APPROVING A CONTRACT AMENDMENT WITH BCM ENGINEERS, INC.,
FOR ADDITIONAL ENGINEERING SERVICES RELATING TO THE
UPGRADE/EXPANSION OF THE POTOMAC RIVER WATER TREATMENT
PLANT
WHEREAS, in March, 1988 the town entered into a cost plus fixed fee contract with BCM
Engineers, Inc., for engineering and design services relating to the expansion/upgrade of the 2.5 MGD
Potomac River Water Treatment Plant; and
WHEREAS, the high-rate pilot testing program conducted under the initial preliminary
engineering study phase of the contract identified several deficiencies in the plant's chemical and
physical processes required for expansion to 5.0 MGD; and
WHEREAS, the contract was amended in September, 1989 to address the out-of-scope work
items required as a result of the preliminary engineering study; and
WHEREAS, construction services required for the expansion/upgrade were completed July 2,
1991 requiring additional consulting engineering services as a result of the extended construction period;
and
WHEREAS, it has been determined that a final adjustment and compensation for engineering
services is deserved and appropriate:
THEREFORE, RESOLVED by the Council of the Town of Leesburg in Virginia as follows:
The Town Manager is hereby authorized and directed to execute a contract amendment in the
amount of $34,852.00 to the engineering services contract with BCM Engineers, Inc., dated March 28,
1988 for the Potomac River Water Treatment Plant upgrade/expansion.