HomeMy Public PortalAbout2021-03-31 Presentation v1_FINAL with ScriptWELCOME!
Public Information Meeting
Virtual Meeting Presentation and Q&A
143rd Street East Extension, IL 59 to IL 126
The meeting will begin momentarily.
1
WELCOME!
Public Information Meeting
Virtual Meeting Presentation and Q&A
143rd Street East Extension, IL 59 to IL 126
March 31, 2021 • 6 PM
Welcome to the “143rd Street Extension, proposed roadway to be located between IL Route
59 to IL Route 126, Public Informational Meeting” On behalf of Mayor Collins and the Village
Board, we wish to thank you for attending this meeting. Your questions and comments are
very important to us as they help our team best understand this project. My name is Allen
Persons and I am the Director of Public Works for the Village of Plainfield. The 143rd Street
Extension Project has been identified within the Village of Plainfield’s Transportation plan for
many years. The Village Board directed Crawford, Murphy, and Tilly, Inc. (CMT), our
consulting engineers, to start a design study for this project in 2005. Since that time the
Village Board has authorized several contracts with CMT, at public meetings, advancing the
Phase 1 and Phase 2 design work. Today, CMT will provide the presentation and answer
questions after the presentation is completed. In an effort to answer all of the questions, we
are respectfully requesting that all participants ask questions, or make comments, relevant to
this project and the region surrounding this project. We will continue to accept questions and
comments after the presentation today until April 14, 2021. Information related to how
public comments can be submitted will be provided at the end of the presentation and a link
on the Village’s website will also guide individuals wanting to ask questions or make
comments. Again, all comments and questions will be accepted through April 14, 2021 and
they will become part of the official record that will be submitted to IDOT as part of this
project. This meeting will be recorded for viewing in the future as well.
2
Thank you again for participating in the Public Information Meeting.
2
Agenda
1.Introduction
2.Meeting Goals, Format and
Resources
3.Project Location,
Description, and Process
4.Project Purpose & Need,
Benefits and History
5.Schedule, Costs and Funding
6.Roadway and Structure
Improvements
7.Drainage
8.Environmental
9.Land Acquisition
10.Q&A
Todays presentation will include the meeting goals, format and resources; the project
location, description, and the typical roadway project process; the purpose and need
for the project, the benefits and history; the schedule, costs and funding; an overview
of the roadway, intersection and structure improvements; the drainage studies,
impacts and proposed features; environmental studies, impacts and mitigation, and
finally, the land acquisition process and schedule.
3
Meeting Goals
Broader Goals of the Meeting
•Present the approved environmental and engineering studies
•Attain public input on the proposed improvements
During and After the Meeting
•Answering public questions about items that may not be clear
•Answering public questions about specific topics or details that weren’t covered in the presentation
After the Meeting
•Follow-up with answers to questions that could not be answered at the meeting
•Accept and review comments regarding the like or dislike of the project or any of its components
The goals of the meeting are to present the approved environmental and engineering
studies and to attain final public input on the proposed improvements. During and
after the meeting, questions are welcome for items that may not be clear or for
specific topics or details that weren’t covered. After the meeting, the project study
team will follow‐up with answers to questions that couldn’t be answered at the
meeting. The village welcomes all comments regarding the like or dislike of the
project or any if its components.
4
Meeting Format
•What is the format and agenda of today’s meeting?
•Presentation for approximately 40 minutes
•Project Study Team will answer questions after the
presentation
•Public information meeting; not a public hearing
•How can you ask questions?
•During the presentation in the chat bar
•After the presentation in the chat bar during Q&A
•All questions will be screened
by a moderator
Unlike previous information meetings, held as in‐person open house format
meetings, this meeting is in a virtual format due to the ongoing safety precautions
within the Village due to COVID‐19. During the presentation, you may ask questions
in the Q&A bar and a moderator will screen and assign questions to appropriate
study team members based on the topic. After the presentation, those questions will
be answered verbally if enough time is available. Questions can still be posted in the
same Q&A bar during the Q&A session. This meeting is not being held in a public
hearing format. There will be no court reporter to document public input.
5
Meeting Format
•Comments vs. Questions
•Questions are meant to clarify issues and be beneficial for the
understanding of the project by attendees
•If you have comments regarding the like or dislike of the project
or its components, please email them to
publicworks@goplainfield.com
If you have comments regarding the like or dislike of the project or its
components, please email them to publicworks@goplainfield.com or mail
them to the public works department. This email address will be shown again
at the end of the presentation along with a mailing address. It is the same
information shown on the postcard and in the newspaper advertisement..
6
Resources
•Website https://plainfield-il.org/pages/publicimprovements
•Strip Aerial Maps
•Proposed Improvements
•Proposed Land Acquisition
•Reports and Studies
•Final Project Development Report (PDR)
•Location Drainage Study (LDS)
•Hydraulic Reports for the West Norman Drain and the DuPage River
•Presentation
•Slides from this Presentation
•Recording of this Zoom Virtual Meeting (available day after meeting)
Copies of Maps and
Studies are available at
Public Works, 14400 Coil
Plus Drive,for in‐person
review
For project information resources, please visit the public improvements page of the
village website. The page will include downloadable pdf documents including the
strip maps of the proposed improvements and land acquisition, reports and studies,
and the slides from this presentation. A recording of this virtual meeting will also be
available through a link to Vimeo.
7
Project Location and Description
•From west of IL 59 to east of IL 126
•Extension of 143rd Street
•Four-lane roadway corridor with
a median on new alignment
•DuPage River Bridge crossing
The project is located in northwest Will County within the Village of Plainfield and
unincorporated Plainfield Township. The project will complete a gap of 143rd Street
between IL 59 and IL 126. The project construction limits will extend from
approximately 1,000 feet west of IL 59 to 600 feet east of IL 126, and includes
construction of a four‐lane roadway corridor with a median on new alignment and a
new bridge crossing over the DuPage River.
8
Roadway Project Process
Phase I
•Preliminary
Engineering
•Environmental
Studies
Phase II
•Contract
Preparation
•Land Acquisition
•Permits
Phase III
•Utility Relocation
•Construction
We
are
here
The roadway project is following the IDOT typical roadway project process due to the
use of federal funds. It is split into three phases. Phase I includes preliminary
engineering and environmental studies. Phase II includes construction contract
preparation, land acquisition, and permits. And Phase III includes utility relocation
and construction.
9
Phase I Study Process
Human and
Natural
Environment
Hydraulics,
Drainage &
BridgeRoadway,
Geometrics
& Traffic
Vehicular/
Pedestrian
Safety
Data
Collection
Purpose
and
Need
Evaluate
Alternatives
Define
Alternatives
and
Evaluation
Criteria
Select
Preferred
Alternative
Stakeholder Outreach
Document
Findings of
Environmental
Studies
IDOT
DESIGN
APPROVAL
The Phase I study process went through multiple stages including development of a
purpose and need, alternatives and evaluation criteria, selection of a preferred
alternative and then finalizing and documenting the environmental studies. Many
design disciplines, like hydraulics, drainage and bridge design, were considered
throughout the study process. The phase I study process ends with Design Approval
and confirmation by FHWA of the Environmental Class of Action Determination and
the appropriate environmental document. In this case, the project was processed as
a federally approved categorical exclusion, meaning, based on past experience with
similar actions, do not involve significant environmental impacts.
10
Purpose and Need
Purpose
Improve mobility and safety along
IL 59 and IL 126 through the
downtown Plainfield corridor by
reducing the travel time and
number of crashesSafety Issues
Mobility and
Safety Issues
Safety Issues
Safety Issues
Safety and
Mobility Issues Train –Truck Collision
at IL 126 Crossing of the CNRR
The purpose of the project is to improve mobility and safety along Illinois
Route 59 and along Illinois Route 126.The need is based upon the
roadway system lacking a direct connection on the 143
rd street corridor
between IL 59 and IL 126. Technical analysis shows a history of
increased travel times as a result of congestion and excessive crash
rates at specific intersections and roadway segments. A detailed need
description is available in the project development report on the
Village website.
11
Project Benefits
•Time
•Improves travel times to and from I-55
•Relieves congestion on IL 59 and Main Street (IL 126)
•Improves access and reliability for Pace express operations
•Improves freight travel times to the national highway system
•Safety
•Reduces transportation system crashes
•Removes freight traffic from an at-grade crossing of the CNRR
•Environment
•Reduces fuel consumption
•Improves air quality by reduced emissions
•Mitigates and improves flood event storage volumes
•Downtown and Economic Development
•Removes Freight traffic from downtown
•Enables expanded streetscape of downtown
•Supports economic development along the 143rd Street corridor
Benefit / Cost Ratio
3+
per USDOT
The project has a benefit to cost ratio of over 3 based upon evaluations by the
USDOT. Travel time, safety and reduced emissions are large benefits of the project.
For downtown and economic development benefits, the project removes freight
traffic from the downtown, which enables an expanded streetscape. It also supports
economic development along the 143rd Street corridor.
12
Project History
Phase
20
0
5
20
0
6
20
0
7
20
0
8
20
0
9
20
1
0
20
1
1
20
1
2
20
1
3
20
1
4
20
1
5
20
1
6
20
1
7
20
1
8
20
1
9
20
2
0
20
2
1
Feasibility
Study
Phase I
Phase II
Alignment Shift
Addendum
The project officially entered a feasibility study in 2005 and a full Phase I roadway
study began in 2007. The project alignment originally included co‐existing in the
existing ComEd Transmission corridor. The original Phase I study was completed in
2014. In 2016, the Phase II began and in late 2017 ComEd communicated that they
would no longer be able to allow a road within their corridor due to recent
developments regarding future energy transmission needs, including a second
potential transmission line. In 2018, the alignment was shifted to outside of the
ComEd corridor and an addendum to the Phase I study was approved in early 2021.
13
Phase 2021 2022 2023 2024
Phase I
Phase II
Phase III
Project Schedule
Addendum
Design
Approval
ROW
Certification
and
Advertisement
Letting
Substantial
Completion /
Open to
Traffic
Construction
Complete
Moving forward, the project schedule includes completing Phase II with a ROW
certification and advertisement of construction plans for bidding in late 2021.
Construction is anticipated to begin in early 2022 with the route open to traffic in late
2023. Construction would officially be completed in the spring of 2024.
14
Costs and Funding
23.2, 36%
19.4, 30%
10, 16%
4.8, 8%
3.9, 6%2.8, 4%Costs
Construction Structures Construction Roads
Land Acquisition Phase II Engineering
Construction Engineering Phase I Engineering
20.3, 32%
17.6, 27%
4.5, 7%
6.2, 10%
15.5, 24%
Funding
Federal - Illinois Competitive Freight Federal - Shared STP
Federal - STP State Ask - Uncommitted
Local - Village
Total =
$64.1 million
The project is estimated to cost approximately 64.1 million dollars. The largest cost is
the proposed structural improvements, which is estimated at approximately 23.2
million dollars. The second largest cost is the construction of the roadways, which is
estimated at 19.4 million dollars. Land acquisition is estimated at 10 million dollars.
The remaining costs include engineering for the Phase I study, Phase II design,
appraisals, negotiations, relocations, and construction observation.
Funding of the project is considered secured with approximately 66% of all project
costs covered by federal funds including: Illinois Competitive Freight, Shared STP and
regular STP funds. Approximately 34% of the project funding is considered local,
which would include State and Village funds. The state contribution has yet to be
committed, but is estimated at approximately $6.2 million based upon the estimated
cost of improving IL 59, US 30 and IL 126 at the project intersections.
15
Roadway Improvements
West of
IL 59
IL 59 to
Naperville
Road
Naperville
Road to
IL 126
East of
IL 126
143rd Street
Copper Drive
For an overview of the roadway improvements, the 143rd street corridor has been
split into four sections including: west of IL 59, from IL 59 to Naperville Road,
Naperville Road to IL 126, and east of IL 126. The overall length of improvement to
143rd Street is approximately 1.3 miles.
16
Roadway Improvements
143rd Street–West of IL 59
143rd Street
Roadway Realignment & Reconstruction
Through‐lane addition,
eastbound at intersection
Westbound through‐lane
drop, west of intersection
West of IL 59, 143rd Street is under IDOT jurisdiction and is marked at US Highway 30.
The improvements include realignment slightly to the north, widening for additional
thru lanes, and reconstruction of the pavement. This section will remain under IDOT
jurisdiction and will also be part of the IL 126 reroute.
17
Roadway Improvements
143rd Street–IL 59 to Naperville Rd
New Construction
•2 Thru Lanes in Each Direction
•Village Jurisdiction – Future Transfer to IDOT
Shared Use Path
from DuPage
River Trail to
Naperville Road
From IL 59 to Naperville Road will be a new alignment with new construction. There
will be two through lanes in each direction. This section is planned to be
jurisdictionally transferred to IDOT in the future and will become part of the IL Route
126 reroute.
18
Roadway Improvements
143rd Street–Naperville Rd to IL 126
New Construction
Shared Use Path
from Naperville
Road to IL 126
Shared Use Path from
Naperville Road to IL 126
•2 Thru Lanes in Each Direction
•Village Jurisdiction – Future Transfer to IDOT
Ma
t
c
h
l
i
n
e
Ma
t
c
h
l
i
n
e
Inside through‐
lane drops into
dual left turn lane
From Naperville Road to IL 126 will be a new alignment with new construction. There
will be two through lanes in each direction. This section is planned to be
jurisdictionally transferred to IDOT in the future and will become part of the IL Route
126 reroute.
19
Roadway Improvements
143rd Street–East of IL 126
Roadway Realignment & Reconstruction
143rd Street
Old 143rd Street
•One Thru Lane in Each Direction
•Westbound Left Turn Lane Added
•Township Jurisdiction
East of IL 126 will be a realignment of existing 143rd Street, widening of the road to
include a median, and reconstruction of the pavement. This section is under
township jurisdiction and will remain under township jurisdiction.
20
Intersection Improvements
IL 59
•New East leg
•Single left and right
turn lanes on all
approaches
•No change to IL 59
through lanes
•Modernized Traffic
Signal with added
Interconnect
Existing Intersection
Proposed Intersection
North
North
Remove extra
right turn lane
(dual rights)
Intersection improvements at IL 59 will include a new east leg and single left and right
turn lanes on all approaches. The existing mainline of IL 59 pavement, two through
lanes in each direction, will remain unchanged. New traffic signals will installed to
accommodate the proposed improvements and the signal will be modernized. The
traffic signal will be interconnected to an existing traffic signal system to the north on
IL 59 for improved traffic flow.
21
Intersection Improvements
Naperville Road
•New Intersection
•Single left turn lanes
on all approaches
•Widening and
reconstruction of
Naperville Road
•New traffic signal
and interconnect
•Bicycle & pedestrian
crosswalks
Existing Intersection
Proposed Intersection
Naperville
Road
Naperville Road
Southbound
right turn lane
The Naperville Road intersection is new. There will be single left turn lanes on all
approaches. Naperville Road will be widened and reconstructed at the intersection.
This intersection will be signalized and interconnected to the traffic signal system to
the west at IL 59 to provide for better traffic flow along the 143rd Street corridor. This
intersection will have crosswalks on all four corners to allow for the safe crossing of
bicyclists along the proposed 143rd Street shared use path. It will also provide for
future sidewalks along Naperville Road without needing to retrofit the intersection.
22
Intersection Improvements
IL 126
•New West Leg
•Dual eastbound
left turn lanes
•Single left turn
lanes on all other
approaches
•Widening and
reconstruction of IL
126
•New traffic signal
and Interconnect
Existing Intersection
Proposed Intersection
Two northbound
through lanesLeft turn lane
Shared
Use Path
Improved
Angle of
Intersection
Continuous Free
Flow Right Turn
Lane
The intersection of IL 126 will have a new west leg. The eastbound movement will
have dual left turn lanes to accommodate the high volume movement to I‐55. All
other approaches will have single left turn lanes. A continuous free‐flow right turn
lane will be installed on the southbound approach to accommodate the high volume
movement from I‐55. IL 126 will be widened and reconstructed at the intersection. A
new traffic signal will be installed at this location and it will be interconnected to the
signal at Naperville Road to allow for better traffic flow along 143rd Street. IL 126 will
also have a northbound left turn lane added at Copper Drive due to the proximity to
the proposed intersection improvements.
23
Structures
Stream
Culvert
River
Bridge
Retaining
Wall
Underpass
143rd Street
Copper Drive
There are four major structures in the project including one stream culvert, one river
bridge, one major mechanically stabilized earth retaining wall, and one culvert
underpass.
24
Structures – Stream Culvert
West Norman Drain Box Culvert under 143rd Street
Proposed:
•Lengthen culvert to accommodate roadway realignment and widening
•Culvert cross section and opening to match existing
An existing 3‐cell 10‐foot wide by 8‐foot tall box culvert conveying the West Norman
Drain under 143rd Street and US 30 will be extended to accommodate the widening
and realignment of 143rd Street.
25
Structures – River Bridge
East
Abutment
Pier
(Typical)
Path
•Bridge Length
•The proposed bridge is nearly 960 feet in length while the river is 140 feet wide.
•The length of bridge is needed to span the river floodway and maintain an opening large
enough so as not to impact flood elevations in accordance with IDNR floodway rules.
West
Abutment
Pond
A new bridge over the DuPage River will be constructed. It will be 83‐feet, 5‐inches
wide, including four travel lanes and a multi‐use path separated from traffic by a
barrier wall. The bridge will be approximately 960 feet long and will have 7 spans and
6 piers. The bridge will span the majority of the floodway to minimize upstream
impacts.
26
Structures – Retaining Wall
Fletcher Lake Retaining Wall
•Purpose of the Wall: Minimize Impacts to
Fletcher Lake and property surrounding lake
•2,455-foot-long retaining wall between
Naperville Road and IL 126
•Average wall height is 10 feet
•12-foot-tall sight screen fence
Wall
Sight
Screen
Wall
Sight
Screen
A nearly 2500‐foot long, 10‐foot tall, mechanically stabilized earth retaining wall be
constructed at Fletcher Lake to minimize environmental impacts. A 12‐foot tall sight
screen will be installed on top of the wall to restrict the view of traffic from the lake
side and to serve as a barrier to limit roadway runoff and salt spray from entering the
lake.
27
Structures – Underpass
IL 126
Underpass Extension
•Lengthen culvert to
accommodate roadway
widening
•Operational opening to match
existing
The final structure is a former quarry railroad underpass. The railroad ties have been
buried and it currently serves as a private access roadway for the Bass & Gill Club to
cross underneath IL 126 and travel between Main Lake and Fletcher Lake. The
minimum vertical clearance of 13‐feet is being maintained. The existing culvert is
approximately 46‐feet long and will be extended to 90‐feet, 9 inches.
28
Drainage Studies
•Three Drainage Studies for the project
•Location Drainage Study
•Hydraulic Report for West Norman Drain
•Hydraulic Report for DuPage River
•Location Drainage Study (Entire Project)
•Identifies existing drainage areas and outlets
•Identifies existing roadway flooding issues within project limits
•Analyzes the additional impervious area and the need for detention
•Evaluates drainage outlets and identifies which are sensitive
•Determines the types of improvements including storm sewers,
ditches, culverts and best management practices
There are three drainage studies for the project including the Location Drainage Study
and Hydraulic Reports for the West Norman Drain and the DuPage River. The
Location Drainage Study, or LDS, encompasses the project overall and documents the
analyses, findings, and the proposed improvements. The LDS has been reviewed and
approved by IDOT.
29
Drainage Studies
•Hydraulic Reports
•For roadways over waterways
•Compile field observations and historic
observations/records
•Uses flood insurance studies from the Federal Emergency
Management Agency (FEMA)
•Identifies sensitive flood receptors
•Models hydrologic events (rainfall) and hydraulics (flow of
waterway)
•Analyzes existing and proposed hydraulic conditions
•Reviews the impacts of scour (removal of sediment around
bridge abutments or piers)
•Identifies appropriate freeboard / clearance of the
roadway from the flood events
Hydraulic reports are for roadways over waterways. While there are many technical
components, overall it helps to ensure that the proposed roadway doesn’t get
flooded and the improvements don’t cause flooding problems. The only portion of
the existing 143rd Street that gets flooded is east of these project limits at Lily Cache
Creek. This project will not improve that condition or make it worse.
30
Drainage Studies
•The IDNR Office of Water Resources (OWR) requirement is no
increase in water surface elevation of all events up to and
including the 100-year frequency event greater than 0.1 feet
(1.2 inches) compared to the existing condition
•Hydraulic Report for West Norman Drain (WND)
•Widening 143rd Street at the crossing of the WND
•Analysis of the 143rd Street Culvert Extension impacts to the WND
•MAX RISE IN WATER LEVEL: 0.1 feet –100-year EVENT
•Hydraulic Report for the DuPage River
•Installing a new crossing of 143rd Street over the DuPage River
•Analysis of the new bridge impacts to the DuPage River
•MAX RISE IN WATER LEVEL: 0.1 feet –100-year EVENT
The Illinois Department of Natural Resources, Office of Water Resources, allows for
no increase in water surface elevation of all rainfall events up to and including the
100‐year frequency event greater than 0.1 feet in comparison to the existing
condition. 0.1 feet is approximately 1.2 inches. Both of the structures have a
maximum impact of 0.1 feet for the critical frequency of the 100‐year event. The
project creates no impacts to sensitive flood receptors. The Hydraulic Reports have
been reviewed and approved by IDOT.
31
Floodplain Impacts
•Compensatory Storage designed at a
minimum 1.5:1 ratio in both the 0-10 year and
the 10-100 year flood event elevation ranges
•Fill of West Norman Drain floodplain at the IL 126 crossing was compensated at the
Crosswinds Church Property on the north side of the West Norman Drain
•Fill of DuPage River floodplain at the 143rd Street River Crossing was compensated at
the CB&I Property along the west side of the river
•Fill of Fletcher Lake floodplain by 143rd Street embankment was compensated in the
expanded Fletcher Lake Areas
•Fill of the Main Lake / Lily Cache Creek floodplain at the IL 126 underpass was
compensated on the east side of IL 126, adjacent to the underpass
For filling of the floodplain, IDOT requires a mitigation ratio of 1:1 to provide volume
for flood waters. A local ordinance requires a mitigation ratio of 1.5:1 compensatory
storage volume to floodplain fill volume. Of the four areas where floodplain fill is
occurring, compensatory storage is being constructed to mitigate that impact.
32
BMPs for Storm Water
•Best Management Practices (BMPs)
•What are Storm Water BMPs?
•Improve overall water quality
•Minimize soil erosion
•Control storm water runoff by capturing soil sediment and roadway pollutants
•Anticipated BMPs
•Infiltration basins
•12-foot-tall sight screen barrier to reduce roadway runoff and salt spray into Fletcher Lake
•Roadway runoff directed away from Fletcher Lake
Select
Preferred
Alternative
Complete
Drainage Study
and Identify
BMPs
Drainage Study
Available at
End of Phase I
Study
Further Design
and Detail in
Phase II
Permits from
Regulatory
AgenciesWe
are
here
The Best Management Practices or BMPs for storm water on this project include two
infiltration basins, a 12‐foot tall sight screen barrier at Fletcher Lake, and a storm
sewer and grading design that directs roadway runoff away from Fletcher Lake.
Infiltration basins are located at the northeast corner of IL 126 and near the western
abutment for the DuPage River Bridge.
33
Environmental Study
•This project is being studied in accordance with National
Environmental Policy Act (NEPA) of 1969.
•Federal requirements and IDOT policies require a detailed analysis
of potential impacts to the natural, social, and built environments
•Facilitates open and transparent study process
•Environmental studies have been completed and approved by
IDOT
The existing environmental conditions within the project area and the proposed
environmental impacts are being studied in accordance with the National
Environmental Policy Act of 1969. Federal requirements and IDOT policies require a
detailed analysis of potential impacts to the natural, social, and built environments.
NEPA facilitates an open and transparent study process. The project’s environmental
studies have been completed and approved by IDOT and are available on the Village
website.
34
Environmental Study Process
•Initiate project
•Develop Purpose and Need for the project
•Begin coordination
•Develop alternatives
•Collect data
•Environmental surveys
•Compliance with environmental regulations
•Analyze alternatives
•Avoid environmental resources if reasonably possible
•Minimize Impacts if resources cannot be avoided
•Mitigate impacts if unavoidable
The environmental study process begins with project initiation, including defining the
purpose and need for the project, beginning agency coordination, and developing
alternatives. Environmental surveys are then completed to collect data about the
existing conditions and to ensure compliance with environmental regulations. Finally,
project alternatives are analyzed to first avoid environmental resources if reasonably
possible, to minimize impacts if resources cannot be avoided, and, if impacts to
resources are unavoidable, mitigation is completed.
35
Review Environmental Impacts
•Section 4(f) impacts
•Waters of the US impacts
•Isolated wetland impacts
•Other surface water impacts
•Tree impacts
•Endangered species
•Noise
•Special waste
•Farmland
•Property impacts
•Displacements
We will now discuss the environmental impacts of the project, beginning with Section
4(f) impacts, natural resources impacts, including surface waters, trees and
endangered species, noise impacts, special waste concerns, farmland impacts, and
finally property impacts and displacements.
It should be noted that there have been no cultural or historic resources identified
and there are no forest preserves within the study limits.
36
Section 4(f) Impacts
•What is 4(f)?
•Publicly-owned parks, recreation areas, and wildlife refuges
•Public and private historic sites
•Acquisition of and de minimis impact to Plainfield Park District property
Existing Build
No‐Build
Path Easement
for River Trail
River Trail
Connector to
143rd Street
Path
River Trail
Extension
with road
project
The project will require the acquisition of Park District property located along the
DuPage River north of the existing DuPage River Trail terminus. The property is
currently undeveloped, and no recreational opportunities for the public are available.
The Park District planned to construct a multiuse paved trail that would connect the
existing River Trail that ends south of the property north to Eaton Preserve Park. To
minimize impact, the project will construct a multi‐use paved trail extension on the
property from the existing trail cul‐de‐sac north underneath the river bridge,
connecting to the 143rd Street path along the north side of the bridge, also allowing
for future connection of the River trail to the north. A permanent easement to the
Park District will also be provided. Because the property will function as a
recreational resource as originally intended by the Park District, a de minimis use
determination is applicable. The Park District, IDOT and FHWA have concurred with
this use finding.
37
Waters of the US Impacts
West Norman Drain (0.071 ac)
Wetland 1 (0.158 ac)
DuPage River (0.106 ac)
Wetland 1 (0.357 ac)
Pond 1 (0.263 ac)
Wetland A (0.021 ac)
Of the major water features identified within the environmental survey limits, the
West Norman Drain, East Norman Drain, DuPage River and two mining ponds were
identified by the United States Army Corps of Engineers as jurisdictional waters of the
US. The private pond adjacent to the river, labeled as Pond 1, and three wetlands
were also identified as waters of the US. Impacts to water resources were minimized
during the alternatives analysis.
As shown here, there are a total of 0.98 acres of permanent impacts to waters of the
US. Temporary impacts totaling 2.26 acres will be restored to pre‐construction
conditions or better.
A regional permit will be received by the Corps of Engineers prior to project letting.
Impacts to wetlands and waters of the US will be mitigated by purchasing 1.47 acres
of certified wetland credits from Mill Creek Wetland Mitigation Bank, which is in the
same watershed as the project, as approved by IDOT, the Department of Natural
Resources and the Corps of Engineers.
38
Wetland 2 (0.026 ac)
Isolated Wetland Impacts
Wetland C (0.003 ac)
Isolated wetland impacts occur at Wetland 2 west of the DuPage River and at
Wetland C on the west side of Fletcher Lake, east of Naperville Road. These features
were found to be isolated based on the jurisdictional determination by the Corps of
Engineers because they lack a surface connection to any other water of the US.
Impacts to these wetlands will be mitigated by purchasing 0.058 acre of certified
wetland credits from Mill Creek Wetland Mitigation Bank.
39
Other Surface Water Impacts
RP1 (0.225 ac)
Fletcher Lake (2.498 ac)
Other surface water impacts occur at Retention Pond 1 west of the DuPage River and
at Fletcher Lake, located on Bass and Gill Club property. These features were also
found to be isolated by the Corps of Engineers.
Impacts to the retention pond will be mitigated by purchasing 0.45 acre of certified
wetland credits from Mill Creek Wetland Mitigation Bank. A portion of impact to
Fletcher Lake will be mitigated by purchasing 2.764 acres of credit from the
mitigation bank, while the remaining portion of impact will be mitigated on site.
40
Fletcher Lake Mitigation
•Surface water area – 2.71ac
•Volume impacted for fishing – 19,862 cy
•Volume created for fishing – 42,190 cy
•Floodplain will not be affected
•Restoration
•6-12 ft deep
•Undulating bottom
•Native wetland/ upland planting
•Tree plantings
•Fish structures
•5 years of monitoring & management
•Conservation easement
To compensate for fill to Fletcher Lake, new lake area will be created on site by
excavating upland area, and the small isolated Wetland C, on the west and east sides
of Fletcher Lake. Additionally, lake volume is being replaced at greater than the
required 1:1 to provide appropriate depths to support habitat and recreation.
A conceptual compensation plan for Fletcher Lake is currently under review by IDOT
and the DNR, and coordination with the Bass and Gill Club has been ongoing
throughout project development. The goals of the compensation plan are to replace
the open water area lost by the project, create a vegetatively diverse buffer and
transitional zone between the new pond area and adjoining upland properties, and
provide and enhance aquatic fish habitat to the satisfaction of the Bass and Gill Club.
41
Ground Water, Wells & Water Quality
Frequently Asked Questions:
Q: Will the project affect the water level of Fletcher Lake?
A:No, the work in the lake will not affect the long-term lake level. Soil borings
indicate the natural soils as granular material including sand and gravel. The
level of the lake is dictated by groundwater.
Q: What will the project do to protect ground water of the unincorporated homes?
A: The following design and best management practices have been changed with
the latest drainage study to protect water quality.
•The storm sewer has been upsized to send water to the DuPage River instead of Fletcher
Lake.
•The site screen at Fletcher Lake is being designed as a barrier to salt and roadway runoff
spray from entering Fletcher Lake.
•Infiltration basins has been designed to improve water quality.
Residents and concerned citizens have frequently asked if the project will affect the
water level of Fletcher Lake or cause additional flooding. The answer is no, the work
in the lake will not affect the long‐term lake level. Soil borings indicate the natural
soils as granular material including sand and gravel. The former use of the site was a
quarry for sand and gravel. The level of the lake is dictated by groundwater. Another
frequently asked question is regarding the ground water of the unincorporated
homes and their wells. There are three major design elements that have been
changed since the previous drainage study to protect water quality. This includes
upsizing the storm sewer along 143rd Street at Fletcher lake to divert roadway runoff
to the DuPage River. Adding a site screen barrier to protect salt and roadway runoff
spray from entering Fletcher Lake. Finally, infiltration basins have been incorporated
at select drainage outlets to improve water quality.
42
Tree Impacts
4,460 Trees Impacted
1,289 Invasive-Species/Low Quality Trees Removed
3,171 Non-Invasive-Species Trees Removed
773 Trees Replaced On-Site
2,398 Trees Replaced Off-Site
Numbers subject to change pending final design details
A tree survey was completed in July 2020 that identifies the diameter, species and
condition of trees within the project area. Based on the current removal plan,
approximately 4460 trees will be removed by the project. Many trees were identified
as low quality, and the understory of the wooded areas were dominated by invasive
species such as buckthorn and honeysuckle. The project will follow IDOT Design &
Environment Policy 18 regarding tree removal and replacement requirements. A total
of 3171 living, non‐invasive trees will be replaced at a 1:1 ratio, with nearly a quarter
being replaced on site.
43
Endangered Species
Not likely to jeopardize the continued existence of any
endangered species or threatened species or result in the
destruction or adverse modification of any critical habitat
Northern Long Eared Bat
May effect the
bat, but will not
cause prohibited
incidental take
No Tree Clearing
Restrictions
Eastern Prairie
Fringed
Orchid
No Suitable Habitat
including Prairies or
High-Quality
Wetlands
Other
Federally
Listed Species
No Suitable Habitat
Present
The project was reviewed for state and federal threatened and endangered species in
fulfillment of the Illinois Endangered Species Protection Act, the Illinois Natural Areas
Preservation Act, and the Endangered Species Act by the IDOT Natural Resources
Unit. The unit found that the proposed improvement is not likely to jeopardize the
continued existence of any threatened or endangered species or result in the
destruction or adverse modification of any critical habitat.
Remove if necessary: IDOT determined that the project may affect the northern long
eared bat, but will not cause prohibited incidental take. No restrictions have been
placed on tree clearing to date. IDOT also determined that there is no suitable habitat
for the eastern prairie fringed orchid or any other listed species.
44
Noise Analysis
Future noise impacts at Common Noise Environments 2, 3 and 4
•Naperville Road residences north of project
•Cemetery and Copper Drive residences south of project
Design Noise
Wall
Solicit
Viewpoints
of Benefitted
Receptors
Abatement
Evaluation
Traffic Noise
Model
Noise
Monitoring
**
Step only pursued if noise exceeds pre-determined levels and a barrier is feasible andreasonable
*
Noise wall north of project not feasible: no receptors (residences) with noise reduction of ≥5 dB
Noise wall south of project feasible but not reasonable: exceeded maximum cost per benefitted receptor set by IDOT
Evaluation using FHWA's Traffic Noise Model showed future noise
impacts at CNEs 2, 3 and 4
Naperville Road residences north of project
Cemetery and Copper Drive residences south of project
Noise barriers were evaluated for these areas. To be built, a barrier must
be both feasible and reasonable as defined by FHWA and IDOT
No barrier could be designed for the Naperville Road residences north
of the project that would reduce noise at least 5 dB; these barriers were
not feasible
While some barriers for the area south of the project were feasible, that
is effective at reducing noise, none could be constructed within IDOT's
allowed cost: they were not reasonable
Therefore no barriers were recommended
IDOT approved the noise analysis on March 31, 2020
45
Special Waste
•15 Sites with RECs
•12 Sites with de minimis
conditions
•Field work required for PSI in
Spring of 2021
Special Waste
Screening
Preliminary
Environmental
Site
Assessment
(PESA)
PESA
Response/PSI
Work Order
Preliminary
Site
Investigation
(PSI)
Remediation
We
are
here
What is a Recognized Environmental
Condition (REC)?
A condition that may be indicative
of releases or potential releases of
hazardous substances on, at, in, or
to the site.
A preliminary environmental site assessment (PESA) was performed by Illinois State
Geological Survey (ISGS) in July of 2019. The PESA is the first step in the analysis of
special waste. A recognized environmental condition, or REC, is where the PESA has
identified that a condition was noted that may be indicative of releases or potential
releases of hazardous substances on, at, in, or to the site. There were 15 sites
identified as recognized environmental conditions (RECs) within the study limits.
Another 12 sites were identified to have de minimis conditions only. The second
step, a preliminary site investigation, or PSI, will be performed in Phase II for REC sites
that will be impacted or will have property acquired in the name of the state or
village. This work will be performed by IDOT and is expected to occur in the spring
and summer of this year. This will include on‐site testing to determine if the soil is
contaminated. The PSI will identify pay items and the scope of work to deal with the
special waste during construction.
46
Farmland
Southwest Corner of IL 59
West Bank of DuPage River
The project area is located completely within land designated as “urbanized area” on
the Census Bureau Map, and coordination with the U.S. Natural Resources
Conservation Service is not necessary. There are approximately 2.2 acres located at
the southwest corner of IL 59 and 1.5 acres located along the west bank of the
DuPage River that will be impacted. Both impacted locations will be converted to
compensatory storage for floodplain fill and will become vegetated with wetland
species.
47
Property Impacts
4 Full Acquisitions
•PIN 06-03-03-403-013/ 14217 S. Naperville Road
•PIN 06-03-03-403-012/ 14213 S. Naperville Road
•PIN 03-03-02-300-004 / Northeast Corner of IL 126 (Vacant)
•PIN 06-03-03-300-016 / Plainfield Park District (Vacant)
18,
78%
5,
22%
Parcels Impacted
Private ComEd
27.9
9.3 10.9
0
5
10
15
20
25
30
Property Impacts (acres)
Fee Simple Acquisition Permanent Easements Temporary Easements
The property impacts on this project are primarily for the new alignment and the
widening of existing roadways. Overall, there are approximately 37.2 acres of
permanent impacts including fee simple acquisition and permanent easements.
Temporary impacts are approximately 10.9 acres. There are 23 parcels proposed for
acquisition, of which 5 are from ComEd. There are 4 full‐property acquisitions.
48
Displacements and Relocations
What is a displaced person?
Any person (individual, family, partnership, association or corporation) who moves
from real property, or moves personal property from real property as a direct result of
(1) the acquisition of the real property, in whole or in part, (2) a written notice from the
agency of its intent to acquire, (3) the initiation of negotiations for the purchase of the
real property by the Agency, or (4) a written notice requiring a person to vacate real
property for the purpose of rehabilitation or demolition of improvements, provided the
displacement is permanent and the property is needed for a Federal or federally
assisted program or project.
A displaced person, is any individual, family partnership, association or corporation,
who moves from real property, or moves personal property from real property as a
direct result of the acquisition of the property, in whole or part, a written notice from
the agency of its intent to acquire, the initiation of negotiations for the purchase of
the real property by the agency or a written notice requiring a person to vacate real
property for the purpose of rehabilitation or demolition improvements, provided the
displacement is permanent and the property is needed for a federal or federally‐
assisted program or project.
49
Displacements and Relocations
Do you buy the
business?
No, businesses will
be relocated. They
are not purchased.
2 Full Residential Relocations & 1 Partial (Garage)
•PIN 06-03-03-403-013/ 14217 S. Naperville Road
•PIN 06-03-03-403-012/ 14213 S. Naperville Road
•PIN 06-03-03-301-001/ 14218 S. Naperville Road
•Personal Property in the Garage is eligible
1 Partial Business Relocation
•PIN 03-03-02-300-004 / 14203 S. Route 59
Storage Unit Tenants
A frequently asked question regarding business displacements is if the businesses are
purchased by the project sponsor agency. The answer is no, businesses will not be
purchased, businesses are relocated. There are 2 full residential relocations and one
partial relocation for a garage in the project. All are on Naperville Road. There is 1
partial business relocation, the storage unit facility on IL 59. Tenants will qualify for
relocation assistance.
50
Land Acquisition Process
Plat of Survey
•A drawing is
prepared to
show the
dimensions and
amount of
property
acquired
Appraisal
•An
independent
appraisal is
made to
determine the
fair market
value
Negotiations
•An offer is
made to
acquire the
necessary
property at the
appraised
value
Relocations
•Displacements
will be
relocated
Construction
•ROW must be
certified before
the project
construction
can be
advertised for
bidding
We
are
here
The acquisition of all rights and interest of real propertyFee Simple Acquisition
Where underlying ownership is retained by the property owner, but access is
permanently allowed during and after construction for maintenance of
facilities such as drainage structuresPermanent Easements
Where underlying ownership is retained by the property owner but access is
temporarily allowed only during construction for items such as grading work,
driveway construction, and landscape restorationTemporary Easements
The land acquisition process has already started. A plat of highways has been
reviewed and approved by IDOT. A ROW Agreement has been executed with IDOT.
Appraisals and Review Appraisals have been completed. Negotiations are set to
begin in the coming weeks with an initial offer letter from the Village of Plainfield.
Following negotiations will be relocations. Finally, construction can begin once all the
relocations have been completed and the ROW has been certified by IDOT.
51
Land Acquisition
•Eminent Domain
•If a settlement cannot be reached, the matter is referred to the courts for acquisition under the law of Eminent Domain
•Quick-Take
•The State has the authority under 735 ILCS 30/20-5-5 to expedite the condemnation process
Offers and
Counter‐offers
Settlement
No Settlement Eminent
Domain
Conventional
(Village)
Quick Take
(State)
Eminent domain can become part of the land acquisition if a settlement cannot be
reached. Quick‐take is an element of Eminent Domain that allows for the process to
go quicker. The state has quick take authority under the Illinois Compiled Statutes.
52
Questions & Answers
•Project Study Team Panel
•Village of Plainfield Public Works
•Crawford, Murphy & Tilly, Inc.
•Phase I, II, and Land Acquisition Consultant
•Meeting will conclude at 8 P.M. or after
last questions are answered, whichever
comes sooner
This concludes the presentation portion of the virtual public information meeting.
Next, a project study team panel including staff from the Village Public Works
Department as well as their consultant, Crawford, Murphy & Tilly, Inc. will begin
answering questions. The meeting will conclude at 8 P.M. or after the last questions,
whichever comes sooner. If you have questions, you can post them to the Q&A
section of the zoom meeting.
53
Comments or Additional Questions
•Email to publicworks@goplainfield.com
•Mail to:
Randy Jessen
Plainfield Public Works
14400 Coil Plus Drive
Plainfield, IL 60544
•To become part of the public notice meeting record, please submit your comments by April 14, 2021.
•Please provide your name and mailing address so that a letter may be sent to you answering your specific questions or addressing your specific comments.
For comments, please email them to publicworks@goplainfield.com or mail to Randy
Jessen, Plainfield Public Works, 14400 Coil Plus Drive, Plainfield, IL 60544. To become
part of the public notice meeting record, please submit your comments by April 14,
2021. Please provide your name and mailing address for any comments or questions
so that the Village may respond in writing.
54
Questions & Answers
Q&A will be grouped into the following topics and
answered in that order by the study team:
1. Property Impacts / Displacements / Land Acquisition
2. Traffic / Trucks
3. Noise
4. Drainage / Flooding / Water Quality
5. Everything else
Based upon past public involvement, Q&A will be grouped into the following topics
and answered in that order by the study team. Property Impacts, Displacements and
Land Acquisition followed by Traffic and Trucks, then Noise, then Drainage, including
flooding and water quality, and finally everything else. If there is an overwhelming
amount of questions, then each topic will be limited to 15 minutes. The village will
follow up in writing with the questions that aren’t answered during the meeting.
55
Questions & Answers
Currently responding to questions regarding:
1. Property Impacts / Displacements / Land Acquisition
2. Traffic / Trucks
3. Noise
4. Drainage / Flooding / Water Quality
5. Everything else
Submit questions via the Q&A Tab below, email them to publicworks@goplainfield.com, or
mail to:Randy Jessen, Plainfield Public Works, 14400 Coil Plus Drive, Plainfield, IL 60544
by April 14, 2021.
56
Questions & Answers
Currently responding to questions regarding:
1. Property Impacts / Displacements / Land Acquisition
2. Traffic / Trucks
3. Noise
4. Drainage / Flooding / Water Quality
5. Everything else
Submit questions via the Q&A Tab below, email them to publicworks@goplainfield.com, or
mail to:Randy Jessen, Plainfield Public Works, 14400 Coil Plus Drive, Plainfield, IL 60544
by April 14, 2021.
57
Questions & Answers
Currently responding to questions regarding:
1. Property Impacts / Displacements / Land Acquisition
2. Traffic / Trucks
3. Noise
4. Drainage / Flooding / Water Quality
5. Everything else
Submit questions via the Q&A Tab below, email them to publicworks@goplainfield.com, or
mail to:Randy Jessen, Plainfield Public Works, 14400 Coil Plus Drive, Plainfield, IL 60544
by April 14, 2021.
58
Questions & Answers
Currently responding to questions regarding
:
1. Property Impacts / Displacements / Land Acquisition
2. Traffic / Trucks
3. Noise
4. Drainage / Flooding / Water Quality
5. Everything else
Submit questions via the Q&A Tab below, email them to publicworks@goplainfield.com, or
mail to:Randy Jessen, Plainfield Public Works, 14400 Coil Plus Drive, Plainfield, IL 60544
by April 14, 2021.
59
Questions & Answers
Currently responding to questions regarding:
1. Property Impacts / Displacements / Land Acquisition
2. Traffic / Trucks
3. Noise
4. Drainage / Flooding / Water Quality
5. Everything else
Submit questions via the Q&A Tab below, email them to publicworks@goplainfield.com, or
mail to:Randy Jessen, Plainfield Public Works, 14400 Coil Plus Drive, Plainfield, IL 60544
by April 14, 2021.
60
Thank you!
Thank you for participating! The public
meeting and Q&A has now concluded.
61