Loading...
HomeMy Public PortalAbout1569th Board Agenda 10-8-20151 Revised: 10/6/2015 8:32 AM AGENDA 1569th MEETING OF THE BOARD OF TRUSTEES THE METROPOLITAN ST. LOUIS SEWER DISTRICT October 8, 2015 4:00 P.M. ROLL CALL & CLOSED SESSION 5:00 P.M. PUBLIC BOARD MEETING MSD OFFICES 2350 MARKET STREET ROOM 109 1 ROLL CALL 2 CLOSED SESSION TO DISCUSS PERSONNEL ACTIONS UNDER §610.021(3), RSMO 1988 SUPP 3. APPROVAL OF JOURNAL OF PRECEDING MEETING September 10, 2015 (1567th) September 29, 2015 (1568th) 4 COMMENTS BY THE CHAIR 5 REPORT OF BOARD COMMITTEES 6 REPORT OF EXECUTIVE DIRECTOR 7 COMMENTS FROM THE PUBLIC 8 SUBMISSION OF PUBLIC HEARING REPORTS – None 9 COMMUNICATIONS 10 CONSENT AGENDA – 11 through 26 2 Revised: 10/6/2015 8:32 AM ORDINANCES 11 Adoption of Proposed Ord. No. 14230- Bissell – Coldwater – Missouri – Meramec Public I/I Reduction (2016) Contract E (11923) Appropriating Two Million Five Hundred Seventy Thousand Dollars ($2,570,000.00) from the Sanitary Replacement Fund to be used for sanitary sewer rehabilitation in Bissell - Coldwater - Missouri - Meramec Public I/I Reduction (2016) Contract E (11923) in the City of Florissant and Unincorporated St. Louis County, Missouri; and authorizing the Executive Director and Secretary-Treasurer on behalf of The Metropolitan St. Louis Sewer District to enter into Contract No. 20293 with Insituform Technologies USA, LLC for the aforesaid sanitary sewer rehabilitation. 12 Adoption of Proposed Ord. No. 14231- CSO Volume Reduction Green Infrastructure – Bellefontaine Cemetery – Evergreen Glen Watershed Restoration (12658) Authorizing the Executive Director and Secretary-Treasurer on behalf of The Metropolitan St. Louis Sewer District to enter into an agreement with the Bellefontaine Cemetery Association for cost sharing in CSO Volume Reduction Green Infrastructure - Bellefontaine Cemetery - Evergreen Glen Watershed Restoration (12658), in the City of St. Louis, Missouri. 13 Adoption of Proposed Ord. No. 14232- North Baden Creek I/I Reduction (BP-532) (Winchester Dr) (11693) Appropriating One Million Six Hundred Twenty Thousand Dollars ($1,620,000.00) from the Sanitary Replacement Fund to be used for sanitary sewer construction and private I/I removal in North Baden Creek I/I Reduction (BP-532) (Winchester Dr) (11693) in the Cities of Normandy, Northwoods, and Pasadena Hills, Missouri; and authorizing the Executive Director and Secretary-Treasurer on behalf of The Metropolitan St. Louis Sewer District to enter into Contract No. 20316 with Fred M. Luth & Sons, Inc. for the aforesaid sanitary sewer construction and private I/I removal. 14 Adoption of Proposed Ord. No. 14233- University City Public I/I Reduction – East (WC-02 & WC-03) (12063) Appropriating Three Million Nine Hundred Seventy Thousand Dollars ($3,970,000.00) from the Sanitary Replacement Fund to be used for sanitary sewer rehabilitation in University City Public I/I Reduction – East (WC-02 & WC-03) (12063) in the Cities of Pagedale and Wellston and the Village of Hillsdale, Missouri; and authorizing the Executive Director and Secretary-Treasurer on behalf of The Metropolitan St. Louis Sewer District to enter into Contract No. 20282 with SAK Construction, LLC for the aforesaid sanitary sewer rehabilitation. 15 Adoption of Proposed Ord. No. 14234- Webster Groves Trunk E Sanitary Rehabilitation and I/I Reduction Phase IV (Part 1) (11678) Appropriating One Million Four Hundred Fifty Thousand Dollars ($1,450,000.00) from the Sanitary Replacement Fund to be used for private I/I removal in Webster Groves Trunk E Sanitary Rehabilitation and I/I Reduction Phase IV (Part 1) (11678) in the Cities of Glendale, Kirkwood, and Webster Groves, Missouri; and authorizing the Executive Director and Secretary-Treasurer on behalf of The Metropolitan St. Louis Sewer District to enter into Contract No. 20311 with Fred M. Luth & Sons, Inc. for the aforesaid private I/I removal. 16 Adoption of Proposed Ord. No. 14235- Webster Groves Trunk E Sanitary Rehabilitation and I/I Reduction Phase IV (Part 2) (11678) Appropriating Two Million Three Hundred Fifty Thousand Dollars ($2,350,000.00) from the Sanitary Replacement Fund to be used for private I/I removal in Webster Groves Trunk E Sanitary Rehabilitation and I/I Reduction Phase IV (Part 2) (11678) in the Cities of Glendale, Kirkwood, and Webster Groves, Missouri; and authorizing the Executive Director and Secretary-Treasurer on behalf of The Metropolitan St. Louis Sewer District to enter into Contract No. 20313 with Bi-State Utilities Company for the aforesaid private I/I removal. 3 Revised: 10/6/2015 8:32 AM 17 Adoption of Proposed Ord. No. 14236- Rock Hill Sanitary Relief (SKME-618) (11069) Appropriating One Million Two Hundred Twenty Thousand Dollars ($1,220,000.00) from the Sanitary Replacement Fund to be used for sanitary sewer construction and private I/I removal in Rock Hill Sanitary Relief (SKME-618) (11069) in the Cities of Rock Hill and Kirkwood, Missouri; and authorizing the Executive Director and Secretary-Treasurer on behalf of The Metropolitan St. Louis Sewer District to enter into Contract No. 20317 with Bi-State Utilities Company for the aforesaid sanitary sewer construction and private I/I removal. 18 Adoption of Proposed Ord. No. 14237- Hermitage Hills Bank Stabilization (Frontenac 3-1) (11003) Appropriating Three Hundred Ten Thousand Dollars ($310,000.00) from the Operations, Maintenance, Construction, Improvement Fund of Deer Creek to be used for channel stabilization in Hermitage Hills Bank Stabilization (Frontenac 3-1) (11003) in the City of Frontenac, Missouri; and authorizing the Executive Director and Secretary-Treasurer on behalf of The Metropolitan St. Louis Sewer District to enter into Contract No. 20312 with Ideal Landscape Group for the aforesaid channel stabilization. 19 Adoption of Proposed Ord. No. 14238- Raleigh Drive #8829 Storm Sewer (11338) Appropriating Two Hundred Ninety Thousand Dollars ($290,000.00) from the Operations, Maintenance, Construction, Improvement Fund of Gravois Creek to be used for storm sewer construction in Raleigh Drive #8829 Storm Sewer (11338) in the Town of Grantwood Village, Missouri; and authorizing the Executive Director and Secretary-Treasurer on behalf of The Metropolitan St. Louis Sewer District to enter into Contract No. 20308 with Above and Below Contracting, LLC for the aforesaid storm sewer construction. 20 Adoption of Proposed Ord. No. 14239- Whitehaven and Raleigh Storm Sewer (11350) Appropriating One Hundred Twenty-Five Thousand Dollars ($125,000.00) from the Operations, Maintenance and Construction Improvement Fund of Gravois Creek to be used for storm sewer construction in Whitehaven and Raleigh Storm Sewer (11350) in the Town of Grantwood Village, Missouri; and authorizing the Executive Director and Secretary-Treasurer on behalf of The Metropolitan St. Louis Sewer District to enter into Contract No. 20305 with J.H. Berra Construction Co., Inc. for the aforesaid storm sewer construction. 21 Adoption of Proposed Ord. No. 14240- Coldwater Creek WWTF Final Clarifiers Replacement (12504) Appropriating Eight Hundred Twenty-Two Thousand Dollars ($822,000.00) from the Sanitary Replacement Fund to be used for the design of a wastewater treatment plant in Coldwater Creek WWTF Final Clarifiers Replacement (12504) in Unincorporated St. Louis County, Missouri; and authorizing the Executive Director and Secretary-Treasurer on behalf of The Metropolitan St. Louis Sewer District to enter into Contract No. 20336 with Donohue & Associates, Inc. for the aforesaid wastewater treatment plant design. 22 Adoption of Proposed Ord. No. 14241- Comprehensive Ammonia and Nutrient Removal Master Plan (12070) Appropriating One Million Six Hundred Ninety-Six Thousand Dollars ($1,696,000.00) from the General Fund to be used for the preparation of a master plan for the District’s wastewater treatment plants in Comprehensive Ammonia and Nutrient Removal Master Plan (12070) throughout the District; and authorizing the Executive Director and Secretary-Treasurer on behalf of The Metropolitan St. Louis Sewer District to enter into Contract No. 20337 with Black & Veatch Corporation for the aforesaid master plan preparation. 4 Revised: 10/6/2015 8:32 AM 23 Adoption of Proposed Ord. No. 14242- Degiverville Combined Sewer Relocation (11136) Appropriating Six Hundred Eighty-Seven Thousand Dollars ($687,000.00) from the Sanitary Replacement Fund to be used for the design of combined sewers in Degiverville Combined Sewer Relocation (11136) in the City of St. Louis, Missouri; and authorizing the Executive Director and Secretary-Treasurer on behalf of The Metropolitan St. Louis Sewer District to enter into Contract No. 20338 with Farnsworth Group, Inc. for the aforesaid combined sewer design. 24 Adoption of Proposed Ord. No. 14243- Lemay Pump Stations 1 and 2 Improvements (12488) Appropriating Four Hundred Forty-One Thousand Dollars ($441,000.00) from the Sanitary Replacement Fund to be used for the design of a pump station in Lemay Pump Stations 1 and 2 Improvements (12488) in Unincorporated St. Louis County, Missouri; and authorizing the Executive Director and Secretary- Treasurer on behalf of The Metropolitan St. Louis Sewer District to enter into Contract No. 20339 with Donohue & Associates, Inc. for the aforesaid pump station design. 25 Adoption of Proposed Ord. No. 14244- Big Bend to Papin Storm Sewer Phase I (10035) Appropriating Two Hundred Ten Thousand Dollars ($210,000.00) from the Operations, Maintenance and Construction Improvement Fund of the Seminary Branch of River Des Peres to be used for the design of storm sewers in Big Bend to Papin Storm Sewer Phase I (10035) in the City of Webster Groves, Missouri; and authorizing the Executive Director and Secretary-Treasurer on behalf of The Metropolitan St. Louis Sewer District to enter into Contract No. 20340 with Hart Engineering, LLC for the aforesaid storm sewer design. 26 Adoption of Proposed Ord. No. 14246- District Rate Model Support, Feasibility Study & Rate Commission Proceedings Authorizing the Executive Director and Secretary-Treasurer on behalf of The Metropolitan St. Louis Sewer District to enter into a change order for Ten Thousand Dollars ($10,000.00) to the original contract with Raftelis Financial Consultants, Inc. for professional services needed to prepare the financial feasibility study needed for the issuance of District bonds. 5 Revised: 10/6/2015 8:32 AM UNFINISHED BUSINESS ORDINANCES 27 Adoption of Proposed Ord. No. 14199- Lackland I/I Reduction (11712) Appropriating One Million Seven Hundred Thousand Dollars ($1,700,000.00) from the Sanitary Replacement Fund to be used for project costs for sanitary sewer construction and private I/I removal in Lackland I/I Reduction (11712) in the Cities of Breckenridge Hills, Overland, St. John and Charlack, Missouri; and authorizing the Executive Director and Secretary-Treasurer on behalf of The Metropolitan St. Louis Sewer District to enter into Contract No. 20301 with Pangea, Inc. d/b/a Pangea Group for the aforesaid sanitary sewer construction and private I/I removal. RESOLUTIONS None 6 Revised: 10/6/2015 8:32 AM New Business Agenda Item No. Name Page No. ORDINANCES 28 Proposed Ord. No. 14248- Baumgartner & Black Forest Sanitary Replacement Phase II (10407) 11 INTRODUCTION OF AN ORDINANCE, appropriating Two Million Three Hundred Seventy- Five Thousand Dollars ($2,375,000.00) from the Sanitary Replacement Fund to be used for sanitary sewer construction in Baumgartner & Black Forest Sanitary Replacement Phase II (10407) in Unincorporated St. Louis County, Missouri; and authorizing the Executive Director and Secretary-Treasurer on behalf of The Metropolitan St. Louis Sewer District to enter into Contract No. 20326 with J.H. Berra Construction Co., Inc. for the aforesaid sanitary sewer construction. 29 Proposed Ord. No. 14249 - Black Creek Sanitary Sewer and I/I Reduction (11883) 12 INTRODUCTION OF AN ORDINANCE, appropriating Three Million Four Hundred Fifty Thousand Dollars ($3,450,000.00) from the Sanitary Replacement Fund to be used for sanitary sewer construction and private I/I removal in Black Creek Sanitary Sewer and I/I Reduction (11883) in the Cities of Clayton, Ladue, Olivette, and University City, Missouri; and authorizing the Executive Director and Secretary-Treasurer on behalf of The Metropolitan St. Louis Sewer District to enter into Contract No. 20334 with Fred M. Luth & Sons, Inc. for the aforesaid sanitary sewer construction and private I/I removal. 30 Proposed Ord. No. 14250 - Forestate and Texas Sanitary Relief (SKME-513) (11750) 14 INTRODUCTION OF AN ORDINANCE, appropriating Two Million Five Hundred Thousand Dollars ($2,500,000.00) from the Sanitary Replacement Fund to be used for sanitary sewer construction and private I/I removal in Forestate and Texas Sanitary Relief (SKME-513) (11750) in the Village of Grantwood Village and Unincorporated St. Louis County, Missouri; and authorizing the Executive Director and Secretary-Treasurer on behalf of The Metropolitan St. Louis Sewer District to enter into Contract No. 20322 with Fred M. Luth & Sons, Inc. for the aforesaid sanitary sewer construction and private I/I removal. 31 Proposed Ord. No. 14251- Meadowridge and Eastwood Storm and Sanitary Relief (11840) 16 INTRODUCTION OF AN ORDINANCE, AN ORDINANCE, appropriating Three Hundred Twenty-Six Thousand Dollars ($326,000.00) from the Sanitary Replacement Fund and Five Hundred Nine Thousand Dollars ($509,000.00) from the Operations, Maintenance, Construction and Improvement Fund of Deer Creek to be used for storm sewer and sanitary sewer construction in Meadowridge and Eastwood Storm and Sanitary Relief (11840) in the City of Kirkwood, Missouri; and authorizing the Executive Director and Secretary-Treasurer on behalf of The Metropolitan St. Louis Sewer District to enter into Contract No. 20325 with J.H. Berra Construction Co., Inc. for the aforesaid storm sewer and sanitary sewer construction. 7 Revised: 10/6/2015 8:32 AM New Business Agenda Item No. Name Page No. 32 Proposed Ord. No. 14252 - University City I/I Reduction – West (11672) 18 INTRODUCTION OF AN ORDINANCE, appropriating Ninety Thousand Dollars ($90,000.00) from the Operations, Maintenance, Construction and Improvement Fund of University City and One Million Sixty Thousand Dollars ($1,060,000.00) from the Sanitary Replacement Fund to be used for storm sewer construction and private I/I removal in University City I/I Reduction – West (11672) in the Cities of Olivette, Overland, Creve Coeur, and Unincorporated St. Louis County, Missouri; and authorizing the Executive Director and Secretary-Treasurer on behalf of The Metropolitan St. Louis Sewer District to enter into Contract No. 20314 with Fred M. Luth & Sons, Inc. for the aforesaid storm sewer construction and private I/I removal. 33 Proposed Ord. No. 14253 - Dacey Branch I/I Reduction (BP-313) (PIR) Storm Sewer (12448) 20 INTRODUCTION OF AN ORDINANCE, authorizing the Executive Director and Secretary- Treasurer on behalf of The Metropolitan St. Louis Sewer District to enter into Contract No. 20329 with Above and Below Contracting, LLC for storm sewer construction, public and private I/I removal in Dacey Branch I/I Reduction (BP-313) (PIR) Storm Sewer (12448) in Unincorporated St. Louis County, Missouri. 34 Proposed Ord. No. 14254 - Firethorn Drive #1901 Storm Improvements (11216) 22 INTRODUCTION OF AN ORDINANCE, appropriating One Hundred Ninety-Five Thousand Dollars ($195,000.00) from the Operations, Maintenance, Construction and Improvement Fund of Deer Creek to be used for storm sewer construction in Firethorn Drive #1901 Storm Improvements (11216) in the City of Des Peres, Missouri; and authorizing the Executive Director and Secretary-Treasurer on behalf of The Metropolitan St. Louis Sewer District to enter into Contract No. 20315 with Above and Below Contracting, LLC for the aforesaid storm sewer construction. 35 Proposed Ord. No. 14255 - Emergency Repair #052 (Chesterfield Commons Pump Station No. 4, P-810) (12669) 23 INTRODUCTION OF AN ORDINANCE, making a supplemental appropriation of Eight Hundred Thousand Dollars ($800,000.00) from the Wastewater Emergency Fund to be used for emergency repair in Emergency Repair #052 (Chesterfield Commons Pump Station No.4, P-810) (12669) in the City of Chesterfield, Missouri. 36 Proposed Ord. No. 14256 - OMCI Stormwater Design (Contract A) (11129 24 INTRODUCTION OF AN ORDINANCE, making a supplemental appropriation of One Hundred Fifty Thousand Dollars ($150,000.00) from the Operations, Maintenance, Construction and Improvement Fund of Deer Creek to be used for the design of storm sewers in OMCI Stormwater Design (Contract A) (11129) in various locations within the Deer Creek Watershed; and authorizing the Executive Director and Secretary-Treasurer on behalf of The Metropolitan St. Louis Sewer District to enter into Amendment No. 3 to Contract No. 20004 with Reitz & Jens, Inc. for additional project costs for the design of storm sewers. 8 Revised: 10/6/2015 8:32 AM New Business Agenda Item No. Name Page No. 37 Proposed Ord. No. 14257 - General Services Agreement – Facility & Sewer Design (2016) (11760) 26 INTRODUCTION OF AN ORDINANCE, AN ORDINANCE, appropriating Three Hundred Thousand Dollars ($300,000.00) from the Sanitary Replacement Fund to be used for general engineering services in General Services Agreement - Facility & Sewer Design (2016) (11760) in various locations within the District; and authorizing the Executive Director and Secretary-Treasurer on behalf of The Metropolitan St. Louis Sewer District to enter into Contract No. 20350 with Tetra Tech, Inc. for the aforesaid engineering services. 38 Proposed Ord. No. 14258 - Natural Bridge Rd – Darby to Chevrolet Combined Sewer Relief (12536) 27 INTRODUCTION OF AN ORDINANCE, appropriating Two Hundred Thousand Dollars ($200,000.00) from the Sanitary Replacement Fund to be used for the design of combined sewers in Natural Bridge Rd – Darby to Chevrolet Combined Sewer Relief (12536) in the City of St. Louis, Missouri; and authorizing the Executive Director and Secretary-Treasurer on behalf of The Metropolitan St. Louis Sewer District to enter into Contract No. 20351 with Access Engineering, LLC for the aforesaid design of combined sewers. 39 Proposed Ord. No. 14259 - Cottage #206 Storm Improvements (10302) 28 INTRODUCTION OF AN ORDINANCE, AN ORDINANCE, appropriating One Hundred Fourteen Thousand Dollars ($114,000.00) from the Operations, Maintenance, Construction and Improvement Fund of Seminary Branch of River Des Peres to be used for the design of storm sewers in Cottage #206 Storm Improvements (10302) in the City of Webster Groves, Missouri; and authorizing the Executive Director and Secretary- Treasurer on behalf of The Metropolitan St. Louis Sewer District to enter into Contract No. 20352 with Stantec Consulting Services, Inc. for the aforesaid design of storm sewers. 40 Proposed Ord. No. 14260- Deer Creek OMCI Stormwater Design (Contract A) (12461) 29 INTRODUCTION OF AN ORDINANCE, appropriating Two Hundred Sixty-Five Thousand Dollars ($265,000.00) from the Operations, Maintenance, Construction and Improvement Fund of Deer Creek to be used for the design of storm sewers in Deer Creek OMCI Stormwater Design (Contract A) (12461) in various locations within the Deer Creek Watershed; and authorizing the Executive Director and Secretary-Treasurer on behalf of The Metropolitan St. Louis Sewer District to enter into Contract No. 20353 with CDG Engineers, Inc. for the aforesaid design of storm sewers. 9 Revised: 10/6/2015 8:32 AM New Business Agenda Item No. Name Page No. 41 Proposed Ord. No. 14261 - Hudson Rd. #1401 - #1405 Bank Stabilization (MCDW- 120) (10020) 30 INTRODUCTION OF AN ORDINANCE, appropriating One Hundred Ninety-Five Thousand Dollars ($195,000.00) from the Operations, Maintenance, Construction and Improvement Fund of Maline Creek to be used for the design of storm sewers in Hudson Rd. #1401 - #1405 Bank Stabilization (MCDW-120) (10020) in the City of Ferguson, Missouri; and authorizing the Executive Director and Secretary-Treasurer on behalf of The Metropolitan St. Louis Sewer District to enter into Contract No. 20354 with HR Green, Inc. for the aforesaid design of storm sewers. 42 Proposed Ord. No. 14262 - Rosewood Lane & Woodard Dr. Storm Sewer (10347) 31 INTRODUCTION OF AN ORDINANCE, appropriating Two Hundred Fifteen Thousand Dollars ($215,000.00) from the Operations, Maintenance, Construction and Improvement Fund of Sugar Creek to be used for the design of storm sewers in Rosewood Lane & Woodard Dr. Storm Sewer (10347) in the City of Kirkwood, Missouri; and authorizing the Executive Director and Secretary-Treasurer on behalf of The Metropolitan St. Louis Sewer District to enter into Contract No. 20355 with Oates Associates, Inc. for the aforesaid design of storm sewers. 43 Proposed Ord. No. 14263- Data Center Colocation 32 INTRODUCTION OF AN ORDINANCE, appropriating One Million Five Hundred Thousand Dollars ($1,500,000.00) from the General Fund to be used for Data Center Computing Colocation Services in the District Data Center Colocation Project initiative throughout the District. 44 Proposed Ord. No. 14264- Data Center Colocation - Intergovernmental Agreement with Regional Justice Information Service Commission (REJIS) 33 INTRODUCTION OF AN ORDINANCE, authorizing the Executive Director and Secretary- Treasurer on behalf of The Metropolitan St. Louis Sewer District to enter into an Intergovernmental Agreement with Regional Justice Information Service Commission (REJIS), whereby the entities agree that REJIS shall provide data center colocation services to the District. These services will include physical hosting and operation of the District’s computing hardware and software within the REJIS Data Center facility. 10 Revised: 10/6/2015 8:32 AM New Business Agenda Item No. Name Page No. RESOLUTIONS 45 Adoption of Resolution No. 3236, expressing the Board of Trustees appreciation To William E. Hargrove for his 37 years of exemplary service to The Metropolitan St. Louis Sewer District from September 26, 1978, to his retirement effective October 1,2015. 46 Adoption of Resolution No. 3237 - expressing the Board of Trustees appreciation To Jocelyn R. Thompson for her 27 years of exemplary service to The Metropolitan St. Louis Sewer District from October 3, 1988, to his retirement effective October 1,2015. 47 Adoption of Resolution No. 3238 - CBA Independent Third Party Monitoring Consultant Services, the adoption of Resolution No. 3238 will extend the contract with Kwame Building Group, Inc. that was previously authorized by Ordinance No. 13973, adopted October 9, 2014, and authorized the Executive Director and Secretary-Treasurer on behalf of The Metropolitan St. Louis Sewer District to enter into a contract with Kwame Building Group, Inc. to provide third party District monitoring activities and to report to the Community Benefits Agreement signatories on compliance of the Community Benefits Agreement activities. 34 48 Adoption of Resolution No. 3239 - CBA Job Training Program Services, the adoption of Resolution No. 3239 will extend the contract with The St. Louis Agency of Training and Employment (SLATE) that was previously authorized by Ordinance No. 13974, adopted October 9, 2014, and authorized the Executive Director and Secretary-Treasurer on behalf of The Metropolitan St. Louis Sewer District to enter into a contract with SLATE to establish a sewer construction occupational training program for low income, unemployed and underemployed applicants. 35 49 Adoption of Resolution No. 3240 - CBA First Source Hiring Program for Construction, the adoption of Resolution No. 3240 will extend the contract with The St. Louis Agency of Training and Employment (SLATE) that was previously authorized by Ordinance No. 13730, adopted October 10, 2013, and authorized the Executive Director on behalf of The Metropolitan St. Louis Sewer District to enter into a contract with SLATE to administer the District’s First Source Hiring Program and to provide outreach and tracking of applicants hired with the service area. 36 50 Adoption of Resolution No. 3241 - Acceptance of Rate Commission Report dated July 20, 2015, the adoption of Resolution No. 3241 will formally acknowledge the Metropolitan St. Louis Sewer District’s Board of Trustees’ acceptance of the Rate Commission’s Recommendation Report dated July 30, 2015. 37 51 ANY OTHER BUSINESS THAT MAY PROPERLY BE BROUGHT BEFORE THE BOARD 52 ADJOURNMENT 11 Revised: 10/6/2015 8:32 AM AGENDA ITEM NUMBER: Item No. 28 Ordinance No 14248 NAME OF PROJECT: Baumgartner & Black Forest Sanitary Replacement Phase II (10407) LOCATION: East and south of Baumgartner Road and west of Telegraph Road in unincorporated St. Louis County, Missouri TYPE OF PROJECT: Sanitary Sewer Construction (015.0 Construction Costs) DEPARTMENT REQUESTING ACTION: Engineering REQUESTED ACTION: Why is this action necessary?: Appropriates funds and authorizes staff to enter into a construction contract. What does action accomplish?: Implements the construction of a CIP project, as required by Consent Decree. SUMMARY EXPLANATION/BACKGROUND: Contractor: J. H. Berra Construction Co., Inc. Previous District Contract: Yes 5091 New Baumgartner Road St. Louis, MO 63129 Consultant: N/A Agency: N/A Number of bidders: 2 Low Bid: $2,221,136.00 High Bid: $2,621,514.35 Appropriation Amount: $2,375,000.00 Designer’s Estimate: $1,750,000.00 Total MWBE Participation: 30.06% (MBE Goal is 17% - African American) B & P Construction, Inc. (African American) – 30.06% - MBE Type of Contract: Unit Cost Properties Affected: 5 Properties Benefiting: 680 Designed by: Heideman & Associates, Inc. The work to be done under Contract #20326 consists of the construction of approximately 3,630 lineal feet of sanitary sewers varying in size from 8-inches to 12-inches in diameter and appurtenances. This construction is the second phase of a multi-phase improvement program. The purpose of this project is to alleviate sanitary backups, overflowing manholes, and overcharged sanitary sewers during wet weather events. This project is scheduled to be completed in 720 days. FUNDING/COST SUMMARY: Budgeted: Capital Improvement Program Budget Year: FY2016, Pg. 87 Amount: $2,100,000 Fund Name: #6660 – Sanitary Replacement Fund Additional Comments: An additional contingency of $40,000 for utility relocation (Electric - $10,000, Gas - $10,000, Telephone - $10,000 & Water - $10,000) is included in the appropriation. This project is expected to be funded by Bond proceeds. Contracted planning resources utilized: Watershed Facility Planning, Separate Sewer Area I/I Assessment, Separate Sewer Area Flow Metering & Monitoring, Modeling, CCTV Inspection, and Radar Rainfall Data. PREVIOUS BOARD ACTION RELATED TO THIS ACTION: 11/21/11 – Ord. No. 13321 – Amount: $1,900,000 – Baumgartner & Black Forest Sanitary Replacement Phase I – Construction Contract No. 10687 10/10/13 – Ord. No. 13727 – Amount: $190,000 – Heideman & Associates, Inc. – Design Contract No. 10854 – Amendment No. 5 12 Revised: 10/6/2015 8:32 AM AG ENDA ITEM NUMBER: Item No 29 Ordinance No 14249 NAME OF PROJECT: Black Creek Sanitary Sewer and I/I Reduction (11883) LOCATION: West of south Hanley Road and north of Clayton Road in the Cities of Clayton, Ladue, Olivette, and University City, Missouri TYPE OF PROJECT: Sanitary Sewer Construction and Private I/I Removal (015.0 Construction Costs) DEPARTMENT REQUESTING ACTION: Engineering REQUESTED ACTION: Why is this action necessary?: Appropriates funds and authorizes staff to enter into a construction contract. What does action accomplish?: Implements the construction of a CIP project, as required by Consent Decree. SUMMARY EXPLANATION/BACKGROUND: Contractor: Fred M. Luth & Sons, Inc. Previous District Contract: Yes 4516 McRee Avenue St. Louis, MO 63110 Consultant: N/A Agency: N/A Number of bidders: 1 Low Bid: $3,226,123.00 High Bid: $3,226,123.00 Appropriation Amount: $3,450,000.00 Designer’s Estimate: $2,233,000.00 Total MWBE Participation: 17.01% (MBE Goal is 17% - African American) XL Contracting, Inc. (African American) – 5.58% - MBE David Mason & Associates, Inc. (African American) – 0.37% - MBE A.L.L. Construction, LLC (African American) – 3.78% - MBE B & P Construction, Inc. (African American) – 6.35% - MBE Tee & E Trucking, Inc. (African American) – 0.93% - MBE Type of Contract: Unit Cost Properties Affected: 265 Properties Benefiting: 1,250 Designed by: Parsons Water & Infrastructure, Inc. The work to be done under Contract #20334 consists of the construction of approximately 1,120 lineal feet of 8-inch diameter sanitary sewers and appurtenances, and the removal of inflow sources at 251 private properties. The purpose of this project is to reduce inflow/infiltration (I/I) in the Deer Creek watershed, reduce building backups, and relieve overcharged sewer mains. This project is scheduled to be completed in 431 days. FUNDING/COST SUMMARY: Budgeted: Capital Improvement Program Budget Year: FY2016, Pg. 93 Amount: $2,200,000 Fund Name: #6660 – Sanitary Replacement Fund Additional Comments: An additional contingency of $90,000 for utility relocation (Gas - $65,000 & Water - $25,000) is included in the appropriation. The first project associated with this area was Black Creek I/I Reduction (11689) that consisted of public rehabilitation. This sanitary sewer and private inflow reduction project is the second project associated with this area. This project is expected to be funded by Bond proceeds. Contracted planning resources utilized: Watershed Facility Planning, Combine Sewer Area I/I Assessment, Separate Sewer Area Flow Metering & Monitoring, Modeling, CCTV Inspection, and Radar Rainfall Data. 13 Revised: 10/6/2015 8:32 AM PREVIOUS BOARD ACTION RELATED TO THIS ACTION: 08/09/12 – Ord. No. 13446 – Amount: $1,215,000 – Parsons Water & Infrastructure, Inc. – Design Contract No. 10733 – Amendment 14 Revised: 10/6/2015 8:32 AM AGENDA ITEM NUMBER: Item No 30 Ordinance No 14250 NAME OF PROJECT: Forestate and Texas Sanitary Relief (SKME-513) (11750) LOCATION: North and south of Gravois Road and west of South Rock Hill Road in the Village of Grantwood Village and unincorporated St. Louis County, Missouri TYPE OF PROJECT: Sanitary Sewer Construction and Private I/I Removal (015.0 Construction Costs) DEPARTMENT REQUESTING ACTION: Engineering REQUESTED ACTION: Why is this action necessary?: Appropriates funds and authorizes staff to enter into a construction contract. What does action accomplish?: Implements the construction of a CIP project, as required by Consent Decree. SUMMARY EXPLANATION/BACKGROUND: Contractor: Fred M. Luth & Sons, Inc. Previous District Contract: Yes 4516 McRee Avenue St. Louis, MO 63110 Consultant: N/A Agency: N/A Number of bidders: 3 Low Bid: $2,355,139.00 High Bid: $2,818,650.00 Appropriation Amount: $2,500,000.00 Designer’s Estimate: $1,950,000.00 Total MWBE Participation: 17.58% (MBE Goal is 17% - African American) Davidson & Sons Hauling, LLC (African American) – 1.44% - MBE Phillips Concrete Services, LLC (African American) – 0.13% - MBE B & P Construction, Inc. (African American) – 0.51% - MBE XL Contracting, Inc. (African American) – 0.59% - MBE ABNA Engineering, Inc. (African American) – 1.02% - MBE Mason’s Landscaping & Construction Services (African American) – 1.66% - MBE Brandt Contracting, Inc. (African American) – 12.23% - MBE Type of Contract: Unit Cost Properties Affected: 60 Properties Benefiting: 380 Designed by: Burns & McDonnell Engineering Co., Inc. The work to be done under Contract #20322 consists of the construction of approximately 2,985 lineal feet of pipe sewers varying in size from 8-inches to 27-inches in diameter, removal of inflow at 57 private properties, and appurtenances. The purpose of this project is to reduce inflow/infiltration (I/I) in the Gravois Creek watershed. This project will provide for the elimination of one (1) constructed SSO (BP-389) after construction. This project is scheduled to be completed in 550 days. FUNDING/COST SUMMARY: Budgeted: Capital Improvement Program Budget Year: FY2016, Pg. 120 Amount: $1,660,000 Fund Name: #6660 – Sanitary Replacement Fund Additional Comments: An additional contingency of $50,000 for utility relocation (Gas - $30,000 & Water - $20,000) is included in the appropriation. This project is expected to be funded by Bond proceeds. Contracted planning resources utilized: Watershed Facility Planning, Combine Sewer Area I/I Assessment, Separate Sewer Area Flow Metering & Monitoring, Modeling, CCTV Inspection, and Radar Rainfall Data. 15 Revised: 10/6/2015 8:32 AM PREVIOUS BOARD ACTION RELATED TO THIS ACTION: 10/11/12 – Ord. No. 13477 – Amount: $420,000 – Burns & McDonnell Engineering Co. – Design Contract No. 11003 – Amendment 16 Revised: 10/6/2015 8:32 AM AGENDA ITEM NUMBER: Item No 31 Ordinance No 14251 NAME OF PROJECT: Meadowridge and Eastwood Storm and Sanitary Relief (11840) LOCATION: East of North Kirkwood Road and south of Manchester Road in the City of Kirkwood, Missouri TYPE OF PROJECT: Storm Sewer and Sanitary Sewer Construction (015.0 Construction Costs) DEPARTMENT REQUESTING ACTION: Engineering REQUESTED ACTION: Why is this action necessary?: Appropriates funds and authorizes staff to enter into a construction contract. What does action accomplish?: Implements the construction of a CIP project, as required by Consent Decree. SUMMARY EXPLANATION/BACKGROUND: Contractor: J. H. Berra Construction Co., Inc. Previous District Contract: Yes 5091 New Baumgartner Road St. Louis, MO 63129 Consultant: N/A Agency: N/A Number of bidders: 4 Low Bid: $755,623.00 High Bid: $1,097,575.00 Appropriation Amount: $835,000.00 Designer’s Estimate: $851,000.00 Total MWBE Participation: 17.08% (MBE Goal is 17% - African American) Windstar Transportation, LLC (African American) – 9.00% - MBE Phillips Concrete Services, LLC (African American) – 3.71% - MBE Supplied Industrial Solutions, Inc. (African American) – 4.37% - MBE Type of Contract: Unit Cost Properties Affected: 9 Properties Benefiting: 13 Designed by: Heideman & Associates, Inc. The work to be done under Contract #20325 consists of the construction of approximately 615 lineal feet of reinforced concrete box culvert, varying in size from 6 feet wide by 3 feet high to 6 feet wide by 4 feet high; approximately 756 lineal feet of pipe sewers varying in size from 15-inches to 24-inches in diameter; and appurtenances. The purpose of this project is to alleviate overland flooding at multiple properties and to relieve the adjacent sanitary system within the area of the storm sewer improvement. This project is scheduled to be completed in 250 days. FUNDING/COST SUMMARY: Budgeted: Capital Improvement Program Budget Year: FY2016, Pg. 148 Amount: $ 280,000 FY2016, Pg. 149 $ 830,000 $1,110,000 Fund Name: #6660 – Sanitary Replacement Fund $326,000.00 #5566 – Deer Creek OMCI Fund $509,000.00 Additional Comments: An additional contingency of $40,000 for utility relocation (Electric - $10,000, Gas - $10,000, Telephone - $10,000 & Water - $10,000) is included in the appropriation. This appropriation includes $509,000 for storm sewer work. The remaining work on this project is expected to be funded by Bond proceeds. This project was one of nine design projects included in OMCI Stormwater Design (Contract D) (11149). Contracted planning resources utilized: Watershed Facility Planning, Stormwater Facility Planning, Combine Sewer Area I/I Assessment, Separate Sewer Area I/I Assessment, Combine Sewer Area Flow Metering & Monitoring, Modeling, CCTV Inspection, and Radar Rainfall Data. 17 Revised: 10/6/2015 8:32 AM PREVIOUS BOARD ACTION RELATED TO THIS ACTION: 01/10/13 – Ord. No. 13556 – Amount: $546,000 – Heideman & Associates, Inc. – OMCI Stormwater Design (Contract D) (11149) – Design Contract No. 20007 18 Revised: 10/6/2015 8:32 AM AGENDA ITEM NUMBER: Item No 32 Ordinance No 14252 NAME OF PROJECT: University City I/I Reduction – West (11672) LOCATION: North of Olive Boulevard and west of Interstate 170 in the Cities of Olivette, Overland, Creve Coeur, and unincorporated St. Louis County, Missouri TYPE OF PROJECT: Storm Sewer Construction and Private I/I Removal (015.0 Construction Costs) DEPARTMENT REQUESTING ACTION: Engineering REQUESTED ACTION: Why is this action necessary?: Appropriates funds and authorizes staff to enter into a construction contract. What does action accomplish?: Implements the construction of a CIP project, as required by Consent Decree. SUMMARY EXPLANATION/BACKGROUND: Contractor: Fred M. Luth & Sons, Inc. Previous District Contract: Yes 4516 McRee Avenue St. Louis, MO 63110 Consultant: N/A Agency: N/A Number of bidders: 2 Low Bid: $1,068,778.00 High Bid: $1,338,500.00 Appropriation Amount: $1,150,000.00 Designer’s Estimate: $1,222,000.00 Total MWBE Participation: 17.03% (MBE Goal is 17% - African American) B & P Construction, Inc. (African American) – 7.95% - MBE Taylormade Construction Co., LLC (African American) – 9.08% - MBE Type of Contract: Unit Cost Properties Affected: 310 Properties Benefiting: 5,200 Designed by: Burns & McDonnell Engineering Co., Inc. The work to be done under Contract #20314 consists of the construction of approximately 310 lineal feet of pipe sewers varying in size from 12-inches to 15-inches in diameter, the removal of private inflow sources at 282 properties, and appurtenances. The purpose of this project is to reduce inflow/infiltration (I/I) in the University City watershed, reduce building backups, and relieve overcharged sanitary sewers. This project is scheduled to be completed in 550 days. FUNDING/COST SUMMARY: Budgeted: Capital Improvement Program Budget Year: FY2016, Pg. 171 Amount: $ 60,000 FY2016, Pg. 172 $915,000 $975,000 Fund Name: #5584 – University City OMCI Fund $ 90,000.00 #6660 – Sanitary Replacement Fund $1,060,000.00 Additional Comments: An additional contingency of $25,000 for utility relocation (Water - $25,000) is included in the appropriation. This appropriation includes $90,000 for storm sewer work. The remaining work on this project is expected to be funded by Bond proceeds. Contracted planning resources utilized: Watershed Facility Planning, Combine Sewer Area I/I Assessment, Separate Sewer Area Flow Metering & Monitoring, Modeling, CCTV Inspection, and Radar Rainfall Data. 19 Revised: 10/6/2015 8:32 AM PREVIOUS BOARD ACTION RELATED TO THIS ACTION: 08/08/13 – Ord. No. 13697 – Amount: $1,397,000 – Burns & McDonnell Engineering Co., Inc. – Design Contract No. 11003 – Amendment 20 Revised: 10/6/2015 8:32 AM AGENDA ITEM NUMBER: Item No 33 Ordinance No 14253 NAME OF PROJECT: Dacey Branch I/I Reduction (BP-313) (PIR) Storm Sewer (12448) LOCATION: West of Halls Ferry Road and north of Chambers Road in unincorporated St. Louis County, Missouri TYPE OF PROJECT: Storm Sewer Construction, Public and Private I/I Removal (015.0 Construction Costs) DEPARTMENT REQUESTING ACTION: Engineering REQUESTED ACTION: Why is this action necessary?: Authorizes staff to enter into a construction contract. What does action accomplish?: Implements the construction of a CIP project, as required by Consent Decree. SUMMARY EXPLANATION/BACKGROUND: Contractor: Above and Below Contracting, LLC Previous District Contract: Yes 2836 Plattin View Drive Festus, MO 63028 Consultant: N/A Agency: N/A Number of bidders: 2 Low Bid: $144,760.00 High Bid: $170,901.00 Appropriation Amount: N/A Designer’s Estimate: $112,000.00 Total MWBE Participation: 17.27% (MBE Goal is 17% - African American) XL Contracting, Inc. (African American) – 12.43% - MBE R.B. Fence Company (African American) – 1.73% - MBE Taylor Trucking Co., LLC (African American) – 3.11% - MBE Type of Contract: Unit Cost Properties Affected: 2 Properties Benefiting: 2 Designed by: District staff The work to be done under Contract #20329 consists of the construction of approximately 183 lineal feet of pipe sewers 12-inches in diameter, the removal of private inflow sources at 2 properties, and appurtenances. The purpose of this project is to reduce inflow/infiltration (I/I) in the Maline Creek watershed, reduce building backups, relieve overcharged sanitary sewers, and address potential stormwater issues. This project is scheduled to be completed in 90 days. FUNDING/COST SUMMARY: Budgeted: Capital Improvement Program Budget Year: N/A Amount: $1,000,000* FY2016, Pg. 236 $ 400,000** $1,400,000 Fund Name: #6660 – Sanitary Replacement Fund $79,000.00 #5576 – Maline Creek OMCI Fund $91,000.00 Additional Comments: An additional contingency of $10,000 for utility relocation (Other - $10,000) is included in the encumbered amount. The encumbered amount includes $91,000 for storm sewer work. The remaining work on this project is expected to be funded by Bond proceeds. Contracted planning resources utilized: Watershed Facility Planning, Separate Sewer Area I/I Assessment, Separate Sewer Area Flow Metering & Monitoring, Modeling, CCTV Inspection, and Radar Rainfall Data. *Requesting Board approval of an ordinance for which $79,000.00 is being encumbered from Ordinance No. 13486. **Requesting Board approval of an ordinance for which $91,000.00 is being encumbered from Ordinance No. 14210. 21 Revised: 10/6/2015 8:32 AM PREVIOUS BOARD ACTION RELATED TO THIS ACTION: 09/27/12 – Ord. No. 13486 – Amount: $1,000,000 – Private Inflow and Infiltration Reduction Program FY2013) – Project No. (11877) 09/10/15 – Ord. No. 14210 – Amount: $550,000 – Stormwater Infrastructure Repair/Replacement – Maline Creek OMCI (Project No. 12458) – Supplemental 22 Revised: 10/6/2015 8:32 AM AGENDA ITEM NUMBER: Item No 34 Ordinance No 14254 NAME OF PROJECT: Firethorn Drive #1901 Storm Improvements (11216) LOCATION: North of Manchester Road and east of Bopp Road in the City of Des Peres, Missouri TYPE OF PROJECT: Storm Sewer Construction (015.0 Construction Costs) DEPARTMENT REQUESTING ACTION: Engineering REQUESTED ACTION: Why is this action necessary?: Appropriates funds and authorizes staff to enter into a construction contract. What does action accomplish?: Implements the construction of a CIP project. SUMMARY EXPLANATION/BACKGROUND: Contractor: Above and Below Contracting, LLC Previous District Contract: Yes 2836 Plattin View Drive Festus, MO 63028 Consultant: N/A Agency: N/A Number of bidders: 4 Low Bid: $159,704.00 High Bid: $215,695.00 Appropriation Amount: $195,000.00 Designer’s Estimate: $86,000.00 Total MWBE Participation: 17.00% (MBE Goal is 17% - African American) Taylor Trucking Co., LLC (African American) – 4.26% - MBE Supplied Industrial Solutions, Inc. (African American) – 4.88% - MBE Crusade Construction, LLC (African American) – 7.86% - MBE Type of Contract: Unit Cost Properties Affected: 6 Properties Benefiting: 9 Designed by: Cole & Associates, Inc. The work to be done under Contract #20315 consists of the construction of approximately 415 lineal feet of pipe sewers varying in size from 6-inches to 12-inches in diameter and appurtenances. The purpose of this project is to alleviate yard and structure flooding near homes in the Firethorn Drive area. This project is scheduled to be completed in 180 days. FUNDING/COST SUMMARY: Budgeted: Capital Improvement Program Budget Year: FY2016, Continued Amount: $180,000 Fund Name: #5566 – Deer Creek OMCI Fund Additional Comments: An additional contingency of $17,000 for utility relocation (Gas - $17,000) is included in the appropriation. This project was one of eleven design projects included in OMCI Stormwater Design (Contract C) (11148). The scope of the project was originally increased to extend stormwater improvements. The final project scope and engineer’s estimate was reduced due to a homeowner refusal to grant an easement. The project was delayed due to increased time required for easement acquisitions. Contracted planning resources utilized: Stormwater Facility Planning. PREVIOUS BOARD ACTION RELATED TO THIS ACTION: 01/10/13 – Ord. No. 13555 – Amount: $594,000 – Cole & Associates, Inc. – OMCI Stormwater Design (Contract C) (11148) – Design Contract No. 20006 23 Revised: 10/6/2015 8:32 AM AGENDA ITEM NUMBER: Item No 35 Ordinance No 14255 NAME OF PROJECT: Emergency Repair #052 (Chesterfield Commons Pump Station No. 4, P-810) (12669) LOCATION: 17369 Chesterfield Airport Road in the City of Chesterfield, Missouri TYPE OF PROJECT: Emergency Repair (015.0 Construction Costs) DEPARTMENT REQUESTING ACTION: Operations REQUESTED ACTION: Why is this action necessary?: Appropriates additional funds. What does action accomplish?: Provides additional funding for the restoration of reliable sewer service and repairs existing pipe. SUMMARY EXPLANATION/BACKGROUND: Contractor: Fred M. Luth & Sons, Inc. Previous District Contract: Yes 4516 McRee Avenue St. Louis, MO 63110 Consultant: N/A Agency: N/A Number of bidders: N/A Low Bid: N/A High Bid: N/A Appropriation Amount: $800,000.00 Designer’s Estimate: N/A MBE/WBE Participation: N/A Type of Contract: Force Account (Time & Materials) Properties Affected: None Properties Benefiting: Numerous Designed by: District staff The work done under the emergency Contract #20323 consists of the dewatering, excavation and repair of approximately 150 feet of 8-inch sanitary sewer pipe and repair of the damaged Chesterfield Commons Pump Station No. 4. District staff declared this project an emergency on July 24, 2015. The contractor, Fred M. Luth & Sons has been selected per MSD Emergency Declaration Policy. The repair has started and is expected to be complete by November 15, 2015. FUNDING/COST SUMMARY: Budgeted: N/A Budget Year: N/A Amount: N/A Fund Name: #4122 – Wastewater Emergency Fund Additional Comments: An emergency declaration was made on July 24, 2015. The estimated cost of $500,000 includes construction costs to dewater, excavate, and repair approximately 150 feet of 8-inch sanitary sewer pipe and make repairs to the damaged Chesterfield Commons Pump Station No. 4. The contractor is encouraged to employ MWBE firms to the extent practical. Further investigation revealed damage has occurred to the pump station mechanical system and pumps. During excavation, it was determined the subgrade of the pump station and the sanitary manhole needed stabilization work beyond what was initially expected. This additional work has extended the bypass and dewatering pump time periods incurring increased costs beyond the initial estimate. This supplemental appropriation will fund these additional costs not known at the time of the initial assessment of the pump station. PREVIOUS BOARD ACTION RELATED TO THIS ACTION: 08/13/15 – Ord. No. 14224 – Amount: $500,000 – Emergency Repair #052 (Chesterfield Commons Pump Station No. 4, P-810) (12669) – Original Contract No. 20323 24 Revised: 10/6/2015 8:32 AM AGENDA ITEM NUMBER: Item No 36 Ordinance No 14256 NAME OF PROJECT: OMCI Stormwater Design (Contract A) (11129) LOCATION: Various locations within the Deer Creek Watershed TYPE OF PROJECT: Design of Storm Sewers (016.0 Professional Services) DEPARTMENT REQUESTING ACTION: Engineering REQUESTED ACTION: Why is this action necessary?: Appropriates additional funds and authorizes staff to amend a design contract. What does action accomplish?: Provides additional funds for the design of a CIP project. SUMMARY EXPLANATION/BACKGROUND: Contractor: N/A Previous District Contract: Yes Consultant: Reitz & Jens Inc. 1055 Corporate Square Dr. St. Louis, MO 63132 Corporate Headquarters – St. Louis, Missouri Number of proposers: N/A Appropriation Amount: $150,000.00 Designer’s Estimate: N/A Total MWBE Participation: 36.30% (Overall – 38.10%) (MWBE Goal is 30%) Access Engineering, LLC – 12.20% - WBE (This Amendment – 13.20%) Gonzalez Companies, LLC (Hispanic) – 3.20% - MBE (This Amendment – 2.60%) M3 Engineering Group, PC (African American) – 7.00% - MBE (This Amendment – 5.70%) Pangea Engineering & Surv., LLC (Hispanic) – 13.90% - MBE (This Amendment – 16.60%) Type of Contract: Lump Sum Properties Affected: 42 Properties Benefiting: 26 Designed by: N/A This ordinance authorizes the District to enter into Amendment No. 3 to Contract #20004 with Reitz & Jens Inc. This project consists of the design and preparation of construction documents for multiple stormwater improvements in the Deer Creek watershed. This design contract consists of seven (7) channel protection and stabilization projects at different locations utilizing rock walls, modular block walls, composite revetment, and bank stabilization. This project includes coordination with the Deer Creek Watershed Alliance where biostabilization might be a feasible alternative. The existing design appropriation was depleted due to multiple scope expansions and modifications throughout the design process. There is not adequate funding for construction phase services for the projects. This contract is for a total maximum contract amount of $714,092.00. Construction is scheduled over several years and has commenced on several projects. This amendment provides for Construction Phase Services (CPS) for the six projects in OMCI Stormwater Design (Contract A). Specific project lump sum design appropriations totaling $150,000 include the following: 25 Revised: 10/6/2015 8:32 AM Project No. Project Name Design Appropriation 11003 Hermitage Hills Bank Stabilization (Frontenac 3-1) (CPS) $ 20,204.00 11222 Tealwood Drive and Beaver Drive Bank Stabilization (CPS) $ 21,243.00 11223 Glen Rd #35 Bank Stabilization (CPS) $ 7,979.00 11196 Picardy Lane Subdivision Bank Stabilization (CPS) $ 18,525.00 10348 Conway – Clerbrook Storm Channel (CPS) $ 42,840.00 (combined with 10306 Lindbergh – Clerbrook Storm Channel) 11196 Picardy Lane Subdivision Bank Stabilization (Design Revisions) $ 22,607.00 Contingency $ 16,602.00 Total $150,000.00 FUNDING/COST SUMMARY: Budgeted: Capital Improvement Program Budget Year: FY2013, Pg. 150 Amount: $500,000 Fund Name: #5566 – Deer Creek OMCI Fund Additional Comments: Construction phase services include construction field surveys, review of shop drawings and submittals, responding to design questions and changes during construction, as-built surveys, and preparation of as-built record drawings. Contracted planning resources utilized: Watershed Facility Planning and Stormwater Facility Planning. PREVIOUS BOARD ACTION RELATED TO THIS ACTION: 01/10/13 – Ord. No. 13553 – Amount: $581,000 – Reitz & Jens, Inc. – OMCI Stormwater Design (Contract A) (11129) – Original Design Contract No. 20004 26 Revised: 10/6/2015 8:32 AM AGENDA ITEM NUMBER: Item No 37 Ordinance No 14257 NAME OF PROJECT: General Services Agreement – Facility & Sewer Design (2016) (11760) LOCATION: Various Locations within the District TYPE OF PROJECT: General Engineering Services (011.0 Design Phase Project Costs) DEPARTMENT REQUESTING ACTION: Engineering REQUESTED ACTION: Why is this action necessary?: Appropriates funds and authorizes staff to enter into a design contract. What does action accomplish?: Implements the design of small capital improvements and Operations projects, as required by Consent Decree. SUMMARY EXPLANATION/BACKGROUND: Contractor: N/A Previous District Contract: Yes Consultant: Tetra Tech, Inc. 938 South Highway Drive Fenton, MO 63026 Corporate Headquarters: Pasadena, California Agency: N/A Number of proposers: (3) George Butler Associates, Inc.; Horner & Shifrin, Inc.; and Tetra Tech, Inc. Appropriation Amount: $300,000.00 Designer’s Estimate: N/A Total MWBE Participation: 25.00% (No MWBE Goal) EFK Moen, LLC – 10.00% - WBE TREKK Design Group, LLC – 10.00% - WBE Custom Engineering, Inc. (African American) – 5.00% - MBE Type of Contract: Hourly Billing Rate Plus Reimbursables Properties Affected: To be determined Properties Benefitting: To be determined Designed by: N/A This ordinance authorizes the District to enter into Contract #20350 for one (1) year with one option year with Tetra Tech, Inc. for the design of various projects in the CIP and the Operations budgets. This project consists of the design of small sanitary, combined, storm sewer, and treatment plant projects as needed throughout the District in support of an ongoing internal design effort. This contract is for a total maximum contract amount of $300,000. Projects will be issued by letter agreement per individual scopes of services. FUNDING/COST SUMMARY: Budgeted: Capital Improvement Program Budget Year: FY2016, Pg. 38 Amount: $300,000 Fund Name: #6660 – Sanitary Replacement Fund Additional Comments: There were two (2) other proposals considered on this project. The appropriation for design services is equal to the proposed funding presented in the CIP Budget Supplement. There is $30,000 provided for non- capital studies that may be required. Contracted planning resources utilized: None. PREVIOUS BOARD ACTION RELATED TO THIS ACTION: N/A 27 Revised: 10/6/2015 8:32 AM AGENDA ITEM NUMBER: Item No 38 Ordinance No 14258 NAME OF PROJECT: Natural Bridge Rd – Darby to Chevrolet Combined Sewer Relief (12536) LOCATION: West of Goodfellow at Natural Bridge Road in the City of St. Louis, Missouri TYPE OF PROJECT: Design of Combined Sewers (011.0 Design Phase Project Costs) DEPARTMENT REQUESTING ACTION: Engineering REQUESTED ACTION: Why is this action necessary?: Appropriates funds and authorizes staff to enter into a design contract. What does action accomplish?: Implements the design of a CIP project, as required by Consent Decree. SUMMARY EXPLANATION/BACKGROUND: Contractor: N/A Previous District Contract: Yes Consultant: Access Engineering, LLC 11820 Tesson Ferry Rd., Suite 203 St. Louis, MO 63128 Corporate Headquarters: St. Louis, Missouri Agency: N/A Number of proposers: (3) Access Engineering, LLC; Cole & Associates, Inc.; Heideman & Associates, Inc. Appropriation Amount: $200,000.00 Designer’s Estimate: N/A Total MWBE Participation: 100.00% (No MWBE Goal) Tech Service, Inc. (African American) – 7.83% - MBE Access Engineering, LLC – 92.17% - WBE Type of Contract: Lump Sum Properties Affected: 7 Properties Benefitting: 11 Designed by: N/A This ordinance authorizes the District to enter into Contract #20351 with Access Engineering, LLC for the design of Natural Bridge Rd – Darby to Chevrolet Combined Sewer Relief (12536). The contract consists of the design of approximately 1,100 lineal feet of 54-inch combined sewer and replace 10 single inlets with double inlets. The purpose of this project is to alleviate overcharged sewer mains resulting in building and overland flooding. The preliminary construction cost estimate is $950,000. Construction is anticipated to begin in FY2018. FUNDING/COST SUMMARY: Budgeted: Capital Improvement Program Budget Year: FY2016, Pg. 69 Amount: $200,000 Fund Name: #6660 – Sanitary Replacement Fund Additional Comments: There were two (2) other proposals considered on this project. The appropriation for design services is equal to the proposed funding presented in the CIP Budget Supplement. The appropriation includes $22,000 for construction phase services. These services include construction field surveys, review of shop drawings and submittals, responding to design questions and changes during construction, as-built surveys, and preparation of as-built record drawings. This project is expected to be funded by Bond proceeds. Contracted planning resources utilized: Watershed Facility Planning, Combine Sewer Area I/I Assessment, Combine Sewer Area Flow Metering & Monitoring, Modeling, CCTV Inspection, and Radar Rainfall Data. PREVIOUS BOARD ACTION RELATED TO THIS ACTION: N/A 28 Revised: 10/6/2015 8:32 AM AGENDA ITEM NUMBER: Item No 39 Ordinance No 14259 NAME OF PROJECT: Cottage #206 Storm Improvements (10302) LOCATION: South of Interstate 44 and west of Laclede Station in the City of Webster Groves, Missouri TYPE OF PROJECT: Design of Storm Sewers (011.0 Design Phase Project Costs) DEPARTMENT REQUESTING ACTION: Engineering REQUESTED ACTION: Why is this action necessary?: Appropriates funds and authorizes staff to enter into a design contract. What does action accomplish?: Implements the design of a CIP project. SUMMARY EXPLANATION/BACKGROUND: Contractor: N/A Previous District Contract: Yes Consultant: Stantec Consulting Services Inc. 1859 Bowles Ave., Suite 250 Fenton, MO 63026 Corporate Headquarters: Rochester, New York & Edmonton, Alberta, Canada (Parent Co.) Agency: N/A Number of proposers: (5) HR Green, Inc.; Reitz & Jens Inc.; Stantec Consulting Services Inc.; Stock & Associates Consulting Engineers, Inc.; and Williams Creek Consulting Inc. Appropriation Amount: $114,000.00 Designer’s Estimate: N/A Total MWBE Participation: 30.87% (No MWBE Goal) Civil Design, Inc. – 20.02% - WBE Hart Engineering, LLC – 7.99% - WBE Tech Service, Inc. (African American) – 2.86% - MBE Type of Contract: Lump Sum Properties Affected: 13 Properties Benefitting: 3 Designed by: N/A This ordinance authorizes the District to enter into Contract #20352 with Stantec Consulting Services Inc. for the design of Cottage #206 Storm Improvements (10302). The contract consists of the design of 600 lineal feet of 4-foot wide trapezoidal concrete channel. The purpose of this project is to alleviate channel erosion along an existing improved channel. The preliminary construction cost estimate is $330,000. Construction is anticipated to begin in FY2018. FUNDING/COST SUMMARY: Budgeted: Capital Improvement Program Budget Year: FY2016, Pg. 208 Amount: $120,000 Fund Name: #5593 – Seminary Branch of River Des Peres OMCI Fund Additional Comments: There were four (4) other proposals considered on this project. The appropriation for design services is $6,000 below the proposed funding presented in the CIP Budget Supplement. The appropriation includes $13,000 for construction phase services. These services include construction field surveys, review of shop drawings and submittals, responding to design questions and changes during construction, as-built surveys, and preparation of as-built record drawings. Contracted planning resources utilized: Stormwater Facility Planning. PREVIOUS BOARD ACTION RELATED TO THIS ACTION: N/A 29 Revised: 10/6/2015 8:32 AM AGENDA ITEM NUMBER: Item No 40 Ordinance No 14260 NAME OF PROJECT: Deer Creek OMCI Stormwater Design (Contract A) (12461) LOCATION: Various locations within the Deer Creek Watershed TYPE OF PROJECT: Design of Storm Sewers (011.0 Design Phase Project Costs) DEPARTMENT REQUESTING ACTION: Engineering REQUESTED ACTION: Why is this action necessary?: Appropriates funds and authorizes staff to enter into a design contract. What does action accomplish?: Implements the design of a CIP project. SUMMARY EXPLANATION/BACKGROUND: Contractor: N/A Previous District Contract: Yes Consultant: CDG Engineers, Inc. One Campbell Plaza St. Louis, MO 63139 Corporate Headquarters: St. Louis, Missouri Agency: N/A Number of proposers: (3) CDG Engineers, Inc.; CMV – Cochran, LLC; and EFK Moen, LLC Appropriation Amount: $265,000.00 Designer’s Estimate: N/A Total MWBE Participation: 34.69% (No MWBE Goal) Gateway Land Services, Inc. – 28.12% - WBE Tech Service, Inc. (African American) – 6.57% - MBE Type of Contract: Lump Sum Properties Affected: 27 Properties Benefitting: 32 Designed by: N/A This ordinance authorizes the District to enter into Contract #20353 with CDG Engineers, Inc. for the design of all projects included in the Deer Creek OMCI Stormwater Design (Contract A) (12461). The contract consists of the design of two (2) storm sewer improvement projects at different locations totaling approximately 3,080 lineal feet of storm sewers 12-inches to 48-inches in diameter, and appurtenances. The purpose of this project is to reduce basement flooding, yard flooding, and street flooding. The preliminary construction cost estimate is $1,130,000. Construction is scheduled over two years with the first project anticipated to begin in FY2018. FUNDING/COST SUMMARY: Budgeted: Capital Improvement Program Budget Year: FY2016, Pg. 209 Amount: $350,000 Fund Name: #5566 – Deer Creek OMCI Fund Additional Comments: There were two (2) other proposals considered on this project. The appropriation for design services is $85,000 below the proposed funding presented in the CIP Budget Supplement. The appropriation includes $27,000 for construction phase services. These services include construction field surveys, review of shop drawings and submittals, responding to design questions and changes during construction, as-built surveys, and preparation of as-built record drawings. Contracted planning resources utilized: Stormwater Facility Planning. PREVIOUS BOARD ACTION RELATED TO THIS ACTION: N/A 30 Revised: 10/6/2015 8:32 AM AGENDA ITEM NUMBER: Item No 41 Ordinance No 14261 NAME OF PROJECT: Hudson Rd. #1401 - #1405 Bank Stabilization (MCDW-120) (10020) LOCATION: South of Interstate 270 and west of West Florissant in the City of Ferguson, Missouri TYPE OF PROJECT: Design of Storm Sewers (011.0 Design Phase Project Costs) DEPARTMENT REQUESTING ACTION: Engineering REQUESTED ACTION: Why is this action necessary?: Appropriates funds and authorizes staff to enter into a design contract. What does action accomplish?: Implements the design of a CIP project. SUMMARY EXPLANATION/BACKGROUND: Contractor: N/A Previous District Contract: Yes Consultant: HR Green, Inc. 16020 Swingley Ridge Rd., Suite 205 Chesterfield, MO 63017 Corporate Headquarters: Cedar Rapids, Iowa Agency: N/A Number of proposers: (5) HR Green, Inc.; Reitz & Jens Inc.; Stantec Consulting Services Inc.; Stock & Associates Consulting Engineers, Inc.; and Williams Creek Consulting Inc. Appropriation Amount: $195,000.00 Designer’s Estimate: N/A Total MWBE Participation: 16.69% (No MWBE Goal) Sabur, Inc. (African American) – 16.69% - MBE Type of Contract: Lump Sum Properties Affected: 10 Properties Benefitting: 10 Designed by: N/A This ordinance authorizes the District to enter into Contract #20354 with HR Green, Inc. for the design of Hudson Rd. #1401 - #1405 Bank Stabilization (MCDW -120) (10020). The contract consists of the design of approximately 280 feet of modular block wall, 365 feet of biostabilized bank, 55 feet of heavy stone revetment, and appurtenances. The purpose of this project is to alleviate stream bank erosion occurring along a reach of Dellwood Creek upstream of the Hudson Road culvert in the Maline Creek watershed. The preliminary construction cost estimate is $623,000. Construction is anticipated to begin in FY2018. FUNDING/COST SUMMARY: Budgeted: Capital Improvement Program Budget Year: FY2016, Pg. 210 Amount: $250,000 Fund Name: #5576 – Maline Creek OMCI Fund Additional Comments: There were four (4) other proposals considered on this project. The appropriation for design services is $55,000 below the proposed funding presented in the CIP Budget Supplement. The appropriation includes $19,000 for construction phase services. These services include construction field surveys, review of shop drawings and submittals, responding to design questions and changes during construction, as-built surveys, and preparation of as-built record drawings. Contracted planning resources utilized: Stormwater Facility Planning. PREVIOUS BOARD ACTION RELATED TO THIS ACTION: N/A 31 Revised: 10/6/2015 8:32 AM AGENDA ITEM NUMBER: Item No 42 Ordinance No 14262 NAME OF PROJECT: Rosewood Lane & Woodard Dr. Storm Sewer (10347) LOCATION: North of Interstate 44 and west of South Geyer Road in the City of Kirkwood, Missouri TYPE OF PROJECT: Design of Storm Sewers (011.0 Design Phase Project Costs) DEPARTMENT REQUESTING ACTION: Engineering REQUESTED ACTION: Why is this action necessary?: Appropriates funds and authorizes staff to enter into a design contract. What does action accomplish?: Implements the design of a CIP project. SUMMARY EXPLANATION/BACKGROUND: Contractor: N/A Previous District Contract: Yes Consultant: Oates Associates, Inc. 720 Olive, Suite 700 St. Louis, MO 63101 Corporate Headquarters: Collinsville, Illinois Agency: N/A Number of proposers: (5) EDM Incorporated; Hart Engineering, LLC; Oates Associates, Inc.; RJN Group, Inc.; and TREKK Design Group, LLC Appropriation Amount: $215,000.00 Designer’s Estimate: N/A Total MWBE Participation: 37.14% (No MWBE Goal) Engineering Design Source, Inc. (Asian American) – 31.20% - MBE Tech Service, Inc. (African American) – 5.94% - MBE Type of Contract: Lump Sum Properties Affected: 30 Properties Benefitting: 5 Designed by: N/A This ordinance authorizes the District to enter into Contract #20355 with Oates Associates, Inc. for the design of Rosewood Lane & Woodard Dr. Storm Sewer (10347). The contract consists of the design of 1,835 lineal feet of 12-inch to 33-inch diameter storm sewer. The purpose of this project is to alleviate street and yard flooding along Rosewood Lane and Woodard Drive. The preliminary construction cost estimate is $654,000. Construction is anticipated to begin in FY2018. FUNDING/COST SUMMARY: Budgeted: Capital Improvement Program Budget Year: FY2016, Pg. 211 Amount: $230,000 Fund Name: #5583 – Sugar Creek OMCI Fund Additional Comments: There were four (4) other proposals considered on this project. The appropriation for design services is $15,000 below the proposed funding presented in the CIP Budget Supplement. The appropriation includes $25,000 for construction phase services. These services include construction field surveys, review of shop drawings and submittals, responding to design questions and changes during construction, as-built surveys, and preparation of as-built record drawings. Contracted planning resources utilized: Stormwater Facility Planning. PREVIOUS BOARD ACTION RELATED TO THIS ACTION: N/A 32 Revised: 10/6/2015 8:32 AM AGENDA ITEM NUMBER: Item No 43 Proposed Ord. No. 14263 NAME OF PROJECT: Data Center Colocation LOCATION: District-wide TYPE OF PROJECT: Data Center Infrastructure Colocation Services DEPARTMENT REQUESTING ACTION: Information Systems REQUESTED ACTION: Why is this action necessary?: Appropriates funds for data center colocation services What does action accomplish?: Transitions the District’s mission critical data center infrastructure computing operation from its current physical location to a data center colocation facility SUMMARY EXPLANATION/BACKGROUND: Contractor: N/A Previous District Contract: Yes Consultant: N/A Agency: N/A Number of bidders: N/A Low Bid: N/A High Bid: N/A Appropriation Amount: $1,500,000.00 Designer’s Estimate: N/A Total MBE/WBE Participation: As appropriate for individual MSD project expenditures Type of Contract: N/A Properties Affected: N/A Properties Benefiting: N/A In support of the District’s FY2016 Strategic Business Plan objective to “Enhance Reliability of Information Technology Infrastructure”, the District proposes to move its current computing operation to a colocation data center provider. The purpose of this project is to improve the resiliency and sustainability of the current data center operation given the need for critical business operations to support the District’s stakeholders on a 7/24/365 basis. Individual expenditure items required to accomplish this project are outlined below; these items will be procured in accordance with the District’s Purchasing Ordinance including the requirement to bring each item to the Board for approval. The first such item will be presented to the Board immediately follow this appropriation. Type of Project Expenditure Expenditure Item Projected Cost Intergovernmental Agreement Colocation Services Annual Fee – Year 1 (FY16) $190,000.00 Equipment Network and Storage Hardware $485,000.00 Professional Services Network Implementation and Storage Upgrade $75,000.00 Moving Services Hardware Move and Specialty Vendor Installation $75,000.00 Temporary Help Project Management, Application Technical Support $250,000.00 Contingency Unplanned $425,000.00 TOTAL $1,500,000.00 FUNDING/COST SUMMARY: Budgeted: Capital Improvement Program Budget Year: FY2016 Amount: $1,500,000.00 Fund Name: #1101 - General Fund Additional Comments: None PREVIOUS BOARD ACTION RELATED TO THIS ACTION: None 33 Revised: 10/6/2015 8:32 AM AGENDA ITEM NUMBER: Item No 44 Ordinance No 14264 NAME OF PROJECT: Data Center Colocation - Intergovernmental Agreement with Regional Justice Information Service Commission (REJIS) LOCATION: District-wide TYPE OF PROJECT: Data Center Computing Colocation Services DEPARTMENT REQUESTING ACTION: Information Systems REQUESTED ACTION: Why is this action necessary?: Authorizes staff to enter into an Intergovernmental Agreement with the Regional Justice Information Service Commission (REJIS) for the provision of data center colocation services. What does action accomplish?: Memorializes an agreement between the entities such that REJIS will provide and operate a data center facility for the colocation of the District’s current mission critical computing operation. SUMMARY EXPLANATION/BACKGROUND: Contractor: N/A Previous District Contract: Yes Consultant: N/A Agency: Regional Justice Information Service Commission (REJIS) 4255 West Pine Boulevard St. Louis MO 63108 Number of bidders: N/A Appropriation Amount: N/A Designer’s Estimate: N/A Total MBE/WBE Participation: N/A (There are no goals) Type of Contract: Intergovernmental Agreement Properties Affected: N/A Properties Benefiting: N/A Properties Affected: N/A FUNDING/COST SUMMARY: Budgeted: Capital Improvement Program Budget Year: FY2016 Amount: $1,500,000.00* Fund Name: #1101 - General Fund Additional Comments: This ordinance authorizes the District to enter into an Intergovernmental Agreement with Regional Justice Information Service Commission for data center colocation services. The Intergovernmental Agreement memorializes that the entities agree that REJIS will provide transition services and ongoing hosting and operation of the District’s computing infrastructure in accordance with established service level agreements for an initial term of one-year with four one-year annual renewals. PREVIOUS BOARD ACTION RELATED TO THIS ACTION: 10/8/2015 - Proposed Ordinance No. 14263 - Amount: $1,500,000 – Data Center Colocation *Requesting Board approval of an ordinance for which $190,000.00 is being encumbered from Proposed Ordinance No. 14263 34 Revised: 10/6/2015 8:32 AM AGENDA ITEM NUMBER: Item No 47 Resolution No. 3238 NAME OF PROJECT: CBA Independent Third Party Monitoring Consultant Services LOCATION: District-wide TYPE OF PROJECT: Community Benefits Agreement project DEPARTMENT REQUESTING ACTION: Human Resources – Diversity REQUESTED ACTION: Why is this action necessary?: To execute a one-year contract extension in accordance with Section IX.C. of the Community Benefits Agreement for an Independent Third Party Monitoring Consultant. What does action accomplish?: Execution of this extension will allow the District to continue under contract with Kwame Building Group, Inc. to perform third party district monitoring activities not covered by district’s diversity staff and to consult and report to CBA signatories on compliance of CBA activities. SUMMARY EXPLANATION/BACKGROUND: Contractor: N/A Previous District Contract: Yes Consultants: KWAME Building Group, Inc.\ 1204 Washington Ave., Ste. 200 St. Louis, Missouri 63103 Agency: N/A Number of bidders: N/A Low Bid: N/A High Bid: N/A Appropriation Amount: N/A District Estimate: N/A MBE/WBE Participation: There are no MWBE goal requirements for Non-Professional Services. This contract does not exceed the threshold for workforce requirements. Plan Approval Date: N/A Type of Contract: Contractual Services Properties Affected: N/A Properties Benefiting: N/A Designed by: FUNDING/COST SUMMARY: Budgeted: Yes Budget Year: 2015/16 Amount: $150,000 Fund Name: General Fund Additional Comments: This is to execute the first option year of the contract with KWAME, which satisfies Section IX.C. of the Community Benefits Agreement to provide independent third party monitoring consultant activities not currently covered by the district’s diversity staff and provides for consultant to report to CBA signatories on compliance of CBA activities through the end of fiscal year 2016. This resolution will exercise a one-year extension of the agreement and authorizes the District to continue under a contract with KWAME Building Group. PREVIOUS BOARD ACTION RELATED TO THIS ACTION: 10/09/2014 - Ordinance No. 13973: Authorized original contract with Kwame 35 Revised: 10/6/2015 8:32 AM AGENDA ITEM NUMBER: Item No 48 Resolution No. 3239 NAME OF PROJECT: CBA Job Training Program Services LOCATION: District-wide TYPE OF PROJECT: Community Benefits Agreement project DEPARTMENT REQUESTING ACTION: Human Resources – Diversity REQUESTED ACTION: Why is this action necessary?: To execute a one-year contract extension in accordance with Section IV of the Community Benefits Agreement (CBA) for a Job Training Program. What does action accomplish?: Execution of this extension will allow the District to continue performance under its contract with SLATE for a one-year period to continue implantation of a sewer construction occupational training program for low income, unemployed and underemployed applicants within MSD’s service area to work on MSD capital projects. SUMMARY EXPLANATION/BACKGROUND: Contractor: N/A Previous District Contract: Yes Consultants: St. Louis Agency on Training and Employment (SLATE) 1520 Market Street, 3rd Floor St. Louis, Missouri 63103 Agency: N/A Number of bidders: N/A Low Bid: N/A High Bid: N/A Appropriation Amount: N/A District Estimate: N/A MBE/WBE Participation: There are no MWBE goal requirements for Non-Professional Services. This contract does not exceed the threshold for workforce requirements. Plan Approval Date: N/A Type of Contract: Contractual Services Properties Affected: N/A Properties Benefiting: N/A Designed by: FUNDING/COST SUMMARY: Budgeted: Yes Budget Year: 2015/16 Amount: $150,000 Fund Name: General Fund Additional Comments This Agreement allows the District to continue performance under its contract with SLATE for a one-year period for administration of a sewer construction occupational training program for low income, unemployed and underemployed applicants within MSD’s service area to work on MSD capital projects. This resolution will exercise a one-year extension of the agreement and authorizes the District to continue under a contract with the St. Louis Agency of Training and Employment (SLATE). PREVIOUS BOARD ACTION RELATED TO THIS ACTION: 10/09/2014 - Ordinance No. 13974: Authorized original contract with SLATE 36 Revised: 10/6/2015 8:32 AM AGENDA ITEM NUMBER: Item No 49 Resolution No. 3240 NAME OF PROJECT: CBA First Source Hiring Program for Construction LOCATION: District-wide TYPE OF PROJECT: Community Benefits Agreement project DEPARTMENT REQUESTING ACTION: Human Resources – Diversity REQUESTED ACTION: Why is this action necessary?: To execute a one-year contract extension in accordance with Section V of the Community Benefits Agreement for the St. Louis Agency on Training and Employment (SLATE), a governmental agency, to administer the First Source Hiring Program. What does action accomplish?: Execution of this extension will allow the District to continue performance under its contract with Slate for a one year period for administration of the First Source Hiring Program to source unemployed and under employed applicants in the District’s service area to work on capital projects as outlined in the proposed Community Benefits Agreement. In addition, Slate will provide outreach and tracking of applicants hired within the service area. SUMMARY EXPLANATION/BACKGROUND: Contractor: N/A Previous District Contract: Yes Consultants: SLATE - Missouri Career Center Agency: N/A 1520 Market Street, 3rd Floor St. Louis, Missouri 63103 Number of bidders: N/A Low Bid: N/A High Bid: N/A Appropriation Amount: N/A District Estimate: N/A MBE/WBE Participation: There are no MWBE goal requirements for Non-Professional Services. This contract does not exceed the threshold for workforce requirements. Plan Approval Date: N/A Type of Contract: Contractual Services Properties Affected: N/A Properties Benefiting: N/A Designed by: FUNDING/COST SUMMARY: Budgeted: Yes Budget Year: 2015/16 Amount: $200,000 Fund Name: General Fund Additional Comments: This Agreement allows the District to continue performance under its contract with Slate for a one year period for administration of the First Source Hiring Program to source unemployed and under employed applicants in the District’s service area to work on MSD capital projects as outlined in the proposed Community Benefits Agreement. In addition, Slate will provide outreach and tracking of applicants hired within the MSD service area. This resolution will exercise a one-year extension of the agreement and authorizes the District to continue under a contract with the St. Louis Agency on Training and Employment (SLATE). PREVIOUS BOARD ACTION RELATED TO THIS ACTION: 01/08/2015 - Resolution No. 3186: Renews contract with SLATE 10/10/2013 - Ordinance No. 13730: Authorized original contract with SLATE 37 Revised: 10/6/2015 8:32 AM AGENDA ITEM NUMBER: Item No 50 Resolution No. 3241 NAME OF PROJECT: Acceptance of Rate Commission Report dated July 20, 2015 LOCATION: District-wide TYPE OF PROJECT: N/A DEPARTMENT REQUESTING ACTION: Board of Trustees REQUESTED ACTION: Why is this action necessary?: Pursuant to Section 7.300 of the District’s Charter, the Board is asked to accept or reject the Rate Commission Recommendation Report What does action accomplish?: This Resolution formally acknowledges the Board of Trustees acceptance of the Rate Commission Recommendation Report dated July 30, 2015 SUMMARY EXPLANATION/BACKGROUND: Contractor: N/A Previous District Contract: N/A Consultant: N/A Agency: N/A Number of bidders: N/A Low Bid: N/A High Bid: N/A Appropriation Amount: N/A Districts Estimate: N/A MBE/WBE Participation: Plan Approval Date: N/A Type of Contract: N/A Properties Affected: N/A Properties Benefiting: N/A Designed by: N/A FUNDING/COST SUMMARY: Budgeted: N/A Budget: N/A Amount: N/A Fund Name: Additional Comments: Staff has calculated that acceptance of the Rate Commission’s recommendation would result in a decrease in proposed revenues of approximately $10 million over the four year rate cycle from Fiscal Year 2017 through Fiscal Year 2020. PREVIOUS BOARD ACTION RELATED TO THIS ACTION: