Loading...
HomeMy Public PortalAbout18 - 190611 Letter to G. Schreiber on final filings BOYLSTON PROPERTIES Originally Submitted: March 11, 2019 Updated: June 11,2019 Mr. Gideon Schreiber Senior Planner Watertown Department Community Development& Planning 149 Main Street Watertown, MA 02472 Re: Phase V,Additional filings Arsenal Yards Dear Gideon, As we have discussed,there are several open items that need to be cleaned up as a closeout to the MPSP approvals with our final Phase V filing for Building G. The list includes: 1. Photometric's for the entire common area site lighting system 2. A final and complete site plan showing the interconnectivity among the phases 3. A final landscape planting plan showing the interconnectivity among the phases 4. The final zoning& building table 5. The 25%design submission to DCR for the pedestrian crossing at Greenough Boulevard 6. A landscape plan showing the proposed landscape solution at the rear of the A Building and the connectivity to Arsenal Park 7. Final location of all Eversource transformers and switches 8. An updated Right in-Right out design 9. The inclusion of a "dog park/run" along the southern edge of the Home Deport parking lot 10. A final revised mixed use path from the South side of G to Greenough Boulevard To summarize,to date we have completed and filed the above referenced items with your office as detailed on the attached spreadsheet or in several instances, are including this information in this planning board package. Under separate cover we submitted plans to DCDP and Conservation for the mixed use path and Dog Park and made a formal presentation to the Conservation Commission during the April 3, 2019 Cons Com meeting. The revised mixed use path and the proposed dog park were approved with some minor conditions that we will work with your office to insure are implemented once both elements are constructed with the final building, Building G. 800 Boylston St. Suite 1390 Boston, MA 02199 1 617-262-4646 1 boylstonproperties.com BOYLSTON PROPERTIES Please review the list and let me know if you have any questions or comments. Sincerely, BOYLSTON PROPERTIES 0&1_0� Andrew J. Copelotti Cc: Mark Deschenes— Boylston Properties (via email) Steve Magoon—Town of Watertown, Assistant Manager(via email) William York—Gilman, McLaughlin & Hanrahan (via email) Project File Attachments (1) 800 Boylston St. Suite 1390 Boston, MA 02199 1 617-262-4646 1 boylstonproperties.com