HomeMy Public PortalAbout1988_01_13_R012RESOLUTION NO.
A RESOLUTION:
PRESENTED January 13~ 1988
88-12 ADOPTED January 13~ 1988
ESTABLISHING FEES FOR CONNECTIONS TO THE PUBLIC WATER
SYSTEM FOR THE ROUTE 643 WATERLINE
WHEREAS, Section 19-24 of the Town Code authorizes the town to collect
pro rata fees for public water facilities for town-constructed facilities
necessitated, at least in part, by future subdivisions or development of
land; and
WHEREAS, the town has constructed approximately 8,765 feet of a 16-inch
watermain and appurtenances and is committed to construct a related water
booster station to serve the Route 643 service area; and
WHEREAS, it has been determined that twenty percent of the costs of the
installation of these facilities is for public benefit, and eighty percent
is for the benefit of the land owners adjacent to these public water
facilities; and
WHEREAS, the final established price for all costs associated with the
Route 643 waterline project is $800,000 and the estimated cost of all costs
associated with the design and construction of the booster station is
$517,000.
THEREFORE, RESOLVED by the Council of the Town of Leesburg in Virginia
as follows:
SECTION I. A Route 643 waterline pro rata facilities charge is hereby
established for all properties shown on the attached Exhibit I as follows:
A. Residential Uses .... $372.69 per dwelling unit not to exceed the
total cost per acre assigned to property within the service area
as certified by the Director of Engineering and Public Works.
2
RESOLUTION - ESTABLISHING FEES FOR CONNECTIONS TO THE PUBLIC WATER SYSTEM
B. Office/Commercial Uses .... $1,062.83 per gross acre.
C. Employment Uses ........... $ 966.21 per gross acre.
D. Institutional and Government
Uses ..................... $ 690.15 per gross acre.
SECTION II. The fee as specified in Section I shall be paid prior to
the issuance of public facilities permits for new connections to the Route
643 waterline. Said fee shall be in addition to all availability and
connection fees the town is authorized to collect.
SECTION III. The fee shall be adjusted by the percentage increase or
decrease in Engineering News Record Construction costs index value at the
time of application. The current construction cost index value from which
the increase or decrease shall be measured is 4456.
SECTION IV. Those properties participating in the Route 643 waterline
agreement will pay a reduced pro rata charge, which will exclude the actual
cost of the Route 643 waterline. The percentage of water use assigned to
any property subject to the prior Route 643 waterline agreement will be
applied to only the estimated cost of the booster station as established
herein.
SECTION V. The fees established herein shall run with the property and
the town manager shall maintain for public inspection a record of properties
subject to these fees.
3
RESOLUTION - ESTABLISHING FEES FOR CONNECTIONS TO THE PUBLIC WATER SYSTEM
PASSED this 13th day of
January , 1988.
Robert E. Sevila~ Mayor
Town of Leesburg
ATTEST:
Clerk of ,C~ncil