Loading...
HomeMy Public PortalAbout1991_08_13_R170The Town of Leesburg, Virginia RESOLUTION NO. A RESOLUTION: PRESENTED August 13, 1991 91-170 ADOPTED August 13~ 1991 APPROVING A CONTRACT AMENDMENT WITH BCM ENGINEERS, INC., FOR ADDITIONAL ENGINEERING SERVICES RELATING TO THE UPGRADE/EXPANSION OF THE POTOMAC RIVER WATER TREATMENT PLANT WHEREAS, in March, 1988 the town entered into a cost plus fixed fee contract with BCM Engineers, Inc., for engineering and design services relating to the expansion/upgrade of the 2.5 MGD Potomac River Water Treatment Plant; and WHEREAS, the high-rate pilot testing program conducted under the initial preliminary engineering study phase of the contract identified several deficiencies in the plant's chemical and physical processes required for expansion to 5.0 MGD; and WHEREAS, the contract was amended in September, 1989 to address the out-of-scope work items required as a result of the preliminary engineering study; and WHEREAS, construction services required for the expansion/upgrade were completed July 2, 1991 requiring additional consulting engineering services as a result of the extended construction period; and WHEREAS, it has been determined that a final adjustment and compensation for engineering services is deserved and appropriate: THEREFORE, RESOLVED by the Council of the Town of Leesburg in Virginia as follows: The Town Manager is hereby authorized and directed to execute a contract amendment in the amount of $34,852.00 to the engineering services contract with BCM Engineers, Inc., dated March 28, 1988 for the Potomac River Water Treatment Plant upgrade/expansion. PASSED this 13th day of August 1991. Town of Leesburg ATTEST: Clerk of Council