HomeMy Public PortalAbout1994_05_10_R097The Town of
Leesburg,
trg ma
RESOLUTION NO.
A RESOLUTION:
PRESENTED May 10, 1994
94-97 ADOPTED Ma}, 10, 1994
AUTHORIZING AN AGREEMENT, APPROVING WATER AND SEWER
EXTENSION PERMITS, WAIVING A PERFORMANCE GUARANTEE AND
APPROVING A CONNECTION FOR WASTEWATER FLOW TO THE
EXISTING CATTAIL BRANCH SEWAGE PUMPING STATION
WHEREAS, the Director of Engineering and Public Works and the Planning Commission have
conditionally approved construction drawings and final development plan for the Potomac Crossing
Elementary School, to be constructed by the Loudoun County Board of Education (School Board hereafter);
and
WHEREAS, it is in the public interest to waive the costs associated with a performance guarantee
for the necessary public improvements; and
WHEREAS, the ultimate interceptor sewer and pumping station in the Cattail Branch Sewer Shed
are currently under design but may not be constructed and functional by the time the Potomac Crossing
Elementary School is constructed and opens in the fall of 1995; and
WHEREAS, the existing Cattail Branch Pumping Station has sufficient unused capacity to accept the
estimated 3,000 gallon per day of wastewater flow from the proposed Potomac Crossing Elementary School.
THEREFORE, RESOLVED by the Council of the town of Leesburg in Virginia, as follows:
SECTION I. The Manager shall execute the contract for public improvements in a form approved
by the Deputy Town Attorney with the School Board for the improvements shown on the plans approved by
the Director of Engineering and Public Works for the Potomac Crossing Elementary School site, located
within the Potomac Crossing Planned Residential Neighborhood.
SECTION II. The extension of municipal water and sewer works for the Potomac Crossing School
site is approved in accordance with Sections 15-9 and 19-18 of the Town Code.
A RESOLUTION:
-2-
AUTHORIZING AN AGREEMENT, APPROVING WATER AND SEWER
EXTENSION PERMITS, WAIVING A PERFORMANCE GUARANTEE AND
APPROVING A CONNECTION FOR WASTEWATER FLOW TO THE
EXISTING CAT-FAIL BRANCH SEWAGE PUMPING STATION
SECTION III. The performance guaranteefor the public improvements in the amount of $205,000.00
is waived, conditioned on the requirements that occupancy to the school shall not be permitted until the public
improvements are completed to the satisfaction of the town, or a subsequent performance guarantee is
furnished in an amount approved by the Director of Engineering and Public Works for outstanding punchlist
items.
SECTION IV. The town's Sewer Master Plan dated April 11, 1989, as amended, is hereby amended
to allow interim connection of the Potomac Crossing Elementary School to the existing Cattail Branch Sewage
Pumping Station until the demolition and abandonment of the existing pumping station at the time the
ultimate Cattail Branch Interceptor and Pumping Station are constructed and in operation.
PASSED this 10th day of May ,1994.
ATYEST:
Clerk of Council
r:cattail
James E. Clem, Mayor
Town of Leesburg