Loading...
HomeMy Public PortalAbout1989_02_14_R041L s urg in irginia RESOLUTION NO. 89-41 PRESENTED ADOPTED February 14, February 14, 1989 1989 A RESOLUTION: AUTHORIZING THE MANAGER TO TAKE CERTAIN STEPS TO CHALLENGE THE EFFICACY OF THE VIRGINIA POLLUTION DISCHARGE ELIMINATION SYSTEM PERMIT (VPDES) FOR THE TOWN'S WATER POLLUTION CONTROL FACILITY; PREPARE A PRESENTATION BEFORE THE VIRG~ WATER CONTROL BOARD CI-IAI,I,ENGING THE DULLES AREA WATERSHED POLICIES AND ENSURE THAT PLANS ARE PREPARED TO INCREASE PLANT CAPACITY WHEREAS, the Virginia Water Control Board (VWCB) in June, 1983, commi.~sioned the Northern Virginia Planning District Commi.~sion (NVPDC) to conduct a technical analysis of Tuscarora Creek to determine if Leesburg's wastewater discharge should be required to meet Dulles Area Watershed Policies (DAWP) for advanced wastewater treatment standards; and WHEREAS, the NVPDC study was completed in June, 1985 and recommended less stringent standards, based on scientific data and new planning tools available to assess receiving water q,,~lity benefits resulting from alternate levels of treatment; and WHEREAS, the NVPDC recommended standards are in accordance with state and federal water q,,~llty goals, particularly the restoration and protection of beneficial uses under state water quality standards; and WHEREAS, this Council adopted Resolution #88-113 in June, 1988 which requested the VWCB to amend the Dulles Area Watershed Policy to include recommendations made by NVPDC; and WHEREAS, the VWCB has taken no action, nor responded to the town's request; and WHEREAS, the town's consulting engineer, CH2M Hill, has determined that a 2.5 rngd expansion of Leesburg's Wastewater Treatment facility will cost in excess of $53 million, nearly $38 million more than an expansion and upgrade built to NVPDC recommended standards; and WHEREAS, these exorbitant costs will not be offset by federal participation and place a severe economic burden on our citizens, in terms of an eventual 300% increase in availability and user fees -2- to retire the debt and pay the required increased operations and maintenance costs; and WHEREAS, this Council wishes to take ~ll steps necessary to expose the devastating impact these standards will impose on our community; and WHEREAS, this Council seeks to ensure that all steps are taken to begin design of Leesburg's planned expansion of its wastewater treatment facility to meet current standards and to establish a capital reserve through increased availability fees to ensure funding for the required capacity: THEREFORE, RESOLVED by the Council of the Town of Leesburg in Virginia as follows: Section I. The manager is authorized and directed to make a written request to the VWCB for a public hearing to facilitate public input on the proposed VPDES permit for Leesburg's Wastewater Treatment Facility under DWAP standards. Section II. The manager is directed to prepare testimony to be presented at the VWCB'S "citizen's hour" during its quarterly meeting on March 20, 1989 in Richmond by the Mayor. Section IlL The manager is authorized and directed to issue a request for proposals for design and construction management services for the upgraded expansion of the Leesburg Wastewater Pollution Control Facility to a capacity of 5.0 mgd under DAWP standards. Section IV. The mAnAger is authorized and directed to update the March 4, 1988 "AvailAbility Fee Rate Study through the Year 2000" report for review by this Council to reflect capital costs associated with the design and construction of an advanced wastewater treatment facility. PASSED this 14th day of February ATTEST: 7 .,1989. Town of Leesburg