Loading...
HomeMy Public PortalAbout1564th Board Journal 7-9-2015Pg. 1 JOURNAL OF THE (1564th) MEETING OF THE BOARD OF TRUSTEES THE METROPOLITAN ST. LOUIS SEWER DISTRICT July 09, 2015 – 4:00 P.M. The Trustees of the District met in Room 109 at 2350 Market on the above date. Present at the meeting were: Board of Trustees Staff Members M.E. Yates, Chair B.L. Hoelscher, Executive Director A.K. Mandel T.R. Snoke, Secretary-Treasurer R.L. Bonner S.M. Myers, General Counsel R. T. Berry T.A. Bellville, Asst Director of Finance R.L. Unverferth, Director of Engineering Also present were: ~ ~ ~ ~ ~ Trustee Yates opened the meeting pursuant to notice and call. Motion was made by Trustee Mandel and seconded by Trustee Berry for the Board go into Closed Session to discuss legal, confidential, or privileged matters under § 610.021(1) and leasing, purchase or sale of real estate under §610.021(2), RSMo 1988 Supp. ~ ~ ~ ~ ~ Upon motion made by Trustee Mandel and seconded by Trustee Berry, both Journals from June 11th and 16th, 2015 meeting were approved by unanimous voice vote. ~ ~ ~ ~ ~ The Chair had no comments. ~ ~ ~ ~ ~ Name Organization Name Organization Tamara Clinton MSD Jon Omvig AMEC John Strahlman MSD Lawrence Nwachukwu Basilico Vicki Edwards MSD Dave Bunch Black & Veatch Crystal Howard MSD Breck Washam Burns & McDonnell Marie Collins MSD Rebecca Losli Burns & McDonnell Todd Loretta MSD Mark Kollitz Burns & McDonnell Barbara Mohn MSD Dan Greco CCMI Betsy Schubert MSD Doug Hickey HDR Mike Grace MSD Bob Januska Horner and Shifrin Shonnah Paredes MSD Jim Coll Jacobs Ronny Griffin Laborers Local 110 Ed Laux RJN Terry Briggs SITE Dave Yates Pg. 2 Trustee Mandel reported that The Program Management Committee met on June 29, 2015 at 8:04 a.m. The meeting was attended by trustees Mandel and Bonner. The minutes of the June 2, 2015 meeting were approved. The agenda items to be introduced tonight were presented and discussed, including a detailed discussion regarding the following items: Item 24 – Infrastructure Repairs Rehabilitation Contract C – Staff provided details on the project and answered questions from the Committee on MWBE subcontractor Luther’s Supply. Item 28 – Infrastructure Repairs Sanitary and Combined Sewers for Fiscal Year 2016 – Staff provided statistics on fiscal year 2015 repair program highlighting the 27% MWBE participation being realized by the small sewer repair program. This is an increase in both MWBE participation and the number of MWBE contractors from fiscal year 2014 repair program. Staff attributed this to increased outreach and solicitation efforts to the small contractor community this past year. There was a brief discussion between staff and the Committee on increased bid prices being experienced this past quarter. There was further discussion on contractor capacity and in particular, MWBE contractor capacity. Staff indicated that bids being received continue to meet current MWBE subcontracting goals. Items 35 thru 80 – Watershed Consultant Contracts for FY2016 – Staff provided a summary of five groupings of projects on tonight’s agenda and the use of the watershed consultant contracts to design a majority of the projects related to the Consent Decree. Staff reiterated that the watershed consultant contracts are one-year contracts with annual extensions based on good performance and being able to satisfactorily meet contractual commitments for MWBE utilization. Staff briefed the Committee on the Deer Creek watershed consultant Parsons Water & Infrastructure and performance issues being experienced with this firm. Staff has determined that no additional new projects would be awarded to this consultant. Emphasis will be placed on the completion of current projects. Other projects within the Deer Creek area have been reassigned to two of the existing watershed consultants. Staff then discussed the details of each project and answered various questions from the Committee. The total watershed consultant appropriation being requested is approximately $44 million, and is approximately $3.8 million below the proposed fiscal year 2016 budget. Consultant compliance with their MWBE contractual requirements were reviewed as detailed on the project write-up sheets. The meeting was adjourned at 10:28 a.m. The next Committee meeting is tentatively scheduled for Tuesday, August 4, 2015 at 8:00 a.m ~ ~ ~ ~ ~ Trustee Berry reported that the Stakeholder Relations Committee met at the District’s Headquarters on Wednesday July 1, 2015 at approximately 8:15 a.m. In addition to public attendance, those present at the meeting included Trustees Yates, Mandel, Faul and Bonner, as well as District Directors and staff. The first agenda item was a discussion by Lance LeComb regarding a renewal contract for the Private I&I Public Engagement Program and Project Clear Efforts that are provided by Pg. 3 StandPoint Public Affairs. The public education, outreach, and engagement provided through this contract are critical to the District. Ordinance No. 13437, adopted August 2012, allowed funding for the original contract with 2 option years. Staff is requesting introduction of an ordinance to amend the current contract to extend it by one additional renewal year. The ordinance will authorize a third and final contract option year and appropriate additional funds for these services. An RFP will be issued in the third quarter of 2016 for additional years of services as those needs are reevaluated and possibly moved in-house. This is Item Number 81 on tonight's agenda. The next item on the agenda was a discussion by Jonathon Sprague regarding a gate failure at McCausland Avenue on June 19, 2015. In a PowerPoint presentation, Jonathon illustrated the background on MSD's Overflow Regulation System, its operation parameters, and how the Combined Sewer System operates during various dry and wet weather stages. Jon explained the specifics related to the sewer backups of approximately 50 homes, clean-up efforts, and claims assistance coordinated by the District. The response model for this event will be used for future wet weather incidents. There is no Board action required at this time. There were no additional items and no further comments. The next meeting is tentatively scheduled for August 4, 2015. The meeting was adjourned at approximately 8:40 a.m. ~ ~ ~ ~ ~ Trustee Yates reported that The Audit Committee met at 7:30 AM on Tuesday, July 1, 2015. In attendance were Trustees Yates, Faul, and Mandel. The Committee approved the minutes from the June 2 meeting. The Chairman had no comments. Staff presented the reports for two Internal Audit engagements. The first engagement titled “Process Review of the Division of Environmental Compliance (or DEC)” focused on the operations of three DEC units: the Regulatory Affairs Unit, the Stormwater Unit, and the Emergency Response Unit. The engagement included a review of the procedures for each of the units to ensure the processes are designed and operating in a manner that provides the District with the ability to maintain compliance with the various government-issued environmental regulations and requirements. The second engagement, titled “Review of the Capacity, Management, Operations, and Maintenance Program (or CMOM),” focused on the District’s repair and maintenance program that was developed and implemented in response to requirements contained in the Consent Decree. The CMOM program addresses the District’s collection systems, which include the Combined System and the Sanitary System. CMOM processes were reviewed for effectiveness and for compliance with the CMOM Program Plan and the Consent Decree. Staff presented and explained the scope, objectives and methodology used for each engagement. Each engagement received a satisfactory rating, as no significant issues were identified for either engagement. The DEC engagement resulted in the identification of three Opportunities for Improvement, and the CMOM engagement resulted in the identification of four Opportunities for Improvement. Questions and concerns were addressed by Staff as they were received from the Committee. The meeting adjourned at approximately 8:10 am. The next meeting is tentatively scheduled for Tuesday, August 4, 2015. This concludes the Audit Committee Report. ~ ~ ~ ~ ~ Pg. 4 Trustee Bonner reported that The Finance Committee met on July 1, 2015 with Trustees Bonner, Mandel, Faul and Yates in attendance. The minutes from the June 2, 2015 meeting were approved. Staff presented a resolution to renew the contract with Connectria Corporation for information technology managed services. Connectria provides remote monitoring, management and administration of the District’s technology infrastructure environment. The renewal represents the second one-year term of the current contract. Resolution No. 3224 will be Item #88 on tonight’s agenda. The next item on the agenda was a recommendation for the reduction of the long term investment earnings assumption from 7¼% to 7.00% for the Employees’ Pension Plan. Bill Winningham of Milliman explained the development of the recommended contribution under prior and proposed assumptions. This will provide conceptual guidance to staff regarding the asset allocation assumptions associated with a lower projected earnings rate. Resolution No. 3226 will be Item #90 on tonight’s agenda. Staff then presented an ordinance authorizing the District to enter into a contract with US Bank for banking and safekeeping services. This will be a two year contract with three one-year options, not to exceed five years. This ordinance allows US Bank to provide general banking services at a guaranteed price for a minimum of two years. Staff explained an RFP was sent to 12 banks and the District received six qualified responses. The approximate savings over the incumbent bank’s proposal is estimated to be $400,000. Ordinance No. 14190 will be Item #82 on tonight’s agenda. The next item on the agenda was an ordinance authorizing the District to enter into a contract with Prudent Man Advisors (PMA). PMA would provide investment management advice for funds not immediately needed by the District. This will be a two year contract with three one-year options, not to exceed five years. The District submitted an RFP for investment management services in which four managers responded. PMA provided the best proposal to the District with an expected savings of approximately $180,000. Ordinance No. 14191 will be Item #83 on tonight’s agenda. Staff presented a resolution to preserve the right of the District to be reimbursed for project costs from tax-exempt bonds. The United States Treasury Department requires that the District state its intent to reimburse itself for project costs from a $75 million SRF loan expected to be approved by the State of Missouri. Resolution No. 3225 will be Item #89 on tonight’s agenda. The meeting adjourned at 9:23 a.m. The next tentatively scheduled meeting is Tuesday, August 4, 2015. This concludes the Finance Committee Report. ~ ~ ~ ~ ~ The Executive Director had three items to report. First, each year the National Association of Clean Water Agencies or NACWA presents Peak Performance Awards to those member agencies that achieve outstanding performance in treatment plant operations. I am happy to report that all seven of the District’s plants have received Peak Performance Awards for calendar 2014. Silver Awards are also presented to facilities that have had five (5) or less violations in the calendar year. This award was presented to the Districts Lemay, Bissell, and Grand Glaze Treatment Plants. Pg. 5 Gold Awards are presented to facilities that have achieved perfect compliance for a single year. This award was presented to the Districts Missouri River Treatment and Coldwater Plants for their lack of violations during 2014. Platinum awards are presented to facilities that have achieved perfect compliance for five or more years. This was achieved by our Lower Meramec and Fenton Treatment plants for maintaining a perfect compliance record for seven consecutive years. Congratulations to all of our facilities for these achievements! Second, in addition to these peak performance awards, NACWA presents Excellence in Management Awards to member utilities in the management arena. This award honors member agencies that have implemented and sustained, for a continuous three-year period, successful programs that address the range of management challenges faced by public clean water utilities in today’s competitive environment. The Excellence in Management Gold award is presented to Utilities that have achieved excellence in at least seven out of ten categories. I am very pleased to announce that the District was presented with the 2015 Excellence in Management Gold award. This level of achievement is only obtained by a handful of agencies each year. MSD will be receiving these awards this month at the annual summer conference in Providence RI. Congratulations to all our management and staff that have made this achievement possible. Finally, with the end of the Fiscal Year, I would like to briefly review some of the successes of MSD’s Diversity Program. In December of 2012 MSD completed a Disparity study to guarantee proper inclusion in its upcoming multi-decade multi-billion dollar capital program. While this study identified areas of improvement, it also reflected the successes of MSD’s Diversity program under of Director of Human Resources, Vicki Edwards, over the previous decade. Of the 30 capital procurement/diversity check points reviewed, MSD was found to have no disparity in 14 of the 30 areas and utilization greater than Minority and Women Business Enterprise availability in 9 of the 30 areas. Again, these results speak to MSD’s successes over the previous decade. The study also provided a detailed examination of each diversity group and provided guidance as to the 7 remaining areas that MSD needed to provide more emphasis. In response, MSD created new goals and took action to improve its program in many areas. Let me give a quick summary of recent results. As far as construction vendor goals from July through March of this past fiscal year, MSD has submitted reports to the Board of Trustees and to the CBA Signatory group showing that 48 of the 50 construction contracts awarded met the new goals with good faith effort being awarded on only two projects. These same reports as presented by MSD’s Manager of Diversity Shonnah Paredes shows total capital expenditures of almost $25 million to Minority and Women Business Enterprise contractors and consultants during that time period, or almost 30% of all capital expenditures. Pg. 6 In addition, Director of Engineering Rich Unverferth recently reported a 26% MWBE participation level during the past fiscal year in MSD’s small sewer program. For engineering professional services, the results have been just as promising. In tonight’s agenda, the Board of Trustees is considering the introduction of $44 million in engineering services work for the next year of the existing watershed consultant contracts, with almost 30% or $12.5 million dollars of that work going to Minority and Woman Business Enterprises. These are similar to the watershed consultant figures adopted by the Board of Trustees at the beginning of last fiscal year. Since the implementation of the Disparity Study results, MSD has also started requiring comprehensive workforce goals on all projects. MSD has a unique requirement for Consulting Engineers. The workforce goal is for their entire local office workforce, not just those individuals working on MSD projects. This means that any entity contracting with these consultants will benefit from our program. For the contracts to date that fall under the new requirement, the overall program results are right on our goals. MSD also instituted a comprehensive requirement for a diverse workforce on MSD capital projects. Along with the contract requirements, MSD is investing in the development of a diverse workforce pool; journeymen, apprentices, and pre-apprentices; through contracts with SLATE. Reported results have shown a marked increase in workforce diversity with many multi-million dollar construction projects reporting a diverse workforce over 30% and in some cases over 40%. Comprehensive results will be able to be reported once these reporting systems come on line. Director of Human Resources, Vicki Edwards, and our manager of Diversity, Shonnah Paredes, continue to review our program with all stakeholders and make adjustments as needed to improve the program results. To conclude, I would like to take the opportunity to thank Vicki Edwards and our Manager of Diversity Shonnah Paredes. Because of their involvement with the delivery of the Capital Program and our efficient operations and maintenance, MSD is now being asked by agencies within St. Louis, as well as other wastewater agencies located throughout the United States, to assist in Disparity Study development and implementation. I would also like to extend thanks to the Diversity staff, the District staff and Board Members, the various majority and minority consultants, contractors, workforce providers and advocacy groups that have all been part of our past successes and continue to support our efforts to improve MSD’s Diversity Program. Thank you Mr. Chairman, this concludes my report. ~ ~ ~ ~ ~ CONSENT AGENDA (*Grouped 14119 – 14129) 11 Adoption of proposed Ord. No. 14119 Pg. 7 APPROPRIATING FOUR HUNDRED TWENTY-SEVEN THOUSAND DOLLARS ($427,000.00) FROM THE COLDWATER CREEK OPERATION, MAINTENANCE, CONSTRUCTION IMPROVEMENT FUND AND NINE HUNDRED SEVENTY-THREE THOUSAND DOLLARS ($973,000.00) FROM THE SANITARY REPLACEMENT FUND TO BE USED FOR PROJECT COSTS FOR SANITARY SEWER CONSTRUCTION AND PRIVATE I/I REMOVAL IN THE BRINWOOD I/I REDUCTION (11719) PROJECT IN THE CITY OF FLORISSANT, MISSOURI; AND AUTHORIZING THE EXECUTIVE DIRECTOR AND SECRETARY-TREASURER ON BEHALF OF THE METROPOLITAN ST. LOUIS SEWER DISTRICT TO ENTER INTO CONTRACT NO. 20278 W ITH GERSHENSON CONSTRUCTION CO., INC., FOR THE AFORESAID SANITARY SEWER CONSTRUCTION AND PRIVATE I/I REMOVAL. 12 Adoption of proposed Ord. No. 14120 APPROPRIATING THREE MILLION DOLLARS ($3,000,000.00) FROM THE SANITARY REPLACEMENT FUND TO BE USED FOR COSTS ASSOCIATED WITH ACQUIRING THE NECESSARY PROPERTY RIGHTS BY MEANS OF NEGOTIATION AND/OR EMINENT DOMAIN FOR THE EASEMENT ACQUISITION FOR COMBINED/SANITARY PROJECTS (FY2016) (11744) THROUGHOUT THE ENTIRE DISTRICT. 13 Adoption of proposed Ord. No. 14121 APPROPRIATING THREE MILLION FIVE HUNDRED THOUSAND DOLLARS ($3,500,000.00) FROM THE SANITARY REPLACEMENT FUND TO BE USED FOR PROJECT COSTS FOR SANITARY SEWER REHABILITATION IN THE FOREST BROOK SANITARY RELIEF (SKME- 003 AND SKME-016) PUBLIC REHABILITATION AND I/I REDUCTION (11944) PROJECT, IN THE CITIES OF BRIDGETON, CREVE COEUR, MARYLAND HEIGHTS, ST. ANN, AND UNINCORPORATED ST. LOUIS COUNTY, MISSOURI; AND AUTHORIZING THE EXECUTIVE DIRECTOR AND SECRETARY-TREASURER ON BEHALF OF THE METROPOLITAN ST. LOUIS SEWER DISTRICT TO ENTER INTO CONTRACT NO. 20259 WITH SAK CONSTRUCTION, LLC, FOR THE AFORESAID SANITARY SEWER REHABILITATION. 14 Adoption of proposed Ord. No. 14122 APPROPRIATING EIGHT MILLION DOLLARS ($8,000,000.00) FROM THE SANITARY REPLACEMENT FUND TO BE USED FOR PROPERTY ACQUISITION, DEMOLITION, AND RELATED ACTIVITIES FOR CONSTRUCTION OF A SANITARY STORAGE FACILITY FOR THE GRAVOIS TRUNK SANITARY STORAGE FACILITY (PARDEE LN AND PARDEE RD) (12569) PROJECT, IN THE CITY OF CRESTWOOD, MISSOURI; AND AUTHORIZING THE EXECUTIVE DIRECTOR AND SECRETARY-TREASURER ON BEHALF OF THE METROPOLITAN ST. LOUIS SEWER DISTRICT TO ACQUIRE PROPERTY WITHOUT ADDITIONAL BOARD ACTION. Pg. 8 15 Adoption of proposed Ord. No. 14123 APPROPRIATING SEVEN HUNDRED SIXTY-TWO THOUSAND DOLLARS ($762,000.00) FROM THE COLDWATER CREEK OPERATION, MAINTENANCE, CONSTRUCTION IMPROVEMENT FUND AND EIGHT HUNDRED EIGHTY-EIGHT THOUSAND DOLLARS ($888,000.00) FROM THE SANITARY REPLACEMENT FUND TO BE USED FOR PROJECT COSTS FOR SANITARY SEWER CONSTRUCTION AND PRIVATE I/I REMOVAL IN THE MIDLAND SANITARY RELIEF—PUBLIC AND PRIVATE I/I REDUCTION (11663) PROJECT IN THE CITIES OF OVERLAND AND BRECKENRIDGE HILLS, MISSOURI; AND AUTHORIZING THE EXECUTIVE DIRECTOR AND SECRETARY-TREASURER ON BEHALF OF THE METROPOLITAN ST. LOUIS SEWER DISTRICT TO ENTER INTO CONTRACT NO. 20280 WITH BATES UTILITY COMPANY, INC. FOR THE AFORESAID SANITARY SEWER CONSTRUCTION AND PRIVATE I/I REMOVAL. 16 Adoption of proposed Ord. No. 14124 APPROPRIATING SIX HUNDRED THIRTY-FIVE THOUSAND DOLLARS ($635,000.00) FROM THE SANITARY REPLACEMENT FUND TO BE USED FOR PROJECT COSTS FOR SANITARY SEWER CONSTRUCTION IN THE POWELL AVE AND ANNALEE SEWER SEPARATION (10737) PROJECT, IN THE CITY OF BRENTWOOD, MISSOURI; AND AUTHORIZING THE EXECUTIVE DIRECTOR AND SECRETARY-TREASURER ON BEHALF OF THE METROPOLITAN ST. LOUIS SEWER DISTRICT TO ENTER INTO CONTRACT NO. 20279 WITH FRED M. LUTH & SONS, INC., FOR THE AFORESAID SANITARY SEWER CONSTRUCTION. 17 Adoption of proposed Ord. No. 14125 APPROPRIATING ONE HUNDRED NINETY THOUSAND DOLLARS ($190,000.00) FROM THE SANITARY REPLACEMENT FUND TO BE USED FOR PROJECT COSTS FOR PRIVATE I/I REMOVAL IN THE SUB-TRUNK #2 LATERAL SANITARY RELIEF (11668) PROJECT, IN UNINCORPORATED ST. LOUIS COUNTY, MISSOURI; AND AUTHORIZING THE EXECUTIVE DIRECTOR AND SECRETARY-TREASURER ON BEHALF OF THE METROPOLITAN ST. LOUIS SEWER DISTRICT TO ENTER INTO CONTRACT NO. 20275 WITH FRED M. LUTH & SONS, INC., FOR THE AFORESAID PRIVATE I/I REMOVAL. 18 Adoption of proposed Ord. No. 14126 APPROPRIATING A SUPPLEMENTAL APPROPRIATION OF TWO HUNDRED SEVEN THOUSAND FIVE HUNDRED DOLLARS ($207,500.00) FROM THE DEER CREEK OPERATION, MAINTENANCE, CONSTRUCTION, IMPROVEMENT FUND TO BE USED FOR COST SHARING WITH THE MISSOURI BOTANICAL GARDEN UNDER CONTRACT NO. 11006 FOR GREEN INFRASTRUCTURE CONSTRUCTION IN THE DEER CREEK WATERSHED INITIATIVE (11065) PROJECT, IN THE DEER CREEK WATERSHED, AND AUTHORIZING THE EXECUTIVE DIRECTOR AND SECRETARY-TREASURER ON BEHALF OF THE METROPOLITAN ST. LOUIS SEWER DISTRICT TO ENTER INTO AN AGREEMENT WITH THE MISSOURI BOTANICAL GARDENS FOR COST SHARING OF GREEN INFRASTRUCTURE CONSTRUCTION. Pg. 9 19 Adoption of proposed Ord. No. 14127 APPROPRIATING SIXTY FIVE THOUSAND DOLLARS ($65,000.00) FROM THE GRAVOIS CREEK OPERATION, MAINTENANCE, CONSTRUCTION IMPROVEMENT FUND TO BE USED FOR PROJECT COSTS FOR STORM SEWER CONSTRUCTION IN THE MANDA LANE #8901 STORM SEWER (11105) PROJECT, IN THE CITY OF CRESTWOOD, MISSOURI; AND AUTHORIZING THE EXECUTIVE DIRECTOR AND SECRETARY-TREASURER ON BEHALF OF THE METROPOLITAN ST. LOUIS SEWER DISTRICT TO ENTER INTO CONTRACT NO. 20271 WITH GAEHLE GRADING, LLC FOR THE AFORESAID STORM SEWER CONSTRUCTION. 20 Adoption of proposed Ord. No. 14128 DECLARING THE NECESSITY FOR THE ACQUISITION OF REAL PROPERTY WITHIN THE METROPOLITAN ST. LOUIS SEWER DISTRICT FOR THE PURPOSE OF PURCHASING PROPERTY DUE TO INADEQUATE STORM AND SANITARY SEWERS FOR THE PROJECT KNOWN AS MALINE CREEK CSO BP 051 & 052 LOCAL STORAGE FACILITY (CHAIN OF ROCKS DR TO CHURCH DR) (11656) TO SERVE THE NEEDS OF RESIDENTS OF THE AREA, AND AUTHORIZING THE ACQUISITION OF SAID REAL PROPERTY BY PURCHASE OR BY THE INSTITUTION OF EMINENT DOMAIN PROCEEDINGS. 21 Adoption of proposed Ord. No. 14129 AUTHORIZING THE EXECUTIVE DIRECTOR AND SECRETARY-TREASURER, WITH AN EMERGENCY CLAUSE, ON BEHALF OF THE METROPOLITAN ST. LOUIS SEW ER DISTRICT TO ENTER INTO AN ADDENDUM TO THE SEWERAGE SYSTEM AGREEMENT WITH THE CITY OF ARNOLD AND MISSOURI AMERICAN WATER COMPANY TO GOVERN THEIR RELATIONSHIP AFTER THE TRANSFER OF THE SEWERAGE SYSTEM FROM THE CITY TO MISSOURI AMERICAN WATER COMPANY. Motion was made by Mr. Yates, seconded by Ms. Mandel that the Consent Agenda Ord. Nos. 14119 - 14129 be adopted Motion passed - 4 ayes Poll taken: A. Mandel - aye M. Yates - aye B. Berry – aye R. Bonner - aye ~ ~ ~ ~ ~ UNFINISHED BUSINESS Ordinances None Resolutions None ~ ~ ~ ~ ~ Pg. 10 NEW BUSINESS ORDINANCES INTRODUCTION OF PROPOSED ORD. NO. 14130, MAKING A SUPPLEMENTAL APPROPRIATION OF FOUR HUNDRED THOUSAND DOLLARS ($400,000.00) FROM THE SANITARY REPLACEMENT FUND TO BE USED FOR ADDITIONAL PROJECT COSTS FOR THE CONSTRUCTION OF SANITARY SEWERS IN FF-02 FEE FEE - ALAN SHEPARD I-270 SANITARY RELIEF PHASE V (10600) IN THE CITY OF MARYLAND HEIGHTS, MISSOURI. Proposed Ord. No. 14130 was presented and read. The work to be done under Contract #20135 consists of the construction of approximately 2,418 lineal feet of pipe sewers varying in size from 8-inches to 36-inches in diameter. This construction is the third and final phase of a multi-phase improvement program. The purpose of this project is to alleviate building backups and to remove an existing wet weather pump station. This project will also elim inate two (2) SSOs (BP-083 and BP-511). This project is scheduled to be completed by January 2016. Motion was made by Mr. Yates, seconded by Mr. Berry that Proposed Ord. No. 14130 be adopted Motion passed - 4 ayes Poll taken: A. Mandel - aye M. Yates - aye B. Berry – aye R. Bonner - aye INTRODUCTION OF PROPOSED ORD. NO. 14131, MAKING A SUPPLEMENTAL APPROPRIATION OF TWO HUNDRED TWENTY-FIVE THOUSAND DOLLARS ($225,000.00) FROM THE SANITARY REPLACEMENT FUND TO BE USED FOR ADDITIONAL PROJECT COSTS FOR SANITARY SEWER CONSTRUCTION IN INFRASTRUCTURE REPAIR #087P CAULKS CREEK A (P-750) PHASE VI (10656), IN THE CITY OF CHESTERFIELD, MISSOURI. Proposed Ord. No. 14131 was presented and read. The work to be done under Contract #20333 consists of the construction of approximately 6,600 lineal feet of sanitary force main varying in size from 14-inches to 30-inches in diameter and appurtenances. The purpose of this project is to provide additional force main capacity and to replace existing deteriorating force main. This project is scheduled to be completed in August 2015. Motion was made by Mr. Yates, seconded by Mr. Berry that Proposed Ord. No. 14131 be adopted Motion passed - 4 ayes Poll taken: A. Mandel - aye M. Yates - aye B. Berry – aye R. Bonner - aye INTRODUCTION OF PROPOSED ORD. NO. 14132, APPROPRIATING FOUR MILLION EIGHT HUNDRED THOUSAND DOLLARS ($4,800,000.00) FROM THE SANITARY REPLACEMENT FUND TO BE USED FOR CONSTRUCTION COSTS FOR SANITARY SEWER REHABILITATION IN INFRASTRUCTURE REPAIRS (REHABILITATION) (FY2015) CONTRACT C (11867) IN THE CITY OF ST. LOUIS AND VARIOUS MUNICIPALITIES IN ST. LOUIS COUNTY, MISSOURI; AND AUTHORIZING THE EXECUTIVE DIRECTOR AND SECRETARY-TREASURER ON BEHALF OF THE METROPOLITAN ST. LOUIS SEWER DISTRICT TO ENTER INTO CONTRACT NO. 20252 WITH SAK CONSTRUCTION, LLC FOR THE AFORESAID SANITARY SEWER REHABILITATION. Proposed Ord. No. 14132 was presented and read. The work to be done under Contract #20252 consists of the rehabilitation of approximately 34,403 lineal feet of pipe sewers varying in size from 8- inches to 36-inches in diameter, using cured-in-place pipe (CIPP) methods. The purpose of this project is to rehabilitate older, damaged, and deteriorated sanitary and combined sewers throughout the District’s boundaries. Sewers identified for rehabilitation are identified through the annual CMOM inspection programs required by the Consent Decree. This project is scheduled to be completed in 550 days. Motion was made by Ms. Bonner, seconded by Ms. Mandel that Proposed Ord. No. 14132 be adopted Motion passed - 4 ayes Poll taken: A. Mandel - aye M. Yates - aye B. Berry – aye R. Bonner - aye Pg. 11 INTRODUCTION OF PROPOSED ORD. NO. 14133, APPROPRIATING SIX HUNDRED SIXTY THOUSAND DOLLARS ($660,000.00) FROM THE SANITARY REPLACEMENT FUND TO BE USED FOR PROJECT COSTS FOR PRIVATE I/I REMOVAL IN BALLAS ROAD SUBTRUNK SOUTH I/I REDUCTION (11682), IN THE CITIES OF TOWN AND COUNTRY, DES PERES, CRYSTAL LAKE PARK, AND FRONTENAC, MISSOURI; AND AUTHORIZING THE EXECUTIVE DIRECTOR AND SECRETARY-TREASURER ON BEHALF OF THE METROPOLITAN ST. LOUIS SEWER DISTRICT TO ENTER INTO CONTRACT NO. 20292 WITH FRED M. LUTH & SONS, INC. FOR THE AFORESAID PRIVATE I/I REMOVAL. Proposed Ord. No. 14133 was presented and read. The work to be done under Contract #20292 consists of the removal of private inflow sources on 85 properties. The purpose of this project is to reduce inflow/infiltration (I/I) in the Deer Creek watershed, reduce building backups and relieve overcharged sewer mains. This project is scheduled to be completed in 242 days. Motion was made by Mr. Yates, seconded by Ms. Mandel that Proposed Ord. No. 14133 be adopted Motion passed - 4 ayes Poll taken: A. Mandel - aye M. Yates - aye B. Berry – aye R. Bonner - aye INTRODUCTION OF PROPOSED ORD. NO. 14134, MAKING A SUPPLEMENTAL APPROPRIATION OF FOUR MILLION SEVEN HUNDRED THOUSAND DOLLARS ($4,700,000.00) FROM THE SANITARY REPLACEMENT FUND TO BE USED FOR ADDITIONAL PROJECT COSTS FOR THE CONSTRUCTION OF SANITARY SEWERS IN FF-15 MCKELVEY/R.R. TO ADIE SANITARY RELIEF PHASE III (10489) IN THE CITY OF MARYLAND HEIGHTS, MISSOURI. Proposed Ord. No. 14134 was presented and read. The work to be done under Contract #20157 consists of the construction of approximately 1,790 lineal feet of new pipe sewers constructed by open cut varying in size from 8-inches to 42-inches in diameter, 2,440 lineal feet of new 42-inches in diameter pipe sewer constructed by pipe in tunnel, slip-lining of approximately 240 lineal feet of 30-inch diameter pipe sewers, and appurtenances. Construction will encounter challenges of poor soil conditions, contaminated soil, mixed face conditions, tight construction areas through commercial properties and multiple tunnel shafts. The purpose of this project is to alleviate overcharged sanitary sewers. The construction of this project is also necessary so future upstream relief sewer projects currently planned by MSD can alleviate basement backups and additional overcharged sanitary sewers. This project is scheduled to be completed in August 2016. Motion was made by Ms. Bonner, seconded by Mr. Berry that Proposed Ord. No. 14134 be adopted Motion passed - 4 ayes Poll taken: A. Mandel - aye M. Yates - aye B. Berry – aye R. Bonner - aye INTRODUCTION OF PROPOSED ORD. NO. 14135, APPROPRIATING EIGHT HUNDRED FIFTEEN THOUSAND DOLLARS ($815,000.00) FROM THE SANITARY REPLACEMENT FUND AND SIX HUNDRED SIXTY-FIVE THOUSAND DOLLARS ($665,000.00) FROM THE OPERATIONS, MAINTENANCE AND CONSTRUCTION IMPROVEMENT FUND OF THE SEMINARY BRANCH OF RIVER DES PERES TO BE USED FOR SANITARY SEWER CONSTRUCTION AT HOLLY DRIVE SEWER SEPARATION (11097), IN THE CITY OF WEBSTER GROVES, MISSOURI; AND AUTHORIZING THE EXECUTIVE DIRECTOR AND SECRETARY-TREASURER ON BEHALF OF THE METROPOLITAN ST. LOUIS SEWER DISTRICT TO ENTER INTO CONTRACT NO. 20289 WITH UNNERSTALL CONTRACTING CO., LTD. FOR THE AFORESAID SANITARY SEWER CONSTRUCTION. Proposed Ord. No. 14135 was presented and read. The work to be done under Contract #20289 consists of the construction of approximately 2,200 lineal feet of pipe sewers varying in size from 8-inches to 24-inches in diameter, the removal of private inflow sources at 33 properties, and appurtenances. The purpose of this project is to reduce inflow/infiltration (I/I) in the Mackenzie Creek watershed. This project will provide for the elimination of one (1) constructed SSO (BP-617) after construction and post construction monitoring. This project is scheduled to be completed in 365 days. Motion was made by Mr. Yates, seconded by Mr. Berry that Proposed Ord. No. 14135 be adopted Motion passed - 4 ayes Poll taken: A. Mandel - aye M. Yates - aye B. Berry – aye R. Bonner - aye Pg. 12 INTRODUCTION OF PROPOSED ORD. NO. 14136, APPROPRIATING ONE MILLION FIVE HUNDRED THOUSAND DOLLARS ($1,500,000.00) FROM THE GENERAL FUND AND FIVE MILLION FIVE HUNDRED THOUSAND DOLLARS ($5,500,000.00) FROM THE SANITARY REPLACEMENT FUND TO BE USED FOR THE REPAIR AND REPLACEMENT OF MANHOLES, SEWERS, AND OTHER INFRASTRUCTURE IN INFRASTRUCTURE REPAIRS (SANITARY/COMBINED - FY2016) (11705) IN VARIOUS LOCATIONS THROUGHOUT THE DISTRICT. Proposed Ord. No. 14136 was presented and read. The work to be done consists of the repair/replacement and construction of manholes, sewers, and other infrastructure as identified by the Operations and Engineering departments at various locations throughout the District. This work is part of the District’s ongoing CMOM program and complies with the acute defect repair requirements outlined in the Consent Decree. Motion was made by Ms. Bonner, seconded by Mr. Yates that Proposed Ord. No. 14136 be adopted Motion passed - 4 ayes Poll taken: A. Mandel - aye M. Yates - aye B. Berry – aye R. Bonner - aye INTRODUCTION OF PROPOSED ORD. NO. 14137, APPROPRIATING ONE MILLION FIVE HUNDRED THIRTY THOUSAND DOLLARS ($1,530,000.00) FROM THE OPERATIONS, MAINTENANCE AND CONSTRUCTION IMPROVEMENT FUND OF COLDWATER CREEK AND TWO MILLION TWENTY THOUSAND DOLLARS ($2,020,000.00) FROM THE SANITARY REPLACEMENT FUND TO BE USED FOR CONSTRUCTION COSTS FOR PRIVATE I/I REMOVAL IN MCNULTY - PALLARDY I/I REDUCTION (11662) IN THE CITIES OF ST. JOHN, WOODSON TERRACE, AND BERKELEY, MISSOURI; AND AUTHORIZING THE EXECUTIVE DIRECTOR AND SECRETARY-TREASURER ON BEHALF OF THE METROPOLITAN ST. LOUIS SEWER DISTRICT TO ENTER INTO CONTRACT NO. 20290 WITH J.H. BERRA CONSTRUCTION CO., INC. FOR THE AFORESAID PRIVATE I/I REMOVAL. Proposed Ord. No. 14137 was presented and read. The work to be done under Contract #20290 consists of the construction of approximately 5,763 lineal feet of storm sewers varying in size from 12- inches to 24-inches in diameter and appurtenances, and the removal of private inflow sources at 54 properties. The purpose of this project is to reduce inflow/infiltration (I/I) in the Coldwater Creek watershed, reduce building backups, and relieve overcharged sanitary sewers. This project is scheduled to be completed in 400 days. Motion was made by Mr. Yates, seconded by Ms. Mandel that Proposed Ord. No. 14137 be adopted Motion passed - 4 ayes Poll taken: A. Mandel - aye M. Yates - aye B. Berry – aye R. Bonner - aye INTRODUCTION OF PROPOSED ORD. NO. 14138, APPROPRIATING THREE MILLION SIX HUNDRED THOUSAND DOLLARS ($3,600,000.00) FROM THE SANITARY REPLACEMENT FUND TO BE USED FOR CONSTRUCTION COSTS FOR SANITARY SEWER REHABILITATION IN MISSOURI RIVER SERVICE AREA I/I REDUCTION - CREVE COEUR CREEK EAST (11774) IN THE CITIES OF CREVE COEUR AND MARYLAND HEIGHTS, AND UNINCORPORATED ST. LOUIS COUNTY, MISSOURI; AND AUTHORIZING THE EXECUTIVE DIRECTOR AND SECRETARY- TREASURER ON BEHALF OF THE METROPOLITAN ST. LOUIS SEWER DISTRICT TO ENTER INTO CONTRACT NO. 20276 WITH INSITUFORM TECHNOLOGIES USA, LLC FOR THE AFORESAID SANITARY SEWER REHABILITATION. Proposed Ord. No. 14138 was presented and read. The work to be done under Contract #20276 consists of the rehabilitation of approximately 59,154 lineal feet of pipe sewers varying in size from 8- inches to 21-inches in diameter using cured-in-place pipe (CIPP) methods, 309 manholes, and 1,133 service connections. The purpose of this project is to reduce inflow/infiltration (I/I) in the Creve Coeur Creek watershed. This project is scheduled to be completed in 730 days. Motion was made by Ms. Bonner, seconded by Mr. Yates that Proposed Ord. No. 14138 be adopted Motion passed - 4 ayes Poll taken: A. Mandel - aye M. Yates - aye B. Berry – aye R. Bonner - aye Pg. 13 INTRODUCTION OF PROPOSED ORD. NO. 14139, APPROPRIATING THREE HUNDRED TWENTY THOUSAND DOLLARS ($320,000.00) FROM THE SANITARY REPLACEMENT FUND TO BE USED FOR CONSTRUCTION COSTS FOR SANITARY SEWER CONSTRUCTION IN VINITA DRIVE SANITARY RELIEF (11089) IN THE VILLAGE OF HANLEY HILLS, MISSOURI; AND AUTHORIZING THE EXECUTIVE DIRECTOR AND SECRETARY-TREASURER ON BEHALF OF THE METROPOLITAN ST. LOUIS SEWER DISTRICT TO ENTER INTO CONTRACT NO. 20284 WITH ABNA ENGINEERING, INC. FOR THE AFORESAID SANITARY SEWER CONSTRUCTION. Proposed Ord. No. 14139 was presented and read. The work to be done under Contract #20284 consists of the construction of approximately 660 lineal feet of 12-inch diameter pipe sewers and appurtenances. The purpose of this project is to alleviate building backups and overcharged sanitary sewers and to remove one (1) constructed SSO (BP-412). This project is scheduled to be completed in 300 days. Motion was made by Ms. Bonner, seconded by Mr. Berry that Proposed Ord. No. 14139 be adopted Motion passed - 4 ayes Poll taken: A. Mandel - aye M. Yates - aye B. Berry – aye R. Bonner - aye INTRODUCTION OF PROPOSED ORD. NO. 14140, APPROPRIATING THIRTY-SEVEN THOUSAND DOLLARS ($37,000.00) FROM THE OPERATION, MAINTENANCE AND CONSTRUCTION IMPROVEMENT FUND OF COLDWATER CREEK TO BE USED FOR PROJECT COSTS FOR THE CONSTRUCTION OF STORM SEWERS IN CALVERT AVE. #3342 STORM SEW ER (11186), IN THE CITY OF BRECKENRIDGE HILLS, MISSOURI; AND AUTHORIZING THE EXECUTIVE DIRECTOR AND SECRETARY-TREASURER ON BEHALF OF THE METROPOLITAN ST. LOUIS SEWER DISTRICT TO ENTER INTO CONTRACT NO. 20287 WITH GAEHLE GRADING, LLC FOR THE AFORESAID STORM SEWER CONSTRUCTION. Proposed Ord. No. 14140 was presented and read. The work to be done under Contract #20287 consists of the construction of approximately 99 lineal feet of pipe sewers 18-inches in diameter and appurtenances. The purpose of this project is to alleviate street flooding. This project is scheduled to be completed in 90 days. Motion was made by Mr. Yates, seconded by Mr. Berry that Proposed Ord. No. 14140 be adopted Motion passed - 4 ayes Poll taken: A. Mandel – aye M. Yates - aye B. Berry – aye R. Bonner - aye INTRODUCTION OF PROPOSED ORD. NO. 14141, APPROPRIATING ONE HUNDRED FIFTY THOUSAND DOLLARS ($150,000.00) FROM THE OPERATIONS, MAINTENANCE AND CONSTRUCTION IMPROVEMENT FUND OF GRAVOIS CREEK TO BE USED FOR THE CONSTRUCTION OF CHANNEL STABILIZATION IN LIGGETT TO BIG BEND CHANNEL REPAIRS (10370) IN THE CITY OF OAKLAND, MISSOURI; AND AUTHORIZING THE EXECUTIVE DIRECTOR AND SECRETARY-TREASURER ON BEHALF OF THE METROPOLITAN ST. LOUIS SEWER DISTRICT TO ENTER INTO CONTRACT NO. 20291 WITH IDEAL LANDSCAPE GROUP FOR THE AFORESAID CONSTRUCTION OF CHANNEL STABILIZATION. Proposed Ord. No. 14141 was presented and read. The work to be done under Contract #20291 consists of the construction of 240 lineal feet of natural channel stabilization, including rock-lined channel, biostabilized slopes, grade control, reinforced concrete retaining wall, 8 lineal feet of 36-inch pipe and appurtenances. The purpose of this project is to alleviate erosion threatening Liggett Avenue and Big Bend Boulevard. This project is scheduled to be completed in 150 days. Motion was made by Ms. Mandel, seconded by Ms. Bonner that Proposed Ord. No. 14141 be adopted Motion passed - 4 ayes Poll taken: A. Mandel - aye M. Yates - aye B. Berry – aye R. Bonner - aye Pg. 14 INTRODUCTION OF PROPOSED ORD. NO. 14142, APPROPRIATING FOUR HUNDRED SIXTY THOUSAND DOLLARS ($460,000.00) FROM THE OPERATION, MAINTENANCE AND CONSTRUCTION IMPROVEMENT FUND OF COLDWATER CREEK TO BE USED FOR CONSTRUCTION COSTS FOR STORM SEWER CONSTRUCTION IN THE ROANOKE AND LOEKES STORM SEWER (11127) IN THE CITY OF FLORISSANT, MISSOURI; AND AUTHORIZING THE EXECUTIVE DIRECTOR AND SECRETARY-TREASURER ON BEHALF OF THE METROPOLITAN ST. LOUIS SEWER DISTRICT TO ENTER INTO CONTRACT NO. 20288 WITH J.H. BERRA CONSTRUCTION CO., INC. FOR THE AFORESAID STORM SEWER CONSTRUCTION. Proposed Ord. No. 14142 was presented and read. The work to be done under Contract #20288 consists of the construction of approximately 1,117 lineal feet of pipe sewers varying in size from 12- inches to 24-inches in diameter and appurtenances. The purpose of this project is to alleviate yard flooding. This project is scheduled to be completed in 180 days. Motion was made by Mr. Yates, seconded by Mr. Berry that Proposed Ord. No. 14142 be adopted Motion passed - 4 ayes Poll taken: A. Mandel - aye M. Yates - aye B. Berry – aye R. Bonner - aye (*GROUPED 14143 – 14154) INTRODUCTION OF PROPOSED ORD. NO. 14143, MAKING AN APPROPRIATION OF TWO MILLION THREE HUNDRED THOUSAND DOLLARS ($2,300,000.00) FROM THE SANITARY REPLACEMENT FUND AND SEVEN HUNDRED THOUSAND DOLLARS ($700,000.00) FROM THE GENERAL FUND FOR ENGINEERING SERVICES FOR THE DESIGN OF BISSELL - COLDWATER - MISSOURI - MERAMEC SANITARY SYSTEM IMPROVEMENTS (11144) IN VARIOUS MUNICIPALITIES AND UNINCORPORATED ST. LOUIS COUNTY, MISSOURI; AND AUTHORIZING THE EXECUTIVE DIRECTOR AND SECRETARY-TREASURER ON BEHALF OF THE METROPOLITAN ST. LOUIS SEWER DISTRICT TO AMEND CONTRACT NO. 11011 WITH AMEC FOSTER WHEELER ENVIRONMENT & INFRASTRUCTURE, INC. FOR THE AFORESAID ENGINEERING SERVICES. Proposed Ord. No. 14143 was presented and read. This ordinance authorizes the District to amend Contract #11011 with AMEC Foster Wheeler Environment & Infrastructure, Inc. for an annual extension to provide Watershed Consultant services for all projects included in the Bissell–Coldwater–Missouri–Meramec Sanitary System Improvements (11144) project. The preliminary construction cost estimate for the entire Bissell– Coldwater–Missouri–Meramec Sanitary program is $277 million. The estimated design contract range for the entire program contract is between $50 to $60 million. This year’s (FY2016) authorization includes fees for project management services for FY2016, coordination with the District and other watershed consultants, project scoping, preliminary studies, quality control and assurance, planning support, and special services. INTRODUCTION OF PROPOSED ORD. NO. 14144, APPROPRIATING SIXTY-FOUR THOUSAND DOLLARS ($64,000.00) FROM THE SANITARY REPLACEMENT FUND FOR ENGINEERING SERVICES FOR THE DESIGN OF PUBLIC I/I REMOVAL IN BISSELL - COLDWATER - MISSOURI - MERAMEC PUBLIC I/I REDUCTION (2017) CONTRACT A (12023) IN UNINCORPORATED ST. LOUIS COUNTY, MISSOURI; AND AUTHORIZING THE EXECUTIVE DIRECTOR AND SECRETARY- TREASURER ON BEHALF OF THE METROPOLITAN ST. LOUIS SEWER DISTRICT TO AMEND CONTRACT NO. 11011 WITH AMEC FOSTER WHEELER ENVIRONMENTAL & INFRASTRUCTURE, INC., FOR THE AFORESAID ENGINEERING SERVICES. Proposed Ord. No. 14144 was presented and read. This ordinance authorizes the District to amend Contract #11011 with AMEC Foster Wheeler Environmental & Infrastructure, Inc. for the design of the Bissell–Coldwater–Missouri–Meramec Public I/I Reduction (2017) Contract A (12023) project as part of the Watershed Consultant services for all projects included in the Bissell–Coldwater–Missouri–Meramec Sanitary System Improvements (11144) project. Bissell–Coldwater–Missouri–Meramec Public I/I Reduction (2017) Contract A (12023) is a lump sum cost project for the design of rehabilitating approximately 43,800 feet of 8-inch to 42-inch diameter sanitary and storm sewers and 438 manholes, 636 service lateral connections, and constructing 6 point repairs. This project will alleviate wet weather building backups and overcharged sanitary sewers. The construction cost estimate for this project is $4,420,000. Construction is anticipated to begin in FY2017. Pg. 15 INTRODUCTION OF PROPOSED ORD. NO. 14145, MAKING AN APPROPRIATION OF ONE HUNDRED TWENTY-EIGHT THOUSAND DOLLARS ($128,000.00) FROM THE SANITARY REPLACEMENT FUND FOR ENGINEERING SERVICES FOR THE DESIGN OF PUBLIC I/I REMOVAL IN BISSELL - COLDWATER - MISSOURI - MERAMEC PUBLIC I/I REDUCTION (2017) CONTRACT B (12024) IN VARIOUS SITES IN UNINCORPORATED ST. LOUIS COUNTY, MISSOURI; AND AUTHORIZING THE EXECUTIVE DIRECTOR AND SECRETARY-TREASURER ON BEHALF OF THE METROPOLITAN ST. LOUIS SEWER DISTRICT TO AMEND CONTRACT NO. 11011 WITH AMEC FOSTER WHEELER ENVIRONMENT & INFRASTRUCTURE, INC. FOR THE AFORESAID ENGINEERING SERVICES. Proposed Ord. No. 14145 was presented and read. This ordinance authorizes the District to amend Contract #11011 with AMEC Foster Wheeler Environmental & Infrastructure, Inc. for the design of the Bissell–Coldwater–Missouri–Meramec Public I/I Reduction (2017) Contract B (12024) project as part of the Watershed Consultant services for all projects included in the Bissell–Coldwater–Missouri–Meramec Sanitary System Improvements (11144) project. Bissell–Coldwater–Missouri–Meramec Public I/I Reduction (2017) Contract B (12024) is a lump sum cost project for the design of rehabilitating approximately 66,615 feet of 8-inch to 12-inch diameter sanitary sewers and 260 manholes, 626 service lateral connections, and constructing 10 point repairs. This project will alleviate wet weather building backups and overcharged sanitary sewers. The construction cost estimate for this project is $5,289,000. Construction is anticipated to begin in FY2017. INTRODUCTION OF PROPOSED ORD. NO. 14146, APPROPRIATING FIFTY-THREE THOUSAND DOLLARS ($53,000.00) FROM THE SANITARY REPLACEMENT FUND FOR ENGINEERING SERVICES FOR THE DESIGN OF PUBLIC I/I REMOVAL IN BISSELL - COLDWATER - MISSOURI - MERAMEC PUBLIC I/I REDUCTION (2017) CONTRACT C (12025) IN UNINCORPORATED ST. LOUIS COUNTY, MISSOURI; AND AUTHORIZING THE EXECUTIVE DIRECTOR AND SECRETARY- TREASURER ON BEHALF OF THE METROPOLITAN ST. LOUIS SEWER DISTRICT TO AMEND CONTRACT NO. 11011 WITH AMEC FOSTER WHEELER ENVIRONMENTAL & INFRASTRUCTURE, INC., FOR THE AFORESAID ENGINEERING SERVICES. Proposed Ord. No. 14146 was presented and read. This ordinance authorizes the District to amend Contract #11011 with AMEC Foster Wheeler Environmental & Infrastructure, Inc. for the design of the Bissell–Coldwater–Missouri–Meramec Public I/I Reduction (2017) Contract C (12025) project as part of the Watershed Consultant services for all projects included in the Bissell–Coldwater–Missouri–Meramec Sanitary System Improvements (11144) project. Bissell–Coldwater–Missouri–Meramec Public I/I Reduction (2017) Contract C (12025) is a lump sum cost project for the design of rehabilitating approximately 37,462 feet of 8-inch to 18-inch diameter sanitary and storm sewers and 179 manholes, 1,083 service lateral connections, and constructing 6 point repairs. This project will alleviate wet weather building backups and overcharged sanitary sewers. Flow metering and monitoring will be required after construction to verify that sanitary sewer overflow BP-091, BP-115, and BP-597 can be removed. The construction cost estimate for this project is $5,282,000. Construction is anticipated to begin in FY2017. INTRODUCTION OF PROPOSED ORD. NO. 14147, MAKING AN APPROPRIATION OF FIFTY-ONE THOUSAND DOLLARS ($51,000.00) FROM THE SANITARY REPLACEMENT FUND FOR ENGINEERING SERVICES FOR THE DESIGN OF PUBLIC I/I REMOVAL IN BISSELL - COLDWATER - MISSOURI - MERAMEC PUBLIC I/I REDUCTION (2017) CONTRACT F (12617) IN VARIOUS SITES IN UNINCORPORATED ST. LOUIS COUNTY, MISSOURI; AND AUTHORIZING THE EXECUTIVE DIRECTOR AND SECRETARY-TREASURER ON BEHALF OF THE METROPOLITAN ST. LOUIS SEWER DISTRICT TO AMEND CONTRACT NO. 11011 WITH AMEC FOSTER WHEELER ENVIRONMENT & INFRASTRUCTURE, INC. FOR THE AFORESAID ENGINEERING SERVICES. Pg. 16 Proposed Ord. No. 14147 was presented and read. This ordinance authorizes the District to amend Contract #11011 with AMEC Foster Wheeler Environmental & Infrastructure, Inc. for the design of the Bissell–Coldwater–Missouri–Meramec Public I/I Reduction (2017) Contract F (12617) project as part of the Watershed Consultant services for all projects included in the Bissell–Coldwater–Missouri–Meramec Sanitary System Improvements (11144) project. Bissell–Coldwater–Missouri–Meramec Public I/I Reduction (2017) Contract F (12617) is a lump sum cost project for the design of rehabilitating approximately 32,194 feet of 8-inch to 72-inch diameter sanitary and storm sewers and 108 manholes, 1,000 service lateral connections, and constructing 0 point repairs. This project will alleviate wet weather building backups and overcharged sanitary sewers. The construction cost estimate for this project is $5,000,000. Construction is anticipated to begin in FY2017. INTRODUCTION OF PROPOSED ORD. NO. 14148, MAKING A SUPPLEMENTAL APPROPRIATION OF ONE MILLION ONE HUNDRED THOUSAND DOLLARS ($1,100,000.00) FROM THE SANITARY REPLACEMENT FUND FOR ENGINEERING DURING CONSTRUCTION SERVICES IN COLDWATER SANITARY RELIEF SECTION B, C, & D WET WEATHER STORAGE FACILITY TANK C (11726) IN THE CITY OF HAZELWOOD, MISSOURI; AND AUTHORIZING THE EXECUTIVE DIRECTOR AND SECRETARY-TREASURER ON BEHALF OF THE METROPOLITAN ST. LOUIS SEWER DISTRICT TO AMEND CONTRACT NO. 11011 WITH AMEC FOSTER WHEELER ENVIRONMENT & INFRASTRUCTURE, INC. FOR THE AFORESAID CONSTRUCTION SERVICES. Proposed Ord. No. 14148 was presented and read. This ordinance authorizes the District to amend Contract #11011 with AMEC Foster Wheeler Environmental & Infrastructure, Inc. for construction phase services on the Coldwater Sanitary Relief Section B, C & D Wet Weather Storage Facility Tank C (11726) project as part of the Watershed Consultant services for all projects included in the Bissell–Coldwater–Missouri– Meramec Sanitary System Improvements (11144) project. Coldwater Sanitary Relief Section B, C & D Wet Weather Storage Facility Tank C (11726) is a lump sum cost project for construction phase services on the Tank C wet weather storage facility. This project provides for the elimination of eight (8) constructed SSOs (BP-091, BP-115, BP-119, BP-141, BP-144, BP-473, BP-526 & BP-527) after the future Coldwater Sanitary Relief Section B, C & D Wet Weather Storage Facility Tank C (11726) and Coldwater Sanitary Relief Section B, C & D – Section B Rehabilitation (11724) projects are constructed and post construction monitoring. The construction cost estimate for this project is $25,000,000. Construction is anticipated to begin in FY2016. INTRODUCTION OF PROPOSED ORD. NO. 14149, MAKING AN APPROPRIATION OF THREE MILLION ONE HUNDRED THOUSAND DOLLARS ($3,100,000.00) FROM THE SANITARY REPLACEMENT FUND FOR ENGINEERING SERVICES FOR THE DESIGN OF PRIVATE I/I REMOVAL AND STORM SEWERS IN COLDWATER SOUTHWEST SUBWATERSHED I/I REDUCTION (ST. CHARLES ROCK RD AND ASHBY RD) (12125) IN THE CITIES OF ST. ANN, BRIDGETON, OVERLAND, EDMUNDSON, AND BRECKENRIDGE HILLS, MISSOURI; AND AUTHORIZING THE EXECUTIVE DIRECTOR AND SECRETARY-TREASURER ON BEHALF OF THE METROPOLITAN ST. LOUIS SEWER DISTRICT TO AMEND CONTRACT NO. 11011 WITH AMEC FOSTER WHEELER ENVIRONMENT & INFRASTRUCTURE, INC. FOR THE AFORESAID ENGINEERING SERVICES. Proposed Ord. No. 14149 was presented and read. This ordinance authorizes the District to amend Contract #11011 with AMEC Foster Wheeler Environmental & Infrastructure, Inc. for the design of the Coldwater Southwest Subwatershed I/I Reduction (St. Charles Rock Rd and Ashby Rd) (12125) project as part of the Watershed Consultant services for all projects included in the Bissell–Coldwater–Missouri–Meramec Sanitary System Improvements (11144) project. Coldwater Southwest Subwatershed I/I Reduction (St. Charles Rock Rd and Ashby Rd) (12125) is a lump sum cost project for the design of approximately 3,296 feet of 12-inch to 15-inch diameter storm sewers, and performing private I/I reduction on approximately 1,896 properties. This project will alleviate wet weather building backups and overcharged sanitary sewers. The construction cost estimate for this project is $3,327,000. Construction is anticipated to begin in FY2018. Pg. 17 INTRODUCTION OF PROPOSED ORD. NO. 14150, APPROPRIATING TWO HUNDRED SEVENTY- EIGHT THOUSAND DOLLARS ($278,000.00) FROM THE SANITARY REPLACEMENT FUND FOR ENGINEERING SERVICES FOR THE DESIGN OF PRIVATE I/I REMOVAL IN CONCORD I/I REDUCTION (TESSON FERRY RD AND E. CONCORD RD) (12128) IN UNINCORPORATED ST. LOUIS COUNTY, MISSOURI; AND AUTHORIZING THE EXECUTIVE DIRECTOR AND SECRETARY-TREASURER ON BEHALF OF THE METROPOLITAN ST. LOUIS SEWER DISTRICT TO AMEND CONTRACT NO. 11011 WITH AMEC FOSTER WHEELER ENVIRONMENTAL & INFRASTRUCTURE, INC. FOR THE AFORESAID ENGINEERING SERVICES. Proposed Ord. No. 14150 was presented and read. This ordinance authorizes the District to amend Contract #11011 with AMEC Foster Wheeler Environmental & Infrastructure, Inc. for the design of the Concord I/I Reduction (Tesson Ferry Rd and E Concord Rd) (12128) project as part of the Watershed Consultant services for all projects included in the Bissell–Coldwater–Missouri–Meramec Sanitary System Improvements (11144) project. Concord I/I Reduction (Tesson Ferry Rd and E Concord Rd) (12128) is a lump sum cost project for the design of private I/I reduction on approximately 85 properties. This project will alleviate wet weather building backups and overcharged sanitary sewers. The construction cost estimate for this project is $184,000. Construction is anticipated to begin in FY2018. INTRODUCTION OF PROPOSED ORD. NO. 14151, APPROPRIATING FIVE HUNDRED FIFTY THOUSAND DOLLARS ($550,000.00) FROM THE SANITARY REPLACEMENT FUND FOR ENGINEERING SERVICES FOR THE DESIGN OF SANITARY SEWERS IN FF-18 VILLA DORADO - LACKLAND - PAGE SANITARY RELIEF (ADIE RD TO VILLA DORADO DR) (10018) IN THE CITY OF MARYLAND HEIGHTS, MISSOURI; AND AUTHORIZING THE EXECUTIVE DIRECTOR AND SECRETARY-TREASURER ON BEHALF OF THE METROPOLITAN ST. LOUIS SEWER DISTRICT TO AMEND CONTRACT NO. 11011 WITH AMEC FOSTER WHEELER ENVIRONMENT & INFRASTRUCTURE, INC. FOR THE AFORESAID ENGINEERING SERVICES. Proposed Ord. No. 14151 was presented and read. This ordinance authorizes the District to amend Contract #11011 with AMEC Foster Wheeler Environmental & Infrastructure, Inc. for the design of the FF-18 Villa Dorado – Lackland – Page Sanitary Relief (Adie Rd to Villa Dorado Dr) (10018) project as part of the Watershed Consultant services for all projects included in the Bissell–Coldwater–Missouri–Meramec Sanitary System Improvements (11144) project. FF-18 Villa Dorado – Lackland – Page Sanitary Relief (Adie Rd to Villa Dorado Dr) (10018) is a lump sum cost project for the design of approximately 5,280 feet of 8-inch to 30-inch diameter sanitary sewers and appurtenances. This project will alleviate wet weather building backups and overcharged sanitary sewers and elimination of one (1) constructed SSO (BP-087). The construction cost estimate for this project is $3,100,000. Construction is anticipated to begin in FY2018. INTRODUCTION OF PROPOSED ORD. NO 14152, APPROPRIATING FIVE HUNDRED FIFTY THOUSAND DOLLARS ($550,000.00) FROM THE SANITARY REPLACEMENT FUND FOR ENGINEERING SERVICES FOR THE DESIGN OF PRIVATE I/I REMOVAL AND SANITARY SEWERS IN HELTA, SAPPINGTON, AND GREGORY COURT I/I REDUCTION (SAPPINGTON RD AND I-270) (12304) IN UNINCORPORATED ST. LOUIS COUNTY, MISSOURI; AND AUTHORIZING THE EXECUTIVE DIRECTOR AND SECRETARY-TREASURER ON BEHALF OF THE METROPOLITAN ST. LOUIS SEWER DISTRICT TO AMEND CONTRACT NO. 11011 WITH AMEC FOSTER WHEELER ENVIRONMENTAL & INFRASTRUCTURE, INC. FOR THE AFORESAID ENGINEERING SERVICES. Proposed Ord. No. 14152 was presented and read. This ordinance authorizes the District to amend Contract #11011 with AMEC Foster Wheeler Environmental & Infrastructure, Inc. for the design of the Helta, Sappington, and Gregory Court I/I Reduction (Sappington Rd and I-270) (12304) project as part of the Watershed Consultant services for all projects included in the Bissell–Coldwater–Missouri–Meramec Sanitary System Improvements (11144) project. Helta, Sappington, and Gregory Court I/I Reduction (Sappington Rd and I-270) (12304) is a lump sum cost project for the design of approximately 295 feet of 8-inch diameter sanitary sewers, and performing private I/I reduction on approximately 58 properties. This project will alleviate wet weather building backups and overcharged sanitary sewers. The construction cost estimate for this project is $276,000. Construction is anticipated to begin in FY2018. Pg. 18 INTRODUCTION OF PROPOSED ORD. NO 14153, MAKING AN APPROPRIATION OF THREE HUNDRED NINETY-FIVE THOUSAND DOLLARS ($395,000.00) FROM THE SANITARY REPLACEMENT FUND FOR ENGINEERING SERVICES FOR THE DESIGN OF PRIVATE I/I REMOVAL IN KAPPEL (PARTIAL) I/I REDUCTION (EXUMA DR AND GLEN OWEN DR) (12314) IN THE CITIES OF FERGUSON AND DELLWOOD AND UNINCORPORATED ST. LOUIS COUNTY, MISSOURI; AND AUTHORIZING THE EXECUTIVE DIRECTOR AND SECRETARY-TREASURER ON BEHALF OF THE METROPOLITAN ST. LOUIS SEWER DISTRICT TO AMEND CONTRACT NO. 11011 WITH AMEC FOSTER WHEELER ENVIRONMENT & INFRASTRUCTURE, INC. FOR THE AFORESAID ENGINEERING SERVICES. Proposed Ord. No. 14153 was presented and read. This ordinance authorizes the District to amend Contract #11011 with AMEC Foster Wheeler Environmental & Infrastructure, Inc. for the design of the Kappel (Partial) I/I Reduction (Exuma Dr and Glen Owen Dr) (12314) project as part of the Watershed Consultant services for all projects included in the Bissell–Coldwater–Missouri–Meramec Sanitary System Improvements (11144) project. Kappel (Partial) I/I Reduction (Exuma Dr and Glen Owen Dr) (12314) is a lump sum cost project for the design of private I/I reduction on approximately 118 properties. This project will alleviate wet weather building backups and overcharged sanitary sewers. The construction cost estimate for this project is $194,000. Construction is anticipated to begin in FY2018. INTRODUCTION OF PROPOSED ORD. NO 14154, APPROPRIATING ONE HUNDRED THIRTY THOUSAND DOLLARS ($130,000.00) FROM THE SANITARY REPLACEMENT FUND FOR ENGINEERING SERVICES FOR THE DESIGN OF SPRINGDALE I/I REDUCTION (ROLLING DR AND SMITHFIELD PL) (12209) IN THE CITY OF BEL-RIDGE AND UNINCORPORATED ST. LOUIS COUNTY, MISSOURI; AND AUTHORIZING THE EXECUTIVE DIRECTOR AND SECRETARY- TREASURER ON BEHALF OF THE METROPOLITAN ST. LOUIS SEWER DISTRICT TO AMEND CONTRACT NO. 11011 WITH AMEC FOSTER WHEELER ENVIRONMENTAL & INFRASTRUCTURE, INC. FOR THE AFORESAID ENGINEERING SERVICES. Proposed Ord. No. 14154 was presented and read. This ordinance authorizes the District to amend Contract #11011 with AMEC Foster Wheeler Environmental & Infrastructure, Inc. for the design of the Springdale I/I Reduction (Rolling Dr and Smithfield Pl) (12209) project as part of the Watershed Consultant services for all projects included in the Bissell–Coldwater–Missouri–Meramec Sanitary System Improvements (11144) project. Springdale I/I Reduction (Rolling Dr and Smithfield Pl) (12209) is a lump sum cost project for the design of private I/I reduction on approximately 26 properties. This project will alleviate wet weather building backups and overcharged sanitary sewers. The construction cost estimate for this project is $82,000. Construction is anticipated to begin in FY2018. Motion was made by Mr. Yates, seconded by Mr. Berry that Proposed Ord. No. 14143-14154 be adopted Motion passed - 4 ayes Poll taken: A. Mandel - aye M. Yates - aye B. Berry – aye R. Bonner - aye INTRODUCTION OF PROPOSED ORD. NO 14155, APPROPRIATING ONE HUNDRED FIFTY THOUSAND DOLLARS ($150,000.00) FROM THE SANITARY REPLACEMENT FUND AND FOUR HUNDRED FIFTY THOUSAND DOLLARS ($450,000.00) FROM THE GENERAL FUND FOR ENGINEERING SERVICES FOR THE DESIGN OF DEER CREEK SANITARY SYSTEM IMPROVEMENTS (11110) AND AUTHORIZING THE EXECUTIVE DIRECTOR AND SECRETARY- TREASURER ON BEHALF OF THE METROPOLITAN ST. LOUIS SEWER DISTRICT TO AMEND CONTRACT NO. 10733 W ITH PARSONS WATER & INFRASTRUCTURE, INC. FOR THE AFORESAID ENGINEERING SERVICES. Proposed Ord. No. 14155 was presented and read. This ordinance authorizes the District to amend Contract #10733 with Parsons Water & Infrastructure, Inc. for an annual extension to provide Watershed Consultant services for all projects included in the Deer Creek Sanitary System Improvements (11110) project. The preliminary construction cost estimate for the entire Deer Creek Sanitary System Improvements program is $420 million. The estimated design contract range for the entire program contract is between $30 to $38 million. This year’s (FY2016) authorization includes fees for project management services for FY2016, coordination with the District and other watershed consultants, project scoping, preliminary studies, quality control and assurance, planning support, and special services. Pg. 19 Motion was made by Mr. Yates, seconded by Mr. Berry that Proposed Ord. No. 14155 be adopted Motion passed - 4 ayes Poll taken: A. Mandel - aye M. Yates - aye B. Berry – aye R. Bonner - aye (*GROUPED 14156 – 14176) INTRODUCTION OF PROPOSED ORD. NO 14156, APPROPRIATING THREE MILLION NINETY- FOUR THOUSAND DOLLARS ($3,094,000.00) FROM THE SANITARY REPLACEMENT FUND AND EIGHT HUNDRED SIXTY-ONE THOUSAND DOLLARS ($861,000.00) FROM THE GENERAL FUND FOR ENGINEERING SERVICES FOR THE DESIGN OF LEMAY SANITARY SYSTEM IMPROVEMENTS (11145) IN VARIOUS MUNICIPALITIES AND UNINCORPORATED ST. LOUIS COUNTY, MISSOURI; AND AUTHORIZING THE EXECUTIVE DIRECTOR AND SECRETARY- TREASURER ON BEHALF OF THE METROPOLITAN ST. LOUIS SEWER DISTRICT TO AMEND CONTRACT NO. 11003 W ITH BURNS & MCDONNELL ENGINEERING CO., INC. FOR THE AFORESAID ENGINEERING SERVICES. Proposed Ord. No. 14156 was presented and read. This ordinance authorizes the District to amend Contract #11003 with Burns & McDonnell Engineering Company, Inc. for an annual extension to provide Watershed Consultant services for all projects included in the Lemay Sanitary System Improvements (11145) project. The preliminary construction cost estimate for the entire Lemay Sanitary System Improvements program is $172,000,000. The estimated design contract range for the entire program contract is between $40 and $50 million. This year’s (FY2016) authorization includes fees for project management services for FY2016, coordination with the District and other watershed consultants, project scoping, preliminary studies, quality control and assurance, modeling and planning support, and special services. INTRODUCTION OF PROPOSED ORD. NO 14157, MAKING AN APPROPRIATION OF EIGHT HUNDRED FIFTY-ONE THOUSAND DOLLARS ($851,000.00) FROM THE SANITARY REPLACEMENT FUND FOR ENGINEERING SERVICES FOR THE DESIGN OF SANITARY SEWERS IN 82ND STREET TO I-170 SANITARY RELIEF (UR-08, UR-09) (11993) IN THE CITY OF UNIVERSITY CITY, MISSOURI; AND AUTHORIZING THE EXECUTIVE DIRECTOR AND SECRETARY-TREASURER ON BEHALF OF THE METROPOLITAN ST. LOUIS SEWER DISTRICT TO AMEND CONTRACT NO. 11003 WITH BURNS & MCDONNELL ENGINEERING CO., INC., FOR THE AFORESAID ENGINEERING SERVICES. Proposed Ord. No. 14157 was presented and read. This ordinance authorizes the District to amend Contract #11003 with Burns & McDonnell Engineering Company, Inc. for the design of 82nd Street to I- 170 Sanitary Relief (UR-08, UR-09) (11993) project as part of the Watershed Consultant services for all projects included in the Lemay Sanitary System Improvements (11145) project. 82nd Street to I-170 Sanitary Relief (UR- 08, UR-09) (11993) is a lump sum cost project for the design of approximately 5,810 feet of 15-inch to 30-inch diameter sanitary sewers and appurtenances. This project will remove sanitary flow from a surcharged combined sewer system to assist in the eventual removal of four (4) constructed SSOs (BP-412, BP-454, BP-457 & BP- 458). The construction cost estimate for this project is $8,046,000. Construction is anticipated to begin in FY2019. INTRODUCTION OF PROPOSED ORD. NO 14158, APPROPRIATING FIVE HUNDRED SIXTY- FOUR THOUSAND DOLLARS ($564,000.00) FROM THE SANITARY REPLACEMENT FUND FOR ENGINEERING SERVICES FOR THE DESIGN OF PRIVATE I/I REMOVAL, SANITARY AND STORM SEWERS IN AFFTON I/I REDUCTION (HANOVER, HILDESHEIM - WEBER RD, SEIBERT, AND HAMBURG) (12075) IN THE CITY OF ST. LOUIS AND UNINCORPORATED ST. LOUIS COUNTY, MISSOURI; AND AUTHORIZING THE EXECUTIVE DIRECTOR AND SECRETARY-TREASURER ON BEHALF OF THE METROPOLITAN ST. LOUIS SEWER DISTRICT TO AMEND CONTRACT NO. 11003 WITH BURNS & MCDONNELL ENGINEERING CO., INC., FOR THE AFORESAID ENGINEERING SERVICES. Pg. 20 Proposed Ord. No. 14158 was presented and read. This ordinance authorizes the District to amend Contract #11003 with Burns & McDonnell Engineering Company, Inc. for the design of Affton I/I Reduction (Hanover, Hildesheim – Weber Rd, Seibert, and Hamburg) (12075) project as part of the Watershed Consultant services for all projects included in the Lem ay Sanitary System Improvements (11145) project. Affton I/I Reduction (Hanover, Hildesheim – Weber Rd, Seibert, and Hamburg) (12075) is a lump sum cost project for the design of private I/I reduction on approximately 121 properties, and performing I/I inspections on 1,265 additional properties. This project will alleviate wet weather building backups and overcharged sanitary sewers. The construction cost estimate for this project is $511,000. Construction is anticipated to begin in FY2019. INTRODUCTION OF PROPOSED ORD. NO 14159, MAKING AN APPROPRIATION OF SIX HUNDRED THREE THOUSAND DOLLARS ($603,000.00) FROM THE SANITARY REPLACEMENT FUND FOR ENGINEERING SERVICES FOR THE DESIGN OF PRIVATE I/I REMOVAL, SANITARY AND STORM SEWERS IN APPLE ORCHARD - SINGERSON - BAYLESS PLACE I/I REDUCTION (LEMAY FERRY RD AND BAYLESS AVE) (12078) IN UNINCORPORATED ST. LOUIS COUNTY, MISSOURI; AND AUTHORIZING THE EXECUTIVE DIRECTOR AND SECRETARY-TREASURER ON BEHALF OF THE METROPOLITAN ST. LOUIS SEWER DISTRICT TO AMEND CONTRACT NO. 11003 WITH BURNS & MCDONNELL ENGINEERING CO., INC. FOR THE AFORESAID ENGINEERING SERVICES. Proposed Ord. No. 14159 was presented and read. This ordinance authorizes the District to amend Contract #11003 with Burns & McDonnell Engineering Company, Inc. for the design of Apple Orchard – Singerson – Bayless Place I/I Reduction (Lemay Ferry Rd and Bayless Ave) (12078) project as part of the Watershed Consultant services for all projects included in the Lemay Sanitary System Improvements (11145) project. Apple Orchard – Singerson – Bayless Place I/I Reduction (Lemay Ferry Rd and Bayless Ave) (12078) is a lump sum cost project for the design of private I/I reduction on approximately 220 properties, and performing I/I inspections on 813 additional properties. This project will alleviate wet weather building backups and overcharged sanitary sewers. The construction cost estimate for this project is $210,000. Construction is anticipated to begin in FY2018. INTRODUCTION OF PROPOSED ORD. NO. 14160, APPROPRIATING THREE HUNDRED TEN THOUSAND DOLLARS ($310,000.00) FROM THE SANITARY REPLACEMENT FUND FOR ENGINEERING SERVICES FOR THE DESIGN OF PRIVATE I/I REMOVAL IN DC-09 WEST I/I REDUCTION (S. LINDBERGH BLVD AND LADUE RD) (11997) IN THE CITIES OF CREVE COEUR, FRONTENAC, AND LADUE, MISSOURI; AND AUTHORIZING THE EXECUTIVE DIRECTOR AND SECRETARY-TREASURER ON BEHALF OF THE METROPOLITAN ST. LOUIS SEWER DISTRICT TO AMEND CONTRACT NO. 11003 WITH BURNS & MCDONNELL ENGINEERING CO., INC., FOR THE AFORESAID ENGINEERING SERVICES. Proposed Ord. No. 14160, was presented and read. This ordinance authorizes the District to amend Contract #11003 with Burns & McDonnell Engineering Company, Inc. for the design of DC-09 West I/I Reduction (S Lindbergh Blvd and Ladue Rd) (11997) project as part of the Watershed Consultant services for all projects included in the Lemay Sanitary System Improvements (11145) project. DC-09 West I/I Reduction (S Lindbergh Blvd and Ladue Rd) (11997) is a lump sum cost project for the design of private I/I reduction on approximately 30 properties, and performing I/I inspections on 564 additional properties. This project will alleviate wet weather building backups and overcharged sanitary sewers. The construction cost estimate for this project is $305,000. Construction is anticipated to begin in FY2018. INTRODUCTION OF PROPOSED ORD. NO 14161, APPROPRIATING ONE HUNDRED SEVENTY THOUSAND DOLLARS ($170,000.00) FROM THE SANITARY REPLACEMENT FUND FOR ENGINEERING SERVICES FOR THE DESIGN OF PUBLIC I/I REMOVAL IN DEER CREEK PUBLIC I/I REDUCTION (2017) CONTRACT A (12036) IN THE CITIES OF CREVE COEUR, DES PERES, FRONTENAC, HUNTLEIGH, KIRKWOOD AND LADUE, MISSOURI; AND AUTHORIZING THE EXECUTIVE DIRECTOR AND SECRETARY-TREASURER ON BEHALF OF THE METROPOLITAN ST. LOUIS SEWER DISTRICT TO AMEND CONTRACT NO. 11003 WITH BURNS & MCDONNELL ENGINEERING CO., INC. FOR THE AFORESAID ENGINEERING SERVICES. Pg. 21 Proposed Ord. No. 14161 was presented and read. This ordinance authorizes the District to amend Contract #11003 with Burns & McDonnell Engineering Company, Inc. for the design of Deer Creek Public I/I Reduction (2017) Contract A (12036) project as part of the Watershed Consultant services for all projects included in the Lemay Sanitary System Improvements (11145) project. Deer Creek Public I/I Reduction (2017) Contract A (12036) is a lump sum cost project for the design of rehabilitating approximately 68,200 feet of sanitary sewers and 1,050 feet of storm sewers, rehabilitating 467 manholes and 1,390 sewer connections, and 20 point repairs. The evaluation of 40,000 feet of CCTV sanitary sewer inspection and preparation of recommendations is included in the design scope. This project will alleviate wet weather building backups and overcharged sanitary sewers. The construction cost estimate for this project is $7,594,000. Construction is anticipated to begin in FY2017. INTRODUCTION OF PROPOSED ORD. NO 14162, APPROPRIATING ONE HUNDRED ONE THOUSAND DOLLARS ($101,000.00) FROM THE SANITARY REPLACEMENT FUND FOR ENGINEERING SERVICES FOR THE DESIGN OF PUBLIC I/I REMOVAL IN DEER CREEK PUBLIC I/I REDUCTION (2017) CONTRACT B (12037) IN THE CITIES OF FRONTENAC, HUNTLEIGH, KIRKWOOD, LADUE, AND WARSON WOODS, MISSOURI; AND AUTHORIZING THE EXECUTIVE DIRECTOR AND SECRETARY-TREASURER ON BEHALF OF THE METROPOLITAN ST. LOUIS SEWER DISTRICT TO AMEND CONTRACT NO. 11003 WITH BURNS & MCDONNELL ENGINEERING CO., INC. FOR THE AFORESAID ENGINEERING SERVICES. Proposed Ord. No. 14162 was presented and read. This ordinance authorizes the District to amend Contract #11003 with Burns & McDonnell Engineering Company, Inc. for the design of Deer Creek Public I/I Reduction (2017) Contract B (12037) project as part of the Watershed Consultant services for all projects included in the Lemay Sanitary System Improvements (11145) project. Deer Creek Public I/I Reduction (2017) Contract B (12037) is a lump sum cost project for the design of rehabilitating approximately 61,190 feet of sanitary sewers and 180 feet of storm sewers, rehabilitating 523 manholes and 1,050 sewer connections, and 10 point repairs. This project will alleviate wet weather building backups and overcharged sanitary sewers. The construction cost estimate for this project is $6,655,000. Construction is anticipated to begin in FY2017. INTRODUCTION OF PROPOSED ORD. NO 14163, APPROPRIATING FOUR HUNDRED EIGHTY- FIVE THOUSAND DOLLARS ($485,000.00) FROM THE SANITARY REPLACEMENT FUND FOR ENGINEERING SERVICES FOR THE DESIGN OF PRIVATE I/I REMOVAL IN FAWN VALLEY, PIONEER PARK, WESTCHESTER I/I REDUCTION (MANCHESTER RD W. OF N. GEYER RD) (11996) IN THE CITIES OF DES PERES AND KIRKWOOD, MISSOURI: AND AUTHORIZING THE EXECUTIVE DIRECTOR AND SECRETARY-TREASURER ON BEHALF OF THE METROPOLITAN ST. LOUIS SEWER DISTRICT TO AMEND CONTRACT NO. 11003 WITH BURNS & MCDONNELL ENGINEERING CO., INC. FOR THE AFORESAID ENGINEERING SERVICES. Proposed Ord. No. 14163 was presented and read. This ordinance authorizes the District to amend Contract #11003 with Burns & McDonnell Engineering Company, Inc. for the design of Fawn Valley, Pioneer Park, Westchester I/I Reduction (Manchester Rd W of N Geyer Rd) (11996) project as part of the Watershed Consultant services for all projects included in the Lemay Sanitary System Improvements (11145) project. Fawn Valley, Pioneer Park, Westchester I/I Reduction (Manchester Rd W of N Geyer Rd) (11996) is a lump sum cost project for the design of private I/I reduction on approximately 30 properties, and performing I/I inspections on 1,416 additional properties. This project will alleviate wet weather building backups and overcharged sanitary sewers. The construction cost estimate for this project is $201,000. Construction is anticipated to begin in FY2018. INTRODUCTION OF PROPOSED ORD. NO 14164 MAKING A SUPPLEMENTAL APPROPRIATION OF ONE MILLION ONE HUNDRED FORTY-EIGHT THOUSAND DOLLARS ($1,148,000.00) FROM THE SANITARY REPLACEMENT FUND FOR ENGINEERING SERVICES FOR THE PRE-DESIGN OF SANITARY STORAGE FACILITIES IN GRAVOIS TRUNK SANITARY STORAGE FACILITY (PARDEE LN AND PARDEE RD) (12569) IN THE CITY OF CRESTWOOD, MISSOURI; AND AUTHORIZING THE EXECUTIVE DIRECTOR AND SECRETARY-TREASURER ON BEHALF OF THE METROPOLITAN ST. LOUIS SEWER DISTRICT TO AMEND CONTRACT NO. 11003 WITH BURNS & MCDONNELL ENGINEERING CO., INC. FOR THE AFORESAID ENGINEERING SERVICES. Pg. 22 Proposed Ord. No. 14164 was presented and read. This ordinance authorizes the District to amend Contract #11003 with Burns & McDonnell Engineering Company, Inc. for the design of Gravois Trunk Sanitary Storage Facility (Pardee Ln and Pardee Rd) (12569) project as part of the Watershed Consultant services for all projects included in the Lemay Sanitary System Improvements (11145) project. Gravois Trunk Sanitary Storage Facility (Pardee Ln and Pardee Rd) (12569) is a lump sum cost project for the pre-design of approximately 676 feet of 30-inch to 54-inch diameter sanitary sewers, 762 feet of 30inch diameter force main, sanitary storage tank facilities, and appurtenances. This project will remove sanitary flow from a surcharged combined sewer system to assist in the eventual removal of two (2) constructed SSOs (BP-588 & BP-599). The construction cost estimate for this project is $53,000,000. Construction is anticipated to begin in FY2018. INTRODUCTION OF PROPOSED ORD. NO 14165, APPROPRIATING THREE HUNDRED TWENTY- FOUR THOUSAND DOLLARS ($324,000.00) FROM THE SANITARY REPLACEMENT FUND FOR ENGINEERING SERVICES FOR THE DESIGN OF PRIVATE I/I REMOVAL IN HUNTLEIGH MANOR, OLD WARSON, TIMBERWYCK I/I REDUCTION (S. LINDBERGH BLVD SOUTH OF LITZSINGER RD) (11994) IN THE CITIES OF FRONTENAC, HUNTLEIGH, KIRKWOOD, LADUE, AND WARSON WOODS, MISSOURI; AND AUTHORIZING THE EXECUTIVE DIRECTOR AND SECRETARY- TREASURER ON BEHALF OF THE METROPOLITAN ST. LOUIS SEWER DISTRICT TO AMEND CONTRACT NO. 11003 WITH BURNS & MCDONNELL ENGINEERING CO., INC. FOR THE AFORESAID ENGINEERING SERVICES. Proposed Ord. No. 14165 was presented and read. This ordinance authorizes the District to amend Contract #11003 with Burns & McDonnell Engineering Company, Inc. for the design of Huntleigh Manor, Old Warson, Timberwyck I/I Reduction (S Lindbergh Blvd South of Litzsinger Rd) (11994) project as part of the Watershed Consultant services for all projects included in the Lemay Sanitary System Improvements (11145) project. Huntleigh Manor, Old Warson, Timberwyck I/I Reduction (S Lindbergh Blvd South of Litzsinger Rd) (11994) is a lump sum cost project for the design of private I/I reduction on approximately 97 properties, and performing I/I inspections on 486 additional properties. This project will alleviate wet weather building backups and overcharged sanitary sewers. The construction cost estimate for this project is $366,000. Construction is anticipated to begin in FY2018. INTRODUCTION OF PROPOSED ORD. NO 14166, APPROPRIATING SEVEN HUNDRED EIGHTY THOUSAND DOLLARS ($780,000.00) FROM THE SANITARY REPLACEMENT FUND FOR ENGINEERING SERVICES FOR THE DESIGN OF PRIVATE I/I REMOVAL, SANITARY AND STORM SEWERS IN KIRKWOOD I/I REDUCTION (BIG BEND BLVD AND S. KIRKWOOD RD) (12317) IN THE CITIES OF KIRKWOOD AND OAKLAND, MISSOURI; AND AUTHORIZING THE EXECUTIVE DIRECTOR AND SECRETARY-TREASURER ON BEHALF OF THE METROPOLITAN ST. LOUIS SEWER DISTRICT TO AMEND CONTRACT NO. 11003 WITH BURNS & MCDONNELL ENGINEERING CO., INC. FOR THE AFORESAID ENGINEERING SERVICES. Proposed Ord. No. 14166 was presented and read. This ordinance authorizes the District to amend Contract #11003 with Burns & McDonnell Engineering Company, Inc. for the design of Kirkwood I/I Reduction (Big Bend Blvd and S Kirkwood Rd) (12317) project as part of the Watershed Consultant services for all projects included in the Lemay Sanitary System Improvements (11145) project. Kirkwood I/I Reduction (Big Bend Blvd and S Kirkwood Rd) (12317) is a lump sum cost project for the design of approximately 494 feet of 12- inch diameter storm sewers, performing private I/I reduction on approximately 112 properties, and performing I/I inspections on 1,818 additional properties. This project will alleviate wet weather building backups and overcharged sanitary sewers. The construction cost estimate for this project is $858,000. Construction is anticipated to begin in FY2018. INTRODUCTION OF PROPOSED ORD. NO 14167, APPROPRIATING FIVE HUNDRED TWENTY- EIGHT THOUSAND DOLLARS ($528,000.00) FROM THE SANITARY REPLACEMENT FUND TO BE USED FOR PROJECT COSTS FOR ENGINEERING SERVICES FOR THE DESIGN OF PRIVATE I/I REMOVAL IN KIRKWOOD MIDDLE SCHOOL, SIMMONS, WILSON, W. SARAH I/I REDUCTION (MANCHESTER RD AND KIRKWOOD RD) (11995) IN THE CITIES OF HUNTLEIGH AND KIRKWOOD, MISSOURI; AND AUTHORIZING THE EXECUTIVE DIRECTOR AND SECRETARY- TREASURER ON BEHALF OF THE METROPOLITAN ST. LOUIS SEWER DISTRICT TO AMEND CONTRACT NO. 11003 W ITH BURNS & MCDONNELL ENGINEERING CO., INC. FOR THE AFORESAID PRIVATE I/I REMOVAL. Pg. 23 Proposed Ord. No. 14167 was presented and read. This ordinance authorizes the District to amend Contract #11003 with Burns & McDonnell Engineering Company, Inc. for the design of Kirkwood Middle School, Simmons, Wilson, W Sarah I/I Reduction (Manchester Rd and Kirkwood Rd) (11995) project as part of the Watershed Consultant services for all projects included in the Lemay Sanitary System Improvements (11145) project. Kirkwood Middle School, Simmons, Wilson, W Sarah I/I Reduction (Manchester Rd and Kirkwood Rd) (11995) is a lump sum cost project for the design of performing private I/I reduction on approximately 91 properties, and performing I/I inspections on 1,211 additional properties. This project will alleviate wet weather building backups and overcharged sanitary sewers. The construction cost estimate for this project is $455,000. Construction is anticipated to begin in FY2018. INTRODUCTION OF PROPOSED ORD. NO 14168, APPROPRIATING NINETY-THREE THOUSAND DOLLARS ($93,000.00) FROM THE SANITARY REPLACEMENT FUND FOR ENGINEERING SERVICES FOR THE DESIGN OF PUBLIC I/I REMOVAL IN LEMAY PUBLIC I/I REDUCTION (2017) CONTRACT A (12048) IN VARIOUS CITIES IN ST. LOUIS COUNTY AND UNINCORPORATED ST. LOUIS COUNTY, MISSOURI; AND AUTHORIZING THE EXECUTIVE DIRECTOR AND SECRETARY- TREASURER ON BEHALF OF THE METROPOLITAN ST. LOUIS SEWER DISTRICT TO AMEND CONTRACT NO. 11003 WITH BURNS & MCDONNELL ENGINEERING CO., INC., FOR THE AFORESAID ENGINEERING SERVICES. Proposed Ord. No. 14168 was presented and read. This ordinance authorizes the District to amend Contract #11003 with Burns & McDonnell Engineering Company, Inc. for the design of Lemay Public I/I Reduction (2017) Contract A (12048) project as part of the Watershed Consultant services for all projects included in the Lemay Sanitary System Improvements (11145) project. Lemay Public I/I Reduction (2017) Contract A (12048) is a lump sum cost project for the design of rehabilitating approximately 53,864 feet of sanitary sewers, rehabilitating 285 manholes, and 1,336 sewer connections. This project will alleviate wet weather building backups and overcharged sanitary sewers. The construction cost estimate for this project is $5,645,000. Construction is anticipated to begin in FY2017. INTRODUCTION OF PROPOSED ORD. NO 14169, APPROPRIATING SEVENTY-EIGHT THOUSAND DOLLARS ($78,000.00) FROM THE SANITARY REPLACEMENT FUND TO BE USED FOR PROJECT COSTS FOR ENGINEERING SERVICES FOR THE DESIGN OF PUBLIC I/I REMOVAL IN THE LEMAY PUBLIC I/I REDUCTION (2017) CONTRACT B (12049) IN VARIOUS CITIES IN ST. LOUIS COUNTY AND UNINCORPORATED ST. LOUIS COUNTY, MISSOURI; AND AUTHORIZING THE EXECUTIVE DIRECTOR AND SECRETARY-TREASURER ON BEHALF OF THE METROPOLITAN ST. LOUIS SEWER DISTRICT TO AMEND CONTRACT NO. 11003 WITH BURNS & MCDONNELL ENGINEERING CO., INC. FOR THE AFORESAID ENGINEERING SERVICES. Proposed Ord. No. 14169 was presented and read. This ordinance authorizes the District to amend Contract #11003 with Burns & McDonnell Engineering Company, Inc. for the design of Lemay Public I/I Reduction (2017) Contract B (12049) project as part of the Watershed Consultant services for all projects included in the Lemay Sanitary System Improvements (11145) project. Lemay Public I/I Reduction (2017) Contract B (12049) is a lump sum cost project for the design of rehabilitating approximately 63,740 feet of sanitary sewers, rehabilitating 434 manholes, and 957 sewer connections. This project will alleviate wet weather building backups and overcharged sanitary sewers. The construction cost estimate for this project is $6,982,000. Construction is anticipated to begin in FY2017. INTRODUCTION OF PROPOSED ORD. NO 14170, APPROPRIATING EIGHTY THOUSAND DOLLARS ($80,000.00) FROM THE SANITARY REPLACEMENT FUND FOR ENGINEERING SERVICES FOR THE DESIGN OF PUBLIC I/I REMOVAL IN LEMAY PUBLIC I/I REDUCTION (2017) CONTRACT C (12050) IN VARIOUS CITIES IN ST. LOUIS COUNTY AND UNINCORPORATED ST. LOUIS COUNTY, MISSOURI; AND AUTHORIZING THE EXECUTIVE DIRECTOR AND SECRETARY- TREASURER ON BEHALF OF THE METROPOLITAN ST. LOUIS SEWER DISTRICT TO AMEND CONTRACT NO. 11003 W ITH BURNS & MCDONNELL ENGINEERING CO., INC. FOR THE AFORESAID ENGINEERING SERVICES. Pg. 24 Proposed Ord. No. 14170 was presented and read. This ordinance authorizes the District to amend Contract #11003 with Burns & McDonnell Engineering Company, Inc. for the design of Lemay Public I/I Reduction (2017) Contract C (12050) project as part of the Watershed Consultant services for all projects included in the Lemay Sanitary System Improvements (11145) project. Lemay Public I/I Reduction (2017) Contract C (12050) is a lump sum cost project for the design of rehabilitating approximately 43,830 feet of sanitary sewers, rehabilitating 314 manholes, and 1,155 sewer connections. This project will alleviate wet weather building backups and overcharged sanitary sewers. The construction cost estimate for this project is $5,521,000. Construction is anticipated to begin in FY2017. INTRODUCTION OF PROPOSED ORD. NO 14171, APPROPRIATING SEVENTY-SIX THOUSAND DOLLARS ($76,000.00) FROM THE SANITARY REPLACEMENT FUND TO BE USED FOR PROJECT COSTS FOR ENGINEERING SERVICES FOR THE DESIGN OF PUBLIC I/I REMOVAL IN THE LEMAY PUBLIC I/I REDUCTION (2017) CONTRACT D (12038) IN VARIOUS CITIES IN ST. LOUIS COUNTY AND UNINCORPORATED ST. LOUIS COUNTY, MISSOURI; AND AUTHORIZING THE EXECUTIVE DIRECTOR AND SECRETARY-TREASURER ON BEHALF OF THE METROPOLITAN ST. LOUIS SEWER DISTRICT TO AMEND CONTRACT NO. 11003 WITH BURNS & MCDONNELL ENGINEERING CO., INC. FOR THE AFORESAID ENGINEERING SERVICES. Proposed Ord. No. 14171 was presented and read. This ordinance authorizes the District to amend Contract #11003 with Burns & McDonnell Engineering Company, Inc. for the design of Lemay Public I/I Reduction (2017) Contract D (12038) project as part of the Watershed Consultant services for all projects included in the Lemay Sanitary System Improvements (11145) project. Lemay Public I/I Reduction (2017) Contract D (12038) is a lump sum cost project for the design of rehabilitating approximately 54,500 feet of sanitary and storm sewers, rehabilitating 486 manholes, and 680 sewer connections. This project will alleviate wet weather building backups and overcharged sanitary sewers. The construction cost estimate for this project is $5,279,000. Construction is anticipated to begin in FY2017. INTRODUCTION OF PROPOSED ORD. NO 14172, APPROPRIATING FOUR HUNDRED EIGHTY- TWO THOUSAND DOLLARS ($482,000.00) FROM THE SANITARY REPLACEMENT FUND FOR ENGINEERING SERVICES FOR THE DESIGN OF PRIVATE I/I REMOVAL, SANITARY AND STORM SEWERS IN REAVSDALE I/I REDUCTION (MACKENZIE RD AND REAVIS BARRACKS RD) (12420) IN UNINCORPORATED ST. LOUIS COUNTY, MISSOURI; AND AUTHORIZING THE EXECUTIVE DIRECTOR AND SECRETARY-TREASURER ON BEHALF OF THE METROPOLITAN ST. LOUIS SEWER DISTRICT TO AMEND CONTRACT NO. 11003 WITH BURNS & MCDONNELL ENGINEERING CO., INC. FOR THE AFORESAID ENGINEERING SERVICES. Proposed Ord. No. 14172 was presented and read. This ordinance authorizes the District to amend Contract #11003 with Burns & McDonnell Engineering Company, Inc. for the design of Reavsdale I/I Reduction (Mackenzie Rd and Reavis Barracks Rd) (12420) project as part of the Watershed Consultant services for all projects included in the Lemay Sanitary System Improvements (11145) project. Reavsdale I/I Reduction (Mackenzie Rd and Reavis Barracks Rd) (12420) is a lump sum cost project for the design of private I/I reduction on approximately 155 properties, and performing I/I inspections on 801 additional properties. This project will alleviate wet weather building backups and overcharged sanitary sewers. The construction cost estimate for this project is $130,000. Construction is anticipated to begin in FY2018. INTRODUCTION OF PROPOSED ORD. NO 14173, APPROPRIATING FIVE HUNDRED SIXTY-TWO THOUSAND DOLLARS ($562,000.00) FROM THE SANITARY REPLACEMENT FUND TO BE USED FOR PROJECT COSTS FOR THE DESIGN OF PRIVATE I/I REMOVAL, AND SANITARY AND STORM SEWERS IN UNION CREEK I/I REDUCTION (I-55 BETWEEN S. LINDBERGH BLVD AND BUCKLEY RD) (12240) IN THE CITY OF GREEN PARK AND UNINCORPORATED ST. LOUIS COUNTY, MISSOURI; AND AUTHORIZING THE EXECUTIVE DIRECTOR AND SECRETARY- TREASURER ON BEHALF OF THE METROPOLITAN ST. LOUIS SEWER DISTRICT TO AMEND CONTRACT NO. 11003 W ITH BURNS & MCDONNELL ENGINEERING CO., INC. FOR THE AFORESAID PRIVATE I/I REMOVAL, AND SANITARY AND STORM SEWER DESIGN. Pg. 25 Proposed Ord. No. 14173 was presented and read. This ordinance authorizes the District to amend Contract #11003 with Burns & McDonnell Engineering Company, Inc. for the design of Union Creek I/I Reduction (I-55 between S Lindbergh Blvd and Buckley Rd) (12240) project as part of the Watershed Consultant services for all projects included in the Lemay Sanitary System Improvements (11145) project. Union Creek I/I Reduction (I-55 between S Lindbergh Blvd and Buckley Rd) (12240) is a lump sum cost project for the design of private I/I reduction on approximately 60 properties, and performing I/I inspections on 1,459 additional properties. This project will alleviate wet weather building backups and overcharged sanitary sewers. The construction cost estimate for this project is $238,000. Construction is anticipated to begin in FY2018. INTRODUCTION OF PROPOSED ORD. NO 14174, MAKING A SUPPLEMENTAL APPROPRIATION OF THREE MILLION NINETY-SIX THOUSAND DOLLARS ($3,096,000.00) FROM THE SANITARY REPLACEMENT FUND FOR ENGINEERING SERVICES FOR THE DESIGN OF A SANITARY SEWER STORAGE FACILITY IN UNIVERSITY CITY SANITARY STORAGE FACILITY (HAFNER CT) (11992) IN THE CITY OF UNIVERSITY CITY, MISSOURI; AND AUTHORIZING THE EXECUTIVE DIRECTOR AND SECRETARY-TREASURER ON BEHALF OF THE METROPOLITAN ST. LOUIS SEWER DISTRICT TO AMEND CONTRACT NO. 11003 WITH BURNS & MCDONNELL ENGINEERING CO., INC. FOR THE AFORESAID ENGINEERING SERVICES. Proposed Ord. No. 14174 was presented and read. This ordinance authorizes the District to amend Contract #11003 with Burns & McDonnell Engineering Company, Inc. for the design of University City Sanitary Storage Facility (Hafner Ct) (11992) project as part of the Watershed Consultant services for all projects included in the Lemay Sanitary System Improvements (11145) project. This is the second and final year of a two- year design. University City Sanitary Storage Facility (Hafner Ct) (11992) is a lump sum cost project for the design for approximately 6.65 million gallons of sanitary storage during wet weather events. This project will alleviate wet weather building backups and overcharged sanitary sewers. The construction cost estimate for this project is $36,000,000. Construction is anticipated to begin in FY2018. INTRODUCTION OF PROPOSED ORD. NO 14175, APPROPRIATING EIGHT HUNDRED FORTY- THREE THOUSAND DOLLARS ($843,000.00) FROM THE SANITARY REPLACEMENT FUND TO BE USED FOR PROJECT COSTS FOR THE DESIGN OF PRIVATE I/I REMOVAL AND SANITARY AND STORM SEWERS IN THE VALCOUR AND BURLINGTON RR SANITARY RELIEF AND I/I REDUCTION (VALCOUR RD AND WATSON RD) (12253) IN THE CITY OF MARLBOROUGH AND UNINCORPORATED ST. LOUIS COUNTY, MISSOURI; AND AUTHORIZING THE EXECUTIVE DIRECTOR AND SECRETARY-TREASURER ON BEHALF OF THE METROPOLITAN ST. LOUIS SEWER DISTRICT TO AMEND CONTRACT NO. 11003 WITH BURNS & MCDONNELL ENGINEERING CO., INC. FOR THE AFORESAID PRIVATE I/I REMOVAL AND SANITARY AND STORM SEWER DESIGN. Proposed Ord. No. 14175 was presented and read. This ordinance authorizes the District to amend Contract #11003 with Burns & McDonnell Engineering Company, Inc. for the design of Valcour and Burlington RR Sanitary Relief and I/I Reduction (Valcour Rd and Watson Rd) (12253) project as part of the Watershed Consultant services for all projects included in the Lemay Sanitary System Improvements (11145) project. Valcour and Burlington RR Sanitary Relief and I/I Reduction (Valcour Rd and Watson Rd) (12253) is a lump sum cost project for the design of approximately 1,800 feet of 12-inch diameter sanitary sewers, performing private I/I reduction on approximately 75 properties, and performing I/I inspections on 1,690 additional properties. This project will alleviate wet weather building backups and overcharged sanitary sewers. The construction cost estimate for this project is $1,425,000. Construction is anticipated to begin in FY2019. INTRODUCTION OF PROPOSED ORD. NO 14176, APPROPRIATING THREE HUNDRED TWO THOUSAND DOLLARS ($302,000.00) FROM THE SANITARY REPLACEMENT FUND FOR ENGINEERING SERVICES FOR THE DESIGN OF SANITARY SEWERS AND SEWER REHABILITATION IN WEBSTER GROVES TRUNK E SANITARY REHABILITATION AND I/I REDUCTION PHASE III (11677) IN THE CITIES OF WEBSTER GROVES AND GLENDALE, MISSOURI; AND AUTHORIZING THE EXECUTIVE DIRECTOR AND SECRETARY-TREASURER ON BEHALF OF THE METROPOLITAN ST. LOUIS SEWER DISTRICT TO AMEND CONTRACT NO. 11003 WITH BURNS & MCDONNELL ENGINEERING CO., INC. FOR THE AFORESAID ENGINEERING SERVICES. Pg. 26 Proposed Ord. No. 14176 was presented and read. This ordinance authorizes the District to amend Contract #11003 with Burns & McDonnell Engineering Company, Inc. for the design of Webster Groves Trunk E Sanitary Rehabilitation and I/I Reduction Phase III (11677) project as part of the Watershed Consultant services for all projects included in the Lemay Sanitary System Improvements (11145) project. Webster Groves Trunk E Sanitary Rehabilitation and I/I Reduction Phase III (11677) is a lump sum cost project for the design of approximately 2,000 feet of 8-inch diameter sanitary sewers. This project will alleviate wet weather building backups and overcharged sanitary sewers. The construction cost estimate for this project is $833,000. Construction is anticipated to begin in FY2019. Motion was made by Ms. Bonner, seconded by Ms. Mandel that Proposed Ord. Nos. 14156 -14176 be adopted Motion passed - 3 ayes 1 abstention Poll taken: A. Mandel - aye M. Yates - aye B. Berry – abstain R. Bonner - aye (*GROUP 14177 – 14184) INTRODUCTION OF PROPOSED ORD. NO 14177, APPROPRIATING FOUR HUNDRED NINETY- TWO THOUSAND DOLLARS ($492,000.00) FROM THE GENERAL FUND AND TWO HUNDRED TWENTY THOUSAND DOLLARS ($220,000.00) FROM THE SANITARY REPLACEMENT FUND TO BE USED FOR ENGINEERING SERVICES FOR DESIGN IN THE LOWER & MIDDLE RDP CSO CONTROLS SYSTEM IMPROVEMENTS (11109) IN LOWER & MIDDLE RDP, MARTIGNEY, AND MALINE CREEK WATERSHEDS IN VARIOUS MUNICIPALITIES AND UNINCORPORATED ST. LOUIS COUNTY, MISSOURI; AND AUTHORIZING THE EXECUTIVE DIRECTOR AND SECRETARY- TREASURER ON BEHALF OF THE METROPOLITAN ST. LOUIS SEWER DISTRICT TO AMEND CONTRACT NO. 10734 W ITH JACOBS ENGINEERING GROUP INC. FOR THE AFORESAID ENGINEERING SERVICES. Proposed Ord. No. 14177 was presented and read. This ordinance authorizes the District to amend Contract #10734 with Jacobs Engineering Group Inc. for an annual extension to provide Watershed Consultant services for all projects included in the Lower & Middle RDP CSO Controls System Improvements (11109) project. The preliminary construction cost estimate for the entire Lower and Middle RDP CSO Controls System Improvements program is $1,225,000,000. The estimated design contract range for the entire program contract is between $90 to $110 million. This year’s (FY2016) authorization includes fees for project management services for FY2016, coordination with the District and other watershed consultants, project scoping, preliminary studies, quality control and assurance, modeling and planning support, and special services. INTRODUCTION OF PROPOSED ORD. NO 14178, APPROPRIATING TWO HUNDRED FORTY- FIVE THOUSAND DOLLARS ($245,000.00) FROM THE SANITARY REPLACEMENT FUND FOR ENGINEERING SERVICES FOR THE DESIGN OF PRIVATE I/I REMOVAL, AND SANITARY AND STORM SEWERS IN HAMBURG AVE TO AL CLAIRE DR TO WEBMORE DR CSO L-181 (I-032) ELIMINATION (12619) IN THE CITY OF ST. LOUIS, MISSOURI; AND AUTHORIZING THE EXECUTIVE DIRECTOR AND SECRETARY-TREASURER ON BEHALF OF THE METROPOLITAN ST. LOUIS SEWER DISTRICT TO AMEND CONTRACT NO. 10734 WITH JACOBS ENGINEERING GROUP INC. FOR THE AFORESAID ENGINEERING SERVICES. Proposed Ord. No. 14178 was presented and read. This ordinance authorizes the District to amend Contract #10734 with Jacobs Engineering Group Inc. for the design of Hamburg Ave to Al Claire Dr to Webmore Dr CSO L-181 (I-032) Elimination (12619) project as part of the Watershed Consultant services for all projects included in the Lower & Middle RDP CSO Controls System Improvements (11109) project. Hamburg Ave to Al Claire Dr to Webmore Dr CSO L-181 (I-032) Elimination (12619) is a lump sum cost project for the design of approximately 32 lineal feet of 15-inch diameter storm sewers, performing private I/I reduction on approximately 139 properties, performing I/I inspections on 139 properties, and rehabilitating approximately 6,550 feet of sanitary and storm sewers, 33 manholes, and 142 sewer connections. This project will alleviate wet weather building backups and overcharged sanitary sewers, and provide for the elimination of CSO L-181 after construction and post construction monitoring. The construction cost estimate for this project is $816,000. Construction is anticipated to begin in FY2018. Pg. 27 INTRODUCTION OF PROPOSED ORD. NO 14179, MAKING A SUPPLEMENTAL APPROPRIATION OF FIVE HUNDRED SIX THOUSAND DOLLARS ($506,000.00) FROM THE SANITARY REPLACEMENT FUND TO BE USED FOR THE PERFORMANCE OF THE LEMAY PLANT STRESS TEST IN THE LEMAY WWTP SECONDARY IMPROVEMENTS (11649) IN THE LEMAY WASTEWATER TREATMENT PLANT IN UNINCORPORATED ST. LOUIS COUNTY, MISSOURI; AND AUTHORIZING THE EXECUTIVE DIRECTOR AND SECRETARY-TREASURER ON BEHALF OF THE METROPOLITAN ST. LOUIS SEWER DISTRICT TO AMEND CONTRACT NO. 10734 WITH JACOBS ENGINEERING GROUP INC. FOR THE AFORESAID STRESS TEST. Proposed Ord. No. 14179 was presented and read. This ordinance authorizes the District to amend Contract #10734 with Jacobs Engineering Group Inc. to perform the stress test of the Lemay WWTP Secondary Improvements (11649) in accordance with the Consent Decree, Long Term Control Plan, and the approved Post-Construction Monitoring Plan. This is the second year of a two-year effort. The first year (FY15) involved preparation and approval of the stress test plan; the second year (FY16) will include performing field work for the stress test and reporting the results. Results of the stress test are due to EPA by 400 days after achievement of full operation of the treatment plant upgrades. INTRODUCTION OF PROPOSED ORD. NO 14180, MAKING A SUPPLEMENTAL APPROPRIATION OF EIGHT MILLION SEVENTY-FIVE THOUSAND DOLLARS ($8,075,000.00) FROM THE SANITARY REPLACEMENT FUND FOR ENGINEERING SERVICES FOR THE DESIGN OF A CSO STORAGE TUNNEL IN LMRDP CSO STORAGE TUNNEL (BROADWAY TO RDP TUBES) (11820) IN THE CITY OF ST. LOUIS AND UNINCORPORATED ST. LOUIS COUNTY, MISSOURI; AND AUTHORIZING THE EXECUTIVE DIRECTOR AND SECRETARY-TREASURER ON BEHALF OF THE METROPOLITAN ST. LOUIS SEWER DISTRICT TO AMEND CONTRACT NO. 10734 WITH JACOBS ENGINEERING GROUP INC. FOR THE AFORESAID ENGINEERING SERVICES. Proposed Ord. No. 14180 was presented and read. This ordinance authorizes the District to amend Contract #10734 with Jacobs Engineering Group Inc. for the design of the LMRDP CSO Storage Tunnel (Broadway to RDP Tubes) (11820) project as part of the Watershed Consultant services for all projects included in the Lower & Middle RDP CSO Controls System Improvements (11109) project. This is the second year of a multi-year design. The project includes design of approximately 9 miles of approximately 30-foot diameter CSO storage tunnel. The construction cost estimate for this project is $666,000,000. Construction is anticipated to begin in FY2020. INTRODUCTION OF PROPOSED ORD. NO 14181, MAKING A SUPPLEMENTAL APPROPRIATION OF EIGHTY-ONE THOUSAND DOLLARS ($81,000.00) FROM THE SANITARY REPLACEMENT FUND TO BE USED FOR THE DESIGN OF COMBINED SEWERS IN LMRDP CSO STORAGE TUNNEL NORTH CONSOLIDATION SEWERS (11959) IN THE CITY OF ST. LOUIS, MISSOURI; AND AUTHORIZING THE EXECUTIVE DIRECTOR AND SECRETARY-TREASURER ON BEHALF OF THE METROPOLITAN ST. LOUIS SEWER DISTRICT TO AMEND CONTRACT NO. 10734 WITH JACOBS ENGINEERING GROUP INC. FOR THE AFORESAID COMBINED SEW ER DESIGN. Proposed Ord. No.14181 was presented and read. This ordinance authorizes the District to amend Contract #10734 with Jacobs Engineering Group Inc. for the design of the LMRDP CSO Storage Tunnel North Consolidation Sewers (11959) project as part of the Watershed Consultant services for all projects included in the Lower & Middle RDP CSO Controls System Improvements (11109) project. This is the second year of a three-year design. Pre-design was performed as part of the LMRDP Storage Tunnel South End (11820) appropriation. The construction cost estimate for this project is $2,000,000. Construction is anticipated to begin in FY2027. INTRODUCTION OF PROPOSED ORD. NO 14182, MAKING A SUPPLEMENTAL APPROPRIATION OF TWO HUNDRED TWENTY-THREE THOUSAND DOLLARS ($223,000.00) FROM THE SANITARY REPLACEMENT FUND FOR ENGINEERING SERVICES FOR THE DESIGN OF COMBINED SEWERS IN LMRDP CSO STORAGE TUNNEL SOUTH CONSOLIDATION SEWERS (11958) IN THE CITY OF ST. LOUIS AND UNINCORPORATED ST. LOUIS COUNTY, MISSOURI; AND AUTHORIZING THE EXECUTIVE DIRECTOR AND SECRETARY-TREASURER ON BEHALF OF THE METROPOLITAN ST. LOUIS SEWER DISTRICT TO AMEND CONTRACT NO. 10734 WITH JACOBS ENGINEERING GROUP INC. FOR THE AFORESAID ENGINEERING SERVICES. Pg. 28 Proposed Ord. No. 14182 was presented and read. This ordinance authorizes the District to amend Contract #10734 with Jacobs Engineering Group Inc. for the design of the LMRDP CSO Storage Tunnel South Consolidation Sewers (11958) project as part of the Watershed Consultant services for all projects included in the Lower & Middle RDP CSO Controls System Improvements (11109) project. This is the second year of a three-year design. Pre-design was performed as part of the LMRDP Storage Tunnel South End (11820) appropriation. The construction cost estimate for this project is $8,000,000. Construction is anticipated to begin in FY2027. INTRODUCTION OF PROPOSED ORD. NO 14183, MAKING A SUPPLEMENTAL APPROPRIATION OF TWO MILLION FORTY-NINE THOUSAND DOLLARS ($2,049,000.00) FROM THE SANITARY REPLACEMENT FUND TO BE USED FOR THE DESIGN OF A PUMP STATION IN LMRDP TUNNEL DEWATERING PUMP STATION (11816) IN THE CITY OF ST. LOUIS AND UNINCORPORATED ST. LOUIS COUNTY, MISSOURI; AND AUTHORIZING THE EXECUTIVE DIRECTOR AND SECRETARY- TREASURER ON BEHALF OF THE METROPOLITAN ST. LOUIS SEWER DISTRICT TO AMEND CONTRACT NO. 10734 WITH JACOBS ENGINEERING GROUP INC. FOR THE AFORESAID PUMP STATION DESIGN. Proposed Ord. No. 14183 was presented and read. This ordinance authorizes the District to amend Contract #10734 with Jacobs Engineering Group Inc. for the design of the LMRDP Tunnel Dewatering Pump Station (11816) project as part of the Watershed Consultant services for all projects included in the Lower & Middle RDP CSO Controls System Improvements (11109) project. This is the second year of a multi-year design. Pre-design was performed as part of the LMRDP Storage Tunnel South End (11820) appropriation. The purpose of this project is to design a pump station to pump stored combined sewer flows from the deep storage tunnel system under the River Des Peres to either high-rate clarification facility or the Lemay Treatment Plant. The construction cost estimate for this project is $45,000,000. Construction is anticipated to begin in FY2024. INTRODUCTION OF PROPOSED ORD. NO 14184, MAKING A SUPPLEMENTAL APPROPRIATION OF TWO HUNDRED ELEVEN THOUSAND DOLLARS ($211,000.00) FROM THE SANITARY REPLACEMENT FUND FOR ENGINEERING SERVICES FOR THE DESIGN OF A CSO STORAGE TUNNEL IN MALINE CREEK CSO BP 051 & 052 LOCAL STORAGE FACILITY (CHAIN OF ROCKS DR TO CHURCH DR) (11656) IN THE CITY OF ST. LOUIS, MISSOURI; AND AUTHORIZING THE EXECUTIVE DIRECTOR AND SECRETARY-TREASURER ON BEHALF OF THE METROPOLITAN ST. LOUIS SEWER DISTRICT TO AMEND CONTRACT NO. 10734 WITH JACOBS ENGINEERING GROUP INC. FOR THE AFORESAID ENGINEERING SERVICES. Proposed Ord. No. 14184 was presented and read. This ordinance authorizes the District to amend Contract #10734 with Jacobs Engineering Group Inc. for the design of the Maline Creek CSO BP 051 & 052 Local Storage Facility (Chain of Rocks Dr to Church Dr) (11656) project as part of the Watershed Consultant services for all projects included in the Lower & Middle RDP CSO Controls System Improvements (11109) project. The purpose of this project is to control combined sewer overflows at CSO BP-051 and BP-052. Flow studies and pre-design for the Maline Creek CSO 051 Treatment Facility (11655) project and this project indicated that it would be possible to eliminate the need for clarification facilities (Project No. 11655). This appropriation is for the first year of post-design services during construction of a storage facility and a dewatering pumping station. The construction cost estimate for this project is $81,200,000. Construction is anticipated to begin in FY2016. Motion was made by Ms. Mandel, seconded by Mr. Yates that Proposed Ord. Nos. 14177- 14184 be adopted Motion passed - 4 ayes Poll taken: A. Mandel - aye M. Yates - aye B. Berry – aye R. Bonner - aye Pg. 29 (*GROUPED 14185 – 14188) INTRODUCTION OF PROPOSED ORD. NO 14185, APPROPRIATING FOUR HUNDRED THOUSAND DOLLARS ($400,000.00) FROM THE SANITARY REPLACEMENT FUND AND FIVE HUNDRED THOUSAND DOLLARS ($500,000.00) FROM THE GENERAL FUND TO BE USED FOR ENGINEERING SERVICES FOR THE DESIGN OF RDP TRIBUTARIES & UPPER RDP CSO CONTROLS & LOWER MERAMEC SYSTEM IMPROVEMENTS (11153) IN DEER CREEK, MERAMEC, AND RIVER DES PERES WATERSHEDS IN VARIOUS MUNICIPALITIES AND UNINCORPORATED ST. LOUIS COUNTY, MISSOURI; AND AUTHORIZING THE EXECUTIVE DIRECTOR AND SECRETARY-TREASURER ON BEHALF OF THE METROPOLITAN ST. LOUIS SEWER DISTRICT TO AMEND CONTRACT NO. 20202 WITH HDR ENGINEERING, INC. FOR THE AFORESAID ENGINEERING SERVICES. Proposed Ord. No. 14185 was presented and read. This ordinance authorizes the District to enter into Contract #20202 with HDR Engineering, Inc. for an annual extension to provide Watershed Consultant services for all projects included in the RDP Tributaries & Upper RDP CSO Controls & Lower Meramec System Improvements (11153) project. The preliminary construction cost estimate for the entire RDP Tributaries & Upper RDP CSO Controls & Lower Meramec System Improvements program is $277 million. The estimated design contract range for the entire program contract is between $20 and $37 million. This year’s (FY2016) authorization includes fees for project management services for FY2016, coordination with the District and other watershed consultants, project scoping, preliminary studies, quality control and assurance, planning support, and special services. INTRODUCTION OF PROPOSED ORD. NO 14186, APPROPRIATING ONE MILLION SIX HUNDRED THOUSAND DOLLARS ($1,600,000.00) FROM THE SANITARY REPLACEMENT FUND FOR ENGINEERING SERVICES FOR THE DESIGN OF DC-02 & DC-03 SANITARY RELIEF (BRENTWOOD BLVD TO CONWAY RD) PHASE III (12472) IN THE CITIES OF BRENTWOOD, LADUE, ROCK HILL, AND WEBSTER GROVES, MISSOURI; AND AUTHORIZING THE EXECUTIVE DIRECTOR AND SECRETARY-TREASURER ON BEHALF OF THE METROPOLITAN ST. LOUIS SEWER DISTRICT TO AMEND CONTRACT NO. 20202 WITH HDR ENGINEERING, INC., FOR THE AFORESAID ENGINEERING SERVICES. Proposed Ord. No. 14186 was presented and read. This ordinance authorizes the District to amend Contract #20202 with HDR Engineering, Inc. for the design of the DC-02 & DC-03 Sanitary Relief (Brentwood Blvd to Conway Rd) Phase III (12472) project as part of the Watershed Consultant services for all projects included in the RDP Tributaries & Upper RDP CSO Controls & Lower Meramec System Improvements (11153) project. DC-02 & DC-03 Sanitary Relief (Brentwood Blvd to Conway Rd) Phase III (12472) is a lump sum cost project for the predesign of approximately 12,730 feet of 8-inch to 54-inch diameter sanitary sewers and appurtenances. This project will provide for the elimination of seven (7) constructed SSOs (BP-591, BP-155, BP- 170, BP-348, BP-349, BP-198 & BP-545) and alleviate wet weather building backups and overcharged sanitary sewers. The construction cost estimate for this project is $30,000,000. Construction is anticipated to begin in FY2020. INTRODUCTION OF PROPOSED ORD. NO 14187, MAKING A SUPPLEMENTAL APPROPRIATION OF THREE MILLION FIVE HUNDRED THOUSAND DOLLARS ($3,500,000.00) FROM THE SANITARY REPLACEMENT FUND TO BE USED FOR ENGINEERING SERVICES FOR PRE- DESIGN OF LOWER MERAMEC RIVER SYSTEM IMPROVEMENTS - BAUMGARTNER TO FENTON WWTF TUNNEL (11746) IN THE CITIES OF FENTON AND SUNSET HILLS, AND UNINCORPORATED ST. LOUIS COUNTY, MISSOURI; AND AUTHORIZING THE EXECUTIVE DIRECTOR AND SECRETARY-TREASURER ON BEHALF OF THE METROPOLITAN ST. LOUIS SEWER DISTRICT TO AMEND CONTRACT NO. 20202 WITH HDR ENGINEERING INC. FOR THE AFORESAID ENGINEERING SERVICES. Pg. 30 Proposed Ord. No. 14187 was presented and read. This ordinance authorizes the District to amend Contract #20202 with HDR Engineering, Inc. for the design of the Lower Meramec River System Improvements – Baumgartner to Fenton WWTF Tunnel (11746) project as part of the Watershed Consultant services for all projects included in the RDP Tributaries & Upper RDP CSO Controls & Lower Meramec System Improvements (11153) project. Lower Meramec River System Improvements – Baumgartner to Fenton WWTF Tunnel (11746) is a lump sum cost project for the predesign of approximately 35,700 feet of 96-inch diameter sanitary sewer conveyance tunnel and appurtenances. This project will eliminate the interim Fenton WWTF and several pump stations including Sub 7 Master Lift. The construction cost estimate for this project is $170,000,000. Construction is anticipated to begin in FY2020. INTRODUCTION OF PROPOSED ORD. NO 14188, MAKING A SUPPLEMENTAL APPROPRIATION OF FIVE HUNDRED THOUSAND DOLLARS ($500,000.00) FROM THE SANITARY REPLACEMENT FUND FOR PLANNING ASSISTANCE FOR THE PRE-DESIGN OF RDP TRIBUTARIES (DEER CREEK) CSO TUNNEL (12441) IN VARIOUS MUNICIPALITIES AND UNINCORPORATED ST. LOUIS COUNTY, MISSOURI; AND AUTHORIZING THE EXECUTIVE DIRECTOR AND SECRETARY- TREASURER ON BEHALF OF THE METROPOLITAN ST. LOUIS SEWER DISTRICT TO AMEND CONTRACT NO. 20202 W ITH HDR ENGINEERING, INC. FOR THE AFORESAID PLANNING ASSISTANCE. Proposed Ord. No. 14188 was presented and read. This ordinance authorizes the District to amend Contract #20202 with HDR Engineering, Inc. for the design of the RDP Tributaries (Deer Creek) CSO Tunnel (12441) project as part of the Watershed Consultant services for all projects included in the RDP Tributaries & Upper RDP CSO Controls & Lower Meramec System Improvements (11153) project. RDP Tributaries (Deer Creek) CSO Tunnel (12441) is a cost plus project to provide planning assistance for evaluating alternatives to consolidate and eliminate 28 CSOs in preparation for predesign of approximately 20,000 feet of 20-foot diameter CSO storage tunnel and appurtenances. The construction cost estimate for the CSO storage tunnel will be determined as part of this project. Construction is anticipated to begin in FY2024. Motion was made by Mr. Yates, seconded by Mr. Berry that Proposed Ord. Nos. 14185 - 14188 be adopted Motion passed - 4 ayes Poll taken: A. Mandel - aye M. Yates - aye B. Berry – aye R. Bonner - aye INTRODUCTION OF PROPOSED ORD. NO 14189, AUTHORIZING THE EXECUTIVE DIRECTOR AND SECRETARY-TREASURER ON BEHALF OF THE METROPOLITAN ST. LOUIS SEWER DISTRICT TO AMEND THE CONTRACT WITH STANDPOINT PUBLIC AFFAIRS FOR REQUIRED PUBLIC EDUCATION, OUTREACH AND ENGAGEMENT SERVICES IN THE PRIVATE INFLOW/INFILTRATION PUBLIC ENGAGEMENT PROGRAM 2013 (11699), AUTHORIZED BY ORDINANCE NO. 13437 AND ADOPTED AUGUST 9, 2012, TO PROVIDE AN ADDITIONAL ONE- YEAR OPTION RENEWAL TERM AND MAKE A SUPPLEMENTAL APPROPRIATION OF FIVE HUNDRED SIXTY-FIVE THOUSAND DOLLARS ($565,000.00) FROM THE GENERAL FUND FOR THE AFORESAID SERVICES. Proposed Ord. No. 14189 was presented and read. This ordinance allows for an additional one (1) year extension of an existing contract that originally called for two (2) contract option years with StandPoint Public Affairs – i.e., this ordinance will authorize a third and final contract option year, for a total of four (4) years of services. An RFP will be issued in the third quarter of FY2016 for additional years of these services. Motion was made by Ms. Mandel, seconded by Mr. Yates that Proposed Ord. No. 14189 be adopted Motion passed - 4 ayes Poll taken: A. Mandel - aye M. Yates - aye B. Berry – aye R. Bonner - aye Pg. 31 INTRODUCTION OF PROPOSED ORD. NO 14190, AUTHORIZING THE EXECUTIVE DIRECTOR AND SECRETARY-TREASURER ON BEHALF OF THE METROPOLITAN ST. LOUIS SEWER DISTRICT TO ENTER INTO A CONTRACT WITH US BANK N.A. FOR BANKING AND SAFEKEEPING SERVICES FOR THE DISTRICT. Proposed Ord. No. 14190 was presented and read. Bank of America’s current contract expired on June 30, 2015. Bank of America presented the District with a proposed increase in net service fees that would have been implemented with the 7/1/15 12-month contract extension. In lieu of this proposed increase, MSD went out to bid for banking services and US Bank provided the best proposal for the District Motion was made by Ms. Bonner, seconded by Ms. Mandel that Proposed Ord. No.14190 be adopted Motion passed - 4 ayes Poll taken: A. Mandel - aye M. Yates - aye B. Berry – aye R. Bonner - aye INTRODUCTION OF PROPOSED ORD. NO 14191, AUTHORIZING THE EXECUTIVE DIRECTOR AND SECRETARY-TREASURER ON BEHALF OF THE METROPOLITAN ST. LOUIS SEWER DISTRICT TO ENTER INTO A CONTRACT WITH PRUDENT MAN ADVISORS, INC. (PMA) WHEREBY PMA WILL PROVIDE INVESTMENT MANAGEMENT SERVICES TO THE DISTRICT. Proposed Ord. No. 14191 was presented and read. PFM’s contract expired on 6/30/2015. The district submitted an RFP for investment management services in which four managers responded. Prudent Man Advisor’s, Inc. (PMA) provided the best proposal to the District. Motion was made by Mr. Yates, seconded by Ms. Bonner that Proposed Ord. No. 14191 be adopted Motion passed - 4 ayes Poll taken: A. Mandel - aye M. Yates - aye B. Berry – aye R. Bonner - aye RESOLUTIONS (*Grouped 3216 – 3223) ADOPTION OF RESOLUTION NO. 3216 EXPRESSING THE BOARD OF TRUSTEES’ APPRECIATION TO ORVIN L. KLEINSCHMIDT FOR HIS 32 YEARS OF EXEMPLARY SERVICE TO THE METROPOLITAN ST. LOUIS SEWER DISTRICT FROM SEPTEMBER 22, 1982 TO HIS RETIREMENT EFFECTIVE JULY 1, 2015. ADOPTION OF RESOLUTION NO. 3217 EXPRESSING THE BOARD OF TRUSTEES’ APPRECIATION TO CHRISTINE A. VERPLANCKE FOR HER 38 YEARS OF EXEMPLARY SERVICE TO THE METROPOLITAN ST. LOUIS SEWER DISTRICT FROM NOVEMBER 1, 1976, TO HER RETIREMENT EFFECTIVE JULY 1, 2015. ADOPTION OF RESOLUTION NO. 3218 EXPRESSING THE BOARD OF TRUSTEES’ APPRECIATION TO JOSEPH WILLIAMS FOR HIS 21 YEARS OF EXEMPLARY SERVICE TO THE METROPOLITAN ST. LOUIS SEWER DISTRICT FROM DECEMBER 6, 1993, TO HIS RETIREMENT EFFECTIVE JULY 1, 2015. ADOPTION OF RESOLUTION NO. 3223 EXPRESSING THE BOARD OF TRUSTEES’ APPRECIATION TO CHARLES A. ROTH FOR HIS 26 YEARS OF EXEMPLARY SERVICE TO THE METROPOLITAN ST. LOUIS SEWER DISTRICT FROM AUGUST 9, 1988, TO HIS RETIREMENT EFFECTIVE JULY 1, 2015. Resolution Nos. 3216 – 3223 were presented and read. Motion was made by Ms. Mandel, seconded by Mr. Yates that Res. Nos. 3216 - 3223 be adopted Motion passed - 4 ayes Poll taken: A. Mandel - aye M. Yates - aye B. Berry – aye R. Bonner - aye ADOPTION OF PROPOSED RES. NO 3224, WILL EXERCISE OPTION YEAR TWO (2) OF THE CONTRACT PREVIOUSLY AUTHORIZED BY ORDINANCE NO. 13641, ADOPTED JULY 11, 2013, WHICH AUTHORIZED THE EXECUTIVE DIRECTOR AND SECRETARY-TREASURER ON BEHALF OF THE METROPOLITAN ST. LOUIS SEWER DISTRICT TO ENTER INTO A CONTRACT WITH CONNECTRIA CORPORATION FOR INFORMATION TECHNOLOGY MANAGEMENT SERVICES FOR THE DISTRICT. Pg. 32 Res. No. 3224 was presented and read. This resolution will allow the District to exercise its renewal option with Connectria Corporation for remote monitoring, management and administration of the District’s technology infrastructure environment. This infrastructure hosts business applications that are considered mission critical in service delivery to the District’s stakeholders as well in meeting Consent Decree requirements Resolution No 3224 was presented and read. Motion was made by Mr. Yates, seconded by Ms. Bonner that Res. No. 3224 be adopted Motion passed - 4 ayes Poll taken: A. Mandel - aye M. Yates - aye B. Berry – aye R. Bonner - aye ADOPTION OF PROPOSED RES. NO 3225, IN ORDER TO PRESERVE THE RIGHT OF THE METROPOLITAN ST. LOUIS SEWER DISTRICT (THE “DISTRICT”) TO BE REIMBURSED FOR PROJECT COSTS FROM A TAX -EXEMPT BOND ISSUE, THE UNITED STATES TREASURY DEPARTMENT REQUIRES THAT THE DISTRICT STATE ITS INTENT TO REIMBURSE ITSELF FOR SAID PROJECT COSTS WITH THE PROCEEDS OF TAX-EXEMPT BONDS. Res. No. 3225 was presented and read. In June of 2015 the State of Missouri and the Missouri Department of Natural Resources approved a $75 million SRF loan to the District however the loan will not be consummated by the State prior to June 30, 2015. Gilmore & Bell suggest a resolution be adopted to make sure the District’s project costs can be reimbursed with funds from an SRF loan that has not been finalized yet. Resolution No 3225 was presented and read. Motion was made by Ms. Bonner, seconded by Ms. Mandel that Res. No. 3225 be adopted Motion passed - 4 ayes Poll taken: A. Mandel – aye M. Yates - aye B. Berry – aye R. Bonner - aye ADOPTION OF PROPOSED RES. NO 3226, WILL REVISE THE EMPLOYEES' PENSION PLAN ACTUARIAL RETURN TARGET, AND WILL SUPERSEDE RESOLUTION NO. 3030 THAT WAS ADOPTED MAY 10, 2012 AND REVISED THE EMPLOYEES' PENSION PLAN ACTUARIAL RETURN TARGET. Res. No. 3226 was presented and read. The District’s Actuary, with the help of Pavilion, the District’s Pension Consultant determined, that based on factors such as return and liability assumptions that the district should reduce their pension long term earnings assumptions from 71/4 % to 7.00%. Resolution No 3226 was presented and read. Motion was made by Ms. Mandel, seconded by Mr. Yates that Res. No. 3226 be adopted Motion passed - 4 ayes Poll taken: A. Mandel - aye M. Yates - aye B. Berry – aye R. Bonner - aye ~ ~ ~ ~ ~ Upon motion made Mr. Berry, seconded by Ms. Mandel, and unanimously passed, the meeting adjourned at 6:00 p.m. Secretary-Treasurer