operating plan shall state the District’s objectives for the succeeding five years and include objective targets by which to measure the District’s performance in meeting these objectives. 62 Adoption of Resolution No. 3036 whereas based on certified election results, on 39 June 5, 2012, the voters of St. Louis City and St. Louis County have authorized The Metropolitan St. Louis Sewer District to issue $945,000,000.00 in Sanitary Revenue Bonds and supported the District Charter Plan Amendments. 63 Adoption of Resolution No. 3032 expressing the Board of Trustees’ appreciation to Charles R. Tucker for his 35 years of exemplary service to The Metropolitan St. Louis Sewer District from February 24, 1977, to his retirement effective June 1, 2012. 64 ITEMS PROPOSED FOR INTRODUCTION & ADOPTION AT THE NEXT BOARD MEETING 65 ANY OTHER BUSINESS THAT MAY PROPERLY BE BROUGHT BEFORE THE BOARD 66 CLOSED SESSION The Metropolitan St. Louis Sewer District Board of Trustees may go into closed session at this meeting if such action is approved by a majority vote of the Board members who constitute a quorum, to discuss legal, confidential, or privileged matters under §610.021(1), RSMo 1988 Supp.; leasing, purchase or sale of real estate under §610.021(2); personnel actions under §610.021(3); discussions regarding negotiations with employee groups under §610.021(9); personnel records or applications under §610.021(13); or records under §610.021(14) which are otherwise protected from disclosure by law; or confidential or privileged communications with the District’s auditor, including auditor work products under §610.021(17). 67 ADJOURNMENT 12 of 6/14/12 AGENDA ITEM NUMBER: 41 – Proposed Ord. No. 13419 NAME OF PROJECT: Windom #8721 Sewer Rehabilitation (10229) LOCATION: South of St. Charles Rock Road and west of Interstate 170 in the Cities of Charlack and St. John, Missouri TYPE OF PROJECT: Storm Sewer Construction (015.0 Construction Costs) DEPARTMENT REQUESTING ACTION: Engineering REQUESTED ACTION: Why is this action necessary?: Appropriates funds and authorizes staff to enter into a construction contract What does action accomplish?: Implements the construction of a CIP project SUMMARY EXPLANATION/BACKGROUND: Contractor: Gershenson Const. Co., Inc. Previous District Contract: Yes #2 Truitt Drive Eureka, MO 63025 Consultant: N/A Agency: N/A Number of bidders: 10 Low Bid: $132,106.05 High Bid: $178,711.56 Appropriation Amount: $240,000.00 Designer’s Estimate: $158,000.00 MBE/WBE Participation: 15.14% McKay’s Hauling – 10.60% - MBE Roden’s Landscaping – 4.54% - WBE Plan Approval Date: May 10, 2012 Type of Contract: Unit Cost Properties Affected: 6 Properties Benefiting: 2 Designed by: District staff The work to be done under Contract #10772 consists of the construction of approximately 821 lineal feet of pipe sewers varying in size from 8-inches to 18-inches in diameter and appurtenances. The purpose of this project is to relieve yard flooding at #8721 Windom Avenue. This project is scheduled to be completed in 180 days. FUNDING/COST SUMMARY: Budgeted: Capital Improvement Program Budget Year: FY2012, Pg. 114 Amount: $254,000 Fund Name: #5564 – Coldwater Creek OMCI Additional Comments: An additional contingency of $95,000 for utility relocation (Gas - $70,000 and Water - $25,000) is included in the appropriation. Contracted planning resources utilized: Stormwater Facility Planning PREVIOUS BOARD ACTION RELATED TO THIS ACTION: N/A 13 of 6/14/12 AGENDA ITEM NUMBER: 42 – Proposed Ord. No. 13420 NAME OF PROJECT: Lemay WWTP Outfall 002 Elimination (Equipment Procurement) (11132) LOCATION: 201 Hoffmeister Avenue in unincorporated St. Louis County, Missouri TYPE OF PROJECT: Wastewater Treatment Plant Construction (015.0 Construction Costs) DEPARTMENT REQUESTING ACTION: Engineering REQUESTED ACTION: Why is this action necessary?: Appropriates funds and authorizes staff to enter into a procurement contract What does action accomplish?: Implements the equipment procurement for a CIP project SUMMARY EXPLANATION/BACKGROUND: Contractor: United Conveyor Corporation Previous District Contract: N/A 2100 Norman Drive West Waukegan, IL 60085 Consultant: N/A Agency: N/A Number of bidders: 1 Low Bid: $1,190,000.00 High Bid: $1,190,000.00 Appropriation Amount: $1,300,000.00 Designer’s Estimate: $1,600,000.00 MBE/WBE Participation: The above bid is for a self-perform procurement contract and therefore, the MWBE goals have been waived for this contract. Plan Approval Date: N/A Type of Contract: Lump Sum Properties Affected: 1 Properties Benefiting: Entire Lemay WWTP Service Area Designed by: HDR Engineering, Inc. The work to be done under Contract #10964 consists of the procurement of an equipment supply contract to be turned over to a contractor for installation. The equipment to be procured is a once-through ash dewatering system consisting of two dewatering bins, incoming and return tie-in piping and all ancillary equipment, controls and materials. The purpose of this project is to eliminate the existing Ash Lagoon Outfall 002 to meet regulatory disinfection mandates. This project is scheduled to be completed in 530 days. FUNDING/COST SUMMARY: Budgeted: Capital Improvement Program Budget Year: FY2013 Wastewater Amount: $4,500,000 Continued Projects Fund Name: #6660 – Sanitary Replacement Fund Additional Comments: The design of this project was included in the design contract for the for the Bissell & Lemay WWTP Disinfection Facilities project. A separate installation contract will be bid later in FY2013. The procurement contract will be transferred to the installation contractor by contract. A procurement contract is required in order to assure that Outfall 002 can be eliminated to meet disinfection deadlines prior to December 31, 2013. The estimated cost of the installation contract is $2,600,000. Contracted planning resources utilized: Watershed Facility Planning PREVIOUS BOARD ACTION RELATED TO THIS ACTION: 12/10/09 – Ord. No. 12994 – Amount: $6,000,000 – HDR Engineering, Inc. – Design Contract No. E-1265 12/08/11 – Ord. No. 13332 – Amount: $15,000,000 – Lemay WWTP Disinfection Facilities – Const. Contract No. 10707 14 of 6/14/12 AGENDA ITEM NUMBER: 43 – Proposed Ord. No. 13421 NAME OF PROJECT: Calvary Cemetery Storage Basin (Property Acquisition) (11121) LOCATION: West Florissant and Union Blvd. in the City of St. Louis, Missouri TYPE OF PROJECT: Property acquisition, demolition and related activities of real property for flood mitigation purposes (13.2 Land Purchase) DEPARTMENT REQUESTING ACTION: Engineering REQUESTED ACTION: Why is this action necessary?: Authorizes District to acquire properties and appropriates funds related to the purchase, demolition and related activities What does action accomplish?: Purchase of property will allow improvements of the area for flood mitigation purpose SUMMARY EXPLANATION/BACKGROUND: Contractor: N/A Previous District Contract: N/A Consultant: N/A Agency: N/A Number of bidders: N/A Low Bid: N/A High Bid: N/A Appropriation Amount: $500,000.00 District’s Estimate: N/A MBE/WBE Participation: N/A Plan Approval Date: N/A Type of Contract: N/A Properties Affected: 1 Properties Benefiting: 1 Designed by: N/A The work to be done consists of a voluntary buyout/acquisition of a portion of one (1) property in the 5000 block of West Florissant, in the City of St. Louis, to allow the removal of improvements in this area that is prone to flooding due to inadequate drainage. The cost associated with relieving the drainage issues outweighed the estimated cost to remove all the improvements. The effort will include the demolition of any remaining structures and securing the site. Since this is a voluntary buyout, the owner will be given compensation for the value of their property and the expenses related to the transaction, but will not be given additional compensation for replacement structures under the Code of Federal Regulations Uniform Relocations and Real Property Assistance Act (49CFR Part 24, amended). A real property acquisition consultant will perform all negotiations and management of the property acquisition from the first contact with the owners through the closing. The District will contract for the demolition, asbestos removal, and final restoration of the site and structures under separate contracts through the Purchasing Division. All of these activities will be funded from this appropriation. FUNDING/COST SUMMARY: Budgeted: Capital Improvement Program Budget Year: FY2013, Pg. 82 Amount: $500,000.00 Fund Name: #6660 – Sanitary Replacement Fund Additional Comments: None PREVIOUS BOARD ACTION RELATED TO THIS ACTION: N/A 15 of 6/14/12 AGENDA ITEM NUMBER: 44 – Proposed Ord. No. 13422 NAME OF PROJECT: Creve Coeur Creek Sanitary Trunk Sewer Relief Phase III (SKME-021) (10428) LOCATION: West of North Woods Mill Road and south of Ladue Road in the City of Chesterfield, Missouri TYPE OF PROJECT: Sanitary Sewer Construction (015.0 Construction Costs) DEPARTMENT REQUESTING ACTION: Engineering REQUESTED ACTION: Why is this action necessary?: Appropriates funds and authorizes staff to enter into a construction contract What does action accomplish?: Implements the construction of a CIP project SUMMARY EXPLANATION/BACKGROUND: Contractor: Bates Utility Company, Inc. Previous District Contract: Yes 841 Westwood Industrial Park Dr. Weldon Springs, MO 63304 Consultant: N/A Agency: N/A Number of bidders: 10 Low Bid: $1,398,590.00 High Bid: $2,486,758.00 Appropriation Amount: $1,500,000.00 Designer’s Estimate: $1,815,000.00 MBE/WBE Participation: 15.01% Brandt Contracting – 6.33% - MBE Windstar Transportation – 1.18% - MBE K & P Precast – 7.50% - WBE Plan Approval Date: June 14, 2012 Type of Contract: Unit Cost Properties Affected: 3 Properties Benefiting: 18,700 Designed by: Heideman & Associates, Inc. The work to be done under Contract #10777 consists of the construction of approximately 35 lineal feet of 30-inch diameter and 1,033 lineal feet of 36-inch diameter sanitary sewers and appurtenances. The purpose of this project is to alleviate overcharging of the sanitary trunk sewer due to wet weather infiltration and inflow occurring within the watershed. This project is scheduled to be completed in 300 days. FUNDING/COST SUMMARY: Budgeted: Capital Improvement Program Budget Year: FY2013, Pg. 87 Amount: $1,500,000 Fund Name: #6660 – Sanitary Replacement Fund Additional Comments: An additional contingency of $30,000 for water and gas utility relocation is included in the appropriation. A future construction contract of $1,800,000 for the next construction phase was included in the design contract for this project. Contracted planning resources utilized: Watershed Facility Planning, Separate Sewer Area I/I Assessment, Separate Sewer Area Flow Metering & Monitoring, Modeling, CCTV Inspection, and Radar Rainfall Data. PREVIOUS BOARD ACTION RELATED TO THIS ACTION: 09/10/10 – Ord. No. 12948 – Amount: $900,000 – Heideman Associates, Inc. – Design Contract No. E-1256 16 of 6/14/12 AGENDA ITEM NUMBER: 45 – Proposed Ord. No. 13423 NAME OF PROJECT: Lemay WWTP Disinfection Facilities (10681) LOCATION: South Broadway at Hoffmeister Avenue in unincorporated St. Louis County, Missouri TYPE OF PROJECT: Wastewater Treatment Plant Construction (015.0 Construction Costs) DEPARTMENT REQUESTING ACTION: Engineering REQUESTED ACTION: Why is this action necessary?: Appropriates funding for scheduled supplemental funds to complete a construction contract What does action accomplish?: Implements the construction of a CIP project SUMMARY EXPLANATION/BACKGROUND: Contractor: KCI Construction Company Previous District Contract: Yes 10315 Lake Bluff Drive St. Louis, MO 63123 Consultant: N/A Agency: N/A Number of bidders: N/A Low Bid: N/A High Bid: N/A Appropriation Amount: $7,700,000.00 Designer’s Estimate: $25,043,000.00 MBE/WBE Participation: 8.53% Rainbow Connection – 5.06% - MBE Zumwalt Corp. – .15% - WBE TD4 – 2.22% - MBE Roden’s Landscaping – .04% - WBE Marvin Peebles Masonry – .82% - MBE J.D. Kutter – .03% - WBE Harlem Anderson Trucking – .21% - MBE Plan Approval Date: October 13, 2011 Type of Contract: Lump Sum Properties Affected: 1 Properties Benefiting: Entire Lemay WWTP Service Area Designed by: HDR Engineering, Inc. The work to be done under Contract #10707 consists of the construction of chlorination, dechlorination, ultraviolet (UV) disinfection facilities, and associated civil, structural, mechanical, electrical and instrumentation installations. The purpose of this project is to meet EPA and MDNR regulatory mandates requiring disinfection of effluent. This project is scheduled to be completed in 545 days. FUNDING/COST SUMMARY: Budgeted: Capital Improvement Program Budget Year: FY2013, Pg. 115 Amount: $11,512,000 Fund Name: #6660 – Sanitary Replacement Fund Additional Comments: The bid for this contract was $21,229,000. Contracted planning resources utilized: Watershed Facility Planning PREVIOUS BOARD ACTION RELATED TO THIS ACTION: 12/08/11 – Ord. No. 13332 – Amount: $15,000,000 – Lemay WWTP Disinfection Facilities – Original Contract No. 10707 17 of 6/14/12 AGENDA ITEM NUMBER: 46 – Proposed Ord. No. 13424 NAME OF PROJECT: Palm Sewer Repair/Replacement (10727) LOCATION: The terminus of Branch Street on the west bank of the Mississippi River in the City of St. Louis, Missouri TYPE OF PROJECT: Combined Sewer Construction (015.0 Construction Costs) DEPARTMENT REQUESTING ACTION: Engineering REQUESTED ACTION: Why is this action necessary?: Appropriates funds and authorizes staff to enter into a construction contract What does action accomplish?: Implements the construction of a CIP project SUMMARY EXPLANATION/BACKGROUND: Contractor: KCI Construction Company Previous District Contract: Yes 10315 Lake Bluff Drive St. Louis, MO 63123 Consultant: N/A Agency: N/A Number of bidders: 6 Low Bid: $2,400,000.00 High Bid: $4,109,534.00 Appropriation Amount: $2,700,000.00 Designer’s Estimate: $5,720,000.00 MBE/WBE Participation: 9.12% J.D. Kutter Insurance (Broker) – 0.02% - WBE City Design Group – 0.69% - MBE Windstar Transportation – 1.39% - MBE WB Industries – 0.08% - MBE Riley Ready Mix – 6.94% - MBE Plan Approval Date: June 14, 2012 Type of Contract: Lump Sum Properties Affected: 11,969 Properties Benefiting: 11,969 Designed by: Kuhlmann Design Group, Inc. The work to be done under Contract #10776 consists of the construction of approximately 120 lineal feet of 18-feet by 14.4 feet of reinforced concrete arch sewer and an outfall structure. The purpose of this project is to repair multiple structural failures of a reinforced concrete horseshow sewer and outfall structure located downstream of the flood protection emergency closure structure. This project is scheduled to be completed in 730 days. FUNDING/COST SUMMARY: Budgeted: Capital Improvement Program Budget Year: FY2013, Pg. 122 Amount: $3,780,000 Fund Name: #6660 – Sanitary Replacement Fund Additional Comments: An additional contingency of $30,000 for water and gas utility relocation is included in the appropriation. The total design costs for this construction package was $350,000, split between two design appropriations. The total budget for this project is $6,350,000. Supplemental funding of $2,520,000 is programmed for FY2014. Contracted planning resources utilized: Watershed Facility Planning and CCTV Inspection. PREVIOUS BOARD ACTION RELATED TO THIS ACTION: 03/22/05 – Ord. No. 11949 – Amount: $940,000 – ABNA Engineering, Inc. – Design Contract No. E-1132 12/11/08 – Ord. No. 12785 – Amount: $500,000 – Kuhlmann Design Group, Inc. – Design Contract No. E-1245 18 of 6/14/12 AGENDA ITEM NUMBER: 47 – Proposed Ord. No. 13425 NAME OF PROJECT: Portis #3242 Combined Sewer Improvements (10145) LOCATION: North of Fyler Avenue and east of Kingshighway in the City of St. Louis, Missouri TYPE OF PROJECT: Combined Sewer Construction (015.0 Construction Costs) DEPARTMENT REQUESTING ACTION: Engineering REQUESTED ACTION: Why is this action necessary?: Appropriates funds and authorizes staff to enter into a construction contract What does action accomplish?: Implements the construction of a CIP project SUMMARY EXPLANATION/BACKGROUND: Contractor: Unnerstall Contracting, Co., Ltd. Previous District Contract: Yes 2803 West Osage Pacific, MO 63069 Consultant: N/A Agency: N/A Number of bidders: 8 Low Bid: $191,475.00 High Bid: $243,805.00 Appropriation Amount: $280,000.00 Designer’s Estimate: $245,000.00 MBE/WBE Participation: 10.41% Luther’s Supply – 7.74% - MBE Roden’s Landscaping – 2.67% - WBE Plan Approval Date: May 10, 2012 Type of Contract: Unit Cost Properties Affected: 30 Properties Benefiting: 8 Designed by: Parsons Water & Infrastructure Inc. and Howard R. Green Company The work to be done under Contract #10747 consists of the construction of a detention pond at #3242 Portis Avenue, approximately 720 lineal feet of 8-inch to 24-inch diameter combined sewers and appurtenances. The purpose of this project is to alleviate localized property and street flooding in the 3200 block of Portis Avenue. This project is scheduled to be completed in 268 days. FUNDING/COST SUMMARY: Budgeted: Capital Improvement Program Budget Year: FY2013, Pg. 123 Amount: $293,000 Fund Name: #6660 – Sanitary Replacement Fund Additional Comments: An additional contingency of $70,000 for water and gas utility relocation is included in the appropriation. After the scope of the project was revised, design was completed by Howard R. Green Company under an existing GSA contract due to a lack of funds remaining in the existing design contract A property that experienced frequent flooding was bought-out in order to build the detention basin. Contracted planning resources utilized: Watershed Facility Planning, Combine Sewer Area Flow Metering & Monitoring, Modeling, and CCTV Inspection. PREVIOUS BOARD ACTION RELATED TO THIS ACTION: 03/20/07 – Ord. No. 12396 – Amount: $154,000 – Parsons Water & Infrastructure Inc. – Design Contract No. E-1207 07/09/09 – Res. No. 2859 – GSA – Sewer and Channel Design – Howard R. Green Company – Contract No. E-1293 – Amendment No. 2 12/09/10 – Ord. No. 13164 – Amount: $500,000 – Land Acquisition 19 of 6/14/12 AGENDA ITEM NUMBER: 48 – Proposed Ord. No. 13426 NAME OF PROJECT: Romaine Ave. #9449 Storm Sewer (10747) LOCATION: West of Interstate 170 and north of Page Avenue in the City of Overland, Missouri TYPE OF PROJECT: Storm Sewer Construction (015.0 Construction Costs) DEPARTMENT REQUESTING ACTION: Engineering REQUESTED ACTION: Why is this action necessary?: Appropriates funds and authorizes staff to enter into a construction contract What does action accomplish?: Implements the construction of a CIP project SUMMARY EXPLANATION/BACKGROUND: Contractor: Gershenson Const. Co., Inc. Previous District Contract: Yes #2 Truitt Drive Eureka, MO 63025 Consultant: N/A Agency: N/A Number of bidders: 9 Low Bid: $74,144.35 High Bid: $115,157.00 Appropriation Amount: $97,000.00 Designer’s Estimate: $85,000.00 MBE/WBE Participation: 16.18% Windstar Hauling – 10.79% - MBE Midwest Turf – 5.39% - WBE Plan Approval Date: May 10, 2012 Type of Contract: Unit Cost Properties Affected: 2 Properties Benefiting: 2 Designed by: District staff The work to be done under Contract #10774 consists of the construction of approximately 348 lineal feet of pipe sewers varying in size from 15-inches to 21-inches in diameter and appurtenances. The purpose of this project is to alleviate ponding in rear yards of 9447 and 9449 Romaine Avenue. This project is scheduled to be completed in 90 days. FUNDING/COST SUMMARY: Budgeted: Capital Improvement Program Budget Year: FY2013, Pg. 162 Amount: $125,000 Fund Name: #5584 – University City OMCI Additional Comments: An additional contingency of $15,000 for utility relocation (Other - $15,000) is included in the appropriation. Contracted planning resources utilized: Stormwater Facility Planning PREVIOUS BOARD ACTION RELATED TO THIS ACTION: N/A 20 of 6/14/12 AGENDA ITEM NUMBER: 49 – Proposed Ord. No. 13427 NAME OF PROJECT: Wabash Ave. #8555 Storm Sewer (10357) LOCATION: North of Airport Road and east of Interstate 170 in the City of Berkeley, Missouri TYPE OF PROJECT: Storm Sewer Construction (015.0 Construction Costs) DEPARTMENT REQUESTING ACTION: Engineering REQUESTED ACTION: Why is this action necessary?: Appropriates funds and authorizes staff to enter into a construction contract What does action accomplish?: Implements the construction of a CIP project SUMMARY EXPLANATION/BACKGROUND: Contractor: Tap Utilities, LLC Previous District Contract: Yes 680 Himmel Road Moscow Mills, MO 63362 Consultant: N/A Agency: N/A Number of bidders: 7 Low Bid: $77,475.00 High Bid: $99,591.00 Appropriation Amount: $115,000.00 Designer’s Estimate: $89,000.00 MBE/WBE Participation: 15.00% Taylor Trucking – 7.50% - MBE K & P Precast – 7.50% - WBE Plan Approval Date: May 10, 2012 Type of Contract: Unit Cost Properties Affected: 3 Properties Benefiting: 1 Designed by: District staff The work to be done under Contract #10778 consists of the construction of approximately 333 lineal feet of pipe sewers varying in size from 18-inches to 24-inches in diameter and appurtenances. The purpose of this project is to alleviate structure and yard flooding. This project is scheduled to be completed in 120 days. FUNDING/COST SUMMARY: Budgeted: Capital Improvement Program Budget Year: FY2013, Pg. 167 Amount: $111,000 Fund Name: #5564 – Coldwater Creek OMCI Additional Comments: An additional contingency of $30,000 for utility relocation (Electric - $25,000 and Other - $5,000) is included in the appropriation. Contracted planning resources utilized: Stormwater Facility Planning PREVIOUS BOARD ACTION RELATED TO THIS ACTION: N/A 21 of 6/14/12 AGENDA ITEM NUMBER: 50 – Proposed Ord. No. 13428 NAME OF PROJECT: Combined Sewer Area – Inflow/Infiltration Assessment (FY2008) (E-1215 & 10232) LOCATION: District-wide TYPE OF PROJECT: Inflow/Infiltration Investigations and Assessment (016.2 Vendor Services) DEPARTMENT REQUESTING ACTION: Engineering REQUESTED ACTION: Why is this action necessary?: Appropriates additional funds, and authorizes staff to amend an existing contract What does action accomplish?: Provides additional funds for investigations necessary to locate excessive inflow/infiltration into sewers and to access critical infrastructure SUMMARY EXPLANATION/BACKGROUND: Contractor: N/A Previous District Contract: Yes Consultant: RJN Group, Inc. 727 N. First Street, Suite 240 St. Louis, MO 63102 Corporate Headquarters : Wheaton, Illinois Agency: N/A Number of Proposers: N/A Appropriation Amount: $3,200,000.00 District’s Estimate: N/A MBE/WBE Participation: 14.4% (20.0% for total project) David Mason & Associates, Inc. – 9.4% - MBE (This amendment only) ERM Technologies, Inc. – 5.0% - MBE (This amendment only) Plan Approval Date: N/A Type of Contract: Cost Plus Fixed Fee Properties Affected: Entire District Properties Benefiting: Entire District Designed by: N/A This ordinance appropriates additional funds and authorizes the District to enter into Amendment No. 6 to Contract #10402 with RJN Group, Inc. This is the final funding for this contact. This appropriation will allow RJN Group, Inc. to complete investigations of sewer systems to identify inflow/infiltration (I/I) problems and to assess the condition of critical infrastructure. With the FY2013 appropriation, RJN will complete the following tasks and investigations with the guidance of the SSO watershed teams, the CSO LTCP team, and the City sewershed team:  Smoke test and evaluate approximately 20 miles of sewers  Inspect and evaluate approximately 1,000 manholes  It is anticipated that over 500 connections to the system will be investigated  Inspect and evaluate 1,000 critical infrastructure sewer reaches  Review flow meter data for quantifying wet weather flows  Prepare initial findings and final I/I study reports for 50 areas of completed fieldwork for use by MSD staff, SSO Watershed Teams, CSO LTCP Team, Operations and design consultants  Provide field investigations for Salisbury, Barton, Trudeau, Prairie, Utah, Fillmore, Gimblin, Humbolt, Carroll, Rock Springs, Miller, Downtown (Elm), 7th Street, and Mill Creek City sewersheds  Conduct post-construction studies in rehabilitation and I/I project areas  Train MSD employees to collect and process I/I data  Maintain and update the District-wide I/I database 22 of 6/14/12  Prepare a final report summarizing the entire project  Provide support/data for Consent Decree reporting  Collaborate with watershed consultants to transfer and interpret I/I data The consultant will use the data from the above efforts to identify, quantify, and recommend initial improvements or rehabilitation solutions to eliminate or reduce I/I entering into the sewer system. In addition to I/I data deliverables, the consultant will develop GIS based project deliverables in association with District staff. Consultant will provide assistance to the SSO watershed teams and the CSO LTCP team, District staff design projects, contracted consultant design projects, and other District Departments as needed. This contract was solicited assuming work would proceed for four years through FY2011 with an option for two additional years through FY2013 to complete the work necessary for watershed and SSO planning. This amendment is the exercise of the second and final year option in the amount of $3,200,000, which is a decrease in funding of $800,000 from Year 5 (FY2012). It is anticipated that in FY2013, MSD will complete the transition of I/I investigation efforts from contracted to internal resources. FUNDING/COST SUMMARY: Budgeted: Capital Improvement Program Budget Year: FY2013, Pg. 15 Amount: $3,200,000 Fund Name: #1101 – General Fund Additional Comments: I/I investigations in the Combined Sewer Area began in FY2004 for known wet weather problem areas. In FY2005, I/I basins (study areas) were delineated and prioritized for the entire District outside of St. Louis City. The priorities are reviewed annually by the watershed teams to support CIRP projects, and the SSO/CSO planning efforts. The contracted I/I efforts provide a basis for planning, design, and construction that will occur for many years. The I/I consultant will work in concert with the District’s staff, planning consultant, other I/I consultant, and specialized service vendors to accomplish project goals of substantial I/I reduction. In addition, the consultant will conduct field investigations in the Salisbury, Prairie, Carroll, Rock Springs, Miller, Downtown (Elm), 7th Street, and Mill Creek city sewersheds to support Cityshed planning. Over the last eight years, RJN has smoke tested 1,620 miles of sewer and inspected 48,000 manholes. Approximately 601 million gallons per day of I/I flow has been estimated from public and private defects. For FY2012, RJN completed smoke testing of 189 miles of sanitary sewer, inspected 1,722 manholes, assessed 2,700 connections, and completed 37 reports. The FY2013 authorization includes $500,000 (the same as FY2012 funding) for the investigation of critical sewers to proactively address potential sewer collapse in locations of high risk. Based on the City sewershed team’s recommendations, critical sewers include large diameter and brick sewers crossing major roadways and railroad right-of- ways, and sewers affecting other critical infrastructure such as public venues, hospitals, and firehouses. The approach will be to assess their condition through manhole and sewer CCTV inspections, then use the information to plan rehabilitation as needed and establish a long-term re-inspection program. Contracted planning resources utilized: Watershed Facility Planning, Combine Sewer Area Flow Metering & Monitoring, Separate Sewer Area Flow Metering & Monitoring, Modeling, CCTV Inspection, Radar Rainfall Data, and General Services Surveying. PREVIOUS BOARD ACTION RELATED TO THIS ACTION: 4/12/12 – Res. No. 3020 – Approving a list of proposed expenditures that included this project for the Capital Improvement and Replacement Program as a result of the Program Planning efforts. 08/11/11 – Ord. No. 13282 – Amount: $4,000,000 – RJN Group, Inc. – Design Contract No. E-1215 – Amendment No. 4 23 of 6/14/12 AGENDA ITEM NUMBER: 51 – Proposed Ord. No. 13429 NAME OF PROJECT: General Services Agreement – Sewer & Process Design (FY2011) (10623) LOCATION: Various locations within the District TYPE OF PROJECT: General Engineering Services (011.0 Design Phase Project Costs) DEPARTMENT REQUESTING ACTION: Engineering REQUESTED ACTION: Why is this action necessary?: Appropriates additional funds and authorizes staff to amend a design contract What does action accomplish?: Provides additional funds for the design of a CIP project SUMMARY EXPLANATION/BACKGROUND: Contractor: N/A Previous District Contract: Yes Consultant: Horner & Shifrin Inc. 5200 Oakland Avenue St. Louis, MO 63110 Corporate Headquarters : St. Louis, Missouri Agency: N/A Number of proposers: N/A Appropriation Amount: $300,000.00 Designer’s Estimate: N/A MBE/WBE Participation: 20.0% (20.0% for the total project) David Mason & Associates, Inc. – 10.0% - MBE (This amendment only.) ERM Technologies, Inc. – 10.0% - MBE (This amendment only.) Plan Approval Date: N/A Type of Contract: Hourly Billing Rate Plus Reimbursables Properties Affected: To be determined Properties Benefiting: To be determined Designed by: N/A This ordinance authorizes the District to enter into Amendment No. 1 to Contract #10408 with Horner & Shifrin Inc. for the design of various projects in the CIRP budget. This project consists of various sewer, wastewater treatment plant and building designs. Projects will be issued by letter agreement per individual scopes of services. Horner & Shifrin, Inc. was previously chosen through the regular consultant review and selection process. The amended design appropriation is $300,000.00, which results in a final contract amount of $420,000. This is the final year for this contract. FUNDING/COST SUMMARY: Budgeted: Capital Improvement Program Budget Year: FY2013, Pg. 32 Amount: $300,000 Fund Name: #6660 – Sanitary Replacement Fund Additional Comments: If any non-capital projects will be required, the funds will be transferred to #1101 – General Fund #1101. Contracted planning resources utilized: Watershed Facility Planning and Stormwater Facility Planning. PREVIOUS BOARD ACTION RELATED TO THIS ACTION: 04/12/12 – Res. No. 3020 – Approving a list of proposed expenditures that included this project for the Capital Improvement and Replacement Program as a result of the Program Planning efforts. 08/12/10 – Ord. No. 11319 – Amount: $120,000 – Horner & Shifrin, Inc. – Original Contract No. 10408 24 of 6/14/12 AGENDA ITEM NUMBER: 52 – Proposed Ord. No. 13430 NAME OF PROJECT: General Services Agreement – Survey Services (FY2011) Contract A (10626) LOCATION: Entire District TYPE OF PROJECT: General Surveying Services (011.8 General Services – Survey) DEPARTMENT REQUESTING ACTION: Engineering REQUESTED ACTION: Why is this action necessary?: Appropriates additional funds and authorizes staff to amend an existing surveying contract What does action accomplish?: Supplements District staff during peak workloads SUMMARY EXPLANATION/BACKGROUND: Contractor: N/A Previous District Contract: Yes Consultant: Engineering Design Source, Inc. 16141 Swingley Ridge Rd., Suite 300 Chesterfield, MO 63017 Corporate Headquarters : Chesterfield, Missouri Agency: N/A Number of proposers: N/A Appropriation Amount: $50,000.00 Designer’s Estimate: N/A MBE/WBE Participation: 100% - MBE Plan Approval Date: N/A Type of Contract: Hourly Billing Rate Properties Affected: To be determined Properties Benefiting: To be determined Designed by: N/A This ordinance authorizes the District to enter into Amendment No. 2 to Contract #10410 with Engineering Design Source, Inc. for surveying services associated with the design of sanitary sewer projects. Services provided include land surveys, property strip maps, and easements for projects to be completed either in-house or by design consultants. Additional general surveying services will be provided on an as needed basis for legal research, legal descriptions, topographic and land surveys for District facilities, and other requirements of the various District departments. Work will be assigned on a project-by-project basis. This contract amendment for $50,000 results in a final contract amount of $140,000.00. This will be the final amendment for this contract. FUNDING/COST SUMMARY: Budgeted: Capital Improvement Program Budget Year: FY2013, Pg. 33 Amount: $50,000 Fund Name: #1101 – General Fund Additional Comments: Contracted planning resources utilized: Watershed Facility Planning and Stormwater Facility Planning. PREVIOUS BOARD ACTION RELATED TO THIS ACTION: 04/12/12 – Res. No. 3020 – Approving a list of proposed expenditures that included this project for the Capital Improvement and Replacement Program as a result of the Program Planning efforts. 08/12/10 – Ord. No. 13122 – Amount: $90,000 – Engineering Design Source, Inc. – Original Contract No. 10410 25 of 6/14/12 AGENDA ITEM NUMBER: 53 – Proposed Ord. No. 13431 NAME OF PROJECT: General Services Agreement – Survey Services (FY2011) Contract D (10629) LOCATION: Entire District TYPE OF PROJECT: General Surveying Services (011.8 General Services – Survey) DEPARTMENT REQUESTING ACTION: Engineering REQUESTED ACTION: Why is this action necessary?: Appropriates additional funds and authorizes staff to amend an existing surveying contract What does action accomplish?: Supplements District staff during peak workloads SUMMARY EXPLANATION/BACKGROUND: Contractor: N/A Previous District Contract: Yes Consultant: The Sterling Company 5055 New Baumgartner Road St. Louis, MO 63129 Corporate Headquarters : St. Louis, Missouri Agency: N/A Number of proposers: N/A Appropriation Amount: $50,000.00 Designer’s Estimate: N/A MBE/WBE Participation: N/A Plan Approval Date: N/A Type of Contract: Hourly Billing Rate Properties Affected: To be determined Properties Benefiting: To be determined Designed by: N/A This ordinance authorizes the District to enter into Amendment No. 2 to Contract #10413 with The Sterling Company for surveying services associated with the design of sanitary sewer projects. Services provided include land surveys, property strip maps, and easements for projects to be completed either in-house or by design consultants. Additional general surveying services will be provided on an as needed basis for legal research, legal descriptions, topographic and land surveys for District facilities, and other requirements of the various District departments. Work will be assigned on a project- by-project basis. This contract amendment for $50,000 results in a final contract amount of $140,000.00. This will be the final amendment for this contract. FUNDING/COST SUMMARY: Budgeted: Capital Improvement Program Budget Year: FY2013, Pg. 36 Amount: $50,000 Fund Name: #1101 – General Fund Additional Comments: Contracted planning resources utilized: Watershed Facility Planning and Stormwater Facility Planning. PREVIOUS BOARD ACTION RELATED TO THIS ACTION: 04/12/12 – Res. No. 3020 – Approving a list of proposed expenditures that included this project for the Capital Improvement and Replacement Program as a result of the Program Planning efforts. 08/12/10 – Ord. No. 13123 – Amount: $90,000 – The Sterling Company – Original Contract No. 10413 26 of 6/14/12 AGENDA ITEM NUMBER: 54 – Proposed Ord. No. 13432 NAME OF PROJECT: Lemay WWTP Secondary Improvements (11649) LOCATION: North of Hoffmeister Avenue and east of South Broadway in unincorporated St. Louis County, Missouri TYPE OF PROJECT: Design of Wastewater Treatment Plant (011.0 Design Phase Project Costs) DEPARTMENT REQUESTING ACTION: Engineering REQUESTED ACTION: Why is this action necessary?: Appropriates funds and authorizes staff to enter into a design contract What does action accomplish?: Implements the design of a CIP project SUMMARY EXPLANATION/BACKGROUND: Contractor: N/A Previous District Contract: Yes Consultant: Black & Veatch Corporation 15450 S. Outer Forty Rd., Suite 200 Chesterfield, MO 63017 Corporate Headquarters: Overland Park, Kansas Agency: N/A Number of proposers: 4 (Black & Veatch Corporation, Donohue & Associates, Inc., HDR Engineering, Inc., and Jacobs Engineering Group, Inc.) Appropriation Amount: $1,580,000.00 Designer’s Estimate: N/A MBE/WBE Participation: 27.06% Intelligent Design & Construction Solutions – 10.00% - WBE Lion CSG LLC – 7.50% - WBE Taliaferro & Browne, Inc. – 6.50% - MBE Gateway Land Surveying Services, Inc. – 1.33% - WBE Document Imaging – 1.73 - MBE Plan Approval Date: N/A Type of Contract: Lump Sum Properties Affected: Lemay WWTP Site Properties Benefiting: Entire Lemay WWTP Service Area Designed by: N/A This ordinance authorizes the District to enter into Contract #10968 with Black & Veatch Corporation for the design of a project in the CIRP. This project consists of the design and preparation of construction documents for improvements to the secondary facilities at the Lemay WWTP to expand treatment capacity. The preliminary construction cost estimate is $6,000,000. FUNDING/COST SUMMARY: Budgeted: Capital Improvement Program Budget Year: FY 2013, Pg. 47 Amount: $1,500,000 Fund Name: #6660 – Sanitary Replacement Fund Additional Comments: There were 3 other proposals considered on this project. The appropriation for design services is $80,000 above the proposed funding presented in the CIRP Budget Supplement. Contracted planning resources utilized: Watershed Facility Planning 27 of 6/14/12 PREVIOUS BOARD ACTION RELATED TO THIS ACTION: 04/12/12 – Res. No. 3020 – Approving a list of proposed expenditures that included this project for the Capital Improvement and Replacement Program as a result of the Program Planning efforts. 28 of 6/14/12 AGENDA ITEM NUMBER: 55 – Proposed Ord. No. 13433 NAME OF PROJECT: Separate Sewer Area – Inflow/Infiltration Assessment (FY2008) (E-1214 & 10231) LOCATION: District-wide TYPE OF PROJECT: Inflow/Infiltration Investigations and Assessment (016.2 Vendor Services) DEPARTMENT REQUESTING ACTION: Engineering REQUESTED ACTION: Why is this action necessary?: Appropriates additional funds, and authorizes staff to amend an existing contract What does action accomplish?: Provides additional funding to continue investigations necessary to locate excessive inflow/infiltration into sewers SUMMARY EXPLANATION/BACKGROUND: Contractor: N/A Previous District Contract: Yes Consultant: Woolpert Consultants, Inc. 1910 Pine Street, Suite 420 St. Louis, MO 63103 Corporate Headquarters : Dayton, Ohio Agency: N/A Number of Proposers: N/A Appropriation Amount: $1,200,000.00 District’s Estimate: N/A MBE/WBE Participation: 5.2% (20.0% for total project) ABNA Engineering, Inc. – 4.2% - MBE (This amendment only) PMA Engineering, Inc. – 1.0% - WBE (This amendment only) Plan Approval Date: N/A Type of Contract: Cost Plus Fixed Fee Properties Affected: Entire District Properties Benefiting: Entire District Designed by: N/A This ordinance appropriates additional funds and authorizes the District to enter into Amendment No. 6 to Contract #10403 with Woolpert Consultants, Inc. This is the final funding for this contract. This appropriation will allow Woolpert to complete investigations of sewer systems to identify inflow/infiltration (I/I) problems. With the FY2013 appropriation, Woolpert will complete the following tasks and investigations under the guidance of the SSO watershed teams:  Conduct post-rehabilitation and I/I reduction assessments in two areas of constructed I/I reduction projects  Prepare initial findings and final I/I study reports for 28 areas of completed fieldwork for use by MSD staff, SSO Watershed Teams, Operations and design consultants.  Prepare 150 geodatabase conversions for 2003 to 2008 data to incorporate in the District-wide I/I database  Review flow meter data for quantifying wet weather flows  Prepare a final report summarizing the entire project  Provide support/data for Consent Decree reporting  Collaborate with watershed consultants to transfer and interpret I/I data 29 of 6/14/12 In addition to I/I data deliverables, the consultant will prepare GIS based project deliverables in association with District staff. Consultant will provide assistance to the SSO watershed teams, District staff design projects, contracted consultant design projects, and other District Departments as needed. This contract was solicited assuming work would proceed for four years through FY2011 with an option for two additional years through FY2013 to complete the work necessary for watershed and SSO planning. This amendment is the exercise of the second and final year option in the amount of $1,200,000, which is a decrease in funding of $300,000 from Year 5 (FY2012). It is anticipated that in FY2013, MSD will complete the transition of I/I investigation efforts from contracted to internal resources. FUNDING/COST SUMMARY: Budgeted: Capital Improvement Program Budget Year: FY2013, Pg. 66 Amount: $1,200,000 Fund Name: #1101 – General Fund Additional Comments: I/I investigations in the Separate Sewer Area began in FY2004 for known wet weather problem areas. In FY2005, I/I basins (study areas) were delineated and prioritized for the entire District outside of St. Louis City. The priorities are reviewed annually by the watershed teams to support CIRP projects and the SSO/CSO planning efforts. The contracted I/I efforts provide a basis for planning, design, and construction that will occur for many years. The I/I consultant will work in concert with the District’s staff, planning consultant, watershed consultants, other consultants, and specialized service vendors to accomplish project goals of substantial I/I reduction. Over the last eight years, Woolpert has smoke tested 1,984 miles of sanitary sewer and inspected 61,817 manholes. Approximately 182 million gallons per day of I/I flow have been estimated from public and private defects. For FY2012, Woolpert completed smoke testing of 81 miles of sewer, inspected 3,560 manholes, and completed 11 final reports. Since FY2013 is the final project year, Woolpert will prepare a final report summarizing their activities and results for the project since FY2008. Field activities will be limited to post-construction investigations and follow-up verifications derived from reporting. Contracted planning resources utilized: Watershed Facility Planning, Separate Sewer Area Flow Metering & Monitoring, Modeling, CCTV Inspection, Radar Rainfall Data, and General Services Surveying. PREVIOUS BOARD ACTION RELATED TO THIS ACTION: 4/12/12 – Res. No. 3020 – Approving a list of proposed expenditures that included this project for the Capital Improvement and Replacement Program as a result of the Program Planning efforts. 08/11/11 – Ord. No. 13287 – Amount: $1,500,000 – Woolpert Consultants, Inc. – Design Contract No. E-1214 – Amendment No. 4 30 of 6/14/12 AGENDA ITEM NUMBER: 56 – Proposed Ord. No. 13434 NAME OF PROJECT: Watershed Facility Planning Phase II (E-1216 & 10230) LOCATION: District-wide TYPE OF PROJECT: Planning (016.1 Professional Services & 016.2 Vendor Services) DEPARTMENT REQUESTING ACTION: Engineering REQUESTED ACTION: Why is this action necessary?: Appropriates additional funds and authorizes staff to amend an existing contract What does action accomplish?: Implements operational plan to augment District staff in providing planning services for the CIRP SUMMARY EXPLANATION/BACKGROUND: Contractor: N/A Previous District Contract: Yes Consultant: Jacobs Engineering Group Inc. 501 No. Broadway St. Louis, MO 63102 Corporate Headquarters: Pasadena, CA Agency: N/A Number of proposers N/A Appropriation Amount: $5,000,000.00 Designer’s Estimate: N/A MBE/WBE Participation: 23.82% (27.43% for total project) ABNA Engineering, Inc. – 8.60% – MBE (This amendment only) PMA Engineering – 7.34% – WBE (This amendment only) Civil Design, Inc. – 2.40% - WBE (This amendment only) Losli Engineering, LLC – 5.48% – WBE (This Amendment only) Plan Approval Date: N/A Type of Contract: Cost Plus Fixed Fee Properties Affected: N/A Properties Benefiting: N/A Designed by: N/A This ordinance authorizes the District to enter into Amendment No. 11 to Contract #10404 with Jacobs Engineering Group Inc. The purpose of the contract is to provide the necessary planning staff of 68 individuals (21 FTEs) to support the District’s planning staff to maintain the District’s planning program for the following services:  Combined Sewer Overflow (CSO) Program 1. Complete Calendar Year 2011 Nine Minimum Control update report 2. Provide support for green infrastructure planning or design 3. Provide support/data information for Consent Decree reporting  Sanitary Sewer Overflow (SSO) Program 1. Transition preliminary study work to District staff. 2. Continue to support HYDRA modeling and to assist in alternative model runs. 3. Assist in the management and analysis of 78 I/I reports 4. Assist in CCTV evaluation and GIS mapping. 31 of 6/14/12 5. Continue to assist in development of watershed plans for Coldwater Creek, Deer Creek, Maline Creek, Gravois Creek, University City, Fishpot Creek, Kiefer Creek, Grand Glaize Creek, Mattese Creek, Martigney Creek, Mackenzie Creek, Creve Coeur Creek, and Bonfils watersheds; Spanish Lake, Watkins Creek, Fee Fee Creek, Caulks Creek, and Fenton Creek watersheds; Missouri River sub-areas, Bissell sub-areas, and Lower Meramec sub-areas 6. Continue to assist in development of SSES reports for each watershed, Hydraulic Model Development reports for each Service Area, Capacity Assurance Evaluation reports for each Service Area, Service Area reports, and the Master Plan. 7. Provide and collaborate with Watershed design consultants as needed. Continue providing resources and support to address regulatory requests and thirteen (13) other smaller technical tasks. Resources may be adjusted as required by program needs. This is the final option year of a four-year contract program with two option years. FUNDING/COST SUMMARY: Budgeted: Capital Improvement Program Budget Year: FY2013, Pg. 73 Amount: $4,500,000 FY2013, Pg. 74 $ 500,000 Fund Name: #6660 – Sanitary Replacement Fund – $4,500,000 #1101 – General Fund – $500,000 Additional Comments: The total appropriation of $5,000,000 consists of $4,500,000 for capital costs that will be applied to future capital projects and $500,000 for non-capital costs for project management, general planning, and regulatory support. The watershed planning with a consultant is proposed to continue with the program through the final option year, FY2013, to complete the planning needed for submittal of the Consent Decree required Sanitary Sewer Overflow Master Control Plan by December 31, 2013. The planning and investigations provide the basis for the Watershed Design Consultants to utilize for design and subsequently construction of projects that will occur many years into the future. Included in the final funding is the transfer of documents and data management tools for use by the District’s Planning staff for continuation of combined and sanitary watershed planning. With the planning consultant and the District coordinating their efforts, the program can continue to be developed with solid, factual, and thorough engineering foundation to assure cost-effective and accurate solutions to the health and safety issues facing the community. Prior Watershed Facility Planning accomplishments include: Issued to the EPA: CSO Long Term Control Plan and 2011 revision, calibration and verification of the Lemay and Bissell Point Hydraulic models, water quality report, water quality modeling report, eleven (11) CSO Nine Minimum Control annual update reports, SSO control work plan and two (2) 308 responses for the CSO and SSO program; participated in regulatory mediation sessions; utilized 33 Jacobs’ personnel and 35 subconsultant personnel resulting in 22 FTEs during the past year; completed 349 preliminary studies; provided resources to assist with I-64 reconstruction coordination of Betterments and conflicts; provided 119 technical reviews and participated in 467 planning meetings for preliminary design and design projects; reviewed and categorized over 5.7 million feet of CCTV video tape; provided modeling support for the Dogtown area; conducted CSO alternatives workshop and level one screening of CSO alternatives; participated in 6 Stakeholder Advisory Committee meetings and provided support for 14 Open Houses for the CSO LTCP; conducted a green infrastructure workshop and provided technical support for the Pilot Program; conducted five Service Area Pre-Alternative SSO Control Plan review workshops; developed capital improvement plans for 7 Wastewater Treatment Plants; assisted with vendor management of two I/I consultants, two CCTV vendors, and one radar rainfall vendor; continued to update and revise a technical Memorandum Manual outlining watershed planning procedures; assisted in establishing the Sharepoint collaboration website; drafted 18 Best Management Practices; and provided various support in 28 areas of technical expertise. Contracted planning resources utilized: Combine Sewer Area I/I Assessment, Separate Sewer Area I/I Assessment, Combine Sewer Area Flow Metering & Monitoring, Separate Sewer Area Flow Metering & Monitoring, Modeling, CCTV Inspection, Radar Rainfall Data, and General Services Surveying. PREVIOUS BOARD ACTION RELATED TO THIS ACTION: 4/12/12 – Res. No. 3020 – Approving a list of proposed expenditures that included this project for the Capital Improvement and Replacement Program as a result of the Program Planning efforts. 07/14/11 – Ord. No. 13298 – Amount: $5,000,000 – Jacobs Eng. Group Inc. – Contract No. E-1216 – Amendment No. 8 32 of 6/14/12 AGENDA ITEM NUMBER: 57 – Proposed Ord. No. 13435 NAME OF PROJECT: General Services Agreement – Stormwater Planning (FY2011) (10624) LOCATION: Various locations within the District TYPE OF PROJECT: Stormwater Planning Services (011.0 Design Phase Project Costs) DEPARTMENT REQUESTING ACTION: Engineering REQUESTED ACTION: Why is this action necessary?: Appropriates additional funds and authorizes staff to amend an existing contract What does action accomplish?: Augments District staff in providing planning services for the CIRP SUMMARY EXPLANATION/BACKGROUND: Contractor: N/A Previous District Contract: Yes Consultant: Parsons Water & Infrastructure Inc. 400 Woods Mill Road South, Suite 330 Chesterfield, MO 63017 Corporate Headquarters : Pasadena, California Agency: N/A Number of proposers: N/A Appropriation Amount: $300,000.00 Designer’s Estimate: N/A MBE/WBE Participation: 25.0% Engineering Design Source, Inc. – 17.0% - MBE M3 Engineering Group, P.C. – 8.0% - MBE Plan Approval Date: N/A Type of Contract: Cost Plus Fixed Fee Reimbursables Properties Affected: To be determined Properties Benefiting: To be determined Designed by: N/A This ordinance authorizes the District to enter into Amendment No. 1 to Contract #10409 with Parsons Water & Infrastructure Inc. for the planning of various stormwater projects in the CIRP located within the Gravois Creek and Coldwater Creek watersheds. This project consists of the review and analysis of existing complaint data, review and analysis of existing identified projects, development of project definitions and preliminary studies for the CIRP, and additional planning services as a supplemental to an ongoing internal stormwater planning effort. Parsons Water & Infrastructure Inc. was previously chosen through the regular consultant review and selection process. This contract amendment for $300,000 results in a final contract amount of $630,000.00. This will be the only amendment for this contract. FUNDING/COST SUMMARY: Budgeted: Capital Improvement Program Budget Year: FY2013, Pg. 149 Amount: $300,000 Fund Name: #5571 – Gravois Creek OMCI – $200,000.00 #5564 – Coldwater Creek OMCI – $100,000.00 Additional Comments: These planning services will provide project definitions to spend down the fund balance of the Gravois Creek OMCI and Coldwater Creek OMCI. Contracted planning resources utilized: Watershed Facility Planning. 33 of 6/14/12 PREVIOUS BOARD ACTION RELATED TO THIS ACTION: 04/12/12 – Res. No. 3020 – Approving a list of proposed expenditures that included this project for the Capital Improvement and Replacement Program as a result of the Program Planning efforts. 06/09/11 – Ord. No. 13259 – Amount: $330,000 – Parsons Water & Infrastructure Inc. – Original Contract No. 10409 34 of 6/14/12 AGENDA ITEM NUMBER: 58 – Resolution No. 3031 NAME OF PROJECT: CSO Volume Reduction – Green Infrastructure (Pilot Program) (11048) LOCATION: Various locations in the City of St. Louis, Missouri TYPE OF PROJECT: General Engineering Services (011.0 External Services) DEPARTMENT REQUESTING ACTION: Engineering REQUESTED ACTION: Why is this action necessary?: Authorizes staff to enter into an amendment What does action accomplish?: Design, geotechnical investigation, planting plan, and survey services as needed for small capital and non-capital green infrastructure projects SUMMARY EXPLANATION/BACKGROUND: Contractor: N/A Previous District Contract: Yes Consultant: M3 Engineering Group, P.C. 1306 Papin Street St. Louis, MO 63103 Corporate Headquarters : St. Louis, Missouri Agency: N/A Number of proposers: N/A Appropriation Amount: N/A Designer’s Estimate: N/A MBE/WBE Participation: 100% - MBE Plan Approval Date: N/A Type of Contract: Hourly Billing Rate Plus Reimbursables Properties Affected: N/A Properties Benefiting: N/A Designed by: N/A This resolution authorizes the District to enter into Amendment No. 1 to Contract #10678 with M3 Engineering Group, P.C. for design, geotechnical investigation, planting plan, and survey services as needed, in support of the CSO Volume Reduction – Green Infrastructure (Pilot Program). The projects consist of small green infrastructure projects in various locations in the City of St. Louis. M3 Engineering Group, P.C. was previously chosen as lead consultant through the regular consultant review and selection process. This project has staff recommendation of M3 Engineering Group to continue as lead consultant for all projects under this General Services Agreement. This contract amendment for $50,000 is funded as part of the CSO Volume Reduction – Green Infrastructure (Pilot Program) project, for a total maximum contract amount of $200,000.00. Projects will be issued by letter agreement per individual scopes of services. This will be the only option year for this contract. FUNDING/COST SUMMARY: Budgeted: Capital Improvement Program Budget Year: FY2011, Pg. 48 Amount: $3,000,000* Fund Name: #6660 – Sanitary Replacement Fund Additional Comments: Contracted planning resources utilized: Watershed Facility Planning *Requesting Board approval of an amendment to a contract with M3 Engineering Group, P.C. for which an additional $50,000 is being encumbered from Ordinance No. 13129. 35 of 6/14/12 PREVIOUS BOARD ACTION RELATED TO THIS ACTION: 9/16/10 – Ord. No. 13129 – Appropriating funding and authorizing an Inter-governmental Agreement with the City of St. Louis for the CSO Volume Reduction – Green Infrastructure (Pilot Program) (11048). 08/11/11 – Ord. No. 13281 – M3 Engineering Group, P.C. – Original Contract No. 10678 36 of 6/14/12 AGENDA ITEM NUMBER: 59 – Resolution No. 3033 NAME OF PROJECT: Harlem – Baden Relief Phase IV (Hebert) Acquisition (10641) LOCATION: South of Natural Bridge Road and west of Clara Avenue in the City of St. Louis, Missouri TYPE OF PROJECT: Property Acquisition, Demolition and Related Activities of Real Property for Flood Mitigation Purposes (013.2 Land Purchase) DEPARTMENT REQUESTING ACTION: Engineering REQUESTED ACTION: Why is this action necessary?: Authorizes the District to complete the transfer of properties What does action accomplish?: Completes the transfer of properties to support the construction of improvements for flood mitigation SUMMARY EXPLANATION/BACKGROUND: Contractor: N/A Previous District Contract: N/A Consultant: N/A Agency: N/A Number of bidders: N/A Low Bid: N/A High Bid: N/A Appropriation Amount: N/A District’s Estimate: N/A MBE/WBE Participation: N/A Plan Approval Date: N/A Type of Contract: N/A Properties Affected: N/A Properties Benefiting: N/A Designed by: N/A This resolution authorizes the District to complete the transfer of property to a neighboring property owner as initially authorized per Ordinance No. 12817. These parcels are not needed for the proposed improvements. FUNDING/COST SUMMARY: Budgeted: Capital Improvement Program Budget Year: N/A Amount: N/A Fund Name: #6660 – Sanitary Replacement Fund Additional Comments: None PREVIOUS BOARD ACTION RELATED TO THIS ACTION: 02/12/09 – Ord. No. 12817 – Appropriating funds for acquisition, demolition, and other related activities 37 of 6/14/12 AGENDA ITEM NUMBER: 60 – Resolution No. 3034 NAME OF PROJECT: Federal Legislative Lobbying Services LOCATION: District-wide TYPE OF PROJECT: Contract DEPARTMENT REQUESTING ACTION: General Counsel REQUESTED ACTION: Why is this action necessary?: To provide legislative lobbying services with the U.S. Congress and federal agencies. What does action accomplish?: Authorizes the contract with Cardinal Point Partners, LLC for federal legislative services. SUMMARY EXPLANATION/BACKGROUND: Contractor: N/A Previous District Contract: Yes Consultant: Cardinal Point Partners, LLC 525 Second Street, NE Washington, DC 2002 Agency: N/A Number of bidders: N/A Low Bid: N/A High Bid: N/A Appropriation Amount: N/A District’s Estimate: N/A MBE/WBE Participation: N/A Plan Approval Date: N/A Type of Contract: Consulting-Federal Legislation Lobbying Properties Affected: N/A Properties Benefiting: N/A Designed by: Under Ordinance No. 13275, the original contract with Cardinal Point Partners provided for a period of twelve (12) months with three (3) additional one-year renewal terms. Said contract expired May 8, 2012. Resolution No. 3034 allows the District to exercise the first of three (3) one-year renewal options. FUNDING/COST SUMMARY: Budgeted: Office of General Counsel Budget Year: FY 12-13 Amount: $75,000.00 Fund Name: N/A Additional Comments: N/A PREVIOUS BOARD ACTION RELATED TO THIS ACTION: 06/19/2011 - Ord. No. 13275 - Federal Legislative Services - Cardinal Point Partners, LLC 06/10/2010 - Res. No. 2911 - Federal Legislative Services - Cardinal Point Partners, LLC; one year renewal 05/14/2009 - Res. No. 2848 - Federal Legislative Services - Cardinal Point Partners, LLC; one year renewal 06/12/2008 - Ord. No. 12655 - Federal Legislative Services - Cardinal Point Partners, LLC 38 of 6/14/12 AGENDA ITEM NUMBER: 61 – Resolution No. 3035 NAME OF PROJECT: MSD Strategic Operating Plan (2013–2017) LOCATION: N/A TYPE OF PROJECT: Annual approval of a continuing five-year Strategic Operating Plan for the District by the Board is required by the District’s Charter (Plan) in Section 5.110. DEPARTMENT REQUESTING ACTION: Administration REQUESTED ACTION: Why is this action necessary?: The District’s Charter requires annual adoption of the Strategic Operating Plan. What does action accomplish?: Approves the fiscal 2013-2017 Strategic Operating Plan. SUMMARY EXPLANATION/BACKGROUND: Contractor: N/A Previous District Contract: N/A Consultant: N/A Agency: N/A Number of bidders: N/A Low Bid: N/A High Bid: N/A Appropriation Amount: N/A District’s Estimate: N/A MBE/WBE Participation: N/A Plan Approval Date: N/A Type of Contract: N/A Properties Affected: N/A Properties Benefiting: N/A Designed by: N/A FUNDING/COST SUMMARY: Budgeted: N/A Budget Year: N/A Amount: N/A Fund Name: N/A Additional Comments: The Charter to the Metropolitan St. Louis Sewer District requires that a continuing five-year Strategic Operating Plan be developed and maintained. SECTION 5.110. Strategic plan. -- A continuing five-year strategic and operating plan for the District shall be adopted on an annual basis by the Board. The strategic and operating plan shall state the District’s objectives for the succeeding five years and include objective targets by which to measure the District’s performance in meeting these objectives. The Strategic Operating Plan defines the District’s Vision, Mission, Values, and Goals with each goal supported by specific strategies. Each department of the District is developing a Tactical Plan designed to support the District’s Strategic Operating Plan. The Strategic Plan (fiscal 2013-2017) indicates the lead departments responsible for various objectives. PREVIOUS BOARD ACTION RELATED TO THIS ACTION: 6/14/11 – Res. No. 2982 – MSD Strategic Business and Operating Plan (2012-2016) 6/10/10 – Res. No. 2912 – MSD Strategic Business and Operating Plan (2011-2015) 7/19/09 – Res. No. 2861 – MSD Strategic Business and Operating Plan (2010-2014) 6/14/07 – Res. No. 2714 – MSD Strategic Business and Operating Plan (2008-2012) 7/06/06 – Res. No. 2656 – MSD Strategic Business and Operating Plan (2007-2011) 39 of 6/14/12 AGENDA ITEM NUMBER: 62 – Resolution No. 3036 NAME OF PROJECT: Acceptance of Election Results LOCATION: District-Wide TYPE OF PROJECT: Financing - Bond Issue DEPARTMENT REQUESTING ACTION: Secretary-Treasurer REQUESTED ACTION: Why is this action necessary?: This resolution memorializes the Districts intent to find the lowest cost financing and to affirm the parameters for the bonds. What does action accomplish?: This resolution formally acknowledges the results of the June 5, 2012 election. SUMMARY EXPLANATION/BACKGROUND: Contractor: N/A Previous District Contract: Yes Consultant: N/A Agency: N/A Number of bidders: N/A Low Bid: N/A High Bid: N/A Appropriation Amount: N/A District’s Estimate: N/A MBE/WBE Participation: N/A Plan Approval Date: N/A Type of Contract: N/A Properties Affected: N/A Properties Benefiting: N/A Designed by: N/A FUNDING/COST SUMMARY: Budgeted: N/A Budget Year: 2012 Amount: N/A Fund Name: N/A Additional Comments: PREVIOUS BOARD ACTION RELATED TO THIS ACTION: 08/14/2008 - Resolution No. 2802 – Accepts election results and affirms parameters for bond issue. 02/12/2004 - Resolution No. 2546 – Accepts election results and affirms parameters for bond issue.