Loading...
HomeMy Public PortalAbout1990_02_27_R030in ~Virginia RESOLUTION NO. 90-30 PRESENTED ADOPTED February 27~ 1990 February 27~ 1990 A RESOLUTION: APPROVING OUTDOOR OPERATIONS FOR A PORTION OF AREA 3 AND AREA 5 AS DESIGNATED ON THE APPROVED PRELIMINARY DEVELOPMENT/REZONING PLAN FOR #ZM-98 HIGH POINT ASSOCIATES. WHEREAS, rezoning application #ZM-98 by High Point Associates was approved on November 8, 1988, by Ordinance No. 8/~O-39, and established a Planned Employment Center (PEC) zoning district with proffers; and WHEREAS, Beckb-m Dickerson applied on beh-lt~ of High Point Associates, on August 21, 1989 for outdoor operations associated with a proposed C & P regional office on a portion of the High Point Planned Employment Center (PEC) parcel; and WHE~, Section 7B-17(e) of the Zoning Ordinance states: "(e) Use Limitations. The following limitations apply to the use of land in a planned employment center in addition to any limitation provided in the ordinance establishing the district. (1) All operations shall be conducted within a fully enclosed building unless the Town Council finds that the outdoor operations are compatible with the planned employment center;" and WHEREAS, the proposed outdoor operations, subject to the conditions enumerated below, do not adversely affect the approved planned employment center, or the adjacent residential development and elementary school; and WHE~, this Council has determined that the proposed re-alignment of area 3 and area 5 to accommodate this proposal is in general conformsnce with the ori~rml rezoning actiom THEREFORE, RESOLVED by the Council of the Town of Leesburg in V-~rginia as follows: The application for outdoor operations for a C & P Regional Headquarters only on a portion of area 3 and area 5 as designated on the approved preliminary development/rezoning plan for #ZM-98 High Point Associates is hereby approved, subject to the following conditions: 1. The layout and location of the outdoor operations shall be in general conform,nee to the concept plan dated February 6, 1990, prepared by Beckbsm W. Dickerson, Jr. APPROVING OUTDOOR OPERATIONS FOR HIGH POINT ASSOCIATES 2 2. An S-2 landscaping screen shall be required along the entire east and west boundaries of the site. o A mRx~m,~m 5-foot berm with a 3 to 1 slope shall generally be required within an area approximately 30 feet wide along the entire east and west sides of the site, subject to final approval by the Land Development Official. The mRx'im~lln allowable building square footage of area 3 shall be restricted to 119,000 square feet with a 20% open space requirement. Excess build~og construction from the other areas may not be averaged onto area 3. The architectural treatment of the C & P buildiog and accessory structures, including the level of detail, scale and material shall be cohesive with the approved architecture of the office buildings depicted in l~xhibit A of the approved rezoning plar~ PASSED this 27th day of ATTEST: ~]erk of Co~eil February , 1990. Robert E. Sevil~ Mayor Town of Leesburg r:highpt