HomeMy Public PortalAbout1582nd Board Agenda 9-15-2016 Pg 1 revised - 9/14/16 Revised: 9/14/2016 9:26 AM AGENDA 1582nd MEETING OF THE BOARD OF TRUSTEES THE METROPOLITAN ST. LOUIS SEWER DISTRICT September 15, 2016 4:00 P.M. ROLL CALL & CLOSED SESSION 5:00 P.M. PUBLIC BOARD MEETING MSD OFFICES 2350 MARKET STREET ROOM 109 1 ROLL CALL 2. CLOSED SESSION TO DISCUSS LEGAL, CONFIDENTIAL OR PRIVILEGED MATTERS UNDER § 610.021(1) AND LEASING, PURCHASE OR SALE OF REAL ESTATE UNDER § 610.021(2), RSMO 1988 SUPP. 3. APPROVAL OF JOURNAL OF PRECEDING MEETING: August 11, 2016 (1581st) 4 COMMENTS BY THE CHAIR 5 REPORT OF BOARD COMMITTEES - All 6 REPORT OF EXECUTIVE DIRECTOR - Yes 7 COMMENTS FROM THE PUBLIC 8 SUBMISSION OF PUBLIC HEARING REPORTS – None 9 COMMUNICATIONS - None 10 CONSENT AGENDA – 11 through 35 Pg 2 revised - 9/14/16 Revised: 9/14/2016 9:26 AM CONSENT AGENDA ORDINANCES 11 Adoption of Proposed Ordinance 14473 - Woodsmill Sanitary Relief (SKME-020) (10237) Making a supplemental appropriation of Two Million Dollars ($2,000,000.00) from the Sanitary Replacement Fund to be used for sanitary sewer construction in Woodsmill Sanitary Relief (SKME-020) (10237) in the Cities of Town & Country and Chesterfield, Missouri. 12 Adoption of Proposed Ordinance 14475 - CSO Volume Reduction Green Infrastructure – Lafayette Preparatory Academy (12770) Authorizing the Executive Director and Secretary-Treasurer on behalf of The Metropolitan St. Louis Sewer District to enter into an agreement with UIC, Inc. for cost sharing in CSO Volume Reduction Green Infrastructure – Lafayette Preparatory Academy (12770) in the City of St. Louis, Missouri. 13 Adoption of Proposed Ordinance 14476 - CSO Volume Reduction Green Infrastructure – M&H Properties Parking Lot Rehabilitation (12768) Authorizing the Executive Director and Secretary-Treasurer on behalf of The Metropolitan St. Louis Sewer District to enter into an agreement with M&H Properties for cost sharing in CSO Volume Reduction Green Infrastructure – M&H Properties Parking Lot Rehabilitation (12768) in the City of St. Louis, Missouri. 14 Adoption of Proposed Ordinance 14477 - CSO Volume Reduction Green Infrastructure – St. Louis University Residence Hall 2 (12773) Authorizing the Executive Director and Secretary-Treasurer on behalf of The Metropolitan St. Louis Sewer District to enter into an agreement with St. Louis University for cost sharing in CSO Volume Reduction Green Infrastructure – St. Louis University Residence Hall 2 (12773) in the City of St. Louis, Missouri. 15 Adoption of Proposed Ordinance 14478 - CSO Volume Reduction Green Infrastructure – The Sheldon Plaza and Parking Lot (12771) Authorizing the Executive Director and Secretary-Treasurer on behalf of The Metropolitan St. Louis Sewer District to enter into an agreement with The Sheldon Arts Foundation for cost sharing in CSO Volume Reduction Green Infrastructure – The Sheldon Plaza and Parking Lot (12771) in the City of St. Louis, Missouri. 16 Adoption of Proposed Ordinance 14479 CSO Volume Reduction Green Infrastructure – Washington Boulevard Streetscape (12769) Authorizing the Executive Director and Secretary-Treasurer on behalf of The Metropolitan St. Louis Sewer District to enter into an agreement with Grand Center, Inc. for cost sharing in CSO Volume Reduction Green Infrastructure – Washington Boulevard Streetscape (12769) in the City of St. Louis, Missouri. 17 Adoption of Proposed Ordinance 14480 - Pershing Ave 5500 – 5600 Blocks Storm Sewer (IR) (12627) Authorizing the Executive Director and Secretary-Treasurer on behalf of The Metropolitan St. Louis Sewer District to enter into Contract No. 20406 with Fred M. Luth & Sons, Inc. for the construction of storm sewers in Pershing Ave 5500 - 5600 Blocks Storm Sewer (IR) (12627) in the City of St. Louis Missouri. Pg 3 revised - 9/14/16 Revised: 9/14/2016 9:26 AM CONSENT AGENDA ORDINANCES 18 Adoption of Proposed Ordinance 14481 - Harlem – Baden Relief Phase IV (Hebert) (Detention Basin) (11768) Making a supplemental appropriation of Six Hundred Thousand Dollars ($600,000.00) from the Sanitary Replacement Fund to be used for storm sewer and detention basin construction in Harlem – Baden Relief Phase IV (Hebert) (Detention Basin) (11768) in the City of St. Louis, Missouri. 19 Adoption of Proposed Ordinance 14482 - Madison #708 Storm Sewer (10221) Making a supplemental appropriation of Thirty-Five Thousand Dollars ($35,000.00) from the Operation, Maintenance, Construction, and Improvement Fund of Gravois Creek to be used for storm sewer construction in Madison #708 Storm Sewer (10221) in the City of Oakland, Missouri 20 Adoption of Proposed Ordinance 14483 - General Services Agreement – Property Appraisal (2015) Contract A (11758) Making a supplemental appropriation of Seventy Thousand Dollars ($70,000.00) from the General Fund to be used for property appraisal services in General Services Agreement – Property Appraisal (2015) Contract A (11758) in the Metropolitan St. Louis Sewer District Service Area; and authorizing the Executive Director and Secretary-Treasurer on behalf of The Metropolitan St. Louis Sewer District to enter into amendment No. 2 to Contract No. 20217 with Przada Appraisal Services LLC for property appraisal services. 21 Adoption of Proposed Ordinance 14484 - General Services Agreement – Property Appraisal (2015) Contract B (12379) Making a supplemental appropriation of Seventy Thousand Dollars ($70,000.00) from the General Fund to be used for property appraisal services in General Services Agreement – Property Appraisal (2015) Contract B (12379) in the Metropolitan Sewer District Service Area; and authorizing the Executive Director and Secretary-Treasurer on behalf of The Metropolitan St. Louis Sewer District to enter into Amendment No. 2 to Contract No. 20218 with Sutton Realty Company for property appraisal services. 22 Adoption of Proposed Ordinance 14485 - General Services Agreement – Property Appraisal (2015) Contract C (12380) Making a supplemental appropriation of Seventy Thousand Dollars ($70,000.00) from the General Fund to be used for property appraisal services in General Services Agreement – Property Appraisal (2015) Contract C (12380) in the Metropolitan St. Louis Sewer District Service Area; and authorizing the Executive Director and Secretary-Treasurer on behalf of The Metropolitan St. Louis Sewer District to enter into Amendment No. 2 to Contract No. 20219 with Mueller & Neff Real Estate Appraisers & Consultants for property appraisal services. Pg 4 revised - 9/14/16 Revised: 9/14/2016 9:26 AM CONSENT AGENDA ORDINANCES 23 Adoption of Proposed Ordinance 14486 - General Services Agreement – Property Appraisal (2015) Contract D (12381) Making a supplemental appropriation of Seventy Thousand Dollars ($70,000.00) from the General Fund to be used for property appraisal services in General Services Agreement – Property Appraisal (2015) Contract D (12381) in the Metropolitan St. Louis Sewer District Service Area; and authorizing the Executive Director and Secretary-Treasurer on behalf of The Metropolitan St. Louis Sewer District to enter into Amendment No. 2 to Contract No. 20220 with Real Estate Analysts Limited for property appraisal services. 24 Adoption of Proposed Ordinance 14487 - Lackland I/I Reduction Part 2 (11712) Appropriating One Million Four Hundred Fifty Thousand Dollars ($1,450,000.00) from the Sanitary Replacement Fund and One Hundred Thousand Dollars ($100,000.00) from the Operation, Maintenance, Construction, and Improvement Fund of Coldwater Creek to be used for private I/I removal and storm sewer construction in Lackland I/I Reduction Part 2 (11712) in the Cities of Overland, Sycamore Hills, St. John, and Charlack, Missouri; and authorizing the Executive Director and Secretary-Treasurer on behalf of The Metropolitan St. Louis Sewer District to enter into Contract No. 20440 with Fred M. Luth & Sons, Inc. for the aforesaid private I/I removal and storm sewer construction. 25 Adoption of Proposed Ordinance 14488 - Landmark Office Pump Station (P-411) Replacement (12324) Appropriating Four Hundred Sixty Thousand Dollars ($460,000.00) from the Sanitary Replacement Fund to be used for pump station improvements in Landmark Office Pump Station (P-411) Replacement (12324) in the City of Sunset Hills, Missouri; and authorizing the Executive Director and Secretary-Treasurer on behalf of The Metropolitan St. Louis Sewer District to enter into Contract No. 20441 with Fred M. Luth & Sons, Inc. for the aforesaid pump station improvements. 26 Adoption of Proposed Ordinance 14489 - LMRDP CSO Storage Tunnel (Broadway to RDP Tubes) (11820) Making an appropriation of Four Million Dollars ($4,000,000.00) from the Sanitary Replacement Fund to be used for property acquisition, demolition, and related activities of real property and easements for the construction of a sanitary tunnel and associated structures in LMRDP CSO Storage Tunnel (Broadway to RDP Tubes) (11820) in the City of St. Louis, Missouri; and authorizing the Executive Director and Secretary-Treasurer on behalf of The Metropolitan St. Louis Sewer District to acquire necessary property rights in order to construct a sanitary tunnel and associated structures without additional Board action. Pg 5 revised - 9/14/16 Revised: 9/14/2016 9:26 AM CONSENT AGENDA ORDINANCES 27 Adoption of Proposed Ordinance 14490 - McNulty – Pallardy I/I Reduction Part 2 (11662) Appropriating One Million Six Hundred Thirty Thousand Dollars ($1,630,000.00) from the Sanitary Replacement Fund and One Million Seventy Thousand Dollars ($1,070,000.00) from the Operation, Maintenance, Construction, and Improvement Fund of Coldwater Creek to be used for private I/I removal and storm sewer construction in McNulty – Pallardy I/I Reduction Part 2 (11662) in the Cities of St. John, Woodson Terrace, and Berkeley, Missouri; and authorizing the Executive Director and Secretary-Treasurer on behalf of The Metropolitan St. Louis Sewer District to enter into Contract No. 20439 with Unnerstall Contracting Co., Ltd. for the aforesaid private I/I removal and storm sewer construction. 28 Adoption of Proposed Ordinance 14493 - Williams Blvd – Anistasia Dr. Storm Sewer (11183) Appropriating Three Hundred Eighty Thousand Dollars ($380,000.00) from the Operation, Maintenance, Construction, and Improvement Fund of Coldwater Creek to be used for storm sewer construction in Williams Blvd – Anistasia Dr. Storm Sewer (11183) in the City of Hazelwood, Missouri; and authorizing the Executive Director and Secretary-Treasurer on behalf of The Metropolitan St. Louis Sewer District to enter into Contract No. 20442 with Gershenson Construction Co. for the aforesaid storm sewer construction. 29 Adoption of Proposed Ordinance 14494 - Park Avenue Storm Improvements (10329) Appropriating One Hundred Thirty Thousand Dollars ($130,000.00) from the Districtwide Stormwater Fund for Park Avenue Storm Improvements (10329) in the City of Oakland, Missouri; and authorizing the Executive Director and Secretary-Treasurer on behalf of The Metropolitan St. Louis Sewer District to enter into an intergovernmental agreement under Contract No. 20466 with the City of Oakland, Missouri to provide financial assistance for construction of storm sewer improvements. 30 Adoption of Proposed Ordinance 14495 - General Services Agreement – Facility & Sewer Design (2016) (11760) Making a supplemental appropriation of Three Hundred Thousand Dollars ($300,000.00) from the Sanitary Replacement Fund to be used for general engineering services in General Services Agreement – Facility & Sewer Design (2016) (11760) in the Metropolitan St. Louis Sewer District Service Area; and authorizing the Executive Director and Secretary-Treasurer on behalf of The Metropolitan St. Louis Sewer District to enter into Amendment No. 1 to Contract No. 20350 with Tetra Tech, Inc. for general engineering services. 31 Adoption of Proposed Ordinance 14496 - Stream Flow Gauge Operation and Maintenance (USGS) (10766) Making a supplemental appropriation of Five Hundred Ninety Thousand Dollars ($590,000.00) from the General Fund to be used for stream flow monitoring in Stream Flow Gauge Operation and Maintenance (USGS) (10766) in the Metropolitan St. Louis Sewer District Service Area. Pg 6 revised - 9/14/16 Revised: 9/14/2016 9:26 AM CONSENT AGENDA ORDINANCES 32 Adoption of Proposed Ordinance 14497 - Stream Flow Water Quality Sampling (2017) (12003) Appropriating Two Hundred Fifty-One Thousand Nine Hundred Forty-Five Dollars ($251,945.00) from the General Fund to be used for water quality sampling in Stream Flow Water Quality Sampling (2017) (12003) in the Metropolitan St. Louis Sewer District Service Area; and authorizing the Executive Director and Secretary-Treasurer on behalf of The Metropolitan St. Louis Sewer District to enter into Contract No. 20455 with Geosyntec Consultants, Inc. for the aforesaid water quality sampling. 33 Adoption of Proposed Ordinance 14498 - Watkins Creek Pump Station (P-101) Upgrades (12491) Appropriating Five Hundred Thousand Dollars ($500,000.00) from the Sanitary Replacement Fund to be used for design in Watkins Creek Pump Station (P-101) Upgrades (12491) in Unincorporated St. Louis County, Missouri; and authorizing the Executive Director and Secretary-Treasurer on behalf of The Metropolitan St. Louis Sewer District to enter into Contract No. 20469 with Thouvenot, Wade & Moerchen, Inc. for the aforesaid design services. 34 Adoption of Proposed Ordinance 14499 - Raftelis Storm Water Consulting Services & Feasibility Study Authorizing the Executive Director and Secretary-Treasurer on behalf of The Metropolitan St. Louis Sewer District to enter into a change order for Two Hundred Fourteen Thousand One Hundred Dollars ($214,100.00) from the General Fund to the original contract with Raftelis Financial Consultants, Inc. for professional services needed for rate model support, development of storm water funding and credit policy recommendations, storm water outreach and communications services and the preparation of the feasibility study needed for the issuance of District bonds. 35 Adoption of Proposed Ordinance 14501 - Designation of underwriting team for the Wastewater System Revenue Bonds, Series 2016B Designating the underwriting team for an issue of Wastewater System Revenue Bonds, Series 2016B of The Metropolitan St. Louis Sewer District. Pg 7 revised - 9/14/16 Revised: 9/14/2016 9:26 AM UNFINISHED BUSINESS ORDINANCES None RESOLUTIONS None Pg 8 revised - 9/14/16 Revised: 9/14/2016 9:26 AM New Business Agenda Item No. Name Page No. ORDINANCES 36 Introduction of Proposed Ordinance 14502 - CSO Volume Reduction Green Infrastructure – St. Margaret of Scotland School (12800) 14 Authorizing the Executive Director and Secretary-Treasurer on behalf of The Metropolitan St. Louis Sewer District to enter into an agreement with St. Margaret of Scotland School for cost sharing in CSO Volume Reduction Green Infrastructure – St. Margaret of Scotland School (12800) in the City of St. Louis, Missouri. 37 Introduction of Proposed Ordinance 14503 - St. Marie Sanitary Relief I/I Reduction (PIR) Storm Sewer (12606) 15 Authorizing the Executive Director and Secretary-Treasurer on behalf of The Metropolitan St. Louis Sewer District to enter into Contract No. 20456 with Gaehle Grading, LLC for private I/I removal in St. Marie Sanitary Relief I/I Reduction (PIR) Storm Sewer (12606) in the City of Florissant, Missouri. 38 Introduction of Proposed Ordinance 14504 - DC-02 & DC-03 Sanitary Relief (Brentwood Blvd to Conway Rd) Phase I (10021) 17 Making a supplemental appropriation of Eleven Million Seven Hundred Fifty Thousand Dollars ($11,750,000.00) from the Sanitary Replacement Fund to be used for sanitary sewer construction in DC-02 & DC-03 Sanitary Relief (Brentwood Blvd to Conway Rd) Phase I (10021) in the City of Brentwood, Missouri; and authorizing the Executive Director and Secretary-Treasurer on behalf of The Metropolitan St. Louis Sewer District to appropriate additional funds for Contract No. 20368 with J. H. Berra Construction Co., Inc. for sanitary sewer construction. 39 Introduction of Proposed Ordinance 14505 - Hollenberg Pump Station (P-713) Replacement (12306) 19 Appropriating Four Hundred Fifty Thousand Dollars ($450,000.00) from the Sanitary Replacement Fund to be used for pump station improvements in Hollenberg Pump Station (P-713) Replacement (12306) in the City of Bridgeton, Missouri; and authorizing the Executive Director and Secretary-Treasurer on behalf of The Metropolitan St. Louis Sewer District to enter into Contract No. 20462 with Fred M. Luth & Sons, Inc. for the aforesaid pump station improvements. 40 INTRODUCTION of Proposed Ordinance 14506 - Maline Creek CSO BP 051 & 052 Local Storage Facility (Chain of Rocks Dr to Church Dr) (11656) 20 Making a supplemental appropriation of Thirty Million Dollars ($30,000,000.00) from the Sanitary Replacement Fund to be used for combined sewer construction in Maline Creek CSO BP 051 & 052 Local Storage Facility (Chain of Rocks Dr to Church Dr) (11656) in the City of St. Louis, Missouri; and authorizing the Executive Director and Secretary-Treasurer on behalf of The Metropolitan St. Louis Sewer District to appropriate additional funds for Contract No. 20375 with SAK/Goodwin Joint Venture for combined sewer construction. Pg 9 revised - 9/14/16 Revised: 9/14/2016 9:26 AM New Business Agenda Item No. Name Page No. ORDINANCES 41 Introduction of Proposed Ordinance 14507 - Busiek Ave. #8044 Storm Sewer (10359) 22 Appropriating One Hundred Thirty-Five Thousand Dollars ($135,000.00) from Operation, Maintenance, Construction, and Improvement Fund of Coldwater Creek to be used for storm sewer construction in Busiek Ave. #8044 Storm Sewer (10359) in the City of Berkeley, Missouri; and authorizing the Executive Director and Secretary-Treasurer on behalf of The Metropolitan St. Louis Sewer District to enter into Contract No. 20444 with Gaehle Grading, LLC for the aforesaid storm sewer construction. 42 Introduction of Proposed Ordinance 14508 - Everman – Tennyson Storm Sewer (11036) 23 Appropriating Four Hundred Seventy Thousand Dollars ($470,000.00) from Operation, Maintenance, Construction, and Improvement Fund of Coldwater Creek to be used for storm sewer construction in Everman – Tennyson Storm Sewer (11036) in the City of Overland, Missouri; and authorizing the Executive Director and Secretary-Treasurer on behalf of The Metropolitan St. Louis Sewer District to enter into Contract No. 20457 with Above and Below Contracting, LLC for the aforesaid storm sewer construction. 43 Introduction of Proposed Ordinance 14509 - Fox Run Drive #1360 Storm Sewer (11159) 24 Appropriating Forty-Five Thousand Dollars ($45,000.00) from the Operation, Maintenance, Construction, and Improvement Fund of Coldwater Creek for storm sewer construction in Fox Run Drive #1360 Storm Sewer (11159) in the City of Florissant, Missouri; and authorizing the Executive Director and Secretary-Treasurer on behalf of The Metropolitan St. Louis Sewer District to enter into Contract No. 20451 with Gaehle Grading, LLC for the aforesaid storm sewer construction. 44 Introduction of Proposed Ordinance 14510 - Larkin Lane 24 Storm Sewer Replacement (IR) (11985) 25 Authorizing the Executive Director and Secretary-Treasurer on behalf of The Metropolitan St. Louis Sewer District to enter into Contract No. 20454 with Wehmeyer Farms, Inc. for storm sewer construction in Larkin Lane 24 Storm Sewer Replacement (IR) (11985) in Unincorporated St. Louis County, Missouri. 45 Introduction of Proposed Ordinance 14511 - Wintergreen 3503 and 3507 Storm Sewer (11362) 27 Appropriating Eighty-Five Thousand Dollars ($85,000.00) from the Operation, Maintenance, Construction, and Improvement Fund of Gravois Creek for storm sewer construction in Wintergreen 3503 and 3507 Storm Sewer (11362) in Unincorporated St. Louis County, Missouri; and authorizing the Executive Director and Secretary-Treasurer on behalf of The Metropolitan St. Louis Sewer District to enter into Contract No. 20454 with ABNA Engineering, Inc. for the aforesaid storm sewer construction. Pg 10 revised - 9/14/16 Revised: 9/14/2016 9:26 AM New Business Agenda Item No. Name Page No. ORDINANCES 46 Introduction of Proposed Ordinance 14512 - Grant #609 Bank Stabilization (11045) 28 Appropriating Two Hundred Fifteen Thousand Dollars ($215,000.00) from the Operation, Maintenance, Construction, and Improvement Fund of Gravois Creek for channel stabilization in Grant #609 Bank Stabilization (11045) in the Cities of Crestwood and Webster Groves, Missouri; and authorizing the Executive Director and Secretary-Treasurer on behalf of The Metropolitan St. Louis Sewer District to enter into Contract No. 20463 with Ideal Landscape Construction, Inc. for the aforesaid channel stabilization. 47 INTRODUCTION & ADOPTION of Proposed Ordinance 14513 - Emergency Repair #056 (Fenton WWTP Ultra-Violet Disinfection Repair) Funding (12808) 29 Appropriating Five Hundred Fifty Thousand Dollars ($550,000.00) from the Wastewater Emergency Fund to be used for emergency repair in Emergency Repair #056 (Fenton WWTP Ultra-Violet Disinfection Repair) Funding (12808) in the City of Fenton, Missouri. 48 INTRODUCTION & ADOPTION of Proposed Ordinance 14514 - Emergency Repair #056 (Fenton WWTP Ultra-Violet Disinfection Repair) Construction Contract (12808) 30 Authorizing the Executive Director and Secretary-Treasurer on behalf of The Metropolitan St. Louis Sewer District to enter into Contract No. 20484 with KCI Construction Company for emergency repair in Emergency Repair #056 (Fenton WWTP Ultra-Violet Disinfection Repair) Construction Contract (12808) in the City of Fenton, Missouri. 49 INTRODUCTION & ADOPTION of Proposed Ordinance 14515 - Emergency Repair #056 (Fenton WWTP Ultra-Violet Disinfection Repair) Design Contract (12808) 31 Authorizing the Executive Director and Secretary-Treasurer on behalf of The Metropolitan St. Louis Sewer District to enter into Contract No. 20485 with Kennedy Associates/Architects, Inc. for emergency repair in Emergency Repair #056 (Fenton WWTP Ultra-Violet Disinfection Repair) Design Contract (12808) in the City of Fenton, Missouri. 50 INTRODUCTION & ADOPTION of Proposed Ordinance 14516 - Riverside and Yarnell Sanitary Relief – Forensic Testing (12789) 33 Making a supplemental appropriation of Four Hundred Thousand Dollars ($400,000.00) from the General Fund to be used for sanitary sewer construction in Riverside and Yarnell Sanitary Relief – Forensic Testing (12789) in the City of Fenton, Missouri. 51 Introduction of Proposed Ordinance 14517 - General Services Agreement – Sewer & Process Design (FY2014) (11759) 34 Making a supplemental appropriation of Ninety Thousand Dollars ($90,000.00) from the Sanitary Replacement Fund for general engineering services in General Services Agreement - Sewer & Process Design (FY2014) (11759) in the Metropolitan St. Louis Sewer District Service Area; and authorizing the Executive Director and Secretary- Treasurer on behalf of The Metropolitan St. Louis Sewer District to amend Contract No. 20086 with Stantec Consulting Services, Inc. for the aforesaid general engineering services. Pg 11 revised - 9/14/16 Revised: 9/14/2016 9:26 AM New Business Agenda Item No. Name Page No. ORDINANCES 52 Introduction of Proposed Ordinance 14518 - County Treatment Facility Design (Contract A) (12727) 35 Appropriating One Million One Hundred Thirty-Four Thousand Dollars ($1,134,000.00) from the Sanitary Replacement Fund to be used for design in County Treatment Facility Design (Contract A) (12727) in St. Louis County, Missouri; and authorizing the Executive Director and Secretary-Treasurer on behalf of The Metropolitan St. Louis Sewer District to enter into Contract No. 20468 with HDR Engineering, Inc. for the design services. 53 Introduction of Proposed Ordinance 14519 - Flow Metering and Monitoring (2017) (12759) 37 Appropriating Two Million Five Hundred Thousand Dollars ($2,500,000.00) from the General Fund to be used for flow meter and monitoring in Flow Metering and Monitoring (2017) (12759) in the Metropolitan St. Louis Sewer District Service Area; and authorizing the Executive Director and Secretary-Treasurer on behalf of The Metropolitan St. Louis Sewer District to enter into Contract No. 20477 with ADS Environmental Services for the aforesaid flow meter and monitoring. 54 Introduction of Proposed Ordinance 14520 - Mississippi Floodwall ORS Pump Stations Rehabilitation (12483) 39 Appropriating Five Hundred Forty-Five Thousand Dollars ($545,000.00) from the Sanitary Replacement Fund to be used for design in Mississippi Floodwall ORS Pump Stations Rehabilitation (12483) in the City of St. Louis, Missouri; and authorizing the Executive Director and Secretary-Treasurer on behalf of The Metropolitan St. Louis Sewer District to enter into Contract No. 20476 with Black & Veatch Corporation for the aforesaid design. 55 INTRODUCTION & ADOPTION of Proposed Ordinance 14521 - Maline Creek CSO BP 051 & 052 Local Storage Facility (Chain of Rocks Dr to Church Dr) (11656)- OJT 41 Making a supplemental appropriation of Five Hundred Thousand Dollars ($500,000.00) from the Sanitary Replacement Fund to be used for combined sewer construction in Maline Creek CSO BP 051 & 052 Local Storage Facility (Chain of Rocks Dr to Church Dr) (11656) in the City of St. Louis, Missouri. 56 INTRODUCTION & ADOPTION of Proposed Ordinance 14522 - Upper Maline Trunk Sanitary Relief Phase IV Section A (10026) 43 Making a supplemental appropriation of Two Hundred Fifty Thousand Dollars $250,000.00) from the Sanitary Replacement Fund to be used for sanitary sewer construction in Upper Maline Trunk Sanitary Relief Phase IV Section A (10026) in the City of Ferguson and Unincorporated St. Louis County, Missouri. Pg 12 revised - 9/14/16 Revised: 9/14/2016 9:26 AM New Business Agenda Item No. Name Page No. RESOLUTIONS 57 Adoption of Resolution No. 3296, Expressing the Board of Trustees appreciation to Martin R. Aubuchon for his 31 years of exemplary service to the Metropolitan St. Louis Sewer District from May 13, 1985, to his retirement effective September 1, 2016. 58 Adoption of Resolution No. 3297, Expressing the Board of Trustees appreciation to William T. Brown for his 34 years of exemplary service to the Metropolitan St. Louis Sewer District from August 16, 1982, to his retirement effective September 1, 2016. 59 Adoption of Resolution No. 3298 - Pension Plan Investment Consultant 45 The Adoption of Resolution No. 3298 will extend the contract with Pavilion Advisory Group, Inc. (Pavilion) that was previously authorized by Ordinance No 13719 adopted September 12, 2013, and authorized the Executive Director and Secretary-Treasurer on behalf of the Metropolitan St. Louis Sewer District to enter into a contract with Pavilion to provide pension fund, deferred compensation plan, and defined contribution plan investment consulting services for the District. 60 Adoption of Resolution 3299 - Force Main Non-Destructive Evaluation (Condition Assessment) Professional Services Agreement 46 The Adoption of Resolution No. 3299 will exercise option year five (5) of the contract previously authorized by Ordinance No. 13464, adopted August 9, 2012, which authorized the Executive Director and Secretary-Treasurer on behalf of The Metropolitan St. Louis Sewer District to enter into a contract with Pure Technologies, Inc., whereby Pure Technologies, Inc. would provide Force Main Non-Destructive Evaluation (Condition Assessment) Professional Services Agreement throughout the District. 61 ANY OTHER BUSINESS THAT MAY PROPERLY BE BROUGHT BEFORE THE BOARD 62 ADJOURNMENT Pg 13 revised - 9/14/16 Revised: 9/14/2016 9:26 AM AGENDA ITEM NUMBER: Item 36 Introduction of Proposed Ordinance 14502 NAME OF PROJECT: CSO Volume Reduction Green Infrastructure – St. Margaret of Scotland School (12800) LOCATION: 3955 Castleman Avenue in the City of St. Louis, Missouri TYPE OF PROJECT: Cost Share for Green Infrastructure Construction (015.0 Construction Costs) DEPARTMENT REQUESTING ACTION: Engineering REQUESTED ACTION: Why is this action necessary?: Authorizes staff to enter into an agreement with St. Margaret of Scotland School What does action accomplish?: Provides Green Infrastructure Grant for construction of green infrastructure to reduce combined sewer overflows, as required by Consent Decree. SUMMARY EXPLANATION/BACKGROUND: Contractor: N/A Previous District Contract: N/A Consultant: N/A Agency: St. Margaret of Scotland School Number of bidders: N/A Low Bid: N/A High Bid: N/A Appropriation Amount: N/A Designer’s Estimate: N/A Total MWBE Participation: N/A Type of Contract: N/A Properties Affected: N/A Properties Benefiting: N/A Designed by: N/A This ordinance authorizes the District to enter into an agreement with St. Margaret of Scotland School to provide financial assistance through a Green Infrastructure Grant Program for construction of green infrastructure. The purpose of this project is to reduce combined sewer overflows into the Mississippi River per the Long Term Control Plan. This project will reduce runoff volume with the installation of a rain garden. Total cost of the project is estimated at $125,000, and St. Margaret of Scotland School is requesting approximately $125,000 reimbursement for the cost of green infrastructure. FUNDING/COST SUMMARY: Budgeted: Capital Improvement Program Budget Year: FY2016, Pg. 103 Amount: $5,000,000* Fund Name: #1101 – General Fund Additional Comments: None. PREVIOUS BOARD ACTION RELATED TO THIS ACTION: 09/10/15 – Ord. No. 14193 – Amount: $5,000,000 – CSO Volume Reduction Green Infrastructure (11146) *Requesting Board approval of an ordinance for which $125,000.00 is being encumbered from Ordinance No. 14193. Pg 14 revised - 9/14/16 Revised: 9/14/2016 9:26 AM AGENDA ITEM NUMBER: Item 37 Introduction of Proposed Ordinance 14503 NAME OF PROJECT: St. Marie Sanitary Relief I/I Reduction (PIR) Storm Sewer (12606) LOCATION: South of Lindbergh Blvd. and east of New Florissant Road in the City of Florissant, Missouri TYPE OF PROJECT: Private I/I Removal (015.0 Construction Costs) DEPARTMENT REQUESTING ACTION: Engineering REQUESTED ACTION: Why is this action necessary?: Authorizes staff to enter into a construction contract. What does action accomplish?: Implements the construction of a CIP project, as required by Consent Decree. SUMMARY EXPLANATION/BACKGROUND: Contractor: Gaehle Grading, LLC Previous District Contract: Yes 4362 Little Tavern Road Pacific, MO 63069 Consultant: N/A Agency: N/A Number of bidders: 5 Low Bid: $57,257.01 High Bid: $100,430.00 Appropriation Amount: N/A Designer’s Estimate: $54,000.00 Total MWBE Participation: 18.86% (MBE Goal is 17% - African American) Westfall Hauling, Inc. (African American) – 18.86% - MBE Type of Contract: Unit Cost Properties Affected: 7 Properties Benefiting: 2 Designed by: District staff The work to be done under Contract #20456 consists of the construction of approximately 100 lineal feet of 12-inch diameter storm sewers and appurtenances, and the removal of private inflow sources at two properties. The purpose of this project is to reduce inflow/infiltration (I/I) in the Coldwater Creek watershed, reduce building backups, relieve overcharged sanitary sewers, and address potential stormwater issues. This project is scheduled to be completed in 90 days. FUNDING/COST SUMMARY: Budgeted: Capital Improvement Program Budget Year: FY2016, Pg. 235 Amount: $ 77,000* N/A $1,000,000** $1,077,000 Fund Name: #5569 – Fountain Creek OMCI Fund $31,000 #6660 – Sanitary Replacement Fund $59,000 $90,000 Additional Comments: An additional contingency of $25,000 for utility relocation (Telephone - $15,000 & Water - $10,000) is included in the encumbered amount. The encumbered amount includes $31,000 for storm sewer work. The remaining work on this project is expected to be funded by Bond proceeds. *Requesting Board approval of a construction contract with Gaehle Grading, LLC for which $31,000 is being encumbered from Ordinance No. 14209. Pg 15 revised - 9/14/16 Revised: 9/14/2016 9:26 AM **Requesting Board approval of a construction contract with Gaehle Grading, LLC for which $59,000 is being encumbered from Ordinance No. 13486. Contracted planning resources utilized: Watershed Facility Planning, Separate Sewer Area I/I Assessment, Separate Sewer Area Flow Metering & Monitoring, Modeling, CCTV Inspection, and Radar Rainfall Data. PREVIOUS BOARD ACTION RELATED TO THIS ACTION: 09/27/12 – Ord. No. 13486 – Amount: $1,000,000 – Private Inflow and Infiltration Reduction Program (FY2013) (11877) 09/10/15 – Ord. No. 14209 – Amount: $77,000 – Stormwater Infrastructure Repair/Replacement – Fountain Creek OMCI (12610) – Original Appropriation Pg 16 revised - 9/14/16 Revised: 9/14/2016 9:26 AM AGENDA ITEM NUMBER: Item 38 Introduction of Proposed Ordinance 14504 NAME OF PROJECT: DC-02 & DC-03 Sanitary Relief (Brentwood Blvd to Conway Rd) Phase I (10021) LOCATION: South of Manchester Road and east and west of Brentwood Boulevard in the City of Brentwood, Missouri TYPE OF PROJECT: Sanitary Sewer Construction (015.0 Construction Costs) DEPARTMENT REQUESTING ACTION: Engineering REQUESTED ACTION: Why is this action necessary?: Appropriates additional funds. What does action accomplish?: Provides additional funding for the construction of a CIP project, as required by Consent Decree. SUMMARY EXPLANATION/BACKGROUND: Contractor: J. H. Berra Construction Co., Inc. Previous District Contract: Yes 5091 New Baumgartner Road St. Louis, MO 63129 Consultant: N/A Agency: N/A Number of bidders: N/A Low Bid: N/A High Bid: N/A Appropriation Amount: $11,750,000.00 Designer’s Estimate: N/A Total MWBE Participation: 17.04% (MBE Goal is 17% - African American) Windstar Transportation, LLC (African American) – 4.32% - MBE ABNA Engineering, Inc. (African American) – 0.96% - MBE Supplied Industrial Solutions, Inc. (African American) – 1.32% - MBE XL Contracting, Inc. (African American) – 3.05% - MBE Basilico Engineering, Inc. (African American) – 7.39% - MBE Type of Contract: Unit Cost Properties Affected: 35 Properties Benefiting: 35,000 Designed by: Parsons Water & Infrastructure, Inc. The work to be done under Contract #20368 consists of the construction of approximately 5,173 lineal feet of 6-inch to 78- inch diameter sanitary sewers, one (1) diversion structure, eight (8) junction chambers, and appurtenances. This construction is the first phase of a multi-phase improvement project. The purpose of this project is to alleviate surcharging sanitary sewers and to provide for the elimination of seven (7) constructed SSOs (BP-545, BP-170, BP-198, BP-348, BP-349, BP-155 & BP-591) after construction of future phases. This project is anticipated to be completed in March 2018. FUNDING/COST SUMMARY: Budgeted: Capital Improvement Program Budget Year: FY2017, Pg. 100 Amount: $11,750,000 (Partial) Fund Name: #6660 – Sanitary Replacement Fund Additional Comments: This is a partial funding request. This supplemental appropriation will bring the current appropriation for construction to $17,750,000. A future supplemental appropriation is planned for construction in FY2018 for $4,000,000 providing a total appropriation of $21,750,000. This project is expected to be funded by Bond proceeds. Pg 17 revised - 9/14/16 Revised: 9/14/2016 9:26 AM Contracted planning resources utilized: Watershed Facility Planning, Combine Sewer Area I/I Assessment, Separate Sewer Area Flow Metering & Monitoring, Modeling, CCTV Inspection, and Radar Rainfall Data. PREVIOUS BOARD ACTION RELATED TO THIS ACTION: 02/11/16 – Ord. No. 14315 – Amount: $6,000,000 – DC-02 & DC-03 Sanitary Relief (Brentwood Blvd to Conway Rd) Phase I (10021) – J.H. Berra Construction Co. – Original Construction Contract No. 20368 03/10/16 – Ord. No. 14338 – Amount: $250,000 – Parsons Water & Infrastructure, Inc. – Design Contract No. 10733 – Amendment Pg 18 revised - 9/14/16 Revised: 9/14/2016 9:26 AM AGENDA ITEM NUMBER: Item 39 Introduction of Proposed Ordinance 14505 NAME OF PROJECT: Hollenberg Pump Station (P-713) Replacement (12306) LOCATION: North of Interstate 70 and east of Earth City Expressway in the City of Bridgeton, Missouri TYPE OF PROJECT: Pump Station Improvements (015.0 Construction Costs) DEPARTMENT REQUESTING ACTION: Engineering REQUESTED ACTION: Why is this action necessary?: Appropriates funds and authorizes staff to enter into a construction contract. What does action accomplish?: Implements the construction of a CIP project, as required by Consent Decree. SUMMARY EXPLANATION/BACKGROUND: Contractor: Fred M. Luth & Sons, Inc. Previous District Contract: Yes 4516 McRee Avenue St. Louis, MO 63110 Consultant: N/A Agency: N/A Number of bidders: 3 Low Bid: $410,840.00 High Bid: $588,017.00 Appropriation Amount: $450,000.00 Designer’s Estimate: $423,000.00 Total MWBE Participation: 17.08% (MBE Goal is 17% - African American) ABNA Engineering, Inc. (African American) – 1.53% - MBE B & P Construction, Inc. (African American) – 9.33% - MBE Mason’s Landscaping & Construction Services (African American) – 0.78% - MBE Tee and E Trucking, Inc. (African American) – 2.07% - MBE XL Contracting, Inc. (African American) – 3.37% - MBE Type of Contract: Unit Cost Properties Affected: 1 Properties Benefiting: 20 Designed by: District staff The work to be done under Contract #20462 consists of the construction of a replacement pump station, approximately 46 lineal feet of sanitary sewers varying in size from 6-inches to 8-inches in diameter and appurtenances. The purpose of this project is to replace the existing deteriorated pump station that has reached its useful life. This project is scheduled to be completed in 180 days. FUNDING/COST SUMMARY: Budgeted: Capital Improvement Program Budget Year: FY2017, Pg. 117 Amount: $715,000 Fund Name: #6660 – Sanitary Replacement Fund Additional Comments: An additional contingency of $15,000 for utility relocation (Other - $15,000) is included in the appropriation. This project is expected to be funded by Bond proceeds. Contracted planning resources utilized: Watershed Facility Planning. PREVIOUS BOARD ACTION RELATED TO THIS ACTION: N/A Pg 19 revised - 9/14/16 Revised: 9/14/2016 9:26 AM AGENDA ITEM NUMBER: Item 40 Introduction of Proposed Ordinance 14506 NAME OF PROJECT: Maline Creek CSO BP 051 & 052 Local Storage Facility (Chain of Rocks Dr to Church Dr) (11656) LOCATION: South of Chain of Rocks Drive and west of Riverview Drive in the City of St. Louis, Missouri TYPE OF PROJECT: Combined Sewer Construction (015.0 Construction Costs) DEPARTMENT REQUESTING ACTION: Engineering REQUESTED ACTION: Why is this action necessary?: Appropriates additional funds. What does action accomplish?: Provides additional funding for the construction of a CIP project, as required by Consent Decree. SUMMARY EXPLANATION/BACKGROUND: Contractor: SAK/Goodwin Joint Venture Previous District Contract: Yes 864 Hoff Road O’Fallon, MO 63366 Consultant: N/A Agency: N/A Number of bidders: N/A Low Bid: N/A High Bid: N/A Appropriation Amount: $30,000,000.00 Designer’s Estimate: N/A Total MWBE Participation: 18.03% (MBE Goal is 17% - African American) Steel Rebar Manufacturing, LLC (African American) – 2.60% - MBE XL Contracting, Inc. (African American) – 3.93% - MBE A-Plus Contractors, LLC (African American) – 0.31% - MBE Supplied Industrial Solutions, Inc. (African American) – 1.48% - MBE TD4 Electrical, LLC (African American) – 0.87% - MBE Williams Tunneling Industries, Inc. (African American) – 7.29% - MBE Luther’s Supply, LLC (African American) – 1.01% - MBE McKay’s Hauling Company, Inc. (African American) – 0.54% - MBE Type of Contract: Lump Sum Properties Affected: 11 Properties Benefiting: The entire Maline Creek Watershed Designed by: Jacobs Engineering Group, Inc. The work to be done under Contract #20375 consists of the construction of a 40-foot diameter, 12.5 MGD submersible pump station, a 28-foot diameter x 2,700-foot long cavern, a 580-foot long x 6-foot lined connecting tunnel, three deaeration chambers, three intake structures, a shallow connector sewer constructed by pipe jacking and related storm sewers. The purpose of this project is to provide for volumetric CSO storage during wet weather events to reduce CSOs to four events in the defined typical year and a maximum of 84 million gallons of untreated overflow volume. This project is anticipated to be completed in September 2020. FUNDING/COST SUMMARY: Budgeted: Capital Improvement Program Budget Year: FY2017, Pg. 138 Amount: $30,000,000 (Partial) Fund Name: #6660 – Sanitary Replacement Fund Pg 20 revised - 9/14/16 Revised: 9/14/2016 9:26 AM Additional Comments: This is a partial funding request. This supplemental appropriation will bring the current appropriation for construction to $40,000,000. Future supplemental appropriations are planned for construction in FY2018, FY2019, and FY2020 for a total appropriation of $86,200,000. This project is expected to be funded by Bond proceeds. Contracted planning resources utilized: Watershed Facility Planning, Combine Sewer Area Flow Metering & Monitoring, Modeling, and Radar Rainfall Data. PREVIOUS BOARD ACTION RELATED TO THIS ACTION: 08/13/15 – Ord. No. 14184 – Amount: $211,000 – Jacobs Engineering Group Inc. – Design Contract No. 10734 – Amendment 05/12/16 – Ord. No. 14364 – Amount: $10,000,000 – Maline Creek CSO BP 051 & 052 Local Storage Facility (Chain of Rocks Dr to Church Dr) (11656) – SAK/Goodwin Joint Venture – Original Construction Contract No. 20375 Pg 21 revised - 9/14/16 Revised: 9/14/2016 9:26 AM AGENDA ITEM NUMBER: Item 41 Introduction of Proposed Ordinance 14507 NAME OF PROJECT: Busiek Ave. #8044 Storm Sewer (10359) LOCATION: North of Airport Road and east of Peurifoy in the City of Berkeley, Missouri TYPE OF PROJECT: Storm Sewer Construction (015.0 Construction Costs) DEPARTMENT REQUESTING ACTION: Engineering REQUESTED ACTION: Why is this action necessary?: Appropriates funds and authorizes staff to enter into a construction contract. What does action accomplish?: Implements the construction of a CIP project. SUMMARY EXPLANATION/BACKGROUND: Contractor: Gaehle Grading, LLC Previous District Contract: Yes 4362 Little Tavern Road Pacific, MO 63069 Consultant: N/A Agency: N/A Number of bidders: 6 Low Bid: $69,432.00 High Bid: $99,489.00 Appropriation Amount: $135,000.00 Designer’s Estimate: $68,000.00 Total MWBE Participation: 17.57% (MBE Goal is 17% - African American) Westfall Hauling, Inc. (African American) – 13.54% - MBE Greenspace Lawn Services, LLC (African American) – 4.03% - MBE Type of Contract: Unit Cost Properties Affected: 4 Properties Benefiting: 2 Designed by: Bilfinger Industrial Services, Inc. The work to be done under Contract #20444 consists of the construction of approximately 227 lineal feet of storm sewers varying in size from 12-inches to 18-inches in diameter, and appurtenances. The purpose of this project is to alleviate yard flooding and erosion of 8044 Busiek Avenue. This project is scheduled to be completed in 120 days. FUNDING/COST SUMMARY: Budgeted: Capital Improvement Program Budget Year: FY2017, Pg. 213 Amount: $125,000 Fund Name: #5564 – Coldwater Creek OMCI Fund Additional Comments: An additional contingency of $57,000 for utility relocation (Electric - $2,000, Gas - $19,000 & Water - $36,000) is included in the appropriation. This project was one of three design projects included in Coldwater Creek OMCI Stormwater Design (Contract F) (11908). Contracted planning resources utilized: Stormwater Facility Planning. PREVIOUS BOARD ACTION RELATED TO THIS ACTION: 01/09/14 – Ord. No. 13773 – Amount: $115,000 – Bilfinger Industrial Services – Coldwater Creek OMCI Stormwater Design (Contract F) (11908) – Design Contract No. 20117 Pg 22 revised - 9/14/16 Revised: 9/14/2016 9:26 AM AGENDA ITEM NUMBER: Item 42 Introduction of Proposed Ordinance 14508 NAME OF PROJECT: Everman – Tennyson Storm Sewer (11036) LOCATION: South of St. Charles Rock Road and east of Woodson Road in the City of Overland, Missouri TYPE OF PROJECT: Storm Sewer Construction (015.0 Construction Costs) DEPARTMENT REQUESTING ACTION: Engineering REQUESTED ACTION: Why is this action necessary?: Appropriates funds and authorizes staff to enter into a construction contract. What does action accomplish?: Implements the construction of a CIP project. SUMMARY EXPLANATION/BACKGROUND: Contractor: Above and Below Contracting, LLC Previous District Contract: Yes 2836 Plattin View Drive Festus, MO 63028 Consultant: N/A Agency: N/A Number of bidders: 7 Low Bid: $424,889.00 High Bid: $777,777.77 Appropriation Amount: $470,000.00 Designer’s Estimate: $431,000.00 Total MWBE Participation: 17.41% (MBE Goal is 17% - African American) XL Contracting, Inc. (African American) – 16.47% - MBE Tee & E Trucking, Inc. (African American) – 0.94% - MBE Type of Contract: Unit Cost Properties Affected: 7 Properties Benefiting: 20 Designed by: EDM Incorporated The work to be done under Contract #20457 consists of the construction of approximately 861 lineal feet of pipe sewers varying in size from 12-inches to 42-inches in diameter and appurtenances, and the removal of inflow from one property. The purpose of this project is to alleviate flooding of two commercial buildings. This project is scheduled to be completed in 180 days. FUNDING/COST SUMMARY: Budgeted: Capital Improvement Program Budget Year: FY2017, Pg. 216 Amount: $406,000 Fund Name: #5564 – Coldwater Creek OMCI Fund Additional Comments: An additional contingency of $20,000 for utility relocation (Electric $20,000) is included in the appropriation. The designer’s estimate is higher than the budgeted amount due to an increased project length. This project was one of four design projects included in the Coldwater Creek OMCI Stormwater Design (Contract A) (11903). Contracted planning resources utilized: Stormwater Facility Planning. PREVIOUS BOARD ACTION RELATED TO THIS ACTION: 01/09/14 – Ord. No. 13768 – Amount: $367,000 – EDM Incorporated – Coldwater Creek OMCI Stormwater Design (Contract A) (11903) – Design Contract No. 20112 Pg 23 revised - 9/14/16 Revised: 9/14/2016 9:26 AM AGENDA ITEM NUMBER: Item 43 Introduction of Proposed Ordinance 14509 NAME OF PROJECT: Fox Run Drive #1360 Storm Sewer (11159) LOCATION: South of Lindbergh Blvd. and east of New Florissant Road in the City of Florissant, Missouri TYPE OF PROJECT: Storm Sewer Construction (015.0 Construction Costs) DEPARTMENT REQUESTING ACTION: Engineering REQUESTED ACTION: Why is this action necessary?: Appropriates funds and authorizes staff to enter into a construction contract. What does action accomplish?: Implements the construction of a CIP project. SUMMARY EXPLANATION/BACKGROUND: Contractor: Gaehle Grading, LLC Previous District Contract: Yes 4362 Little Tavern Road Pacific, MO 63069 Consultant: N/A Agency: N/A Number of bidders: 7 Low Bid: $29,652.00 High Bid: $46,910.00 Appropriation Amount: $45,000.00 Designer’s Estimate: $30,000.00 Total MWBE Participation: 5.73% (No MBE Goal) Westfall Hauling, Inc. (African American) – 2.36% - MBE Greenspace Lawn Services, LLC (African American) – 3.37% - MBE Type of Contract: Unit Cost Properties Affected: 3 Properties Benefiting: 3 Designed by: CMV – Cochran, LLC The work to be done under Contract #20451 consists of the construction of approximately 80 lineal feet of storm sewers 18-inches in diameter and appurtenances. The purpose of this project is to alleviate yard flooding of 1480 Pepperhill Drive, 1465 Willowbrook Drive, and 1360 Fox Run Drive. This project is scheduled to be completed in 60 days. FUNDING/COST SUMMARY: Budgeted: Capital Improvement Program Budget Year: FY2017, Pg. 217 Amount: $40,000 Fund Name: #5564 – Coldwater Creek OMCI Fund Additional Comments: An additional contingency of $10,000 for utility relocation (Other - $10,000) is included in the appropriation. This project was one of three design projects included in Coldwater Creek OMCI Stormwater Design (Contract B) (11904). Contracted planning resources utilized: Stormwater Facility Planning. PREVIOUS BOARD ACTION RELATED TO THIS ACTION: 01/09/14 – Ord. No. 13769 – Amount: $111,000 – CMV – Cochran, LLC – Coldwater Creek OMCI Stormwater Design (Contract B) (11904) – Design Contract No. 20113 Pg 24 revised - 9/14/16 Revised: 9/14/2016 9:26 AM AGENDA ITEM NUMBER: Item 44 Introduction of Proposed Ordinance 14510 NAME OF PROJECT: Larkin Lane 24 Storm Sewer Replacement (IR) (11985) LOCATION: South of Lindbergh Boulevard and west of Interstate 55 in unincorporated St. Louis County, Missouri TYPE OF PROJECT: Storm Sewer Construction (015.0 Construction Costs) DEPARTMENT REQUESTING ACTION: Engineering REQUESTED ACTION: Why is this action necessary?: Authorizes staff to enter into a construction contract. What does action accomplish?: Implements the construction of a CIP project. SUMMARY EXPLANATION/BACKGROUND: Contractor: Wehmeyer Farms, Inc. Previous District Contract: Yes 680 Himmel Road Moscow Mills, MO 63362 Consultant: N/A Agency: N/A Number of bidders: 6 Low Bid: $175,000.00 High Bid: $234,850.00 Appropriation Amount: N/A Designer’s Estimate: $190,000.00 Total MWBE Participation: 17.22% (MBE Goal is 17% - African American) A.L.L. Construction, LLC (African American) – 17.22% - MBE Type of Contract: Unit Cost Properties Affected: 26 Properties Benefiting: 3 Designed by: District staff The work to be done under Contract #20454 consists of the construction of approximately 467 lineal feet of storm sewers varying in size from 12-inches to 30-inches in diameter and appurtenances. The purpose of this project is to alleviate structure and yard flooding in the area near 24 Larkin Lane. This project is scheduled to be completed in 90 days. FUNDING/COST SUMMARY: Budgeted: Capital Improvement Program Budget Year: FY2017, Pg. 228 Amount: $1,000,000* FY2014, Pg. 179 $ 700,000** $1,700,000 Fund Name: #5120 – Districtwide Stormwater Fund $ 81,273 #5571 – Gravois Creek OMCI Fund $158,727 $240,000 Additional Comments: An additional contingency of $50,000 for utility relocation (Gas - $30,000 & Other - $20,000) is included in the encumbered amount. *Requesting Board approval of a construction contract with Wehmeyer Farms, Inc. for which $81,273 is being encumbered from Ordinance No. 14420. **Requesting Board approval of a construction contract with Wehmeyer Farms, Inc. for which $158,727 is being encumbered from Ordinance No. 13650. Pg 25 revised - 9/14/16 Revised: 9/14/2016 9:26 AM Contracted planning resources utilized: Stormwater Facility Planning. PREVIOUS BOARD ACTION RELATED TO THIS ACTION: 08/08/13 – Ord. No. 13650 – Amount: $700,000 – Stormwater Infrastructure Repair/Replacement – Gravois Creek OMCI (11843) – Supplemental Appropriation 08/11/16 – Ord. No. 14420 – Amount: $1,000,000 – Stormwater Infrastructure Repair/Replacement – Districtwide (2017) (12672) – Original Appropriation Pg 26 revised - 9/14/16 Revised: 9/14/2016 9:26 AM AGENDA ITEM NUMBER: Item 45 Introduction of Proposed Ordinance 14511 NAME OF PROJECT: Wintergreen 3503 and 3507 Storm Sewer (11362) LOCATION: North of South Lindbergh Boulevard and west of Union Road in unincorporated St. Louis County, Missouri TYPE OF PROJECT: Storm Sewer Construction (015.0 Construction Costs) DEPARTMENT REQUESTING ACTION: Engineering REQUESTED ACTION: Why is this action necessary?: Appropriates funds and authorizes staff to enter into a construction contract. What does action accomplish?: Implements the construction of a CIP project. SUMMARY EXPLANATION/BACKGROUND: Contractor: ABNA Engineering, Inc. Previous District Contract: Yes 4140 Lindell Blvd. St. Louis, MO 63108 Consultant: N/A Agency: N/A Number of bidders: 6 Low Bid: $70,758.00 High Bid: $98,789.00 Appropriation Amount: $85,000.00 Designer’s Estimate: $74,000.00 Total MWBE Participation: 17.10% (MBE Goal is 17% - African American) Tee & E Trucking, Inc. (African American) – 6.36% - MBE Crusade Construction, LLC (African American) – 10.74% - MBE ABNA Engineering, Inc. (African American) – 82.90% - MWBE Prime Type of Contract: Unit Cost Properties Affected: 2 Properties Benefiting: 2 Designed by: Thouvenot, Wade & Moerchen, Inc. The work to be done under Contract #20454 consists of the construction of approximately 178 lineal feet of storm sewers 12-inches in diameter and appurtenances. The purpose of this project is to alleviate yard flooding of 3503 and 3507 Wintergreen Lane. This project is scheduled to be completed in 120 days. FUNDING/COST SUMMARY: Budgeted: Capital Improvement Program Budget Year: FY2017, Pg. 234 Amount: $80,000 Fund Name: #5571 – Gravois Creek OMCI Fund Additional Comments: An additional contingency of $5,000 for utility relocation (Other - $5,000) is included in the appropriation. This project was one of four design projects included in Gravois Creek OMCI Stormwater Design (Contract C) (11901). Contracted planning resources utilized: Stormwater Facility Planning. PREVIOUS BOARD ACTION RELATED TO THIS ACTION: 01/09/14 – Ord. No. 13777 – Amount: $245,000 – Thouvenot, Wade & Moerchen – Gravois Creek OMCI Stormwater Design (Contract C) (11901) – Design Contract No. 20121 Pg 27 revised - 9/14/16 Revised: 9/14/2016 9:26 AM AGENDA ITEM NUMBER: Item 46 Introduction of Proposed Ordinance 14512 NAME OF PROJECT: Grant #609 Bank Stabilization (11045) LOCATION: West of Grant Road and south of Interstate 44 in the Cities of Crestwood and Webster Groves, Missouri TYPE OF PROJECT: Channel Stabilization (015.0 Construction Costs) DEPARTMENT REQUESTING ACTION: Engineering REQUESTED ACTION: Why is this action necessary?: Appropriates funds and authorizes staff to enter into a construction contract. What does action accomplish?: Implements the construction of a CIP project. SUMMARY EXPLANATION/BACKGROUND: Contractor: Ideal Landscape Construction, Inc. Previous District Contract: Yes 6264 Lemay Ferry Road St. Louis, MO 63129 Consultant: N/A Agency: N/A Number of bidders: 2 Low Bid: $182,329.00 High Bid: $301,855.00 Appropriation Amount: $215,000.00 Designer’s Estimate: $216,000.00 Total MWBE Participation: 17.00% (MBE Goal is 17% - African American) Eu-Hodos Enterprises, Inc. (African American) – 3.29% - MBE McKay’s Hauling Company, Inc. (African American) – 7.90% - MBE Taylormade Construction Co., LLC (African American) – 5.81% - MBE Type of Contract: Unit Cost Properties Affected: 3 Properties Benefiting: 3 Designed by: Reitz & Jens, Inc. The work to be done under Contract #20463 consists of the construction of approximately 225 lineal feet of natural channel stabilization including grade controls, biostabilized slopes and modular block walls, and appurtenances. The purpose of this project is to alleviate creek erosion. This project is scheduled to be completed in 120 days. FUNDING/COST SUMMARY: Budgeted: Capital Improvement Program Budget Year: FY2017, Continued Amount: $152,000 Fund Name: #5571 – Gravois Creek OMCI Fund Additional Comments: An additional contingency of $11,000 for utility relocation (Electric - $11,000) is included in the appropriation. The designer’s estimate is higher than the budgeted amount due to recent increases in unit bid prices for channel stabilization work. This project was one of three design projects included in the Gravois Creek OMCI Stormwater Design (Contract E) (11936). Contracted planning resources utilized: Stormwater Facility Planning. PREVIOUS BOARD ACTION RELATED TO THIS ACTION: 01/09/14 – Ord. No. 13779 – Amount: $249,000 – Reitz & Jens Inc. – Gravois Creek OMCI Stormwater Design (Contract E) (11936) – Design Contract No. 20123 Pg 28 revised - 9/14/16 Revised: 9/14/2016 9:26 AM AGENDA ITEM NUMBER: Item 47 INTRODUCTION & ADOPTION of Proposed Ordinance 14513 NAME OF PROJECT: Emergency Repair #056 (Fenton WWTP Ultra-Violet Disinfection Repair) Funding (12808) LOCATION: Fenton Wastewater Treatment Plant in the City of Fenton, Missouri TYPE OF PROJECT: Emergency Repair (011.0 Design Phase Project Costs) (014.0 Construction Inspection and Management Services Costs) (015.0 Construction Costs) DEPARTMENT REQUESTING ACTION: Operations REQUESTED ACTION: Why is this action necessary?: Appropriates funds for the emergency repair/replacement of the Ultra-Violet Disinfection System at the Fenton WWTP which were impacted by rain and flooding from the August 15, 2016 rain event. What does action accomplish?: Restores the functionality of the Ultra-Violet Disinfection System at the Fenton WWTP to bring the plant back in compliance with regulatory requirements. SUMMARY EXPLANATION/BACKGROUND: Contractor: N/A Previous District Contract: Yes Consultant: N/A Agency: N/A Number of bidders: N/A Low Bid: N/A High Bid: N/A Appropriation Amount: $550,000.00 Designer’s Estimate: N/A Total MWBE Participation: N/A Type of Contract: N/A Properties Affected: Fenton Service Area Properties Benefiting: Numerous Designed by: District staff The work consists of assisting the Operations Department with setting up a temporary disinfection system; dry, clean, and assess damages to the Ultra-Violet (UV) Disinfection System; and repair/replace all necessary components in order to place the UV Disinfection System back into service. District staff declared this project an emergency on August 15, 2016. The work has started and is expected to be complete by December 15, 2016. FUNDING/COST SUMMARY: Budgeted: N/A Budget Year: N/A Amount: N/A Fund Name: #4122 – Wastewater Emergency Fund Additional Comments: District staff declared an emergency on August 15, 2016. All companies working on this project will be encouraged to employ MWBE firms and minority and women workforce to the extent practical. PREVIOUS BOARD ACTION RELATED TO THIS ACTION: N/A Pg 29 revised - 9/14/16 Revised: 9/14/2016 9:26 AM AGENDA ITEM NUMBER: Item 48 INTRODUCTION & ADOPTION of Proposed Ordinance 14514 NAME OF PROJECT: Emergency Repair #056 (Fenton WWTP Ultra-Violet Disinfection Repair) Construction Contract (12808) LOCATION: Fenton Wastewater Treatment Plant in the City of Fenton, Missouri TYPE OF PROJECT: Emergency Repair (015.0 Construction Costs) DEPARTMENT REQUESTING ACTION: Operations REQUESTED ACTION: Why is this action necessary?: Authorizes staff to enter into an emergency construction contract. What does action accomplish?: Restores the functionality of the Ultra-Violet Disinfection System at the Fenton WWTP to bring the plant back in compliance with regulatory requirements. SUMMARY EXPLANATION/BACKGROUND: Contractor: KCI Construction Company Previous District Contract: Yes 10315 Lake Bluff Drive St. Louis, MO 63123 Consultant: N/A Agency: N/A Number of bidders: N/A Low Bid: N/A High Bid: N/A Appropriation Amount: N/A Designer’s Estimate: N/A Total MWBE Participation: N/A Type of Contract: Force Account (Time & Materials) Properties Affected: Fenton Service Area Properties Benefiting: Numerous Designed by: District staff The work to be done under emergency Contract #20484 consists of assisting the Operations Department with setting up a temporary disinfection system; dry, clean, and assess damages to the Ultra-Violet (UV) Disinfection System; and repair/replace all necessary components in order to place the UV Disinfection System back into service. District staff declared this project an emergency on August 15, 2016. The work has started and is expected to be complete by December 15, 2016. FUNDING/COST SUMMARY: Budgeted: N/A Budget Year: N/A Amount: N/A Fund Name: N/A Additional Comments: District staff declared an emergency on August 15, 2016. KCI Construction Company has been encouraged to employ MWBE firms and minority and women workforce to the extent practical. KCI Construction Company was selected for this work based on availability and they are still on site completing the work from the previous December 2015 Emergency Repair. PREVIOUS BOARD ACTION RELATED TO THIS ACTION: 09/15/16 – Proposed Ordinance No. 14513 – Amount: $550,000 – Emergency Repair #056 (Fenton WWTP Ultra-Violet Disinfection Repair) Funding (12808) *Requesting Board approval of a construction contract with KCI Construction Company for which $475,000.00 is being encumbered from Proposed Ordinance No. 14513. Pg 30 revised - 9/14/16 Revised: 9/14/2016 9:26 AM AGENDA ITEM NUMBER: Item 49 INTRODUCTION & ADOPTION of Proposed Ordinance 14515 NAME OF PROJECT: Emergency Repair #056 (Fenton WWTP Ultra-Violet Disinfection Repair) Design Contract (12808) LOCATION: Fenton Wastewater Treatment Plant in the City of Fenton, Missouri TYPE OF PROJECT: Emergency Repair (011.0 Design Phase Project Costs) (014.0 Construction Inspection and Management Services Costs) DEPARTMENT REQUESTING ACTION: Operations REQUESTED ACTION: Why is this action necessary?: Authorizes staff to enter into an emergency design and construction management services contract. What does action accomplish?: Restores the functionality of the Ultra-Violet Disinfection System at the Fenton WWTP to bring the plant back in compliance with regulatory requirements. SUMMARY EXPLANATION/BACKGROUND: Contractor: N/A Previous District Contract: Yes Consultant: Kennedy Associates/Architects, Inc. 2060 Craigshire Road St. Louis, MO 63146 Corporate Headquarters: St. Louis, Missouri Agency: N/A Number of bidders: N/A Low Bid: N/A High Bid: N/A Appropriation Amount: N/A Designer’s Estimate: N/A Total MWBE Participation: 100% MBE Prime (No MWBE Goal) Type of Contract: Cost Plus Properties Affected: Fenton Service Area Properties Benefiting: Numerous Designed by: District staff The work to be done under emergency Contract #20485 for design and construction management services consists of assisting the Operations Department with setting up a temporary disinfection system; dry, clean, and assess damages to the Ultra-Violet (UV) Disinfection System; and repair/replace all necessary components in order to place the UV Disinfection System back into service. District staff declared this project an emergency on August 15, 2016. The work has started and is expected to be complete by December 15, 2016. FUNDING/COST SUMMARY: Budgeted: N/A Budget Year: N/A Amount: N/A Fund Name: N/A Additional Comments: District staff declared an emergency on August 15, 2016. Kennedy Associates has been encouraged to employ MWBE firms to the extent practical. Kennedy Associates was selected for this work based on availability and they are still on site completing the CM services from the previous December 2015 Emergency Repair. *Requesting Board approval of a design and construction management services contract with Kennedy Associates/Architects, Inc. for which $75,000.00 is being encumbered from Proposed Ordinance No. 14513. Pg 31 revised - 9/14/16 Revised: 9/14/2016 9:26 AM PREVIOUS BOARD ACTION RELATED TO THIS ACTION: 09/15/16 – Proposed Ordinance No. 14513 – Amount: $550,000 – Emergency Repair #056 (Fenton WWTP Ultra-Violet Disinfection Repair) Funding (12808) Pg 32 revised - 9/14/16 Revised: 9/14/2016 9:26 AM AGENDA ITEM NUMBER: Item 50 INTRODUCTION & ADOPTION of Proposed Ordinance 14516 NAME OF PROJECT: Riverside and Yarnell Sanitary Relief – Forensic Testing (12789) LOCATION: South of Interstate 44 and west of the Meramec River located in the City of Fenton, Missouri TYPE OF PROJECT: Sanitary Sewer Construction (016.0 Consultant/Vendor Services) DEPARTMENT REQUESTING ACTION: Engineering REQUESTED ACTION: Why is this action necessary?: Appropriates additional funds for repair work. What does action accomplish?: Supports forensic testing related to design and construction issues. SUMMARY EXPLANATION/BACKGROUND: Contractor: Unnerstall Contracting Co., Ltd. Previous District Contract: N/A 2803 W. Osage Pacific, MO 63069 Consultant: N/A Agency: N/A Number of bidders: 3 Low Bid: $574,202.00 High Bid: $641,300.00 Appropriation Amount: $400,000.00 Designer’s Estimate: N/A TOTAL MWBE Participation: N/A (Due to the short time allowed for bidding, full compliance with the policy, including good faith effort, is not a requirement of this project: however, bidders are encouraged to maximize MBE utilization.) Type of Contract: Time and Material Properties Affected: 1 Properties Benefiting: 950 Designed by: District staff The work to be done under the emergency Contract #20486 consists of the excavation, pipe removal and replacement of approximately 24 lineal feet of pipe sewers 42-inches in diameter and appurtenances. This work is being done in relation to design and construction issues related to a previous project failure. The work is expected to be complete by October 4, 2016. FUNDING/COST SUMMARY: Budgeted: N/A Budget Year: N/A Amount: $0 Fund Name: #1101 – General Fund Additional Comments: The District is utilizing an existing contract with a GSA geotechnical consultant to oversee the work. The project was bid as an Immediate Need per the District’s purchasing policy due to the time sensitive nature of this work. Staff is requesting introduction and adoption at the September 15, 2016 Board meeting to allow for this work to be expedited to provide timely information on cause(s) of failures for purposes of repair estimates and discussions with other involved parties concerning responsibility for same. This supplemental appropriation will bring the total appropriation for this project to $600,000 and fully fund the construction for the project. PREVIOUS BOARD ACTION RELATED TO THIS ACTION: 08/31/06 – Ord. No. 12284 – Amount: $1,297,000 – BIS Frucon Engineering Inc. – Design Contract No. E-1183 03/13/13 – Ord. No. 13575 – Amount: $7,900,000 – Riverside and Yarnell Sanitary Relief (SKME-400) (10146) – Gershenson Construction Co., Inc. 07/14/16 – Ord. No. 14470 – Amount: $200,000 – Riverside and Yarnell Sanitary Relief – Forensic Testing (12789) – Original Appropriation to Contract No. 20486 Pg 33 revised - 9/14/16 Revised: 9/14/2016 9:26 AM AGENDA ITEM NUMBER: Item 51 Introduction of Proposed Ordinance 14517 NAME OF PROJECT: General Services Agreement – Sewer & Process Design (FY2014) (11759) LOCATION: Various locations within in the District TYPE OF PROJECT: General Engineering Services (011.0 Design Phase Project Costs) DEPARTMENT REQUESTING ACTION: Engineering REQUESTED ACTION: Why is this action necessary?: Appropriates additional funds and authorizes staff to amend a design contract. What does action accomplish?: Provides additional funds for the design of small, capital projects and Operations projects, as required by Consent Decree. SUMMARY EXPLANATION/BACKGROUND: Contractor: N/A Previous District Contract: Yes Consultant: Stantec Consulting Services, Inc. 1859 Bowles Ave., Suite 250 Fenton, MO 63026 Corporate Headquarters : Rochester, New York & Edmonton, Alberta, Canada (Parent Co.) Agency: N/A Number of proposers: N/A Appropriation Amount: $90,000.00 Designer’s Estimate: N/A Total MWBE Participation: 35.00% (Overall – 35.00%) (MWBE Goal is 30.00%) Hart Engineering, LLC – 15.00% - WBE (This amendment – 6.00%) ERM Technologies, Inc. (African American) – 9.00% - MBE (This amendment – 19.00%) Intelligent Design & Construction Solutions LLC – 7.00% - WBE (This amendment – 0.00%) Sabur, Inc. (African American) – 2.00% - MBE (This amendment – 8.00%) Maag Geotechnical Services, Inc. – 2.00% - WBE (This amendment – 0.00%) Total 33.00% Type of Contract: Hourly Billing Rate Plus Reimbursables Properties Affected: To Be Determined Properties Benefiting: To Be Determined Designed by: N/A This ordinance authorizes the District to enter into Amendment No. 2 to Contract #20086 with Stantec Consulting Services, Inc. to supplement the appropriation for the design and construction phase services for various projects in the CIP and Operations’ budgets. This project consists of various wastewater treatment plant and building designs. Projects will be issued by letter agreement per individual scopes of services. Stantec Consulting Services, Inc. was previously chosen through the regular consultant review and selection process. The amended design appropriation is $690,000. FUNDING/COST SUMMARY: Budgeted: Capital Improvement Program Budget Year: FY2015, Pg. 38 Amount: $300,000 Fund Name: #6660 – Sanitary Replacement Fund Additional Comments: This amendment provides for construction phase services (CPS) for four construction projects and also provides design services to re-design the Missouri River WWTP Berm project subsequent to the December 2015 flood. Contracted planning resources utilized: Watershed Facility Planning. PREVIOUS BOARD ACTION RELATED TO THIS ACTION: 12/11/14 – Ord. No. 14007 – Amount: $300,000 – Stantec Consulting Services, Inc. – Design Contract No. 20086 – Amendment No. 1 Pg 34 revised - 9/14/16 Revised: 9/14/2016 9:26 AM AGENDA ITEM NUMBER: Item 52 Introduction of Proposed Ordinance 14518 NAME OF PROJECT: County Treatment Facility Design (Contract A) (12727) LOCATION: Various locations in St. Louis County, Missouri TYPE OF PROJECT: Design (016.0 Consultant/Vendor Services) DEPARTMENT REQUESTING ACTION: Engineering REQUESTED ACTION: Why is this action necessary?: Appropriates funds and authorizes staff to enter into a design contract. What does action accomplish?: Provides for a multi-year consultant contract to implement the design of projects at various wastewater treatment facilities in St. Louis County, Missouri SUMMARY EXPLANATION/BACKGROUND: Contractor: N/A Previous District Contract: Yes Consultant: HDR Engineering, Inc. 401 South 18th Street, Suite 300 St. Louis, MO 63103 Corporate Headquarters: Omaha, Nebraska Agency: N/A Number of proposers: (3) Crawford Murphy & Tilly Inc.; Donohue & Associates, Inc.; and HDR Engineering, Inc. Appropriation Amount: $1,134,000.00 Designer’s Estimate: N/A Total MWBE Participation: 7.78% (5.00% Overall) (No MWBE Goal) Intelligent Design & Construction Solutions LLC – 3.38% - WBE Kowelman Engineering, Inc. – 2.87% - WBE TSI Geotechnical, Inc. (African American) – 1.53% - MBE Type of Contract: Lump Sum Properties Affected: 2 Properties Benefitting: Grand Glaize and Missouri River Service Areas Designed by: N/A This ordinance authorizes the District to enter into Contract #20468 with HDR Engineering, Inc. to provide design services for all projects included in the County Treatment Facility Design (Contract A) (12727) project. The preliminary construction cost estimate for the entire County Treatment Facility Design (Contract A) (12727) program in FY2017 is $7,321,000. The estimated design contract range for the entire program contract is between $1 and $2 million. Specific project lump sum design appropriations totaling $825,553 in design costs and $308,447 for allowances and contingencies to be used only with the approval of MSD associated with the contract in this fiscal year are being appropriated as part of the County Treatment Facility Design (Contract A) (12727) contract and include the following projects: Project Name Estimated Construction Cost Grand Glaize Sludge Odor Reduction (12725) $3,000,000 Grand Glaize WWTF Building, Switchgear, Tank and Screen Repair (12495) $3,321,000 Missouri River WWTF Ferric Chloride Storage and Feed Facility (12708) $1,000,000 Total $7,321,000 Pg 35 revised - 9/14/16 Revised: 9/14/2016 9:26 AM FUNDING/COST SUMMARY: Budgeted: Capital Improvement Program Budget Year: FY2017, Pg. 13 Amount: $ 50,000 FY2017, Pg. 36 $ 620,000 FY2017, Pg. 37 $ 700,000 FY2017, Pg. 63 $ 300,000 Total $1,670,000 Fund Name: #6660 – Sanitary Replacement Fund Additional Comments: There were two (2) other proposals considered on this project. These projects are being designed as part of the County Treatment Facility Design (Contract A) (12727) contract. The total appropriation for design services is $536,000 below the total proposed funding presented in the CIP Budget Supplement. The total appropriation includes $825,553 for design services, $116,447 in contingencies, and $192,000 for construction phase services. These services include construction field surveys, review of shop drawings and submittals, responding to design questions and changes during construction, as-built surveys, and preparation of as-built record drawings. These projects are expected to be funded by Bond proceeds. Grand Glaize Sludge Odor Reduction (12725) is a lump sum cost project to provide engineering evaluation of alternative sludge handling facilities to reduce odors through enhanced processing of sludge. Based on results of the engineering evaluation a supplemental appropriation for design services for the required odor facilities design may be requested. There is a possibility the engineering evaluation may recommend an alternative such as selecting vendor equipment for installation or some other alternative that does not require professional engineering design services. This project will not eliminate any constructed SSOs. The appropriation for design services is $435,000 below the proposed funding for the project presented in the CIP Budget Supplement. The appropriation includes $168,710 for engineering services and $16,290 in contingencies. The construction cost estimate for this project is $3,000,000. Construction is anticipated to begin in FY2018. Grand Glaize WWTF Building, Switchgear, Tank and Screen Repairs (12495) is a lump sum cost project for design to stabilize the administration building foundation settlement, modifications and upgraded to the electrical switchgear, and an additional mechanical bar screen and modifications to the existing screen system to correct deficiencies and improve performance and reliability. This project will not eliminate any constructed SSOs. The appropriation for design services is $139,000 below the proposed funding for this project presented in the CIP Budget Supplement. The appropriation includes $398,332 for design services, $30,668 in contingencies, and $132,000 for construction phase services. These services include construction field surveys, review of shop drawings and submittals, responding to design questions and changes during construction, as-built surveys, and preparation of as-built record drawings. The construction cost estimate for this project is $3,321,000. Construction is anticipated to begin in FY2018. Missouri River WWTF Ferric Chloride Storage and Feed Facility (12708) is a lump sum cost project for the design of the ferric chloride system. This project will not eliminate any constructed SSOs. The appropriation for design services is $38,000 above the proposed funding for this project presented in the CIP Budget Supplement. The appropriation includes $258,511 for engineering services, $19,489 in contingencies, and $60,000 for construction phase services. These services include construction field surveys, review of shop drawings and submittals, responding to design questions and changes during construction, as-built surveys, and preparation of as-built record drawings. The construction cost estimate for this project is $1,000,000. Construction is anticipated to begin in FY2018. Future appropriations will be required for the Grand Glaize Sludge Odor Reduction (12725) design and for construction phase services, if required, after evaluation of potential solutions is completed. Future appropriations will also be required for other design projects as part of this multi-year contract as identified. The total MWBE commitment of 5% is for the project duration per the original proposal. Contracted planning resources utilized: Watershed Facility Planning. PREVIOUS BOARD ACTION RELATED TO THIS ACTION: N/A Pg 36 revised - 9/14/16 Revised: 9/14/2016 9:26 AM AGENDA ITEM NUMBER: Item 53 Introduction of Proposed Ordinance 14519 NAME OF PROJECT: Flow Metering and Monitoring (2017) (12759) LOCATION: District-wide TYPE OF PROJECT: Flow Meter and Monitoring (016.0 Vendor Services) DEPARTMENT REQUESTING ACTION: Operations REQUESTED ACTION: Why is this action necessary?: Appropriates funds and authorizes staff to enter into a contract. What does action accomplish?: Provides sewer flow meter data to support Consent Decree and other regulatory compliance, to update and maintain District hydraulic models, and to evaluate the effectiveness of ongoing inflow and infiltration mitigation and Capital Improvement projects, as required by Consent Decree. SUMMARY EXPLANATION/BACKGROUND: Contractor: N/A Previous District Contract: Yes Consultant: ADS Environmental Services 13266 Lakefront Drive Earth City, MO 63045 Agency: N/A Number of proposers: (4) ADS Environmental Services; Burns & McDonnell Engineering Co.; George Butler Associates, Inc.; and RJN Group, Inc. Appropriation Amount: $2,500,000.00 Designer’s Estimate: N/A MBE/WBE Participation: 21.81% (No MWBE Goal) Gonzalez Companies, LLC (Hispanic) – 7.78% - MBE Civil Design, Inc. – 6.25% - WBE TREKK Design Group, LLC – 7.78% - WBE Type of Contract: Unit Cost Properties Affected: N/A Properties Benefiting: N/A Designed by: N/A This ordinance authorizes the District to enter into Contract #20477 with ADS Environmental Services. The purpose of this contract is to provide District staff with information regarding separate sanitary, combined, and storm sewer system flows during dry and wet weather conditions at approximately 250 locations annually for durations ranging from three (3) months to twelve (12) months. This data is a diagnostic tool that will be used to meet Consent Decree requirements, refine hydraulic models, determine project effectiveness, and support inflow/infiltration (I/I) investigations. The data from these meters will also be used to support the District’s ongoing programs such as the CMOM, Asset Management, Sewer Prioritization, Stormwater Control Programs, the SSO Control Plan, the CSO Control Plan, and the Infiltration & Inflow Reduction Program. This contract for flow metering and monitoring is $2,500,000. Approximately 15% of the metering locations will be installed specifically to provide data at regulatory and billing sites. The remaining 85% of the meter locations will indirectly support Consent Decree requirements by providing pre and post construction data, updating models, and supporting other operational and engineering needs. This contract is renewable for up to four (4) additional years. FUNDING/COST SUMMARY: Budgeted: Capital Improvement Program Budget Year: FY2017, Pg. 20 Amount: $2,500,000 Fund Name: #1101 – General Fund Pg 37 revised - 9/14/16 Revised: 9/14/2016 9:26 AM Additional Comments: The District, through the Purchasing Division, solicited proposals from a total of 147 vendors for this project. Proposals were submitted by four firms. A committee was formed to review RFP 6546 and ADS Environmental Services was selected as the vendor that was best qualified to meet the Flow Metering and Monitoring requirements and specifications. The appropriation amount is equal to the proposed funding presented in the CIP Budget Supplement, and is needed in order to meet the requirements of the Consent Decree projects and post construction monitoring. Typically, the number of meters needed each year greatly exceed 250. PREVIOUS BOARD ACTION RELATED TO THIS ACTION: N/A Pg 38 revised - 9/14/16 Revised: 9/14/2016 9:26 AM AGENDA ITEM NUMBER: Item 54 Introduction of Proposed Ordinance 14520 NAME OF PROJECT: Mississippi Floodwall ORS Pump Stations Rehabilitation (12483) LOCATION: Various locations in the City of St. Louis, Missouri TYPE OF PROJECT: Design (011.0 Design Phase Project Costs) DEPARTMENT REQUESTING ACTION: Engineering REQUESTED ACTION: Why is this action necessary?: Appropriates funds and authorizes staff to enter into a design contract. What does action accomplish?: Implements the design of a CIP project. SUMMARY EXPLANATION/BACKGROUND: Contractor: N/A Previous District Contract: Yes Consultant: Black & Veatch Corporation 16305 Swingley Ridge Rd., Suite 230 Chesterfield, MO 63017 Corporate Headquarters: Overland Park, Kansas Agency: N/A Number of proposers: (3) AECOM Technical Services, Inc.; Black & Veatch Corporation; and Stantec Consulting Services, Inc. Appropriation Amount: $545,000.00 Designer’s Estimate: N/A Total MWBE Participation: 25.21% (No MWBE Goal) Lion, CSG LLC – 11.07% - WBE Intelligent Design & Construction Solutions LLC – 7.18% - WBE Engineering Design Source, Inc. (Asian American) – 3.89% - MBE KWAME Building Group Inc. (African American) – 3.07% - MBE Type of Contract: Cost Plus Fixed Fee and Lump Sum Fee Work Properties Affected: 27 Properties Benefitting: Mississippi River Tributary Areas Designed by: N/A This ordinance authorizes the District to enter into Contract #20476 with Black & Veatch Corporation for Engineering Design Services and for the preparation of Design Build project delivery solicitation documents including strategies, procedures, policies and processes for the District’s use and consideration, and 30% Design Build project delivery solicitation documents for Phase I of the Mississippi Floodwall ORS Pump Stations Rehabilitation (12483) project. The purpose of this project is to rehabilitate and/or replace the deteriorating components of the St. Louis Flood Protection System that are operated and maintained by the Metropolitan St. Louis Sewer District. Black & Veatch will also provide Advisory Services during the design, construction, and start-up after the selection is completed. Advisory Services include reviewing the Design Build progress to make sure the project stays on track, on schedule, and within budget. The preliminary construction cost estimate is $5,000,000. Construction is anticipated to begin in FY2018. FUNDING/COST SUMMARY: Budgeted: Capital Improvement Program Budget Year: FY2017, Pg. 62 Amount: $545,000 Fund Name: #6660 – Sanitary Replacement Fund Pg 39 revised - 9/14/16 Revised: 9/14/2016 9:26 AM Additional Comments: There were two (2) other proposals considered on this project. The appropriation for design services is equal to the proposed funding presented in the CIP Budget Supplement. The appropriation includes $44,841 for project management; $104,357 for preparation of Design Build project delivery solicitation strategies, procedures, policies and processes; $336,772 for 30% Design Build project delivery solicitation documents for Phase I of the Mississippi Floodwall ORS Pump Stations Rehabilitation (12483) project; $32,000 for Advisory Services during the Design Build; and $25,040 in contingencies. This project is expected to be funded by Bond proceeds. This contract is for the first year of a planned multi-year program to repair failing gates on the Mississippi Floodwall ORS Pump Stations Rehabilitation (12483) project that will require additional appropriations and contract amendments in future years. Extension of the contract is contingent upon acceptable performance by the consultant team, and is subject to the District’s discretion. Contracted planning resources utilized: Watershed Facility Planning, Combine Sewer Area I/I Assessment. PREVIOUS BOARD ACTION RELATED TO THIS ACTION: N/A Pg 40 revised - 9/14/16 Revised: 9/14/2016 9:26 AM AGENDA ITEM NUMBER: Item 55 Introduction of Proposed Ordinance 14521 NAME OF PROJECT: Maline Creek CSO BP 051 & 052 Local Storage Facility (Chain of Rocks Dr to Church Dr) (11656) OJT LOCATION: South of Chain of Rocks Drive and west of Riverview Drive in the City of St. Louis, Missouri TYPE OF PROJECT: Combined Sewer Construction (015.0 Construction Costs) DEPARTMENT REQUESTING ACTION: Engineering REQUESTED ACTION: Why is this action necessary?: Appropriates additional funds and authorizes staff to amend a contract. What does action accomplish?: Implements a Tunneling Training Program that will provide opportunities for minority and women journeymen and apprentices to gain experience in tunnel type work. SUMMARY EXPLANATION/BACKGROUND: Contractor: SAK/Goodwin Joint Venture Previous District Contract: Yes 864 Hoff Road O’Fallon, MO 63366 Consultant: N/A Agency: N/A Number of bidders: N/A Low Bid: N/A High Bid: N/A Appropriation Amount: $500,000.00 Designer’s Estimate: N/A Total MWBE Participation: 18.03% (MBE Goal is 17% - African American) Steel Rebar Manufacturing, LLC (African American) – 2.60% - MBE XL Contracting, Inc. (African American) – 3.93% - MBE A-Plus Contractors, LLC (African American) – 0.31% - MBE Supplied Industrial Solutions, Inc. (African American) – 1.48% - MBE TD4 Electrical, LLC (African American) – 0.87% - MBE Williams Tunneling Industries, Inc. (African American) – 7.29% - MBE Luther’s Supply, LLC (African American) – 1.01% - MBE McKay’s Hauling Company, Inc. (African American) – 0.54% - MBE Type of Contract: Lump Sum Properties Affected: 11 Properties Benefiting: The entire Maline Creek Watershed Designed by: Jacobs Engineering Group, Inc. The activities planned for this contract amendment and supplemental appropriation will implement a Tunneling Training Program that will provide opportunities for minority and women journeymen or apprentices to gain experience in tunnel type work. The Program will be implemented on the Upper Maline Trunk Sanitary Relief Phase IV Section A and the Maline Creek CSO BP 051 & 052 Local Storage Facility projects. The goal of the Program is to train an additional 8 minority and women journeyman or apprentices unfamiliar with tunnel type work. Contractor is responsible to meet all workforce diversity goals as required by the Contract, prior to implementation of this Program. At the completion of the training the trainees will be skilled in tunneling type work. The work to be done under the original Contract #20375 consists of the construction of a 40-foot diameter, 12.5 MGD submersible pump station, a 28-foot diameter x 2,700-foot long cavern, a 580-foot long x 6-foot lined connecting tunnel, three deaeration chambers, three intake structures, a shallow connector sewer constructed by pipe jacking and related storm sewers. The purpose of this project is to provide for volumetric CSO storage during wet weather events to reduce CSOs to four events in the defined typical year and a maximum of 84 million gallons of untreated overflow volume. Pg 41 revised - 9/14/16 Revised: 9/14/2016 9:26 AM This project is scheduled to be completed in 1,589 days. FUNDING/COST SUMMARY: Budgeted: Capital Improvement Program Budget Year: FY2017, Pg. 138 Amount: $ 30,000,000 (Partial) Fund Name: #6660 – Sanitary Replacement Fund Additional Comments: A supplemental appropriation request is planned for construction in FY2017, FY2018, FY2019, and FY2020 for a total construction appropriation of $86,200,000. With this supplemental appropriation, a total appropriation of $86,700,000 is anticipated. This project is expected to be funded by Bond proceeds. PREVIOUS BOARD ACTION RELATED TO THIS ACTION: 05/12/16 – Ord. No. 14364 – Amount $10,000,000 – Maline Creek CSO BP 051 & 052 Local Storage Facility (Chain of Rocks Dr to Church Dr) (11656) – Original Construction Contract No. 20375 Pg 42 revised - 9/14/16 Revised: 9/14/2016 9:26 AM AGENDA ITEM NUMBER: Item 56 Introduction of Proposed Ordinance 14522 NAME OF PROJECT: Upper Maline Trunk Sanitary Relief Phase IV Section A (10026) LOCATION: East of Interstate I-170 and north of Natural Bridge Road in the City of Ferguson and unincorporated St. Louis County, Missouri TYPE OF PROJECT: Sanitary Sewer Construction (015.0 Construction Costs) DEPARTMENT REQUESTING ACTION: Engineering REQUESTED ACTION: Why is this action necessary?: Appropriates additional funds and authorizes staff to amend a contract. What does action accomplish?: Implements a Tunneling Training Program that will provide opportunities for minority and women journeymen and apprentices to gain experience in tunnel type work. SUMMARY EXPLANATION/BACKGROUND: Contractor: SAK Construction, LLC Previous District Contract: Yes 864 Hoff Road O’Fallon, MO 63366 Consultant: N/A Agency: N/A Number of bidders: N/A Low Bid: N/A High Bid: N/A Appropriation Amount: $250,000.00 Designer’s Estimate: N/A Total MWBE Participation: 18.33% (MBE Goal is 17% - African American) Williams Tunneling Industries (African American) – 16.67% - MBE DM Hauling (African American) – 0.89% - MBE Luther’s Supply, LLC (African American) – 0.77% - MBE Type of Contract: Unit Cost Properties Affected: 80 Properties Benefiting: 9,500 Designed by: HR Green, Inc. The activities planned for this contract amendment and supplemental appropriation will implement a Tunneling Training Program that will provide opportunities for minority and women journeymen or apprentices to gain experience in tunnel type work. The Program will be implemented on the Upper Maline Trunk Sanitary Relief Phase IV Section A and the Maline Creek CSO BP 051 & 052 Local Storage Facility projects. The goal of the Program is to train an additional 8 minority and women journeyman or apprentices unfamiliar with tunnel type work. Contractor is responsible to meet all workforce diversity goals as required by the Contract, prior to implementation of this Program. At the completion of the training the trainees will be skilled in tunneling type work. The work to be done under Contract #20349 consists of the construction of approximately 597 lineal feet of pipe sewers varying in size from 8-inches to 48-inches in diameter, and 6,911 lineal feet of 42-inch to 48-inch pipe in tunnel, and appurtenances. This construction is the first phase of a multi-phase improvement program. The purpose of this project is to alleviate overcharged sewer mains and basement backups. This project will eliminate two (2) constructed SSOs (BP-304 & BP-305). This project is scheduled to be completed in 700 days. FUNDING/COST SUMMARY: Budgeted: Capital Improvement Program Budget Year: FY2017, Pg. 162 Amount: $9,100,000 (Partial) Fund Name: #6660 – Sanitary Replacement Fund Pg 43 revised - 9/14/16 Revised: 9/14/2016 9:26 AM Additional Comments: A supplemental appropriation request is planned for construction later in FY2017 for $9,100,000 providing a total construction appropriation of $16,600,000. With this supplemental appropriation, a total appropriation of $16,850,000 is anticipated. This project is expected to be funded by Bond proceeds. Contracted planning resources utilized: Watershed Facility Planning, Separate Sewer Area I/I Assessment, Separate Sewer Area Flow Metering & Monitoring, Modeling, CCTV Inspection, and Radar Rainfall Data. PREVIOUS BOARD ACTION RELATED TO THIS ACTION: 03/10/16 – Ord. No. 14334 – Amount: $7,500,000 – Upper Maline Trunk Sanitary Relief Phase IV Section A (10026) – Original Construction Contract No. 20349 Pg 44 revised - 9/14/16 Revised: 9/14/2016 9:26 AM AGENDA ITEM NUMBER: Item 59 RESOLUTION 3298 NAME OF PROJECT: Pension Plan Investment Consultant LOCATION: District Wide TYPE OF PROJECT: Pension Investment Consultant DEPARTMENT REQUESTING ACTION: Secretary-Treasurer REQUESTED ACTION: Why is this action necessary?: This resolution is needed to authorize the exercise of an additional one-year option for the Pavilion contract that expires on September 30, 2016. What does action accomplish?: This resolution allows Pavilion to continue to provide their investment consulting services for the District’s pension fund, deferred compensation plan, and defined contribution plan through the quarter ending September 30, 2017. SUMMARY EXPLANATION/BACKGROUND: Contractor: N/A Previous District Contract: Yes Consultant: Pavilion Advisory Group Inc. Richard P. Marra, Senior Consultant 227 W. Monroe Street STE 2020 Chicago, IL 60606 Agency: N/A Number of bidders: N/A Low Bid: N/A High Bid: N/A Appropriation Amount: N/A District’s Estimate: $140,500 MBE/WBE Participation: N/A – There are no MWBE Goals Plan Approval Date: N/A Type of Contract: % of assets managed plus expenses Properties Affected: N/A Properties Benefiting: N/A Designed by: N/A FUNDING/COST SUMMARY: Budgeted: Pension Plan & Secretary Treasurer Budget Year: 2016-2017 Amount: $140,500 Fund Name: Additional Comments: PREVIOUS BOARD ACTION RELATED TO THIS ACTION: 09/10/2015 - Res. No. 3234 - Renewal for a third year term with Pavilion 09/11/2014 - Res. No. 3170 - Renewal for a second year term with Pavilion 09/12/2013 - Ord. No. 13719 - Contract authorization with Pavilion Pg 45 revised - 9/14/16 Revised: 9/14/2016 9:26 AM AGENDA ITEM NUMBER: Item 60 RESOLUTION 3299 NAME OF PROJECT: Force Main Non-Destructive Evaluation (Condition Assessment) Professional Services Agreement LOCATION: Throughout St. Louis City and St. Louis County, Missouri TYPE OF PROJECT: Professional Services – Force Main Non-Destructive Evaluation (Condition Assessment) DEPARTMENT REQUESTING ACTION: Operations REQUESTED ACTION: Why is this action necessary?: Authorizes staff to enter into a contract amendment to a Professional Services Agreement for Non-Destructive Evaluation of Force Main Asset Inventory and exercise year five for this existing contract. What does action accomplish?: Implements a requirement of Consent Decree to perform non-destructive evaluations of MSD force main asset inventory. SUMMARY EXPLANATION/BACKGROUND: Contractor: N/A Previous District Contract: Yes Consultant: Pure Technologies, Inc. Formerly Jason Consultants, LLC 3636 South Geyer St. Louis, MO 63127 Agency: N/A Number of proposers: N/A Appropriation Amount: N/A Designer’s Estimate: N/A Total MWBE Participation: 34.00% (MWBE Goal is 30%) M3 Engineering Group, PC (African American) – 34.00% - MBE Type of Contract: Hourly Billing Rate Plus Reimbursable Properties Affected: MSD Service Area Properties Benefitting: MSD Service Area Designed by: N/A This resolution authorizes the District to enter into an amendment for the year five (5) extension of a recurring Professional Services Agreement with Pure Technologies to perform Consent Decree required analysis of existing force main asset inventory in order to recommend non-destructive evaluation techniques, processes, and technologies for use by the District. In addition, Consultant will analyze non-destructive evaluation results and assist District personnel in estimating remaining asset life cycles, recommend capital improvements, to include identifying scope of work, and cost estimates for proposed improvements. Consultant will additionally prepare contingency plans for emergency repairs of high and medium risk force main assets. The proposed agreement will be for one year with up to one (1) more one-year extension, to match the Consent Decree required non-destructive evaluation schedule. The purpose of the agreement is to meet one of the key provisions of the Consent Decree, to conduct a periodic non-destructive evaluation of existing force main assets. The contract amendment will not exceed $359,933. FUNDING/COST SUMMARY: Budgeted: Operations Department Operating Budget Budget Year: FY2017 Amount: $359,933 Fund Name: N/A Additional Comments: Requesting Board approval of an amendment to a contract with Pure Technologies, Inc. for which an additional $359,933 was encumbered in the FY2017 Operating Budget. Pg 46 revised - 9/14/16 Revised: 9/14/2016 9:26 AM PREVIOUS BOARD ACTION RELATED TO THIS ACTION: 08/09/12 – Ord. No. 13464 – Jason Consultants, LLC – Professional Services Agreement – Original Contract 09/12/13 – Res. No. 3108 – Jason Consultants, LLC – Professional Services Agreement – Amendment 08/14/14 – Res. No. 3168 – Jason Consultants, LLC – Professional Services Agreement – Amendment 09/10/15 – Res. No. 3235 – Jason Consultants, LLC – Professional Services Agreement – Amendment