HomeMy Public PortalAbout11-0001 AlbeeFla:MN al
28x4" STUDS EVERY
24" O.C. BREAK -AWAY
TYPE CONNECTIONS
I "Xa" BOARDS
W/ I" GAP
EXISTING PIER
BEYOND
ADD 4'! OF HEIGHT
TO EXISTING STRUCTURE
.r
1r ,
NEW STUCCO
CORNICE
.°.__°.°°_°__FAIR STUCCO
AND PAINT
•
11
' 11
18TH STREET ELEVATION
I !4i' = 1 ` -0!I
NO UT ROMEX,
DUCTS„ l l� & � ���� >° IL, Y S /PA!EL
ETC,) AME ALLOW al IN 2H.EAKAWAY WALLf°
BREAK AWAY WALL SECTION
TYPCIAL
3.49 =
28X6" WD 40ISTS
EVERY 12" O.C.
350" STEEL ANGLE--;
WELDED TO SEAM
3 "xl e TUBE STEEL
TOP RAIL. WELDED
TO 38X4" POST,
NI" STEEL PICKET. WELDED
TO TOP RAIL AND SEAM.
154' TIRE STEEL
SEAM. POCKET SET
INTO EXISTING STRUCTURE
—5"x4' -- -38x4" TUBE STEEL
POST. mixer) TO
STEEL BEAM
S "Xa" TUBE STEEL
BEAM. POCKET SET
INTO EXISTING STRUCTURE
BALCONY SECTION
314" -11.0"
AND
WINDOW
APPROV
� HANDRAILS a =wt�?
ryn I �1 i/i 8k X0°7 Ile` I
airiU' in e. ail!' !°f� ��1i!' :
PQrchcec, s a:; i' .
NEW BALCONY
-SEE DETAILS
NEW STUCCO
RELIEF SAND
NEW BALCONY
-SEE DETAILS
REPAIR STUCCO
AND PAINT
NEW BALCONY
-SEE DETAILS
NEW STUCCO
RELIEF BAND
MODIFIED ENTRANCE.
TO SE STUCCO
NEW BREAK AWAY
WALL TYPE CONSTRUCTION
-SEE SECTION
REPAIR STUCCO
AND PAINT
-NEW PANEL -TYPE
OVERHEAD GARAGE DOORS
•
I I O 5 /a"
a'-0 5/a"
14` -IO I /a"
TYP.
NEW WALLS BETWEEN
EXISTING PIER BLOCKS
TO SE 'BREAK- MAY'.
(CRC- HATCHED)
EXISTING PER
BLOCKS. STUCCO
TO BE REPAIRED
AND PAINTED
I "XI" STEEL PICKETS
- ..._..._..18X4" BOARDS
SPACING
TUBE STEEL
POST WELDED TO BEAM
NOTE: ALL STEEL CONNECTIONS TO BE WELDED
-�-� BALCONY ELEVATION
42
POCKET SET INTO
EXISTING FRAME
LT= PM"
OVERHANG
I NEW WALLS BETWEEN
EXISTING PIER BLOCKS
TO BE 'BREAK- AYVAY!.
(GROSS - HATCHED)
NEW (2) 4'-0"
DOORS
EXISTING
ELEVATOR
STAIRWAY, HALL
4 ELEVATOR ARE TO
REMAIN AS EXISTING
NEW PANEL -TYPE-
OVERHEAD
GARAGE DOORS
FIRST FLOOR PLAN
EXISTING
HALL
2f-R 3 /Se
UP
EXISTING
FOYER
5-0"
��1.7�
NEW (2) 4!_0"
DOORS`
NEW WALLS BETWEEN
EXISTING PIER BLOCKS
TO BE BREAK- AWAY'.
(CROSS- HATCHED)
2 —�I 5/8"
28X6" PV LEDGER --
2irX6 IND LEDGER
NEW PANEL -TYPE
OVERHEAD
GARAGE DOORS
NEW WALLS 2X4 WD STUDS
Ib" O.C. BETWEEN EXISTING PIERS.
TO BE FINISHED WITH STUCCO (EXT)
AND GAB (INT) (SOLID HATCH)
E..
BALCONY STRUCTURAL PLAN
21'-6 5/5"
'MOM,
1/4"=1(-0"
58X4" TUBE STEEL
POST WELDED TO
v�-
—POCKET SET INTO
EXISTING FRAME
PLAN
NORTH
z
H
•
xw}n
x
t.:
=
z
COP YT:IY5rn 20(19
WATKINS ASS1CIATI,S ARC .C1
f
IC
SEA SPRAY BEACH HOUSE RENOVA
44 0
rip
W
JJW
DRAWN BY
CHECKED BY
12-20-10
DATE
REVISION DATE.
2010 -18
PR(MECT NO.
A1.0