Loading...
HomeMy Public PortalAbout1990_05_22_R095L....;~f PRESENTED May 22, 1990 RESOLUTION NO. 90-95 ADOPTED May 22, 1990 A RESOLUTION: ESTABLISHING PRO RATA FEES FOR CONNECTION TO THE ROUTE ??3 WATERLINE WHEREAS, Section 19-24 of the Town Code authorizes the town to collect pro rata fees for public water facilities for town-constructed facilities necessitated, at least in part~ by future subdivisions or development of land; and WHEREAS, the town has constructed approximately 10,600 feet of 24-inch water main and appurtenances on Route 773, between the Water Treatment Plant and the Carr Tank; and WHEREAS, it has been determined that fifty-eight percent of the cost of the installation of this facility is for public benefit, and forty-two percent is for the benefit of the land owners adjacent to this public water facility; and WHEREAS, the final established price for all costs associated with the Route 773 waterline project is $988,032.00. THEREFORE, RESOLVED by the Council of the Town of Leesburg in Virginia as follows: SECTION I. The Route 773 waterline pro rata facility charge is hereby established for all properties shown on the attached Exhibit I as follows: a. Shopping centers/Commercial uses (FAR -- 0.25) -- $5.15 per 100-square feet of floor area. b. Residential uses -- $69 per dwelling unit, not to exceed the total cost per acre assigned to property within the service area as determined by the Director of Utilities. Light & medium industry -- $171 per gross acre. Employment uses, PEC (FAR -- 0.375) -- $1.72 per 100-square feet of floor area. The fee as specified in Section I shall be paid prior to the issuance of public Said fee shall be in addition to all d. SECTION II. facilities permits for new connections to the Route 773 waterline. availability and connection fees the town is authorized to collect. A RESOLUTION: ESTABLISHING PRO RATA FEES ... ROUTE 773 WATERLINE 2 SECTION III. The fee shall be adjusted by the percentage increase or decrease in Engineering News Record Construction costs index value at the time of application. The construction cost index value at the time of Substantial Completion of the project from which the increase or decrease shall be measured is 4655. SECTION IV. The fees established herein shall run with the prope,q:y and the town manager shall maintain for public inspection a record of properties subject to these fees. ATTEST: PASSED this 22nd day of i~Iay , 1990. R~y o r Town of Leesburg Clerk of Co~lcil EXHIBIT I SUMMARY TABLE OF PROPERTIES AND ESTIMATED PRO-RATA COSTS ROUTE 773 WATERLINE EXTENSION Tax Map Reference Area Future Est. Water Non-Town % Estimated (Acres) Land Use Cons. (gpd) of Total Flow Cost 49-8 49-32 49-29 49-37 49-34 49-33 49-1 50-1 Xerex 49-3-1 49-3-6 49-3-7 49-1-A 49-1-B 49-27-C 49-27-D 49-26 49-26B 49-26C 49-37B 49-28 32.95 Res. (4 DUA) 52,720 2.19 $ 9,088 211.84 Res. (4 DUA) 338,944 14.05 $ 58,304 10.06 Res. (4 DUA) 16,096 0.67 $ 2,780 217.40 Res. (3 DUA) 260,880 10.82 $ 44,900 100.17 Res. (3 DUA) 120,204 4.98 $ 20,666 8.00 Res. (3 DUA) 9,600 0.40 $ 1,660 287.95 Res. (3 DUA) 345,540 14.33 $ 59,466 401.68 Res. (3 DUA) 482,016 19.97 $ 82,870 211.00 Res. (453 DU) 165,400 6.86 $ 28,467 21.83 PEC 35,659 1.48 $ 6,142 54.37 PEC 88,813 3.68 $ 15,271 52.55 PEC 85,840 3.56 $ 14,773 23.49 I-1 23,490 0.97 $ 4,025 3.00 PEC 4,901 0.20 $ 830 6.00 PEC 9,801 0.41 $ 1,701 178.29 PEC 291,237 12.07 $ 50,087 6.44 B-3 21,039 0.87 $ 3,610 8.43 B-3 27,541 1.14 $ 4,731 0.19 B-3 621 0.03 $ 124 15.78 PEC 25,777 1.07 $ 4,440 3.62 PEC 5,913 0.25 $ 1,037 Total Private Share 1,895.16 2,412,032 100.00% $414,973 SUMMARY OF PRO-RATA CHARGES BY LAND USE Residential = $69 per dwelling unit PEC (FAR = 0.375) = $1.72 per 100-square feet of floor area Light/Medium Industry = $171 per gross area Commercial/Shopping Center = $5.15 per 100-square feet of floor (FAR = 0.25) area