HomeMy Public PortalAbout1567th Board Agenda 9-10-20151 Revised: 9/3/2015 9:18 AM AGENDA 1567th MEETING OF THE BOARD OF TRUSTEES THE METROPOLITAN ST. LOUIS SEWER DISTRICT September 10, 2015 4:00 P.M. ROLL CALL & CLOSED SESSION 5:00 P.M. PUBLIC BOARD MEETING MSD OFFICES 2350 MARKET STREET ROOM 109 1 ROLL CALL 2 CLOSED SESSION TO DISCUSS PERSONNEL ACTIONS UNDER §610.021(3), AND LEGAL, CONFIDENTIAL, OR PRIVILEGED MATTERS UNDER § 610.021(1), RSMO 1988 SUPP 3. APPROVAL OF JOURNAL OF PRECEDING MEETING August 13, 2015 (1566th) 4 COMMENTS BY THE CHAIR 5 REPORT OF BOARD COMMITTEES 6 REPORT OF EXECUTIVE DIRECTOR 7 COMMENTS FROM THE PUBLIC 8 SUBMISSION OF PUBLIC HEARING REPORTS – None 9 COMMUNICATIONS 10 CONSENT AGENDA – 11 through 45 2 Revised: 9/3/2015 9:18 AM ORDINANCES 11 Adoption of Proposed Ord. No. 14192- Bissell – Coldwater – Missouri – Meramec Public I/I Reduction (2016) Contract A (12060) Appropriating Three Million Eight Hundred Fifty Thousand Dollars ($3,850,000.00) from the Sanitary Replacement Fund to be used for project costs for sanitary sewer rehabilitation in Bissell - Coldwater - Missouri - Meramec Public I/I Reduction (2016) Contract A (12060), in the Cities of Jennings, Florissant, Northwoods, Pasadena Hills and Unincorporated St. Louis County, Missouri; and authorizing the Executive Director and Secretary-Treasurer on behalf of The Metropolitan St. Louis Sewer District to enter into Contract No. 20283 with SAK Construction, LLC, for the aforesaid sanitary sewer rehabilitation. 12 Adoption of Proposed Ord. No. 14193- CSO Volume Reduction Green Infrastructure (11146) Making a supplemental appropriation of Five Million Dollars ($5,000,000.00) from the General Fund to be used for Green Infrastructure construction in the CSO Volume Reduction Green Infrastructure (11146), in the Cities of St. Louis and Pine Lawn, Missouri. 13 Adoption of Proposed Ord. No. 14194- CSO Volume Reduction Green Infrastructure – Heart of Pine Lawn/Northwoods Point (12659) Authorizing the Executive Director and Secretary-Treasurer on behalf of The Metropolitan St. Louis Sewer District to enter into an agreement with 24:1 Parkway Collaborative for cost sharing in CSO Volume Reduction Green Infrastructure - Heart of Pine Lawn/Northwoods Point (12659), in the City of Pine Lawn, Missouri. 14 Adoption of Proposed Ord. No. 14195- CSO Volume Reduction Green Infrastructure – Luther Ely Smith Square Improvements (12660) Authorizing the Executive Director and Secretary-Treasurer on behalf of The Metropolitan St. Louis Sewer District to enter into an agreement with the CityArchRiver Foundation for cost sharing in CSO Volume Reduction Green Infrastructure - Luther Ely Smith Square Improvements (12660), in the City of St. Louis, Missouri. 15 Adoption of Proposed Ord. No. 14196- CSO Volume Reduction Green Infrastructure – North Sarah Phase III (12661) Authorizing the Executive Director and Secretary-Treasurer on behalf of The Metropolitan St. Louis Sewer District to enter into an agreement with the St. Louis Housing Authority for cost sharing in CSO Volume Reduction Green Infrastructure - North Sarah Phase III (12661), in the City of St. Louis, Missouri. 16 Adoption of Proposed Ord. No. 14197- CSO Volume Reduction Green Infrastructure – Sigma Aldrich Sustainable Stormwater Improvements (12662) Authorizing the Executive Director and Secretary-Treasurer on behalf of The Metropolitan St. Louis Sewer District to enter into an agreement with Sigma Aldrich Corporation for cost sharing in CSO Volume Reduction Green Infrastructure - Sigma Aldrich Sustainable Stormwater Improvements (12662), in the City of St. Louis, Missouri. 17 Adoption of Proposed Ord. No. 14198- Jefferson Barracks Tunnel (Lemay WWTP to Martigney PS) (11711) Appropriating One Million Dollars ($1,000,000.00) from the Sanitary Replacement Fund to be used for property acquisition, demolition, utility relocation, and related activities for construction of a sanitary tunnel and associated structures for Jefferson Barracks Tunnel (Lemay WWTP to Martigney PS) (11711) in Unincorporated St. Louis County, Missouri; and authorizing the Executive Director and Secretary- Treasurer on behalf of The Metropolitan St. Louis Sewer District to acquire property without additional board action. 3 Revised: 9/3/2015 9:18 AM 18 Adoption of Proposed Ord. No. 14199- Lackland I/I Reduction (11712) Appropriating One Million Seven Hundred Thousand Dollars ($1,700,000.00) from the Sanitary Replacement Fund to be used for project costs for sanitary sewer construction and private I/I removal in Lackland I/I Reduction (11712) in the Cities of Breckenridge Hills, Overland, St. John and Charlack, Missouri; and authorizing the Executive Director and Secretary-Treasurer on behalf of The Metropolitan St. Louis Sewer District to enter into Contract No. 20301 with Pangea, Inc. d/b/a Pangea Group for the aforesaid sanitary sewer construction and private I/I removal. 19 Adoption of Proposed Ord. No. 14200- Lynkirk Study Area I/I Reduction (11651) Appropriating Three Hundred Thousand Dollars ($300,000.00) from the Sanitary Replacement Fund to be used for construction costs for sanitary sewer construction and private I/I removal in Lynkirk Study Area I/I Reduction (11651) in the City of Kirkwood, Missouri; and authorizing the Executive Director and Secretary- Treasurer on behalf of The Metropolitan St. Louis Sewer District to enter into Contract No. 20300 with Bates Utility Company, Inc., for the aforesaid sanitary sewer construction and private I/I removal. 20 Adoption of Proposed Ord. No. 14201- Missouri River WWTP Secondary Treatment Expansion (Mitigation Credit) (10465) Appropriating One Hundred Fifty Thousand Dollars ($150,000.00) from the Sanitary Replacement Fund to be used for project costs for the construction of compensatory flood storage in Missouri River WWTP Secondary Treatment Expansion (Mitigation Credit) (10465) in the City of Maryland Heights, Missouri. 21 Adoption of Proposed Ord. No. 14202- Newcastle I/I Reduction (11664) Appropriating Forty Two Thousand Dollars ($42,000.00) from the Sanitary Replacement Fund to be used for construction costs for private I/I removal in Newcastle I/I Reduction (11664) in the City of Florissant, Missouri; and authorizing the Executive Director and Secretary-Treasurer on behalf of The Metropolitan St. Louis Sewer District to enter into Contract No. 20294 with Fred M. Luth & Sons, Inc. for the aforesaid emergency repair. 22 Adoption of Proposed Ord. No. 14203- Pickwick – Bernadine – Bimini Sanitary Relief (11698) Appropriating Two Million One Hundred Thousand Dollars ($2,100,000.00) from the Sanitary Replacement Fund to be used for project costs for sanitary sewer construction and private I/I removal in Pickwick - Bernadine - Bimini Sanitary Relief (11698) in Unincorporated St. Louis County, Missouri; and authorizing the Executive Director and Secretary-Treasurer on behalf of The Metropolitan St. Louis Sewer District to enter into Contract No. 20302 with Unnerstall Contracting Co., Ltd. for the aforesaid sanitary sewer construction and private I/I removal. 23 Adoption of Proposed Ord. No. 14204- University City Public I/I Reduction – East (WC-01) (12062) Appropriating Two Million Five Hundred Thousand Dollars ($2,500,000.00) from the Sanitary Replacement Fund to be used for construction costs for sanitary sewer rehabilitation in University City Public I/I Reduction – East (WC-01) (12062) in the Cities of Greendale, Normandy, and Pagedale, and the Villages of Bel-Nor and Glen Echo Park, Missouri; and authorizing the Executive Director and Secretary-Treasurer on behalf of The Metropolitan St. Louis Sewer District to enter into Contract No. 20257 with Insituform Technologies USA, LLC for the aforesaid sanitary sewer rehabilitation. 24 Adoption of Proposed Ord. No. 14205- University City Sanitary Storage Facility (Hafner Ct) (11992) Appropriating Four Million Dollars ($4,000,000.00) from the Sanitary Replacement Fund to be used for property acquisition, demolition, and related activities for the construction of a sanitary storage facility in University City Sanitary Storage Facility (Hafner Ct) (11992) in the City of University City, Missouri; and authorizing the Executive Director and Secretary-Treasurer on behalf of The Metropolitan St. Louis Sewer District to acquire property without additional board action. 4 Revised: 9/3/2015 9:18 AM 25 Adoption of Proposed Ord. No. 14206- Coldwater Creek WWTP Screenings & Washer/Compactor Improvements (11809) Appropriating Three Million Five Hundred Thousand Dollars ($3,500,000.00) from the Sanitary Replacement Fund to be used for construction costs for wastewater treatment plant construction in Coldwater Creek WWTP Screenings & Washer/Compactor Improvements (11809) in Unincorporated St. Louis County, Missouri; and authorizing the Executive Director and Secretary-Treasurer on behalf of The Metropolitan St. Louis Sewer District to enter into Contract No. 20285 with Plocher Construction Company, Inc., for the aforesaid wastewater treatment plant construction. 26 Adoption of Proposed Ord. No. 14207- Lavinia Dr. #10709 Storm Sewer (11354) Appropriating Sixty Thousand Dollars ($60,000.00) from the Operations, Maintenance and Construction Improvement Fund of Gravois Creek to be used for construction project costs for storm sewer construction in Lavinia Dr. #10709 Storm Sewer (11354) in Unincorporated St. Louis County, Missouri; and authorizing the Executive Director and Secretary-Treasurer on behalf of The Metropolitan St. Louis Sewer District to enter into Contract No. 20297 with Gaehle Grading, LLC for the aforesaid storm sewer construction. 27 Adoption of Proposed Ord. No. 14208- Madison #708 Storm Sewer (10221) Appropriating Fifty-Two Thousand Dollars ($52,000.00) from the Operations, Maintenance and Construction Improvement Fund of Gravois Creek to be used for construction costs for storm sewer construction in Madison #708 Storm Sewer (10221) in the City of Oakland, Missouri; and authorizing the Executive Director and Secretary-Treasurer on behalf of The Metropolitan St. Louis Sewer District to enter into Contract No. 20298 with J.H. Berra Construction Co., Inc., for the aforesaid storm sewer construction. 28 Adoption of Proposed Ord. No. 14209- Stormwater Infrastructure Repair/Replacement– Fountain Creek OMCI (12610) Appropriating Seventy-Seven Thousand Dollars ($77,000.00) from the Operations, Maintenance and Construction Improvement Fund of Fountain Creek to be used for the repair and replacement of inlets, manholes, sewers, and other infrastructure in Stormwater Infrastructure Repair/Replacement - Fountain Creek OMCI (12610) in various locations throughout the Fountain Creek Watershed. 29 Adoption of Proposed Ord. No. 14210- Stormwater Infrastructure Repair/Replacement – Maline Creek OMCI (12458) Making a supplemental appropriation of Five Hundred Fifty Thousand Dollars ($550,000.00) from the Operations, Maintenance and Construction Improvement Fund of Maline Creek to be used for the repair and placement of inlets, manholes, sewers, and other infrastructure for Stormwater Infrastructure Repair/Replacement – Maline Creek OMCI (12458) at various locations throughout the Maline Creek Watershed. 30 Adoption of Proposed Ord. No. 14211- Stormwater Infrastructure Repair/Replacement – University City OMCI (12608) Appropriating One Hundred Thirty Thousand Dollars ($130,000.00) from the Operations, Maintenance and Construction Improvement Fund of University City to be used for the repair and replacement of inlets, manholes, sewers, and other infrastructure in Stormwater Infrastructure Repair/Replacement – University City OMCI (12608) in various locations throughout the University City Watershed. 31 Adoption of Proposed Ord. No. 14212- West Oak Drive Storm Improvements (11000) Appropriating Thirty-Nine Thousand Dollars ($39,000.00) from the Operations, Maintenance and Construction Improvement Fund of Deer Creek to be used for construction costs for storm sewer construction in West Oak Drive Storm Improvements (11000) in the Cities of Glendale and Kirkwood, Missouri; and authorizing the Executive Director and Secretary-Treasurer on behalf of The Metropolitan St. Louis Sewer District to enter into Contract No. 20299 with Gaehle Grading, LLC for the aforesaid storm sewer construction. 5 Revised: 9/3/2015 9:18 AM 32 Adoption of Proposed Ord. No. 14213- Coldwater Creek WWTP Screenings & Washer/Compactor Improvements (11809) Making a supplemental appropriation of Eighty-Five Thousand Dollars ($85,000.00) from the Sanitary Replacement Fund to be used for the Coldwater Creek WWTP Screenings & Washer/Compactor Improvements (11809) in Unincorporated St. Louis County, Missouri; and authorizing the Executive Director and Secretary-Treasurer on behalf of The Metropolitan St. Louis Sewer District to enter into Amendment No. 4 to Contract No. 20098 with Tetra Tech, Inc. for additional project costs for the design of a wastewater treatment plant. 33 Adoption of Proposed Ord. No. 14214- Caulks Creek Forcemain Rehabilitation (11789) Appropriating Six Hundred Thousand Dollars ($600,000.00) from the Sanitary Replacement Fund to be used for the design of forcemain rehabilitation in Caulks Creek Forcemain Rehabilitation (11789) in the Cities of Chesterfield and Maryland Heights, Missouri; and authorizing the Executive Director and Secretary-Treasurer on behalf of The Metropolitan St. Louis Sewer District to enter into Contract No. 20320 with M3 Engineering Group, PC, for the aforesaid design of forcemain rehabilitation. 34 Adoption of Proposed Ord. No. 14215- General Services Agreement – Sewer Design (FY2013) Contract B (11780) Making a supplemental appropriation of Ninety Thousand Dollars ($90,000.00) from the Sanitary Replacement Fund to be used for the General Services Agreement - Sewer Design (FY2013) Contract B (11780) throughout the District, and authorizing the Executive Director and Secretary-Treasurer on behalf of The Metropolitan St. Louis Sewer District to enter into Amendment No. 1 to Contract No. 20027 with Vance Engineering, Inc. for aforesaid sewer design services. 35 Adoption of Proposed Ord. No 14216- Stream Flow Gauge Operation and Maintenance (USGS) (10766) Appropriating Five Hundred Seventy Thousand Dollars ($570,000.00) from the General Fund of the District for the operation and maintenance of stream flow gauges in Stream Flow Gauge Operation and Maintenance (USGS) (10766); and authorizing the Executive Director and Secretary-Treasurer on behalf of The Metropolitan St. Louis Sewer District to enter into Contract No. 10422 with the U.S. Geological Survey for the aforesaid services. 36 Adoption of Proposed Ord. No 14217- Stream Flow Water Quality Sampling (FY2014) (11916) Making a supplemental appropriation of Five Hundred Ninety-Five Thousand Four Hundred Fifty-One Dollars ($599,451.00) from the General Fund of the District to continue the operation and maintenance of water quality sampling and analysis in Stream Flow Water Quality Sampling (FY2014) (11916); and authorizing the Executive Director and Secretary-Treasurer on behalf of The Metropolitan St. Louis Sewer District to amend Contract No. 20087 with the Geosyntec Consultants, Inc. for the aforesaid services. 37 Adoption of Proposed Ord. No. 14218- General Services Agreement – Property Appraisal (2015) Contract A (11758) Making a supplemental appropriation of Seventy Thousand Dollars ($70,000.00) from the General Fund to be used for property appraisal services in the General Services Agreement – Property Appraisal (2015) Contract A (11758) throughout the District; and authorizing the Executive Director and Secretary-Treasurer on behalf of The Metropolitan St. Louis Sewer District to enter into Amendment No. 1 under Contract No. 20217 with Przada Appraisal Services LLC, for the aforesaid property appraisal services. 38 Adoption of Proposed Ord. No. 14219- General Services Agreement – Property Appraisal (2015) Contract B (12379) Making a supplemental appropriation of Seventy Thousand Dollars ($70,000.00) from the General Fund for property appraisal services for General Services Agreement - Property Appraisal (2015) Contract B (12379) and authorizing the Executive Director and Secretary-Treasurer on behalf of The Metropolitan St. Louis Sewer District to enter into Amendment No. 1 under Contract No. 20218 with Sutton Realty Company for the aforesaid property appraisal services. 6 Revised: 9/3/2015 9:18 AM 39 Adoption of Proposed Ord. No. 14220- General Services Agreement – Property Appraisal (2015) Contract C (12380) Making a supplemental appropriation of Seventy Thousand Dollars ($70,000.00) from the General Fund to be used for property appraisal services in the General Services Agreement - Property Appraisal (2015) Contract C (12380) throughout the District; and authorizing the Executive Director and Secretary- Treasurer on behalf of The Metropolitan St. Louis Sewer District to enter into Amendment No. 1 under Contract No. 20219 with Mueller & Neff Real Estate Appraisers & Consultants, for the aforesaid property appraisal services. 40 Adoption of Proposed Ord. No. 14221- General Services Agreement – Property Appraisal (2015) Contract D (12381) Making a supplemental appropriation of Seventy Thousand Dollars ($70,000.00) from the General Fund to be used for property appraisal services in the General Services Agreement - Property Appraisal (2015) Contract D (12381) throughout the District; and authorizing the Executive Director and Secretary- Treasurer on behalf of The Metropolitan St. Louis Sewer District to enter into Amendment No. 1 to Contract No. 20220 with Real Estate Analysts Limited, for the aforesaid property appraisal services. 41 Adoption of Proposed Ord. No. 14222- Maline Creek CSO BO 051 & 052 Local Storage Facility (Chain of Rocks Dr to Church Dr) (11656) Declaring the necessity for the acquisition of real property within The Metropolitan St. Louis Sewer District for the purpose of purchasing property due to inadequate storm and sanitary sewers for the project known as Maline Creek CSO BO 051 & 052 Local Storage Facility (Chain of Rocks Dr to Church Dr) (11656), in the City of St. Louis, Missouri to serve the needs of residents of the area, and authorizing the acquisition of said real property by purchase or by the institution of condemnation proceedings. 42 Adoption of Proposed Ord. No. 14226 - Flow Meter Data Processing Services Authorizing the Executive Director and Secretary-Treasurer on behalf of The Metropolitan St. Louis Sewer District (MSD) to enter into a contract with ADS Environmental Services (ADS) whereby ADS will provide data processing services for the raw flow meter data collected by the District’s in-house flow monitoring group. The resulting processed data is utilized by the Engineering department for collection system modelling and to evaluate construction project effectiveness to comply with Consent Decree requirements. 43 Adoption of Proposed Ord. No. 14227- Conflict of Interest Policy** Repealing Ordinance No. 13721 as adopted September 12, 2013, and enacting a new ordinance in lieu thereof, establishing a Conflict of Interest Policy for District trustees, officers and employees. 44 Adoption of Proposed Ord. No. 14228- Designation of Underwriting team for the Wastewater System Revenue Bonds, Series 2015B Designating the underwriting team for an issue of Wastewater System Revenue Bonds, Series 2015B of The Metropolitan St. Louis Sewer District. 45 Adoption of Proposed Ord. No. 14229- Insurance Brokerage & Consultant Services Appointing McGriff, Seibels & Williams of Missouri, Inc. the insurance broker of record for The Metropolitan St. Louis Sewer District for a period of one (1) year, effective October 1, 2015 through September 30, 2016, with four (4) additional one-year renewal terms at the option of the District, and authorizing the Executive Director and Secretary-Treasurer on behalf of the District to enter into a contract with McGriff, Seibels & Williams of Missouri, Inc. whereby McGriff, Seibels & Williams of Missouri, Inc. will serve as the District's broker of record and provide other services for the District's insurance program. 7 Revised: 9/3/2015 9:18 AM UNFINISHED BUSINESS ORDINANCES None RESOLUTIONS None 8 Revised: 9/3/2015 9:18 AM New Business Agenda Item No. Name Page No. ORDINANCES 46 Proposed Ord. No. 14230- Bissell – Coldwater – Missouri – Meramec Public I/I Reduction (2016) Contract E (11923) 12 INTRODUCTION OF AN ORDINANCE, appropriating Two Million Five Hundred Seventy Thousand Dollars ($2,570,000.00) from the Sanitary Replacement Fund to be used for sanitary sewer rehabilitation in Bissell - Coldwater - Missouri - Meramec Public I/I Reduction (2016) Contract E (11923) in the City of Florissant and Unincorporated St. Louis County, Missouri; and authorizing the Executive Director and Secretary-Treasurer on behalf of The Metropolitan St. Louis Sewer District to enter into Contract No. 20293 with Insituform Technologies USA, LLC for the aforesaid sanitary sewer rehabilitation. 47 Proposed Ord. No. 14231- CSO Volume Reduction Green Infrastructure – Bellefontaine Cemetery – Evergreen Glen Watershed Restoration (12658) 14 INTRODUCTION OF AN ORDINANCE, authorizing the Executive Director and Secretary-Treasurer on behalf of The Metropolitan St. Louis Sewer District to enter into an agreement with the Bellefontaine Cemetery Association for cost sharing in CSO Volume Reduction Green Infrastructure - Bellefontaine Cemetery - Evergreen Glen Watershed Restoration (12658), in the City of St. Louis, Missouri. 48 Proposed Ord. No. 14232- North Baden Creek I/I Reduction (BP-532) (Winchester Dr) (11693) 15 INTRODUCTION OF AN ORDINANCE, appropriating One Million Six Hundred Twenty Thousand Dollars ($1,620,000.00) from the Sanitary Replacement Fund to be used for sanitary sewer construction and private I/I removal in North Baden Creek I/I Reduction (BP-532) (Winchester Dr) (11693) in the Cities of Normandy, Northwoods, and Pasadena Hills, Missouri; and authorizing the Executive Director and Secretary-Treasurer on behalf of The Metropolitan St. Louis Sewer District to enter into Contract No. 20316 with Fred M. Luth & Sons, Inc. for the aforesaid sanitary sewer construction and private I/I removal. 49 Proposed Ord. No. 14233- University City Public I/I Reduction – East (WC-02 & WC- 03) (12063) 17 INTRODUCTION OF AN ORDINANCE, appropriating Three Million Nine Hundred Seventy Thousand Dollars ($3,970,000.00) from the Sanitary Replacement Fund to be used for sanitary sewer rehabilitation in University City Public I/I Reduction – East (WC-02 & WC-03) (12063) in the Cities of Pagedale and Wellston and the Village of Hillsdale, Missouri; and authorizing the Executive Director and Secretary- Treasurer on behalf of The Metropolitan St. Louis Sewer District to enter into Contract No. 20282 with SAK Construction, LLC for the aforesaid sanitary sewer rehabilitation. 50 Proposed Ord. No. 14234- Webster Groves Trunk E Sanitary Rehabilitation and I/I Reduction Phase IV (Part 1) (11678) 18 INTRODUCTION OF AN ORDINANCE, appropriating One Million Four Hundred Fifty Thousand Dollars ($1,450,000.00) from the Sanitary Replacement Fund to be used for private I/I removal in Webster Groves Trunk E Sanitary Rehabilitation and I/I Reduction Phase IV (Part 1) (11678) in the Cities of Glendale, Kirkwood, and Webster Groves, Missouri; and authorizing the Executive Director and Secretary- Treasurer on behalf of The Metropolitan St. Louis Sewer District to enter into Contract No. 20311 with Fred M. Luth & Sons, Inc. for the aforesaid private I/I removal. 51 Proposed Ord. No. 14235- Webster Groves Trunk E Sanitary Rehabilitation and I/I Reduction Phase IV (Part 2) (11678) 20 INTRODUCTION OF AN ORDINANCE, appropriating Two Million Three Hundred Fifty Thousand Dollars ($2,350,000.00) from the Sanitary Replacement Fund to be used for private I/I removal in Webster Groves Trunk E Sanitary Rehabilitation and I/I Reduction Phase IV (Part 2) (11678) in the Cities of Glendale, Kirkwood, and Webster Groves, Missouri; and authorizing the Executive Director and Secretary- Treasurer on behalf of The Metropolitan St. Louis Sewer District to enter into Contract No. 20313 with Bi- State Utilities Company for the aforesaid private I/I removal. 9 Revised: 9/3/2015 9:18 AM New Business Agenda Item No. Name Page No. 52 Proposed Ord. No. 14236- Rock Hill Sanitary Relief (SKME-618) (11069) 22 INTRODUCTION OF AN ORDINANCE, appropriating One Million Two Hundred Twenty Thousand Dollars ($1,220,000.00) from the Sanitary Replacement Fund to be used for sanitary sewer construction and private I/I removal in Rock Hill Sanitary Relief (SKME-618) (11069) in the Cities of Rock Hill and Kirkwood, Missouri; and authorizing the Executive Director and Secretary-Treasurer on behalf of The Metropolitan St. Louis Sewer District to enter into Contract No. 20317 with Bi-State Utilities Company for the aforesaid sanitary sewer construction and private I/I removal. 53 Proposed Ord. No. 14237- Hermitage Hills Bank Stabilization (Frontenac 3-1) (11003) 24 INTRODUCTION OF AN ORDINANCE, appropriating Three Hundred Ten Thousand Dollars ($310,000.00) from the Operations, Maintenance, Construction, Improvement Fund of Deer Creek to be used for channel stabilization in Hermitage Hills Bank Stabilization (Frontenac 3-1) (11003) in the City of Frontenac, Missouri; and authorizing the Executive Director and Secretary-Treasurer on behalf of The Metropolitan St. Louis Sewer District to enter into Contract No. 20312 with Ideal Landscape Group for the aforesaid channel stabilization. 54 Proposed Ord. No. 14238- Raleigh Drive #8829 Storm Sewer (11338) 25 INTRODUCTION OF AN ORDINANCE, appropriating Two Hundred Ninety Thousand Dollars ($290,000.00) from the Operations, Maintenance, Construction, Improvement Fund of Gravois Creek to be used for storm sewer construction in Raleigh Drive #8829 Storm Sewer (11338) in the Town of Grantwood Village, Missouri; and authorizing the Executive Director and Secretary-Treasurer on behalf of The Metropolitan St. Louis Sewer District to enter into Contract No. 20308 with Above and Below Contracting, LLC for the aforesaid storm sewer construction. 55 Proposed Ord. No. 14239- Whitehaven and Raleigh Storm Sewer (11350) 26 INTRODUCTION OF AN ORDINANCE, appropriating One Hundred Twenty-Five Thousand Dollars ($125,000.00) from the Operations, Maintenance and Construction Improvement Fund of Gravois Creek to be used for storm sewer construction in Whitehaven and Raleigh Storm Sewer (11350) in the Town of Grantwood Village, Missouri; and authorizing the Executive Director and Secretary-Treasurer on behalf of The Metropolitan St. Louis Sewer District to enter into Contract No. 20305 with J.H. Berra Construction Co., Inc. for the aforesaid storm sewer construction. 56 Proposed Ord. No. 14240- Coldwater Creek WWTF Final Clarifiers Replacement (12504) 28 INTRODUCTION OF AN ORDINANCE, appropriating Eight Hundred Twenty-Two Thousand Dollars ($822,000.00) from the Sanitary Replacement Fund to be used for the design of a wastewater treatment plant in Coldwater Creek WWTF Final Clarifiers Replacement (12504) in Unincorporated St. Louis County, Missouri; and authorizing the Executive Director and Secretary-Treasurer on behalf of The Metropolitan St. Louis Sewer District to enter into Contract No. 20336 with Donohue & Associates, Inc. for the aforesaid wastewater treatment plant design. 57 Proposed Ord. No. 14241- Comprehensive Ammonia and Nutrient Removal Master Plan (12070) 30 INTRODUCTION OF AN ORDINANCE, appropriating One Million Six Hundred Ninety-Six Thousand Dollars ($1,696,000.00) from the General Fund to be used for the preparation of a master plan for the District’s wastewater treatment plants in Comprehensive Ammonia and Nutrient Removal Master Plan (12070) throughout the District; and authorizing the Executive Director and Secretary-Treasurer on behalf of The Metropolitan St. Louis Sewer District to enter into Contract No. 20337 with Black & Veatch Corporation for the aforesaid master plan preparation. 10 Revised: 9/3/2015 9:18 AM New Business Agenda Item No. Name Page No. 58 Proposed Ord. No. 14242- Degiverville Combined Sewer Relocation (11136) 31 INTRODUCTION OF AN ORDINANCE, appropriating Six Hundred Eighty-Seven Thousand Dollars ($687,000.00) from the Sanitary Replacement Fund to be used for the design of combined sewers in Degiverville Combined Sewer Relocation (11136) in the City of St. Louis, Missouri; and authorizing the Executive Director and Secretary-Treasurer on behalf of The Metropolitan St. Louis Sewer District to enter into Contract No. 20338 with Farnsworth Group, Inc. for the aforesaid combined sewer design. 59 Proposed Ord. No. 14243- Lemay Pump Stations 1 and 2 Improvements (12488) 32 INTRODUCTION OF AN ORDINANCE, appropriating Four Hundred Forty-One Thousand Dollars ($441,000.00) from the Sanitary Replacement Fund to be used for the design of a pump station in Lemay Pump Stations 1 and 2 Improvements (12488) in Unincorporated St. Louis County, Missouri; and authorizing the Executive Director and Secretary-Treasurer on behalf of The Metropolitan St. Louis Sewer District to enter into Contract No. 20339 with Donohue & Associates, Inc. for the aforesaid pump station design. 60 Proposed Ord. No. 14244- Big Bend to Papin Storm Sewer Phase I (10035) 33 INTRODUCTION OF AN ORDINANCE, appropriating Two Hundred Ten Thousand Dollars ($210,000.00) from the Operations, Maintenance and Construction Improvement Fund of the Seminary Branch of River Des Peres to be used for the design of storm sewers in Big Bend to Papin Storm Sewer Phase I (10035) in the City of Webster Groves, Missouri; and authorizing the Executive Director and Secretary-Treasurer on behalf of The Metropolitan St. Louis Sewer District to enter into Contract No. 20340 with Hart Engineering, LLC for the aforesaid storm sewer design. 61 Proposed Ord. No. 14245- Taylor – Fillmore – Harrison Sanitary Relief (SKME-502 & 503) (10121) 35 INTRODUCTION & ADOPTION OF AN ORDINANCE, making a supplemental appropriation of Two Hundred Thousand Dollars ($200,000.00) from the Sanitary Replacement Fund to be used for additional project costs for sanitary sewer construction in Taylor - Fillmore - Harrison Sanitary Relief (SKME-502 & 503) (10121) in the City of Kirkwood and Unincorporated St. Louis County, Missouri. 62 Proposed Ord. No. 14246- District Rate Model Support, Feasibility Study & Rate Commission Proceedings 37 INTRODUCTION OF AN ORDINANCE, authorizing the Executive Director and Secretary-Treasurer on behalf of The Metropolitan St. Louis Sewer District to enter into a change order for Ten Thousand Dollars ($10,000.00) to the original contract with Raftelis Financial Consultants, Inc. for prof essional services needed to prepare the financial feasibility study needed for the issuance of District bonds. 11 Revised: 9/3/2015 9:18 AM New Business Agenda Item No. Name Page No. RESOLUTIONS 63 Adoption of Resolution No. 3231, expressing the Board of Trustees’ appreciation to Andrew Kurtz for his 29 years of exemplary service to the Metropolitan St. Louis Sewer District from May 27, 1986, to his retirement effective September 1, 2015. 64 Adoption of Resolution No. 3232, expressing the Board of Trustees’ appreciation to Maurice E. Stinnett for his 29 years of exemplary service to The Metropolitan St. Louis Sewer District from February 3, 1986, to his retirement effective September 1, 2015. 65 Adoption of Resolution No. 3233, the adoption of Resolution No. 3233 will exercise the one-year renewal term of the contract previously authorized by Ordinance No. 13718, adopted September 12 2013, which authorized the Executive Director and Secretary-Treasurer on behalf of The Metropolitan St. Louis Sewer District to enter into a contract with Kyna Iman, LLC for State Legislative Lobbying services for the District. 38 66 Adoption of Resolution No. 3234, the adoption of Resolution No. 3234 will extend the contract with Pavilion Advisory Group, Inc. (Pavilion) that was previously authorized by Ordinance No. 13719, adopted September 12, 2013, and authorized the Executive Director and Secretary-Treasurer on behalf of The Metropolitan St. Louis Sewer District to enter into a contract with Pavilion to provide pension fund, deferred compensation plan, and defined contribution plan investment consulting services for the District. 39 67 Adoption of Resolution No. 3235, the adoption of Resolution No. 3235 will extend the agreement previously authorized by Ordinance No. 13464, adopted August 9, 2012, which authorized the Executive Director and Secretary-Treasurer on behalf of The Metropolitan St. Louis Sewer District to enter into a professional services agreement with Jason Consultants, LLC whereby Jason Consultants, LLC would provide Force Main Non-Destructive Evaluation (Condition Assessment) Professional Services throughout the District, 40 68 ANY OTHER BUSINESS THAT MAY PROPERLY BE BROUGHT BEFORE THE BOARD 69 ADJOURNMENT 12 Revised: 9/3/2015 9:18 AM AGENDA ITEM NUMBER: Item 46 Proposed Ordinance No 14230 NAME OF PROJECT: Bissell – Coldwater – Missouri – Meramec Public I/I Reduction (2016) Contract E (11923) LOCATION: Various sites in the City of Florissant and unincorporated St. Louis County, Missouri TYPE OF PROJECT: Sanitary Sewer Rehabilitation (015.0 Construction Costs) DEPARTMENT REQUESTING ACTION: Engineering REQUESTED ACTION: Why is this action necessary?: Appropriates funds and authorizes staff to enter into a construction contract. What does action accomplish?: Implements the construction of a CIP project, as required by Consent Decree. SUMMARY EXPLANATION/BACKGROUND: Contractor: Insituform Technologies USA, LLC Previous District Contract: Yes 17988 Edison Avenue Chesterfield, MO 63005 Consultant: N/A Agency: N/A Number of bidders: 3 Low Bid: $2,411,653.55 High Bid: $2,606,127.50 Appropriation Amount: $2,570,000.00 Designer’s Estimate: $2,626,000.00 Total MWBE Participation: 15.14% (MBE Goal is 10% - WBE Goal is 5%) David Mason & Associates, Inc. (African American) – 4.27% - MBE XL Contracting, Inc. (African American) – 5.81% - MBE ABNA Engineering, Inc. – 5.06% - WBE Type of Contract: Unit Cost Properties Affected: 389 Properties Benefiting: 6,542 Designed by: AMEC Foster Wheeler Environment & Infrastructure, Inc. The work to be done under Contract #20293 consists of the rehabilitation of approximately 41,831 lineal feet of pipe sewers varying in size from 8-inches to 48-inches in diameter using cured-in-place pipe (CIPP) methods, 387 manholes, and 560 service connections. The purpose of this project is to reduce inflow/infiltration (I/I) in the Mattese Creek and Coldwater Creek watersheds, reduce building backups, and relieve overcharged sanitary sewers. There are no constructed SSOs to be removed/eliminated with this project. This project is scheduled to be completed in 550 days. FUNDING/COST SUMMARY: Budgeted: Capital Improvement Program Budget Year: FY2016, Pg. 90 Amount: $4,550,000 Fund Name: #6660 – Sanitary Replacement Fund Additional Comments: An additional contingency of $50,000 for utility relocation (Electric - $40,000 & Water - $10,000) is included in the appropriation. This project includes public I/I removal that was separated from the New Castle I/I Reduction (11664), Paddock Creek I/I Reduction (Private) (11696), and Chapel Hill I/I Reduction (Mattis Rd and Venarde Dr) (12119) projects. The construction cost estimate decreased due to the substitution of public I/I scope from the Dixie I/I Reduction (11738) project with the New Castle I/I Reduction project. This project is expected to be funded by a low interest loan from the State of Missouri, under the State Revolving Loan Fund (SRF). Contracted planning resources utilized: Watershed Facility Planning, Separate Sewer Area I/I Assessment, Separate Sewer Area Flow Metering & Monitoring, Modeling, CCTV Inspection, and Radar Rainfall Data. 13 Revised: 9/3/2015 9:18 AM PREVIOUS BOARD ACTION RELATED TO THIS ACTION: 08/08/13 – Ord. No. 13655 – Amount: $38,000 – AMEC Foster Wheeler Environment & Infrastructure, Inc. – Design Contract No. 11011 – Amendment 14 Revised: 9/3/2015 9:18 AM AGENDA ITEM NUMBER: Item No 47 Proposed Ordinance No 14231 NAME OF PROJECT: CSO Volume Reduction Green Infrastructure – Bellefontaine Cemetery – Evergreen Glen Watershed Restoration (12658) LOCATION: At 4847 West Florissant Avenue in the City of St. Louis, Missouri TYPE OF PROJECT: Cost Share for Green Infrastructure Construction (015.0 Construction Costs) DEPARTMENT REQUESTING ACTION: Engineering REQUESTED ACTION: Why is this action necessary?: Authorizes staff to enter into an agreement with Bellefontaine Cemetery Association. What does action accomplish?: Provides Green Infrastructure Grant for construction of green infrastructure to reduce combined sewer overflows, as required by Consent Decree. SUMMARY EXPLANATION/BACKGROUND: Contractor: N/A Previous District Contract: N/A Consultant: N/A Agency: Bellefontaine Cemetery Association Number of bidders: N/A Low Bid: N/A High Bid: N/A Appropriation Amount: N/A Designer’s Estimate: N/A Total MWBE Participation: N/A Type of Contract: N/A Properties Affected: N/A Properties Benefiting: N/A Designed by: N/A This ordinance authorizes the District to enter into an agreement with Bellefontaine Cemetery Association to provide financial assistance through a Green Infrastructure Grant Program for construction of green infrastructure. The purpose of this project is to reduce combined sewer overflows into the Mississippi River per the Long Term Control Plan. This project will include the installation of a bioretention basin at the northeast corner of the cemetery property. Total cost of the green infrastructure is estimated at $160,000. Bellefontaine Cemetery Association is requesting approximately $90,000 reimbursement for the project. This project has been approved by the MDNR/EPA as an early action project under the conditions outlined in the Long Term Control Plan. FUNDING/COST SUMMARY: Budgeted: Capital Improvement Program Budget Year: FY2016, Pg. 103 Amount: $5,000,000* Fund Name: #1101 – General Fund Additional Comments: None. PREVIOUS BOARD ACTION RELATED TO THIS ACTION: 09/10/15 – Proposed Ord. No. 14193 – Amount: $5,000,000 – CSO Volume Reduction Green Infrastructure (11146) *Requesting Board approval of an ordinance for which $90,000.00 is being encumbered from Proposed Ordinance No. 14193. 15 Revised: 9/3/2015 9:18 AM AGENDA ITEM NUMBER: Item 48 Proposed Ordinance No 14232 NAME OF PROJECT: North Baden Creek I/I Reduction (BP-532) (Winchester Dr) (11693) LOCATION: North of Natural Bridge Road and east of Lucas and Hunt Road in the Cities of Normandy, Northwoods, and Pasadena Hills, Missouri TYPE OF PROJECT: Sanitary Sewer Construction and Private I/I Removal (015.0 Construction Costs) DEPARTMENT REQUESTING ACTION: Engineering REQUESTED ACTION: Why is this action necessary?: Appropriates funds and authorizes staff to enter into a construction contract. What does action accomplish?: Implements the construction of a CIP project, as required by Consent Decree. SUMMARY EXPLANATION/BACKGROUND: Contractor: Fred M. Luth & Sons, Inc. Previous District Contract: Yes 4516 McRee Avenue St. Louis, MO 63110 Consultant: N/A Agency: N/A Number of bidders: 2 Low Bid: $1,482,940.00 High Bid: $1,832,500.00 Appropriation Amount: $1,620,000.00 Designer’s Estimate: $1,720,000.00 Total MWBE Participation: 17.02% (MBE Goal is 17% - African American) Davidson & Sons Hauling, LLC (African American) – 7.05% - MBE B & P Construction, Inc. (African American) – 3.46% - MBE XL Contracting, Inc. (African American) – 6.51% - MBE Type of Contract: Unit Cost Properties Affected: 42 Properties Benefiting: 327 Designed by: AMEC Foster Wheeler Environment & Infrastructure, Inc. The work to be done under Contract #20316 consists of the construction of approximately 2,695 lineal feet of pipe sewers varying in size from 6-inches to 15-inches in diameter and the removal of private inflow sources at 42 properties. The purpose of this project is to reduce inflow/infiltration (I/I) in the Baden watershed. This project will provide for the elimination of one (1) constructed SSO (BP-532) after construction of additional public I/I removal and post construction monitoring. This project is scheduled to be completed in 365 days. FUNDING/COST SUMMARY: Budgeted: Capital Improvement Program Budget Year: FY2016, Pg. 158 Amount: $1,600,000 Fund Name: #6660 – Sanitary Replacement Fund Additional Comments: An additional contingency of $64,000 for utility relocation (Electric - $64,000) is included in the appropriation. Construction costs were increased after additional PIR properties and approximately 1,665 lineal feet of 12-inch to 15-inch sewers were identified during final design and added to the scope of work. A second phase will be performed at a later date to remove private I/I from additional homes and construct necessary storm sewers. This project is expected to be funded by Bond proceeds. Contracted planning resources utilized: Watershed Facility Planning, Combine Sewer Area I/I Assessment, Combine Sewer Area Flow Metering & Monitoring, Modeling, CCTV Inspection, and Radar Rainfall Data. 16 Revised: 9/3/2015 9:18 AM PREVIOUS BOARD ACTION RELATED TO THIS ACTION: 08/08/13 – Ord. No. 13671 – Amount: $382,000 – AMEC Foster Wheeler Environment & Infrastructure – Design Contract No. 11011 – Amendment 17 Revised: 9/3/2015 9:18 AM AGENDA ITEM NUMBER: Item 49 Proposed Ordinance No 14233 NAME OF PROJECT: University City Public I/I Reduction – East (WC-02 & WC-03) (12063) LOCATION: Various sites in the Cities of Pagedale and Wellston, and the Village of Hillsdale, Missouri TYPE OF PROJECT: Sanitary Sewer Rehabilitation (015.0 Construction Costs) DEPARTMENT REQUESTING ACTION: Engineering REQUESTED ACTION: Why is this action necessary?: Appropriates funds and authorizes staff to enter into a construction contract. What does action accomplish?: Implements the construction of a CIP project, as required by Consent Decree. SUMMARY EXPLANATION/BACKGROUND: Contractor: SAK Construction, LLC Previous District Contract: Yes 864 Hoff Road O’Fallon, MO 63366 Consultant: N/A Agency: N/A Number of bidders: 3 Low Bid: $3,763,855.75 High Bid: $4,121,600.45 Appropriation Amount: $3,970,000.00 Designer’s Estimate: $4,190,000.00 Total MWBE Participation: 19.09% (MBE Goal is 10% - WBE Goal is 5%) ABNA Engineering, Inc. – 5.48% - WBE XL Contracting, Inc. (African American) – 9.49% - MBE Luther’s Supply, LLC (African American) – 4.12% - MBE Type of Contract: Unit Cost Properties Affected: 980 Properties Benefiting: 7,340 Designed by: Burns & McDonnell Engineering Co., Inc. The work to be done under Contract #20282 consists of the rehabilitation of approximately 63,500 lineal feet of pipe sewers varying in size from 6-inches to 27-inches in diameter using cured-in-place pipe (CIPP) methods, 280 manholes, and 964 service connections. The purpose of this project is to reduce inflow/infiltration (I/I) in the Lemay watershed, reduce building backups, and relieve overcharged sanitary sewers. This project will provide for the future elimination of two (2) constructed SSOs (BP-451 & BP-621) after additional project construction and post construction monitoring. This project is scheduled to be completed in 780 days. FUNDING/COST SUMMARY: Budgeted: Capital Improvement Program Budget Year: FY2016, Pg. 174 Amount: $5,120,000 Fund Name: #6660 – Sanitary Replacement Fund Additional Comments: An additional contingency of $10,000 for utility relocation (Gas - $5,000 & Water - $5,000) is included in the appropriation. This project is expected to be funded by a low interest loan from the State of Missouri, under the State Revolving Loan Fund (SRF). Contracted planning resources utilized: Watershed Facility Planning, Combine Sewer Area I/I Assessment, Combine Sewer Area Flow Metering & Monitoring, Modeling, CCTV Inspection, and Radar Rainfall Data. PREVIOUS BOARD ACTION RELATED TO THIS ACTION: 08/05/14 – Ord. No. 13917 – Amount: $79,000 – Burns & McDonnell Engineering Co., Inc. – Design Contract No. 11003 – Amendment 18 Revised: 9/3/2015 9:18 AM AGENDA ITEM NUMBER: Item 50 Proposed Ordinance No 14234 NAME OF PROJECT: Webster Groves Trunk E Sanitary Rehabilitation and I/I Reduction Phase IV (Part 1) (11678) LOCATION: South of Manchester Road, east of S. Kirkwood Road, north of Interstate 44 and west of Laclede Station Road in the Cities of Glendale, Kirkwood, and Webster Groves, Missouri TYPE OF PROJECT: Private I/I Removal (015.0 Construction Costs) DEPARTMENT REQUESTING ACTION: Engineering REQUESTED ACTION: Why is this action necessary?: Appropriates funds and authorizes staff to enter into a construction contract. What does action accomplish?: Implements the construction of a CIP project, as required by Consent Decree. SUMMARY EXPLANATION/BACKGROUND: Contractor: Fred M. Luth & Sons, Inc. Previous District Contract: Yes 4516 McRee Avenue St. Louis, MO 63110 Consultant: N/A Agency: N/A Number of bidders: 3 Low Bid: $1,369,800.00 High Bid: $1,672,760.00 Appropriation Amount: $1,450,000.00 Designer’s Estimate: $1,461,000.00 Total MWBE Participation: 17.02% (MBE Goal is 17% - African American) XL Contracting, Inc. (African American) – 10.66% - MBE David Mason & Associates, Inc. (African American) – 1.10% - MBE B & P Construction, Inc. (African American) – 5.26% - MBE Type of Contract: Lump Sum Properties Affected: 476 Properties Benefiting: 6,700 Designed by: Parsons Water & Infrastructure, Inc. The work to be done under Contract #20311 consists of the removal of private inflow sources on 476 properties. This construction is the fourth phase of a multi-phase improvement project. The purpose of this project is to reduce inflow/infiltration (I/I) in the Deer Creek watershed, to reduce building backups and relieve overcharged sewer mains. This project will provide for the elimination of four (4) constructed SSOs (BP-187, BP-194, BP-578 & BP-587) after construction of future phases and post construction monitoring. This project is scheduled to be completed in 426 days. FUNDING/COST SUMMARY: Budgeted: Capital Improvement Program Budget Year: FY2016, Pg. 181 Amount: $3,800,000 Fund Name: #6660 – Sanitary Replacement Fund Additional Comments: This phase started as one PIR project (937 properties) but was separated into two separate PIR bid packages due to the large number of PIR properties. A third bid package will be required to remove private I/I from additional properties that require storm sewers. This project is expected to be funded by Bond proceeds. Contracted planning resources utilized: Watershed Facility Planning, Combine Sewer Area I/I Assessment, Separate Sewer Area Flow Metering & Monitoring, Modeling, CCTV Inspection, and Radar Rainfall Data. 19 Revised: 9/3/2015 9:18 AM PREVIOUS BOARD ACTION RELATED TO THIS ACTION: 08/09/12 – Ord. No. 13456 – Amount: $1,600,000 – Parsons Water & Infrastructure, Inc. – Contract No. 10733 – Amendment 20 Revised: 9/3/2015 9:18 AM AGENDA ITEM NUMBER: Item 51 Proposed Ordinance No 14235 NAME OF PROJECT: Webster Groves Trunk E Sanitary Rehabilitation and I/I Reduction Phase IV (Part 2) (11678) LOCATION: South of Manchester Road, east of S. Kirkwood Road, north of Interstate 44 and west of Laclede Station Road in the Cities of Glendale, Kirkwood, and Webster Groves, Missouri TYPE OF PROJECT: Private I/I Removal (015.0 Construction Costs) DEPARTMENT REQUESTING ACTION: Engineering REQUESTED ACTION: Why is this action necessary?: Appropriates funds and authorizes staff to enter into a construction contract. What does action accomplish?: Implements the construction of a CIP project, as required by Consent Decree. SUMMARY EXPLANATION/BACKGROUND: Contractor: Bi-State Utilities Company Previous District Contract: Yes 12894 Pennridge Drive Bridgeton, MO 63044 Consultant: N/A Agency: N/A Number of bidders: 3 Low Bid: $2,242,738.14 High Bid: $2,725,705.00 Appropriation Amount: $2,350,000.00 Designer’s Estimate: $2,272,000.00 Total MWBE Participation: 17.02% (MBE Goal is 17% - African American) Taylor Trucking Co., LLC (African American) – 0.83% - MBE Taylormade Construction Co., LLC (African American) – 13.20% - MBE B & P Construction, Inc. (African American) – 2.99% - MBE Type of Contract: Lump Sum Properties Affected: 461 Properties Benefiting: 6,700 Designed by: Parsons Water & Infrastructure, Inc. The work to be done under Contract #20313 consists of the removal of private inflow sources on 461 properties. This construction is the fourth phase of a multi-phase improvement project. The purpose of this project is to reduce inflow/infiltration (I/I) in the Deer Creek watershed, to reduce building backups and relieve overcharged sewer mains. This project will provide for the elimination of four (4) constructed SSOs (BP-187, BP-194, BP-578 & BP-587) after construction of future phases and post construction monitoring. This project is scheduled to be completed in 426 days. FUNDING/COST SUMMARY: Budgeted: Capital Improvement Program Budget Year: FY2016, Pg. 181 Amount: $3,800,000 Fund Name: #6660 – Sanitary Replacement Fund Additional Comments: This phase started as one PIR project (937 properties) but was separated into two separate PIR bid packages due to the large number of PIR properties. A third bid package will be required to remove private I/I from additional properties that require storm sewers. This project is expected to be funded by Bond proceeds. Contracted planning resources utilized: Watershed Facility Planning, Combine Sewer Area I/I Assessment, Separate Sewer Area Flow Metering & Monitoring, Modeling, CCTV Inspection, and Radar Rainfall Data. 21 Revised: 9/3/2015 9:18 AM PREVIOUS BOARD ACTION RELATED TO THIS ACTION: 08/09/12 – Ord. No. 13456 – Amount: $1,600,000 – Parsons Water & Infrastructure, Inc. – Contract No. 10733 – Amendment 22 Revised: 9/3/2015 9:18 AM AGENDA ITEM NUMBER: Item 52 Proposed Ordinance No 14236 NAME OF PROJECT: Rock Hill Sanitary Relief (SKME-618) (11069) LOCATION: East of Lindbergh Boulevard and south of Interstate 64 in the Cities of Rock Hill and Kirkwood, Missouri TYPE OF PROJECT: Sanitary Sewer Construction and Private I/I Removal (015.0 Construction Costs) DEPARTMENT REQUESTING ACTION: Engineering REQUESTED ACTION: Why is this action necessary?: Appropriates funds and authorizes staff to enter into a construction contract. What does action accomplish?: Implements the construction of a CIP project, as required by Consent Decree. SUMMARY EXPLANATION/BACKGROUND: Contractor: Bi-State Utilities Company Previous District Contract: Yes 12894 Pennridge Drive Bridgeton, MO 63044 Consultant: N/A Agency: N/A Number of bidders: 3 Low Bid: $1,135,693.00 High Bid: $1,713,955.00 Appropriation Amount: $1,220,000.00 Designer’s Estimate: $1,201,000.00 Total MWBE Participation: 17.04% (MBE Goal is 17% - African American) Taylor Trucking Co., LLC (African American) – 1.63% - MBE Taylormade Construction Co., LLC (African American) – 15.41% - MBE Type of Contract: Unit Cost Properties Affected: 255 Properties Benefiting: 2,700 Designed by: Parsons Water & Infrastructure, Inc. The work to be done under Contract #20317 consists of the construction of approximately 932 lineal feet of storm sewers varying in size from 12-inches to 15-inches in diameter and the removal of inflow sources from 249 private properties. The purpose of this project is to reduce inflow/infiltration (I/I) in the Deer Creek watershed. This project will provide for the elimination of four (4) SSOs (BP-158, BP-196, BP-340 & BP-501) after construction of additional public I/I removal and post construction monitoring. This project is scheduled to be completed in 420 days. FUNDING/COST SUMMARY: Budgeted: Capital Improvement Program Budget Year: FY2016, Continued Amount: $1,350,000 Fund Name: #6660 – Sanitary Replacement Fund Additional Comments: An additional contingency of $20,000 for utility relocation (Electric - $7,000, Water - $5,000 & Other - $8,000) is included in the appropriation. A second phase will be constructed at a later date to remove private inflow from additional homes and construct necessary storm sewers. This project is expected to be funded by Bond proceeds. Contracted planning resources utilized: Watershed Facility Planning, Combine Sewer Area I/I Assessment, Separate Sewer Area Flow Metering & Monitoring, Modeling, CCTV Inspection, and Radar Rainfall Data. 23 Revised: 9/3/2015 9:18 AM PREVIOUS BOARD ACTION RELATED TO THIS ACTION: 08/09/12 – Ord. No. 13453 – Amount: $695,000 – Parsons Water & Infrastructure – Design Contract No. 10733 – Amendment 24 Revised: 9/3/2015 9:18 AM AGENDA ITEM NUMBER: Item 53 Proposed Ordinance No 14237 NAME OF PROJECT: Hermitage Hills Bank Stabilization (Frontenac 3-1) (11003) LOCATION: West of Geyer Road and south of Clayton Road in the City of Frontenac, Missouri TYPE OF PROJECT: Channel Stabilization (015.0 Construction Costs) DEPARTMENT REQUESTING ACTION: Engineering REQUESTED ACTION: Why is this action necessary?: Appropriates funds and authorizes staff to enter into a construction contract. What does action accomplish?: Implements the construction of a CIP project. SUMMARY EXPLANATION/BACKGROUND: Contractor: Ideal Landscape Group Previous District Contract: Yes 6264 Lemay Ferry Road St. Louis, MO 63129 Consultant: N/A Agency: N/A Number of bidders: 2 Low Bid: $255,550.00 High Bid: $336,750.00 Appropriation Amount: $310,000.00 Designer’s Estimate: $295,000.00 Total MWBE Participation: 17.22% (MBE Goal is 17% - African American) Eu-Hodos Enterprises, Inc. (African American) – 4.99% - MBE A.L.L. Construction, LLC (African American) – 8.32% - MBE McKays Hauling Company, Inc. (African American) – 3.91% - MBE Type of Contract: Unit Cost Properties Affected: 4 Properties Benefiting: 3 Designed by: Reitz & Jens, Inc. The work to be done under Contract #20312 consists of the construction of approximately 685 lineal feet of natural channel stabilization, including rock lined channel, biostabilized slopes, anchor reinforced vegetated slopes, 80 lineal feet of pipe sewers varying in size from 8-inches to 12-inches in diameter, and appurtenances. The purpose of this project is to alleviate creek erosion threatening properties. This project is scheduled to be completed in 283 days. FUNDING/COST SUMMARY: Budgeted: Capital Improvement Program Budget Year: FY2016, Pg. 224 Amount: $315,000 Fund Name: #5566 – Deer Creek OMCI Fund Additional Comments: An additional contingency of $30,000 for utility relocation (Electric - $30,000) is included in the appropriation. This project is one of the eight design projects included in the OMCI Stormwater Design (Contract A) (11129). Contracted planning resources utilized: Stormwater Facility Planning. PREVIOUS BOARD ACTION RELATED TO THIS ACTION: 01/10/13 – Ord. No. 13553 – Amount: $581,000 – Reitz & Jens, Inc. – OMCI Stormwater Design (Contract A) (11129) – Design Contract No. 20004 25 Revised: 9/3/2015 9:18 AM AGENDA ITEM NUMBER: Item No. 54 Proposed Ordinance 14238 NAME OF PROJECT: Raleigh Drive #8829 Storm Sewer (11338) LOCATION: West of South Laclede Station Road and north of Gravois Road in the Town of Grantwood Village, Missouri TYPE OF PROJECT Storm Sewer Construction (015.0 Construction Costs) DEPARTMENT REQUESTING ACTION: Engineering REQUESTED ACTION: Why is this action necessary?: Appropriates funds and authorizes staff to enter into a construction contract. What does action accomplish?: Implements the construction of a CIP project. SUMMARY EXPLANATION/BACKGROUND: Contractor: Above and Below Contracting, LLC Previous District Contract: Yes 2836 Plattin View Drive Festus, MO 63028 Consultant: N/A Agency: N/A Number of bidders: 3 Low Bid: $237,628.00 High Bid: $358,072.00 Appropriation Amount: $290,000.00 Designer’s Estimate: $238,000.00 Total MWBE Participation: 17.25% (MBE Goal is 17% - African American) Supplied Industrial Solutions, Inc. (African American) – 5.93% - MBE Taylor Trucking Co., LLC (African American) – 2.95% - MBE XL Contracting, Inc. (African American) – 8.37% - MBE Type of Contract: Unit Cost Properties Affected: 4 Properties Benefiting: 5 Designed by: Thouvenot, Wade & Moerchen, Inc. The work to be done under Contract #20308 consists of the construction of approximately 659 lineal feet of pipe sewers 30-inches in diameter and appurtenances. The purpose of this project is to alleviate yard flooding of 8821 and 8829 Raleigh Drive and 8828 and 8836 Rock Forest Drive and to alleviate structure flooding of 8837 Raleigh Drive. This project is scheduled to be completed in 180 days. FUNDING/COST SUMMARY: Budgeted: Capital Improvement Program Budget Year: FY2016, Pg. 248 Amount: $200,000 Fund Name: #5571 – Gravois Creek OMCI Fund Additional Comments: An additional contingency of $36,000 for utility relocation (Electric - $1,000 & Water - $35,000) is included in the appropriation. This project was one of the four design projects included in Gravois Creek OMCI Stormwater Design (Contract C) (11901). Contracted planning resources utilized: Stormwater Facility Planning. PREVIOUS BOARD ACTION RELATED TO THIS ACTION: 01/09/14 – Ord. No. 13777 – Amount: $245,000 – Thouvenot, Wade & Moerchen – Gravois Creek OMCI Stormwater Design (Contract C) (11901) – Design Contract No. 20121 26 Revised: 9/3/2015 9:18 AM AGENDA ITEM NUMBER: Item No. 55 Proposed Ordinance 14239 NAME OF PROJECT: Whitehaven and Raleigh Storm Sewer (11350) LOCATION: South of Rock Hill Road and west of South Laclede Station Road in the Town of Grantwood Village, Missouri TYPE OF PROJECT: Storm Sewer Construction (015.0 Construction Costs) DEPARTMENT REQUESTING ACTION: Engineering REQUESTED ACTION: Why is this action necessary?: Appropriates funds and authorizes staff to enter into a construction contract. What does action accomplish?: Implements the construction of a CIP project. SUMMARY EXPLANATION/BACKGROUND: Contractor: J. H. Berra Construction Co., Inc. Previous District Contract: Yes 5091 New Baumgartner Road St. Louis, MO 63129 Consultant: N/A Agency: N/A Number of bidders: 2 Low Bid: $87,547.00* High Bid: $125,447.00 Appropriation Amount: $125,000.00 Designer’s Estimate: $68,000.00 Total MWBE Participation: 17.37% (MBE Goal is 17% - African American) Phillips Concrete Services, LLC (African American) – 4.80% - MBE Windstar Transportation, LLC (African American) – 6.63% - MBE Crusade Construction, LLC (African American) – 4.80% - MBE Supplied Industrial Solutions, Inc. (African American) – 1.14% - MBE Type of Contract: Unit Cost Properties Affected: 4 Properties Benefiting: 4 Designed by: Taliaferro & Browne, Inc. The work to be done under Contract #20305 consists of the construction of approximately 246 lineal feet of pipe sewers varying in size from 12-inches to 18-inches in diameter and appurtenances. The purpose of this project is to alleviate structural flooding at 8951 Whitehaven Drive. This project is scheduled to be completed in 120 days. FUNDING/COST SUMMARY: Budgeted: Capital Improvement Program Budget Year: FY2016, Pg. 254 Amount: $100,000 Fund Name: #5571 – Gravois Creek OMCI Fund Additional Comments: An additional contingency of $28,000 for utility relocation (Water - $28,000) is included in the appropriation. This project was one of the two design projects included in Gravois Creek OMCI Stormwater Design (Contract D) (11902). *The low bid by Above and Below Contracting, LLC was found to be non-responsive due to failure to meet the District’s MWBE requirements. Staff recommends accepting the bid of J.H. Berra Construction Co., Inc. for $87,547.00. Contracted planning resources utilized: Stormwater Facility Planning. 27 Revised: 9/3/2015 9:18 AM PREVIOUS BOARD ACTION RELATED TO THIS ACTION: 01/09/14 – Ord. No. 13778 – Amount: $139,000 – Taliaferro & Browne, Inc. – Gravois Creek OMCI Stormwater Design (Contract D) (11902) – Design Contract No. 20122 28 Revised: 9/3/2015 9:18 AM AGENDA ITEM NUMBER: Item No. 56 Proposed Ordinance 14240 NAME OF PROJECT: Coldwater Creek WWTF Final Clarifiers Replacement (12504) LOCATION: South of Lindbergh Boulevard and east of Old Halls Ferry Road in unincorporated St. Louis County, Missouri TYPE OF PROJECT: Design of Wastewater Treatment Plant (011.0 Design Phase Project Costs) DEPARTMENT REQUESTING ACTION: Engineering REQUESTED ACTION: Why is this action necessary?: Appropriates funds and authorizes staff to enter into a design contract. What does action accomplish?: Implements the design of a CIP project, as required by Consent Decree. SUMMARY EXPLANATION/BACKGROUND: Contractor: N/A Previous District Contract: Yes Consultant: Donohue & Associates, Inc. 1415 Elbridge Payne Rd., Suite 165 Chesterfield, MO 63017 Corporate Headquarters: Sheboygan, Wisconsin Agency: N/A Number of proposers: (3) Crawford Murphy & Tilly Inc.; Donohue & Associates, Inc.; and Tetra Tech, Inc. Appropriation Amount: $822,000.00 Designer’s Estimate: N/A Total MWBE Participation: 38.97% (No MWBE Goal) Gonzalez Companies, LLC (Hispanic) – 26.21% - MBE Lion CSG, LLC – 8.52% - WBE Pitzman’s Company of Surveyors & Engineers (African American) – 1.83% - MBE Sequoia Engineering & Environmental, Inc. – 2.41% - WBE Type of Contract: Lump Sum Properties Affected: One Properties Benefitting: The entire Coldwater Creek Service Area Designed by: N/A This ordinance authorizes the District to enter into Contract #20336 with Donohue & Associates, Inc. for the design of the Coldwater Creek WWTF Final Clarifiers Replacement (12504) project. The purpose of this project is to demolish four existing square final clarifiers, construct a new circular final clarifier, and enlarge the existing channel and piping to three remaining circular clarifiers. The preliminary construction cost estimate is $4,540,000. Construction is anticipated to begin in FY2018. FUNDING/COST SUMMARY: Budgeted: Capital Improvement Program Budget Year: FY2016, Pg. 13 Amount: $900,000 Fund Name: #6660 – Sanitary Replacement Fund Additional Comments: There were two (2) other proposals considered on this project. The appropriation for design services is $78,000 below the proposed funding presented in the CIP Budget Supplement. The appropriation includes $140,000 for construction phase services. These services include construction field surveys, review of shop drawings and submittals, responding to design questions and changes during construction, as-built surveys, and preparation of as-built record drawings. This project is expected to be funded by Bond proceeds. 29 Revised: 9/3/2015 9:18 AM Contracted planning resources utilized: Watershed Facility Planning. PREVIOUS BOARD ACTION RELATED TO THIS ACTION: N/A 30 Revised: 9/3/2015 9:18 AM AGENDA ITEM NUMBER: Item No. 57 Proposed Ordinance 14241 NAME OF PROJECT: Comprehensive Ammonia and Nutrient Removal Master Plan (12070) LOCATION: The Entire MSD Service Area TYPE OF PROJECT: Preparation of a Master Plan for the District’s Wastewater Treatment Plants (016.0 Professional Services) DEPARTMENT REQUESTING ACTION: Engineering REQUESTED ACTION: Why is this action necessary?: Appropriates funds and authorizes staff to enter into a design contract. What does action accomplish?: Implements the design of a CIP project. SUMMARY EXPLANATION/BACKGROUND: Contractor: N/A Previous District Contract: Yes Consultant: Black & Veatch Corporation 16305 Swingley Ridge Rd., Suite 230 Chesterfield, MO 63017 Corporate Headquarters: Overland Park, Kansas Agency: N/A Number of proposers: (2) Black & Veatch Corporation and Jacobs Engineering Group, Inc. Appropriation Amount: $1,696,000.00 Designer’s Estimate: N/A Total MWBE Participation: 13.41% (No MWBE Goal) Lion CSG, LLC – 10.68% - WBE Ecological Specialists, Inc. – 0.89% - WBE Taliaferro & Browne, Inc. (African American) – 1.84% - MBE Type of Contract: Lump Sum Properties Affected: 0 Properties Benefitting: The entire MSD Service Area Designed by: N/A This ordinance authorizes the District to enter into Contract #20337 with Black & Veatch Corporation for the design of the Comprehensive Ammonia and Nutrient Removal Master Plan (12070) project. The purpose of this project is to prepare a comprehensive Master Plan to develop and guide the District’s ammonia and nutrient removal strategy at the District’s wastewater treatment plant facilities over the next 15 years. FUNDING/COST SUMMARY: Budgeted: Capital Improvement Program Budget Year: FY2016, Pg. 16 Amount: $1,500,000 Fund Name: #1101 – General Fund Additional Comments: There was one (1) other proposal considered on this project. The appropriation for the Master Plan is $196,000 above the proposed funding presented in the CIP Budget Supplement. The appropriation includes $280,000 for the comprehensive sampling and lab analysis scope necessary for a reliable master plan. The lab sampling volume and time requirements are beyond what the District’s lab can accommodate. The Master Plan will evaluate new regulations being promulgated regarding ammonia and nutrient effluent limitations. Contracted planning resources utilized: Watershed Facility Planning. PREVIOUS BOARD ACTION RELATED TO THIS ACTION: N/A 31 Revised: 9/3/2015 9:18 AM AGENDA ITEM NUMBER: Item No. 58 Proposed Ordinance 14242 NAME OF PROJECT: Degiverville Combined Sewer Relocation (11136) LOCATION: South of Delmar Boulevard and west of DeBaliviere Avenue in the City of St. Louis, Missouri TYPE OF PROJECT: Design of Combined Sewers (011.0 Design Phase Project Costs) DEPARTMENT REQUESTING ACTION: Engineering REQUESTED ACTION: Why is this action necessary?: Appropriates funds and authorizes staff to enter into a design contract. What does action accomplish?: Implements the design of a CIP project, as required by Consent Decree. SUMMARY EXPLANATION/BACKGROUND: Contractor: N/A Previous District Contract: Yes Consultant: Farnsworth Group, Inc. 20 Allen Avenue, Suite 200 St. Louis, MO 63119 Corporate Headquarters: Bloomington, Illinois Agency: N/A Number of proposers: (3) ABNA Engineering, Inc.; Farnsworth Group, Inc.; and Gonzalez Companies, LLC Appropriation Amount: $687,000.00 Designer’s Estimate: N/A Total MWBE Participation: 25.00% (No MWBE Goal) Access Engineering, LLC – 25.00% - WBE Type of Contract: Lump Sum Properties Affected: Approximately 85 Properties Benefitting: Approximately 80 Designed by: N/A This ordinance authorizes the District to enter into Contract #20338 with Farnsworth Group, Inc. for the design of the Degiverville Combined Sewer Relocation (11136) project. The purpose of this project is to relocate approximately 3,800 lineal feet of existing combined sewer out of the Metrolink right-of-way and increase the level of service. The preliminary construction cost estimate is $2,640,000. Construction is anticipated to begin in FY2019. FUNDING/COST SUMMARY: Budgeted: Capital Improvement Program Budget Year: FY2016, Pg. 30 Amount: $650,000 Fund Name: #6660 – Sanitary Replacement Fund Additional Comments: There were two (2) other proposals considered on this project. The appropriation for design services is $37,000 above the proposed funding presented in the CIP Budget Supplement. Construction will be limited within the Degiverville Avenue alley. It may be necessary to relocate the existing sewer using tunneling methods, and install a shallow sanitary sewer to connect service connections from the properties along the alley. The appropriation includes a contingency of $76,000 to design a sanitary sewer if necessary. The consultant will prepare a design study prior to final design to confirm if open cut construction is feasible. The appropriation also includes $70,000 for construction phase services. These services include construction field surveys, review of shop drawings and submittals, responding to design questions and changes during construction, as-built surveys, and preparation of as-built record drawings. This project is expected to be funded by Bond proceeds. Contracted planning resources utilized: None. PREVIOUS BOARD ACTION RELATED TO THIS ACTION: N/A 32 Revised: 9/3/2015 9:18 AM AGENDA ITEM NUMBER: Item No. 59 Proposed Ordinance 14243 NAME OF PROJECT: Lemay Pump Stations 1 and 2 Improvements (12488) LOCATION: South of Lindbergh Boulevard and east of Broadway in unincorporated St. Louis County, Missouri TYPE OF PROJECT: Design of a Pump Station (011.0 Design Phase Project Costs) DEPARTMENT REQUESTING ACTION: Engineering REQUESTED ACTION: Why is this action necessary?: Appropriates funds and authorizes staff to enter into a design contract. What does action accomplish?: Implements the design of a CIP project, as required by Consent Decree. SUMMARY EXPLANATION/BACKGROUND: Contractor: N/A Previous District Contract: Yes Consultant: Donohue & Associates, Inc. 1415 Elbridge Payne Road, Suite 165 Chesterfield, MO 63017 Corporate Headquarters: Sheboygan, Wisconsin Agency: N/A Number of proposers: (3) Crawford Murphy & Tilly Inc.; Donohue & Associates, Inc.; and Wade Trim, PC Appropriation Amount: $441,000.00 Designer’s Estimate: N/A Total MWBE Participation: 42.54% (No MWBE Goal) Gonzalez Companies, LLC (Hispanic) – 22.88% - MBE ERM Technologies, Inc. (African American) – 8.10% - MBE Intelligent Design & Construction Solutions, LLC – 7.18% - WBE Lion CSG, LLC – 4.38% - WBE Type of Contract: Lump Sum Properties Affected: 2 Properties Benefitting: The entire Lemay Service Area Designed by: N/A This ordinance authorizes the District to enter into Contract #20339 with Donohue & Associates, Inc. for the design of the Lemay Pump Stations 1 and 2 Improvements (12488) project. The purpose of this project is to make improvements to aging failing pump stations by upgrading gates, pumps, and electrical systems. The preliminary construction cost estimate is $4,318,000. Construction is anticipated to begin in FY2017. FUNDING/COST SUMMARY: Budgeted: Capital Improvement Program Budget Year: FY2016, Pg. 57 Amount: $470,000 Fund Name: #6660 – Sanitary Replacement Fund Additional Comments: There were two (2) other proposals considered on this project. The appropriation for design services is $29,000 below the proposed funding presented in the CIP Budget Supplement. The appropriation includes $108,000 for construction phase services. These services include construction field surveys, review of shop drawings and submittals, responding to design questions and changes during construction, as-built surveys, and preparation of as-built record drawings. This project is expected to be funded by Bond proceeds. Contracted planning resources utilized: Watershed Facility Planning. PREVIOUS BOARD ACTION RELATED TO THIS ACTION: N/A 33 Revised: 9/3/2015 9:18 AM AGENDA ITEM NUMBER: Item No. 60 Proposed Ordinance 14244 NAME OF PROJECT: Big Bend to Papin Storm Sewer Phase I (10035) LOCATION: North of Interstate 44 west of South Elm in the City of Webster Groves, Missouri TYPE OF PROJECT: Design of Storm Sewers (011.0 Design Phase Project Costs) DEPARTMENT REQUESTING ACTION: Engineering REQUESTED ACTION: Why is this action necessary?: Appropriates funds and authorizes staff to enter into a design contract. What does action accomplish?: Implements the design of a CIP project. SUMMARY EXPLANATION/BACKGROUND: Contractor: N/A Previous District Contract: Yes Consultant: Hart Engineering, LLC 5717 Mango Drive St. Louis, MO 63129 Corporate Headquarters: St. Louis, Missouri Agency: N/A Number of proposers: (5) EDM Incorporated; Hart Engineering, LLC; Oates Associates, Inc.; RJN Group, Inc.; and TREKK Design Group, LLC Appropriation Amount: $210,000.00 Designer’s Estimate: N/A Total MWBE Participation: 100.00% (No MWBE Goal) Civil Design, Inc. – 22.00% - W BE Tech Service, Inc. (African American) – 7.00% - MBE Hart Engineering, LLC – 71.00% - WBE Type of Contract: Lump Sum Properties Affected: 33 Properties Benefitting: 5 Designed by: N/A This ordinance authorizes the District to enter into Contract #20340 with Hart Engineering, LLC for the design of the Big Bend to Papin Storm Sewer Phase I (10035) project. The purpose of this project is to alleviate basement and yard flooding at five properties by designing 2,730 lineal feet of 12-inch to 36-inch diameter storm sewers. This project scope was increased to add 815 feet of 12-inch storm sewer in support of Private Inflow Reduction affiliated with the Webster Groves Trunk E I/I Reduction project. The preliminary construction cost estimate is $978,000. Construction is anticipated to begin in FY2018. FUNDING/COST SUMMARY: Budgeted: Capital Improvement Program Budget Year: FY2016, Pg. 207 Amount: $200,000 Fund Name: #5593 – Seminary Branch of River Des Peres OMCI Fund Additional Comments: There were four (4) other proposals considered on this project. The appropriation for design services is $10,000 above the proposed funding presented in the CIP Budget Supplement. The appropriation includes $15,000 for construction phase services. These services include construction field surveys, review of shop drawings and submittals, responding to design questions and changes during construction, as-built surveys, and preparation of as-built record drawings. 34 Revised: 9/3/2015 9:18 AM Contracted planning resources utilized: Watershed Facility Planning, Stormwater Facility Planning, Combine Sewer Area I/I Assessment, Separate Sewer Area Flow Metering & Monitoring, Modeling, CCTV Inspection, and Radar Rainfall Data. PREVIOUS BOARD ACTION RELATED TO THIS ACTION: N/A 35 Revised: 9/3/2015 9:18 AM AGENDA ITEM NUMBER: INTRODUCTION & ADOPTION Item No. 61 Proposed Ordinance 14245 NAME OF PROJECT: Taylor – Fillmore – Harrison Sanitary Relief (SKME-502 & 503) (10121) LOCATION: North of Big Bend Road and west of Leffingwell Avenue in unincorporated St. Louis County and the City of Kirkwood, Missouri TYPE OF PROJECT: Sanitary Sewer Construction (015.0 Construction Costs) DEPARTMENT REQUESTING ACTION: Engineering REQUESTED ACTION: Why is this action necessary?: Appropriates additional funds for a construction contract. What does action accomplish?: Provides additional funding for the construction of a CIP project, as required by Consent Decree. SUMMARY EXPLANATION/BACKGROUND: Contractor: Gershenson Construction Co., Inc. Previous District Contract: Yes #2 Truitt Drive Eureka, MO 63025 Consultant: N/A Agency: N/A Number of bidders: N/A Low Bid: N/A High Bid: N/A Appropriation Amount: $200,000.00 Designer’s Estimate: $3,774,000.00 Total MWBE Participation: 15.36% (MWBE Goal is 15%) B & P Construction (African American) – 15.36% - MBE Type of Contract: Unit Cost Properties Affected: 60 Properties Benefiting: 1,200 Designed by: AMEC Environment & Infrastructure, Inc. The work being done under Contract #20033 consists of the construction of approximately 6,500 lineal feet of sewers varying in size from 8-inches to 30-inches in diameter and appurtenances. The purpose of this project is to alleviate building backups and overcharged sanitary sewers. This project will eliminate three (3) SSOs (BP-400, BP-385 and BP- 407). This project is scheduled to be completed by July 2015. FUNDING/COST SUMMARY: Budgeted: Capital Improvement Program Budget Year: FY2013, Pg. 130 Amount: $3,900,000 Fund Name: #6660 – Sanitary Replacement Fund Additional Comments: This supplemental appropriation is requested to fund additional costs associated with unforeseen rock conditions and the work necessary to remove this material to place the new pipe. The rock removed increased from an initial 3-4 feet to an additional 6-7 feet of rock along the last half of reaches along the alignment, causing these additional excavation costs. This is inconsistent with pre-construction geotechnical borings. Staff is requesting introduction and adoption at the September Board meeting due to encountering a much deeper amount of rock (9 feet compared to 3.5 feet) in late June. The contractor is completing the reaches where we continue to encounter the 9 feet of rock. Because of the geotechnical bore locations and inaccuracies, we did not have the data to make an educated estimate for the rock through these reaches. The introduction and adoption will allow the contractor to complete the restoration of the pavement and front yards on the final reaches with no delays. This project is expected to be funded by Bond proceeds. 36 Revised: 9/3/2015 9:18 AM Contracted planning resources utilized: Watershed Facility Planning, Combine Sewer Area I/I Assessment, Separate Sewer Area Flow Metering & Monitoring, Modeling, CCTV Inspection, Radar Rainfall Data, and General Services Surveying. PREVIOUS BOARD ACTION RELATED TO THIS ACTION: 11/10/05 – Ord. No. 12128 – Amount: $535,000 – AMEC Environment & Infra., Inc. – Design Contract No. 10994 06/12/13 – Ord. No. 13607 – Amount: $3,400,000 – Taylor – Fillmore – Harrison Sanitary Relief (SKME-502 & 503) – Construction Contract No. 20033 – Original Appropriation 03/12/15 – Ord. No. 14050 – Amount: $300,000 – Taylor – Fillmore – Harrison Sanitary Relief (SKME-502 & 503) – Construction Contract No. 20033 – Supplemental Appropriation 08/13/15 – Ord. No. 14223 – Amount: $75,000 – Taylor – Fillmore – Harrison Sanitary Relief (SKME-502 & 503) – Construction Contract No. 20033 – Supplemental Appropriation (Intergovernmental Agreement with the City of Kirkwood) 37 Revised: 9/3/2015 9:18 AM AGENDA ITEM NUMBER: Item No. 62 Proposed Ordinance No. 14246 NAME OF PROJECT: District Rate Model Support, Feasibility Study & Rate Commission Proceedings LOCATION: Finance TYPE OF PROJECT: Professional Services for Rate Modeling Support DEPARTMENT REQUESTING ACTION: Finance REQUESTED ACTION: Why is this action necessary? Supplemental appropriation and authorization to enter into a change order to original contract to complete professional services for the preparation of the feasibility study needed for the issuance of District bonds. What does action accomplish? This authorizes MSD to enter into a change order with Raftelis Financial Consultants (RFC). This change order will provide additional funds for technical engineering and economic feasibility review services for the District to complete a feasibility study needed for the issuance of District Bonds. SUMMARY EXPLANATION/BACKGROUND: Contractor: Raftelis Financial Consultants, Inc. Previous District Contract: Yes 1031 S. Caldwell Street, Suite 100 Charlotte, NC 28203 Consultant: N/A Agency: N/A Number of Proposers: N/A Appropriation Amount: $10,000.00 Designer’s Estimate: N/A MBE/WBE Participation: MWBE Goal is 20% Basilico Engineering MBE 11.59% ECCO Select WBE 9.21% 20.8% Type of Contract: Professional Properties Affected: N/A Properties Benefiting: N/A Designed by: N/A FUNDING/COST SUMMARY: This authorizes the District to execute a change order to the original contract with Raftelis continue work on the debt feasibility study. Budgeted: Finance Division Budget Budget Year: FY16 Amount: $10,000.00 Fund Name: General Fund Additional Comments: Raftelis Financial Consultants, Inc. will support the District for rate model software and preparation of feasibility study needed for the issuance of District bonds in the last third quarter of calendar year 2015. PREVIOUS BOARD ACTION RELATED TO THIS ACTION: Resolution No. 3199, March 12, 2015 38 Revised: 9/3/2015 9:18 AM AGENDA ITEM NUMBER: Item No 65 Resolution No. 3233 NAME OF PROJECT: State Legislative Lobbying Services LOCATION: District-wide TYPE OF PROJECT: Professional Services - State Legislative Lobbying Services DEPARTMENT REQUESTING ACTION: Executive Director - Office of Public Information REQUESTED ACTION: Why is this action necessary?: To maintain lobbying services at the Missouri legislature. What does this action accomplish?: Authorizes a one-year (1) renewal term to existing contract. SUMMARY EXPLANATION/BACKGROUND: Contractor: N/A Previous District Contract: Yes Consultants: Kyna Iman, LLC Agency: N/A 124 East High Street Jefferson City, Missouri 65102 Corporate Headquarters: Jefferson City MO Number of Proposers: N/A Appropriation Amount: N/A Designer's Estimate: N/A MBE/WBE Participation: MWBE Goal is: 0% WBE: 100% Type of Contract: Lump Sum Properties Affected: N/A Properties Benefiting: N/A Designed by: N/A This Resolution authorizes the District to enter into a one-year (1) renewal term with Kyna Iman, LLC to provide state legislative lobbying services. FUNDING/COST SUMMARY: Budgeted: Exec. Director - Office of Public Info. Budget Year: FY2016 Amount: $55,000 Fund Name: General Fund Additional Comments: Ordinance No. 13718, adopted September 12, 2013, authorized a two (2) year contract with one (1) additional one-year extension to be exercised at the District's discretion. The contract will pay an amount not to exceed $55,000 per year, including expenses approved by the District and appropriate for the service. PREVIOUS BOARD ACTION RELATED TO THIS ACTION: 09/12/2013 - Ordinance No. 13718 - State Legislative Lobbying Services 39 Revised: 9/3/2015 9:18 AM AGENDA ITEM NUMBER: Item 66 Resolution No. 3234 NAME OF PROJECT: Pension Plan Investment Consultant LOCATION: District Wide TYPE OF PROJECT: Pension Investment Consultant DEPARTMENT REQUESTING ACTION: Secretary-Treasurer REQUESTED ACTION: Why is this action necessary?: This resolution is needed to authorize the exercise of an additional one-year option for the Pavilion contract that expires on September 30, 2015. What does action accomplish?: This resolution allows Pavilion to continue to provide their investment consulting services for the District’s pension fund, deferred compensation plan, and defined contribution plan through the quarter ending September 30, 2016. SUMMARY EXPLANATION/BACKGROUND: Contractor: N/A Previous District Contract: Yes Consultant: Pavilion Advisory Group Inc. Richard P. Marra, Senior Consultant 227 W. Monroe Street, Ste. 2020 Chicago, IL 60606 Agency: N/A Number of bidders: N/A Low Bid: N/A High Bid: N/A Appropriation Amount: N/A District’s Estimate: $140,500 MBE/WBE Participation: 0% (No Goal) Plan Approval Date: N/A Type of Contract: % of assets managed plus expenses Properties Affected: N/A Properties Benefiting: N/A Designed by: N/A FUNDING/COST SUMMARY: Budgeted: Secretary-Treasurer Budget Year: FY2015/16 Amount: $140,500 Fund Name: Additional Comments: PREVIOUS BOARD ACTION RELATED TO THIS ACTION: 09/11/2014 - Resolution No. 3170 - Renewal for a second year term with Pavilion 09/12/2013 - Ordinance No. 13719 - Contract authorization with Pavilion 40 Revised: 9/3/2015 9:18 AM AGENDA ITEM NUMBER: Item 67 Resolution No. 3235 NAME OF PROJECT: Force Main Non-Destructive Evaluation (Condition Assessment) Professional Services Agreement LOCATION: Throughout St. Louis City and County TYPE OF PROJECT: Professional Services – Force Main Non-Destructive Evaluation (Condition Assessment) DEPARTMENT REQUESTING ACTION: Operations REQUESTED ACTION: Why is this action necessary?: Authorizes staff to enter into a contract amendment to a Professional Services Agreement for Non-Destructive Evaluation of Force Main Asset Inventory and exercise year four for this existing contract. What does action accomplish?: Implements a requirement of Consent Decree to perform non-destructive evaluations of MSD force main asset inventory. SUMMARY EXPLANATION/BACKGROUND: Contractor: N/A Previous District Contract: Yes Consultant: Jason Consultants, LLC Agency: N/A 8920 State Route 108, Suite D Columbia, MD 21045 Number of proposers: N/A Appropriation Amount: N/A Designer’s Estimate: N/A Total MWBE Participation: 34.00% (MWBE Goal is 30%) M3 Engineering Group, PC - MBE Type of Contract: Hourly Billing Rate Plus Reimbursable Properties Affected: N/A Properties Benefitting: N/A Designed by: N/A This resolution authorizes the District to enter into an amendment for the year four (4) extension of a recurring Professional Services Agreement with Jason Consultants to perform Consent Decree required analysis of existing force main asset inventory in order to recommend non-destructive evaluation techniques, processes, and technologies for use by the District. In addition, Consultant will analyze non-destructive evaluation results and assist District personnel in estimating remaining asset life cycles, recommend capital improvements, to include identifying scope of work , and cost estimates for proposed improvements. Consultant will additionally prepare contingency plans for emergency repairs of high and medium risk force main assets. The proposed agreement will be for one year with up to two (2) more one-year extensions, to match the Consent Decree required non-destructive evaluation schedule. The purpose of the agreement is to meet one of the key provisions of the Consent Decree, to conduct a periodic non-destructive evaluation of existing force main assets. The contract amendment will not exceed $375,400. FUNDING/COST SUMMARY: Budgeted: Operations Department Operating Budget Budget Year: FY2016 Amount: $375,400 Fund Name: N/A Additional Comments: Requesting Board approval of an amendment to a contract with Jason Consultants, LLC for which an additional $375,400 was encumbered in the FY2016 Operating Budget. PREVIOUS BOARD ACTION RELATED TO THIS ACTION: 08/14/2014 - Resolution No. 3168: Jason Consultants, LLC 09/12/2013 - Resolution No. 3108: Jason Consultants, LLC 08/09/2012 - Ordinance No. 13464: Jason Consultants, LLC