HomeMy Public PortalAbout1997_05_13_R118 The Town of
Leesburg,
Virginia
PRESENTED May 13, 1997
97-118 ADOPTED May 13, 1997 _
AUTHORIZING REIMBURSEMENT FOR WATER LINE CONSTRUCTION
ATTEST:
Clerk of Council
lj S~FR&O:R103
__ day of May, 1997.
Jflines E. Clem, Mayor
Town of Leesburg
RESOLUTION NO.
A RESOLUTION:
WHEREAS, construction of the Evergreen Mill Elementary School will require extension of a 10-
inch water line from South King Street to the school; and
WHEREAS, the contractor for the school, Perini Construction, is required to provide the I0 - inch
water line extension under their contract with the County of Loudoun; and
WHEREAS,, the town has requested Perini Construction to increase the line size to 16 inches; and
WHEREAS, Perini Construction has agreed to accept $53,424.00 as the town's share for the water
line upsize, based on unit costs for the approved water line design.
THEREFORE, RESOLVED by the Council of the Town of Leesburg in Virginia as follows:
SECTION I. The manager is hereby authorized and directed to reimburse Perini Construction
upon completion of the 16-inch water line, an amount not to exceed $53,424.00.
SECTION II. An appropriation is hereby made to utility account #(306)3120.700.774 in the
amount of $53,424.00 from the unappropriated Utility Fund balance for construction of the Evergreen Mill
Road water line.
PASSED this 13th