Loading...
HomeMy Public PortalAboutC-06-003 - Parson's Transportaion Group, Inc. Amendment No. 3, Project No. 919. CITY OF CARSON CARSON REDEVELOPMENT AGENCY THIRD AMENDMENT TO THE A.GlEaLLVT L114 1PIALE& 1 c ` 9 :6; n t THIRD AMENDMENT TO AGREEMENT CARSON REDEVELOPMENT AGENCY PARSONS Project No. 919: Wilmington Avenue Interchange Modification at the I-495 Freeway. This Third Amendment to the Agreement for Professional Services .(the "Third Amendment"), to be effective December 15, 2009, is hereby entered into by and between the Carson . Redevelopment Agency (herein "Agency"), and Parsons Transportation Group Inc. (Hereinafter called "Engineer"), and is an amendment to the Agreement for Professional Services ("Agreement") executed by the parties and effective as of September 5, 2006. R EIT A L S A, Agency and Engineer have entered into that certain "Agreement for Professional Services" to perform the technical and professional services, m connection with the project identified as: Project No. 919: Wilmington Avenue Interchange Modification at the 1-405 Freeway. B. Accordingly, the parties desire to amend the Agreement to expand the description of work and increase the compensation by $179,652.93 to perform work beyond that provided in the original, the First Amendment, and the Second Amendment description of work, NOW, THEREFORE, in consideration of performance, by the parties hereto, of the promises, covenants, and conditions herein contained, the parties hereto agree to the terms of this Third Amendment and hereby amend the following provisions of the Contract: 1. Section 3. Description of Work: is hereby amended, to add the additional Scope of Work attached hereto as Exhibit "A" and incorporated herein by this reference, 2. Section 10. Comoensation: is hereby amended, to increase the total compensation by an amount not -to -exceed one hundred seventy nine thousand six hundred fifty two dollars and ninety three cents ($179,652.93) attached hereto as Exhibit "B" and incorporated herein by this reference. Except as amended by the First Amendment, the Second Amendment, and this Third Amendment, all other provisions of the Contract shall remain unmodified and in full force and effect. THIRD AMENDMENT TO AGREEMENT CARSON REDEVELOPMENT AGENCY PARSONS Project No. 919: Wilmington Avenue Interchange Modification at the 1-405 Freeway. N IN WITNESS WHEREOF, the parties have caused their duly authorized representatives to execute this Third Amendment to the Agreement as of the date first written above. WOMW By: L"', --x , A " Y tC/MMC - By. - Helen Kawagoe, Chairman Jim Dear Agency Secretary By: L Agency Couns4) "ENGINEER" Parsons Trans By: Y. THIRD AMENDMENT TO AGREEMENT PARSONS Project No. 919.- Wilmington Avenue Interchange Modification at the 1-405 Freeway. 3 Title: Vice'- �Q- Group Inc. Dated. � Z - Zq, Q� 6*1 CARSON REDEVELOPMENT AGENCY EXHIBIT A Proiect No. 919- rj I 1'JrJJJ :, Following items are added to the Exhibit "A" of the original, the First Amendment, and the Second Amendment scope of services for the above referenced project. THIRD AMENDMENT TO AGREEMENT CARSON REDEVELOPMENT AGENCY PARSONS Project No. 919: Wilmington Avenue Interchange Modification at the 1-405 Freeway. 4 Caltrans has offered ars option to eliminate the proposed work along the I-405 southbound off - ramp in lieu of widening the outside lane and shoulder widths on the freeway mainline at the ramp entrance to full standard in addition to constructing the ramp improvements. The widening on the mainline would have increased the cost to the project by approximately $2 million while the elimination of the ramp improvements would result in cost savings of $1 million to the City's project. The work on the ramp is required under the Project Study Report (PSR) and the Draft Project Report (DPR) but Caltrans has offered the City the option to eliminate this work frons the City's project and Caltrans would complete this work in the fixture under a separate contract. Tasks 1, 2, and 3 below show the additional engineering services required to incorporate these changes into the Project Approval/Environmental Document (PA/ED) and the Plans, Specifications, and Estimate (PS&E). Furthermore it was determined by Shell Oil Company that modifications to their utility bridge beneath the existing Dominguez Channel Bridge were also required for the project. This utility bridge is wholly owned by the Shell Oil Company and it carries a number of oil pipe lines over Dominguez Channel. The utility bridge is a completely separate structure and the required modifications to facilitate widening of the Dominguez Channel Bridge became necessary after a complete survey of the existing bridges was performed. Task 4 below shows the additional design services that were required for the modification of the utility bridge. Task I — Revise Project Report ($ 16,693.96) Consultant will update the Project Report to reflect the elimination of improvements to the southbound off -ramp. Consultant will update the project description, update the accident analysis using current data, update the design exceptions description, revise layouts and exhibits, update the transportation management plan, update the storm water data report., and revalidate the CEQA and NEPA documentation accordingly. Task 2 — Revise Design Exception — Fact Sheets ($5,407.16) Consultant will update the advisory and mandatory design exceptions fact sheets to reflect the elimination of improvements to the southbound off -ramp and will maintain coordination with Caltrans towards the approval of the fact sheets. Task 3 — Revise Plans, Specifications and Estimate ($ 42,96171) Consultant will update the project plans to reflect the elimination of improvements to the southbound off -ramp. The following sheets will be revised. Sheet Name Sheet ember Title and Location Map Typical Cross Sections X-3 & Xm4 Layout L-2 Profile and Superelevation Diagram PS -3 Construction Details C-2 & C4 Construction Details - Removal Plan C-6 THIRD AMENDMENT TO AGREEMENT CARSON REDEVELOPMENT AGENCY PARSONS Project No. 919: Wilmington Avenue Interchange Modification at the 1-405 Freeway. 5 Construction Details - Shoulder Cross Slope Transition C-15 Contour Grading G-2 Drainage Plan D-2 Drainage Profile DP -3 Drainage Quantities DQ -1 Utility Plan U-2 & U-5 Construction Area Signs CS -1 Stage Construction (Stage 1) SC -1 Stage Construction (Stage 3) SC -3 Stage Construction (Stage 4) SC -4 I Traffic Handling Plan (Stage 1) TH-3 Traffic Handling Plan (Stage 2) TH-5 Traffic Handling Plan (Stage 3) TH-9 Traffic Handling Plan (Stage 3,4) TH-14 .Traffic Handling Plan (Stage 313) TH-1 8 Traffic Handling Plan (Stage 4) TH-20 Traffic Handling Plan .(Stage 4B) TH-24 Traffic Handling Plan (Stage 5) TH-27 -Traffic Handling Plan (Stage 513) TH-32 Traffic Handling Quantities - Temporary Pavement Delineation THIrk-1-1, 2, 3 Traffic Handling Quantities - Temporary Signs THQ-4, 5, 7 Pavement Delineation Plan PD -2 Pavement Delineation Quantities 2 sheets PDQ -1 & 2 Sign Plan S-2 -Sign. Details SD -2 Sign Quantities SQ -2 & 4 Summary of Quantities Q-1,2, 3, 4, 5, 7 Retaining Wall Plan - Retaining Wall No. 7 R-6 Retaining Wall No. 7 - Log of Test Sorin s R-7 Retaining Wall No. 7 - Soil Legend 1 Log of Test Borings R-8 Retaining Wall No. 7 - Soil Legend 2 Log of Test Borings R-9 Retaining Wall Details R-18 I Plan List PL -1 Planting Plan PP -2 Irrigation Plan IP -2 Sprinkler Schedule and Legend LD -1 THIRD AMENDMENT TO AGREEMENT CARSON REDEVELOPMENT AGENCY PARSONS Project No. 919: Wilmington Avenue Interchange Modification at the 1-405 Freeway. Consultant will update the quantity calculations and the engineers cost estimates accordingly. Consultant will revise the project specifications to reflect the changes described above. Task 4 — Modification of Utility Bridge ($ 59,089. 10) Consultant scope of services includes site visits, meetings with Shell Company representatives and hand measurements of the existing utility bridge. There are no as -built plans for the existing utility bridge therefore, field surveys are necessary. Shell Oil Company has confin- zed the project scope, method of construction, and Shell Oil Company requirements. Shell Oil Company requirements need to be reflected both in the project specifications and the plans. Consultant scope requires the preparation of utility bridge modification plans. The utility bridge design modification process consists of developing constructions plans, modifying Dominguez Channel Bridge Plans, preparing back up calculations, editing special provisions, preparing quantity tape off and marginal estimates, and submittal to Caltrans for review and approval. b addition, Dominguez Channel Bridge Foundation Report requires updates for existing and new pile issues and submittals to Caltrans for review and approval. A total of 4 drawings are required for the proposed modifications. A redesign of the Bent 6 of the Dominguez Channel Bridge is necessary to avoid interference with the existing Beat 3 of the utility bridge. Three Dominguez Bridge Channel drawings need to be revised for this purpose. Task 5 — Potholing all existing Utility limes Since there are numerous sensitive pipelines within Wilmington Avenue right-of-way, Caltrans requested a precise horizontal location and vertical elevation of all utility lines to be shown on a utility map. This task requires potholing of the existing pipelines using special soils vacuum system equipment. The cost associated with this task is estimated at $49,000.00. This project requires a permit from California Department of Fish and Game. The cost associated with this permit is estimated at $4,000.00. Reproduction cost is estimated at $2,500.00 THIRD AMENDMENT TO AGREEMENT CARSON REDEVELOPMENT AGENCY PARSONS Project No, 919: Wilmington Avenue Interchange Modification at the 1-405 Freeway. 7 EXHIBIT B Project No. 919- Wilmington Ave Interchange Modification at the 1-405 freeway An additional compensation not to exceed $179,652.93 to cover the costs for additional services reflected by exhibit "A" above, Original agreement $19804,200.00 First Amendment to the agreement - ---Second 96,972.21 Amendment tothe"agreemen t 329,732.98 Third Amendment to the agreement 1-7--9,652.93 TO FAL $2,410,558.12 THIRD AMENDMENT TO AGREEMENT CARSON REDEVELOPMENT AGENCY PARSONS Project No. 919: Wilmington Avenue Interchange Modification at the 1-405 Freeway.