HomeMy Public PortalAbout1988_08_09_R152Lccsl~urg in ~trirginia
RESOLUTION NO.
A RESOLUTION:
PRESENTED August 9, 1988
88-152
ADOPTED August 9, 1988
AUTHORIZING A CONTRACT AMENDMENT WITH CAMP, DRESSER AND
MCKEE FOR CONSTRUCTION ENGINEERING SERVICES IN CONNECTION
WITH THE WATER POLLUTION CONTROL FACILITY EXPANSION AND
UPGRADE
WHEREAS, the Town of Leesburg entered into a contract with Camp,
Dresser and McKee on June 28, 1984, for construction and engineering
services in connection with the town's water pollution control facility
expansion and upgrade; and
WHEREAS, this contract was amended by Resolution No. 87-172 dated
August 12, 1987 to extend construction engineering services to November
30, 1987 and compensate Camp, Dresser and McKee for these services;
and
WHEREAS, the duration of the construction has exceeded the November
30, 1987 completion date in the amended contract which requires
additional construction engineering services beyond the scope of the
amended contract; and
WHEREAS, services beyond the contract scope of services have been
performed by Camp, Dresser and McKee; and
WHEREAS, the town's contract with Camp, Dresser and McKee sets out
procedures for compensating the construction engineer for additional
services required for the water pollution control facility expansion and
upgrade; and
WHEREAS, contingency funds presently exist to permit Environmental
Protection Agency participation in the additional costs of approximately
75 percent of the increased contract amount:
AUTHORIZING A CONTRACT AMENDMENT WITH CAMP, DRESSER AND MCKEE FOR
CONSTRUCTION ENGINEERING SERVICES IN CONNECTION WITH THE WATER
POLLUTION CONTROL FACILITY EXPANSION AND UPGRADE
THEREFORE, RESOLVED by the Council of the Town of Leesburg in
Virginia as follows:
SECTION I. The Manager shall execute, on behalf of the town·
Amendment No. 2 to the cost plus fixed fee contract dated June 28, 1984
for professional services in connection with the water pollution control
facility expansion and upgrade project in an amount not to exceed
$83·600.00.
SECTION II. The approval of contract Amendment No. 2 shall be
conditioned upon approval by the U.S. Environmental Protection Agency and
Virginia Water Control Board.
PASSED this 9th day of
ATTE ST:
Clerk of ~uncil
Robert E. Sevila, Mayor
Town of Leesburg
· 1988.