This Staff Report is a technical analysis of the submitted application material and the required
findings of the Watertown Zoning Ordinance. It is based only upon information submitted prior
to the public hearing and may be revised or updated with new recommendations,findings
and/or conditions as new information is obtained by Planning Staff during the public hearing
process.
Case Number: PB-2016-02 SP/SR
Subject Property: 30 Manley Way(Formerly Seyon Street) in the Pleasant Street
Corridor District
Parcel ID: 806 1D 0
Zoning District: Pleasant Street Corridor District
Petitioner(s): Smaranda Albeck, Boston Rhythmic
Owner: Calare Properties,43 Broad Street, Hudson, MA
Zoning Relief Sought: Special Permit with Site Plan Review
• §5.01.3(b)(2), New Construction or Conversion Greater
than 4,000 square feet of Building Area
Special Permit Granting Authority: Planning Board
Site Plan Review Meeting(s): Waived—Only minor changes to the site
Date of Staff Report: May 24, 2016
Staff Recommendation: Conditional Approval
Planning Board Hearing: Scheduled June 8, 2016
30 Manley Way/PSCD May 24, 2016
PB-2016-02 SP/SR Staff Report
I. PUBLIC NOTICE(M.G.L.c.40A,§11)
A. Procedural Summary
Petition PB-2016-02 SP/SR is scheduled to be heard in a public hearing before the Planning
Board on June 8, 2016. As required by M.G.L. c.40A, Sec.11 and the Watertown Zoning
Ordinance, notice was given as follows:
• Publish in the newspaper of record (Watertown Tab)on May 20, 2016 and May 27,
2016
• Post at the Town Administration Building and on the Town Website on May 20, 2016
• Mail to Parties in Interest on May 20, 2016
B. Legal Notice
Miranda Albeck, Manager, Boston Rhythmic,30 Manley Way, Watertown, MA 02472 herein requests
the Planning Board grant a Special Permit with Site Plan Review in accordance with§5.01.3(b)(2):
Conversion Greater Than 4,000 Square Feet to allow the conversion of 7,200 s.f. of existing warehouse
space to gym space. PSCD(Pleasant Street Corridor District)Zoning District. PB-2016-02."
_ -w
b i
- - III, , �•i
0411651 R14Jin. -
Entrance to site from Pleasant Street Boston Rhythmic's Entrance and Signs
(The For Lease sign is no longer there) (The use is already in operation)
Page 2 of 7
30 Manley Way/PSCD May 24, 2016
PB-2016-02 SP/SR Staff Report
Facade Nearest to BJs(Red Building View from Boston Rhythmic looking
On the right)Boston Rhythmic is on towards Pleasant Street and Watertown
the end in the far background Ford (Entrance to Launch in background,
left)
II. DESCRIPTION
A. Site Characteristics
The site currently contains a concrete block building which contains a warehouse previously
used by Target, and now used by Saks Fifth Avenue, the Petitioner's business, and the family
entertainment center Launch, which offers indoor trampolines, an arcade and snack bar.
Launch was approved through a Special Permit(Site Plan Review was waived) by the
Planning Board in 2014. The existing site is entirely developed, consisting of buildings and
parking areas,with small landscaped areas.
B. Surrounding Land Use
The project site is located immediately behind Watertown Ford off of Pleasant Street, and
adjacent to the BJs store that is located in Waltham. The Municipal boundary runs through the
grassed strip between BJs and the parking area to the west of the subject building. The area is
dominated by old mill and industrial buildings, and a Stop&Shop, in Watertown to the south of
Pleasant Street, as well as the BJs. To the east,there is a large residential development(Repton
Place). In addition,Walker Pond is directly north of the site, and a small portion of the bordering
pond bank is on this property. A recreational path is desired by the Town to create a complete
loop around Walker Pond.
C. Nature of the Request
The Petitioner is seeking Site Plan Review/Special Permit to approve already-completed interior-
only renovation and refit of part of the building to convert approximately 7,200 square feet of
warehouse use within the existing 94,268 square foot building to be used for a gymnastics facility.
No changes are proposed to the site, parking layout, or grassed and landscaped areas.
Page 3 of 7
30 Manley Way/PSCD May 24, 2016
PB-2016-02 SP/SR Staff Report
D. Relevant Permitting History
According to Town records, Manley Way, formerly Seyon Street,was owned and operated by
Raytheon as part of a larger building that was primarily in Waltham. In 2006,the Waltham portion
and part of the building in Watertown was demolished.At that time, approvals were given by the
Conservation Commission to construct the parking lot, which complied with zoning. As noted
above, 2014,the Planning Board approved a Special Permit for the interior-only retrofit/renovation
of approximately 36,791 square feet inside the existing 94,268 square foot building for a family
entertainment center offering indoor trampolines, an arcade and snack bar. This business is now
operating as Launch.
III. ANALYSIS AND FINDINGS
A. Plan Consistencv
1. Pleasant Street Corridor-Concept Plan and Implementation Study, 11/01/2007
• Create a mix of uses and construct appropriate development
2. Strategic Framework for Economic Development,08/02/2011
• The vision identifies key aspirations such as a thriving business community in
strategic locations in former industrial sites, owner-occupied business
• Allowed uses include commercial recreation
• Redevelopment/reuse of an existing structure supports Goal#3 by maintaining the
tax base, and reflecting market realities
3. Comprehensive Plan,Approved 2015
• The Land Use Section states in part, "given that much of the new development along
the corridor has been residential, revised zoning should specify that mixed use and
commercial development nodes be incorporated within the district to better match
the vision espoused in the 2007 Concept Plan for the corridor and refine how and
where particular uses should be established."
B. Special Permit with Site Plan Review §5.01.3(b)(2), New Construction or Conversion
Greater than 4,000 square feet of Building Area
Projects must meet the four conditions of approval for a Special Permit set forth in §9.05(b),
§9.07, and §9.08 of the WZO. In addition,the project is subject to the review procedures under
§9.03 Site Plan Review of the WZO, in which the ten criteria listed in §9.03(c) must be evaluated.
Special Permit Criteria§9.05(b)
1. The specific site is an appropriate location for such a use, structure, or condition.
Met: The development proposal is an appropriate use. Other than creating spaces for a
reception area and three training spaces, no changes will be made to the site or the
building's exterior.
Page 4of7
30 Manley Way/PSCD May 24, 2016
PB-2016-02 SP/SR Staff Report
2. The use as developed will not adversely affect the neighborhood.
Met: The proposed interior-only renovation will not affect the neighborhood as neither the
exterior of the building nor the site design will be changed. The site has a small portion of
Walker Pond located to the north of the building.
3. There will be no nuisance or serious hazard to vehicles and pedestrians.
Met: The portion of the building which the Petitioner proposes to repurpose warehouse
space for the gymnastics use. As such,the site already experiences truck and vehicle traffic.
The Petitioner submitted a Parking Analysis based on the gymnastics use with the remainder
of the structure continuing to be used as a warehouse or for the Launch family arcade. This
analysis indicates the site has more than the required number of parking spaces required by
WZO for the three combined uses.
4. Adequate and appropriate facilities will be provided for the proper operation of the
proposed use.
Conditionally Met: The proposal will be required to meet all building, health, and safety
requirements. Two bicycle parking space (one rack) is required to be installed based on
the 18 automobile parking spaces attributed to the Petitioner's use. (Per§6.07(a)(1)—1
bicycle parking space/15 automobile parking spaces)
Site Plan Review Criteria§9.03(c)
Section 9.03 states in the preamble that "[s]ite Plan Review shall be used to judge the
appropriateness and impacts of the site development characteristics of a proposed
development." Given the minimal impact to the exterior and no changes to the site plan, and
the intent expressed in the preamble of§9.03, DCDP staff has determined that a formal Site Plan
Review was not necessary. Specifically, no criteria are applicable to this application.
IV. STAFF RECOMMENDATION:
Based on the finding that the proposed project meets the criteria set forth in §9.05 and with the
general purpose of the Ordinance outlined in §1.00 of the WZO, DCDP staff recommends that a
Special Permit be granted with the following conditions:
Page 5 of 7
30 Manley Way/PSCD May 24, 2016
PB-2016-02 SP/SR Staff Report
Timeframe To be
# Condition for Verified
Compliance by
Control Documents.This approval is based upon the application materials and the
Control Documents titled:
1. ALTA/ACSM Land Title Survey,20 Seyon Street/625 Pleasant Street, Watertown,
MA. Feldman Professional Land Surveys, 11/22/13. Stamped by Karl A.
1.
McCarthy, Professional Land Surveyor. Perpetual ZEO/ISD
2. Parking and Traffic Control Plan,Sheet C-3B,dated 4/20/2006, by RJ O'Connell&
Associates,Inc.,showing exterior parking and landscaping strip between subject
property and abutting property to the West,and municipal boundary.
3. Schematic of interior of the site used by Boston Rhythmic, indicating the front of
the building and main entrance. Interior spaces labeled as Training Area 1,
Training Area 2, Training Area 3, and Reception. Also shows break room,
bathrooms,storage room,sprinkler room and a utility room. Undated. Received
by DCDP on 5/10/15.
Plan Modifications. Neither the Petitioners nor any present or future owner of any
interest in the project shall change or modify either the Control Plans referenced in this
decision,or the project itself,without first filing a formal request with the DCDP Director,
Zoning Enforcement Officer,and Building Inspector,for an opinion as to whether or not
2 such change or modification requires further review from the Special Permit Granting BP ZEO/ISD
Authority. Minor modifications including changes to interior floor plans that do not
change the layout beyond the area to be used in connection with this approval may be
considered and approved by the DCDP Director that are found to be consistent with the
project approval granted by the Special Permit Granting Authority.
Recordation. Upon application for a Final Certificate of Use/Occupancy,the Petitioners
3. shall provide evidence to the Zoning Enforcement Officer that this entire decision has CO ZEO
been filed with the Registry of Deeds,and/or Land Court.
4 Codes/Regulation Compliance.The Petitioners shall comply with all other applicable CO ZEO/ISD
local,state,and federal requirements,ordinances,and statutes.
Certificate of Occupancy/Final Inspection. A copy of the Building Permit with final
5. approval signatures from all relevant inspectors must be submitted to the Zoning CO ZEO
Enforcement Officer upon completion of the project.
Signage. No signs shall be permitted except those that meet the signage requirements
7. in Article VII of the WZO,and those shall be subject to a separate review and permit Perpetual Planning
process.
Permit Expiration. In accordance with WZO§9.13,a Special Permit granted under
§9.04 shall lapse one year from the date of grant thereof if substantial use thereof has
8. not sooner commenced except for good cause,or,in the case of a permit for Perpetual ZEO
construction,if the construction has not begun by such date except for good cause,or as
allowed by applicable State or Federal law.
Bicycle Parking.One rack for Bicycle Parking(Inverted U or Ring&Post style)shall be BP ZEO
9' installed near the main entrance of the business.
Page 6 of 7
30 Manley Way/PSCD May 24, 2016
PB-2016-02 SP/SR Staff Report
a
14
• € L IXM1 1
P0100111JI1000flollilwma . lop U
a
m
a�
L
Q Cl)
O �1
V
$ co
s�
Qr
2
J
N �
i
f.
h
2
Y
h
a
HI
Page 7 of 7