Loading...
HomeMy Public PortalAbout1997_05_13_R118 The Town of Leesburg, Virginia PRESENTED May 13, 1997 97-118 ADOPTED May 13, 1997 _ AUTHORIZING REIMBURSEMENT FOR WATER LINE CONSTRUCTION ATTEST: Clerk of Council lj S~FR&O:R103 __ day of May, 1997. Jflines E. Clem, Mayor Town of Leesburg RESOLUTION NO. A RESOLUTION: WHEREAS, construction of the Evergreen Mill Elementary School will require extension of a 10- inch water line from South King Street to the school; and WHEREAS, the contractor for the school, Perini Construction, is required to provide the I0 - inch water line extension under their contract with the County of Loudoun; and WHEREAS,, the town has requested Perini Construction to increase the line size to 16 inches; and WHEREAS, Perini Construction has agreed to accept $53,424.00 as the town's share for the water line upsize, based on unit costs for the approved water line design. THEREFORE, RESOLVED by the Council of the Town of Leesburg in Virginia as follows: SECTION I. The manager is hereby authorized and directed to reimburse Perini Construction upon completion of the 16-inch water line, an amount not to exceed $53,424.00. SECTION II. An appropriation is hereby made to utility account #(306)3120.700.774 in the amount of $53,424.00 from the unappropriated Utility Fund balance for construction of the Evergreen Mill Road water line. PASSED this 13th