HomeMy Public PortalAbout1998_05_12_R117 The Town of
Leesburg,
Virginia
RESOLUTION NO.
A RESOLUTION:
PRESENTED May 12, 1998
98-117 ADOPTED May 12, 1998
ESTABLISHING PRORATA FEES FOR EVERGREEN MILL
WATERLINE
WHEREAS, Section 19-24 of the Town Code authorizes the town to collect pro rata fees
for public water facilities for town-constructed facilities necessitated, at least in part, by future
subdivisions or development of land; and
WHEREAS, the town participated in upsizing of the waterline to Evergreen Mill
Elementary School for a total cost of $72,411.00; and
WHEREAS, it has been determined that all of the cost associated with the upsizing of
this facility is for public benefit.
THEREFORE, RESOVLED by the Council of the Town of Leesburg in Virginia as
follows:
SECTION I. The Evergreen Mill waterline pro rata facility charge is hereby established
for all properties identified on the attached Exhibit I:
a. Shopping centers/Commercial and other uses -- $56 per 100 square feet of
floor area.
b. Residential uses -- $196 per dwelling unit.
SECTION II. The fee, as specified in Section I, shall be paid prior to the issuance of
public facilities permits for new connections to the Evergreen Mill waterline. Said fee shall be
in addition to all availability and connection fees the town is authorized to collect.
SECTION III. The fee shall be adjusted by the percentage increase or decrease in
Engineering News Record Construction costs index value at the time of application. The
construction cost index value at the time of Substantial Completion of the project from which
the increase or decrease shall be measured is 5,883.
SECTION IV. The fees established herein shall run with the property and the town
manager shall maintain for public inspection a record of properties subject to these fees.
PASSED this 12th day of May, 1998.
Jat/mes E. Clem, Mayor
Town of Leesburg
ATTEST:
Clerk of Council
R:evergrn
EXHIBIT I
SUMMARY TABLE OF PROPERTIES AND ESTIMATED PRO-RATA COSTS
EVERGREEN MILL WATERLINE EXTENSION
Tax Map # Property Use TYpe Estimated % of Total Estimated
Name Flow Flow Cost
66 Stratford 350 Single-Family 122,500 gpd 94.7 % $68,603.
73A Simpson School 4,000 glxl 3.09% $2,240
67, 73C, 73B N/A 8 units 2,800 gpd 2.17% $1,568
73D, 70, 71,
70A, & 7lB
TOTAL Private Responsibility 129,300 gpd 100% $72,411
TOTAL PROJECT COST
Cost per gallon =
Residential uses =
Engineering News Record (April '98)
= $72,411.00
$56per 100 square feetoffloorarea($0.56 S/gallon)
$196per dwelling unit.
= 5883