Loading...
HomeMy Public PortalAbout1988_08_09_R152Lccsl~urg in ~trirginia RESOLUTION NO. A RESOLUTION: PRESENTED August 9, 1988 88-152 ADOPTED August 9, 1988 AUTHORIZING A CONTRACT AMENDMENT WITH CAMP, DRESSER AND MCKEE FOR CONSTRUCTION ENGINEERING SERVICES IN CONNECTION WITH THE WATER POLLUTION CONTROL FACILITY EXPANSION AND UPGRADE WHEREAS, the Town of Leesburg entered into a contract with Camp, Dresser and McKee on June 28, 1984, for construction and engineering services in connection with the town's water pollution control facility expansion and upgrade; and WHEREAS, this contract was amended by Resolution No. 87-172 dated August 12, 1987 to extend construction engineering services to November 30, 1987 and compensate Camp, Dresser and McKee for these services; and WHEREAS, the duration of the construction has exceeded the November 30, 1987 completion date in the amended contract which requires additional construction engineering services beyond the scope of the amended contract; and WHEREAS, services beyond the contract scope of services have been performed by Camp, Dresser and McKee; and WHEREAS, the town's contract with Camp, Dresser and McKee sets out procedures for compensating the construction engineer for additional services required for the water pollution control facility expansion and upgrade; and WHEREAS, contingency funds presently exist to permit Environmental Protection Agency participation in the additional costs of approximately 75 percent of the increased contract amount: AUTHORIZING A CONTRACT AMENDMENT WITH CAMP, DRESSER AND MCKEE FOR CONSTRUCTION ENGINEERING SERVICES IN CONNECTION WITH THE WATER POLLUTION CONTROL FACILITY EXPANSION AND UPGRADE THEREFORE, RESOLVED by the Council of the Town of Leesburg in Virginia as follows: SECTION I. The Manager shall execute, on behalf of the town· Amendment No. 2 to the cost plus fixed fee contract dated June 28, 1984 for professional services in connection with the water pollution control facility expansion and upgrade project in an amount not to exceed $83·600.00. SECTION II. The approval of contract Amendment No. 2 shall be conditioned upon approval by the U.S. Environmental Protection Agency and Virginia Water Control Board. PASSED this 9th day of ATTE ST: Clerk of ~uncil Robert E. Sevila, Mayor Town of Leesburg · 1988.