Loading...
HomeMy Public PortalAbout1988_04_13_R070L~es§urg in ~irginin RESOLUTION NO. A RESOLUTION: PRESENTED April 13, ]1988 88-70 ADOPTED April 13, 1988 AUTHORIZING A CONTRACT WITH CAMP, DRESSER & MCKEE ENGINEERS FOR ENGINEERING SERVICES RELATED TO THE DESIGN AND CONSTRUCTION OF THE ROUTE 643 BOOSTER WATER PUMPING STATION WHEREAS, a special study commissioned by the town, evaluating flow and pressure along the Route 643 corridor, was prepared by Camp, Dresser & McKee and this study recommended installation of a booster station to increase water pressure within this service area; and WHEREAS, this project was shown on the town's approved capital improvements program; and WHEREAS, the Loudoun County School Board has begun construction on the Cool Spring Elementary School to be located adjacent to the Tavistock Farms planned development; and WHEREAS, this school is planned for occupancy for the 1989/90 school year; and WHEREAS, this Council desires to take all appropriate actions to ensure that the water system available to service this school has adequate fire flow and pressure; and WHEREAS, design is already underway for a waterline loop from Sycolin Road, along the Route 15 by-pass, to Fort Evans Road extended, which will improve water service to the new school; and WHEREAS, operation of the Route 643 booster water pumping station by summer of 1989 is essential to permit the scheduled opening of the Cool Spring Elementary School; and -2- WHEREAS, failure to meet this deadline will create an emergency condition under Section 8.5 of the Leesburg Purchasing Policy: THEREFORE, RESOLVED by the Council of the Town of Leesburg in Virginia as follows: SECTION I. The manager is authorized and directed to enter into a cost plus fixed fee contract, on behalf of the town, in a form approved by the town attorney with Camp, Dresser & McKee Engineers, in the amount of $ 115,000 for design and construction engineering services in connection with the Route 643 booster water pumping station. SECTION II. An appropriation in the amount of $ 115,000 is made to Account No. 3120.700.150.300 from the Utility Fund for engineering and design services. PASSED this 13th day of April , 1988. Robert E. Sevila, Mayor Town of Leesburg ATTE ST: Clerk of