Loading...
HomeMy Public PortalAbout1529th Board Agenda 3-14-2013 A G E N D A 1529th MEETING OF THE BOARD OF TRUSTEES THE METROPOLITAN ST. LOUIS SEWER DISTRICT March 14, 2013 – 4:00 P.M. MSD OFFICES 2350 MARKET STREET ROOM 109 ROLL CALL THE BOARD OF TRUSTEES WILL BE IN CLOSED SESSION BETWEEN 4:00 P.M. AND 5:00 P.M. 1 CLOSED SESSION TO DISCUSS LEGAL, CONFIDENTIAL OR PRIVILEGED MATTERS UNDER §610.021(1), RSMO 1988 SUPP.; PERSONNEL ACTIONS UNDER §610.021(3) 2 APPROVAL OF JOURNAL OF PRECEDING MEETING February 14, 2013 (1528th) 3 COMMENTS BY THE CHAIR 4 REPORT OF BOARD COMMITTEES 5 REPORT OF EXECUTIVE DIRECTOR 6 COMMENTS FROM THE PUBLIC 7 SUBMISSION OF PUBLIC HEARING REPORTS – None 8 COMMUNICATIONS – None 9 CONSENT AGENDA – Item Nos. 10 through 22 2 of 3/14/13 Ordinances 10 Adoption of proposed Ord. No. 13572 repealing Ordinance No. 11479 adopted May 22, 2003 and enacting a new Ordinance in lieu thereof and appropriating $65,000.00 from the Operation, Maintenance, Construction and Improvement Fund of Gravois Creek to provide flood proofing protection in East Watson and Kathy Ct. Storm Improvement (10588), in the Cities of Sunset Hills and Crestwood, Missouri. (Intro. 2/14/13) 11 Adoption of proposed Ord. No. 13573 appropriating $370,000.00 from the Sanitary Replacement Fund to be used for project costs for the construction of sanitary sewers in Page Ave. & Lindbergh Sanitary Sewer (10725) in Unincorporated St. Louis County, Missouri; and authorizing the Executive Director and Secretary-Treasurer on behalf of The Metropolitan St. Louis Sewer District to enter into a contract with Midwest Mole, Inc. for the aforesaid construction. (Intro. 2/14/13) 12 Adoption of proposed Ord. No. 13574 appropriating $1,250,000.00 from the Sanitary Replacement Fund to be used for project costs for the construction of sanitary sewers in Providence Place Sanitary Relief (10184) in Unincorporated St. Louis County, Missouri; and authorizing the Executive Director and Secretary-Treasurer on behalf of The Metropolitan St. Louis Sewer District to enter into a contract with Metro Utilities, LLC for the aforesaid construction. (Intro. 2/14/13) 13 Adoption of proposed Ord. No. 13575 appropriating $5,100,000.00 from the Meramec River Basin Subdistrict #449 and $2,800,000.00 from the Sanitary Replacement Fund to be used for project costs for the construction of sanitary sewers in Riverside and Yarnell Sanitary Relief (SKME-400) (10146), in City of Fenton, Missouri; and authorizing the Executive Director and Secretary-Treasurer on behalf of The Metropolitan St. Louis Sewer District to enter into a contract with Gershenson Construction Co., Inc. for the aforesaid construction. (Intro. 2/14/13) 14 Adoption of proposed Ord. No. 13576 appropriating $3,800,000.00 from the Sanitary Replacement Fund to be used for project costs for the construction of sanitary sewers in Upper Maline Trunk Sanitary Relief Phase III Section C (10782) in City of Ferguson and Unincorporated St. Louis County, Missouri; and authorizing the Executive Director and Secretary-Treasurer on behalf of The Metropolitan St. Louis Sewer District to enter into a contract with J.H. Berra Construction Co., Inc. for the aforesaid construction. (Intro. 2/14/13) 15 Adoption of proposed Ord. No. 13577 making an appropriation of $80,000.00 from the Sanitary Replacement Fund for engineering services for the design of Gravois Trunk (Whitecliff to RDP) Sanitary Relief Phase III (10496 & E-1159) and authorizing the Executive Director and Secretary-Treasurer on behalf of The Metropolitan St. Louis Sewer District to enter into Amendment No. 7 of Contract #20009 with EDM Incorporated, for the aforesaid engineering services. (Intro. 2/14/13) 16 Adoption of proposed Ord. No. 13578 appropriating $90,000.00 from the Sanitary Replacement Fund to be used for the General Services Agreement - Sewer Design (FY2013) Contract A (11779) throughout the District, and authorizing the Executive Director and Secretary-Treasurer on behalf of The Metropolitan St. Louis Sewer District to enter into Contract #20026 with Tetra Tech, Inc. for General Services Agreement - Sewer Design (FY 2013) Contract A (11779). (Intro. 2/14/13) 3 of 3/14/13 17 Adoption of proposed Ord. No. 13579 appropriating $90,000.00 from the Sanitary Replacement Fund to be used for the General Services Agreement - Sewer Design (FY2013) Contract B (11780) throughout the District, and authorizing the Executive Director and Secretary-Treasurer on behalf of The Metropolitan St. Louis Sewer District to enter into Contract #20027 with Vance Engineering, Inc. for General Services Agreement - Sewer Design (FY 2013) Contract B (11780). (Intro. 2/14/13) 18 Adoption of proposed Ord. No. 13580 appropriating $90,000.00 from the Sanitary Replacement Fund to be used for the General Services Agreement - Sewer Design (FY2013) Contract C (11781) throughout the District, and authorizing the Executive Director and Secretary-Treasurer on behalf of The Metropolitan St. Louis Sewer District to enter into Contract #20028 with Shalom Services Corporation for General Services Agreement - Sewer Design (FY2013) Contract C (11781). (Intro. 2/14/13) 19 Adoption of proposed Ord. No. 13581 appropriating $587,000.00 from the Sanitary Replacement Fund for engineering services for the design of Prospect Hill Landfill Vertical Expansion (11094), and authorizing the Executive Director and Secretary-Treasurer on behalf of The Metropolitan St. Louis Sewer District to enter into Contract #20029 with Horner & Shifrin, Inc. for the design of this project. (Intro. 2/14/13) 20 Adoption of proposed Ord. No. 13582 appropriating $1,000,000.00 from the Sanitary Replacement Fund for the acquisition, transfer, closing approval, demolition, and related activities for real property in the City of St. Louis, Missouri, for flood mitigation purpose for the Ashland Avenue – Clara to Belt (Property Acquisition) (11862); and authorizing the Executive Director and Secretary-Treasurer on behalf of the Metropolitan St. Louis Sewer District to acquire, transfer, approve closing, demolish and perform related activities for real property necessary for the above project. (Intro. 2/14/13) 21 Adoption of proposed Ord. No. 13583 appropriating $2,000,000.00 from the Sanitary Replacement Fund for the acquisition, transfer, closing approval, demolition, and related activities for real property in the Cities of Jennings and Flordell Hills, Missouri, for flood mitigation purpose for the Jennings Station Road/North Baden Basin (Property Acquisition) (11140); and authorizing the Executive Director and Secretary-Treasurer on behalf of the Metropolitan St. Louis Sewer District to acquire, transfer, approve closing, demolish and perform related activities for real property necessary for the above project. (Intro. 2/14/13) 22 Adoption of proposed Ord. No. 13584 appropriating $1,000,000.00 from the Sanitary Replacement Fund for the acquisition, transfer, closing approval, demolition, and related activities for real property in the City of St. Louis, Missouri, for flood mitigation purpose for the Partridge Avenue 8500 Block Combined Sewer Relief (Property Acquisition) (11828); and authorizing the Executive Director and Secretary-Treasurer on behalf of the Metropolitan St. Louis Sewer District to acquire, transfer, approve closing, demolish and perform related activities for real property necessary for the above project. (Intro. 2/14/13) 4 of 3/14/13 UNFINISHED BUSINESS Ordinances None Resolutions None 5 of 3/14/13 New Business Agenda Item Number Name Page Number Ordinances 23 – Proposed Ord. No. 13586 Page Ave. #9441-9445 Storm Sewer (10295) 8 Introduction of proposed Ord. No. 13586 appropriating $115,000.00 from the Operation, Maintenance, Construction and Improvement Fund of University City to be used for project costs for the construction of storm sewers in Page Ave. #9441- 9445 Storm Sewer (10295), in The City of Overland, Missouri; and authorizing the Executive Director and Secretary-Treasurer on behalf of The Metropolitan St. Louis Sewer District to enter into a contract with T and J Lawn and Tree Service for the aforesaid storm sewer construction. 24 – Proposed Ord. No. 13587 Lemay WWTP Outfall 002 Elimination 9 (11132 & E-1265) Introduction of proposed Ord. No. 13587 making an appropriation of $430,000.00 from the Sanitary Replacement Fund for additional engineering services for Lemay WWTP Outfall 002 Elimination (11132) (E-1265); and authorizing the Executive Director and Secretary-Treasurer on behalf of The Metropolitan St. Louis Sewer District to enter into Amendment No. 13 to Contract #10847 with HDR Engineering, Inc. for the aforesaid engineering services. 25 – Proposed Ord. No. 13588 Coldwater Sanitary Relief Section B, C, D 10 Wet Weather Storage Facility Tank C – Property Acquisition (11876) Introduction of proposed Ord. No. 13588 appropriating $3,000,000.00 from the Sanitary Replacement Fund for the acquisition, transfer, demolition, and related activities for real property in the City of Hazelwood, Missouri, for wet weather storage for the Coldwater Sanitary Relief Section B, C, D Wet Weather Storage Facility Tank C - Property Acquisition (11876); and authorizing the Executive Director and Secretary-Treasurer on behalf of the Metropolitan St. Louis Sewer District to acquire, transfer, demolish and perform related activities for real property necessary for the above project. 26 – Proposed Ord. No. 13589 Maximo Transportation Module 11 Implementation Services Introduction of proposed Ord. No. 13589 appropriating $163,027.00 from the General Fund to be used for project costs for engineering services for the design of Maximo Transportation Module Implementation Services at various locations throughout the District; and authorizing the Executive Director and Secretary-Treasurer on behalf of The Metropolitan St. Louis Sewer District to enter into a contract with Mercury & Associates for the aforesaid engineering services. 6 of 3/14/13 Agenda Item Number Name Page Number 27 – Proposed Ord. No. 13590 General Services Agreement 12 Engineering Services Introduction of proposed Ord. No. 13590 appropriating $100,000.00 from the General Fund of the District for General Services Agreement - Engineering Services associated with the design of small projects throughout the District; and authorizing the Executive Director and Secretary-Treasurer on behalf of The Metropolitan St. Louis Sewer District to enter into a contract with Black & Veatch for said services. 28 – Proposed Ord. No. 13591 Intergovernmental Agreement with the City of 13 St. Louis and St. Louis County Introduction of proposed Ord. No. 13591 authorizing the Executive Director and Secretary-Treasurer on behalf of The Metropolitan St. Louis Sewer District (“MSD”) to enter into an Intergovernmental Agreement with the City of St. Louis and St. Louis County, whereby the entities agree to amend the Mason Tillman Contract with MSD dated February 21, 2012 to include scope of services for Mason Tillman to conduct a separate Disparity Study report for both the City and the County. 29 – Proposed Ord. No. 13592 Topping Sanitary Relief (SKME-421) (10199) 14 Introduction and adoption of proposed Ord. No. 13592 declaring the necessity for the acquisition of a temporary construction easement in certain real property within The Metropolitan St. Louis Sewer District for the purpose of construction of sewers and related appurtenances in the project known as Topping Sanitary Relief (SKME- 421) (10199) to serve the needs of residents of the area, and authorizing the acquisition of temporary construction easement by purchase or by the institution of condemnation proceedings. Resolutions 30 Adoption of Resolution No. 3080 as part of the Metropolitan St. Louis District’s 15 (MSD) continued commitment to the utilization of certified Minority and Women Business Enterprises (MWBE) and minority and female workforces in all aspects of its contracting activities a Disparity Study has been completed (by Mason Tillman) that defines narrowly tailored MWBE contracting and minority and female workforce goals for MSD’s program. As committed, the Board of Trustees received the Disparity Study and will enact the appropriate narrowly tailored contracting and workforce goals, as defined in the study. 31 Adoption of Resolution No. 3072 expressing the Board of Trustees’ appreciation to George C. Bohn for his 46 years of exemplary service to The Metropolitan St. Louis Sewer District from June 13, 1966, to his retirement effective March 1, 2013. 32 Adoption of Resolution No. 3073 expressing the Board of Trustees’ appreciation to Ramona L. Dickens for her 9 years of exemplary service to The Metropolitan St. Louis Sewer District from August 25, 2003, to her retirement effective March 1, 2013. 7 of 3/14/13 Agenda Item Number Name Page Number 33 Adoption of Resolution No. 3074 expressing the Board of Trustees’ appreciation to Earl A. Jackson for his 23 years of exemplary service to The Metropolitan St. Louis Sewer District from October 9, 1989, to his retirement effective March 1, 2013. 34 Adoption of Resolution No. 3075 expressing the Board of Trustees’ appreciation to Ann M. Ravetta for her 5 years of exemplary service to The Metropolitan St. Louis Sewer District from February 4, 2008, to her retirement effective March 1, 2013. 35 Adoption of Resolution No. 3076 expressing the Board of Trustees’ appreciation to Dennis J. Washington for his 38 years of exemplary service to The Metropolitan St. Louis Sewer District from September 9, 1974, to his retirement effective March 1, 2013. 36 Adoption of Resolution No. 3077 expressing the Board of Trustees’ appreciation to Howard A. Whitener for his 17 years of exemplary service to The Metropolitan St. Louis Sewer District from May 1, 1995, to his retirement effective March 1, 2013. 37 Adoption of Resolution No. 3078 expressing the Board of Trustees’ appreciation to James E. Woods for his 22 years of exemplary service to The Metropolitan St. Louis Sewer District from September 10, 1990, to his retirement effective March 1, 2013. 38 Adoption of Resolution No. 3079 expressing the Board of Trustees’ appreciation to Paul A. McElyea for his 28 years of exemplary service to The Metropolitan St. Louis Sewer District from January 1, 1985, to his retirement effective March 1, 2013. 39 ITEMS PROPOSED FOR INTRODUCTION & ADOPTION AT THE NEXT BOARD MEETING 40 ELECTION OF OFFICERS FOR THE PERIOD OF MARCH 2013 THROUGH MARCH 2015 41 ANY OTHER BUSINESS THAT MAY PROPERLY BE BROUGHT BEFORE THE BOARD 42 CLOSED SESSION The Metropolitan St. Louis Sewer District Board of Trustees may go into closed session at this meeting if such action is approved by a majority vote of the Board members who constitute a quorum, to discuss legal, confidential, or privileged matters under §610.021(1), RSMo 1988 Supp.; leasing, purchase or sale of real estate under §610.021(2); personnel actions under §610.021(3); discussions regarding negotiations with employee groups under §610.021(9); personnel records or applications under §610.021(13); or records under §610.021(14) which are otherwise protected from disclosure by law; or confidential or privileged communications with the District’s auditor, including auditor work products under §610.021(17). 43 ADJOURNMENT 8 of 3/14/13 AGENDA ITEM NUMBER: 23 – Proposed Ord. No. 13586 NAME OF PROJECT: Page Ave. #9441-9445 Storm Sewer (10295) LOCATION: North of Page Avenue and west of Woodson Road in the City of Overland, Missouri TYPE OF PROJECT: Storm Sewer Construction (015.0 Construction Costs) DEPARTMENT REQUESTING ACTION: Engineering REQUESTED ACTION: Why is this action necessary?: Appropriates funds and authorizes staff to enter into a construction contract. What does action accomplish?: Implements the construction of a CIP project. SUMMARY EXPLANATION/BACKGROUND: Contractor: T and J Lawn and Tree Service Previous District Contract: No* 8410 Tara Trails Pevely, MO 63070 Consultant: N/A Agency: N/A Number of bidders: 13 Low Bid: $84,990.00 High Bid: $172,835.00 Appropriation Amount: $115,000.00 Designer’s Estimate: $105,000.00 MBE/WBE Participation: 16.26% MWBE Goal is 15%) Home Turf, LLC – 16.26% - MBE Type of Contract: Unit Cost Properties Affected: 7 Properties Benefiting: 4 Designed by: District staff The work to be done under Contract #20023 consists of the construction of approximately 398 lineal feet of pipe sewers varying in size from 18-inches to 24-inches in diameter and appurtenances. The purpose of this project is to relieve structure and yard flooding. This project is scheduled to be completed in 90 days. FUNDING/COST SUMMARY: Budgeted: Capital Improvement Program Budget Year: FY2013, Pg. 159 Amount: $150,000 Fund Name: #5584 – University City OMCI Additional Comments: An additional contingency of $20,000 for utility relocation (Electric - $2,000, Gas - $16,000 & Communications Fiber Optic - $2,000) is included in the appropriation. Contracted planning resources utilized: Stormwater Facility Planning PREVIOUS BOARD ACTION RELATED TO THIS ACTION: N/A *T and J Lawn and Tree Service was organized in 2008, is located in Festus, Missouri, and has a bonding capacity of $300,000 through JW Surety Bonds. Employees of the company have previously performed work on District projects. This is the company’s first contract for sewer work. 9 of 3/14/13 AGENDA ITEM NUMBER: 24 – Proposed Ord. No. 13587 NAME OF PROJECT: Lemay WWTP Outfall 002 Elimination (11132 & E-1265) LOCATION: The Bissell Point and Lemay Wastewater Treatment Plants TYPE OF PROJECT: Design of Wastewater Treatment Plant Facilities (011.0 Design Phase Project Costs) DEPARTMENT REQUESTING ACTION: Engineering REQUESTED ACTION: Why is this action necessary?: Appropriates additional funds and authorizes staff to amend a design contract. What does action accomplish?: Provides additional funds for the design of a CIP project, as required by Consent Decree. SUMMARY EXPLANATION/BACKGROUND: Contractor: N/A Previous District Contract: Yes Consultant: HDR Engineering, Inc. 326 So. 21st Street, Suite 400 St. Louis, MO 63103 Corporate Headquarters: Omaha, Nebraska Agency: N/A Number of proposers: N/A Appropriation Amount: $430,000.00 Designer’s Estimate: N/A MBE/WBE Participation: 45.04% (24.01% for total project) Engineering Design Source, Inc. – 20.71% - MBE (This amendment only) David Mason & Associates, Inc. – 3.46% - MBE (This amendment only) Intelligent Design & Construction Solutions, LLC – 16.16% - WBE (This amendment only) Tech Service, Inc. – 4.71% - MBE (This amendment only) Type of Contract: Lump Sum Properties Affected: 1 Properties Benefiting: Lemay WWTP Service Area Designed by: N/A This ordinance authorizes the District to enter into Amendment No. 13 under Contract #10847 with HDR Engineering, Inc. This amendment provides for the engineering phase services for the Lemay WWTP Outfall 002 Elimination (11132) project. The amended design appropriation is $7,284,000.00 for approximately $42,000,000 in construction. FUNDING/COST SUMMARY: Budgeted: Capital Improvement Program Budget Year: FY2010, Pg. 19 Amount: $6,000,000 Fund Name: #6660 – Sanitary Replacement Fund Additional Comments: The cost of this additional work is approximately $411,000. Contracted planning resources utilized: Watershed Facility Planning. PREVIOUS BOARD ACTION RELATED TO THIS ACTION: 12/10/09 – Ord. No. 12994 – Amount: $6,000,000 – HDR Engineering, Inc. – Design Contract No. E-1265 12/08/11 – Ord. No. 13334 – Amount: $300,000 – HDR Engineering, Inc. – Design Contract No. E-1265 – Amend. No. 7 02/09/12 – Ord. No. 13369 – Amount: $554,000 – HDR Engineering, Inc. – Design Contract No. E-1265 – Amend. No. 10 10 of 3/14/13 AGENDA ITEM NUMBER: 25 – Proposed Ord. No. 13588 NAME OF PROJECT: Coldwater Sanitary Relief Section B, C, D Wet Weather Storage Facility Tank C – Property Acquisition (11876) LOCATION: South of I-270 and east of Lindbergh Boulevard in the City of Hazelwood, Missouri TYPE OF PROJECT: Property acquisition, demolition and related activities of real property for wet weather storage facility (13.2 Land Purchase) DEPARTMENT REQUESTING ACTION: Engineering REQUESTED ACTION: Why is this action necessary?: Appropriates funds related to the purchase of properties, demolition, and related activities and authorizes District staff to acquire property without additional Board action. What does action accomplish?: Purchase of property will allow improvements of the area for a wet weather storage facility, as required by Consent Decree. SUMMARY EXPLANATION/BACKGROUND: Contractor: N/A Previous District Contract: N/A Consultant: N/A Agency: N/A Number of bidders: N/A Low Bid: N/A High Bid: N/A Appropriation Amount: $3,000,000.00 District’s Estimate: N/A MBE/WBE Participation: N/A Plan Approval Date: N/A Type of Contract: N/A Properties Affected: 1 Properties Benefiting: Entire Watershed Designed by: N/A A buyout/acquisition of one (1) property in the area of the 9200 block of Pershall Road, in the City of Hazelwood to allow for the area necessary to accommodate the construction of a sanitary wet weather storage facility. The effort will include the acquisition of the property through negotiation and/or condemnation if necessary, and securing the site. Through the approval of this Board action, District Staff will be authorized to negotiate with property owner and purchase the property included in the scope without further Board action. A real property acquisition consultant will perform all negotiations and management of the property acquisition from the first contact with the owners through the closing. The consultant will perform all services in accordance with the Code of Federal Regulations Uniform Relocations and Real Property Assistance Act (49CFR Part 24, amended). The District will contract for the final restoration of the site under separate contracts through the Purchasing Division. All of these activities will be funded from this appropriation. Any development of the wet weather storage facility would be funded by a separate Board action. FUNDING/COST SUMMARY: Budgeted: Capital Improvement Program Budget Year: FY2013, Pg. S 4 Amount: $3,000,000 Fund Name: #6660 – Sanitary Replacement Fund Additional Comments: None PREVIOUS BOARD ACTION RELATED TO THIS ACTION: N/A 11 of 3/14/13 AGENDA ITEM NUMBER: 26 – Proposed Ord. No. 13589 NAME OF PROJECT: Maximo Transportation Module Implementation Services LOCATION: Various locations in the District TYPE OF PROJECT: Fleet Management Consulting DEPARTMENT REQUESTING ACTION: Operations REQUESTED ACTION: Why is this action necessary?: Appropriates Funds and authorizes staff to enter into a contract. What does action accomplish?: This ordinance authorizes a contract with the firm of Mercury & Associates to provide Fleet Management Consulting regarding the implementation of the IBM Maximo Transportation Module. SUMMARY EXPLANATION/BACKGROUND: Contractor: N/A Previous District Contract: N/A Consultant: Mercury & Associates 10717 W. 121st Street Overland Park, KS 66213 Agency: N/A Number of bidders: 1 Low Bid: $148,120 High Bid: N/A Appropriation Amount: $163,027 District’s Estimate: N/A MBE/WBE Participation: N/A Plan Approval Date: N/A Type of Contract: Lump Sum Properties Affected: N/A Properties Benefiting: N/A Designed by: N/A This ordinance authorizes the District to enter into contract with Mercury & Associates for Fleet Management consulting services associated with the implementation of the IBM Maximo Transportation Module as defined in RFP 2822. FUNDING/COST SUMMARY: Budgeted: Unencumbered Funds Budget Year: FY12 Amount: $163,027 Fund Name: General Fund Additional Comments: PREVIOUS BOARD ACTION RELATED TO THIS ACTION: None 12 of 3/14/13 AGENDA ITEM NUMBER: 27 – Proposed Ord. No. 13590 NAME OF PROJECT: General Services Agreement – Engineering Services LOCATION: Various locations in the District TYPE OF PROJECT: General Engineering Services (011.0 Design Phase Project Costs) DEPARTMENT REQUESTING ACTION: Operations REQUESTED ACTION: Why is this action necessary?: Appropriates Funds and authorizes staff to enter into an contract. What does action accomplish?: Supplements District Staff SUMMARY EXPLANATION/BACKGROUND: Contractor: N/A Previous District Contract: N/A Consultant: Black & Veatch 15450 South Outer Road Suite 200 Chesterfield, MO 63017 Agency: N/A Number of bidders: N/A Low Bid: N/A High Bid: N/A Appropriation Amount: $100,000 District’s Estimate: N/A MBE/WBE Participation: 30% Intelligent Design Solutions – 10% - WBE Lion CSG – 8.5% - WBE Taliferro & Brown – 9.5% - MBE Gateway Surveying – 1% – WBE Document Imaging – 1% - WBE Plan Approval Date: N/A Type of Contract: Hourly Billing Rate plus Reimbursables Properties Affected: N/A Properties Benefiting: N/A Designed by: N/A This ordinance authorizes the District to enter into a contract with Black & Veatch for engineering services associated with the design of small projects and tasks as needed throughout the District as defined in RFP 2732. Services provided may include electrical, controls, mechanical, structural, process, and regulatory. Projects will be issued by letter agreement per individual scopes of service. FUNDING/COST SUMMARY: Budgeted: Unencumbered Funds Budget Year: FY13/14 Amount: $100,000 Fund Name: General Fund Additional Comments: PREVIOUS BOARD ACTION RELATED TO THIS ACTION: None 13 of 3/14/13 AGENDA ITEM NUMBER: 28 – Proposed Ord. No. 13591 NAME OF PROJECT: Intergovernmental Agreement with the City of St. Louis and St. Louis County LOCATION: District-Wide TYPE OF PROJECT: DEPARTMENT REQUESTING ACTION: REQUESTED ACTION: Why is this action necessary?: Authorizes staff to enter into an Intergovernmental Agreement with the City of St. Louis and St. Louis County What does action accomplish?: Memorializes an agreement between the entities to amend an existing contract to include additional scope of services. SUMMARY EXPLANATION/BACKGROUND: Contractor: N/A Previous District Contract: N/A Consultant: N/A Agency: N/A Number of proposers: N/A Appropriation Amount: N/A Designer’s Estimate: N/A MBE/WBE Participation: N/A Plan Approval Date: N/A Type of Contract: Intergovernmental Agreement Properties Affected: N/A Properties Benefiting: N/A Designed by: N/A The Intergovernmental Agreement memorializes that the entities agree to amend the Mason Tillman Contract with MSD dated February 21, 2012 to include scope of services for Mason Tillman to conduct a separate Disparity Study report for both the City and the County. The advantages of said amended contract includes a cost savings from the overlap of certain required tasks for each study report for entities in a common service area; and a more uniform implementation of procurement recommendations in the region by each entity to benefit minority and women-owned business enterprises. FUNDING/COST SUMMARY: Budgeted: N/A Budget Year: FY2013 Amount: NA Fund Name: N/A Additional Comments: N/A PREVIOUS BOARD ACTION RELATED TO THIS ACTION: N/A 14 of 3/14/13 AGENDA ITEM NUMBER: 29 – Proposed Ord. No. 13592 NAME OF PROJECT: Topping Sanitary Relief (SKME-421) (10199) LOCATION: From Barrett Station, south of Laurel Lake Court, northeasterly to Karlin Drive and Fiddlecreek along Topping in the City of Town and Country, Missouri TYPE OF PROJECT: Easement Condemnation (015.0 Construction Costs) DEPARTMENT REQUESTING ACTION: Engineering REQUESTED ACTION: Why is this action necessary?: Authorizes staff to enter into condemnation proceedings. What does action accomplish?: Acquires a temporary construction easement to construct a sanitary sewer project with appurtenances, as required by Consent Decree. SUMMARY EXPLANATION/BACKGROUND: Contractor: N/A Previous District Contract: Yes Consultant: N/A Agency: N/A Number of bidders: N/A Low Bid: N/A High Bid: N/A Appropriation Amount: N/A Designer’s Estimate: N/A MBE/WBE Participation: N/A Type of Contract: N/A Properties Affected: 1 Properties Benefiting: 29 Designed by: N/A This ordinance authorizes the staff to enter into condemnation proceedings for a temporary construction easement on one (1) parcel of ground located in the City of Town and Country, Missouri. This easement is needed to construct this project, which consists of the construction of approximately 2,205 feet of 12-inch to 15-inch diameter sanitary sewers and appurtenances. Also, this project will address sanitary sewer surcharging, manhole overflows, and building backups during wet weather events. This easement has been appraised. Currently, the District has been unable to negotiate a settlement with the owner. This project is now tentatively scheduled to begin construction in FY2013. FUNDING/COST SUMMARY: Budgeted: Capital Improvement Program Budget Year: FY2013, Pg. 132 Amount: $1,200,000 Fund Name: #6660 – Sanitary Replacement Fund Additional Comments: The Board of Trustees originally adopted Ordinance No. 13463 to authorize staff to enter into condemnation proceedings on three (3) properties. This ordinance requests condemnation rights for an additional temporary construction easement for the remaining unsettled property. PREVIOUS BOARD ACTION RELATED TO THIS ACTION: 08/09/12 – Ord. No. 13463 – Authorized condemnation proceedings on three properties. 15 of 3/14/13 AGENDA ITEM NUMBER: 30 – Resolution No. 3080 NAME OF PROJECT: MSD Disparity Study and MWBE Goals LOCATION: N/A TYPE OF PROJECT: N/A DEPARTMENT REQUESTING ACTION: Human Resources REQUESTED ACTION: Acceptance of the Disparity Study and enactment of narrowly tailored contracting and workforce goals. Why is this action necessary?: To enact the appropriate narrowly tailored contracting and workforce goals as defined in the Disparity Study. What does action accomplish?: Promotes improved participation in the District’s MWBE Utilization Initiative SUMMARY EXPLANATION/BACKGROUND: Contractor: N/A Previous District Contract: N/A Consultant: N/A Agency: N/A Number of bidders: N/A Low Bid: N/A High Bid: N/A Appropriation Amount: N/A District’s Estimate: N/A MBE/WBE Participation: N/A Plan Approval Date: N/A Type of Contract: N/A Properties Affected: N/A Properties Benefiting: N/A Designed by: N/A FUNDING/COST SUMMARY: Budgeted: N/A Budget Year: N/A Amount: N/A Fund Name: N/A Additional Comments: This accepts the Disparity Study and enacts narrowly tailored contracting and workforce goals as defined in that study. PREVIOUS BOARD ACTION RELATED TO THIS ACTION: 03/08/2012: Resolution No. 3017 - Interim MWBE Program Goals 07/12/2007: Resolution No. 2717 - MWB Goal Achievement Amendment