Loading...
HomeMy Public PortalAbout12-21-21 Plan Commission Agenda PacketPlan Commission Tuesday, December 21, 2021 7:00 PM Village Boardroom 24401 W. Lockport Street Plainfield, IL 60544 Due to the COVID-19 pandemic, members of the public attending the meeting may do so subject to compliance with COVID-19 safety protocols, including wearing face coverings at all times while inside Village buildings. Agenda CALL TO ORDER, PLEDGE TO THE FLAG, ROLL CALL APPROVAL OF MINUTES Approval of the Minutes of the Plan Commission held on December 7, 2021. 12-07-21 Plan Commission Minutes.pdf PUBLIC COMMENTS DEVELOPMENT REPORT OLD BUSINESS NEW BUSINESS 1.BRONK FARM (CASE 1948-101121.AA.SU.SPR.PP) 1.a.Seeking a motion to open a Public Hearing regarding the annexation of approximately 162 acres into the Village of Plainfield and a special use permit to allow a Planned Development of 450 unit mixed-residential development for the property located generally at the southwest corner of 127th St. and Van Dyke Rd, commonly known as the Bronk Farm. 1.b.Seeking a motion to close the Public Hearing regarding the annexation of approximately 162 acres into the Village of Plainfield and a special use permit to allow a Planned Development of 450 unit mixed-residential development for the property located 1 Plan Commission Page - 2 generally at the southwest corner of 127th St. and Van Dyke Rd, commonly known as the Bronk Farm. 1.c.Seeking a motion to recommend approval of annexation of the residential development commonly known as Bronk Farm (PIN: 07-01-33-100-006-0000), located generally on the southwest corner of 127th Street and Van Dyke Road, as a logical extension of the Village boundary. Bronk Farm Staff Report Packet.pdf 1.d.Seeking a motion to adopt the findings of fact of staff as the findings of fact of the Plan Commission and, furthermore, recommend approval of the special use for planned development to permit a mixed residential development, commonly known as Bronk Farm, including 332 single-family-detached dwelling units and 118 townhome dwelling units, subject to the stipulations in the staff report. 1.e.Seeking a motion to recommend approval of the requested site plan review for a mixed residential development, commonly known as Bronk Farm, including 332 single-family-detached dwelling units and 118 townhome dwelling units, subject to the stipulations in the staff report. 1.f.Seeking a motion to recommend approval of the Preliminary Plat of Subdivision for a mixed residential development, commonly known as Bronk Farm, including 332 single-family-detached dwelling units and 118 townhome dwelling units, subject to the stipulations in the staff report. DISCUSSION ADJOURN REMINDERS - December 24th - Village Offices Closed December 27th - Village Offices Closed December 31st - Village Offices Closed January 3rd - Village Board Meeting at 7:00 p.m. January 4th - Plan Commission at 7:00 p.m. 2 Plan Commission Record of Minutes Date: December 7, 2021 Location: Village Hall CALL TO ORDER, PLEDGE, & ROLL CALL Chairman Kiefer called the Plan Commission meeting to order at 7:00 p.m. and led the pledge to the flag. ROLL CALL: Commissioners Heinen, Minnis, Renzi, Seggebruch, Valerga, Womack and Chairman Kiefer were present. Commissioners Goins and Nicholson were absent. OTHERS PRESENT: John Argoudelis, Village President (Mayor); Jonathan Proulx, Planning Director; and Yuchen Ding, Associate Planner. Mayor Argoudelis provided his vision on how to have cohesiveness between the Plan Commission and Village Board. Mayor Argoudelis swore in Commissioner Womack and Commissioner Valerga. APPROVAL OF MINUTES The Minutes of the Plan Commission meeting held on November 16, 2021 were approved as amended. PUBLIC COMMENTS No Public Comments. DEVELOPMENT REPORT Mr. Proulx stated the mayor has made four appointments to the Plan Commission which included two ex- officio members. Mr. Proulx briefly explained the role of the ex-officio members. Mr. Proulx provide an update on the following items: Lockport St. Variance, and the Onyx Subdivision. OLD BUSINESS No Old Business. NEW BUSINESS 1950-102621.SU 14917 S. EASTERN AVE. CHANCE H. EIKER Commissioner Minnis made a to open a Public Hearing regarding a proposed special use request for the property located at 14917 S. Eastern Ave., in the Village of Plainfield. Seconded by Commissioner Renzi. Voice Vote. All in favor. 0 opposed. Motion carried 7-0. Mr. Ding stated the applicant is seeking approval of a special use with a Planned Development agreement at 14917 S. Eastern Avenue in order to renovate the existing bi-level single-family residential home and divide the home into two (2) dwelling units with separated entrances. Staff deems that a Planned Development (PD) agreement is more appropriate than re-zoning the property to R-2 Two-Family Residential District to avoid the spot zoning issue. In accordance with Section 9-47 of the Zoning Ordinance, a Planned Development requires approval of a Special Use permit. Mr. Ding reviewed the staff report dated December 7, 2021. Mr. Ding concluded staff submits that the proposed special use for Planned Development is appropriate in terms of the proposed total number of dwelling units and the scale of the project. Staff also deems that the location of the subject house will ensure minimal detrimental impact to the neighborhood, and the applicant, who lives next to the property, will commit to the on-site maintenance. Based on the foregoing analysis, prior to public comments and 3 Plan Commission Minutes December 7, 2021 Page 2 of 4 direction from the Plan Commission, staff recommends approval of the requested special use for Planned Development. Chairman Kiefer asked if the special use would expire if the property owner were to sell the property. Mr. Ding indicated that it would not. Chairman Kiefer swore in Chance Eiker, applicant. Mr. Eiker stated that there is already existing egress and ingress for each proposed unit. Chairman Kiefer asked for public comment. Mr. Ding stated an email was received from Mr. Ben Fitzhugh with general questions regarding the special use, which staff responded to. Mr. Ding add Ms. Debra Olsen called with general questions regarding the special use and she suggested adding a term limit, so the ordinance expires if the property is ever sold. There was no response from the public in attendance. Commissioner Heinen understands the stipulation request by Ms. Olsen but once it is converted into a duplex it would not make sense to utilize it as a single-family dwelling. Commissioner Heinen asked if there are any existing duplexes in the area. Mr. Proulx explained that there are multi-unit buildings in the area. Commissioner Heinen stated he can support this request because of the site specifics and surrounding area conditions. Commissioner Minnis asked for clarification on the square footage in the staff report. Mr. Ding confirmed that the garage was included in the square footage. Commissioner Minnis asked if the applicant was converting the garage into a dwelling unit. Mr. Eiker stated he has no intention on using the garage as a dwelling unit. Commissioner Minnis asked if the applicant plans to create secured separate entrances. Mr. Eiker explained how he will create entrances for both units. Commissioner Minnis asked how many bedrooms per unit. Mr. Eiker stated upstairs unit will be 3-bedroom, 2- bathroom, with a kitchen and the downstairs unit will be 1- or 2-bedroom, 1 bathroom with a kitchen. Mr. Eiker indicated per his estimate the upstairs unit will be 1,700 square feet and downstairs unit will be 1,400 to 1,500 square foot. Commissioner Minnis suggested this information be added to the report. Commissioner Minnis asked who owns the garage along the drive near the adjacent property. Mr. Eiker explained the shared egress and ingress with the adjacent property owner and further stated there is a recorded document permitting the shared access. Commissioner Minnis indicated that based on the improvements the applicant is making to the property he does not feel that the special use should end with the sale of the property. Commissioner Renzi is hesitant to allow for a special use to be permitted forever because it is not a permitted use in R-1 zoning and is concerned about setting a precedent. Commissioner Renzi stated he does not recall a special use ever being a permanent use. Commissioner Renzi asked how the school and park fees will be determined and if this is something we have always collected. Mr. Proulx explained that the school and park fees should be collected for the new unit and explained the Village’s policy. Mr. Proulx stated that the Village will work with the school and park district to determine the fees once Buildings permits have been applied for. Mr. Proulx indicated a stipulation can be added to have the special use end with the current owner but explained why this would be costly to a new property owner and that the Village does not have a transfer tax so we do not track ownership. Chairman Kiefer asked why the property is not being zoned to R-2 since it will allow for requested use. Commissioner Renzi explained why he does not want to bind the future Plan Commission or Village Board to the use since we do not know what the future holds for this neighborhood. Commissioner Renzi understands that it would be costly to convert the home back to a single-family from a duplex. Commissioner Renzi asked the 4 Plan Commission Minutes December 7, 2021 Page 3 of 4 applicant to explain how he will create two separate entrances from the garage. Mr. Eiker explained the entrances already exist and he will need to build a wall to separate the access. Commissioner Renzi asked if each tenant will have their own outdoor space. Mr. Eiker explained how he can ensure that each unit has their own outdoor space. Commissioner Renzi asked if the tenant would need to pay additional for garage parking and if the other tenant will have access to the garage. Mr. Eiker stated garage parking will be for only one of the units and whichever tenant is not paying for the garage will not have access to the garage. Commissioner Renzi asked where the tenant who does not have garage access will park. Mr. Eiker explained how he will create designating parking on the driveway. Commissioner Renzi asked if a stipulation can be added for insurance to be maintained. Mr. Proulx stated a stipulation could be added but stipulation should be added to help with the findings of facts. Commissioner Seggebruch agrees that this is a unique property because most people don’t even know the house is back there. Commissioner Seggebruch asked the applicant how long he has owned the property and how long he has lived at his current residence. Mr. Eiker stated he has owned this property for four weeks and he owned his current residence since December of 2018. Commissioner Seggebruch asked if this house was privately owned before he purchased it. Mr. Eiker confirmed. Commissioner Seggebruch asked if he has considered renting it as a single-family dwelling. Mr. Eiker explained that his research shows it makes more sense as an investment for a multi-unit rental. Commissioner Seggebruch asked what is under the sunroom. Mr. Eiker stated there is nothing. Commissioner Seggebruch stated that the upstairs unit will still need an outdoor space besides the sunroom. Commissioner Seggebruch asked if the garage is a 2-car. Mr. Eiker stated it is a two and half car garage. Commissioner Seggebruch does have issues making this a special use for perpetuity and is surprised that the neighbors have not provided comments. Commissioner Seggebruch indicted that the building will need to be brought up to code for fire rating. Mr. Eiker stated he is aware of that because he has already met with the Building Department. Commissioner Seggebruch states he supports the request. Commissioner Valerga had no questions or comments. Commissioner Womack stated the density is not an issue because of the large lot and parking is not an issue because there is a very long driveway. Commissioner Womack asked if the next owner wants to convert back to single-family residence, they would be able to do so. Mr. Proulx confirmed. Commissioner Womack asked if the planned development would affect the property tax. Mr. Proulx believes the assessment is based on the improvements. Commissioner Womack explained why he supports the request. Chairman Kiefer supports the use the applicant is trying to get from the property but he is concerned about doing a PUD and not rezoning. Chairman Kiefer wants the Village Board to understand that this is unique because normally the special use expires with the change of ownership. Commissioner Seggebruch made a motion to close the Public Hearing regarding a proposed special use for a Planned Development for the property located at 15009 S. Route 59. Seconded by Commissioner Heinen. Voice Vote. All in favor. 0 opposed. Motion carried 7-0. Commissioner Womack asked if a stipulation needs to be added for the special use not to expire with ownership change. Mr. Proulx stated he recommended to the Planner to remove the stipulation not allowing the special use to remain regardless of ownership if the applicant in agreeable it can be added to the motion. Mr. Proulx explained why he requested the Planner to remove the stipulation. The commissioners discussed adding a stipulation for the special use to not expire when there is a change of ownership. 5 Plan Commission Minutes December 7, 2021 Page 4 of 4 Commissioner Renzi made a motion to adopt the findings of fact of staff as the findings of fact of the Plan Commission and, furthermore, recommend approval of the special use running with the land for perpetuity for Planned Development for the property at 14917 S. Eastern Avenue to allow for two (2) rental dwelling units in the existing bi-level single-family residential house, subject to the following stipulations: 1. Compliance with the requirements of the Village Building Department; and 2. Compliance with the requirements of the Plainfield Fire Protection District; and 3. Payment of the school and park impact fees for the newly created dwelling unit upon receiving residential permits. Second by Commissioner Womack. Vote by roll call: Heinen, yes; Minnis, yes; Seggebruch, yes; Valerga, yes; Womack, yes; Renzi, no; and Kiefer, yes. Motion carried 6-1. DISCUSSION Commissioner Renzi suggested a minimal transfer tax for real estate transactions, which would help the Village, know when properties are being sold. Commissioner Renzi added it would be about monitoring property sales and not profiting. Chairman Kiefer read the reminders. ADJOURN Plan Commission meeting adjourned at 8:10 p.m. Respectfully submitted by Tracey Erickson Tracey Erickson Recording Secretary 6 7 8 9 10 11 12 13 14 15 16 Bronk Farm County of Will, Maxar, Sources: Esri, HERE, Garmin, Intermap, increment P Corp., GEBCO, USGS, FAO, NPS, NRCAN, GeoBase, IGN, Kadaster NL, World Imagery Low Resolution 15m Imagery High Resolution 60cm Imagery High Resolution 30cm Imagery Citations 2.4m Resolution Metadata Parcels Subdivisions Plainfield Municipal Boundary 12/17/2021, 3:50:15 PM 0 0.1 0.20.05 mi 0 0.15 0.30.07 km 1:9,028 Plainfield Staff County of Will, Esri, HERE, Garmin, INCREMENT P, Intermap, USGS, METI/NASA, EPA, USDA | Plainfield GIS | Will County GIS | NPMS National Repository | County of Will, Maxar |17 18 19 20 21 22 23 24 25 26 IGNATURE DESIGN GROUP S COPYRIGHT 2021: ALL RIGHTS RESERVED SIGNATURE DESIGN GROUP INC. Landscape Development Plans LANDSCAPE ARCHITECT : 132 N. Washington Street Signature Design Group, Inc. (630) 305.3980 voice Naperville, Illinois 60540 Preliminary BRONK FARM L.100 Overall Landscape Plan L.101 Landscape Plan - Northeast L.102 Landscape Plan - Northwest L.103 Landscape Plan - Southwest L.104 Landscape Plan - Southeast L.105 Central Park & Clubhouse Plan L.106 Parkway Tree Exhibit & Turf Establishment Exhibit L.107 Prototypical House & Key Lot Plans L.108 Prototypical Townhome Plans L.109 Plant Material Legend, Notes & Planting Details TS.100 Existing Tree Survey LOCATION MAP SITESITE Project Manager: Greg G. Sagen, RLA 11.3.2021 - Per Village Review Comments dated 10.21.20211 DEVELOPER : 1900 E. Golf Road - Suite 300 Schaumburg, Illinois 60173 ENGINEER : 2280 White Oak Circle CEMCON, Ltd. Aurora, IL 60502 Project Manager : Matt Brolley, P.E. Project Manager : Chris Morgart, P.E. (630) 862.2100 voice INDEX OF DRAWINGS PLAINFIELD, ILLINOIS 2 12.10.2021 - Per Village Review Comments dated 11.24.2021 27 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 1718 19 20 21 22 2324 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 464748495051525354 55 56 57 58 59 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80 81 82 83 84 85 86 87 88 89 90 91 92 9394 95 96 97 98 99 100 101 102 103 104 105 106 107 108 109 110 111112113114115116117118 119 120 121 122 123 124 125 126 127 128 129 130 131 132 133 134 135 136 137 138 139 140 141 142 143 144 145 146 147 148 149 150 151 152 153 154 155 156 157 158 159 160 161 162 163 164 165 166167168169170 171 172 173 174 175 176 177178179 180 181 182 183 184 185 186 187 188 189 190 191 192 193 194 195 196 197 198 199200201202203204205 206 207 208 209 210 211 212 213 214 215 216 217 218 219 220 221 222 223 224 225 226 227 228 229 230 231 232 233 234 235 236 237 238 239 240 241 242 243 244 245 246 247 248 249 250 251 252 253 254 255 256 257 258 259 260 261 262 263 264 265 266 267268 269 270 271 272 273 274 275 276 277 278 279 280 281 282 283 284 285 286 287 288289290291292 293 294 295 296 297 298 299 300 301 302 303 304 305 306 307 308309 310 311 312 313 314 315 316 317 318 319 320 321 322 323 324 325 326 327 328 329 330 331 332 333 334 335 336 337 338 339 340 341 342343345 346 347 348349 350 351 353 354 355 356 357 ROAD C ROAD H TIPPERARY LANE VI C A R A G E VI C A R A G E D R I V E VICA R A G E D R I V E ROAD I VI C A R A G E ROAD I RO A D I ROA D J ROA D K ROA D L ROAD D ROA D M R O A D D HAMILTON LANEROAD E ROA D N RO A D C RO A D F ROA D D ROAD E ROAD O RO A D G RO A D C R O A D D DR I V E DR I V E 344 60 352 Va n D y k e R o a d Open Water Pond w/ Rip-Rap Shoreline Naturalized SWM Basin 127th Street Naturalized SWM Basin Naturalized SWM Basin Va n D y k e R o a d Open Water Pond w/ Rip-Rap Shoreline PARK SITE Open Water Pond Open Water Pond 46 46 46 drawn by: 132 N. WASHINGTON ST. - NAPERVILLE, IL 60540 - 630.305.3980 Fax 630.305.3994 Environmental Site Design Landscape Architecture Land Planning checked by: project no.: sheet no.: original issue date: revisions: north:scale: project: sheet description: COPYRIGHT 2021 ALL RIGHTS RESERVED SIGNATURE DESIGN GROUP INC. IGNATURE DESIGN GROUP S owner: Bronk Farm Subdivision 127th & Van Dyke Road Preliminary Overall Landscape Plan 1" = 120'0" 0 60 120 180 300 420 8 October 2021 21021 L.100 Plainfield, Illinois Special Lot Designation Legend : - Key Lot Designation - 54 Total - Through Lot Designation - 23 Total - Has Both Designations - Parkway Trees, 3" - Shade Tree, 212" - 3" - River Birch, 8' - 12' m/s - Ornamental Tree, 6' - 8' - Evergreen Tree 6' - 8' - Columnar Evergreen Tree, 6' - Deciduous Shrub Bed, 18"-36" - Evergreen Shrub Bed, 18" - Ornamental Grass Bed, 1gal. Plant Material Legend : ·See Sheet L.105 for Central Park Enlargement Plan ·See Sheet L.106 for Parkway Trees and Turf Establishment Plan ·See Sheet L.107 for Typical House Landscape Packages ·See Sheet L.108 for Typical Townhome Foundation Planting Plans ·See Sheet L.109 for Plant Material Information ·See Sheet L.110 for Monument Sign Details General Notes : HOA Clubhouse & Pool PARK SITE SIGN SIGNS 1 11.3.2021 Per Village Review Commentsdated 10.21.2021 2 12.10.2021 Per Village Review Commentsdated 11.24.2021 28 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 1718 19 20 21 22 23 24 464748 333 334 335 336 337 338 339 340 341 342343345 346 347 348349 350 351 353 354 355 356 357 ROAD C ROAD H V I C A R A G E VI C A R A G E D R I V E HAMILTON LANE R O A D G R O A D C D R I V E 344 352 Va n D y k e R o a d Open Water Pond w/ Rip-Rap Shoreline Monument Sign Proposed Trail Naturalized SWM Basin Proposed Trail Monument Sign See Sheet L.108 for Typical Townhome Landscaping Landscape Berm Fountain Fountain 1 1 1 End Rip-Rap End Rip-Rap 1 1 Na t i v e Mo w e d 1 1 1 1 PARK SITE Open Water Pond 2 2 2 2 drawn by: 132 N. WASHINGTON ST. - NAPERVILLE, IL 60540 - 630.305.3980 Fax 630.305.3994 Environmental Site Design Landscape Architecture Land Planning checked by: project no.: sheet no.: original issue date: revisions: north:scale: project: sheet description: COPYRIGHT 2021 ALL RIGHTS RESERVED SIGNATURE DESIGN GROUP INC. IGNATURE DESIGN GROUP S owner: Bronk Farm Subdivision 127th & Van Dyke Road Preliminary Landscape Plan Northeast 1" = 60'0" 0 30 60 90 150 210 8 October 2021 21021 L.101 Plainfield, Illinois 1 11.3.2021 Per Village Review Commentsdated 10.21.2021 Townhome Landscape Code Reqts : Bufferyard Requirement - 30 P.U. / 1000 SF Buildings 354-357 Rear. 700 LF x 40' wide = 840 P.U. Required Rear / Side Bldg Foundation = 672 P.U. Common Area Berm = 169 P.U. TOTAL = 841 P.U. Provided Corner Sideyard - 30 P.U. / 1000 SF Buildings 346-352 Side / Rear. 1240 LF x 25' wide = 930 P.U. Required Rear / Side Bldg Foundation = 1224 P.U. Common Area = 152 P.U. TOTAL = 1376 P.U. Provided Interior Sideyard/Rearyard - 20 P.U. / 1000 SF Buildings 333-345 Side / Rear. 2160 LF x 25' wide = 2160 P.U. Required Rear / Side Bldg Foundation = 2164 P.U. Common Area = 334 P.U. TOTAL = 2498 P.U. Provided 1 2 12.10.2021 Per Village Review Commentsdated 11.24.2021 29 18 19 20 21 22 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 48495051525354 55 56 57 58 59 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80 81 82 83 84 85 86 87 88 89 90 91 92 9394 95 96 97 98 99 100 101 102 103 104 105 106 107 108 109 110 111112113114115116117118 119 120 121 122 123 124 125 126 127 128 129 130 131 132 133 134 135 136 137 138 139 ROAD E ROA D N RO A D C RO A D F ROA D D ROAD E ROAD O 60 127th Street Landscape Berm Landscape Berm Landscape Berm Proposed Trail PARK ( See Sheet L.105 ) Open Water 20' LandscapeBuffer2 20' LandscapeBuffer2 drawn by: 132 N. WASHINGTON ST. - NAPERVILLE, IL 60540 - 630.305.3980 Fax 630.305.3994 Environmental Site Design Landscape Architecture Land Planning checked by: project no.: sheet no.: original issue date: revisions: north:scale: project: sheet description: COPYRIGHT 2021 ALL RIGHTS RESERVED SIGNATURE DESIGN GROUP INC. IGNATURE DESIGN GROUP S owner: Bronk Farm Subdivision 127th & Van Dyke Road Preliminary Landscape Plan Northwest 1" = 60'0" 0 30 60 90 150 210 8 October 2021 21021 L.102 Plainfield, Illinois 1 11.3.2021 Per Village Review Commentsdated 10.21.2021 2 12.10.2021 Per Village Review Commentsdated 11.24.2021 30 134 135 136 137 138 139 140 141 142 143 144 145 146 147 148 149 150 151 152 153 154 155 156 157 158 159 160 161 162 163 164 165 166167168169170 171 172 173 174 175 176 177178179 180 181 182 183 184 185 186 187 188 189 190 191 192 193 194 195 196 197 198 199200201202203204205 206 207 208 209 210 211 212 213 214 215 216 217 218 219 220 221 222 223 224 225 226 227 228 229 230 231 232 233 234 TIPPERARY LANE ROAD I VI C A R A G E ROAD I R O A D I ROA D M R O A D D DR I V E End Fence at Corner Proposed Split-Rail Fence Landscape Berm Berm Top of Slope Landscape Berm Naturalized SWM Basin To Park Site Connection to Regional Trail Open Water Pond drawn by: 132 N. WASHINGTON ST. - NAPERVILLE, IL 60540 - 630.305.3980 Fax 630.305.3994 Environmental Site Design Landscape Architecture Land Planning checked by: project no.: sheet no.: original issue date: revisions: north:scale: project: sheet description: COPYRIGHT 2021 ALL RIGHTS RESERVED SIGNATURE DESIGN GROUP INC. IGNATURE DESIGN GROUP S owner: Bronk Farm Subdivision 127th & Van Dyke Road Preliminary Landscape Plan Southwest 1" = 60'0" 0 30 60 90 150 210 8 October 2021 21021 L.103 Plainfield, Illinois 1 11.3.2021 Per Village Review Commentsdated 10.21.2021 2 12.10.2021 Per Village Review Commentsdated 11.24.2021 31 234 235 236 237 238 239 240 241 242 243 244 245 246 247 248 249 250 251 252 253 254 255 256 257 258 259 260 261 262 263 264 265 266 267268 269 270 271 272 273 274 275 276 277 278 279 280 281 282 283 284 285 286 287 288289290291292 293 294 295 296 297 298 299 300 301 302 303 304 305 306 307 308309 310 311 312 313 314 315 316 317 318 319 320 321 322 323 324 325 326 327 328 329 330 331 332 VICA R A G E D R I V E ROA D J ROA D K ROA D L ROAD D R O A D D Interpretive Overlook / Sitting Area End Fence at Lot Corner 20' Opening at Fence at New Trail Connection Proposed Trail Split-Rail Fence Naturalized SWM Basin Proposed Trail Va n D y k e R o a d 4 - Parkway Trees- to be preserved -( See Sheet TS.101 ) Na t i v e Mo w e d End Rip-Rap1 End Rip-Rap 1 Open Water Pond w/ Rip-Rap Shoreline Fountain1 1 Add 12 River Birchalong Property Line 1 1 1 1 1 1 1 1 1 1 1 1 1 1 drawn by: 132 N. WASHINGTON ST. - NAPERVILLE, IL 60540 - 630.305.3980 Fax 630.305.3994 Environmental Site Design Landscape Architecture Land Planning checked by: project no.: sheet no.: original issue date: revisions: north:scale: project: sheet description: COPYRIGHT 2021 ALL RIGHTS RESERVED SIGNATURE DESIGN GROUP INC. IGNATURE DESIGN GROUP S owner: Bronk Farm Subdivision 127th & Van Dyke Road Preliminary Landscape Plan Southeast 1" = 60'0" 0 30 60 90 150 210 8 October 2021 21021 L.104 Plainfield, Illinois 1 11.3.2021 Per Village Review Commentsdated 10.21.2021 2 12.10.2021 Per Village Review Commentsdated 11.24.2021 32 9 10 11 25 26 27 28 29 30 31 32 33 34 35 36 37 68 143 144 145 146 147 148 149 150 154 156 157 158 159 160 161 162 163 164 312 313 314 315 316325 326 327 328 329 330 331 332 333 354 VICA R A G E D R I V E ROA D M R O A D D ROAD E ROA D D Sun Deck MembersPatio ShadePergolas Pool 45' x 75' Clubhouse 2,500 SF FirePit Play Lawn Clubhouse & PoolParking PerimeterPool Fence PassivePlay Lawn BasketballCourt SittingArea Asphalt Trail, 8' Fountain Open Water SWM Pond Open Water SWM Pond Island Asphalt Trail, 8' Play Hill Sled Hill + 14' Asphalt Trail, 8' ActivePlay Lawn BaseballBackstop BBQ Shallow Pool PoolStorage &Trash Shade Structure 16' x 20' Picnic Under WaterLand Bridge Picnic Pavilion Playground w/ Forever Lawn Surface Asphalt Trail, 8' PARK SITE ± 5.0 Ac. HOA ClubhouseProperty Limit Park PropertyLimit HOA SITE ± 1.4 Ac. Park PropertyLimit Park PropertyLimit PassivePlay Lawn Park Sign Park Sign Sitting Area Bike Parking 1 1 Berm, 36"Hedge, 36" 1 1 drawn by: 132 N. WASHINGTON ST. - NAPERVILLE, IL 60540 - 630.305.3980 Fax 630.305.3994 Environmental Site Design Landscape Architecture Land Planning checked by: project no.: sheet no.: original issue date: revisions: north:scale: project: sheet description: COPYRIGHT 2021 ALL RIGHTS RESERVED SIGNATURE DESIGN GROUP INC. IGNATURE DESIGN GROUP S owner: Bronk Farm Subdivision 127th & Van Dyke Road Central Park & Clubhouse Plan 1" = 50'0" 0 25 50 75 125 175 8 October 2021 21021 L.105 Plainfield, Illinois 1 10.7.2021 Per PPD Comments 2 12.10.2021 Per Village Review Commentsdated 11.24.2021 33 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 1718 19 20 21 22 2324 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 464748495051525354 55 56 57 58 59 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80 81 82 83 84 85 86 87 88 89 90 91 92 9394 95 96 97 98 99 100 101 102 103 104 105 106 107 108 109 110 111112113114115116117118 119 120 121 122 123 124 125 126 127 128 129 130 131 132 133 134 135 136 137 138 139 140 141 142 143 144 145 146 147 148 149 150 151 152 153 154 155 156 157 158 159 160 161 162 163 164 165 166167168169170 171 172 173 174 175 176 177178179 180 181 182 183 184 185 186 187 188 189 190 191 192 193 194 195 196 197 198 199200201202203204205 206 207 208 209 210 211 212 213 214 215 216 217 218 219 220 221 222 223 224 225 226 227 228 229 230 231 232 233 234 235 236 237 238 239 240 241 242 243 244 245 246 247 248 249 250 251 252 253 254 255 256 257 258 259 260 261 262 263 264 265 266 267268 269 270 271 272 273 274 275 276 277 278 279 280 281 282 283 284 285 286 287 288289290291292 293 294 295 296 297 298 299 300 301 302 303 304 305 306 307 308309 310 311 312 313 314 315 316 317 318 319 320 321 322 323 324 325 326 327 328 329 330 331 332 333 334 335 336 337 338 339 340 341 342343345 346 347 348349 350 351 353 354 355 356 357 ROAD C ROAD H TIPPERARY LANE VI C A R A G E VI C A R A G E D R I V E VICA R A G E D R I V E ROAD I VI C A R A G E ROAD I RO A D I ROA D J ROA D K ROA D L ROAD D ROA D M R O A D D HAMILTON LANEROAD E ROA D N RO A D C RO A D F ROA D D ROAD E ROAD O RO A D G RO A D C R O A D D DR I V E DR I V E 344 60 352 drawn by: 132 N. WASHINGTON ST. - NAPERVILLE, IL 60540 - 630.305.3980 Fax 630.305.3994 Environmental Site Design Landscape Architecture Land Planning checked by: project no.: sheet no.: original issue date: revisions: north:scale: project: sheet description: COPYRIGHT 2021 ALL RIGHTS RESERVED SIGNATURE DESIGN GROUP INC. IGNATURE DESIGN GROUP S owner: Bronk Farm Subdivision 127th & Van Dyke Road Preliminary Parkway Trees & Turf Exhibit 1" = 120'0" 0 60 120 180 300 420 8 October 2021 21021 L.106 Plainfield, Illinois Symbol Legend : - Common Area Parkway Trees ( planted w/ initial site improvements ) - Individual Lot Parkway Trees ( to be planted at the time of individual house construction ) Sample Parkway Tree List : ·See Sheet L.105 for Central Park Enlargement Plan ·See Sheet L.107 for Typical House Landscape Packages ·See Sheet L.108 for Typical Townhome Foundation Planting Plans ·See Sheet L.109 for Plant Material Information ·See Sheet L.110 for Monument Sign Details General Notes : Planting Season : March 15 - June 15 September 15 - December 15 127th STREET Perimeter Buffer Mowed Turf Seed & Blanket Perimeter Buffer Mowed Turf Seed & Blanket Turf TransitionLimit Line Naturalized SWM Basin VA N D Y K E R O A D SOD Entrance Median & ROW Townhomes FULL SOD Perimeter Turf & ROWoutside of Trial Mowed - Seed & Blanket Open Water Pond w/ Mowed Turf Slopes PARKMowed Turf Seed & Blanket CLUBHOUSE Full SOD SOD Entrance Median & ROW Open Water Pond w/ Mowed Turf Slopes Open Water Pond w/ Mowed Turf Slopes Landscape BufferMowed Turf Seed & Blanket All Cul de Sac Islands Mowed Turf Seed & Blanket Naturalized SWM Basin Naturalized SWM Basin Perimeter Turf & ROWoutside of Trial Mowed - Seed & Blanket Mowed TurfSeed & BlanketMowed Turf Seed & Blanket VA N D Y K E R O A D 1 11.3.2021 Per Village Review Commentsdated 10.21.2021 Open Water Pond w/ Mowed Turf Slopes Landscape BufferMowed Turf Seed & Blanket 2 12.10.2021 Per Village Review Commentsdated 11.24.2021 34 1 Note : Key Lot Shrubs shall be min. 24" at planting.* * * 1 1 1 1 drawn by: 132 N. WASHINGTON ST. - NAPERVILLE, IL 60540 - 630.305.3980 Fax 630.305.3994 Environmental Site Design Landscape Architecture Land Planning checked by: project no.: sheet no.: original issue date: revisions: north:scale: project: sheet description: COPYRIGHT 2021 ALL RIGHTS RESERVED SIGNATURE DESIGN GROUP INC. IGNATURE DESIGN GROUP S owner: Bronk Farm Subdivision 127th & Van Dyke Road Prototypical House Planting Plan & Key Lot Upgrade 1" = 15" 0 7.5 15 22.5 37.5 52.5 8 October 2021 21021 L.107 Plainfield, Illinois 1 11.3.2021 Per Village Review Commentsdated 10.21.2021 2 12.10.2021 Per Village Review Commentsdated 11.24.2021 35 ST R E E T ST R E E T Proposed Parkway Tree Decorative Stone over Fabric- typical - Driveway Driveway Driveway Driveway Note: Field adjust unit sideplantings to gap windows Patio Patio Patio Patio Note: Field adjust unit sideplantings to gap windows Patio Patio Patio Patio Patio Driveway Driveway Driveway Driveway Proposed Parkway Tree ST R E E T ST R E E T Decorative Stone over Fabric- typical - Note: Adjacent Common Area Plant Materialnot shown on these details Note: Field adjust unit sideplantings to gap windows Note: Field adjust unit sideplantings to gap windows Note: Townhome Turf to be Full SOD Mulch Bedline- typical - drawn by: 132 N. WASHINGTON ST. - NAPERVILLE, IL 60540 - 630.305.3980 Fax 630.305.3994 Environmental Site Design Landscape Architecture Land Planning checked by: project no.: sheet no.: original issue date: revisions: north:scale: project: sheet description: COPYRIGHT 2021 ALL RIGHTS RESERVED SIGNATURE DESIGN GROUP INC. IGNATURE DESIGN GROUP S owner: Bronk Farm Subdivision 127th & Van Dyke Road Typical Townhome Landscape Package 1" = 15" 0 7.5 15 22.5 37.5 52.5 8 October 2021 21021 L.108 Plainfield, Illinois Ornamental Trees, 6' - 8' m/s or 2.5" cal. 20% Prairie Fire Crab, 8' or 2.5" 20% Red Jewel Crab, 8' or 2.5" 20% Apple Serviceberry, 7' 20% Eastern Redbud, 6' 10% Common Witchhazel, 6' 10% Ivory Silk Tree Lilac, 6' Upright Evergreen, 4' - 6' tall 40% Mission Arborvitae, 6' 40% Fairview Upright Juniper, 5' 20% Hetz Arborvitae, 4' Evergreen Shrubs, 24" wide 50% Dense Yew, 24" 25% Green Velvet Boxwood, 18" 25% Kallay Compact Juniper, 18" Deciduous Shrubs, 24" - 36" tall 35% Redtwig Dogwood, 36" ( large ) 25% Mohican Viburnums, 36" ( large ) 20% Limelight Hydrangea, 30" ( large ) 20% Miss Kim Lilac, 36" ( large ) 50% Annabella Hydrangea, 24" ( med. ) 20% Black Chokeberry, 24" ( med. ) 20% Knockout Shrub Rose, 18" ( med. ) 10% Snowmound Spirea, 24" ( med. ) 20% G.M. Alpine Currant, 18" ( small ) 20% Goldmound Spirea, 18" ( small ) 20% Brox Forsythia, 18" ( small ) 20% Potentilla - Yellow, 18" ( small ) 20% Little Princess Spirea, 18" ( small ) Perennial 25% Blue Wonder Catmint 25% Happy Return Daylily 25% Autumn Joy Sedum 25% Summer Beauty Allium Groundcover 50% Kanchaticum Sedum 50% Bowles Vinca PLANT MATERIAL LEGEND : CONSTRUCTION NOTES : ·Sod all turf areas as noted with an approved blend of improved Kentucky Bluegrass Sod with a mineral soil back. ·Fine grading shall provide slopes which are smooth and continuous. Positive drainage shall be provided in all areas. ·Prior to turf installation all areas shall be fertilized with a 12-12-12 granular fertilizer at a rate of 400 lbs. per Acre. ·Prepare perennial, ornamental grass, groundcover and annual flower beds with 1 CY. mushroom compost per 100 SF. rototilled to an 8” depth. ·Mulch all trees, shrub, perennial & orn'l grass beds with a minimum of three inches shredded hardwood bark mulch. ·Mulch all groundcover and annual beds with minimum of one inch pinebark fines. ·All bed lines and tree saucers require a 4” deep spaded edge between lawn and mulch areas. ·All evergreen (conifers) trees and shrubs must be grown in a natural shape - and not sheared. ·Plant material sizing, branching and ball sizes shall conform to the “American Standards for Nursery Stock” (latest edition) by the American Association of Nurseryman, Inc. ·Plant material shall be nursery grown and be either balled and burlapped or container grown. Sizes and spreads on plant list represent minimum requirements. ·Quantity lists are supplied as a convenience. Contractor shall verify all quantities, and in case of a discrepancy, the plan shall prevail. ·The Landscape Contractor shall adjust plant locations in field to maintain appropriate spacing from fire hydrants, light poles, all utility structures, driveways and sidewalks. Approval of the Landscape Architect is required when field adjustments to be implemented do not conform to the intent of the plans. ·Contractor shall report any discrepancies in the field to the Landscape Architect and/or Owner. ·The Landscape Contractor shall verify locations of all underground utilities prior to digging, is required to Contact J.U.L.I.E. (1.800.892.0123), and any other public or private agency necessary for utility location 48 hours prior to construction. ·Where underground utilities exist, all field adjustments must be approved by the landscape architect. ·The Landscape Contractor shall water plant material, seed and sod areas until the plants have become adequately established and until final acceptance by the owner. Owner to provide all supplemental watering and proper care and maintenance of all plant materials, seed and sod areas after acceptance of Landscape Contractors work. ·No plants are to be changed or substituted without the approval of the Landscape Architect and the Village of Plainfield. ·Landscape Contractor shall warrantee all material and labor for a period of one year from the date of final acceptance and shall repair any defects and replace all dead plant material as required during the warranty period. Contractor Quality Control : Upon Completion of landscape installation, and prior to final acceptance, the Contractor Shall : ·Lightly hand-prune all trees and evergreens to remove broken, crossing or mis-shaped branches. ·On clump-form ornamental trees, remove all minor branches, suckers and stems from the bottom 24" of the main trunks. ·Lightly hand-prune all shrubs to remove wild branches and insure uniformity in groups of similar shrubs. ·Dead head all perennials plants to remove all old flowers and dead or discolored foliage. ·Remove all nursery tags and ribbons from all plantings ·Hand water all plant material. ·Rake out mulch beds to insure a smooth, uniform layer with a sharp, defined spade edge. ( Sheet L.108 Only ) Typical 4 - Unit Building scale: 1" = 15'0" Typical 5 - Unit Building scale: 1" = 15'0" 1 11.3.2021 Per Village Review Commentsdated 10.21.2021 11 Townhome Front Yard Requirement - 4 Unit Bldg Required Provided Trees 4 6 Shrubs 60 45 Perennials 0 80 sf Townhome Front Yard Requirement - 5 Unit Bldg Required Provided Trees 5 8 Shrubs 75 55 Perennials 0 100 sf 11 1 1 2 12.10.2021 Per Village Review Commentsdated 11.24.2021 36 drawn by: 132 N. WASHINGTON ST. - NAPERVILLE, IL 60540 - 630.305.3980 Fax 630.305.3994 Environmental Site Design Landscape Architecture Land Planning checked by: project no.: sheet no.: original issue date: revisions: north:scale: project: sheet description: COPYRIGHT 2021 ALL RIGHTS RESERVED SIGNATURE DESIGN GROUP INC. IGNATURE DESIGN GROUP S owner: Bronk Farm Subdivision 127th & Van Dyke Road Plant Legend, Notes & Planting Details 1" = 50'0" 0 25 50 75 125 175 8 October 2021 21021 L.109 Plainfield, Illinois NTS Typical Tree Planting Detail NTS Typical Evergreen Planting Detail DO NOT CUT LEADER ON EVERGREENS OR PYRAMIDAL TREES. PRUNE 1/3 OF CROWN, MAINTAINING NATURAL SHAPE. WRAP TRUNK WITH APPROVED TREE WRAP TO FIRST BRANCH. SET ROOTBALL APPROXIMATELY 3" HIGHER THAN FINISH GRADE. 3" DEEP SHREDDED HARDWOOD PREPARE A 3" MIN. SAUCER AROUND PIT. DISCARD EXCESS EXCAVATED MATERIAL. SUBGRADE. BACKFILL PIT WITH PLANTING PIT TOPSOIL. CUT AWAY SYNTHETIC CORDS AROUND ROOTBALL AND TRUNK. SET ROOTBALL ON UNDISTURBED SUBGRADE. BARK MULCH. 12" DO NOT CUT LEADER ON EVERGREENS OR PYRAMIDAL TREES. SET ROOTBALL APPROXIMATELY 3" HIGHER THAN FINISH GRADE. 3" DEEP SHREDDED HARDWOOD PREPARE A 3" MIN. SAUCER AROUND PIT. DISCARD EXCESS EXCAVATED MATERIAL. SUBGRADE. BACKFILL PIT WITH PLANTING PIT TOPSOIL. CUT AWAY SYNTHETIC CORDS AROUND ROOTBALL AND TRUNK. SET ROOTBALL ON UNDISTURBED SUBGRADE. BARK MULCH. 24" NTS Typical Shrub Planting Detail NTS Typical Perennial Planting Detail FINISH GRADE. 3" LAYER SHREDDED SET SHRUB PLUMB AND STRAIGHT. HARDWOOD BARK MULCH. PLANTING SOIL MIX. COMPACTED SUBGRADE. THE TOP OF THE BALL IS 1" ABOVE THE ADJACENT SET CROWN OF SHRUB SO FINISHED GRADE.SET PLANTS AT SAME LEVEL IN DIAGONAL PATTERN. 1" PINE BARK FINES MULCH FINISH GRADE UNDISTURBED SUBGRADE ADMEND EXISTING SOIL WITH MUSHROOM COMPOST AT A RATE ROTOTILL TO 8" DEPTH 2" 8" RAISE PLANT BED 2" ABOVE FINISH GRADE PREPARE ENTIRE PLANTING BED AS GROWN IN CONTAINER WORK MULCH UNDER LEAVES VARIES OF 1 C.Y. PER 100 S.F. A B C D CONSTRUCTION NOTES : ·Sod all turf areas as noted with an approved blend of improved Kentucky Bluegrass Sod with a mineral soil back. ·Drill seed all remaining turf areas as noted and cover with an S-75 Straw Erosion Control Blanket and staple in place. ·Fine grading shall provide slopes which are smooth and continuous. Positive drainage shall be provided in all areas. ·Prior to turf installation all areas shall be fertilized with a 12-12-12 granular fertilizer at a rate of 400 lbs. per Acre. ·Prepare perennial, ornamental grass, groundcover and annual flower beds with 1 CY. mushroom compost per 100 SF. rototilled to an 8” depth. ·Mulch all trees, shrub, perennial & orn'l grass beds with a minimum of three inches shredded hardwood bark mulch. ·Mulch all groundcover and annual beds with minimum of one inch pinebark fines. ·All bed lines and tree saucers require a 4” deep spaded edge between lawn and mulch areas. ·All evergreen (conifers) trees and shrubs must be grown in a natural shape - and not sheared. ·Plant material sizing, branching and ball sizes shall conform to the “American Standards for Nursery Stock” (latest edition) by the American Association of Nurseryman, Inc. ·Plant material shall be nursery grown and be either balled and burlapped or container grown. Sizes and spreads on plant list represent minimum requirements. ·Quantity lists are supplied as a convenience. Contractor shall verify all quantities, and in case of a discrepancy, the plan shall prevail. ·The Landscape Contractor shall adjust plant locations in field to maintain appropriate spacing from fire hydrants, light poles, all utility structures, driveways and sidewalks. Approval of the Landscape Architect is required when field adjustments to be implemented do not conform to the intent of the plans. ·Contractor shall report any discrepancies in the field to the Landscape Architect and/or Owner. ·The Landscape Contractor shall verify locations of all underground utilities prior to digging, is required to Contact J.U.L.I.E. (1.800.892.0123), and any other public or private agency necessary for utility location 48 hours prior to construction. ·Where underground utilities exist, all field adjustments must be approved by the landscape architect. ·The Landscape Contractor shall water plant material, seed and sod areas until the plants have become adequately established and until final acceptance by the owner. Owner to provide all supplemental watering and proper care and maintenance of all plant materials, seed and sod areas after acceptance of Landscape Contractors work. ·No plants are to be changed or substituted without the approval of the Landscape Architect and the Village of Plainfield. ·Landscape Contractor shall warrantee all material and labor for a period of one year from the date of final acceptance and shall repair any defects and replace all dead plant material as required during the warranty period. ·Trees shall be set back a minimum of ten (10) feet horizontally from utility structures, including, but not limited to, manholes, valve vaults, valve boxes, fire hydrants, transformers and switch cans. Where possible, trees shall be set back a minimum of five (5) feet horizontally from sanitary sewer, water services and underground electric cable. Approval of the Landscape Architect is required when field adjustments to be implemented do not conform to the intent of the plans. ·Parkway Trees must be offset 5 feet from all storm sewer. ·No trees, shrubs or obstacles will be allowed 10' in front, 5' on the sides, and 7' to the rear of the electrical transformer. E Naturalized SWM Basin - Typical Section N.T.S. Parkway Trees, 3.0" Caliper See Sheet L.106 Shade Trees, 2.5" - 3" Caliper Autum Blaze Maple Swamp White Oak State Street Maple Chicagoland Hackberry Shawnee Brave Baldcypress Kentucky Coffeetree Redmond Linden Exclamation London Planetree Accolade Elm Bur Oak Skyline Locust Triumph Elm River Birch Trees, 8' - 12' m/s Ornamental Trees, 6' - 8' m/s Blackhaw Viburnum Prairie Fire Crab Apple Serviceberry Ivory Silk Tree Lilac Redbud Thornless Cockspur Hawthorne Sargent Crab Common Witchhazel Evergreen Trees, 6' - 8' tall Norway Spruce Fairview Juniper Colorado Spruce Wintergreen Arborvitae White Pine Mission Arborvitae Black Hills Spruce Canaerti Juniper Evergreen Shrubs, 18" - 24" wide Hughes Juniper Green Sargent Juniper Kallay Compact Juniper Deciduous Shrubs, 18" - 36" tall American Filbert Grolo Sumac Black Chokeberry Miss Kim Lilac Dogwood Var.Viburnums Var. Panicle Hydrangea Shrub Rose Var. Texas Scarlet Quince Spirea Var. Annabelle Hydrangea Elderberry Perennials, Orn'l Grasses & Groundcovers, 1gal. Feather Reed Grass Daylily sp. Prairie Dropseed Blue Wonder Catmint Switchgrass Black Eye Susan Lillyturf Russian Sage Aut. Moor Grass Allium sp. Sedum sp.Amsonia sp. Preliminary Plant Material Legend :( Sheet L.101 - L.105 ) Note: Subject to Revision at Final Design & Permitting 1 11.3.2021 Per Village Review Commentsdated 10.21.2021 2 12.10.2021 Per Village Review Commentsdated 11.24.2021 37 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 1718 19 20 21 22 2324 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 464748495051525354 55 56 57 58 59 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80 81 82 83 84 85 86 87 88 89 90 91 92 9394 95 96 97 98 99 100 101 102 103 104 105 106 107 108 109 110 111112113114115116117118 119 120 121 122 123 124 125 126 127 128 129 130 131 132 133 134 135 136 137 138 139 140 141 142 143 144 145 146 147 148 149 150 151 152 153 154 155 156 157 158 159 160 161 162 163 164 165 166167168169170 171 172 173 174 175 176 177178179 180 181 182 183 184 185 186 187 188 189 190 191 192 193 194 195 196 197 198 199200201202203204205 206 207 208 209 210 211 212 213 214 215 216 217 218 219 220 221 222 223 224 225 226 227 228 229 230 231 232 233 234 235 236 237 238 239 240 241 242 243 244 245 246 247 248 249 250 251 252 253 254 255 256 257 258 259 260 261 262 263 264 265 266 267268 269 270 271 272 273 274 275 276 277 278 279 280 281 282 283 284 285 286 287 288289290291292 293 294 295 296 297 298 299 300 301 302 303 304 305 306 307 308309 310 311 312 313 314 315 316 317 318 319 320 321 322 323 324 325 326 327 328 329 330 331 332 333 334 335 336 337 338 339 340 341 342343345 346 347 348349 350 351 353 354 355 356 357 ROAD C ROAD H TIPPERARY LANE VI C A R A G E VI C A R A G E D R I V E VICA R A G E D R I V E ROAD I VI C A R A G E ROAD I RO A D I ROA D J ROA D K ROA D L ROAD D ROA D M R O A D D HAMILTON LANEROAD E ROA D N RO A D C RO A D F ROA D D ROAD E ROAD O RO A D G RO A D C R O A D D DR I V E DR I V E 344 60 352 Va n D y k e R o a d Open Water Pond w/ Rip-Rap Shoreline Naturalized SWM Basin 127th Street Naturalized SWM Basin Naturalized SWM Basin Va n D y k e R o a d Open Water Pond w/ Rip-Rap Shoreline PARK SITE Open Water Pond Open Water Pond drawn by: 132 N. WASHINGTON ST. - NAPERVILLE, IL 60540 - 630.305.3980 Fax 630.305.3994 Environmental Site Design Landscape Architecture Land Planning checked by: project no.: sheet no.: original issue date: revisions: north:scale: project: sheet description: COPYRIGHT 2021 ALL RIGHTS RESERVED SIGNATURE DESIGN GROUP INC. IGNATURE DESIGN GROUP S owner: Bronk Farm Subdivision 127th & Van Dyke Road Existing Tree Survey 1" = 140'0" 0 70 140 210 350 490 8 October 2021 21021 TS.100 Plainfield, Illinois Existing tree inventory and rating completed by Signature Design Group on September 22, 2021. Location Survey and Tree Sizing Plan prepared by CEMCON, Ltd. Tree Survey Date : 1.Tree Removal Permit Required: A tree removal permit shall be required for the removal of any tree in the woodland. No person shall, directly or indirectly, remove, damage or destroy a woodland without having secured a TRP. 2.The Owner or his/her designee shall be responsible for construction and maintenance of temporary fencing or other tree protection measures, to be used during construction. 3.Snow fencing shall be temporarily installed at the critical root zone for protection of trees prior to any construction activities and maintained throughout the entire project. The Critical Root zones equals one foot ( 1') for each one inch ( 1”) of trunk diameter measured 4.5 feet above ground. See detail A. 4.Grading and construction equipment shall be forbidden from encroaching within the drip line of a tree. 5.No construction activity, movement, and/or placement of equipment or materials or spoils storage shall be permitted within the critical root zone of a protected tree or at any higher location where drainage toward the tree could conceivably affect the health of the tree. No excess soil, additional fill, liquids or construction debris shall be placed within the critical root zone of a protected tree. 6.No attachments, fences, or wires, other than those approved for bracing, guying or wrapping, shall be attached to trees during the construction period. 7.Grade change shall be allowed under the drip line of any trees designated for preservation only if tree trunks and branches are protected when construction must occur within tree drip line areas. 8.To improve the survival rate of trees, root pruning and/or thinning shall be performed in accordance with industry standards and practices and where indicated on the plan. Tree Preservation Notes : - Existing Tree & Tag No. - Existing Tree - To Be Preserved - Existing Tree - To Be Removed - Tree Preservation Fencing LEGEND : NTSA 1 Typical Tree Preservation Fencing TREE DRIPLINE SNOW FENCE PLACED OUTSIDE OF DRIPLINE TREE DRIPLINE SNOWFENCE EXISTING TREES AREA. REMOVE THE PROTECTIVE FENCE ONLY AFTER CONSTRUCTION ACTIVITY. DO NOT STORE ANY EQUIPMENT WITHIN THE PROTECTED ERECT PROTECTIVE SNOWFENCE PRIOR TO ANY CONSTRUCTION OPERATIONS ARE COMPLETED. TO BE PRESERVED Existing Tree Inventory : A B C D E F G HRQP O N M L K X I J W V U T S A 1 11.3.2021 Per Village Review Commentsdated 10.21.2021 2 12.10.2021 Per Village Review Commentsdated 11.24.2021 38 Confidential and Proprietary Bronk Farm -Elevations December 14, 2021 39 Confidential and Proprietary Product Matrix 2 40 Confidential and Proprietary Townes –Front, Side and Rear Elevations 3 41 Confidential and Proprietary Townes –Front Elevation 4 42 Confidential and Proprietary Townes –Front Elevation 5 43 Confidential and Proprietary Townes –Side and Rear Elevation-1 6 44 Confidential and Proprietary Townes –Side and Rear Elevation-2 7 45 Confidential and Proprietary Townes –Side and Rear Elevation-3 8 46 Confidential and Proprietary Townes –Side and Rear Elevation-4 9 47 Confidential and Proprietary Townes –Side and Rear Elevation-5 10 48 Confidential and Proprietary Townes –Side and Rear Elevation-6 11 49 Confidential and Proprietary Meadows –Front, Side and Rear Elevations 12 50 Confidential and Proprietary Meadows -Abbeyville 13 Elev 7 51 Confidential and Proprietary Meadows -Abbeyville 14 Elev 7 52 Confidential and Proprietary Meadows -Abbeyville 15 Elev 11 53 Confidential and Proprietary Meadows -Abbeyville 16 Elev 11 54 Confidential and Proprietary Meadows -Abbeyville 17 EC2G 55 Confidential and Proprietary Meadows -Abbeyville 18 EC2G 56 Confidential and Proprietary Meadows -Abbeyville 19 Elev 15 57 Confidential and Proprietary Meadows -Abbeyville 20 Elev 15 58 Confidential and Proprietary Meadows -Abbeyville 21 Elev 17 59 Confidential and Proprietary Meadows -Abbeyville 22 Elev 17 60 Confidential and Proprietary Meadows -Abbeyville 23 HR2J 61 Confidential and Proprietary Meadows -Abbeyville 24 HR2J 62 Confidential and Proprietary Meadows -Newberry 25 HR2G 63 Confidential and Proprietary Meadows -Newberry 26 HR2G 64 Confidential and Proprietary Meadows -Newberry 27 HR2H 65 Confidential and Proprietary Meadows -Newberry 28 HR2H 66 Confidential and Proprietary Meadows -Newberry 29 CR2G 67 Confidential and Proprietary Meadows -Newberry 30 CR2G 68 Confidential and Proprietary Meadows -Newberry 31 NC2G 69 Confidential and Proprietary Meadows -Newberry 32 NC2G 70 Confidential and Proprietary Meadows -Newberry 33 HR3S 71 Confidential and Proprietary Meadows -Newberry 34 HR3S 72 Confidential and Proprietary Meadows -Newberry 35 EC2G 73 Confidential and Proprietary Meadows -Newberry 36 EC2G 74 Confidential and Proprietary Meadows -Newberry 37 HR3T 75 Confidential and Proprietary Meadows -Newberry 38 HR3T 76 Confidential and Proprietary Meadows -Mercer 39 HR2G 77 Confidential and Proprietary Meadows -Mercer 40 HR2G 78 Confidential and Proprietary Meadows -Mercer 41 HR2H 79 Confidential and Proprietary Meadows -Mercer 42 HR2H 80 Confidential and Proprietary Meadows -Mercer 43 CR2G 81 Confidential and Proprietary Meadows -Mercer 44 CR2G 82 Confidential and Proprietary Meadows -Mercer 45 NC2G 83 Confidential and Proprietary Meadows -Mercer 46 NC2G 84 Confidential and Proprietary Meadows -Mercer 47 EC2G 85 Confidential and Proprietary Meadows -Mercer 48 EC2G 86 Confidential and Proprietary Meadows -Mercer 49 HR3S 87 Confidential and Proprietary Meadows -Mercer 50 HR3S 88 Confidential and Proprietary Meadows -Mercer 51 HR3T 89 Confidential and Proprietary Meadows -Mercer 52 HR3T 90 Confidential and Proprietary Meadows -Continental 53 HR2G 91 Confidential and Proprietary Meadows -Continental 54 HR2G 92 Confidential and Proprietary Meadows -Continental 55 HR2H 93 Confidential and Proprietary Meadows -Continental 56 HR2H 94 Confidential and Proprietary Meadows -Continental 57 CR2G 95 Confidential and Proprietary Meadows -Continental 58 CR2G 96 Confidential and Proprietary Meadows -Continental 59 EC2G 97 Confidential and Proprietary Meadows -Continental 60 EC2G 98 Confidential and Proprietary Meadows -Continental 61 NC2G 99 Confidential and Proprietary Meadows -Continental 62 NC2G 100 Confidential and Proprietary Meadows -Continental 63 HR3S 101 Confidential and Proprietary Meadows -Continental 64 HR3S 102 Confidential and Proprietary Meadows -Continental 65 HR3T 103 Confidential and Proprietary Meadows -Continental 66 HR3T 104 Confidential and Proprietary Estates –Front, Side and Rear Elevations 67 105 Confidential and Proprietary Estates -Hilltop 68 HR2G 106 Confidential and Proprietary Estates -Hilltop 69 HR2G 107 Confidential and Proprietary Estates -Hilltop 70 HR2H 108 Confidential and Proprietary Estates -Hilltop 71 HR2H 109 Confidential and Proprietary Estates -Hilltop 72 HR3M 110 Confidential and Proprietary Estates -Hilltop 73 HR3M 111 Confidential and Proprietary Estates -Hilltop 74 NC2G 112 Confidential and Proprietary Estates -Hilltop 75 NC2G 113 Confidential and Proprietary Estates -Hilltop 76 EC2H 114 Confidential and Proprietary Estates -Hilltop 77 EC2H 115 Confidential and Proprietary Estates -Hilltop 78 HR3S 116 Confidential and Proprietary Estates -Hilltop 79 HR3S 117 Confidential and Proprietary Estates -Riverton 80 HR1A 118 Confidential and Proprietary Estates -Riverton 81 HR1A 119 Confidential and Proprietary Estates -Riverton 82 HR3T HR2M 120 Confidential and Proprietary Estates -Riverton 83 HR2M 121 Confidential and Proprietary Estates -Riverton 84 HR3T HR2G 122 Confidential and Proprietary Estates -Riverton 85 HR3T HR2G 123 Confidential and Proprietary Estates -Riverton 86 HR3T EC2H 124 Confidential and Proprietary Estates -Riverton 87 HR3T EC2H 125 Confidential and Proprietary Estates -Riverton 88 HR3T HR3M 126 Confidential and Proprietary Estates -Riverton 89 HR3T HR3M 127 Confidential and Proprietary Estates -Riverton 90 HR3T NC2G 128 Confidential and Proprietary Estates -Riverton 91 HR3T NC2G 129 Confidential and Proprietary Estates -Westchester 92 HR2G 130 Confidential and Proprietary Estates -Westchester 93 HR2G 131 Confidential and Proprietary Estates -Westchester 94 HR2M 132 Confidential and Proprietary Estates -Westchester 95 HR2M 133 Confidential and Proprietary Estates -Westchester 96 HR3S 134 Confidential and Proprietary Estates -Westchester 97 HR3S 135 Confidential and Proprietary Estates -Westchester 98 EC2H 136 Confidential and Proprietary Estates -Westchester 99 EC2H 137 Confidential and Proprietary Estates -Westchester 100 NC2G 138 Confidential and Proprietary Estates -Westchester 101 NC2G 139 Confidential and Proprietary Estates -Westchester 102 HR3T 140 Confidential and Proprietary Estates -Westchester 103 HR3T 141 Confidential and Proprietary Estates -Woodside 104 HR2A 142 Confidential and Proprietary Estates -Woodside 105 HR2A 143 Confidential and Proprietary Estates -Woodside 106 EC2G 144 Confidential and Proprietary Estates -Woodside 107 EC2G 145 Confidential and Proprietary Estates -Woodside 108 CR2H 146 Confidential and Proprietary Estates -Woodside 109 CR2H 147 Confidential and Proprietary Estates -Woodside 110 HR2T 148 Confidential and Proprietary Estates -Woodside 111 HR2T 149 Confidential and Proprietary Estates -Woodside 112 NC2G 150 Confidential and Proprietary Estates -Woodside 113 NC2G 151 Confidential and Proprietary Estates -Willwood 114 HR2G 152 Confidential and Proprietary Estates -Willwood 115 HR2G 153 Confidential and Proprietary Estates -Willwood 116 HR2T 154 Confidential and Proprietary Estates -Willwood 117 HR2T 155 Confidential and Proprietary Estates -Willwood 118 HR2B 156 Confidential and Proprietary Estates -Willwood 119 HR2B 157 Confidential and Proprietary Estates -Willwood 120 CT2M 158 Confidential and Proprietary Estates -Willwood 121 CT2M 159 Confidential and Proprietary Estates -Willwood 122 NC2G 160 Confidential and Proprietary Estates -Willwood 123 NC2G 161 Confidential and Proprietary Reserve –Front, Side and Rear Elevations 124 162 Confidential and Proprietary Reserves –Maple Valley 125 HR2G 163 Confidential and Proprietary Reserves –Maple Valley 126 HR2G 164 Confidential and Proprietary Reserves –Maple Valley 127 HR2U 165 Confidential and Proprietary Reserves –Maple Valley 128 HR2U 166 Confidential and Proprietary Reserves –Maple Valley 129 CR2G 167 Confidential and Proprietary Reserves –Maple Valley 130 CR2G 168 Confidential and Proprietary Reserves –Maple Valley 131 NC2G 169 Confidential and Proprietary Reserves –Maple Valley 132 NC2G 170 Confidential and Proprietary Reserves –Melrose 133 HR2M 171 Confidential and Proprietary Reserves –Melrose 134 HR2M 172 Confidential and Proprietary Reserves –Melrose 135 NC2G 173 Confidential and Proprietary Reserves –Melrose 136 NC2G 174 Confidential and Proprietary Reserves –Melrose 137 CR2N 175 Confidential and Proprietary Reserves –Melrose 138 CR2N 176 Confidential and Proprietary Reserves –Melrose 139 HR2T 177 Confidential and Proprietary Reserves –Melrose 140 HR2T 178 Confidential and Proprietary Reserves -Castleton 141 HR2G 179 Confidential and Proprietary Reserves -Castleton 142 HR2G 180 Confidential and Proprietary Reserves -Castleton 143 CR2M 181 Confidential and Proprietary Reserves -Castleton 144 CR2M 182 Confidential and Proprietary Reserves -Castleton 145 NC2G 183 Confidential and Proprietary Reserves -Castleton 146 NC2G 184 Confidential and Proprietary Reserves -Castleton 147 HR2T 185 Confidential and Proprietary Reserves -Castleton 148 HR2T 186 Confidential and Proprietary Reserves –Deer Valley 149 HR2T 187 Confidential and Proprietary Reserves –Deer Valley 150 HR2T 188 Confidential and Proprietary Reserves –Deer Valley 151 CR3G 189 Confidential and Proprietary Reserves –Deer Valley 152 CR3G 190 Confidential and Proprietary Reserves –Deer Valley 153 NC2G 191 Confidential and Proprietary Reserves –Deer Valley 154 NC2G 192 Confidential and Proprietary Reserves –Deer Valley 155 HR2S 193 Confidential and Proprietary Reserves –Deer Valley 156 HR2S 194 Confidential and Proprietary Architectural Enhancements 157 Key Lots: 1.Window Treatment Upgrades matching the Front Elevation for key side windows (i.e., Shutters, Trim or Grids) 2.Optional Windows as depicted herein on key side shall be made standard. 3.Upgraded Landscape package will feature and frame the front elevations and soften the exposed corner sideyard elevations. 4.Key Lots will have a masonry wainscot on the key side, except that no masonry is required for optional rear structural upgrades (Sunroom, etc.) when setback from key side building plane. 5.Garage-hand restricted on key side (except for Reserves) Through Lots: 1.The Northern Through Lots will be buffered from 127th Street by a 50 ft. wide outlot that will be bermed 3 ft. The berm will be heavily landscaped with a combination of evergreen, ornamental and canopy trees supplemented with shrub masses and flowering perennial accents. 2.The Eastern Through Lots are setback a minimum of 44 ft from Van Dyke Street, separated by a naturalized detention basin and will be buffered with a double-layer of landscape screening. The first layer will be along Van Dyke Street as part of our perimeter buffering of the project. The second layer will be at the rear of each lot and will be landscaped with a combination of evergreen and ornamental trees, with layered canopy trees, shrubs and flowering perennials. 3.Window Treatment Upgrades matching the Front Elevation for rear windows (i.e., Shutters, Trim or Grids) 4.Through Lots will have 360-degree masonry wainscot. 5.Through Lots will have rear elevation articulation. All Homesites shall feature: 1.Architectural Shingles 2.12” Roof Overhang (rake) on all four sides 3.Corner boards on all four sides 4.Garage Door Upgrade to include top row of windows to be available as an option. 5.Rear and Side elevation windows to have Window Grids that match the chosen front elevation * In the event that the following renderings differ from the above list, the above list shall govern. * Key and Through Lots are designated on the approved Preliminary PUD Plat 195 Confidential and Proprietary Monotony Code Restrictions 158 I.Single Family Detached Communities a.The following criteria apply to homes on straight or curved streets, cul-de-sacs and corner lots. 1.No house shall have the same configuration that is within one (1) house on either side or on any of the three houses most directly across the street from the subject house. 2.No house shall have the same color package that is within one (1) house on either side or on any house directly across the street from the subject house. II.Definitions a.Configuration –a combination of product type, elevation, exterior fenestration (siding or stone), and/or color package. b.Color Package –a combination of siding, stone, trim / gutter, accent and roof colors incorporated into the exterior color fenestration of a single house. 196 Traffic Impact Study Bronk Parcel Residential Development Plainfield, Illinois Prepared For: December 1, 2021 SITE 197 Bronk Parcel Residential Development Plainfield, Illinois 1 1. Introduction This report summarizes the methodologies, results, and findings of a traffic impact study conducted by Kenig, Lindgren, O’Hara, Aboona, Inc. (KLOA, Inc.) for the proposed residential development to be located in the Bronk Parcel in the southwest quadrant of the intersection of 127th Street with Van Dyke Road. As proposed, the site will be developed with a residential subdivision containing approximately 450 residential units consisting of 332 single family lots and 118 townhomes. Access to the site will be provided via two full movement access roads with one off 127th Street and one off Van Dyke Road. Additional access will be provided via connections to the existing street stubs at Tipperary Lane and Vicarage Drive. The purpose of this study was to examine background traffic conditions, assess the impact that the proposed development will have on traffic conditions in the area, and determine if any roadway or access improvements are necessary to accommodate traffic generated by the proposed development. Figure 1 shows the location of the site in relation to the area roadway system. Figure 2 shows an aerial view of the site. The sections of this report present the following: • Existing roadway conditions • A description of the proposed development • Directional distribution of the development traffic • Vehicle trip generation for the development • Future traffic conditions including access to the development • Traffic analyses for the weekday morning and weekday evening peak hours • Recommendations with respect to adequacy of the site access and adjacent roadway system Traffic capacity analyses were conducted for the weekday morning and weekday evening peak hours for the following conditions: 1. Existing Conditions - Analyzes the capacity of the existing roadway system using existing peak hour traffic volumes in the surrounding area. 2. Future Conditions – Analyzes the projected traffic volumes which includes the existing traffic volumes increased by an ambient area growth factor (growth not attributable to any particular development) and the traffic estimated to be generated by the proposed subject development. 198 Bronk Parcel Residential Development Plainfield, Illinois 2 Site Location Figure 1 F SITE 199 Bronk Parcel Residential Development Plainfield, Illinois 3 Aerial View of Site Figure 2 SITE 200 Bronk Parcel Residential Development Plainfield, Illinois 4 2. Existing Conditions Existing transportation conditions in the vicinity of the site were documented in order to obtain a database for projecting future conditions. The following provides a description of the geographical location of the site, physical characteristics of the area roadway system including lane usage and traffic control devices and existing peak hour traffic volumes. Site Location The site is located in the southwest quadrant of the intersection of 127th Street with Van Dyke Road in Plainfield, Illinois. Land uses in the vicinity of the site are primarily residential with Eagle Pointe Elementary School located to the south and Edward Elmhurst Health Plainfield Emergency Center located to the north. Existing Roadway System Characteristics The characteristics of the existing roadways near the development are described below. Figure 3 illustrates the existing roadway characteristics. 127th Street is an east-west major collector roadway that generally provides one eastbound lane and two westbound lanes along the site’s frontage. At its signalized intersection with Van Dyke Road, 127th Street provides an exclusive left-turn lane, a through lane, and an exclusive right-turn lane on the eastbound approach and an exclusive left-turn lane and a combined through/right-turn lane on the westbound approach. At its unsignalized intersection with Edward Elmhurst access drive, 127th Street provides an exclusive left-turn lane and a through lane on the eastbound approach and a through lane and a combined through/right-turn lane on the westbound approach. At its signalized intersection with 248th Avenue, 127th Street provides an exclusive left-turn lane and a through lane on the eastbound approach and a through lane and an exclusive right-turn lane on the westbound approach. The west leg of the intersection provides a high-visibility crosswalk. At its unsignalized intersection with Waterford Boulevard, 127th Street provides a combined through/right-turn lane on the eastbound approach and an exclusive left-turn lane and a through lane on the westbound approach. At its signalized intersection with U.S. Route 30, 127th Street provides an exclusive left-turn lane and a combined through/right-turn lane on both approaches. From 248th Avenue to approximately 700 feet east of U.S. Route 30 and east of Van Dyke Road, 127th Street is under the jurisdiction of the Village of Plainfield. The remainder of the road within the study area is under the jurisdiction of Wheatland Township. 127th Street carries an annual average daily traffic (AADT) volume of 8,600 vehicles (Illinois Department of Transportation [IDOT] 2019) west of U.S. Route 30 and 14,100 vehicles (IDOT 2019) east of Van Dyke Road. 127th Street has a posted speed limit of 45 miles per hour west of 248th Avenue, 40 miles per hour between 248th Avenue and Van Dyke Road, and 35 miles per hour east of Van Dyke Road. 201 SITE 30 Kenig,Lindgren,O'Hara,Aboona,Inc. Figure: 3Job No: 21-272 N NOT TO SCALE STREET 135TH R O A D V A N D Y K E HI G H W A Y LI N C O L N A C C E S S D R I V E E D W A R D E L M H U R S T STREET 127TH LANE HAMILTON A V E N U E 2 4 8 T H C A N A D I A N N A TI O N A L R AI L W A Y B O U L E V A R D W A T E R F O R D L A N E TIP P E R A R Y DOOWRONEVIRD 248TH AVENUE 127TH STREET @ PLAINFIELD, ILLINOIS DEVELOPMENT RESIDENTIAL BRONK PARCEL D R I V E V I C A R A G E LEGEND - TRAVEL LANE - TRAFFIC SIGNAL - STOP SIGN - SPEED LIMITXX - HIGH VISIBILITY CROSSWALK - STANDARD CROSSWALK - HIGH VISIBILITY CROSSWALK - SCHOOL SPEED LIMIT SIGN 20 SCHOOL EXISTING ROADWAY CHARACTERISTICS 45 45 55 55 25 40 45 45 40 35 45 45 45 25 45 25 25 45 45 35 45 3535 25 35 25 35 55 50 20 SCHOOL 202 Bronk Parcel Residential Development Plainfield, Illinois 6 U.S. Route 30 is a north-south other principal arterial roadway that in the vicinity of the site provides one travel lane in each direction. At its signalized intersection with 127th Street, U.S. Route 30 provides an exclusive left-turn lane, a through lane, and an exclusive right-turn lane on the northbound approach. On the southbound approach, U.S. Route 30 provides an exclusive left- turn lane and a combined through/right-turn lane. At its signalized intersection with 135th Street, U.S. Route 30 provides an exclusive left-turn lane and a combined through/right-turn lane on the northbound and southbound approaches with a high-visibility crosswalk provided on the south leg. Within the study area, U.S. Route 30 closely parallels the Canadian National Railway right-of- way, with its intersection with 127th Street being less than 150 feet from a railroad crossing. U.S. Route 30 carries an AADT volume of 20,000 vehicles (IDOT 2019) north of 135th Street and 14,900 vehicles (IDOT 2019) south of 135th Street. U.S. Route 30 is under the jurisdiction of IDOT and has a posted speed limit of 55 miles per hour north of 135th Street and 50 miles per hour south of 135th Street. 135th Street is an east-west minor arterial roadway that in the vicinity of the site generally provides one lane in each direction. At its signalized intersections with Van Dyke Road and U.S. Route 30, 135th Street provides an exclusive left-turn lane and a combined through/right-turn lane on the eastbound and westbound approaches. At its unsignalized intersection with Vicarage Drive, 135th Street provides an exclusive left-turn lane and a combined through/right-turn lane on both approaches. 135th Street carries an AADT volume of 10,000 vehicles west of U.S. Route 30 and 13,500 vehicles (IDOT 2019) east of Van Dyke Road. 135th Street is under the jurisdiction of the Village of Plainfield and has a posted speed limit of 35 miles per hour. West of U.S. Route 30, 135th Street has a posted school speed limit of 20 miles per hour on school days when children are present. Van Dyke Road is a north-south major collector roadway that in the vicinity of the site provides two travel lanes in each direction. At its signalized intersection with 127th Street, Van Dyke Road provides an exclusive left-turn lane, a through lane, and a combined through/right-turn lane on both approaches. At its unsignalized intersection with Hamilton Lane and Norwood Drive, Van Dyke Road provides an exclusive left-turn lane, a through lane, and a combined through/right-turn lane on both approaches. At its signalized intersection with 135th Street, Van Dyke Road provides an exclusive left-turn lane, a through lane, and a combined through/right-turn lane on the southbound approach and an exclusive left-turn lane and a combined through/right-turn lane on the northbound approach. Van Dyke Road is primarily under the jurisdiction of the Village of Plainfield. However, there is an approximately 670-foot segment north of Norwood Drive that is under the jurisdiction of Wheatland Township. Van Dyke Road carries an AADT volume that ranges between 5,550 vehicles and 9,250 vehicles (IDOT 2019). Van Dyke Road has a posted speed limit of 45 miles per hour. Edward Elmhurst Health Access Drive is a north-south private roadway that in the vicinity of the site provides one travel lane in each direction separated by a landscaped median. At its unsignalized intersection with 127th Street, Edward Elmhurst Health access drive provides an exclusive left-turn lane and an exclusive right-turn lane on the southbound approach. 203 Bronk Parcel Residential Development Plainfield, Illinois 7 Hamilton Lane is an east-west local roadway that in the vicinity of the site provides one travel lane in each direction separated by a landscaped median. At its unsignalized intersection with Van Dyke Road, Hamilton Lane provides an exclusive left-turn lane and an exclusive right-turn lane that are under stop sign control on the westbound approach. Hamilton Lane is under the jurisdiction of the Village of Plainfield and has a posted speed limit of 25 miles per hour. Waterford Boulevard is a north-south local roadway that in the vicinity of the site provides one travel lane in each direction separated by a landscaped median. At its unsignalized intersection with 127th Street, Waterford Boulevard provides an exclusive left-turn lane and an exclusive right- turn lane that are under stop sign control on the northbound approach. Waterford Boulevard is under the jurisdiction of the Village of Plainfield and has a posted speed limit of 25 miles per hour. 248th Avenue is a north-south local roadway that in the vicinity of the site provides one travel lane in each direction. At its signalized intersection with 127th Street, 248th Avenue provides on the southbound approach an exclusive left-turn lane and an exclusive right-turn lane. 248th Street is under the jurisdiction of the Village of Plainfield and has a posted speed limit of 45 miles per hour. Norwood Drive is an east-west local roadway that in the vicinity of the site provides one travel lane in each direction. At its unsignalized intersection with Van Dyke Road, Norwood Drive provides a combined left-turn/through/right-turn lane on the eastbound and westbound approaches that are stop sign controlled. Norwood Drive is under the jurisdiction of the Village of Plainfield and has a posted speed limit of 25 miles per hour. Vicarage Drive is a north-south local roadway that in the vicinity of the site provides one travel lane in each direction. At its unsignalized intersection with 135th Street, Vicarage Drive provides a combined left-turn/through/right-turn lane on the southbound approach. On the northbound approach, a combined left-turn/through lane and an exclusive right-turn lane are provided. Vicarage Drive is under the jurisdiction of the Village of Plainfield and has a posted speed limit of 25 miles per hour. 204 Bronk Parcel Residential Development Plainfield, Illinois 8 Existing Traffic Volumes In order to determine current traffic conditions in the vicinity of the site, KLOA, Inc. utilized peak period traffic counts that were conducted on Tuesday, September 21, 2021, during the weekday morning (7:00 A.M. to 9:00 A.M.) and weekday evening (4:00 P.M. to 6:00 P.M.) peak periods at the following intersections: • 127th Street with Van Dyke Road • 127th Street with Edward Elmhurst Health Access Drive • 127th Street with 248th Avenue • 127th Street with Waterford Boulevard • 127th Street with U.S. Route 30 • Van Dyke Road with Hamilton Lane • Van Dyke Road with Norwood Drive • Van Dyke Road with 135th Street • 135th Street with Vicarage Drive • 135th Street with U.S. Route 30 The results of the traffic counts showed that the weekday morning peak hour of traffic occurs from 7:30 A.M. to 8:30 A.M. and the weekday evening peak hour of traffic occurs from 5:00 P.M. to 6:00 P.M. Copies of the traffic count summary sheets are included in the Appendix. Due to the ongoing pandemic and in order to accurately represent Year 2021 normal traffic conditions, the collected traffic volumes were compared with IDOT’s 2019 hourly traffic count at various segments. Based on this comparison, the morning peak hour volumes were approximately 12.5 percent lower while the evening peak hour volumes were approximately 10 percent higher. As such, the morning peak hour volumes were increased by 15 percent and the evening peak hour volumes were left unchanged. Figure 4 illustrates the existing traffic volumes. Crash Analysis KLOA, Inc. obtained crash data1 from IDOT for the most recent available five years (2016 to 2020) for the intersections of 127th Street with Van Dyke Road, 127th Street with Edward Elmhurst Heath Access Drive, 127th Street with Waterford Boulevard, 127th Street with U.S. Route 30, Van Dyke Road with Hamilton Lane, Van Dyke Road with Norwood Drive, Van Dyke Road with 135th Street, 135th Street with Vicarage Drive, and 135th Street with U.S. Route 30. The crash data for the intersections is summarized in Tables 1 through 10. A review of the crash data indicated that no fatalities were reported at these intersections. 1 IDOT DISCLAIMER: The motor vehicle crash data referenced herein was provided by the Illinois Department of Transportation. Any conclusions drawn from analysis of the aforementioned data are the sole responsibility of the data recipient(s). Additionally, for coding years 2015 to present, the Bureau of Data Collection uses the exact latitude/longitude supplied by the investigating law enforcement agency to locate crashes. Therefore, location data may vary in previous years since data prior to 2015 was physically located by bureau personnel. 205 SITE 30 Kenig,Lindgren,O'Hara,Aboona,Inc. Figure: 4Job No: 21-272 N NOT TO SCALE STREET 135TH R O A D V A N D Y K E HI G H W A Y LI N C O L N A C C E S S D R I V E E D W A R D E L M H U R S T STREET 127TH LANE HAMILTON A V E N U E 2 4 8 T H C A N A D I A N N A TI O N A L R AI L W A Y B O U L E V A R D W A T E R F O R D L A N E TIP P E R A R Y DOOWRONEVIRD 248TH AVENUE 127TH STREET @ VICARAGE DRIVE 135TH STREET @ LEGEND 00 (00) - AM PEAK HOUR (7:30-8:30 AM) - PM PEAK HOUR (5:00-6:00 PM) PLAINFIELD, ILLINOIS DEVELOPMENT RESIDENTIAL BRONK PARCEL D R I V E V I C A R A G E YEAR 2021 BASE TRAFFIC VOLUMES 23 (53) 4 7 (9 5)83 (86) 49 (153) 5 (11) 396 (284) 1 (8) 3 4 2 (4 1 6)203 (467) 599 (477) 2 (12) 422 (363) 118 (196) 259 (499) 15 1 ( 2 2 4 ) 220 (151) 9 7 ( 2 4 2 ) 37 (50) 75 (168) 67 (158) 75 (44) 340 (534) 392 (428) 59 (44) 55 (95) 90 (182) 153 (458) 294 (256) 128 (126) 14 (29) 29 (36) 281 (699) 7 (23) 428 (396) 5 (4) 55 (96) 49 (98) 14 (30) 76 (52) 240 (595) 349 (350) 85 (34) 67 (15) 361 (649) 506 (572) 21 (29) 14 (12) 22 (15) 55 (44) 9 (9) 3 (14) 2 (5) 9 (20) 330 (697) 26 (44) 15 ( 4 7 ) 3 3 9 ( 5 0 1 ) 6 4 ( 7 4 ) 7 9 ( 13 3 ) 4 3 4 ( 3 4 4 ) 1 2 4 ( 9 1 ) 2 2 ( 2 4 ) 0 ( 0 ) 4 6 ( 14 ) 5 ( 6 ) 1 5 ( 2 2 ) 0 ( 0 ) 2 2 ( 3 9 ) 2 6 2 ( 2 5 1 ) 7 8 ( 7 4 ) 5 6 ( 8 9 ) 1 2 0 ( 3 2 6 ) 4 0 ( 11 7 ) 2 0 ( 1 6 ) 3 7 6 ( 3 4 3 ) 6 ( 1 1 ) 8 ( 17 ) 18 2 ( 4 9 4 ) 6 8 ( 7 3 ) 4 4 6 ( 3 9 4 ) 7 ( 8 ) 2 4 4 ( 5 7 2 ) 1 3 ( 2 5 ) 7 8 ( 9 9 ) 2 6 6 ( 18 7 ) 12 3 ( 13 7 ) 5 2 ( 7 7 ) 11 5 ( 2 7 1 ) 2 8 ( 5 0 ) 16 ( 4 6 ) 2 8 ( 5 8 ) 5 ( 9 ) 4 3 ( 3 7 ) 3 8 5 (3 3 9 ) 1 5 8 (1 1 0 ) 1 (2 8 ) 206 Bronk Parcel Residential Development Plainfield, Illinois 10 Table 1 127TH STREET WITH VAN DYKE ROAD – CRASH SUMMARY Year Type of Crash Frequency Angle Pedestrian Object Rear End Sideswipe Turning Other Total 2016 2 0 0 2 0 1 0 5 2017 2 1 0 5 1 4 0 13 2018 3 0 0 6 0 4 2 15 2019 1 0 0 2 0 2 0 5 2020 1 0 1 0 1 0 0 3 Total 9 1 1 15 2 11 2 41 Average 1.8 <1.0 <1.0 3.0 <1.0 2.2 <1.0 8.2 Table 2 127TH STREET WITH EDWARD ELMHURST HEALTH ACCESS DRIVE - CRASH SUMMARY Year Type of Crash Frequency Angle Pedestrian Object Rear End Sideswipe Turning Other Total 2016 0 0 0 0 0 0 0 0 2017 0 0 0 1 0 0 0 1 2018 0 0 0 0 0 0 0 0 2019 0 0 1 0 0 0 0 1 2020 0 0 0 0 0 0 0 0 Total 0 0 1 1 0 0 0 2 Average 0.0 0.0 <1.0 <1.0 0.0 0.0 0.0 <1.0 Table 3 127TH STREET WITH 248th AVENUE – CRASH SUMMARY Year Type of Crash Frequency Angle Pedestrian Object Rear End Sideswipe Turning Other Total 2016 0 0 0 2 0 1 0 3 2017 0 0 0 2 0 2 0 4 2018 0 0 1 3 0 1 0 5 2019 0 0 1 2 0 1 0 4 2020 0 0 0 1 0 0 0 1 Total 0 0 2 10 0 5 0 17 Average 0.0 0.0 <1.0 2.0 0.0 1.0 0.0 3.4 207 Bronk Parcel Residential Development Plainfield, Illinois 11 Table 4 127TH STREET WITH WATERFORD BOULEVARD – CRASH SUMMARY Year Type of Crash Frequency Angle Pedestrian Object Rear End Sideswipe Turning Other Total 2016 0 0 0 4 1 0 0 5 2017 0 0 0 3 1 0 0 4 2018 0 0 0 5 0 0 0 5 2019 0 0 0 3 0 0 0 3 2020 0 0 0 3 0 0 0 3 Total 0 0 0 18 2 0 0 20 Average 0.0 0.0 0.0 3.6 <1.0 0.0 0.0 4.0 Table 5 127TH STREET WITH U.S. ROUTE 30 – CRASH SUMMARY Year Type of Crash Frequency Angle Pedestrian Object Rear End Sideswipe Turning Other Total 2016 0 0 0 9 0 0 0 9 2017 1 0 0 9 0 1 0 11 2018 1 0 1 11 0 2 0 15 2019 1 0 0 6 2 1 0 10 2020 1 0 1 7 0 0 0 9 Total 4 0 2 42 2 5 0 54 Average <1.0 0.0 <1.0 8.4 <1.0 1.0 0.0 10.8 Table 6 VAN DYKE ROAD WITH HAMILTON LANE – CRASH SUMMARY Year Type of Crash Frequency Angle Pedestrian Object Rear End Sideswipe Turning Other Total 2016 0 0 0 0 0 0 0 0 2017 0 0 0 0 0 0 0 0 2018 0 0 0 0 0 0 0 0 2019 0 0 0 0 0 0 0 0 2020 0 0 0 0 0 0 0 0 Total 0 0 0 0 0 0 0 0 Average 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 208 Bronk Parcel Residential Development Plainfield, Illinois 12 Table 7 VAN DYKE ROAD WITH NORWOOD DRIVE– CRASH SUMMARY Year Type of Crash Frequency Angle Pedestrian Object Rear End Sideswipe Turning Other Total 2016 0 0 0 1 0 0 1 2 2017 0 0 0 1 0 0 0 1 2018 0 0 0 0 1 2 0 3 2019 0 0 1 0 0 0 0 1 2020 0 0 1 0 0 0 0 1 Total 0 0 2 2 1 2 1 8 Average 0.0 0.0 <1.0 <1.0 <1.0 <1.0 <1.0 1.6 Table 8 VAN DYKE ROAD WITH 135TH STREET – CRASH SUMMARY Year Type of Crash Frequency Angle Pedestrian Object Rear End Sideswipe Turning Other Total 2016 0 0 1 8 0 0 0 9 2017 0 0 1 12 0 4 1 18 2018 2 0 1 5 0 3 1 12 2019 0 0 1 8 0 0 0 9 2020 0 0 1 0 0 0 0 1 Total 2 0 5 33 0 7 2 49 Average <1.0 0.0 1.0 6.6 0.0 1.4 <1.0 9.8 Table 9 135TH STREET WITH VICARAGE DRIVE – CRASH SUMMARY Year Type of Crash Frequency Angle Pedestrian Object Rear End Sideswipe Turning Other Total 2016 0 0 0 1 0 0 0 1 2017 0 0 0 1 0 0 0 1 2018 0 0 0 2 0 0 0 2 2019 1 0 0 1 0 0 1 3 2020 0 0 0 2 0 0 0 2 Total 1 0 0 7 0 0 1 9 Average <1.0 0.0 0.0 1.4 0.0 0.0 <1.0 1.8 209 Bronk Parcel Residential Development Plainfield, Illinois 13 Table 10 135TH STREET WITH U.S. ROUTE 30 – CRASH SUMMARY Year Type of Crash Frequency Angle Pedestrian Object Rear End Sideswipe Turning Other Total 2016 0 0 1 10 0 3 0 14 2017 0 0 1 12 0 1 0 14 2018 2 0 0 20 1 2 0 25 2019 2 0 0 8 0 4 0 14 2020 2 0 0 7 0 1 0 10 Total 6 0 2 57 1 11 0 77 Average 1.2 0.0 <1.0 11.4 <1.0 2.2 <1.0 15.4 210 Bronk Parcel Residential Development Plainfield, Illinois 14 3. Traffic Characteristics of the Proposed Development In order to properly evaluate future traffic conditions in the surrounding area, it was necessary to determine the traffic characteristics of the proposed development, including the directional distribution and volumes of traffic that it will generate. Proposed Site and Development Plan As proposed, the plans call for developing the site with 450 residential units consisting of 118 townhomes and 332 single family lots. Access to the site will be provided off 127th Street opposite the Edward Elmhurst Health Access Drive and off Van Dyke Road opposite Hamilton Drive. Additional access will be provided via connections to Tipperary Lane and Vicarage Drive on the west and south sides of the site, respectively. The access road opposite the Edwards Elmhurst Health Access Drive should provide one inbound lane and two outbound lanes striped to provide a shared left-turn/through lane and an exclusive right-turn lane. Exclusive left- and right-turn lanes should be provided on 127th Street at its intersection with the proposed access road (to be discussed later). Outbound movements from the access roads onto 127th Street and Van Dyke Road should be under stop sign control. A copy of the preliminary site plan depicting the proposed development and access is included in the Appendix. Directional Distribution The directions from which residents of the proposed development will approach and depart the site were estimated based on existing travel patterns, as determined from the traffic counts. Figure 5 illustrates the directional distribution of the development-generated traffic. Estimated Site Traffic Generation The number of peak hour vehicle trips estimated to be generated by the proposed development was based on vehicle trip generation rates contained in Trip Generation Manual, 11th Edition, published by the Institute of Transportation Engineers (ITE). Land-Use Codes 210 (Single-Family Detached Housing) and 220 (Multi-Family Housing) were utilized. Copies of the ITE trip generation sheets are included in the Appendix. Table 11 shows the estimated vehicle trip generation for the weekday morning and weekday evening peak hours. 211 SITE 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 1718 19 20 21 22 2324 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 464748495051525354 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80 81 82 83 84 85 86 87 88 89 90 91 92 9394 95 96 97 98 99 100 101 102 103 104 105 106 107 108 109 110 111112113114115116117 118 119 120 121 122 123 124 125 126 127 128 129 130 131 132 133 134 135 136 137 138 139 140 141 142 143 144 145 146 147 148 149 150 151 152 153 154 155 156 157 158 159 160 161 162 163 164 165 166167168169170 171 172 173 174 175 176 177178179 180 181 182 183 184 185 186 187 188 189 190 191 192 193 194 195 196 197 198 199200201202203204205 206 207 208 209 210 211 212 213 214 215 216 217 218 219 220 221 222 223 224 225 226 227 228 229 230 231 232 233 234 235 236 237 238 239 240 241 242 243 244 245 246 247 248 249 250 251 252 253 254 255 256 257 258 259 260 261 262 263 264 265 266 267268 269 270 271 272 273 274 275 276 277 278 279 280 281 282 283 284 285 286 287 288289290291292 293 294 295 296 297 298 299 300 301 302 303 304 305 306 307 308309 310 311 312 313 314 315 316 317 318 319 320 321 322 323 324 325 326 327 328 329 330 331 332 333 334 335 336 337 338 339 340 341 342343345 346 347 348349 350 351 352353 354 355 356 357 OUTLOT A OUTLOT B OUTLOT C OUT L OT D OUTLOT E OUTLOT F OUTLOT G OUTLOT H OUTLOT I OUTLOT J OUTLOT K OUTLOT L OUTLOT M OUTL O T N OUTLOT O OUTLOT J OUTLOT J ROAD C ROAD H TIPPERARY LANE V IC A RAG E VICARAGE DRIVE ROAD I VIC A R AG E ROAD I ROA D I ROAD J ROAD K ROAD L ROAD D ROAD M R O A D D HAMILTON LANE ROAD E ROAD N ROAD C R OAD F R OA D D ROAD E ROAD O ROA D G ROA D C R O A D D OUTLOT G D RIV E D RIV E 344 390'1100'1550' 1710' 1 9 4 5 ' 1 3 2 0 ' 1 7 4 0 ' 30 00' 00%- PERCENT DISTRIBUTION - DISTANCE IN FEET Kenig,Lindgren,O'Hara,Aboona,Inc. Figure: 5Job No: 21-272 N NOT TO SCALE STREET 135TH R O A D V A N D Y K E HI G H W A Y LI N C O L N A C C E S S D R I V E E D W A R D E L M H U R S T STREET 127TH LANE HAMILTON A V E N U E 2 4 8 T H C A N A D I A N N A TI O N A L R AI L W A Y B O U L E V A R D W A T E R F O R D L A N E TIP P E R A R Y DOOWRONEVIRD LEGEND PLAINFIELD, ILLINOIS DEVELOPMENT RESIDENTIAL BRONK PARCEL D R I V E V I C A R A G E 5% 1 5 % 1 0 % 10% 1 5 % 1 0 % ESTIMATED DIRECTIONAL DISTRIBUTION 20% 15% 212 Bronk Parcel Residential Development Plainfield, Illinois 16 Table 11 ESTIMATED SITE-GENERATED TRAFFIC VOLUMES ITE Land Use Code Weekday Morning Peak Hour Weekday Evening Peak Hour Type/Size In Out Total In Out Total 210 Single-Family Housing (332 units) 57 164 221 192 113 305 220 Multifamily Housing (118 units) 14 45 59 45 26 71 Total 71 209 280 237 139 376 213 Bronk Parcel Residential Development Plainfield, Illinois 17 4. Projected Traffic Conditions The total projected traffic volumes include the existing traffic volumes, increase in background traffic due to growth, and the traffic estimated to be generated by the proposed subject development. Development Traffic Assignment The estimated weekday morning and evening peak hour traffic volumes that will be generated by the proposed development were assigned to the roadway system in accordance with the previously described directional distribution (Figure 5). The total new traffic assignment for the residential development is illustrated in Figure 6. Background Traffic Conditions The existing traffic volumes (Figure 4) were increased by a regional growth factor to account for the increase in existing traffic related to regional growth in the area (i.e., not attributable to any particular planned development). Based on 2050 Average Daily Traffic (ADT) projections provided by the Chicago Metropolitan Agency for Planning (CMAP) in a letter dated October 21, 2021, the existing traffic volume were increased by an annually compounded growth rate for six years (one-year buildout plus five years) totaling six percent to represent Year 2027 total projected conditions. A copy of the CMAP 2050 projections letter is included in the Appendix. Total Projected Traffic Volumes The development-generated traffic (Figure 6) was added to the existing traffic volumes increased by a regional growth factor to determine the Year 2027 total projected traffic volumes, as illustrated in Figure 7. 214 SITE 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 1718 19 20 21 22 2324 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 464748495051525354 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80 81 82 83 84 85 86 87 88 89 90 91 92 9394 95 96 97 98 99 100 101 102 103 104 105 106 107 108 109 110 111112113114115116117 118 119 120 121 122 123 124 125 126 127 128 129 130 131 132 133 134 135 136 137 138 139 140 141 142 143 144 145 146 147 148 149 150 151 152 153 154 155 156 157 158 159 160 161 162 163 164 165 166167168169170 171 172 173 174 175 176 177178179 180 181 182 183 184 185 186 187 188 189 190 191 192 193 194 195 196 197 198 199200201202203204205 206 207 208 209 210 211 212 213 214 215 216 217 218 219 220 221 222 223 224 225 226 227 228 229 230 231 232 233 234 235 236 237 238 239 240 241 242 243 244 245 246 247 248 249 250 251 252 253 254 255 256 257 258 259 260 261 262 263 264 265 266 267268 269 270 271 272 273 274 275 276 277 278 279 280 281 282 283 284 285 286 287 288289290291292 293 294 295 296 297 298 299 300 301 302 303 304 305 306 307 308309 310 311 312 313 314 315 316 317 318 319 320 321 322 323 324 325 326 327 328 329 330 331 332 333 334 335 336 337 338 339 340 341 342343345 346 347 348349 350 351 352353 354 355 356 357 OUTLOT A OUTLOT B OUTLOT C OUT L OT D OUTLOT E OUTLOT F OUTLOT G OUTLOT H OUTLOT I OUTLOT J OUTLOT K OUTLOT L OUTLOT M OUTL O T N OUTLOT O OUTLOT J OUTLOT J ROAD C ROAD H TIPPERARY LANE V IC A RAG E VICARAGE DRIVE ROAD I VIC A R AG E ROAD I ROA D I ROAD J ROAD K ROAD L ROAD D ROAD M R O A D D HAMILTON LANE ROAD E ROAD N ROAD C R OAD F R OA D D ROAD E ROAD O ROA D G ROA D C R O A D D OUTLOT G D RIV E D RIV E 344 30 Kenig,Lindgren,O'Hara,Aboona,Inc. Figure: 6Job No: 21-272 N NOT TO SCALE STREET 135TH R O A D V A N D Y K E HI G H W A Y LI N C O L N A C C E S S D R I V E E D W A R D E L M H U R S T STREET 127TH LANE HAMILTON A V E N U E 2 4 8 T H C A N A D I A N N A TI O N A L R AI L W A Y B O U L E V A R D W A T E R F O R D L A N E TIP P E R A R Y DOOWRONEVIRD 248TH AVENUE 127TH STREET @ VICARAGE DRIVE 135TH STREET @ LEGEND 00 (00) - AM PEAK HOUR (7:30-8:30 AM) - PM PEAK HOUR (5:00-6:00 PM) PLAINFIELD, ILLINOIS DEVELOPMENT RESIDENTIAL BRONK PARCEL D R I V E V I C A R A G E ESTIMATED SITE-GENERATED TRAFFIC VOLUMES 1 1 (3 6 ) 7 (24) 21 (14) 31 (21) 3 1 ( 2 0 ) 11 (36) 3 (11) 11 (8) 11 ( 3 5 ) 31 (21) 11 (7) 3 (12) 2 8 ( 19 ) 7 (22) 4 (13) 11 ( 8 ) 3 (11) 2 (2) 3 ( 9 ) 4 ( 15 ) 3 (8) 15 (52) 49 (33) 15 (52) 8 (30) 5 (20) 9 (27) 8 ( 5 ) 3 ( 10 ) 4 ( 1 4 ) 14 ( 4 8 ) 14 ( 4 8 ) 3 ( 2 ) 15 (52) 4 9 ( 3 3 ) 3 9 ( 2 5 ) 24 (15) 43 (33) 26 (16) 13 (9) 1 3 ( 4 1 ) 7 (22) 5 ( 5 ) 49 (33) 16 ( 1 0 ) 4 3 ( 3 3 ) 15 (6) 19 ( 1 2 ) 3 (3) 215 SITE 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 1718 19 20 21 22 2324 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 464748495051525354 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80 81 82 83 84 85 86 87 88 89 90 91 92 9394 95 96 97 98 99 100 101 102 103 104 105 106 107 108 109 110 111112113114115116117 118 119 120 121 122 123 124 125 126 127 128 129 130 131 132 133 134 135 136 137 138 139 140 141 142 143 144 145 146 147 148 149 150 151 152 153 154 155 156 157 158 159 160 161 162 163 164 165 166167168169170 171 172 173 174 175 176 177178179 180 181 182 183 184 185 186 187 188 189 190 191 192 193 194 195 196 197 198 199200201202203204205 206 207 208 209 210 211 212 213 214 215 216 217 218 219 220 221 222 223 224 225 226 227 228 229 230 231 232 233 234 235 236 237 238 239 240 241 242 243 244 245 246 247 248 249 250 251 252 253 254 255 256 257 258 259 260 261 262 263 264 265 266 267268 269 270 271 272 273 274 275 276 277 278 279 280 281 282 283 284 285 286 287 288289290291292 293 294 295 296 297 298 299 300 301 302 303 304 305 306 307 308309 310 311 312 313 314 315 316 317 318 319 320 321 322 323 324 325 326 327 328 329 330 331 332 333 334 335 336 337 338 339 340 341 342343345 346 347 348349 350 351 352353 354 355 356 357 OUTLOT A OUTLOT B OUTLOT C OUT L OT D OUTLOT E OUTLOT F OUTLOT G OUTLOT H OUTLOT I OUTLOT J OUTLOT K OUTLOT L OUTLOT M OUTL O T N OUTLOT O OUTLOT J OUTLOT J ROAD C ROAD H TIPPERARY LANE V IC A RAG E VICARAGE DRIVE ROAD I VIC A R AG E ROAD I ROA D I ROAD J ROAD K ROAD L ROAD D ROAD M R O A D D HAMILTON LANE ROAD E ROAD N ROAD C R OAD F R OA D D ROAD E ROAD O ROA D G ROA D C R O A D D OUTLOT G D RIV E D RIV E 344 30 Kenig,Lindgren,O'Hara,Aboona,Inc. Figure: 7Job No: 21-272 N NOT TO SCALE STREET 135TH R O A D V A N D Y K E 39 (53) 89 (205) 65 (116) 52 (104) 23 (16) 10 (10) 22 (31) 15 (13) 63 (47) 17 (34) 84 (66) 8 4 ( 14 1 ) 58 (47) 24 (56) 6 1 (1 3 7 ) HI G H W A Y LI N C O L N 52 (162) A C C E S S D R I V E E D W A R D E L M H U R S T STREET 127TH 58 (101)258 (644) 414 (368) 3 (15) 2 (5) 0 (0) 365 (586) LANE HAMILTON A V E N U E 2 4 8 T H 119 (112) 236 (510) 1 6 7 (1 1 7) 4 0 8 (3 5 9 ) 1 (3 0 ) 5 (12) 426 (325) 3 6 3 (4 4 1 ) 1 (8) 173 (492) 126 (214) 315 (283) 136 (134) 4 6 0 ( 3 6 5 ) 1 4 2 ( 13 1 ) C A N A D I A N N A TI O N A L R AI L W A Y B O U L E V A R D W A T E R F O R D L A N E TIP P E R A R Y 25 (27) DOOWRONEVIRD YEAR 2027 TOTAL PROJECTED TRAFFIC VOLUMES 90 (36) 383 (688) 8 (30) 650 (558) 5 (21) 462 (437) 248TH AVENUE 127TH STREET @ 125 (208) 324 (562) 233 (160) 399 (772) 28 (47) 21 (51) 42 (74) VICARAGE DRIVE 135TH STREET @ 309 (751) 7 (24) 457 (431) 5 (4) LEGEND 00 (00) - AM PEAK HOUR (7:30-8:30 AM) - PM PEAK HOUR (5:00-6:00 PM) PLAINFIELD, ILLINOIS DEVELOPMENT RESIDENTIAL BRONK PARCEL 93 (56) 450 (474) 71 (167) 24 (15) 0 (0) 43 (33) D R I V E V I C A R A G E 1 0 3 ( 2 5 7 ) 16 0 ( 2 3 7 ) 1 7 ( 4 9 ) 0 ( 0 ) 3 0 ( 6 1 ) 3 3 ( 6 3 ) 12 6 ( 2 8 4 ) 5 5 ( 8 2 ) 1 3 ( 4 1 ) 2 5 9 ( 5 8 8 ) 1 4 ( 2 7 ) 7 2 ( 7 7 ) 2 3 7 ( 5 3 9 ) 8 ( 18 ) 5 3 ( 13 2 ) 1 4 6 ( 3 5 8 ) 8 7 ( 1 1 3 ) 4 2 ( 14 ) 0 ( 0 ) 5 4 ( 4 5 ) 1 6 ( 5 0 ) 3 5 9 ( 5 3 1 ) 6 8 ( 7 8 ) 8 ( 1 2 ) 4 6 ( 3 9 ) 14 6 ( 15 5 ) 2 9 0 ( 2 0 5 ) 8 3 ( 10 5 ) 7 ( 8 ) 4 7 3 ( 4 1 9 ) 14 ( 4 8 ) 6 ( 12 ) 4 1 3 ( 4 1 2 ) 2 1 ( 17 ) 8 3 ( 7 8 ) 2 8 2 ( 2 8 1 ) 2 6 ( 5 0 ) 5 ( 6 ) 0 ( 0 ) 16 ( 2 3 ) 71 (16) 536 (606) 15 (52) 4 9 ( 3 3 ) 0 ( 0 ) 4 8 ( 3 0 ) 216 Bronk Parcel Residential Development Plainfield, Illinois 20 5. Traffic Analysis and Recommendations The following provides an evaluation conducted for the weekday morning and weekday evening peak hours. The analysis includes conducting capacity analyses to determine how well the roadway system and access drives are projected to operate and whether any roadway improvements or modification are required. Traffic Analyses Roadway and adjacent or nearby intersection analyses were performed for the weekday morning and weekday evening peak hours for the existing (Year 2021) and future projected (Year 2027) traffic volumes. The traffic analyses were performed using the methodologies outlined in the Transportation Research Board’s Highway Capacity Manual (HCM), 6th Edition and analyzed using Synchro/SimTraffic 11 computer software. The analysis for the traffic-signal controlled intersections of U.S. Route 30 with 127th Street and 135th Street were accomplished using provided cycle lengths and phasings to determine the average overall vehicle delay and levels of service. The capacity analyses conducted for the other traffic-signal controlled intersections utilized field measured cycle lengths and phasings. The analyses for the unsignalized intersections determine the average control delay to vehicles at an intersection. Control delay is the elapsed time from a vehicle joining the queue at a stop sign (includes the time required to decelerate to a stop) until its departure from the stop sign and resumption of free flow speed. The methodology analyzes each intersection approach controlled by a stop sign and considers traffic volumes on all approaches and lane characteristics. The ability of an intersection to accommodate traffic flow is expressed in terms of level of service, which is assigned a letter from A to F based on the average control delay experienced by vehicles passing through the intersection. The Highway Capacity Manual definitions for levels of service and the corresponding control delay for signalized intersections and unsignalized intersections are included in the Appendix of this report. Summaries of the traffic analysis results showing the level of service and overall intersection delay (measured in seconds) for the existing and Year 2027 total projected conditions are presented in Tables 12 through 18. A discussion of the intersections follows. Summary sheets for the capacity analyses are included in the Appendix. 217 Bronk Parcel Residential Development Plainfield, Illinois 21 Table 12 CAPACITY ANALYSIS RESULTS – VAN DYKE ROAD WITH 127TH STREET – SIGNALIZED Peak Hour Eastbound Westbound Northbound Southbound Overall L T R L T/R L T/R L T/R Ye a r 2 0 2 1 B a s e Tr a f f i c V o l u m e s Weekday Morning Peak Hour B 17.5 C 33.8 A 1.4 B 17.5 D 37.5 B 14.5 B 16.8 B 17.9 B 19.4 C 25.2 C – 27.4 C – 34.2 B – 16.4 B – 19.0 Weekday Evening Peak Hour B 12.8 C 30.0 A 4.1 B 19.7 C 33.8 B 18.4 B 14.2 B 17.7 C 22.1 C 23.6 C – 22.3 C – 30.7 B – 15.2 C – 21.3 Ye a r 2 0 2 7 P r o j e c t e d Tr a f f i c V o l u m e s Weekday Morning Peak Hour B 19.6 D 37.0 A 1.6 C 21.6 D 37.3 B 15.7 B 18.5 B 19.2 B 20.0 C 26.7 C – 30.2 C – 34.4 B – 18.0 B – 19.8 Weekday Evening Peak Hour B 13.6 C 29.0 A 3.9 C 27.6 D 40.8 B 19.9 B 14.8 B 19.0 C 23.2 C 26.3 C – 21.8 D – 37.6 B – 16.0 C – 22.4 218 Bronk Parcel Residential Development Plainfield, Illinois 22 Table 13 CAPACITY ANALYSIS RESULTS – VAN DYKE ROAD WITH 135TH STREET – SIGNALIZED Peak Hour Eastbound Westbound Northbound Southbound Overall L T/R L T/R L T/R L T R Ye a r 2 0 2 1 B a s e Tr a f f i c V o l u m e s Weekday Morning Peak Hour B 17.6 D 44.2 B 18.1 C 32.0 B 13.5 C 24.8 B 11.5 B 14.0 A 0.6 C 29.0 D – 40.1 C – 30.0 C – 24.1 B – 10.9 Weekday Evening Peak Hour B 16.4 C 24.9 B 13.3 D 44.6 C 22.5 D 35.5 C 25.4 C 33.0 A 6.2 C 32.4 C – 23.8 D – 40.7 C – 34.1 C – 25.9 Ye a r 2 0 2 7 P r o j e c t e d Tr a f f i c V o l u m e s Weekday Morning Peak Hour B 18.5 D 45.7 B 18.3 C 33.4 B 13.7 C 26.4 B 13.3 B 16.4 A 0.7 C 29.7 D – 41.2 C – 31.3 C – 25.6 B – 12.6 Weekday Evening Peak Hour B 19.1 C 24.1 B 13.0 D 52.6 C 24.3 D 42.8 D 35.2 D 38.5 A 6.2 D 37.3 C – 23.4 D – 47.8 D – 40.5 C – 30.9 219 Bronk Parcel Residential Development Plainfield, Illinois 23 Table 14 CAPACITY ANALYSIS RESULTS – U.S. ROUTE 30 WITH 135TH STREET – SIGNALIZED Peak Hour Eastbound Westbound Northbound Southbound Overall L T/R L T/R L T/R L T/R Ye a r 2 0 2 1 B a s e Tr a f f i c V o l u m e s Weekday Morning Peak Hour C 26.5 E 66.3 D 42.2 D 37.5 B 15.8 C 35.0 B 16.9 C 27.8 D 39.7 E – 61.5 D – 38.9 C – 32.6 C – 26.2 Weekday Evening Peak Hour D 39.8 E 61.6 D 49.7 E 67.4 C 27.6 D 37.0 C 21.9 D 45.5 D 50.2 E – 59.3 E – 63.0 C – 34.8 D – 42.7 Ye a r 2 0 2 7 P r o j e c t e d Tr a f f i c V o l u m e s Weekday Morning Peak Hour C 26.3 E 69.0 E 76.0 D 37.5 B 16.6 D 39.9 B 18.9 C 29.5 D 44.4 E – 63.8 D – 51.0 D – 37.1 C – 27.8 Weekday Evening Peak Hour D 43.0 E 62.8 E 74.1 E 70.7 D 35.7 D 42.0 C 24.1 D 51.0 E 55.9 E – 60.8 E – 71.6 D – 40.6 D – 47.8 220 Bronk Parcel Residential Development Plainfield, Illinois 24 Table 15 CAPACITY ANALYSIS RESULTS – U.S. ROUTE 30 WITH 127TH STREET – SIGNALIZED Peak Hour Eastbound Westbound Northbound Southbound Overall L T/R L T/R L T R L T/R Ye a r 2 0 2 1 B a s e Tr a f f i c V o l u m e s Weekday Morning Peak Hour E 67.2 E 61.4 E 71.8 D 37.5 E 65.0 C 32.9 C 28.4 E 77.4 C 25.7 D 41.3 E – 61.5 D – 42.5 C – 31.7 C – 32.0 Weekday Evening Peak Hour E 78.4 E 67.3 F 83.3 E 56.3 F 80.4 D 40.2 C 34.6 F 84.9 D 35.7 D 53.8 E – 67.6 E – 62.2 D – 41.3 D – 44.7 Ye a r 2 0 2 7 P r o j e c t e d Tr a f f i c V o l u m e s Weekday Morning Peak Hour E 67.2 E 62.4 E 72.8 D 39.7 E 65.0 D 35.8 C 30.3 F 80.7 C 27.4 D 43.4 E – 62.5 D – 43.9 C – 34.2 D – 35.1 Weekday Evening Peak Hour E 79.2 E 68.2 F 84.3 E 60.6 F 84.5 D 45.7 D 37.8 F 94.3 D 38.9 E 58.2 E – 68.6 E – 65.5 D – 46.2 D – 51.8 221 Bronk Parcel Residential Development Plainfield, Illinois 25 Table 16 CAPACITY ANALYSIS RESULTS – 127TH STREET WITH 248TH AVENUE – SIGNALIZED Peak Hour Eastbound Westbound Southbound Overall L T T R L R Ye a r 2 0 2 1 B a s e Tr a f f i c V o l u m e s Weekday Morning Peak Hour C 32.1 C 30.6 E 57.6 A 8.0 C 20.1 A 4.4 C 31.0 C – 31.1 D – 42.1 B – 14.0 Weekday Evening Peak Hour C 23.7 B 15.5 D 38.4 A 3.6 C 27.2 A 4.8 C 21.7 B – 17.9 C – 28.6 B – 15.6 Ye a r 2 0 2 7 P r o j e c t e d Tr a f f i c V o l u m e s Weekday Morning Peak Hour C 33.6 C 26.9 D 54.9 A 6.6 C 24.1 A 5.2 C 30.7 C – 29.1 D – 41.4 B – 16.7 Weekday Evening Peak Hour C 29.9 B 14.8 D 38.4 A 4.2 C 30.3 A 5.2 C 22.7 B – 18.8 C – 29.2 B – 17.2 222 Bronk Parcel Residential Development Plainfield, Illinois 26 Table 17 CAPACITY ANALYSIS RESULTS – YEAR 2021 EXISTING CONDITIONS1 Weekday Morning Peak Hour Weekday Evening Peak Hour Intersection LOS Delay LOS Delay 127th Street with Edward Elmhurst Access Drive • Southbound Approach C 18.8 D 28.3 • Eastbound Left Turn A 9.3 B 10.5 Van Dyke Road with Hamilton Lane • Westbound Approach B 12.5 B 14.5 • Southbound Left Turn A 8.4 A 8.7 Van Dyke Road with Norwood Drive • Eastbound Approach C 18.0 C 20.6 • Westbound Approach B 14.3 C 15.8 • Northbound Left Turn A 8.0 A 8.7 • Southbound Left Turn A 8.4 A 8.1 Vicarage Drive with 135th Street • Northbound Approach B 13.9 C 16.4 • Southbound Approach C 20.9 D 25.1 • Eastbound Left Turn A 8.2 A 9.4 • Westbound Left Turn A 8.4 A 8.3 Waterford Boulevard with 127th Street • Northbound Approach C 17.3 C 23.4 • Westbound Left Turn A 9.9 A 9.3 LOS = Level of Service Delay is measured in seconds 1 – All intersections under two-way stop sign control 223 Bronk Parcel Residential Development Plainfield, Illinois 27 Table 18 CAPACITY ANALYSIS RESULTS – YEAR 2027 PROJECTED CONDITIONS1 Weekday Morning Peak Hour Weekday Evening Peak Hour Intersection LOS Delay LOS Delay 127th Street with Edward Elmhurst Access Drive • Northbound Approach C 22.8 C 24.2 • Southbound Approach D 30.7 F 72.0 • Eastbound Left Turn A 9.5 B 10.8 • Westbound Left Turn A 9.5 B 10.4 Van Dyke Road with Hamilton Lane • Eastbound Approach B 12.2 D 25.9 • Westbound Approach B 13.6 C 18.6 • Northbound Left Turn A 7.9 A 9.9 • Southbound Left Turn A 8.5 A 8.8 Van Dyke Road with Norwood Drive • Eastbound Approach C 20.6 C 23.8 • Westbound Approach C 16.0 C 18.1 • Northbound Left Turn A 8.2 A 8.9 • Southbound Left Turn A 8.6 A 8.3 Vicarage Drive with 135th Street • Northbound Approach C 15.1 C 20.4 • Southbound Approach C 21.1 D 29.8 • Eastbound Left Turn A 8.3 B 10.0 • Westbound Left Turn A 8.4 A 8.4 Waterford Boulevard with 127th Street • Northbound Approach C 20.1 E 36.2 • Westbound Left Turn B 10.2 A 9.9 LOS = Level of Service Delay is measured in seconds 1 – All intersections under two-way stop sign control 224 Bronk Parcel Residential Development Plainfield, Illinois 28 Discussion and Recommendations The following summarizes how the intersections are projected to operate and identify any roadway and traffic control improvements to accommodate the development traffic. Van Dyke Road with 127th Street The results of the capacity analysis indicate that overall, this intersection currently operates at Level of Service (LOS) C during the weekday morning and weekday evening peak hours. Under Year 2027 total projected conditions, this intersection overall is projected to continue operating at LOS C during the weekday morning and weekday evening peak hours with increases in delay of approximately one and two seconds, respectively. Furthermore, all of the approaches are projected to continue operating at LOS D or better during the peak hours. Overall, this intersection has sufficient reserve capacity to accommodate the traffic estimated to be generated by the proposed development. Van Dyke Road with 135th Street The results of the capacity analysis indicate that overall, this intersection currently operates at LOS C during the weekday morning and weekday evening peak hours. Under Year 2027 total projected conditions, this intersection is projected to continue operating at LOS C during the weekday morning peak hour and at LOS D during the weekday evening peak hour with increases in delay of approximately three and six seconds, respectively. Furthermore, all of the approaches are projected to continue operating at LOS D or better during the peak hours with increases in delay of approximately nine seconds or less. As such, this intersection has sufficient reserve capacity to accommodate the traffic estimated to be generated by the proposed development and no roadway improvements or signal modifications will be required. U.S. Route 30 with 135th Street The results of the capacity analysis indicate that overall, this intersection currently operates at LOS D during the weekday morning and weekday evening peak hours. Under Year 2027 total projected conditions, this intersection is projected to continue operating at LOS D during the weekday morning peak hour and at LOS E during the weekday evening peak hour with increases in delay of approximately five and six seconds, respectively. The increase in LOS during the evening peak hour is mainly due to the projected growth in background traffic, as the site generated traffic will only account for a three percent increase in the Year 2021 traffic volumes. Furthermore, all of the approaches are projected to continue operating at LOS E or better during the peak hours with increases in delay of approximately twelve seconds or less. As such, this intersection has sufficient reserve capacity to accommodate the traffic estimated to be generated by the proposed development and no roadway improvements or signal modifications will be required. 225 Bronk Parcel Residential Development Plainfield, Illinois 29 U.S. Route 30 with 127th Street The results of the capacity analysis indicate that overall, this intersection currently operates at LOS D during the weekday morning and weekday evening peak hours. It should be noted that all of the left-turn movements operate at LOS E or F as a result of the protected only phase and not due to capacity deficiencies. Under Year 2027 total projected conditions, this intersection is projected to continue operating at LOS D during the weekday morning peak hour and at LOS E during the weekday evening peak hour with increases in delay of approximately two and four seconds, respectively. The increase in the overall delay during the evening peak hour is mainly due to the projected growth in background traffic, as the site-generated traffic will only account for four percent of the total traffic. As such, this intersection has sufficient reserve capacity to accommodate the traffic estimated to be generated by the proposed development and no roadway improvements or signal modifications will be required. 127th Street with 248th Avenue The results of the capacity analysis indicate that overall, this intersection currently operates at LOS C during the weekday morning and weekday evening peak hours. Under Year 2027 total projected conditions, this intersection is projected to continue operating at LOS C during the weekday morning and evening peak hours. As such, this intersection has sufficient reserve capacity to accommodate the traffic estimated to be generated by the proposed development and no roadway improvements or signal modifications will be required. 127th Street with Edward Elmhurst Access Road The results of the capacity analysis indicate that the southbound approach currently operates at LOS C during the weekday morning peak hour and at LOS D during the weekday evening peak hours. The eastbound left-turn movements currently operate at LOS A during the weekday morning peak hour and at LOS B during the weekday evening peak hour. Based on a review of the total projected traffic volumes and the turn lane warrant figures published in Chapter 36 of the IDOT Bureau of Design and Environment (BDE) Manual, an exclusive westbound left-turn lane and an exclusive eastbound right-turn lane are warranted and, as such, should be provided. Per the BDE Manual, these turn lanes should provide 145 feet of storage and 175 feet of taper. Under Year 2027 total projected conditions, with the addition of the south leg and assuming the identified geometric improvements, the northbound approach is projected to operate at LOS C during both peak hours. The southbound approach is projected to operate at LOS C during the weekday morning peak hour and LOS F during the weekday evening peak hour. This LOS and delay for the southbound approach is typical and expected when a minor road/dri ve intersects a major road such as 127th Street. Inspection of the capacity analyses indicate that the left-turn movements from the major road are projected to operate at acceptable LOS B or better. Furthermore, based on a review of the peak hour traffic signal warrants published in the Manual on Uniform Traffic Control Devices (MUTCD) and the projected traffic volumes, a traffic signal will not be warranted at this intersection. As such, no additional geometric or traffic control improvements are necessary in conjunction with the proposed development. 226 Bronk Parcel Residential Development Plainfield, Illinois 30 Van Dyke Road with Hamilton Lane The results of the capacity analysis indicate that the westbound approach currently operates at LOS B during the weekday morning and evening peak hours. The southbound left-turn movements currently operate at LOS A during the weekday morning and evening peak hours. Under Year 2027 total projected conditions, with the addition of the west leg of the intersection, the eastbound and westbound approaches are projected to operate at LOS B during the weekday morning peak hour and at LOS D during the weekday evening peak hour. Northbound and southbound left-turn movements are projected to operate at LOS A during the peak hours. As such, the proposed access road will be adequate in accommodating the traffic estimated to be generated by the proposed development. Van Dyke Road with Norwood Drive The results of the capacity analysis indicate that the eastbound approach currently operates at LOS C during the weekday morning and evening peak hours. The westbound approach currently operates at LOS B during the weekday morning peak hour and at LOS C during the weekday evening peak hour. The northbound and southbound left-turn movements currently operate at LOS A during both the weekday morning and evening peak hours. Under Year 2027 total projected conditions, the eastbound approach is projected to continue operating at LOS C during the weekday morning and evening peak hours. The westbound approach is projected to operate at LOS C during both peak hours. The northbound and southbound left-turn movements are projected to continue operating at LOS A during the weekday morning and evening peak hours. As such, the proposed development will have a limited impact on the operation of this intersection and no roadway or traffic control improvements will be required. Vicarage Drive with 135th Street The results of the capacity analysis indicate that the northbound approach currently operates at LOS B during the weekday morning peak hour and at LOS C during the weekday evening peak hour. The southbound approach currently operates at LOS C during the weekday morning peak hour and at LOS D during the weekday evening peak hour. The eastbound and westbound left- turn movements currently operate at LOS A during both the weekday morning and evening peak hours. Under Year 2027 total projected conditions, the northbound approach is projected to operate at LOS C during the weekday morning and evening peak hours. The southbound approach is projected to continue to operate at the same LOS as under existing conditions with minimal increases in delay. It should be noted that the proposed extension of Vicarage Drive to the north will provide southbound exiting traffic onto 135th Street with accessibility to the north thus distributing existing and future traffic volumes in a more efficient manner. Further inspection of the capacity analyses indicate that the eastbound and westbound left-turn movements are projected to operate at LOS B or better during both peak hours. It is important to note that as part of the development and in order to provide adequate traffic calming measures, curb extensions will be provided along the proposed extension of Vicarage Drive at select internal intersections. As such, no additional geometric or traffic control improvements are necessary in conjunction with the proposed development. 227 Bronk Parcel Residential Development Plainfield, Illinois 31 Waterford Boulevard with 127th Street The results of the capacity analysis indicate that the northbound approach currently operates at LOS C during the weekday morning and evening peak hours. The westbound left-turn movements currently operate at LOS A during both the weekday morning and evening peak hours. Under Year 2027 total projected conditions, the northbound approach is projected to continue operating at LOS C during the weekday morning peak hour and is projected to operate at LOS E during the weekday evening peak hour. A level of service like this is normal and expected when a local road such as Waterford Boulevard meets a major collector road such as 127th Street. The westbound left-turn movement is projected to operate at LOS B during the weekday morning peak hour and at LOS A during the weekday evening peak hour. As such, the proposed development will have a limited impact on the operation of this intersection and no roadway or traffic control improvements will be required. 228 Bronk Parcel Residential Development Plainfield, Illinois 32 6. Conclusion Based on the preceding analyses and recommendations, the following conclusions have been made: • The traffic that will be generated by the proposed residential development can be accommodated by the existing area roadway system. • All of the signalized intersections within the study area have sufficient reserve capacity to accommodate the background growth and the traffic estimated to be generated by the proposed development. • The proposed access system in conjunction with the proposed connections to the adjacent neighborhoods will be adequate in accommodating the traffic estimated to be generated by the proposed development and will ensure efficient and flexible access is provided for the proposed development and the neighborhoods. • Outbound movements from, the proposed access roads are projected to operate at acceptable levels of service and the projected traffic volumes will not warrant a traffic signal during the peak hours at any of the access roads. • When the total projected traffic volumes at the proposed access roads are compared to the turn lane warrant guidelines published in the IDOT BDE Manual, an exclusive left-turn lane and an exclusive right-turn lane are warranted on 127th Street at its intersection with the proposed access road. • Curb extensions at select intersections along the proposed extension of Vicarage Drive will be provided as traffic control measures. 229 Appendix Traffic Count Summary Sheets Site Plan CMAP 2050 Projections Letter Level of Service Criteria Capacity Analysis Summary Sheets 230 Traffic Count Summary Sheets 231 Type of peak hour being reported: User-Defined Method for determining peak hour: Total Entering Volume LOCATION: LOCATION: S Van Dyke Rd -- W 127th St QC JOB #: QC JOB #: 15572821 CITY/STATE: CITY/STATE: Plainfield, IL DATE: DATE: Tue, Sep 21 2021 170 335 24 101 45 388 65 32 393 341 0.800.80 296 464 58 65 493 68 238 107 224 413 Peak-Hour: 7:30 AM -- 8:30 AMPeak-Hour: 7:30 AM -- 8:30 AM Peak 15-Min: 7:40 AM -- 7:55 AMPeak 15-Min: 7:40 AM -- 7:55 AM 11.2 4.8 0 6.9 26.7 5.4 6.2 6.3 5.1 2.3 6.1 2.6 0 0 4.7 4.4 4.2 2.8 3.1 3.9 0 0 2 0 0 0 0 0 0 0 0 0 0 0 0 0 N/A N/A N/A N/A N/A N/A N/A N/A 5-Min Count5-Min CountPeriod Period Beginning AtBeginning At S Van Dyke Rd S Van Dyke Rd (Northbound)(Northbound) S Van Dyke Rd S Van Dyke Rd (Southbound)(Southbound) W 127th StW 127th St (Eastbound)(Eastbound) W 127th StW 127th St (Westbound)(Westbound)TotalTotal HourlyHourlyTotalsTotalsLeftLeftThruThruRightRightUULeftLeftThruThruRightRightUULeftLeftThruThruRightRightUULeftLeftThruThruRightRightUU 7:00 AM 3 17 6 0 3 10 2 0 3 41 6 0 2 11 4 0 108 7:05 AM 5 23 11 0 3 12 2 0 4 32 9 0 4 12 5 0 122 7:10 AM 6 14 6 0 3 2 0 0 6 23 2 0 4 12 4 0 82 7:15 AM 2 15 9 0 3 4 0 0 3 23 6 0 6 8 1 0 80 7:20 AM 5 17 9 0 1 1 1 0 4 28 4 0 3 17 2 0 92 7:25 AM 3 18 9 0 1 6 1 0 4 20 5 0 2 19 1 0 89 7:30 AM 7 21 12 0 3 6 1 0 11 21 6 0 5 27 1 0 121 7:35 AM 1 24 9 0 0 6 0 0 8 13 3 0 7 22 2 0 95 7:40 AM 6 30 13 0 2 5 2 0 12 34 4 0 7 20 4 0 139 7:45 AM 6 31 14 0 4 11 5 0 7 33 6 0 9 27 4 0 157 7:50 AM 7 24 8 0 13 16 8 0 6 37 5 0 9 21 1 0 155 7:55 AM 8 21 8 0 3 14 1 0 9 24 8 0 9 27 6 0 138 1378 8:00 AM 11 19 6 0 2 4 1 0 2 43 2 0 4 25 6 0 125 1395 8:05 AM 3 12 11 0 3 5 1 0 2 26 2 0 3 35 1 0 104 1377 8:10 AM 5 11 10 0 5 11 3 0 0 34 7 0 4 27 1 0 118 1413 8:15 AM 2 23 11 0 3 6 0 0 0 27 1 0 3 20 1 0 97 1430 8:20 AM 4 16 4 0 3 4 0 0 2 23 8 0 4 21 3 0 92 1430 8:25 AM 8 6 1 0 4 13 2 0 6 26 6 0 1 24 2 0 99 1440 8:30 AM 5 12 5 0 0 6 1 0 1 33 10 0 4 17 3 0 97 1416 8:35 AM 7 11 10 0 2 6 3 0 5 25 8 0 3 22 3 0 105 1426 8:40 AM 6 20 5 0 6 9 0 0 1 17 7 0 7 27 9 0 114 1401 8:45 AM 9 11 11 0 4 9 0 0 5 18 7 0 6 23 3 0 106 1350 8:50 AM 6 23 11 0 2 9 1 0 2 32 10 0 4 18 4 0 122 1317 8:55 AM 7 16 13 0 3 8 2 0 3 34 3 0 8 19 4 0 120 1299 Peak 15-MinPeak 15-MinFlowratesFlowrates NorthboundNorthbound SouthboundSouthbound EastboundEastbound WestboundWestbound TotalTotalLeftLeftThruThruRightRightUULeftLeftThruThruRightRightUULeftLeftThruThruRightRightUULeftLeftThruThruRightRightUU All Vehicles 76 340 140 0 76 128 60 0 100 416 60 0 100 272 36 0 1804 Heavy Trucks 0 24 4 36 12 0 0 8 0 0 16 4 104 Buses Pedestrians 0 0 0 4 4 Bicycles 0 0 0 0 0 0 0 0 0 0 0 0 0 Scooters Comments: Report generated on 10/21/2021 11:55 AM SOURCE: Quality Counts, LLC (http://www.qualitycounts.net) 1-877-580-2212 Page 1 of 1 232 Type of peak hour being reported: User-Defined Method for determining peak hour: Total Entering Volume LOCATION: LOCATION: US 30 -- W 127th St QC JOB #: QC JOB #: 15572823 CITY/STATE: CITY/STATE: Will, IL DATE: DATE: Tue, Sep 21 2021 339 411 1 297 41 162 4 72 275 350 0.940.94 160 374 20 43 528 1 335 137 360 473 Peak-Hour: 7:30 AM -- 8:30 AMPeak-Hour: 7:30 AM -- 8:30 AM Peak 15-Min: 7:40 AM -- 7:55 AMPeak 15-Min: 7:40 AM -- 7:55 AM 13.6 6.8 100 14.5 4.9 8 0 4.2 5.8 1.1 7.5 1.6 10 2.3 1.1 0 7.5 0 12.8 5.3 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 N/A N/A N/A N/A N/A N/A N/A N/A 5-Min Count5-Min CountPeriod Period Beginning AtBeginning At US 30 US 30 (Northbound)(Northbound) US 30 US 30 (Southbound)(Southbound) W 127th StW 127th St (Eastbound)(Eastbound) W 127th StW 127th St (Westbound)(Westbound)TotalTotal HourlyHourlyTotalsTotalsLeftLeftThruThruRightRightUULeftLeftThruThruRightRightUULeftLeftThruThruRightRightUULeftLeftThruThruRightRightUU 7:00 AM 0 35 9 0 2 31 0 0 0 15 0 0 8 10 3 0 113 7:05 AM 0 19 5 0 3 17 0 0 4 19 0 0 8 14 2 0 91 7:10 AM 0 28 7 0 0 22 0 0 0 30 1 0 1 6 5 0 100 7:15 AM 0 35 8 0 2 38 0 0 0 19 0 0 0 8 3 0 113 7:20 AM 0 33 8 0 0 22 0 0 0 24 2 0 5 5 4 0 103 7:25 AM 0 33 9 0 1 25 0 0 0 25 1 0 2 13 7 0 116 7:30 AM 0 27 12 0 1 34 0 0 0 30 3 0 4 11 6 0 128 7:35 AM 0 36 6 0 6 30 0 0 0 17 1 0 4 10 3 0 113 7:40 AM 1 36 16 0 2 17 1 0 0 33 0 0 4 17 8 0 135 7:45 AM 0 33 14 0 7 36 0 0 1 31 1 0 1 9 7 0 140 7:50 AM 0 10 16 0 0 12 0 0 0 43 3 0 4 21 6 0 115 7:55 AM 0 31 12 0 7 28 0 0 0 28 0 0 2 16 7 0 131 1398 8:00 AM 0 26 13 0 2 26 0 0 0 32 1 0 4 15 4 0 123 1408 8:05 AM 0 32 7 0 5 20 0 0 1 26 0 0 4 11 9 0 115 1432 8:10 AM 0 21 12 0 2 20 0 0 1 36 2 0 2 13 10 0 119 1451 8:15 AM 0 33 9 0 1 37 0 0 0 25 8 0 2 12 7 0 134 1472 8:20 AM 0 21 8 0 6 19 0 0 0 24 1 0 8 6 2 0 95 1464 8:25 AM 0 29 12 0 2 18 0 0 1 25 0 0 4 19 3 0 113 1461 8:30 AM 1 8 4 0 6 25 1 0 2 20 2 0 1 16 4 0 90 1423 8:35 AM 1 21 11 0 2 24 0 0 0 26 3 0 4 10 8 0 110 1420 8:40 AM 1 29 5 0 0 27 0 0 0 19 11 0 4 17 4 0 117 1402 8:45 AM 2 26 10 0 5 21 0 0 0 18 8 0 7 19 4 0 120 1382 8:50 AM 1 22 11 0 3 13 0 0 0 36 10 0 1 20 5 0 122 1389 8:55 AM 4 26 7 0 7 17 0 0 0 33 2 0 3 13 1 0 113 1371 Peak 15-MinPeak 15-MinFlowratesFlowrates NorthboundNorthbound SouthboundSouthbound EastboundEastbound WestboundWestbound TotalTotalLeftLeftThruThruRightRightUULeftLeftThruThruRightRightUULeftLeftThruThruRightRightUULeftLeftThruThruRightRightUU All Vehicles 4 316 184 0 36 260 4 0 4 428 16 0 36 188 84 0 1560 Heavy Trucks 0 12 0 4 36 4 0 8 4 0 12 4 84 Buses Pedestrians 0 0 0 0 0 Bicycles 0 0 0 0 0 0 0 0 0 0 0 0 0 Scooters Comments: Report generated on 10/21/2021 11:55 AM SOURCE: Quality Counts, LLC (http://www.qualitycounts.net) 1-877-580-2212 Page 1 of 1 233 Type of peak hour being reported: User-Defined Method for determining peak hour: Total Entering Volume LOCATION: LOCATION: S Van Dyke Rd -- Norwood Dr QC JOB #: QC JOB #: 15572827 CITY/STATE: CITY/STATE: Plainfield, IL DATE: DATE: Tue, Sep 21 2021 224 394 59 158 7 84 48 19 30 2 0.750.75 8 58 8 3 14 17 327 5 169 349 Peak-Hour: 7:30 AM -- 8:30 AMPeak-Hour: 7:30 AM -- 8:30 AM Peak 15-Min: 7:45 AM -- 8:00 AMPeak 15-Min: 7:45 AM -- 8:00 AM 2.7 2.8 0 3.8 0 3.6 0 0 10 0 37.5 0 0 0 7.1 0 3.4 20 3.6 3.4 4 0 2 0 0 0 0 0 0 0 6 0 0 0 0 0 N/A N/A N/A N/A N/A N/A N/A N/A 5-Min Count5-Min CountPeriod Period Beginning AtBeginning At S Van Dyke Rd S Van Dyke Rd (Northbound)(Northbound) S Van Dyke Rd S Van Dyke Rd (Southbound)(Southbound) Norwood DrNorwood Dr (Eastbound)(Eastbound) Norwood DrNorwood Dr (Westbound)(Westbound)TotalTotal HourlyHourlyTotalsTotalsLeftLeftThruThruRightRightUULeftLeftThruThruRightRightUULeftLeftThruThruRightRightUULeftLeftThruThruRightRightUU 7:00 AM 0 20 1 0 0 14 3 0 3 0 0 0 0 0 0 0 41 7:05 AM 0 31 0 0 2 15 5 0 4 0 2 0 0 0 1 0 60 7:10 AM 0 17 0 0 0 8 3 0 7 0 2 0 1 0 1 0 39 7:15 AM 0 25 0 0 0 13 3 0 1 0 0 0 0 0 2 0 44 7:20 AM 1 24 0 0 0 5 0 0 2 1 2 0 0 0 1 0 36 7:25 AM 1 33 2 0 0 11 1 0 1 0 0 0 0 0 1 0 50 7:30 AM 0 26 0 0 2 13 1 0 3 0 1 0 1 0 2 0 49 7:35 AM 0 27 0 0 0 16 4 0 6 0 0 0 1 2 5 0 61 7:40 AM 2 36 0 0 0 8 5 0 2 0 0 0 0 0 3 0 56 7:45 AM 2 44 1 0 1 18 4 0 11 0 1 0 0 0 1 0 83 7:50 AM 1 28 1 0 0 22 11 0 4 0 1 0 0 1 1 0 70 7:55 AM 4 25 0 0 2 20 9 0 5 1 0 0 0 0 2 0 68 657 8:00 AM 2 31 1 0 0 7 2 0 4 0 1 0 0 1 1 0 50 666 8:05 AM 2 24 0 0 0 9 2 0 0 0 1 0 0 0 0 0 38 644 8:10 AM 1 19 1 0 1 17 1 0 5 0 1 0 0 1 3 0 50 655 8:15 AM 0 34 1 0 0 8 3 0 3 0 1 0 0 1 0 0 51 662 8:20 AM 3 21 0 0 1 13 6 0 1 1 0 0 1 2 0 0 49 675 8:25 AM 0 12 0 0 0 7 11 0 4 0 1 0 0 0 1 0 36 661 8:30 AM 1 23 1 0 0 15 11 0 3 1 1 0 0 4 2 0 62 674 8:35 AM 1 14 0 0 0 6 10 0 1 0 0 0 0 4 0 0 36 649 8:40 AM 2 36 1 0 0 17 14 0 2 1 0 0 0 8 2 0 83 676 8:45 AM 2 34 3 0 0 14 12 0 3 1 0 0 0 3 0 0 72 665 8:50 AM 4 26 3 0 1 9 12 0 5 0 4 0 0 2 3 0 69 664 8:55 AM 3 23 1 0 0 11 8 0 12 5 5 0 0 3 2 0 73 669 Peak 15-MinPeak 15-MinFlowratesFlowrates NorthboundNorthbound SouthboundSouthbound EastboundEastbound WestboundWestbound TotalTotalLeftLeftThruThruRightRightUULeftLeftThruThruRightRightUULeftLeftThruThruRightRightUULeftLeftThruThruRightRightUU All Vehicles 28 388 8 0 12 240 96 0 80 4 8 0 0 4 16 0 884 Heavy Trucks 0 12 0 0 12 0 0 0 0 0 4 0 28 Buses Pedestrians 0 0 0 4 4 Bicycles 0 0 0 0 0 0 0 0 0 0 0 0 0 Scooters Comments: Report generated on 10/21/2021 11:55 AM SOURCE: Quality Counts, LLC (http://www.qualitycounts.net) 1-877-580-2212 Page 1 of 1 234 Type of peak hour being reported: User-Defined Method for determining peak hour: Total Entering Volume LOCATION: LOCATION: S Van Dyke Rd -- 135th St QC JOB #: QC JOB #: 15572829 CITY/STATE: CITY/STATE: Plainfield, IL DATE: DATE: Tue, Sep 21 2021 188 342 35 104 49 263 66 48 300 347 0.850.85 209 425 12 43 464 19 228 68 159 315 Peak-Hour: 7:30 AM -- 8:30 AMPeak-Hour: 7:30 AM -- 8:30 AM Peak 15-Min: 7:40 AM -- 7:55 AMPeak 15-Min: 7:40 AM -- 7:55 AM 4.3 4.4 5.7 5.8 0 4.6 7.6 2.1 3.7 2 4.8 2.8 0 0 1.9 0 3.9 2.9 3.8 3.5 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 N/A N/A N/A N/A N/A N/A N/A N/A 5-Min Count5-Min CountPeriod Period Beginning AtBeginning At S Van Dyke Rd S Van Dyke Rd (Northbound)(Northbound) S Van Dyke Rd S Van Dyke Rd (Southbound)(Southbound) 135th St135th St (Eastbound)(Eastbound) 135th St135th St (Westbound)(Westbound)TotalTotal HourlyHourlyTotalsTotalsLeftLeftThruThruRightRightUULeftLeftThruThruRightRightUULeftLeftThruThruRightRightUULeftLeftThruThruRightRightUU 7:00 AM 3 22 2 0 6 10 4 0 3 26 2 0 2 11 3 0 94 7:05 AM 2 14 8 0 2 13 3 0 5 47 0 0 3 17 7 0 121 7:10 AM 1 18 4 0 2 12 1 0 4 44 0 0 4 10 1 0 101 7:15 AM 0 18 2 0 2 11 0 0 5 26 1 0 2 16 0 0 83 7:20 AM 0 13 3 0 3 5 1 0 2 45 1 0 1 19 4 0 97 7:25 AM 0 27 6 0 4 7 2 0 6 26 2 0 1 16 7 0 104 7:30 AM 3 14 7 0 5 9 4 0 6 23 0 0 6 12 5 0 94 7:35 AM 1 23 7 0 3 11 4 0 3 15 0 0 4 16 2 0 89 7:40 AM 3 31 12 0 3 8 1 0 12 38 2 0 1 18 3 0 132 7:45 AM 0 23 9 0 10 11 0 0 13 35 0 0 1 16 4 0 122 7:50 AM 0 16 3 0 2 14 7 0 7 30 2 0 4 17 6 0 108 7:55 AM 0 19 2 0 5 14 4 0 1 39 2 0 2 26 3 0 117 1262 8:00 AM 2 19 3 0 2 4 3 0 6 30 0 0 6 21 8 0 104 1272 8:05 AM 2 19 5 0 5 4 3 0 3 22 1 0 2 18 4 0 88 1239 8:10 AM 2 12 7 0 6 8 5 0 8 28 0 0 5 23 5 0 109 1247 8:15 AM 4 27 5 0 2 4 3 0 4 32 0 0 1 11 2 0 95 1259 8:20 AM 1 13 4 0 4 9 1 0 1 28 3 0 5 13 3 0 85 1247 8:25 AM 1 12 4 0 2 8 0 0 2 27 2 0 6 18 3 0 85 1228 8:30 AM 0 19 4 0 5 12 2 0 2 33 1 0 4 20 5 0 107 1241 8:35 AM 3 14 1 0 2 0 4 0 6 24 0 0 5 23 4 0 86 1238 8:40 AM 2 19 5 0 2 10 5 0 6 38 3 0 3 15 6 0 114 1220 8:45 AM 2 24 7 0 2 8 4 0 9 20 2 0 1 12 2 0 93 1191 8:50 AM 1 12 2 0 9 9 3 0 4 32 0 0 2 18 4 0 96 1179 8:55 AM 1 14 8 0 10 13 2 0 6 38 2 0 6 20 2 0 122 1184 Peak 15-MinPeak 15-MinFlowratesFlowrates NorthboundNorthbound SouthboundSouthbound EastboundEastbound WestboundWestbound TotalTotalLeftLeftThruThruRightRightUULeftLeftThruThruRightRightUULeftLeftThruThruRightRightUULeftLeftThruThruRightRightUU All Vehicles 12 280 96 0 60 132 32 0 128 412 16 0 24 204 52 0 1448 Heavy Trucks 0 12 0 0 12 4 4 4 0 0 4 0 40 Buses Pedestrians 0 0 0 0 0 Bicycles 0 0 0 0 0 0 0 0 0 0 0 0 0 Scooters Comments: Report generated on 10/21/2021 11:55 AM SOURCE: Quality Counts, LLC (http://www.qualitycounts.net) 1-877-580-2212 Page 1 of 1 235 Type of peak hour being reported: User-Defined Method for determining peak hour: Total Entering Volume LOCATION: LOCATION: US 30 -- 135th St QC JOB #: QC JOB #: 15572833 CITY/STATE: CITY/STATE: Plainfield, IL DATE: DATE: Tue, Sep 21 2021 364 476 13 295 56 215 51 48 259 256 0.910.91 133 418 111 78 420 69 377 108 484 554 Peak-Hour: 7:30 AM -- 8:30 AMPeak-Hour: 7:30 AM -- 8:30 AM Peak 15-Min: 7:40 AM -- 7:55 AMPeak 15-Min: 7:40 AM -- 7:55 AM 14 9 7.7 16.6 1.8 5.6 0 0 3.9 1.6 6 1.9 3.6 2.6 2.1 4.3 11.4 3.7 11.4 9 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 N/A N/A N/A N/A N/A N/A N/A N/A 5-Min Count5-Min CountPeriod Period Beginning AtBeginning At US 30 US 30 (Northbound)(Northbound) US 30 US 30 (Southbound)(Southbound) 135th St135th St (Eastbound)(Eastbound) 135th St135th St (Westbound)(Westbound)TotalTotal HourlyHourlyTotalsTotalsLeftLeftThruThruRightRightUULeftLeftThruThruRightRightUULeftLeftThruThruRightRightUULeftLeftThruThruRightRightUU 7:00 AM 3 33 6 0 6 13 2 0 5 29 3 0 2 17 3 0 122 7:05 AM 1 25 7 0 5 41 3 0 4 31 14 0 9 2 3 0 145 7:10 AM 1 27 6 0 3 16 0 0 5 33 13 0 3 11 6 0 124 7:15 AM 2 37 8 0 2 32 0 0 2 22 8 0 2 5 3 0 123 7:20 AM 3 35 3 0 4 30 4 0 2 31 11 0 6 10 4 0 143 7:25 AM 2 33 7 0 5 18 0 0 3 22 15 0 10 9 3 0 127 7:30 AM 4 32 13 0 6 35 1 0 6 12 13 0 6 10 6 0 144 7:35 AM 2 40 12 0 4 25 0 0 6 16 14 0 1 5 1 0 126 7:40 AM 4 47 12 0 5 31 2 0 5 24 8 0 10 8 8 0 164 7:45 AM 7 30 5 0 3 7 0 0 3 31 16 0 1 14 4 0 121 7:50 AM 4 31 8 0 4 34 3 0 7 23 7 0 13 11 6 0 151 7:55 AM 16 29 8 0 4 28 1 0 3 32 12 0 6 11 4 0 154 1644 8:00 AM 4 22 13 0 3 15 0 0 5 18 5 0 13 13 3 0 114 1636 8:05 AM 7 30 3 0 6 21 1 0 1 18 8 0 6 14 5 0 120 1611 8:10 AM 3 27 10 0 2 16 4 0 6 29 8 0 8 18 7 0 138 1625 8:15 AM 5 31 7 0 9 37 0 0 4 20 4 0 7 10 2 0 136 1638 8:20 AM 4 28 9 0 3 18 0 0 3 17 7 0 6 5 1 0 101 1596 8:25 AM 9 30 8 0 7 28 1 0 2 16 9 0 1 14 1 0 126 1595 8:30 AM 3 21 9 0 2 18 1 0 1 20 7 0 6 15 2 0 105 1556 8:35 AM 5 21 7 0 2 25 3 0 5 23 10 0 6 11 4 0 122 1552 8:40 AM 3 38 9 0 3 22 5 0 4 24 9 0 7 14 4 0 142 1530 8:45 AM 8 28 10 0 5 36 11 0 5 12 5 0 6 7 1 0 134 1543 8:50 AM 10 34 8 0 3 12 6 0 0 11 5 0 6 12 6 0 113 1505 8:55 AM 6 20 21 0 2 21 4 0 3 25 5 0 6 11 9 0 133 1484 Peak 15-MinPeak 15-MinFlowratesFlowrates NorthboundNorthbound SouthboundSouthbound EastboundEastbound WestboundWestbound TotalTotalLeftLeftThruThruRightRightUULeftLeftThruThruRightRightUULeftLeftThruThruRightRightUULeftLeftThruThruRightRightUU All Vehicles 60 432 100 0 48 288 20 0 60 312 124 0 96 132 72 0 1744 Heavy Trucks 0 28 0 0 44 0 0 8 0 4 4 0 88 Buses Pedestrians 0 0 0 0 0 Bicycles 0 0 0 0 0 0 0 0 0 0 0 0 0 Scooters Comments: Report generated on 10/21/2021 11:55 AM SOURCE: Quality Counts, LLC (http://www.qualitycounts.net) 1-877-580-2212 Page 1 of 1 236 Type of peak hour being reported: User-Defined Method for determining peak hour: Total Entering Volume LOCATION: LOCATION: Waterford Blvd -- W 127th St QC JOB #: QC JOB #: 15572835 CITY/STATE: CITY/STATE: Plainfield, IL DATE: DATE: Tue, Sep 21 2021 0 0 0 0 0 4 0 0 23 0 0.750.75 0 2 2 23 37 4 0 37 25 41 Peak-Hour: 7:30 AM -- 8:30 AMPeak-Hour: 7:30 AM -- 8:30 AM Peak 15-Min: 7:30 AM -- 7:45 AMPeak 15-Min: 7:30 AM -- 7:45 AM 0 0 0 0 0 0 0 0 13 0 0 0 0 13 5.4 0 0 5.4 12 4.9 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 N/A N/A N/A N/A N/A N/A N/A N/A 15-Min Count15-Min CountPeriod Period Beginning AtBeginning At Waterford Blvd Waterford Blvd (Northbound)(Northbound) Waterford Blvd Waterford Blvd (Southbound)(Southbound) W 127th StW 127th St (Eastbound)(Eastbound) W 127th StW 127th St (Westbound)(Westbound)TotalTotal HourlyHourlyTotalsTotalsLeftLeftThruThruRightRightUULeftLeftThruThruRightRightUULeftLeftThruThruRightRightUULeftLeftThruThruRightRightUU 7:00 AM 1 0 6 0 0 0 0 0 0 0 0 0 2 0 0 0 9 7:15 AM 2 0 7 0 0 0 0 0 0 0 0 0 2 0 0 0 11 7:30 AM 1 0 13 0 0 0 0 0 0 0 2 0 6 0 0 0 22 7:45 AM 3 0 13 0 0 0 0 0 0 0 0 0 6 0 0 0 22 64 8:00 AM 0 0 7 0 0 0 0 0 0 0 0 0 5 0 0 0 12 67 8:15 AM 0 0 4 0 0 0 0 0 0 0 0 0 6 0 0 0 10 66 8:30 AM 1 0 17 0 0 0 0 0 0 0 1 0 3 0 0 0 22 66 8:45 AM 1 0 12 0 0 0 0 0 0 0 3 0 4 0 0 0 20 64 Peak 15-MinPeak 15-Min FlowratesFlowrates NorthboundNorthbound SouthboundSouthbound EastboundEastbound WestboundWestbound TotalTotalLeftLeftThruThruRightRightUULeftLeftThruThruRightRightUULeftLeftThruThruRightRightUULeftLeftThruThruRightRightUU All Vehicles 4 0 52 0 0 0 0 0 0 0 8 0 24 0 0 0 88 Heavy Trucks 0 0 8 0 0 0 0 0 0 8 0 0 16 Buses Pedestrians 0 0 0 0 0 Bicycles 0 0 0 0 0 0 0 0 0 0 0 0 0 Scooters Comments: Report generated on 10/21/2021 12:12 PM SOURCE: Quality Counts, LLC (http://www.qualitycounts.net) 1-877-580-2212 Page 1 of 1 237 Type of peak hour being reported: User-Defined Method for determining peak hour: Total Entering Volume LOCATION: LOCATION: 248th Ave -- W 127th St QC JOB #: QC JOB #: 15572837 CITY/STATE: CITY/STATE: Plainfield, IL DATE: DATE: Tue, Sep 21 2021 215 294 84 0 131 84 191 103 103 0 0.830.83 0 191 0 0 131 0 0 0 0 0 Peak-Hour: 7:30 AM -- 8:30 AMPeak-Hour: 7:30 AM -- 8:30 AM Peak 15-Min: 7:45 AM -- 8:00 AMPeak 15-Min: 7:45 AM -- 8:00 AM 5.1 3.1 7.1 0 3.8 7.1 1 6.8 6.8 0 0 1 0 0 3.8 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 N/A N/A N/A N/A N/A N/A N/A N/A 15-Min Count15-Min CountPeriod Period Beginning AtBeginning At 248th Ave 248th Ave (Northbound)(Northbound) 248th Ave 248th Ave (Southbound)(Southbound) W 127th StW 127th St (Eastbound)(Eastbound) W 127th StW 127th St (Westbound)(Westbound)TotalTotal HourlyHourlyTotalsTotalsLeftLeftThruThruRightRightUULeftLeftThruThruRightRightUULeftLeftThruThruRightRightUULeftLeftThruThruRightRightUU 7:00 AM 0 0 0 0 50 0 30 0 29 0 0 0 0 0 18 0 127 7:15 AM 0 0 0 0 26 0 14 0 29 0 0 0 0 0 16 0 85 7:30 AM 0 0 0 0 32 0 21 0 40 0 0 0 0 0 17 0 110 7:45 AM 0 0 0 0 36 0 19 0 63 0 0 0 0 0 36 0 154 476 8:00 AM 0 0 0 0 33 0 16 0 50 0 0 0 0 0 28 0 127 476 8:15 AM 0 0 0 0 30 0 28 0 38 0 0 0 0 0 22 0 118 509 8:30 AM 0 0 0 0 31 0 18 0 35 0 0 0 0 0 17 0 101 500 8:45 AM 0 0 0 0 32 0 15 0 30 0 0 0 0 0 18 0 95 441 Peak 15-MinPeak 15-Min FlowratesFlowrates NorthboundNorthbound SouthboundSouthbound EastboundEastbound WestboundWestbound TotalTotalLeftLeftThruThruRightRightUULeftLeftThruThruRightRightUULeftLeftThruThruRightRightUULeftLeftThruThruRightRightUU All Vehicles 0 0 0 0 144 0 76 0 252 0 0 0 0 0 144 0 616 Heavy Trucks 0 0 0 0 0 4 4 0 0 0 0 0 8 Buses Pedestrians 0 0 0 0 0 Bicycles 0 0 0 0 0 0 0 0 0 0 0 0 0 Scooters Comments: Report generated on 10/21/2021 12:12 PM SOURCE: Quality Counts, LLC (http://www.qualitycounts.net) 1-877-580-2212 Page 1 of 1 238 Type of peak hour being reported: User-Defined Method for determining peak hour: Total Entering Volume LOCATION: LOCATION: Edward Elmhurst Health Access Dr -- W 127th St QC JOB #: QC JOB #: 15572839 CITY/STATE: CITY/STATE: Plainfield, IL DATE: DATE: Tue, Sep 21 2021 38 132 14 0 24 14 58 74 74 0 0.670.67 0 58 0 0 24 0 0 0 0 0 Peak-Hour: 7:30 AM -- 8:30 AMPeak-Hour: 7:30 AM -- 8:30 AM Peak 15-Min: 8:15 AM -- 8:30 AMPeak 15-Min: 8:15 AM -- 8:30 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 N/A N/A N/A N/A N/A N/A N/A N/A 15-Min Count15-Min CountPeriod Period Beginning AtBeginning At Edward Elmhurst HealthEdward Elmhurst Health Access Dr Access Dr (Northbound)(Northbound) Edward Elmhurst HealthEdward Elmhurst Health Access Dr Access Dr (Southbound)(Southbound) W 127th StW 127th St (Eastbound)(Eastbound) W 127th StW 127th St (Westbound)(Westbound)TotalTotal HourlyHourlyTotalsTotals LeftLeft ThruThru RightRight UU LeftLeft ThruThru RightRight UU LeftLeft ThruThru RightRight UU LeftLeft ThruThru RightRight UU 7:00 AM 0 0 0 0 5 0 2 0 6 0 0 0 0 0 7 0 20 7:15 AM 0 0 0 0 2 0 4 0 5 0 0 0 0 0 10 0 21 7:30 AM 0 0 0 0 4 0 3 0 10 0 0 0 0 0 16 0 33 7:45 AM 0 0 0 0 3 0 1 0 9 0 0 0 0 0 14 0 27 101 8:00 AM 0 0 0 0 4 0 3 0 17 0 0 0 0 0 23 0 47 128 8:15 AM 0 0 0 0 13 0 7 0 22 0 0 0 0 0 21 0 63 170 8:30 AM 0 0 0 0 7 0 4 0 22 0 0 0 0 0 18 0 51 188 8:45 AM 0 0 0 0 10 0 7 0 20 0 0 0 0 0 19 0 56 217 Peak 15-MinPeak 15-MinFlowratesFlowrates NorthboundNorthbound SouthboundSouthbound EastboundEastbound WestboundWestbound TotalTotalLeftLeftThruThruRightRightUULeftLeftThruThruRightRightUULeftLeftThruThruRightRightUULeftLeftThruThruRightRightUU All Vehicles 0 0 0 0 52 0 28 0 88 0 0 0 0 0 84 0 252 Heavy Trucks 0 0 0 0 0 0 0 0 0 0 0 0 0 Buses Pedestrians 0 0 0 0 0 Bicycles 0 0 0 0 0 0 0 0 0 0 0 0 0 Scooters Comments: Report generated on 10/21/2021 12:12 PM SOURCE: Quality Counts, LLC (http://www.qualitycounts.net) 1-877-580-2212 Page 1 of 1 239 Type of peak hour being reported: User-Defined Method for determining peak hour: Total Entering Volume LOCATION: LOCATION: Vicarage Dr -- 135th St QC JOB #: QC JOB #: 15572843 CITY/STATE: CITY/STATE: Plainfield, IL DATE: DATE: Tue, Sep 21 2021 59 37 19 0 40 23 25 12 18 0 0.880.88 0 29 4 6 53 4 0 13 10 17 Peak-Hour: 7:30 AM -- 8:30 AMPeak-Hour: 7:30 AM -- 8:30 AM Peak 15-Min: 7:30 AM -- 7:45 AMPeak 15-Min: 7:30 AM -- 7:45 AM 6.8 8.1 10.5 0 5 8.7 12 0 0 0 0 13.8 25 0 7.5 0 0 15.4 10 11.8 2 0 4 0 0 0 0 0 0 0 0 0 0 0 0 0 N/A N/A N/A N/A N/A N/A N/A N/A 15-Min Count15-Min CountPeriod Period Beginning AtBeginning At Vicarage Dr Vicarage Dr (Northbound)(Northbound) Vicarage Dr Vicarage Dr (Southbound)(Southbound) 135th St135th St (Eastbound)(Eastbound) 135th St135th St (Westbound)(Westbound)TotalTotal HourlyHourlyTotalsTotalsLeftLeftThruThruRightRightUULeftLeftThruThruRightRightUULeftLeftThruThruRightRightUULeftLeftThruThruRightRightUU 7:00 AM 0 0 2 0 6 0 1 0 3 0 0 0 1 0 2 0 15 7:15 AM 0 0 2 0 8 0 2 0 1 0 1 0 0 0 3 0 17 7:30 AM 1 0 2 0 12 0 7 0 5 0 2 0 0 0 6 0 35 7:45 AM 0 0 2 0 9 0 5 0 8 0 0 0 5 0 3 0 32 99 8:00 AM 1 0 7 0 4 0 5 0 5 0 2 0 0 0 2 0 26 110 8:15 AM 2 0 2 0 15 0 2 0 7 0 0 0 1 0 1 0 30 123 8:30 AM 0 0 1 0 2 0 2 0 7 0 1 0 2 0 5 0 20 108 8:45 AM 0 0 8 0 28 0 12 0 4 0 0 0 2 0 4 0 58 134 Peak 15-MinPeak 15-Min FlowratesFlowrates NorthboundNorthbound SouthboundSouthbound EastboundEastbound WestboundWestbound TotalTotalLeftLeftThruThruRightRightUULeftLeftThruThruRightRightUULeftLeftThruThruRightRightUULeftLeftThruThruRightRightUU All Vehicles 4 0 8 0 48 0 28 0 20 0 8 0 0 0 24 0 140 Heavy Trucks 0 0 4 4 0 4 8 0 4 0 0 0 24 Buses Pedestrians 0 4 0 0 4 Bicycles 0 0 0 0 0 0 0 0 0 0 0 0 0 Scooters Comments: Report generated on 10/21/2021 12:12 PM SOURCE: Quality Counts, LLC (http://www.qualitycounts.net) 1-877-580-2212 Page 1 of 1 240 Type of peak hour being reported: User-Defined Method for determining peak hour: Total Entering Volume LOCATION: LOCATION: S Van Dyke Rd -- Hamilton Ln QC JOB #: QC JOB #: 15572849 CITY/STATE: CITY/STATE: Plainfield, IL DATE: DATE: Tue, Sep 21 2021 11 18 0 0 11 0 0 18 30 0 0.900.90 0 0 0 12 17 0 0 6 12 6 Peak-Hour: 7:30 AM -- 8:30 AMPeak-Hour: 7:30 AM -- 8:30 AM Peak 15-Min: 7:30 AM -- 7:45 AMPeak 15-Min: 7:30 AM -- 7:45 AM 0 16.7 0 0 0 0 0 16.7 10 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 0 0 0 0 0 1 0 N/A N/A N/A N/A N/A N/A N/A N/A 15-Min Count15-Min CountPeriod Period Beginning AtBeginning At S Van Dyke Rd S Van Dyke Rd (Northbound)(Northbound) S Van Dyke Rd S Van Dyke Rd (Southbound)(Southbound) Hamilton LnHamilton Ln (Eastbound)(Eastbound) Hamilton LnHamilton Ln (Westbound)(Westbound)TotalTotal HourlyHourlyTotalsTotalsLeftLeftThruThruRightRightUULeftLeftThruThruRightRightUULeftLeftThruThruRightRightUULeftLeftThruThruRightRightUU 7:00 AM 0 0 3 0 3 0 0 0 0 0 0 0 2 0 5 0 13 7:15 AM 0 0 1 0 2 0 0 0 0 0 0 0 1 0 7 0 11 7:30 AM 0 0 0 0 1 0 0 0 0 0 0 0 2 0 10 0 13 7:45 AM 0 0 1 0 5 0 0 0 0 0 0 0 2 0 5 0 13 50 8:00 AM 0 0 2 0 3 0 0 0 0 0 0 0 1 0 2 0 8 45 8:15 AM 0 0 3 0 2 0 0 0 0 0 0 0 7 0 1 0 13 47 8:30 AM 0 0 0 0 2 0 0 0 0 0 0 0 14 0 5 0 21 55 8:45 AM 0 0 8 0 3 0 0 0 0 0 0 0 9 0 6 0 26 68 Peak 15-MinPeak 15-Min FlowratesFlowrates NorthboundNorthbound SouthboundSouthbound EastboundEastbound WestboundWestbound TotalTotalLeftLeftThruThruRightRightUULeftLeftThruThruRightRightUULeftLeftThruThruRightRightUULeftLeftThruThruRightRightUU All Vehicles 0 0 0 0 4 0 0 0 0 0 0 0 8 0 40 0 52 Heavy Trucks 0 0 0 0 0 0 0 0 0 0 0 8 8 Buses Pedestrians 0 0 0 0 0 Bicycles 0 4 0 0 0 0 0 0 0 0 0 0 4 Scooters Comments: Report generated on 10/21/2021 12:12 PM SOURCE: Quality Counts, LLC (http://www.qualitycounts.net) 1-877-580-2212 Page 1 of 1 241 Type of peak hour being reported: User-Defined Method for determining peak hour: Total Entering Volume LOCATION: LOCATION: S Van Dyke Rd -- W 127th St QC JOB #: QC JOB #: 15572822 CITY/STATE: CITY/STATE: Plainfield, IL DATE: DATE: Tue, Sep 21 2021 398 280 50 271 77 672 44 50 740 438 0.940.94 522 640 158 168 652 99 187 137 597 423 Peak-Hour: 5:00 PM -- 6:00 PMPeak-Hour: 5:00 PM -- 6:00 PM Peak 15-Min: 5:00 PM -- 5:15 PMPeak 15-Min: 5:00 PM -- 5:15 PM 0.5 0.7 0 0.7 0 0.3 2.3 0 0.4 0.7 0.4 0.6 0 0.6 0.5 0 0.5 0 0.5 0.2 1 0 1 0 0 1 1 0 0 0 0 0 0 0 1 0 N/A N/A N/A N/A N/A N/A N/A N/A 15-Min Count15-Min CountPeriod Period Beginning AtBeginning At S Van Dyke Rd S Van Dyke Rd (Northbound)(Northbound) S Van Dyke Rd S Van Dyke Rd (Southbound)(Southbound) W 127th StW 127th St (Eastbound)(Eastbound) W 127th StW 127th St (Westbound)(Westbound)TotalTotal HourlyHourlyTotalsTotalsLeftLeftThruThruRightRightUULeftLeftThruThruRightRightUULeftLeftThruThruRightRightUULeftLeftThruThruRightRightUU 4:00 PM 19 56 31 0 18 57 6 0 15 118 49 0 34 125 12 0 540 4:15 PM 24 45 30 0 23 76 11 0 9 92 28 0 33 106 10 0 487 4:30 PM 16 45 43 0 16 70 5 0 6 102 47 0 42 149 13 0 554 4:45 PM 30 47 24 0 14 45 10 0 9 101 45 0 40 117 13 0 495 2076 5:00 PM 26 41 35 0 15 74 13 0 15 120 66 0 36 140 7 0 588 2124 5:15 PM 22 49 24 0 19 86 9 0 9 106 38 0 39 127 13 0 541 2178 5:30 PM 28 55 44 0 22 63 10 0 10 97 30 1 45 113 13 0 531 2155 5:45 PM 23 42 34 0 21 48 18 0 9 115 24 0 48 142 17 0 541 2201 Peak 15-MinPeak 15-Min FlowratesFlowrates NorthboundNorthbound SouthboundSouthbound EastboundEastbound WestboundWestbound TotalTotalLeftLeftThruThruRightRightUULeftLeftThruThruRightRightUULeftLeftThruThruRightRightUULeftLeftThruThruRightRightUU All Vehicles 104 164 140 0 60 296 52 0 60 480 264 0 144 560 28 0 2352 Heavy Trucks 0 0 0 0 4 0 0 8 0 0 8 0 20 Buses Pedestrians 0 0 0 0 0 Bicycles 0 4 0 0 4 0 0 0 0 0 0 0 8 Scooters Comments: Report generated on 10/21/2021 12:14 PM SOURCE: Quality Counts, LLC (http://www.qualitycounts.net) 1-877-580-2212 Page 1 of 1 242 Type of peak hour being reported: User-Defined Method for determining peak hour: Total Entering Volume LOCATION: LOCATION: US 30 -- W 127th St QC JOB #: QC JOB #: 15572824 CITY/STATE: CITY/STATE: Will, IL DATE: DATE: Tue, Sep 21 2021 519 436 8 416 95 503 11 86 706 284 0.930.93 467 348 53 153 489 28 339 110 622 477 Peak-Hour: 5:00 PM -- 6:00 PMPeak-Hour: 5:00 PM -- 6:00 PM Peak 15-Min: 5:30 PM -- 5:45 PMPeak 15-Min: 5:30 PM -- 5:45 PM 4 6.4 0 5 0 0.4 0 1.2 0.7 1.1 0.4 1.1 1.9 1.3 0.6 0 8 0 3.9 5.7 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 N/A N/A N/A N/A N/A N/A N/A N/A 15-Min Count15-Min CountPeriod Period Beginning AtBeginning At US 30 US 30 (Northbound)(Northbound) US 30 US 30 (Southbound)(Southbound) W 127th StW 127th St (Eastbound)(Eastbound) W 127th StW 127th St (Westbound)(Westbound)TotalTotal HourlyHourlyTotalsTotalsLeftLeftThruThruRightRightUULeftLeftThruThruRightRightUULeftLeftThruThruRightRightUULeftLeftThruThruRightRightUU 4:00 PM 5 98 32 0 26 127 2 0 5 77 8 0 40 100 16 0 536 4:15 PM 5 77 28 0 15 102 0 0 3 65 10 0 37 117 18 0 477 4:30 PM 5 101 31 0 31 93 0 0 5 62 8 0 32 119 16 0 503 4:45 PM 5 97 41 0 24 107 1 0 3 67 4 0 30 100 20 0 499 2015 5:00 PM 8 72 29 0 31 89 4 0 1 70 8 0 53 112 29 0 506 1985 5:15 PM 10 95 31 0 18 100 0 0 4 81 11 0 30 118 27 0 525 2033 5:30 PM 3 103 22 0 27 126 3 0 2 72 26 0 36 116 16 0 552 2082 5:45 PM 7 69 28 0 19 101 1 0 4 61 8 0 34 121 14 0 467 2050 Peak 15-MinPeak 15-Min FlowratesFlowrates NorthboundNorthbound SouthboundSouthbound EastboundEastbound WestboundWestbound TotalTotalLeftLeftThruThruRightRightUULeftLeftThruThruRightRightUULeftLeftThruThruRightRightUULeftLeftThruThruRightRightUU All Vehicles 12 412 88 0 108 504 12 0 8 288 104 0 144 464 64 0 2208 Heavy Trucks 0 36 0 0 12 0 0 0 4 0 0 0 52 Buses Pedestrians 0 0 0 0 0 Bicycles 0 0 0 0 0 0 0 0 0 0 0 0 0 Scooters Comments: Report generated on 10/21/2021 12:14 PM SOURCE: Quality Counts, LLC (http://www.qualitycounts.net) 1-877-580-2212 Page 1 of 1 243 Type of peak hour being reported: User-Defined Method for determining peak hour: Total Entering Volume LOCATION: LOCATION: S Van Dyke Rd -- Norwood Dr QC JOB #: QC JOB #: 15572828 CITY/STATE: CITY/STATE: Plainfield, IL DATE: DATE: Tue, Sep 21 2021 582 398 73 492 17 98 44 15 38 5 0.940.94 9 69 20 14 34 16 339 11 525 366 Peak-Hour: 5:00 PM -- 6:00 PMPeak-Hour: 5:00 PM -- 6:00 PM Peak 15-Min: 5:00 PM -- 5:15 PMPeak 15-Min: 5:00 PM -- 5:15 PM 0.3 0 0 0.4 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.4 0 1 1 1 0 1 0 0 0 0 0 3 1 0 0 0 0 N/A N/A N/A N/A N/A N/A N/A N/A 15-Min Count15-Min CountPeriod Period Beginning AtBeginning At S Van Dyke Rd S Van Dyke Rd (Northbound)(Northbound) S Van Dyke Rd S Van Dyke Rd (Southbound)(Southbound) Norwood DrNorwood Dr (Eastbound)(Eastbound) Norwood DrNorwood Dr (Westbound)(Westbound)TotalTotal HourlyHourlyTotalsTotalsLeftLeftThruThruRightRightUULeftLeftThruThruRightRightUULeftLeftThruThruRightRightUULeftLeftThruThruRightRightUU 4:00 PM 2 89 3 0 1 109 20 0 11 0 5 0 1 1 2 0 244 4:15 PM 4 72 3 0 5 122 9 0 18 0 7 0 1 0 2 0 243 4:30 PM 3 81 2 0 6 130 12 0 15 2 2 0 3 2 5 0 263 4:45 PM 3 95 3 0 5 110 18 0 9 0 1 0 4 0 2 0 250 1000 5:00 PM 2 92 2 0 5 140 21 0 8 0 6 0 2 1 2 0 281 1037 5:15 PM 5 61 3 0 2 130 24 0 10 3 3 0 3 5 4 0 253 1047 5:30 PM 7 101 3 0 5 115 12 0 13 1 7 0 6 3 6 1 280 1064 5:45 PM 2 85 3 0 5 107 16 0 13 1 4 0 2 0 3 0 241 1055 Peak 15-MinPeak 15-Min FlowratesFlowrates NorthboundNorthbound SouthboundSouthbound EastboundEastbound WestboundWestbound TotalTotalLeftLeftThruThruRightRightUULeftLeftThruThruRightRightUULeftLeftThruThruRightRightUULeftLeftThruThruRightRightUU All Vehicles 8 368 8 0 20 560 84 0 32 0 24 0 8 4 8 0 1124 Heavy Trucks 0 0 0 0 0 0 0 0 0 0 0 0 0 Buses Pedestrians 0 0 0 0 0 Bicycles 0 0 0 0 0 4 0 0 0 0 4 0 8 Scooters Comments: Report generated on 10/21/2021 12:14 PM SOURCE: Quality Counts, LLC (http://www.qualitycounts.net) 1-877-580-2212 Page 1 of 1 244 Type of peak hour being reported: User-Defined Method for determining peak hour: Total Entering Volume LOCATION: LOCATION: S Van Dyke Rd -- 135th St QC JOB #: QC JOB #: 15572830 CITY/STATE: CITY/STATE: Plainfield, IL DATE: DATE: Tue, Sep 21 2021 532 399 117 326 89 750 52 96 789 350 0.920.92 595 432 30 98 513 39 251 74 455 364 Peak-Hour: 5:00 PM -- 6:00 PMPeak-Hour: 5:00 PM -- 6:00 PM Peak 15-Min: 5:30 PM -- 5:45 PMPeak 15-Min: 5:30 PM -- 5:45 PM 0.4 0 0 0.6 0 0.3 0 0 0.3 2.6 0.3 2.1 0 0 1.9 0 0 1.4 0.4 0.3 0 0 0 1 0 1 0 0 0 0 0 0 0 0 0 0 N/A N/A N/A N/A N/A N/A N/A N/A 15-Min Count15-Min CountPeriod Period Beginning AtBeginning At S Van Dyke Rd S Van Dyke Rd (Northbound)(Northbound) S Van Dyke Rd S Van Dyke Rd (Southbound)(Southbound) 135th St135th St (Eastbound)(Eastbound) 135th St135th St (Westbound)(Westbound)TotalTotal HourlyHourlyTotalsTotalsLeftLeftThruThruRightRightUULeftLeftThruThruRightRightUULeftLeftThruThruRightRightUULeftLeftThruThruRightRightUU 4:00 PM 8 58 29 0 25 77 21 0 19 99 7 0 26 115 20 0 504 4:15 PM 5 49 16 0 14 95 21 0 15 79 11 0 29 150 27 0 511 4:30 PM 8 50 17 0 21 93 28 0 21 80 5 0 27 139 26 0 515 4:45 PM 7 47 11 0 29 77 15 1 21 90 7 0 39 131 32 0 507 2037 5:00 PM 8 66 11 0 34 92 28 0 15 79 5 0 18 134 29 0 519 2052 5:15 PM 6 48 17 1 19 83 26 0 12 84 4 0 30 163 15 0 508 2049 5:30 PM 14 72 24 0 17 83 32 0 14 98 12 0 28 154 27 0 575 2109 5:45 PM 10 65 22 0 19 68 31 0 11 89 9 0 22 144 25 0 515 2117 Peak 15-MinPeak 15-Min FlowratesFlowrates NorthboundNorthbound SouthboundSouthbound EastboundEastbound WestboundWestbound TotalTotalLeftLeftThruThruRightRightUULeftLeftThruThruRightRightUULeftLeftThruThruRightRightUULeftLeftThruThruRightRightUU All Vehicles 56 288 96 0 68 332 128 0 56 392 48 0 112 616 108 0 2300 Heavy Trucks 0 0 4 0 0 0 0 4 0 0 4 0 12 Buses Pedestrians 0 0 0 0 0 Bicycles 0 0 0 0 0 0 0 0 0 0 0 0 0 Scooters Comments: Report generated on 10/21/2021 12:14 PM SOURCE: Quality Counts, LLC (http://www.qualitycounts.net) 1-877-580-2212 Page 1 of 1 245 Type of peak hour being reported: User-Defined Method for determining peak hour: Total Entering Volume LOCATION: LOCATION: US 30 -- 135th St QC JOB #: QC JOB #: 15572834 CITY/STATE: CITY/STATE: Plainfield, IL DATE: DATE: Tue, Sep 21 2021 622 483 47 501 74 638 44 95 735 256 0.920.92 458 426 126 182 421 133 344 91 809 568 Peak-Hour: 5:00 PM -- 6:00 PMPeak-Hour: 5:00 PM -- 6:00 PM Peak 15-Min: 5:30 PM -- 5:45 PMPeak 15-Min: 5:30 PM -- 5:45 PM 3.9 5.8 2.1 4.2 2.7 0.3 0 2.1 0.3 1.6 0 0.9 0 0 1.9 0.8 7.6 2.2 2.6 5.1 0 0 0 0 0 0 0 0 0 1 0 0 0 0 0 0 N/A N/A N/A N/A N/A N/A N/A N/A 15-Min Count15-Min CountPeriod Period Beginning AtBeginning At US 30 US 30 (Northbound)(Northbound) US 30 US 30 (Southbound)(Southbound) 135th St135th St (Eastbound)(Eastbound) 135th St135th St (Westbound)(Westbound)TotalTotal HourlyHourlyTotalsTotalsLeftLeftThruThruRightRightUULeftLeftThruThruRightRightUULeftLeftThruThruRightRightUULeftLeftThruThruRightRightUU 4:00 PM 29 104 34 0 13 125 9 0 12 72 35 0 24 96 16 0 569 4:15 PM 30 76 26 0 13 135 7 0 19 65 40 0 44 105 16 0 576 4:30 PM 35 104 21 0 13 113 7 0 12 73 37 0 48 108 26 0 597 4:45 PM 43 90 31 0 19 119 10 0 18 66 33 0 42 80 20 0 571 2313 5:00 PM 24 84 17 0 15 122 14 0 7 66 30 0 46 103 20 0 548 2292 5:15 PM 42 93 24 0 15 104 10 0 12 63 34 0 44 119 26 0 586 2302 5:30 PM 30 97 31 0 24 155 12 0 10 64 25 0 47 108 34 0 637 2342 5:45 PM 37 70 19 0 20 120 11 0 15 63 37 0 45 128 15 0 580 2351 Peak 15-MinPeak 15-Min FlowratesFlowrates NorthboundNorthbound SouthboundSouthbound EastboundEastbound WestboundWestbound TotalTotalLeftLeftThruThruRightRightUULeftLeftThruThruRightRightUULeftLeftThruThruRightRightUULeftLeftThruThruRightRightUU All Vehicles 120 388 124 0 96 620 48 0 40 256 100 0 188 432 136 0 2548 Heavy Trucks 4 32 4 0 8 0 0 0 0 0 0 4 52 Buses Pedestrians 0 0 0 0 0 Bicycles 0 0 0 0 0 0 0 0 0 0 0 0 0 Scooters Comments: Report generated on 10/21/2021 12:14 PM SOURCE: Quality Counts, LLC (http://www.qualitycounts.net) 1-877-580-2212 Page 1 of 1 246 Type of peak hour being reported: User-Defined Method for determining peak hour: Total Entering Volume LOCATION: LOCATION: Waterford Blvd -- W 127th St QC JOB #: QC JOB #: 15572836 CITY/STATE: CITY/STATE: Plainfield, IL DATE: DATE: Tue, Sep 21 2021 0 0 0 0 0 9 0 0 44 0 0.690.69 0 12 12 44 37 9 0 37 56 46 Peak-Hour: 5:00 PM -- 6:00 PMPeak-Hour: 5:00 PM -- 6:00 PM Peak 15-Min: 5:30 PM -- 5:45 PMPeak 15-Min: 5:30 PM -- 5:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2.7 0 0 2.7 0 2.2 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 N/A N/A N/A N/A N/A N/A N/A N/A 15-Min Count15-Min CountPeriod Period Beginning AtBeginning At Waterford Blvd Waterford Blvd (Northbound)(Northbound) Waterford Blvd Waterford Blvd (Southbound)(Southbound) W 127th StW 127th St (Eastbound)(Eastbound) W 127th StW 127th St (Westbound)(Westbound)TotalTotal HourlyHourlyTotalsTotalsLeftLeftThruThruRightRightUULeftLeftThruThruRightRightUULeftLeftThruThruRightRightUULeftLeftThruThruRightRightUU 4:00 PM 2 0 6 0 0 0 0 0 0 0 5 0 10 0 0 0 23 4:15 PM 5 0 10 0 0 0 0 0 0 0 3 0 7 0 0 0 25 4:30 PM 0 0 5 0 0 0 0 0 0 0 3 0 10 0 0 0 18 4:45 PM 2 0 6 0 0 0 0 0 0 0 4 0 9 0 0 0 21 87 5:00 PM 3 0 8 0 0 0 0 0 0 0 2 0 12 0 0 0 25 89 5:15 PM 2 0 9 0 0 0 0 0 0 0 2 0 11 0 0 0 24 88 5:30 PM 4 0 11 0 0 0 0 0 0 0 7 0 15 0 0 0 37 107 5:45 PM 0 0 9 0 0 0 0 0 0 0 1 0 6 0 0 0 16 102 Peak 15-MinPeak 15-Min FlowratesFlowrates NorthboundNorthbound SouthboundSouthbound EastboundEastbound WestboundWestbound TotalTotalLeftLeftThruThruRightRightUULeftLeftThruThruRightRightUULeftLeftThruThruRightRightUULeftLeftThruThruRightRightUU All Vehicles 16 0 44 0 0 0 0 0 0 0 28 0 60 0 0 0 148 Heavy Trucks 0 0 4 0 0 0 0 0 0 0 0 0 4 Buses Pedestrians 0 0 0 0 0 Bicycles 0 0 0 0 0 0 0 0 0 0 0 0 0 Scooters Comments: Report generated on 10/21/2021 12:14 PM SOURCE: Quality Counts, LLC (http://www.qualitycounts.net) 1-877-580-2212 Page 1 of 1 247 Type of peak hour being reported: User-Defined Method for determining peak hour: Total Entering Volume LOCATION: LOCATION: 248th Ave -- W 127th St QC JOB #: QC JOB #: 15572838 CITY/STATE: CITY/STATE: Plainfield, IL DATE: DATE: Tue, Sep 21 2021 466 347 242 0 224 242 151 196 196 0 0.850.85 0 151 0 0 224 0 0 0 0 0 Peak-Hour: 5:00 PM -- 6:00 PMPeak-Hour: 5:00 PM -- 6:00 PM Peak 15-Min: 5:00 PM -- 5:15 PMPeak 15-Min: 5:00 PM -- 5:15 PM 0.4 0 0.8 0 0 0.8 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 1 0 0 0 0 1 0 0 0 0 0 0 0 0 0 N/A N/A N/A N/A N/A N/A N/A N/A 15-Min Count15-Min CountPeriod Period Beginning AtBeginning At 248th Ave 248th Ave (Northbound)(Northbound) 248th Ave 248th Ave (Southbound)(Southbound) W 127th StW 127th St (Eastbound)(Eastbound) W 127th StW 127th St (Westbound)(Westbound)TotalTotal HourlyHourlyTotalsTotalsLeftLeftThruThruRightRightUULeftLeftThruThruRightRightUULeftLeftThruThruRightRightUULeftLeftThruThruRightRightUU 4:00 PM 0 0 0 0 70 0 74 0 40 0 0 0 0 0 39 0 223 4:15 PM 0 0 0 0 46 0 49 0 40 0 0 0 0 0 42 0 177 4:30 PM 0 0 0 0 50 0 53 0 33 0 0 0 0 0 46 0 182 4:45 PM 0 0 0 0 60 0 67 0 47 0 0 0 0 0 59 0 233 815 5:00 PM 0 0 0 0 73 0 79 0 37 0 0 0 0 0 50 0 239 831 5:15 PM 0 0 0 0 49 0 46 0 36 0 0 0 0 0 51 0 182 836 5:30 PM 0 0 0 0 55 0 62 0 45 0 0 0 0 0 44 0 206 860 5:45 PM 0 0 0 0 47 0 55 0 33 0 0 0 0 0 51 0 186 813 Peak 15-MinPeak 15-Min FlowratesFlowrates NorthboundNorthbound SouthboundSouthbound EastboundEastbound WestboundWestbound TotalTotalLeftLeftThruThruRightRightUULeftLeftThruThruRightRightUULeftLeftThruThruRightRightUULeftLeftThruThruRightRightUU All Vehicles 0 0 0 0 292 0 316 0 148 0 0 0 0 0 200 0 956 Heavy Trucks 0 0 0 0 0 0 0 0 0 0 0 0 0 Buses Pedestrians 0 4 4 0 8 Bicycles 0 0 0 0 0 0 0 0 0 0 0 0 0 Scooters Comments: Report generated on 10/21/2021 12:14 PM SOURCE: Quality Counts, LLC (http://www.qualitycounts.net) 1-877-580-2212 Page 1 of 1 248 Type of peak hour being reported: User-Defined Method for determining peak hour: Total Entering Volume LOCATION: LOCATION: Edward Elmhurst Health Access Dr -- W 127th St QC JOB #: QC JOB #: 15572840 CITY/STATE: CITY/STATE: Plainfield, IL DATE: DATE: Tue, Sep 21 2021 104 49 46 0 58 46 15 34 34 0 0.660.66 0 15 0 0 58 0 0 0 0 0 Peak-Hour: 5:00 PM -- 6:00 PMPeak-Hour: 5:00 PM -- 6:00 PM Peak 15-Min: 5:00 PM -- 5:15 PMPeak 15-Min: 5:00 PM -- 5:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2 0 0 0 0 0 0 0 0 1 0 0 0 0 0 0 N/A N/A N/A N/A N/A N/A N/A N/A 15-Min Count15-Min CountPeriod Period Beginning AtBeginning At Edward Elmhurst HealthEdward Elmhurst Health Access Dr Access Dr (Northbound)(Northbound) Edward Elmhurst HealthEdward Elmhurst Health Access Dr Access Dr (Southbound)(Southbound) W 127th StW 127th St (Eastbound)(Eastbound) W 127th StW 127th St (Westbound)(Westbound)TotalTotal HourlyHourlyTotalsTotals LeftLeft ThruThru RightRight UU LeftLeft ThruThru RightRight UU LeftLeft ThruThru RightRight UU LeftLeft ThruThru RightRight UU 4:00 PM 0 0 0 0 18 0 16 0 8 0 0 0 0 0 11 0 53 4:15 PM 0 0 0 0 15 0 13 0 6 0 0 0 0 0 6 0 40 4:30 PM 0 0 0 0 29 0 8 0 12 0 0 0 0 0 10 0 59 4:45 PM 0 0 0 0 8 0 14 0 6 0 0 0 0 0 10 0 38 190 5:00 PM 0 0 0 0 26 0 19 0 4 0 0 0 0 0 9 0 58 195 5:15 PM 0 0 0 0 14 0 16 0 5 0 0 0 0 0 7 0 42 197 5:30 PM 0 0 0 0 9 0 6 0 3 0 0 0 0 0 8 0 26 164 5:45 PM 0 0 0 0 9 0 5 0 3 0 0 0 0 0 10 0 27 153 Peak 15-MinPeak 15-Min FlowratesFlowrates NorthboundNorthbound SouthboundSouthbound EastboundEastbound WestboundWestbound TotalTotalLeftLeftThruThruRightRightUULeftLeftThruThruRightRightUULeftLeftThruThruRightRightUULeftLeftThruThruRightRightUU All Vehicles 0 0 0 0 104 0 76 0 16 0 0 0 0 0 36 0 232 Heavy Trucks 0 0 0 0 0 0 0 0 0 0 0 0 0 Buses Pedestrians 0 4 0 0 4 Bicycles 0 0 0 0 0 0 0 0 0 0 0 0 0 Scooters Comments: Report generated on 10/21/2021 12:14 PM SOURCE: Quality Counts, LLC (http://www.qualitycounts.net) 1-877-580-2212 Page 1 of 1 249 Type of peak hour being reported: User-Defined Method for determining peak hour: Total Entering Volume LOCATION: LOCATION: Vicarage Dr -- 135th St QC JOB #: QC JOB #: 15572844 CITY/STATE: CITY/STATE: Plainfield, IL DATE: DATE: Tue, Sep 21 2021 38 65 24 0 14 30 36 29 52 0 0.940.94 0 40 4 23 36 6 0 22 27 28 Peak-Hour: 5:00 PM -- 6:00 PMPeak-Hour: 5:00 PM -- 6:00 PM Peak 15-Min: 5:15 PM -- 5:30 PMPeak 15-Min: 5:15 PM -- 5:30 PM 5.3 0 8.3 0 0 6.7 0 0 1.9 0 0 0 0 4.3 0 0 0 0 3.7 0 1 0 0 5 0 0 0 1 0 1 3 0 0 0 0 1 N/A N/A N/A N/A N/A N/A N/A N/A 15-Min Count15-Min CountPeriod Period Beginning AtBeginning At Vicarage Dr Vicarage Dr (Northbound)(Northbound) Vicarage Dr Vicarage Dr (Southbound)(Southbound) 135th St135th St (Eastbound)(Eastbound) 135th St135th St (Westbound)(Westbound)TotalTotal HourlyHourlyTotalsTotalsLeftLeftThruThruRightRightUULeftLeftThruThruRightRightUULeftLeftThruThruRightRightUULeftLeftThruThruRightRightUU 4:00 PM 1 0 3 0 5 0 3 0 5 0 2 0 3 0 7 0 29 4:15 PM 1 0 6 0 7 0 14 0 6 0 1 0 2 0 8 0 45 4:30 PM 1 0 6 0 6 0 4 0 3 0 0 0 5 0 8 0 33 4:45 PM 0 0 6 0 8 0 6 0 6 0 3 0 7 0 11 0 47 154 5:00 PM 1 0 2 0 2 0 8 0 10 0 2 0 4 0 6 0 35 160 5:15 PM 1 0 7 0 4 0 4 0 11 0 1 0 8 0 6 0 42 157 5:30 PM 0 0 7 0 4 0 9 0 9 0 0 0 4 0 7 0 40 164 5:45 PM 4 0 6 0 4 0 3 0 6 0 1 0 7 0 10 0 41 158 Peak 15-MinPeak 15-Min FlowratesFlowrates NorthboundNorthbound SouthboundSouthbound EastboundEastbound WestboundWestbound TotalTotalLeftLeftThruThruRightRightUULeftLeftThruThruRightRightUULeftLeftThruThruRightRightUULeftLeftThruThruRightRightUU All Vehicles 4 0 28 0 16 0 16 0 44 0 4 0 32 0 24 0 168 Heavy Trucks 0 0 0 0 0 0 0 0 0 4 0 0 4 Buses Pedestrians 8 0 0 0 8 Bicycles 0 0 0 0 0 0 0 0 0 0 0 0 0 Scooters Comments: Report generated on 10/21/2021 12:14 PM SOURCE: Quality Counts, LLC (http://www.qualitycounts.net) 1-877-580-2212 Page 1 of 1 250 Type of peak hour being reported: User-Defined Method for determining peak hour: Total Entering Volume LOCATION: LOCATION: S Van Dyke Rd -- Hamilton Ln QC JOB #: QC JOB #: 15572850 CITY/STATE: CITY/STATE: Plainfield, IL DATE: DATE: Tue, Sep 21 2021 25 29 0 0 25 0 0 29 41 0 0.740.74 0 0 0 12 33 0 0 8 12 8 Peak-Hour: 5:00 PM -- 6:00 PMPeak-Hour: 5:00 PM -- 6:00 PM Peak 15-Min: 5:00 PM -- 5:15 PMPeak 15-Min: 5:00 PM -- 5:15 PM 4 3.4 0 0 4 0 0 3.4 2.4 0 0 0 0 0 3 0 0 0 0 0 0 0 3 0 0 1 0 0 0 0 0 0 0 0 0 0 N/A N/A N/A N/A N/A N/A N/A N/A 15-Min Count15-Min CountPeriod Period Beginning AtBeginning At S Van Dyke Rd S Van Dyke Rd (Northbound)(Northbound) S Van Dyke Rd S Van Dyke Rd (Southbound)(Southbound) Hamilton LnHamilton Ln (Eastbound)(Eastbound) Hamilton LnHamilton Ln (Westbound)(Westbound)TotalTotal HourlyHourlyTotalsTotalsLeftLeftThruThruRightRightUULeftLeftThruThruRightRightUULeftLeftThruThruRightRightUULeftLeftThruThruRightRightUU 4:00 PM 0 0 2 0 10 0 0 0 0 0 0 0 0 0 5 0 17 4:15 PM 0 0 3 0 6 0 0 0 0 0 0 0 2 0 11 0 22 4:30 PM 0 0 1 0 14 0 0 0 0 0 0 0 6 0 4 0 25 4:45 PM 0 0 3 0 6 0 0 0 0 0 0 0 1 0 3 0 13 77 5:00 PM 0 0 3 0 10 0 0 0 0 0 0 0 2 0 10 0 25 85 5:15 PM 0 0 1 0 7 0 0 0 0 0 0 0 2 0 7 0 17 80 5:30 PM 0 0 0 0 4 0 0 0 0 0 0 0 3 0 9 0 16 71 5:45 PM 0 0 4 0 4 0 0 0 0 0 0 0 5 0 3 0 16 74 Peak 15-MinPeak 15-Min FlowratesFlowrates NorthboundNorthbound SouthboundSouthbound EastboundEastbound WestboundWestbound TotalTotalLeftLeftThruThruRightRightUULeftLeftThruThruRightRightUULeftLeftThruThruRightRightUULeftLeftThruThruRightRightUU All Vehicles 0 0 12 0 40 0 0 0 0 0 0 0 8 0 40 0 100 Heavy Trucks 0 0 0 4 0 0 0 0 0 0 0 0 4 Buses Pedestrians 0 0 0 0 0 Bicycles 0 0 0 0 4 0 0 0 0 0 0 0 4 Scooters Comments: Report generated on 10/21/2021 12:14 PM SOURCE: Quality Counts, LLC (http://www.qualitycounts.net) 1-877-580-2212 Page 1 of 1 251 Site Plan 252 253 CMAP 2050 Projections Letter 254 October 21, 2021 Javier Millan Senior Consultant Kenig, Lindgren, O’Hara and Aboona, Inc. 9575 West Higgins Road Suite 400 Rosemont, IL 60018 Subject: 127th Street @ Van Dyke Road IDOT Dear Mr. Millan: In response to a request made on your behalf and dated October 20, 2021, we have developed year 2050 average daily traffic (ADT) projections for the subject location. ROAD SEGMENT Current ADT Year 2050 ADT 127th St east of Van Dyke Rd 14,100 18,800 127th St east of US 30 10,800 14,500 127th St east of IL 59 9,350 11,200 IL 59 south of 127th St 33,300 37,600 Van Dyke Rd north of 127th St 5,500 8,600 Van Dyke Rd south of 127th St 9,250 13,400 US 30 south of 127th St 20,000 23,700 135th St east of US 30 11,100 18,200 135th St east of Van Dyke Rd 13,500 22,100 Traffic projections are developed using existing ADT data provided in the request letter and the results from the June 2021 CMAP Travel Demand Analysis. The regional travel model uses CMAP 2050 socioeconomic projections and assumes the implementation of the ON TO 2050 Comprehensive Regional Plan for the Northeastern Illinois area. The provision of this data in support of your request does not constitute a CMAP endorsement of the proposed development or any subsequent developments. If you have any questions, please call me at (312) 386-8806. Sincerely, Jose Rodriguez, PTP, AICP Senior Planner, Research & Analysis cc: Rios (IDOT) 2021_CY_TrafficForecast\Plainfield\wi-40-21\wi-40-21.docx 255 Level of Service Criteria 256 LEVEL OF SERVICE CRITERIA Signalized Intersections Level of Service Interpretation Average Control Delay (seconds per vehicle) A Favorable progression. Most vehicles arrive during the green indication and travel through the intersection without stopping. 10 B Good progression, with more vehicles stopping than for Level of Service A. >10 - 20 C Individual cycle failures (i.e., one or more queued vehicles are not able to depart as a result of insufficient capacity during the cycle) may begin to appear. Number of vehicles stopping is significant, although many vehicles still pass through the intersection without stopping. >20 - 35 D The volume-to-capacity ratio is high and either progression is ineffective or the cycle length is too long. Many vehicles stop and individual cycle failures are noticeable. >35 - 55 E Progression is unfavorable. The volume-to-capacity ratio is high and the cycle length is long. Individual cycle failures are frequent. >55 - 80 F The volume-to-capacity ratio is very high, progression is very poor, and the cycle length is long. Most cycles fail to clear the queue. >80.0 Unsignalized Intersections Level of Service Average Total Delay (SEC/VEH) A 0 - 10 B > 10 - 15 C > 15 - 25 D > 25 - 35 E > 35 - 50 F > 50 Source: Highway Capacity Manual, 2010. 257 Capacity Analysis Summary Sheets 258 Lanes, Volumes, Timings 1: Van Dyke Road & 127th Street 11/05/2021 21-272 Bronk Parcel Development Synchro 11 Report Existing Weekday Morning Peak Hour Page 1 Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Volume (vph) 75 392 67 75 340 37 78 266 123 52 115 28 Future Volume (vph) 75 392 67 75 340 37 78 266 123 52 115 28 Ideal Flow (vphpl) 1900 2000 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Storage Length (ft) 180 180 250 0 280 0 145 0 Storage Lanes 1 1 1 0 1 0 1 0 Taper Length (ft) 205 210 190 155 Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.95 0.95 1.00 0.95 0.95 Frt 0.850 0.985 0.953 0.971 Flt Protected 0.950 0.950 0.950 0.950 Satd. Flow (prot) 1703 1961 1615 1805 1766 0 1736 3318 0 1421 3318 0 Flt Permitted 0.207 0.190 0.639 0.393 Satd. Flow (perm) 371 1961 1615 361 1766 0 1167 3318 0 588 3318 0 Right Turn on Red Yes Yes Yes Yes Satd. Flow (RTOR) 135 8 83 33 Link Speed (mph) 40 35 45 45 Link Distance (ft) 1125 2135 1316 1535 Travel Time (s) 19.2 41.6 19.9 23.3 Peak Hour Factor 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 Heavy Vehicles (%) 6% 2% 0% 0% 6% 6% 4% 4% 3% 27% 7% 0% Shared Lane Traffic (%) Lane Group Flow (vph) 94 490 84 94 471 0 98 487 0 65 179 0 Turn Type pm+pt NA Perm pm+pt NA pm+pt NA pm+pt NA Protected Phases 7 4 3 8 5 2 1 6 Permitted Phases 4 4 8 2 6 Detector Phase 74438 52 16 Switch Phase Minimum Initial (s) 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 Minimum Split (s) 9.5 22.5 22.5 9.5 22.5 9.5 22.5 9.5 22.5 Total Split (s) 10.6 39.2 39.2 10.4 39.0 10.4 23.9 11.5 25.0 Total Split (%) 12.5% 46.1% 46.1% 12.2% 45.9% 12.2% 28.1% 13.5% 29.4% Yellow Time (s) 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 All-Red Time (s) 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 Lost Time Adjust (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Total Lost Time (s) 4.5 4.5 4.5 4.5 4.5 4.5 4.5 4.5 4.5 Lead/Lag Lead Lag Lag Lead Lag Lead Lag Lead Lag Lead-Lag Optimize? Yes Yes Yes Yes Yes Yes Yes Yes Yes Recall Mode None None None None None None C-Max None C-Max Act Effct Green (s) 32.5 27.7 27.7 32.2 27.5 36.4 30.4 36.4 30.3 Actuated g/C Ratio 0.38 0.33 0.33 0.38 0.32 0.43 0.36 0.43 0.36 v/c Ratio 0.40 0.77 0.14 0.40 0.82 0.18 0.39 0.20 0.15 Control Delay 17.5 33.8 1.4 17.5 37.5 14.5 16.8 17.9 19.4 Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Total Delay 17.5 33.8 1.4 17.5 37.5 14.5 16.8 17.9 19.4 LOS B C A B D B B B B Approach Delay 27.4 34.2 16.4 19.0 Approach LOS C C B B Queue Length 50th (ft) 28 231 0 28 223 25 58 20 30 Queue Length 95th (ft) 41 255 3 41 251 m47 99 44 51 259 Lanes, Volumes, Timings 1: Van Dyke Road & 127th Street 11/05/2021 21-272 Bronk Parcel Development Synchro 11 Report Existing Weekday Morning Peak Hour Page 2 Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Internal Link Dist (ft) 1045 2055 1236 1455 Turn Bay Length (ft) 180 180 250 280 145 Base Capacity (vph) 237 800 739 237 721 548 1238 326 1205 Starvation Cap Reductn 00000 00 00 Spillback Cap Reductn 00000 00 00 Storage Cap Reductn 00000 00 00 Reduced v/c Ratio 0.40 0.61 0.11 0.40 0.65 0.18 0.39 0.20 0.15 Intersection Summary Area Type: Other Cycle Length: 85 Actuated Cycle Length: 85 Offset: 0 (0%), Referenced to phase 2:NBTL and 6:SBTL, Start of Green Natural Cycle: 65 Control Type: Actuated-Coordinated Maximum v/c Ratio: 0.82 Intersection Signal Delay: 25.2 Intersection LOS: C Intersection Capacity Utilization 54.8% ICU Level of Service A Analysis Period (min) 15 m Volume for 95th percentile queue is metered by upstream signal. Splits and Phases: 1: Van Dyke Road & 127th Street 260 Lanes, Volumes, Timings 2: Van Dyke Road & 135th Street 11/05/2021 21-272 Bronk Parcel Development Synchro 11 Report Existing Weekday Morning Peak Hour Page 3 Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Volume (vph) 76 399 14 49 240 55 22 262 78 56 120 40 Future Volume (vph) 76 399 14 49 240 55 22 262 78 56 120 40 Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 2000 1900 Storage Length (ft) 155 0 190 0 250 0 145 0 Storage Lanes 1 0 1 0 1 0 1 1 Taper Length (ft) 145 110 150 220 Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Frt 0.995 0.972 0.965 0.850 Flt Protected 0.950 0.950 0.950 0.950 Satd. Flow (prot) 1671 1855 0 1805 1768 0 1805 1767 0 1805 1887 1524 Flt Permitted 0.316 0.165 0.667 0.329 Satd. Flow (perm) 556 1855 0 314 1768 0 1267 1767 0 625 1887 1524 Right Turn on Red Yes Yes Yes Yes Satd. Flow (RTOR) 2 14 19 135 Link Speed (mph) 35 35 45 45 Link Distance (ft) 883 1887 980 2247 Travel Time (s) 17.2 36.8 14.8 34.0 Peak Hour Factor 0.85 0.85 0.85 0.85 0.85 0.85 0.85 0.85 0.85 0.85 0.85 0.85 Heavy Vehicles (%) 8% 2% 0% 0% 5% 2% 0% 4% 3% 0% 6% 6% Shared Lane Traffic (%) Lane Group Flow (vph) 89 485 0 58 347 0 26 400 0 66 141 47 Turn Type pm+pt NA pm+pt NA pm+pt NA pm+pt NA Perm Protected Phases 7 4 3 8 5 2 1 6 Permitted Phases 48266 Detector Phase 7 4 3 8 5 2 1 6 6 Switch Phase Minimum Initial (s) 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 Minimum Split (s) 9.5 22.5 9.5 22.5 9.5 22.5 9.5 22.5 22.5 Total Split (s) 11.0 33.0 9.6 31.6 9.6 32.6 9.8 32.8 32.8 Total Split (%) 12.9% 38.8% 11.3% 37.2% 11.3% 38.4% 11.5% 38.6% 38.6% Yellow Time (s) 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 All-Red Time (s) 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 Lost Time Adjust (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Total Lost Time (s) 4.5 4.5 4.5 4.5 4.5 4.5 4.5 4.5 4.5 Lead/Lag Lead Lag Lead Lag Lead Lag Lead Lag Lag Lead-Lag Optimize? Yes Yes Yes Yes Yes Yes Yes Yes Yes Recall Mode None None None None None C-Max None C-Max C-Max Act Effct Green (s) 30.9 25.7 28.7 24.6 38.8 34.4 40.9 38.8 38.8 Actuated g/C Ratio 0.36 0.30 0.34 0.29 0.46 0.40 0.48 0.46 0.46 v/c Ratio 0.31 0.86 0.30 0.67 0.04 0.55 0.17 0.16 0.06 Control Delay 17.6 44.2 18.1 32.0 13.5 24.8 11.5 14.0 0.6 Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Total Delay 17.6 44.2 18.1 32.0 13.5 24.8 11.5 14.0 0.6 LOS BD BC BC BBA Approach Delay 40.1 30.0 24.1 10.9 Approach LOS D C C B Queue Length 50th (ft) 27 234 17 152 7 173 13 28 0 Queue Length 95th (ft) 51 320 36 219 21 251 28 93 1 261 Lanes, Volumes, Timings 2: Van Dyke Road & 135th Street 11/05/2021 21-272 Bronk Parcel Development Synchro 11 Report Existing Weekday Morning Peak Hour Page 4 Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Internal Link Dist (ft) 803 1807 900 2167 Turn Bay Length (ft) 155 190 250 145 Base Capacity (vph) 287 623 195 573 612 725 380 861 768 Starvation Cap Reductn 0 0 0 0 0 0 0 0 0 Spillback Cap Reductn 0 0 0 0 0 0 0 0 0 Storage Cap Reductn 0 0 0 0 0 0 0 0 0 Reduced v/c Ratio 0.31 0.78 0.30 0.61 0.04 0.55 0.17 0.16 0.06 Intersection Summary Area Type: Other Cycle Length: 85 Actuated Cycle Length: 85 Offset: 0 (0%), Referenced to phase 2:NBTL and 6:SBTL, Start of Green Natural Cycle: 70 Control Type: Actuated-Coordinated Maximum v/c Ratio: 0.86 Intersection Signal Delay: 29.0 Intersection LOS: C Intersection Capacity Utilization 63.7% ICU Level of Service B Analysis Period (min) 15 Splits and Phases: 2: Van Dyke Road & 135th Street 262 Lanes, Volumes, Timings 3: U.S. 30 & 135th Street 11/05/2021 21-272 Bronk Parcel Development Synchro 11 Report Existing Weekday Morning Peak Hour Page 5 Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Volume (vph) 59 294 128 90 153 55 79 434 124 64 339 15 Future Volume (vph) 59 294 128 90 153 55 79 434 124 64 339 15 Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Storage Length (ft) 105 0 160 0 185 0 180 0 Storage Lanes 1 0 1 0 1 0 1 0 Taper Length (ft) 130 125 125 240 Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Frt 0.954 0.961 0.967 0.994 Flt Protected 0.950 0.950 0.950 0.950 Satd. Flow (prot) 1805 1767 0 1752 1749 0 1736 1679 0 1770 1619 0 Flt Permitted 0.520 0.137 0.390 0.227 Satd. Flow (perm) 988 1767 0 253 1749 0 712 1679 0 423 1619 0 Right Turn on Red No No No No Satd. Flow (RTOR) Link Speed (mph) 35 35 50 55 Link Distance (ft) 1073 1801 769 1118 Travel Time (s) 20.9 35.1 10.5 13.9 Peak Hour Factor 0.91 0.91 0.91 0.91 0.91 0.91 0.91 0.91 0.91 0.91 0.91 0.91 Heavy Vehicles (%) 0% 2% 4% 3% 6% 0% 4% 11% 4% 2% 17% 8% Shared Lane Traffic (%) Lane Group Flow (vph) 65 464 0 99 228 0 87 613 0 70 389 0 Turn Type pm+pt NA pm+pt NA pm+pt NA pm+pt NA Protected Phases 7 4 3 8 5 2 1 6 Permitted Phases 4826 Detector Phase 7 4 3 8 5 2 1 6 Switch Phase Minimum Initial (s) 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 Minimum Split (s) 9.5 22.5 9.5 22.5 9.5 22.5 9.5 22.5 Total Split (s) 9.6 46.0 11.0 47.4 10.4 63.5 9.5 62.6 Total Split (%) 7.4% 35.4% 8.5% 36.5% 8.0% 48.8% 7.3% 48.2% Yellow Time (s) 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 All-Red Time (s) 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 Lost Time Adjust (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Total Lost Time (s) 4.5 4.5 4.5 4.5 4.5 4.5 4.5 4.5 Lead/Lag Lead Lag Lead Lag Lead Lag Lead Lag Lead-Lag Optimize? Yes Yes Yes Yes Yes Yes Yes Yes Recall Mode None None None None None C-Max None C-Max Act Effct Green (s) 42.8 37.7 46.2 41.0 69.3 64.0 67.1 61.2 Actuated g/C Ratio 0.33 0.29 0.36 0.32 0.53 0.49 0.52 0.47 v/c Ratio 0.18 0.91 0.60 0.41 0.20 0.74 0.25 0.51 Control Delay 26.5 66.3 42.2 37.5 15.8 35.0 16.9 27.8 Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Total Delay 26.5 66.3 42.2 37.5 15.8 35.0 16.9 27.8 LOS CE DD BC BC Approach Delay 61.5 38.9 32.6 26.2 Approach LOS E D C C Queue Length 50th (ft) 34 368 53 150 34 436 27 234 Queue Length 95th (ft) 65 #530 92 223 64 603 53 335 263 Lanes, Volumes, Timings 3: U.S. 30 & 135th Street 11/05/2021 21-272 Bronk Parcel Development Synchro 11 Report Existing Weekday Morning Peak Hour Page 6 Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Internal Link Dist (ft) 993 1721 689 1038 Turn Bay Length (ft) 105 160 185 180 Base Capacity (vph) 357 564 165 577 431 826 279 762 Starvation Cap Reductn 0 0 0 0 0 0 0 0 Spillback Cap Reductn 0 0 0 0 0 0 0 0 Storage Cap Reductn 0 0 0 0 0 0 0 0 Reduced v/c Ratio 0.18 0.82 0.60 0.40 0.20 0.74 0.25 0.51 Intersection Summary Area Type: Other Cycle Length: 130 Actuated Cycle Length: 130 Offset: 0 (0%), Referenced to phase 2:NBTL and 6:SBTL, Start of Green Natural Cycle: 90 Control Type: Actuated-Coordinated Maximum v/c Ratio: 0.91 Intersection Signal Delay: 39.7 Intersection LOS: D Intersection Capacity Utilization 77.8% ICU Level of Service D Analysis Period (min) 15 # 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles. Splits and Phases: 3: U.S. 30 & 135th Street 264 Lanes, Volumes, Timings 4: U.S. 30 & 127th Street 11/05/2021 21-272 Bronk Parcel Development Synchro 11 Report Existing Weekday Morning Peak Hour Page 7 Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Volume (vph) 5 396 23 49 203 83 1 385 158 47 342 1 Future Volume (vph) 5 396 23 49 203 83 1 385 158 47 342 1 Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 2000 1900 1900 1900 1900 Storage Length (ft) 225 0 285 0 225 220 255 0 Storage Lanes 1 0 1 0 1 1 1 0 Taper Length (ft) 175 175 250 300 Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Frt 0.992 0.957 0.850 Flt Protected 0.950 0.950 0.950 0.950 Satd. Flow (prot) 1805 1857 0 1770 1702 0 1805 1852 1615 1719 1663 0 Flt Permitted 0.950 0.950 0.950 0.950 Satd. Flow (perm) 1805 1857 0 1770 1702 0 1805 1852 1615 1719 1663 0 Right Turn on Red No No No No Satd. Flow (RTOR) Link Speed (mph) 45 45 55 55 Link Distance (ft) 1528 1614 4667 1415 Travel Time (s) 23.2 24.5 57.9 17.5 Peak Hour Factor 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 Heavy Vehicles (%) 0% 1% 10% 2% 8% 4% 0% 8% 0% 5% 14% 100% Shared Lane Traffic (%) Lane Group Flow (vph) 5 445 0 52 304 0 1 410 168 50 365 0 Turn Type Prot NA Prot NA Prot NA Perm Prot NA Protected Phases 7 4 3 8 5 2 1 6 Permitted Phases 2 Detector Phase 7 4 3 8 52216 Switch Phase Minimum Initial (s) 3.0 8.0 10.0 10.0 3.0 15.0 15.0 3.0 15.0 Minimum Split (s) 9.5 24.5 14.5 24.5 9.5 24.5 24.5 9.5 24.5 Total Split (s) 10.0 56.0 15.0 61.0 10.0 55.0 55.0 14.0 59.0 Total Split (%) 7.1% 40.0% 10.7% 43.6% 7.1% 39.3% 39.3% 10.0% 42.1% Yellow Time (s) 3.5 4.5 3.5 4.5 3.5 4.5 4.5 3.5 4.5 All-Red Time (s) 1.0 2.0 1.0 2.0 1.0 2.0 2.0 1.0 2.0 Lost Time Adjust (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Total Lost Time (s) 4.5 6.5 4.5 6.5 4.5 6.5 6.5 4.5 6.5 Lead/Lag Lead Lag Lead Lag Lead Lag Lag Lead Lag Lead-Lag Optimize? Yes Yes Yes Yes Yes Yes Yes Yes Yes Recall Mode None None None None None C-Max C-Max None C-Max Act Effct Green (s) 5.5 39.9 10.2 49.7 5.6 64.2 64.2 8.7 73.3 Actuated g/C Ratio 0.04 0.28 0.07 0.36 0.04 0.46 0.46 0.06 0.52 v/c Ratio 0.07 0.84 0.41 0.50 0.01 0.48 0.23 0.47 0.42 Control Delay 67.2 61.4 71.8 37.5 65.0 32.9 28.4 77.4 25.7 Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Total Delay 67.2 61.4 71.8 37.5 65.0 32.9 28.4 77.4 25.7 LOS EE ED ECCEC Approach Delay 61.5 42.5 31.7 32.0 Approach LOS E D C C Queue Length 50th (ft) 5 382 46 204 1 276 98 45 200 Queue Length 95th (ft) 20 469 92 292 7 431 174 90 373 265 Lanes, Volumes, Timings 4: U.S. 30 & 127th Street 11/05/2021 21-272 Bronk Parcel Development Synchro 11 Report Existing Weekday Morning Peak Hour Page 8 Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Internal Link Dist (ft) 1448 1534 4587 1335 Turn Bay Length (ft) 225 285 225 220 255 Base Capacity (vph) 70 656 132 673 71 848 740 119 870 Starvation Cap Reductn 0 0 0 0 00000 Spillback Cap Reductn 0 0 0 0 00000 Storage Cap Reductn 0 0 0 0 00000 Reduced v/c Ratio 0.07 0.68 0.39 0.45 0.01 0.48 0.23 0.42 0.42 Intersection Summary Area Type: Other Cycle Length: 140 Actuated Cycle Length: 140 Offset: 0 (0%), Referenced to phase 2:NBT and 6:SBT, Start of Green Natural Cycle: 80 Control Type: Actuated-Coordinated Maximum v/c Ratio: 0.84 Intersection Signal Delay: 41.3 Intersection LOS: D Intersection Capacity Utilization 71.5% ICU Level of Service C Analysis Period (min) 15 Splits and Phases: 4: U.S. 30 & 127th Street 266 Lanes, Volumes, Timings 5: 127th Street & 248th Avenue 11/05/2021 21-272 Bronk Parcel Development Synchro 11 Report Existing Weekday Morning Peak Hour Page 9 Lane Group EBL EBT WBT WBR SBL SBR Lane Configurations Traffic Volume (vph) 220 422 259 118 151 97 Future Volume (vph) 220 422 259 118 151 97 Ideal Flow (vphpl) 1900 2000 2000 1900 1900 1900 Storage Length (ft) 90 205 200 0 Storage Lanes 1 1 1 1 Taper Length (ft) 100 195 Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 Frt 0.850 0.850 Flt Protected 0.950 0.950 Satd. Flow (prot) 1787 2000 2000 1509 1736 1509 Flt Permitted 0.193 0.950 Satd. Flow (perm) 363 2000 2000 1509 1736 1509 Right Turn on Red Yes Yes Satd. Flow (RTOR) 142 117 Link Speed (mph) 40 45 45 Link Distance (ft) 406 1540 1616 Travel Time (s) 6.9 23.3 24.5 Peak Hour Factor 0.83 0.83 0.83 0.83 0.83 0.83 Heavy Vehicles (%) 1% 0% 0% 7% 4% 7% Shared Lane Traffic (%) Lane Group Flow (vph) 265 508 312 142 182 117 Turn Type pm+pt NA NA Perm Prot Perm Protected Phases 7 4 8 6 Permitted Phases 4 8 6 Detector Phase 748866 Switch Phase Minimum Initial (s) 5.0 5.0 5.0 5.0 5.0 5.0 Minimum Split (s) 9.5 23.5 23.5 23.5 23.5 23.5 Total Split (s) 31.0 80.0 49.0 49.0 40.0 40.0 Total Split (%) 25.8% 66.7% 40.8% 40.8% 33.3% 33.3% Yellow Time (s) 3.5 3.5 3.5 3.5 3.5 3.5 All-Red Time (s) 1.0 2.0 2.0 2.0 2.0 2.0 Lost Time Adjust (s) 0.0 0.0 0.0 0.0 0.0 0.0 Total Lost Time (s) 4.5 5.5 5.5 5.5 5.5 5.5 Lead/Lag Lead Lag Lag Lead-Lag Optimize? Yes Yes Yes Recall Mode None None None None C-Max C-Max Act Effct Green (s) 50.0 49.0 24.3 24.3 60.0 60.0 Actuated g/C Ratio 0.42 0.41 0.20 0.20 0.50 0.50 v/c Ratio 0.68 0.62 0.77 0.34 0.21 0.14 Control Delay 32.1 30.6 57.6 8.0 20.1 4.4 Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 Total Delay 32.1 30.6 57.6 8.0 20.1 4.4 LOS C C E A C A Approach Delay 31.1 42.1 14.0 Approach LOS C D B Queue Length 50th (ft) 138 307 230 0 76 0 Queue Length 95th (ft) 148 299 277 39 138 30 267 Lanes, Volumes, Timings 5: 127th Street & 248th Avenue 11/05/2021 21-272 Bronk Parcel Development Synchro 11 Report Existing Weekday Morning Peak Hour Page 10 Lane Group EBL EBT WBT WBR SBL SBR Internal Link Dist (ft) 326 1460 1536 Turn Bay Length (ft) 90 205 200 Base Capacity (vph) 465 1241 725 637 867 812 Starvation Cap Reductn 000000 Spillback Cap Reductn 000000 Storage Cap Reductn 000000 Reduced v/c Ratio 0.57 0.41 0.43 0.22 0.21 0.14 Intersection Summary Area Type: Other Cycle Length: 120 Actuated Cycle Length: 120 Offset: 0 (0%), Referenced to phase 2: and 6:SBL, Start of Green Natural Cycle: 60 Control Type: Actuated-Coordinated Maximum v/c Ratio: 0.77 Intersection Signal Delay: 31.0 Intersection LOS: C Intersection Capacity Utilization 46.4% ICU Level of Service A Analysis Period (min) 15 Splits and Phases: 5: 127th Street & 248th Avenue 268 HCM 6th TWSC 6: 127th Street & Edwards Elmhurst Drive 11/05/2021 21-272 Bronk Parcel Development Synchro 11 Report Existing Weekday Morning Peak Hour Page 1 Intersection Int Delay, s/veh 1.4 Movement EBL EBT WBT WBR SBL SBR Lane Configurations Traffic Vol, veh/h 67 506 361 85 28 16 Future Vol, veh/h 67 506 361 85 28 16 Conflicting Peds, #/hr 0 00000 Sign Control Free Free Free Free Stop Stop RT Channelized - None - None - None Storage Length 200 - - - 0 0 Veh in Median Storage, # - 0 0 - 0 - Grade, % - 0 0 - 0 - Peak Hour Factor 67 67 67 67 67 67 Heavy Vehicles, % 0 00000 Mvmt Flow 100 755 539 127 42 24 Major/Minor Major1 Major2 Minor2 Conflicting Flow All 666 0 - 0 1558 333 Stage 1 - - - - 603 - Stage 2 - - - - 955 - Critical Hdwy 4.1 - - - 6.6 6.9 Critical Hdwy Stg 1 - - - - 5.8 - Critical Hdwy Stg 2 - - - - 5.4 - Follow-up Hdwy 2.2 - - - 3.5 3.3 Pot Cap-1 Maneuver 933 - - - 115 669 Stage 1 - - - - 515 - Stage 2 - - - - 377 - Platoon blocked, % - - - Mov Cap-1 Maneuver 933 - - - 103 669 Mov Cap-2 Maneuver - - - - 236 - Stage 1 - - - - 460 - Stage 2 - - - - 377 - Approach EB WB SB HCM Control Delay, s 1.1 0 18.8 HCM LOS C Minor Lane/Major Mvmt EBL EBT WBT WBRSBLn1SBLn2 Capacity (veh/h) 933 - - - 236 669 HCM Lane V/C Ratio 0.107 - - - 0.177 0.036 HCM Control Delay (s) 9.3 - - - 23.5 10.6 HCM Lane LOS A - - - C B HCM 95th %tile Q(veh) 0.4 - - - 0.6 0.1 269 HCM 6th TWSC 7: Van Dyke Road & Hamilton Lane 11/05/2021 21-272 Bronk Parcel Development Synchro 11 Report Existing Weekday Morning Peak Hour Page 2 Intersection Int Delay, s/veh 0.7 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Vol, veh/h 0 0 0 14 0 21 0 446 7 13 244 0 Future Vol, veh/h 0 0 0 14 0 21 0 446 7 13 244 0 Conflicting Peds, #/hr 0 00000000000 Sign Control Stop Stop Stop Stop Stop Stop Free Free Free Free Free Free RT Channelized - - None - - None - - None - - None Storage Length - - - 0 - 0 145 - - 135 - - Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 - Grade, % - 0 - - 0 - - 0 - - 0 - Peak Hour Factor 90 90 90 90 90 90 90 90 90 90 90 90 Heavy Vehicles, % 0 000017000000 Mvmt Flow 0 0 0 16 0 23 0 496 8 14 271 0 Major/Minor Minor2 Minor1 Major1 Major2 Conflicting Flow All 547 803 136 664 - 252 271 0 0 504 0 0 Stage 1 299 299 - 500 -------- Stage 2 248 504 - 164 -------- Critical Hdwy 7.5 6.5 6.9 7.5 - 7.24 4.1 - - 4.1 - - Critical Hdwy Stg 1 6.5 5.5 - 6.5 -------- Critical Hdwy Stg 2 6.5 5.5 - 6.5 -------- Follow-up Hdwy 3.5 4 3.3 3.5 - 3.47 2.2 - - 2.2 - - Pot Cap-1 Maneuver 424 319 894 350 0 704 1304 - - 1071 - - Stage 1 691 670 - 527 0 ------- Stage 2 740 544 - 828 0 ------- Platoon blocked, % - - - - Mov Cap-1 Maneuver 406 315 894 347 - 704 1304 - - 1071 - - Mov Cap-2 Maneuver 406 315 - 347 -------- Stage 1 691 661 - 527 -------- Stage 2 715 544 - 817 -------- Approach EB WB NB SB HCM Control Delay, s 0 12.5 0 0.4 HCM LOS A B Minor Lane/Major Mvmt NBL NBT NBREBLn1WBLn1WBLn2 SBL SBT SBR Capacity (veh/h) 1304 - - - 347 704 1071 - - HCM Lane V/C Ratio ----0.045 0.033 0.013 - - HCM Control Delay (s) 0 - - 0 15.9 10.3 8.4 - - HCM Lane LOS A - - A C B A - - HCM 95th %tile Q(veh) 0 - - - 0.1 0.1 0 - - 270 HCM 6th TWSC 8: Van Dyke Road & Norwood Drive 11/05/2021 21-272 Bronk Parcel Development Synchro 11 Report Existing Weekday Morning Peak Hour Page 3 Intersection Int Delay, s/veh 2.5 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Vol, veh/h 55 293922203766818268 Future Vol, veh/h 55 293922203766818268 Conflicting Peds, #/hr 0 00000000000 Sign Control Stop Stop Stop Stop Stop Stop Free Free Free Free Free Free RT Channelized - - None - - None - - None - - None Storage Length -----0130--150-- Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 - Grade, % - 0 - - 0 - - 0 - - 0 - Peak Hour Factor 75 75 75 75 75 75 75 75 75 75 75 75 Heavy Vehicles, % 0 0 0 0 38 0 0 3 20 0 4 0 Mvmt Flow 73 3 12 4 12 29 27 501 8 11 243 91 Major/Minor Minor2 Minor1 Major1 Major2 Conflicting Flow All 622 874 167 704 915 255 334 0 0 509 0 0 Stage 1 311 311 - 559 559 ------- Stage 2 311 563 - 145 356 ------- Critical Hdwy 7.5 6.5 6.9 7.5 7.26 6.9 4.1 - - 4.1 - - Critical Hdwy Stg 1 6.5 5.5 - 6.5 6.26 ------- Critical Hdwy Stg 2 6.5 5.5 - 6.5 6.26 ------- Follow-up Hdwy 3.5 4 3.3 3.5 4.38 3.3 2.2 - - 2.2 - - Pot Cap-1 Maneuver 375 290 854 328 215 750 1237 - - 1066 - - Stage 1 680 662 - 486 429 ------- Stage 2 680 512 - 849 545 ------- Platoon blocked, % - - - - Mov Cap-1 Maneuver 336 281 854 313 208 750 1237 - - 1066 - - Mov Cap-2 Maneuver 336 281 - 313 208 ------- Stage 1 665 655 - 475 420 ------- Stage 2 621 501 - 825 540 ------- Approach EB WB NB SB HCM Control Delay, s 18 14.3 0.4 0.3 HCM LOS C B Minor Lane/Major Mvmt NBL NBT NBREBLn1WBLn1WBLn2 SBL SBT SBR Capacity (veh/h) 1237 - - 364 227 750 1066 - - HCM Lane V/C Ratio 0.022 - - 0.242 0.07 0.039 0.01 - - HCM Control Delay (s) 8 - - 18 22.1 10 8.4 - - HCM Lane LOS A - - C C B A - - HCM 95th %tile Q(veh) 0.1 - - 0.9 0.2 0.1 0 - - 271 HCM 6th TWSC 9: Vicarage Drive & 135th Street 11/05/2021 21-272 Bronk Parcel Development Synchro 11 Report Existing Weekday Morning Peak Hour Page 4 Intersection Int Delay, s/veh 2.3 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Vol, veh/h 29 428 5 7 281 14 5 0 15 46 0 22 Future Vol, veh/h 29 428 5 7 281 14 5 0 15 46 0 22 Conflicting Peds, #/hr 0 00000000000 Sign Control Free Free Free Free Free Free Stop Stop Stop Stop Stop Stop RT Channelized - - None - - None - - None - - None Storage Length 135 - - 125 ----0--- Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 - Grade, % - 0 - - 0 - - 0 - - 0 - Peak Hour Factor 88 88 88 88 88 88 88 88 88 88 88 88 Heavy Vehicles, % 12 0 25 00000155010 Mvmt Flow 33 486 6 8 319 16 6 0 17 52 0 25 Major/Minor Major1 Major2 Minor1 Minor2 Conflicting Flow All 335 0 0 492 0 0 911 906 489 907 901 327 Stage 1 ------555555-343343- Stage 2 ------356351-564558- Critical Hdwy 4.22 - - 4.1 - - 7.1 6.5 6.35 7.15 6.5 6.3 Critical Hdwy Stg 1 ------6.15.5-6.15 5.5 - Critical Hdwy Stg 2 ------6.15.5-6.15 5.5 - Follow-up Hdwy 2.308 - - 2.2 - - 3.5 4 3.435 3.545 4 3.39 Pot Cap-1 Maneuver 1170 - - 1082 - - 257 278 554 253 280 696 Stage 1 ------520516-666641- Stage 2 ------666636-505515- Platoon blocked, % - - - - Mov Cap-1 Maneuver 1170 - - 1082 - - 241 268 554 239 270 696 Mov Cap-2 Maneuver ------241268-239270- Stage 1 ------505502-647637- Stage 2 ------637632-476501- Approach EB WB NB SB HCM Control Delay, s 0.5 0.2 13.9 20.9 HCM LOS B C Minor Lane/Major Mvmt NBLn1NBLn2 EBL EBT EBR WBL WBT WBRSBLn1 Capacity (veh/h) 241 554 1170 - - 1082 - - 303 HCM Lane V/C Ratio 0.024 0.031 0.028 - - 0.007 - - 0.255 HCM Control Delay (s) 20.3 11.7 8.2 - - 8.4 - - 20.9 HCM Lane LOS C B A - - A - - C HCM 95th %tile Q(veh) 0.1 0.1 0.1 - - 0 - - 1 272 HCM 6th TWSC 10: Waterford Boulevard & 127th Street 11/05/2021 21-272 Bronk Parcel Development Synchro 11 Report Existing Weekday Morning Peak Hour Page 5 Intersection Int Delay, s/veh 1.1 Movement EBT EBR WBL WBT NBL NBR Lane Configurations Traffic Vol, veh/h 599 2 26 330 5 43 Future Vol, veh/h 599 2 26 330 5 43 Conflicting Peds, #/hr 0 00000 Sign Control Free Free Free Free Stop Stop RT Channelized - None - None - None Storage Length - - 90 - 0 0 Veh in Median Storage, # 0 - - 0 0 - Grade, % 0 - - 0 0 - Peak Hour Factor 75 75 75 75 75 75 Heavy Vehicles, % 0 0 13 0 0 5 Mvmt Flow 799 3 35 440 7 57 Major/Minor Major1 Major2 Minor1 Conflicting Flow All 0 0 802 0 1311 801 Stage 1 - - - - 801 - Stage 2 - - - - 510 - Critical Hdwy - - 4.23 - 6.4 6.25 Critical Hdwy Stg 1 - - - - 5.4 - Critical Hdwy Stg 2 - - - - 5.4 - Follow-up Hdwy - - 2.317 - 3.5 3.345 Pot Cap-1 Maneuver - - 775 - 177 380 Stage 1 - - - - 445 - Stage 2 - - - - 607 - Platoon blocked, % - - - Mov Cap-1 Maneuver - - 775 - 169 380 Mov Cap-2 Maneuver - - - - 169 - Stage 1 - - - - 445 - Stage 2 - - - - 580 - Approach EB WB NB HCM Control Delay, s 0 0.7 17.3 HCM LOS C Minor Lane/Major Mvmt NBLn1NBLn2 EBT EBR WBL WBT Capacity (veh/h) 169 380 - - 775 - HCM Lane V/C Ratio 0.039 0.151 - - 0.045 - HCM Control Delay (s) 27.2 16.2 - - 9.9 - HCM Lane LOS D C - - A - HCM 95th %tile Q(veh) 0.1 0.5 - - 0.1 - 273 Lanes, Volumes, Timings 1: Van Dyke Road & 127th Street 11/05/2021 21-272 Bronk Parcel Development Synchro 11 Report Existing Weekday Evening Peak Hour Page 1 Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Volume (vph) 44 428 158 168 534 50 99 187 137 77 271 50 Future Volume (vph) 44 428 158 168 534 50 99 187 137 77 271 50 Ideal Flow (vphpl) 1900 2000 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Storage Length (ft) 180 180 250 0 280 0 145 0 Storage Lanes 1 1 1 0 1 0 1 0 Taper Length (ft) 205 210 190 155 Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.95 0.95 1.00 0.95 0.95 Frt 0.850 0.987 0.937 0.977 Flt Protected 0.950 0.950 0.950 0.950 Satd. Flow (prot) 1770 1980 1615 1787 1875 0 1805 3383 0 1805 3497 0 Flt Permitted 0.160 0.229 0.501 0.502 Satd. Flow (perm) 298 1980 1615 431 1875 0 952 3383 0 954 3497 0 Right Turn on Red Yes Yes Yes Yes Satd. Flow (RTOR) 168 7 146 25 Link Speed (mph) 40 35 45 45 Link Distance (ft) 1125 2135 1316 1535 Travel Time (s) 19.2 41.6 19.9 23.3 Peak Hour Factor 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 Heavy Vehicles (%) 2% 1% 0% 1% 0% 0% 0% 0% 0% 0% 1% 0% Shared Lane Traffic (%) Lane Group Flow (vph) 47 455 168 179 621 0 105 345 0 82 341 0 Turn Type pm+pt NA Perm pm+pt NA pm+pt NA pm+pt NA Protected Phases 7 4 3 8 5 2 1 6 Permitted Phases 4 4 8 2 6 Detector Phase 74438 52 16 Switch Phase Minimum Initial (s) 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 Minimum Split (s) 9.5 22.5 22.5 9.5 22.5 9.5 22.5 9.5 22.5 Total Split (s) 9.6 35.2 35.2 11.4 37.0 9.6 23.8 9.6 23.8 Total Split (%) 12.0% 44.0% 44.0% 14.3% 46.3% 12.0% 29.8% 12.0% 29.8% Yellow Time (s) 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 All-Red Time (s) 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 Lost Time Adjust (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Total Lost Time (s) 4.5 4.5 4.5 4.5 4.5 4.5 4.5 4.5 4.5 Lead/Lag Lead Lag Lag Lead Lag Lead Lag Lead Lag Lead-Lag Optimize? Yes Yes Yes Yes Yes Yes Yes Yes Yes Recall Mode None None None None None None C-Max None C-Max Act Effct Green (s) 30.8 25.7 25.7 35.5 31.4 30.4 25.8 30.2 25.7 Actuated g/C Ratio 0.38 0.32 0.32 0.44 0.39 0.38 0.32 0.38 0.32 v/c Ratio 0.23 0.72 0.27 0.58 0.84 0.25 0.29 0.20 0.30 Control Delay 12.8 30.0 4.1 19.7 33.8 18.4 14.2 17.7 22.1 Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Total Delay 12.8 30.0 4.1 19.7 33.8 18.4 14.2 17.7 22.1 LOS B C A B C B B B C Approach Delay 22.3 30.7 15.2 21.3 Approach LOS C C B C Queue Length 50th (ft) 11 181 0 45 269 34 42 26 69 Queue Length 95th (ft) 26 272 36 78 #446 69 77 57 107 274 Lanes, Volumes, Timings 1: Van Dyke Road & 127th Street 11/05/2021 21-272 Bronk Parcel Development Synchro 11 Report Existing Weekday Evening Peak Hour Page 2 Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Internal Link Dist (ft) 1045 2055 1236 1455 Turn Bay Length (ft) 180 180 250 280 145 Base Capacity (vph) 208 759 723 308 765 422 1187 419 1138 Starvation Cap Reductn 00000 00 00 Spillback Cap Reductn 00000 00 00 Storage Cap Reductn 00000 00 00 Reduced v/c Ratio 0.23 0.60 0.23 0.58 0.81 0.25 0.29 0.20 0.30 Intersection Summary Area Type: Other Cycle Length: 80 Actuated Cycle Length: 80 Offset: 0 (0%), Referenced to phase 2:NBTL and 6:SBTL, Start of Green Natural Cycle: 75 Control Type: Actuated-Coordinated Maximum v/c Ratio: 0.84 Intersection Signal Delay: 23.6 Intersection LOS: C Intersection Capacity Utilization 64.9% ICU Level of Service C Analysis Period (min) 15 # 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles. Splits and Phases: 1: Van Dyke Road & 127th Street 275 Lanes, Volumes, Timings 2: Van Dyke Road & 135th Street 11/05/2021 21-272 Bronk Parcel Development Synchro 11 Report Existing Weekday Evening Peak Hour Page 3 Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Volume (vph) 52 350 30 98 595 96 39 251 74 89 326 117 Future Volume (vph) 52 350 30 98 595 96 39 251 74 89 326 117 Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 2000 1900 Storage Length (ft) 155 0 190 0 250 0 145 0 Storage Lanes 1 0 1 0 1 0 1 1 Taper Length (ft) 145 110 150 220 Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Frt 0.988 0.979 0.966 0.850 Flt Protected 0.950 0.950 0.950 0.950 Satd. Flow (prot) 1805 1827 0 1805 1860 0 1805 1831 0 1805 1980 1615 Flt Permitted 0.097 0.341 0.351 0.303 Satd. Flow (perm) 184 1827 0 648 1860 0 667 1831 0 576 1980 1615 Right Turn on Red Yes Yes Yes Yes Satd. Flow (RTOR) 6 11 14 127 Link Speed (mph) 35 35 45 45 Link Distance (ft) 883 1887 980 2247 Travel Time (s) 17.2 36.8 14.8 34.0 Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 Heavy Vehicles (%) 0% 3% 0% 0% 0% 0% 0% 0% 1% 0% 1% 0% Shared Lane Traffic (%) Lane Group Flow (vph) 57 413 0 107 751 0 42 353 0 97 354 127 Turn Type pm+pt NA pm+pt NA pm+pt NA pm+pt NA Perm Protected Phases 7 4 3 8 5 2 1 6 Permitted Phases 48266 Detector Phase 7 4 3 8 5 2 1 6 6 Switch Phase Minimum Initial (s) 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 Minimum Split (s) 9.5 22.5 9.5 22.5 9.5 22.5 9.5 22.5 22.5 Total Split (s) 9.6 49.4 10.6 50.4 9.6 30.4 9.6 30.4 30.4 Total Split (%) 9.6% 49.4% 10.6% 50.4% 9.6% 30.4% 9.6% 30.4% 30.4% Yellow Time (s) 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 All-Red Time (s) 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 Lost Time Adjust (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Total Lost Time (s) 4.5 4.5 4.5 4.5 4.5 4.5 4.5 4.5 4.5 Lead/Lag Lead Lag Lead Lag Lead Lag Lead Lag Lag Lead-Lag Optimize? Yes Yes Yes Yes Yes Yes Yes Yes Yes Recall Mode None None None None None C-Max None C-Max C-Max Act Effct Green (s) 45.5 40.4 48.2 43.4 36.0 31.7 37.3 34.2 34.2 Actuated g/C Ratio 0.46 0.40 0.48 0.43 0.36 0.32 0.37 0.34 0.34 v/c Ratio 0.34 0.56 0.28 0.92 0.14 0.60 0.34 0.52 0.20 Control Delay 16.4 24.9 13.3 44.6 22.5 35.5 25.4 33.0 6.2 Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Total Delay 16.4 24.9 13.3 44.6 22.5 35.5 25.4 33.0 6.2 LOS BC BD CD CCA Approach Delay 23.8 40.7 34.1 25.9 Approach LOS CDCC Queue Length 50th (ft) 16 179 30 414 18 198 42 204 0 Queue Length 95th (ft) 34 267 56 #650 41 302 79 305 44 276 Lanes, Volumes, Timings 2: Van Dyke Road & 135th Street 11/05/2021 21-272 Bronk Parcel Development Synchro 11 Report Existing Weekday Evening Peak Hour Page 4 Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Internal Link Dist (ft) 803 1807 900 2167 Turn Bay Length (ft) 155 190 250 145 Base Capacity (vph) 166 823 383 859 301 590 286 677 635 Starvation Cap Reductn 0 0 0 0 0 0 0 0 0 Spillback Cap Reductn 0 0 0 0 0 0 0 0 0 Storage Cap Reductn 0 0 0 0 0 0 0 0 0 Reduced v/c Ratio 0.34 0.50 0.28 0.87 0.14 0.60 0.34 0.52 0.20 Intersection Summary Area Type: Other Cycle Length: 100 Actuated Cycle Length: 100 Offset: 0 (0%), Referenced to phase 2:NBTL and 6:SBTL, Start of Green Natural Cycle: 90 Control Type: Actuated-Coordinated Maximum v/c Ratio: 0.92 Intersection Signal Delay: 32.4 Intersection LOS: C Intersection Capacity Utilization 78.9% ICU Level of Service D Analysis Period (min) 15 # 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles. Splits and Phases: 2: Van Dyke Road & 135th Street 277 Lanes, Volumes, Timings 3: U.S. 30 & 135th Street 11/05/2021 21-272 Bronk Parcel Development Synchro 11 Report Existing Weekday Evening Peak Hour Page 5 Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Volume (vph) 44 256 126 182 458 95 133 344 91 74 501 47 Future Volume (vph) 44 256 126 182 458 95 133 344 91 74 501 47 Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Storage Length (ft) 105 0 160 0 185 0 180 0 Storage Lanes 1 0 1 0 1 0 1 0 Taper Length (ft) 130 125 125 240 Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Frt 0.950 0.974 0.969 0.987 Flt Protected 0.950 0.950 0.950 0.950 Satd. Flow (prot) 1805 1781 0 1805 1844 0 1787 1725 0 1752 1806 0 Flt Permitted 0.093 0.193 0.183 0.330 Satd. Flow (perm) 177 1781 0 367 1844 0 344 1725 0 609 1806 0 Right Turn on Red No No No No Satd. Flow (RTOR) Link Speed (mph) 35 35 50 55 Link Distance (ft) 1073 1801 769 1118 Travel Time (s) 20.9 35.1 10.5 13.9 Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 Heavy Vehicles (%) 0% 2% 0% 0% 0% 2% 1% 8% 2% 3% 4% 2% Shared Lane Traffic (%) Lane Group Flow (vph) 48 415 0 198 601 0 145 473 0 80 596 0 Turn Type pm+pt NA pm+pt NA pm+pt NA pm+pt NA Protected Phases 7 4 3 8 5 2 1 6 Permitted Phases 4826 Detector Phase 7 4 3 8 5 2 1 6 Switch Phase Minimum Initial (s) 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 Minimum Split (s) 9.5 22.5 9.5 22.5 9.5 22.5 9.5 22.5 Total Split (s) 9.5 59.3 17.2 67.0 15.0 72.7 10.8 68.5 Total Split (%) 5.9% 37.1% 10.8% 41.9% 9.4% 45.4% 6.8% 42.8% Yellow Time (s) 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 All-Red Time (s) 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 Lost Time Adjust (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Total Lost Time (s) 4.5 4.5 4.5 4.5 4.5 4.5 4.5 4.5 Lead/Lag Lead Lag Lead Lag Lead Lag Lead Lag Lead-Lag Optimize? Yes Yes Yes Yes Yes Yes Yes Yes Recall Mode None None None None None C-Max None C-Max Act Effct Green (s) 52.7 47.7 64.9 57.3 84.7 74.4 78.5 71.3 Actuated g/C Ratio 0.33 0.30 0.41 0.36 0.53 0.46 0.49 0.45 v/c Ratio 0.44 0.78 0.75 0.91 0.53 0.59 0.23 0.74 Control Delay 39.8 61.6 49.7 67.4 27.6 37.0 21.9 45.5 Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Total Delay 39.8 61.6 49.7 67.4 27.6 37.0 21.9 45.5 LOS DE DE CD CD Approach Delay 59.3 63.0 34.8 42.7 Approach LOS E E C D Queue Length 50th (ft) 29 388 133 591 78 383 41 542 Queue Length 95th (ft) 55 502 186 739 127 519 76 726 278 Lanes, Volumes, Timings 3: U.S. 30 & 135th Street 11/05/2021 21-272 Bronk Parcel Development Synchro 11 Report Existing Weekday Evening Peak Hour Page 6 Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Internal Link Dist (ft) 993 1721 689 1038 Turn Bay Length (ft) 105 160 185 180 Base Capacity (vph) 109 609 263 720 280 802 349 804 Starvation Cap Reductn 0 0 0 0 0 0 0 0 Spillback Cap Reductn 0 0 0 0 0 0 0 0 Storage Cap Reductn 0 0 0 0 0 0 0 0 Reduced v/c Ratio 0.44 0.68 0.75 0.83 0.52 0.59 0.23 0.74 Intersection Summary Area Type: Other Cycle Length: 160 Actuated Cycle Length: 160 Offset: 0 (0%), Referenced to phase 2:NBTL and 6:SBTL, Start of Green Natural Cycle: 90 Control Type: Actuated-Coordinated Maximum v/c Ratio: 0.91 Intersection Signal Delay: 50.2 Intersection LOS: D Intersection Capacity Utilization 85.6% ICU Level of Service E Analysis Period (min) 15 Splits and Phases: 3: U.S. 30 & 135th Street 279 Lanes, Volumes, Timings 4: U.S. 30 & 127th Street 11/05/2021 21-272 Bronk Parcel Development Synchro 11 Report Existing Weekday Evening Peak Hour Page 7 Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Volume (vph) 11 284 53 153 467 86 28 339 110 95 416 8 Future Volume (vph) 11 284 53 153 467 86 28 339 110 95 416 8 Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 2000 1900 1900 1900 1900 Storage Length (ft) 225 0 285 0 225 220 255 0 Storage Lanes 1 0 1 0 1 1 1 0 Taper Length (ft) 175 175 250 300 Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Frt 0.976 0.977 0.850 0.997 Flt Protected 0.950 0.950 0.950 0.950 Satd. Flow (prot) 1805 1833 0 1787 1853 0 1805 1852 1615 1805 1806 0 Flt Permitted 0.950 0.950 0.950 0.950 Satd. Flow (perm) 1805 1833 0 1787 1853 0 1805 1852 1615 1805 1806 0 Right Turn on Red No No No No Satd. Flow (RTOR) Link Speed (mph) 45 45 55 55 Link Distance (ft) 1528 1614 4667 1415 Travel Time (s) 23.2 24.5 57.9 17.5 Peak Hour Factor 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 Heavy Vehicles (%) 0% 1% 2% 1% 0% 1% 0% 8% 0% 0% 5% 0% Shared Lane Traffic (%) Lane Group Flow (vph) 12 362 0 165 594 0 30 365 118 102 456 0 Turn Type Prot NA Prot NA Prot NA Perm Prot NA Protected Phases 7 4 3 8 5 2 1 6 Permitted Phases 2 Detector Phase 7 4 3 8 52216 Switch Phase Minimum Initial (s) 3.0 8.0 10.0 10.0 3.0 15.0 15.0 3.0 15.0 Minimum Split (s) 9.5 24.5 14.5 24.5 9.5 24.5 24.5 9.5 24.5 Total Split (s) 9.5 51.8 27.7 70.0 11.0 50.5 50.5 20.0 59.5 Total Split (%) 6.3% 34.5% 18.5% 46.7% 7.3% 33.7% 33.7% 13.3% 39.7% Yellow Time (s) 3.5 4.5 3.5 4.5 3.5 4.5 4.5 3.5 4.5 All-Red Time (s) 1.0 2.0 1.0 2.0 1.0 2.0 2.0 1.0 2.0 Lost Time Adjust (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Total Lost Time (s) 4.5 6.5 4.5 6.5 4.5 6.5 6.5 4.5 6.5 Lead/Lag Lead Lag Lead Lag Lead Lag Lag Lead Lag Lead-Lag Optimize? Yes Yes Yes Yes Yes Yes Yes Yes Yes Recall Mode None None None None None C-Max C-Max None C-Max Act Effct Green (s) 5.0 36.6 18.6 55.9 7.1 59.7 59.7 13.1 69.9 Actuated g/C Ratio 0.03 0.24 0.12 0.37 0.05 0.40 0.40 0.09 0.47 v/c Ratio 0.20 0.81 0.75 0.86 0.35 0.50 0.18 0.65 0.54 Control Delay 78.4 67.3 83.3 56.3 80.4 40.2 34.6 84.9 35.7 Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Total Delay 78.4 67.3 83.3 56.3 80.4 40.2 34.6 84.9 35.7 LOS E E F E F D C F D Approach Delay 67.6 62.2 41.3 44.7 Approach LOS E E D D Queue Length 50th (ft) 12 339 158 513 29 268 75 98 334 Queue Length 95th (ft) 36 426 235 645 66 434 145 162 520 280 Lanes, Volumes, Timings 4: U.S. 30 & 127th Street 11/05/2021 21-272 Bronk Parcel Development Synchro 11 Report Existing Weekday Evening Peak Hour Page 8 Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Internal Link Dist (ft) 1448 1534 4587 1335 Turn Bay Length (ft) 225 285 225 220 255 Base Capacity (vph) 60 553 276 784 88 737 643 187 842 Starvation Cap Reductn 0 0 0 0 00000 Spillback Cap Reductn 0 0 0 0 00000 Storage Cap Reductn 0 0 0 0 00000 Reduced v/c Ratio 0.20 0.65 0.60 0.76 0.34 0.50 0.18 0.55 0.54 Intersection Summary Area Type: Other Cycle Length: 150 Actuated Cycle Length: 150 Offset: 0 (0%), Referenced to phase 2:NBT and 6:SBT, Start of Green Natural Cycle: 90 Control Type: Actuated-Coordinated Maximum v/c Ratio: 0.86 Intersection Signal Delay: 53.8 Intersection LOS: D Intersection Capacity Utilization 77.2% ICU Level of Service D Analysis Period (min) 15 Splits and Phases: 4: U.S. 30 & 127th Street 281 Lanes, Volumes, Timings 5: 127th Street & 248th Avenue 11/05/2021 21-272 Bronk Parcel Development Synchro 11 Report Existing Weekday Evening Peak Hour Page 9 Lane Group EBL EBT WBT WBR SBL SBR Lane Configurations Traffic Volume (vph) 151 363 499 196 224 242 Future Volume (vph) 151 363 499 196 224 242 Ideal Flow (vphpl) 1900 2000 2000 1900 1900 1900 Storage Length (ft) 90 205 200 0 Storage Lanes 1 1 1 1 Taper Length (ft) 100 195 Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 Frt 0.850 0.850 Flt Protected 0.950 0.950 Satd. Flow (prot) 1805 2000 2000 1615 1805 1599 Flt Permitted 0.114 0.950 Satd. Flow (perm) 217 2000 2000 1615 1805 1599 Right Turn on Red Yes Yes Satd. Flow (RTOR) 231 285 Link Speed (mph) 40 45 45 Link Distance (ft) 406 1540 1616 Travel Time (s) 6.9 23.3 24.5 Peak Hour Factor 0.85 0.85 0.85 0.85 0.85 0.85 Heavy Vehicles (%) 0% 0% 0% 0% 0% 1% Shared Lane Traffic (%) Lane Group Flow (vph) 178 427 587 231 264 285 Turn Type pm+pt NA NA Perm Prot Perm Protected Phases 7 4 8 6 Permitted Phases 4 8 6 Detector Phase 748866 Switch Phase Minimum Initial (s) 5.0 5.0 5.0 5.0 5.0 5.0 Minimum Split (s) 9.5 23.5 23.5 23.5 23.5 23.5 Total Split (s) 16.0 67.0 51.0 51.0 33.0 33.0 Total Split (%) 16.0% 67.0% 51.0% 51.0% 33.0% 33.0% Yellow Time (s) 3.5 3.5 3.5 3.5 3.5 3.5 All-Red Time (s) 1.0 2.0 2.0 2.0 2.0 2.0 Lost Time Adjust (s) 0.0 0.0 0.0 0.0 0.0 0.0 Total Lost Time (s) 4.5 5.5 5.5 5.5 5.5 5.5 Lead/Lag Lead Lag Lag Lead-Lag Optimize? Yes Yes Yes Recall Mode None None None None C-Max C-Max Act Effct Green (s) 52.4 51.4 35.9 35.9 37.6 37.6 Actuated g/C Ratio 0.52 0.51 0.36 0.36 0.38 0.38 v/c Ratio 0.62 0.42 0.82 0.32 0.39 0.37 Control Delay 23.7 15.5 38.4 3.6 27.2 4.8 Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 Total Delay 23.7 15.5 38.4 3.6 27.2 4.8 LOS CBDACA Approach Delay 17.9 28.6 15.6 Approach LOS B C B Queue Length 50th (ft) 56 156 332 0 124 0 Queue Length 95th (ft) 89 169 371 34 205 48 282 Lanes, Volumes, Timings 5: 127th Street & 248th Avenue 11/05/2021 21-272 Bronk Parcel Development Synchro 11 Report Existing Weekday Evening Peak Hour Page 10 Lane Group EBL EBT WBT WBR SBL SBR Internal Link Dist (ft) 326 1460 1536 Turn Bay Length (ft) 90 205 200 Base Capacity (vph) 296 1230 910 860 678 778 Starvation Cap Reductn 000000 Spillback Cap Reductn 000000 Storage Cap Reductn 000000 Reduced v/c Ratio 0.60 0.35 0.65 0.27 0.39 0.37 Intersection Summary Area Type: Other Cycle Length: 100 Actuated Cycle Length: 100 Offset: 0 (0%), Referenced to phase 2: and 6:SBL, Start of Green Natural Cycle: 60 Control Type: Actuated-Coordinated Maximum v/c Ratio: 0.82 Intersection Signal Delay: 21.7 Intersection LOS: C Intersection Capacity Utilization 58.6% ICU Level of Service B Analysis Period (min) 15 Splits and Phases: 5: 127th Street & 248th Avenue 283 HCM 6th TWSC 6: 127th Street & Edwards Elmhurst Drive 11/05/2021 21-272 Bronk Parcel Development Synchro 11 Report Existing Weekday Evening Peak Hour Page 1 Intersection Int Delay, s/veh 2.3 Movement EBL EBT WBT WBR SBL SBR Lane Configurations Traffic Vol, veh/h 15 572 649 34 58 46 Future Vol, veh/h 15 572 649 34 58 46 Conflicting Peds, #/hr 0 00000 Sign Control Free Free Free Free Stop Stop RT Channelized - None - None - None Storage Length 200 - - - 0 0 Veh in Median Storage, # - 0 0 - 0 - Grade, % - 0 0 - 0 - Peak Hour Factor 66 66 66 66 66 66 Heavy Vehicles, % 0 00000 Mvmt Flow 23 867 983 52 88 70 Major/Minor Major1 Major2 Minor2 Conflicting Flow All 1035 0 - 0 1922 518 Stage 1 - - - - 1009 - Stage 2 - - - - 913 - Critical Hdwy 4.1 - - - 6.6 6.9 Critical Hdwy Stg 1 - - - - 5.8 - Critical Hdwy Stg 2 - - - - 5.4 - Follow-up Hdwy 2.2 - - - 3.5 3.3 Pot Cap-1 Maneuver 679 - - - ~ 67 508 Stage 1 - - - - 318 - Stage 2 - - - - 395 - Platoon blocked, % - - - Mov Cap-1 Maneuver 679 - - - ~ 65 508 Mov Cap-2 Maneuver - - - - 187 - Stage 1 - - - - 307 - Stage 2 - - - - 395 - Approach EB WB SB HCM Control Delay, s 0.3 0 28.3 HCM LOS D Minor Lane/Major Mvmt EBL EBT WBT WBRSBLn1SBLn2 Capacity (veh/h) 679 - - - 187 508 HCM Lane V/C Ratio 0.033 - - - 0.47 0.137 HCM Control Delay (s) 10.5 - - - 40.2 13.2 HCM Lane LOS B - - - E B HCM 95th %tile Q(veh) 0.1 - - - 2.3 0.5 Notes ~: Volume exceeds capacity $: Delay exceeds 300s +: Computation Not Defined *: All major volume in platoon 284 HCM 6th TWSC 7: Van Dyke Road & Hamilton Lane 11/05/2021 21-272 Bronk Parcel Development Synchro 11 Report Existing Weekday Evening Peak Hour Page 2 Intersection Int Delay, s/veh 0.8 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Vol, veh/h 0 0 0 12 0 29 0 394 8 25 572 0 Future Vol, veh/h 0 0 0 12 0 29 0 394 8 25 572 0 Conflicting Peds, #/hr 0 00000000000 Sign Control Stop Stop Stop Stop Stop Stop Free Free Free Free Free Free RT Channelized - - None - - None - - None - - None Storage Length - - - 0 - 0 145 - - 135 - - Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 - Grade, % - 0 - - 0 - - 0 - - 0 - Peak Hour Factor 74 74 74 74 74 74 74 74 74 74 74 74 Heavy Vehicles, % 0 00003000400 Mvmt Flow 0 0 0 16 0 39 0 532 11 34 773 0 Major/Minor Minor2 Minor1 Major1 Major2 Conflicting Flow All 1107 1384 387 993 - 272 773 0 0 543 0 0 Stage 1 841 841 - 538 -------- Stage 2 266 543 - 455 -------- Critical Hdwy 7.5 6.5 6.9 7.5 - 6.96 4.1 - - 4.18 - - Critical Hdwy Stg 1 6.5 5.5 - 6.5 -------- Critical Hdwy Stg 2 6.5 5.5 - 6.5 -------- Follow-up Hdwy 3.5 4 3.3 3.5 - 3.33 2.2 - - 2.24 - - Pot Cap-1 Maneuver 167 145 617 203 0 723 851 - - 1008 - - Stage 1 330 383 - 500 0 ------- Stage 2 722 523 - 560 0 ------- Platoon blocked, % - - - - Mov Cap-1 Maneuver 154 140 617 198 - 723 851 - - 1008 - - Mov Cap-2 Maneuver 154 140 - 198 -------- Stage 1 330 370 - 500 -------- Stage 2 683 523 - 541 -------- Approach EB WB NB SB HCM Control Delay, s 0 14.5 0 0.4 HCM LOS A B Minor Lane/Major Mvmt NBL NBT NBREBLn1WBLn1WBLn2 SBL SBT SBR Capacity (veh/h) 851 - - - 198 723 1008 - - HCM Lane V/C Ratio ----0.082 0.054 0.034 - - HCM Control Delay (s) 0 - - 0 24.8 10.3 8.7 - - HCM Lane LOS A - - A C B A - - HCM 95th %tile Q(veh) 0 - - - 0.3 0.2 0.1 - - 285 HCM 6th TWSC 8: Van Dyke Road & Norwood Drive 11/05/2021 21-272 Bronk Parcel Development Synchro 11 Report Existing Weekday Evening Peak Hour Page 3 Intersection Int Delay, s/veh 2.2 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Vol, veh/h 44 5 20 14 9 15 16 343 11 17 494 73 Future Vol, veh/h 44 5 20 14 9 15 16 343 11 17 494 73 Conflicting Peds, #/hr 0 00000000000 Sign Control Stop Stop Stop Stop Stop Stop Free Free Free Free Free Free RT Channelized - - None - - None - - None - - None Storage Length -----0130--150-- Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 - Grade, % - 0 - - 0 - - 0 - - 0 - Peak Hour Factor 94 94 94 94 94 94 94 94 94 94 94 94 Heavy Vehicles, % 0 00000000000 Mvmt Flow 47 5 21 15 10 16 17 365 12 18 526 78 Major/Minor Minor2 Minor1 Major1 Major2 Conflicting Flow All 823 1012 302 707 1045 189 604 0 0 377 0 0 Stage 1 601 601 - 405 405 ------- Stage 2 222 411 - 302 640 ------- Critical Hdwy 7.5 6.5 6.9 7.5 6.5 6.9 4.1 - - 4.1 - - Critical Hdwy Stg 1 6.5 5.5 - 6.5 5.5 ------- Critical Hdwy Stg 2 6.5 5.5 - 6.5 5.5 ------- Follow-up Hdwy 3.5 4 3.3 3.5 4 3.3 2.2 - - 2.2 - - Pot Cap-1 Maneuver 269 241 700 326 231 827 984 - - 1193 - - Stage 1 459 493 - 599 602 ------- Stage 2 766 598 - 688 473 ------- Platoon blocked, % - - - - Mov Cap-1 Maneuver 249 233 700 303 224 827 984 - - 1193 - - Mov Cap-2 Maneuver 249 233 - 303 224 ------- Stage 1 451 486 - 589 592 ------- Stage 2 726 588 - 650 466 ------- Approach EB WB NB SB HCM Control Delay, s 20.6 15.8 0.4 0.2 HCM LOS C C Minor Lane/Major Mvmt NBL NBT NBREBLn1WBLn1WBLn2 SBL SBT SBR Capacity (veh/h) 984 - - 304 266 827 1193 - - HCM Lane V/C Ratio 0.017 - - 0.241 0.092 0.019 0.015 - - HCM Control Delay (s) 8.7 - - 20.6 19.9 9.4 8.1 - - HCM Lane LOS A - - C C A A - - HCM 95th %tile Q(veh) 0.1 - - 0.9 0.3 0.1 0 - - 286 HCM 6th TWSC 9: Vicarage Drive & 135th Street 11/05/2021 21-272 Bronk Parcel Development Synchro 11 Report Existing Weekday Evening Peak Hour Page 4 Intersection Int Delay, s/veh 1.6 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Vol, veh/h 36 396 4 23 699 29 6 0 22 14 0 24 Future Vol, veh/h 36 396 4 23 699 29 6 0 22 14 0 24 Conflicting Peds, #/hr 0 00000000000 Sign Control Free Free Free Free Free Free Stop Stop Stop Stop Stop Stop RT Channelized - - None - - None - - None - - None Storage Length 135 - - 125 ----0--- Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 - Grade, % - 0 - - 0 - - 0 - - 0 - Peak Hour Factor 94 94 94 94 94 94 94 94 94 94 94 94 Heavy Vehicles, % 0 00400000008 Mvmt Flow 38 421 4 24 744 31 6 0 23 15 0 26 Major/Minor Major1 Major2 Minor1 Minor2 Conflicting Flow All 775 0 0 425 0 0 1320 1322 423 1319 1309 760 Stage 1 ------499499-808808- Stage 2 ------821823-511501- Critical Hdwy 4.1 - - 4.14 - - 7.1 6.5 6.2 7.1 6.5 6.28 Critical Hdwy Stg 1 ------6.15.5-6.15.5- Critical Hdwy Stg 2 ------6.15.5-6.15.5- Follow-up Hdwy 2.2 - - 2.236 - - 3.5 4 3.3 3.5 4 3.372 Pot Cap-1 Maneuver 850 - - 1124 - - 135 158 635 135 161 396 Stage 1 ------557547-378397- Stage 2 ------371391-549546- Platoon blocked, % - - - - Mov Cap-1 Maneuver 850 - - 1124 - - 120 148 635 124 151 396 Mov Cap-2 Maneuver ------120148-124151- Stage 1 ------532522-361389- Stage 2 ------340383-505521- Approach EB WB NB SB HCM Control Delay, s 0.8 0.3 16.4 25.1 HCM LOS C D Minor Lane/Major Mvmt NBLn1NBLn2 EBL EBT EBR WBL WBT WBRSBLn1 Capacity (veh/h) 120 635 850 - - 1124 - - 219 HCM Lane V/C Ratio 0.053 0.037 0.045 - - 0.022 - - 0.185 HCM Control Delay (s) 36.7 10.9 9.4 - - 8.3 - - 25.1 HCM Lane LOS E B A - - A - - D HCM 95th %tile Q(veh) 0.2 0.1 0.1 - - 0.1 - - 0.7 287 HCM 6th TWSC 10: Waterford Boulevard & 127th Street 11/05/2021 21-272 Bronk Parcel Development Synchro 11 Report Existing Weekday Evening Peak Hour Page 5 Intersection Int Delay, s/veh 1.2 Movement EBT EBR WBL WBT NBL NBR Lane Configurations Traffic Vol, veh/h 477 12 44 697 9 37 Future Vol, veh/h 477 12 44 697 9 37 Conflicting Peds, #/hr 0 00000 Sign Control Free Free Free Free Stop Stop RT Channelized - None - None - None Storage Length - - 90 - 0 0 Veh in Median Storage, # 0 - - 0 0 - Grade, % 0 - - 0 0 - Peak Hour Factor 69 69 69 69 69 69 Heavy Vehicles, % 0 00003 Mvmt Flow 691 17 64 1010 13 54 Major/Minor Major1 Major2 Minor1 Conflicting Flow All 0 0 708 0 1838 700 Stage 1 - - - - 700 - Stage 2 - - - - 1138 - Critical Hdwy - - 4.1 - 6.4 6.23 Critical Hdwy Stg 1 - - - - 5.4 - Critical Hdwy Stg 2 - - - - 5.4 - Follow-up Hdwy - - 2.2 - 3.5 3.327 Pot Cap-1 Maneuver - - 900 - 84 438 Stage 1 - - - - 496 - Stage 2 - - - - 308 - Platoon blocked, % - - - Mov Cap-1 Maneuver - - 900 - 78 438 Mov Cap-2 Maneuver - - - - 78 - Stage 1 - - - - 496 - Stage 2 - - - - 286 - Approach EB WB NB HCM Control Delay, s 0 0.6 23.4 HCM LOS C Minor Lane/Major Mvmt NBLn1NBLn2 EBT EBR WBL WBT Capacity (veh/h) 78 438 - - 900 - HCM Lane V/C Ratio 0.167 0.122 - - 0.071 - HCM Control Delay (s) 60.2 14.4 - - 9.3 - HCM Lane LOS F B - - A - HCM 95th %tile Q(veh) 0.6 0.4 - - 0.2 - 288 Lanes, Volumes, Timings 1: Van Dyke Road & 127th Street 11/30/2021 21-272 Bronk Parcel Development Synchro 11 Report Proposed Weekday Morning Peak Hour Page 1 Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Volume (vph) 93 450 71 89 365 39 83 290 146 55 126 33 Future Volume (vph) 93 450 71 89 365 39 83 290 146 55 126 33 Ideal Flow (vphpl) 1900 2000 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Storage Length (ft) 180 180 250 0 280 0 145 0 Storage Lanes 1 1 1 0 1 0 1 0 Taper Length (ft) 205 210 190 155 Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.95 0.95 1.00 0.95 0.95 Frt 0.850 0.985 0.950 0.969 Flt Protected 0.950 0.950 0.950 0.950 Satd. Flow (prot) 1703 1961 1615 1805 1766 0 1736 3308 0 1421 3314 0 Flt Permitted 0.193 0.137 0.627 0.337 Satd. Flow (perm) 346 1961 1615 260 1766 0 1145 3308 0 504 3314 0 Right Turn on Red Yes Yes Yes Yes Satd. Flow (RTOR) 135 8 97 36 Link Speed (mph) 40 35 45 45 Link Distance (ft) 1125 2135 1316 1535 Travel Time (s) 19.2 41.6 19.9 23.3 Peak Hour Factor 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 Heavy Vehicles (%) 6% 2% 0% 0% 6% 6% 4% 4% 3% 27% 7% 0% Shared Lane Traffic (%) Lane Group Flow (vph) 116 563 89 111 505 0 104 546 0 69 199 0 Turn Type pm+pt NA Perm pm+pt NA pm+pt NA pm+pt NA Protected Phases 7 4 3 8 5 2 1 6 Permitted Phases 4 4 8 2 6 Detector Phase 74438 52 16 Switch Phase Minimum Initial (s) 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 Minimum Split (s) 9.5 22.5 22.5 9.5 22.5 9.5 22.5 9.5 22.5 Total Split (s) 10.6 39.2 39.2 10.4 39.0 10.4 23.9 11.5 25.0 Total Split (%) 12.5% 46.1% 46.1% 12.2% 45.9% 12.2% 28.1% 13.5% 29.4% Yellow Time (s) 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 All-Red Time (s) 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 Lost Time Adjust (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Total Lost Time (s) 4.5 4.5 4.5 4.5 4.5 4.5 4.5 4.5 4.5 Lead/Lag Lead Lag Lag Lead Lag Lead Lag Lead Lag Lead-Lag Optimize? Yes Yes Yes Yes Yes Yes Yes Yes Yes Recall Mode None None None None None None C-Max None C-Max Act Effct Green (s) 34.1 29.2 29.2 33.8 29.1 34.7 28.8 35.1 29.0 Actuated g/C Ratio 0.40 0.34 0.34 0.40 0.34 0.41 0.34 0.41 0.34 v/c Ratio 0.49 0.84 0.14 0.53 0.83 0.20 0.46 0.24 0.17 Control Delay 19.6 37.0 1.6 21.6 37.3 15.7 18.5 19.2 20.0 Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Total Delay 19.6 37.0 1.6 21.6 37.3 15.7 18.5 19.2 20.0 LOS BDACD BB BB Approach Delay 30.2 34.4 18.0 19.8 Approach LOS C C B B Queue Length 50th (ft) 34 269 0 32 238 27 71 22 35 Queue Length 95th (ft) 49 302 5 47 274 m51 118 46 56 289 Lanes, Volumes, Timings 1: Van Dyke Road & 127th Street 11/30/2021 21-272 Bronk Parcel Development Synchro 11 Report Proposed Weekday Morning Peak Hour Page 2 Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Internal Link Dist (ft) 1045 2055 1236 1455 Turn Bay Length (ft) 180 180 250 280 145 Base Capacity (vph) 236 800 739 210 721 515 1186 288 1155 Starvation Cap Reductn 00000 00 00 Spillback Cap Reductn 00000 00 00 Storage Cap Reductn 00000 00 00 Reduced v/c Ratio 0.49 0.70 0.12 0.53 0.70 0.20 0.46 0.24 0.17 Intersection Summary Area Type: Other Cycle Length: 85 Actuated Cycle Length: 85 Offset: 0 (0%), Referenced to phase 2:NBTL and 6:SBTL, Start of Green Natural Cycle: 70 Control Type: Actuated-Coordinated Maximum v/c Ratio: 0.84 Intersection Signal Delay: 26.7 Intersection LOS: C Intersection Capacity Utilization 59.3% ICU Level of Service B Analysis Period (min) 15 m Volume for 95th percentile queue is metered by upstream signal. Splits and Phases: 1: Van Dyke Road & 127th Street 290 Lanes, Volumes, Timings 2: Van Dyke Road & 135th Street 11/30/2021 21-272 Bronk Parcel Development Synchro 11 Report Proposed Weekday Morning Peak Hour Page 3 Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Volume (vph) 84 414 17 52 258 65 26 282 83 87 146 53 Future Volume (vph) 84 414 17 52 258 65 26 282 83 87 146 53 Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 2000 1900 Storage Length (ft) 155 0 190 0 250 0 145 0 Storage Lanes 1 0 1 0 1 0 1 1 Taper Length (ft) 145 110 150 220 Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Frt 0.994 0.970 0.966 0.850 Flt Protected 0.950 0.950 0.950 0.950 Satd. Flow (prot) 1671 1853 0 1805 1765 0 1805 1769 0 1805 1887 1524 Flt Permitted 0.279 0.159 0.649 0.304 Satd. Flow (perm) 491 1853 0 302 1765 0 1233 1769 0 578 1887 1524 Right Turn on Red Yes Yes Yes Yes Satd. Flow (RTOR) 3 16 19 135 Link Speed (mph) 35 35 45 45 Link Distance (ft) 883 1887 980 2247 Travel Time (s) 17.2 36.8 14.8 34.0 Peak Hour Factor 0.85 0.85 0.85 0.85 0.85 0.85 0.85 0.85 0.85 0.85 0.85 0.85 Heavy Vehicles (%) 8% 2% 0% 0% 5% 2% 0% 4% 3% 0% 6% 6% Shared Lane Traffic (%) Lane Group Flow (vph) 99 507 0 61 380 0 31 430 0 102 172 62 Turn Type pm+pt NA pm+pt NA pm+pt NA pm+pt NA Perm Protected Phases 7 4 3 8 5 2 1 6 Permitted Phases 48266 Detector Phase 7 4 3 8 5 2 1 6 6 Switch Phase Minimum Initial (s) 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 Minimum Split (s) 9.5 22.5 9.5 22.5 9.5 22.5 9.5 22.5 22.5 Total Split (s) 11.0 33.0 9.6 31.6 9.6 32.6 9.8 32.8 32.8 Total Split (%) 12.9% 38.8% 11.3% 37.2% 11.3% 38.4% 11.5% 38.6% 38.6% Yellow Time (s) 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 All-Red Time (s) 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 Lost Time Adjust (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Total Lost Time (s) 4.5 4.5 4.5 4.5 4.5 4.5 4.5 4.5 4.5 Lead/Lag Lead Lag Lead Lag Lead Lag Lead Lag Lag Lead-Lag Optimize? Yes Yes Yes Yes Yes Yes Yes Yes Yes Recall Mode None None None None None C-Max None C-Max C-Max Act Effct Green (s) 31.5 26.3 29.3 25.2 38.0 33.8 39.4 36.2 36.2 Actuated g/C Ratio 0.37 0.31 0.34 0.30 0.45 0.40 0.46 0.43 0.43 v/c Ratio 0.37 0.88 0.31 0.71 0.05 0.60 0.29 0.21 0.09 Control Delay 18.5 45.7 18.3 33.4 13.7 26.4 13.3 16.4 0.7 Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Total Delay 18.5 45.7 18.3 33.4 13.7 26.4 13.3 16.4 0.7 LOS BD BC BC BBA Approach Delay 41.2 31.3 25.6 12.6 Approach LOS D C C B Queue Length 50th (ft) 30 243 18 167 9 191 22 65 0 Queue Length 95th (ft) 56 #350 38 243 23 274 43 109 m1 291 Lanes, Volumes, Timings 2: Van Dyke Road & 135th Street 11/30/2021 21-272 Bronk Parcel Development Synchro 11 Report Proposed Weekday Morning Peak Hour Page 4 Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Internal Link Dist (ft) 803 1807 900 2167 Turn Bay Length (ft) 155 190 250 145 Base Capacity (vph) 272 623 194 573 586 714 351 804 727 Starvation Cap Reductn 0 0 0 0 0 0 0 0 0 Spillback Cap Reductn 0 0 0 0 0 0 0 0 0 Storage Cap Reductn 0 0 0 0 0 0 0 0 0 Reduced v/c Ratio 0.36 0.81 0.31 0.66 0.05 0.60 0.29 0.21 0.09 Intersection Summary Area Type: Other Cycle Length: 85 Actuated Cycle Length: 85 Offset: 0 (0%), Referenced to phase 2:NBTL and 6:SBTL, Start of Green Natural Cycle: 75 Control Type: Actuated-Coordinated Maximum v/c Ratio: 0.88 Intersection Signal Delay: 29.7 Intersection LOS: C Intersection Capacity Utilization 66.7% ICU Level of Service C Analysis Period (min) 15 # 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles. m Volume for 95th percentile queue is metered by upstream signal. Splits and Phases: 2: Van Dyke Road & 135th Street 292 Lanes, Volumes, Timings 3: U.S. 30 & 135th Street 11/30/2021 21-272 Bronk Parcel Development Synchro 11 Report Proposed Weekday Morning Peak Hour Page 5 Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Volume (vph) 63 315 136 126 173 58 84 460 142 68 359 16 Future Volume (vph) 63 315 136 126 173 58 84 460 142 68 359 16 Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Storage Length (ft) 105 0 160 0 185 0 180 0 Storage Lanes 1 0 1 0 1 0 1 0 Taper Length (ft) 130 125 125 240 Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Frt 0.955 0.962 0.965 0.993 Flt Protected 0.950 0.950 0.950 0.950 Satd. Flow (prot) 1805 1768 0 1752 1749 0 1736 1677 0 1770 1618 0 Flt Permitted 0.490 0.119 0.361 0.178 Satd. Flow (perm) 931 1768 0 220 1749 0 660 1677 0 332 1618 0 Right Turn on Red No No No No Satd. Flow (RTOR) Link Speed (mph) 35 35 50 55 Link Distance (ft) 1073 1801 769 1118 Travel Time (s) 20.9 35.1 10.5 13.9 Peak Hour Factor 0.91 0.91 0.91 0.91 0.91 0.91 0.91 0.91 0.91 0.91 0.91 0.91 Heavy Vehicles (%) 0% 2% 4% 3% 6% 0% 4% 11% 4% 2% 17% 8% Shared Lane Traffic (%) Lane Group Flow (vph) 69 495 0 138 254 0 92 661 0 75 413 0 Turn Type pm+pt NA pm+pt NA pm+pt NA pm+pt NA Protected Phases 7 4 3 8 5 2 1 6 Permitted Phases 4826 Detector Phase 7 4 3 8 5 2 1 6 Switch Phase Minimum Initial (s) 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 Minimum Split (s) 9.5 22.5 9.5 22.5 9.5 22.5 9.5 22.5 Total Split (s) 9.6 46.0 11.0 47.4 10.4 63.5 9.5 62.6 Total Split (%) 7.4% 35.4% 8.5% 36.5% 8.0% 48.8% 7.3% 48.2% Yellow Time (s) 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 All-Red Time (s) 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 Lost Time Adjust (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Total Lost Time (s) 4.5 4.5 4.5 4.5 4.5 4.5 4.5 4.5 Lead/Lag Lead Lag Lead Lag Lead Lag Lead Lag Lead-Lag Optimize? Yes Yes Yes Yes Yes Yes Yes Yes Recall Mode None None None None None C-Max None C-Max Act Effct Green (s) 44.3 39.2 47.7 42.5 67.9 62.8 65.6 60.0 Actuated g/C Ratio 0.34 0.30 0.37 0.33 0.52 0.48 0.50 0.46 v/c Ratio 0.20 0.93 0.88 0.44 0.23 0.82 0.33 0.55 Control Delay 26.3 69.0 76.0 37.5 16.6 39.9 18.9 29.5 Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Total Delay 26.3 69.0 76.0 37.5 16.6 39.9 18.9 29.5 LOS CE ED BD BC Approach Delay 63.8 51.0 37.1 27.8 Approach LOS E D D C Queue Length 50th (ft) 36 394 74 167 38 493 30 254 Queue Length 95th (ft) 68 #590 #171 249 67 #727 56 361 293 Lanes, Volumes, Timings 3: U.S. 30 & 135th Street 11/30/2021 21-272 Bronk Parcel Development Synchro 11 Report Proposed Weekday Morning Peak Hour Page 6 Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Internal Link Dist (ft) 993 1721 689 1038 Turn Bay Length (ft) 105 160 185 180 Base Capacity (vph) 351 564 157 579 397 810 229 746 Starvation Cap Reductn 0 0 0 0 0 0 0 0 Spillback Cap Reductn 0 0 0 0 0 0 0 0 Storage Cap Reductn 0 0 0 0 0 0 0 0 Reduced v/c Ratio 0.20 0.88 0.88 0.44 0.23 0.82 0.33 0.55 Intersection Summary Area Type: Other Cycle Length: 130 Actuated Cycle Length: 130 Offset: 0 (0%), Referenced to phase 2:NBTL and 6:SBTL, Start of Green Natural Cycle: 90 Control Type: Actuated-Coordinated Maximum v/c Ratio: 0.93 Intersection Signal Delay: 44.4 Intersection LOS: D Intersection Capacity Utilization 83.9% ICU Level of Service E Analysis Period (min) 15 # 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles. Splits and Phases: 3: U.S. 30 & 135th Street 294 Lanes, Volumes, Timings 4: U.S. 30 & 127th Street 11/30/2021 21-272 Bronk Parcel Development Synchro 11 Report Proposed Weekday Morning Peak Hour Page 7 Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Volume (vph) 5 426 24 52 236 119 1 408 167 61 363 1 Future Volume (vph) 5 426 24 52 236 119 1 408 167 61 363 1 Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 2000 1900 1900 1900 1900 Storage Length (ft) 225 0 285 0 225 220 255 0 Storage Lanes 1 0 1 0 1 1 1 0 Taper Length (ft) 175 175 250 300 Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Frt 0.992 0.950 0.850 Flt Protected 0.950 0.950 0.950 0.950 Satd. Flow (prot) 1805 1857 0 1770 1692 0 1805 1852 1615 1719 1663 0 Flt Permitted 0.950 0.950 0.950 0.950 Satd. Flow (perm) 1805 1857 0 1770 1692 0 1805 1852 1615 1719 1663 0 Right Turn on Red No No No No Satd. Flow (RTOR) Link Speed (mph) 45 45 55 55 Link Distance (ft) 1528 1614 4667 1415 Travel Time (s) 23.2 24.5 57.9 17.5 Peak Hour Factor 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 Heavy Vehicles (%) 0% 1% 10% 2% 8% 4% 0% 8% 0% 5% 14% 100% Shared Lane Traffic (%) Lane Group Flow (vph) 5 479 0 55 378 0 1 434 178 65 387 0 Turn Type Prot NA Prot NA Prot NA Perm Prot NA Protected Phases 7 4 3 8 5 2 1 6 Permitted Phases 2 Detector Phase 7 4 3 8 52216 Switch Phase Minimum Initial (s) 3.0 8.0 10.0 10.0 3.0 15.0 15.0 3.0 15.0 Minimum Split (s) 9.5 24.5 14.5 24.5 9.5 24.5 24.5 9.5 24.5 Total Split (s) 10.0 56.0 15.0 61.0 10.0 55.0 55.0 14.0 59.0 Total Split (%) 7.1% 40.0% 10.7% 43.6% 7.1% 39.3% 39.3% 10.0% 42.1% Yellow Time (s) 3.5 4.5 3.5 4.5 3.5 4.5 4.5 3.5 4.5 All-Red Time (s) 1.0 2.0 1.0 2.0 1.0 2.0 2.0 1.0 2.0 Lost Time Adjust (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Total Lost Time (s) 4.5 6.5 4.5 6.5 4.5 6.5 6.5 4.5 6.5 Lead/Lag Lead Lag Lead Lag Lead Lag Lag Lead Lag Lead-Lag Optimize? Yes Yes Yes Yes Yes Yes Yes Yes Yes Recall Mode None None None None None C-Max C-Max None C-Max Act Effct Green (s) 5.5 41.7 10.2 51.5 5.6 61.6 61.6 9.6 71.5 Actuated g/C Ratio 0.04 0.30 0.07 0.37 0.04 0.44 0.44 0.07 0.51 v/c Ratio 0.07 0.87 0.43 0.61 0.01 0.53 0.25 0.56 0.46 Control Delay 67.2 62.4 72.8 39.7 65.0 35.8 30.3 80.7 27.4 Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Total Delay 67.2 62.4 72.8 39.7 65.0 35.8 30.3 80.7 27.4 LOS EE ED EDCFC Approach Delay 62.5 43.9 34.2 35.1 Approach LOS E D C D Queue Length 50th (ft) 5 410 49 260 1 312 110 58 224 Queue Length 95th (ft) 20 515 96 377 7 461 184 #115 400 295 Lanes, Volumes, Timings 4: U.S. 30 & 127th Street 11/30/2021 21-272 Bronk Parcel Development Synchro 11 Report Proposed Weekday Morning Peak Hour Page 8 Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Internal Link Dist (ft) 1448 1534 4587 1335 Turn Bay Length (ft) 225 285 225 220 255 Base Capacity (vph) 70 656 132 681 71 814 710 126 848 Starvation Cap Reductn 0 0 0 0 00000 Spillback Cap Reductn 0 0 0 0 00000 Storage Cap Reductn 0 0 0 0 00000 Reduced v/c Ratio 0.07 0.73 0.42 0.56 0.01 0.53 0.25 0.52 0.46 Intersection Summary Area Type: Other Cycle Length: 140 Actuated Cycle Length: 140 Offset: 0 (0%), Referenced to phase 2:NBT and 6:SBT, Start of Green Natural Cycle: 90 Control Type: Actuated-Coordinated Maximum v/c Ratio: 0.87 Intersection Signal Delay: 43.4 Intersection LOS: D Intersection Capacity Utilization 74.3% ICU Level of Service D Analysis Period (min) 15 # 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles. Splits and Phases: 4: U.S. 30 & 127th Street 296 Lanes, Volumes, Timings 5: 127th Street & 248th Avenue 11/30/2021 21-272 Bronk Parcel Development Synchro 11 Report Proposed Weekday Morning Peak Hour Page 9 Lane Group EBL EBT WBT WBR SBL SBR Lane Configurations Traffic Volume (vph) 233 462 324 125 160 103 Future Volume (vph) 233 462 324 125 160 103 Ideal Flow (vphpl) 1900 2000 2000 1900 1900 1900 Storage Length (ft) 90 205 200 0 Storage Lanes 1 1 1 1 Taper Length (ft) 100 195 Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 Frt 0.850 0.850 Flt Protected 0.950 0.950 Satd. Flow (prot) 1787 2000 2000 1509 1736 1509 Flt Permitted 0.151 0.950 Satd. Flow (perm) 284 2000 2000 1509 1736 1509 Right Turn on Red Yes Yes Satd. Flow (RTOR) 151 124 Link Speed (mph) 40 45 45 Link Distance (ft) 406 1540 1616 Travel Time (s) 6.9 23.3 24.5 Peak Hour Factor 0.83 0.83 0.83 0.83 0.83 0.83 Heavy Vehicles (%) 1% 0% 0% 7% 4% 7% Shared Lane Traffic (%) Lane Group Flow (vph) 281 557 390 151 193 124 Turn Type pm+pt NA NA Perm Prot Perm Protected Phases 7 4 8 6 Permitted Phases 4 8 6 Detector Phase 748866 Switch Phase Minimum Initial (s) 5.0 5.0 5.0 5.0 5.0 5.0 Minimum Split (s) 9.5 23.5 23.5 23.5 23.5 23.5 Total Split (s) 31.0 80.0 49.0 49.0 40.0 40.0 Total Split (%) 25.8% 66.7% 40.8% 40.8% 33.3% 33.3% Yellow Time (s) 3.5 3.5 3.5 3.5 3.5 3.5 All-Red Time (s) 1.0 2.0 2.0 2.0 2.0 2.0 Lost Time Adjust (s) 0.0 0.0 0.0 0.0 0.0 0.0 Total Lost Time (s) 4.5 5.5 5.5 5.5 5.5 5.5 Lead/Lag Lead Lag Lag Lead-Lag Optimize? Yes Yes Yes Recall Mode None None None None C-Max C-Max Act Effct Green (s) 55.5 54.5 29.2 29.2 54.5 54.5 Actuated g/C Ratio 0.46 0.45 0.24 0.24 0.45 0.45 v/c Ratio 0.72 0.61 0.80 0.31 0.24 0.16 Control Delay 33.6 26.9 54.9 6.6 24.1 5.2 Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 Total Delay 33.6 26.9 54.9 6.6 24.1 5.2 LOS C C D A C A Approach Delay 29.1 41.4 16.7 Approach LOS C D B Queue Length 50th (ft) 135 319 285 0 90 0 Queue Length 95th (ft) 166 294 325 36 160 33 297 Lanes, Volumes, Timings 5: 127th Street & 248th Avenue 11/30/2021 21-272 Bronk Parcel Development Synchro 11 Report Proposed Weekday Morning Peak Hour Page 10 Lane Group EBL EBT WBT WBR SBL SBR Internal Link Dist (ft) 326 1460 1536 Turn Bay Length (ft) 90 205 200 Base Capacity (vph) 463 1241 725 643 788 752 Starvation Cap Reductn 000000 Spillback Cap Reductn 000000 Storage Cap Reductn 000000 Reduced v/c Ratio 0.61 0.45 0.54 0.23 0.24 0.16 Intersection Summary Area Type: Other Cycle Length: 120 Actuated Cycle Length: 120 Offset: 0 (0%), Referenced to phase 2: and 6:SBL, Start of Green Natural Cycle: 60 Control Type: Actuated-Coordinated Maximum v/c Ratio: 0.80 Intersection Signal Delay: 30.7 Intersection LOS: C Intersection Capacity Utilization 50.9% ICU Level of Service A Analysis Period (min) 15 Splits and Phases: 5: 127th Street & 248th Avenue 298 HCM 6th TWSC 6: Vicarage Drive/Edwards Elmhurst Access Drive & 127th Street 11/30/2021 21-272 Bronk Parcel Development Synchro 11 Report Proposed Weekday Morning Peak Hour Page 1 Intersection Int Delay, s/veh 3.1 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Vol, veh/h 71 536 15 8 383 90 49 0 48 30 0 17 Future Vol, veh/h 71 536 15 8 383 90 49 0 48 30 0 17 Conflicting Peds, #/hr 0 00000000000 Sign Control Free Free Free Free Free Free Stop Stop Stop Stop Stop Stop RT Channelized - - None - - None - - None - - None Storage Length 200 - 145 145 ----0--0 Veh in Median Storage, # - 0 - - 0 - - 1 - - 1 - Grade, % - 0 - - 0 - - 0 - - 0 - Peak Hour Factor 67 67 92 92 67 67 92 92 92 67 92 67 Heavy Vehicles, % 0 02200222020 Mvmt Flow 106 800 16 9 572 134 53 0 52 45 0 25 Major/Minor Major1 Major2 Minor1 Minor2 Conflicting Flow All 706 0 0 816 0 0 1316 1736 800 1703 1685 353 Stage 1 ------1012 1012 - 657 657 - Stage 2 ------304724-1046 1028 - Critical Hdwy 4.1 - - 4.13 - - 7.33 6.53 6.23 7.3 6.53 6.9 Critical Hdwy Stg 1 ------6.13 5.53 - 6.5 5.53 - Critical Hdwy Stg 2 ------6.53 5.53 - 6.1 5.53 - Follow-up Hdwy 2.2 - - 2.219 - - 3.519 4.019 3.319 3.5 4.019 3.3 Pot Cap-1 Maneuver 902 - - 810 - - 125 87 384 67 94 649 Stage 1 ------288316-425461- Stage 2 ------681429-278310- Platoon blocked, % - - - - Mov Cap-1 Maneuver 902 - - 810 - - 108 76 384 52 82 649 Mov Cap-2 Maneuver ------198170-141187- Stage 1 ------254279-375456- Stage 2 ------647424-212273- Approach EB WB NB SB HCM Control Delay, s 1.1 0.1 22.8 30.7 HCM LOS C D Minor Lane/Major Mvmt NBLn1NBLn2 EBL EBT EBR WBL WBT WBRSBLn1SBLn2 Capacity (veh/h) 198 384 902 - - 810 - - 141 649 HCM Lane V/C Ratio 0.269 0.136 0.117 - - 0.011 - - 0.318 0.039 HCM Control Delay (s) 29.7 15.8 9.5 - - 9.5 - - 42 10.8 HCM Lane LOS D C A - - A - - E B HCM 95th %tile Q(veh) 1 0.5 0.4 - - 0 - - 1.3 0.1 299 HCM 6th TWSC 7: Van Dyke Road & Hamilton Lane 11/30/2021 21-272 Bronk Parcel Development Synchro 11 Report Proposed Weekday Morning Peak Hour Page 2 Intersection Int Delay, s/veh 1.7 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Vol, veh/h 24 0 43 15 0 22 14 473 7 14 259 13 Future Vol, veh/h 24 0 43 15 0 22 14 473 7 14 259 13 Conflicting Peds, #/hr 0 00000000000 Sign Control Stop Stop Stop Stop Stop Stop Free Free Free Free Free Free RT Channelized - - None - - None - - None - - None Storage Length - - - 0 - 0 145 - - 135 - - Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 - Grade, % - 0 - - 0 - - 0 - - 0 - Peak Hour Factor 90 90 90 90 90 90 90 90 90 90 90 90 Heavy Vehicles, % 0 000017000000 Mvmt Flow 27 0 48 17 0 24 16 526 8 16 288 14 Major/Minor Minor2 Minor1 Major1 Major2 Conflicting Flow All 622 893 151 738 - 267 302 0 0 534 0 0 Stage 1 327 327 - 562 -------- Stage 2 295 566 - 176 -------- Critical Hdwy 7.5 6.5 6.9 7.5 - 7.24 4.1 - - 4.1 - - Critical Hdwy Stg 1 6.5 5.5 - 6.5 -------- Critical Hdwy Stg 2 6.5 5.5 - 6.5 -------- Follow-up Hdwy 3.5 4 3.3 3.5 - 3.47 2.2 - - 2.2 - - Pot Cap-1 Maneuver 375 283 875 310 0 688 1270 - - 1044 - - Stage 1 665 651 - 484 0 ------- Stage 2 695 511 - 814 0 ------- Platoon blocked, % - - - - Mov Cap-1 Maneuver 354 275 875 287 - 688 1270 - - 1044 - - Mov Cap-2 Maneuver 354 275 - 287 -------- Stage 1 656 641 - 478 -------- Stage 2 662 504 - 758 -------- Approach EB WB NB SB HCM Control Delay, s 12.2 13.6 0.2 0.4 HCM LOS B B Minor Lane/Major Mvmt NBL NBT NBREBLn1WBLn1WBLn2 SBL SBT SBR Capacity (veh/h) 1270 - - 573 287 688 1044 - - HCM Lane V/C Ratio 0.012 - - 0.13 0.058 0.036 0.015 - - HCM Control Delay (s) 7.9 - - 12.2 18.3 10.4 8.5 - - HCM Lane LOS A - - B C B A - - HCM 95th %tile Q(veh) 0 - - 0.4 0.2 0.1 0 - - 300 HCM 6th TWSC 8: Van Dyke Road & Norwood Drive 11/30/2021 21-272 Bronk Parcel Development Synchro 11 Report Proposed Weekday Morning Peak Hour Page 3 Intersection Int Delay, s/veh 2.9 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Vol, veh/h 58 2 25 3 10 23 21 413 6 8 237 72 Future Vol, veh/h 58 2 25 3 10 23 21 413 6 8 237 72 Conflicting Peds, #/hr 0 00000000000 Sign Control Stop Stop Stop Stop Stop Stop Free Free Free Free Free Free RT Channelized - - None - - None - - None - - None Storage Length -----0130--150-- Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 - Grade, % - 0 - - 0 - - 0 - - 0 - Peak Hour Factor 75 75 75 75 75 75 75 75 75 75 75 75 Heavy Vehicles, % 0 0 0 0 38 0 0 3 20 0 4 0 Mvmt Flow 77 3 33 4 13 31 28 551 8 11 316 96 Major/Minor Minor2 Minor1 Major1 Major2 Conflicting Flow All 724 1001 206 793 1045 280 412 0 0 559 0 0 Stage 1 386 386 - 611 611 ------- Stage 2 338 615 - 182 434 ------- Critical Hdwy 7.5 6.5 6.9 7.5 7.26 6.9 4.1 - - 4.1 - - Critical Hdwy Stg 1 6.5 5.5 - 6.5 6.26 ------- Critical Hdwy Stg 2 6.5 5.5 - 6.5 6.26 ------- Follow-up Hdwy 3.5 4 3.3 3.5 4.38 3.3 2.2 - - 2.2 - - Pot Cap-1 Maneuver 317 245 807 283 177 723 1158 - - 1022 - - Stage 1 614 614 - 453 403 ------- Stage 2 656 485 - 808 497 ------- Platoon blocked, % - - - - Mov Cap-1 Maneuver 278 236 807 262 171 723 1158 - - 1022 - - Mov Cap-2 Maneuver 278 236 - 262 171 ------- Stage 1 599 607 - 442 393 ------- Stage 2 592 473 - 763 492 ------- Approach EB WB NB SB HCM Control Delay, s 20.6 16 0.4 0.2 HCM LOS C C Minor Lane/Major Mvmt NBL NBT NBREBLn1WBLn1WBLn2 SBL SBT SBR Capacity (veh/h) 1158 - - 343 186 723 1022 - - HCM Lane V/C Ratio 0.024 - - 0.33 0.093 0.042 0.01 - - HCM Control Delay (s) 8.2 - - 20.6 26.3 10.2 8.6 - - HCM Lane LOS A - - C D B A - - HCM 95th %tile Q(veh) 0.1 - - 1.4 0.3 0.1 0 - - 301 HCM 6th TWSC 9: Vicarage Drive & 135th Street 11/30/2021 21-272 Bronk Parcel Development Synchro 11 Report Proposed Weekday Morning Peak Hour Page 4 Intersection Int Delay, s/veh 2.9 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Vol, veh/h 42 457 5 7 309 21 5 0 16 42 0 54 Future Vol, veh/h 42 457 5 7 309 21 5 0 16 42 0 54 Conflicting Peds, #/hr 0 00000000000 Sign Control Free Free Free Free Free Free Stop Stop Stop Stop Stop Stop RT Channelized - - None - - None - - None - - None Storage Length 135 - - 125 ----0--- Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 - Grade, % - 0 - - 0 - - 0 - - 0 - Peak Hour Factor 88 88 88 88 88 88 88 88 88 88 88 88 Heavy Vehicles, % 12 0 25 00000155010 Mvmt Flow 48 519 6 8 351 24 6 0 18 48 0 61 Major/Minor Major1 Major2 Minor1 Minor2 Conflicting Flow All 375 0 0 525 0 0 1028 1009 522 1006 1000 363 Stage 1 ------618618-379379- Stage 2 ------410391-627621- Critical Hdwy 4.22 - - 4.1 - - 7.1 6.5 6.35 7.15 6.5 6.3 Critical Hdwy Stg 1 ------6.15.5-6.15 5.5 - Critical Hdwy Stg 2 ------6.15.5-6.15 5.5 - Follow-up Hdwy 2.308 - - 2.2 - - 3.5 4 3.435 3.545 4 3.39 Pot Cap-1 Maneuver 1131 - - 1052 - - 214 242 530 217 245 664 Stage 1 ------480484-637618- Stage 2 ------623611-466482- Platoon blocked, % - - - - Mov Cap-1 Maneuver 1131 - - 1052 - - 187 230 530 202 233 664 Mov Cap-2 Maneuver ------187230-202233- Stage 1 ------460464-610613- Stage 2 ------561606-431462- Approach EB WB NB SB HCM Control Delay, s 0.7 0.2 15.1 21.1 HCM LOS C C Minor Lane/Major Mvmt NBLn1NBLn2 EBL EBT EBR WBL WBT WBRSBLn1 Capacity (veh/h) 187 530 1131 - - 1052 - - 332 HCM Lane V/C Ratio 0.03 0.034 0.042 - - 0.008 - - 0.329 HCM Control Delay (s) 24.9 12 8.3 - - 8.4 - - 21.1 HCM Lane LOS C B A - - A - - C HCM 95th %tile Q(veh) 0.1 0.1 0.1 - - 0 - - 1.4 302 HCM 6th TWSC 10: Waterford Boulevard & 127th Street 11/30/2021 21-272 Bronk Parcel Development Synchro 11 Report Proposed Weekday Morning Peak Hour Page 5 Intersection Int Delay, s/veh 1.2 Movement EBT EBR WBL WBT NBL NBR Lane Configurations Traffic Vol, veh/h 649 5 28 399 8 46 Future Vol, veh/h 649 5 28 399 8 46 Conflicting Peds, #/hr 0 00000 Sign Control Free Free Free Free Stop Stop RT Channelized - None - None - None Storage Length - - 90 - 0 0 Veh in Median Storage, # 0 - - 0 0 - Grade, % 0 - - 0 0 - Peak Hour Factor 75 75 75 75 75 75 Heavy Vehicles, % 0 0 13 0 0 5 Mvmt Flow 865 7 37 532 11 61 Major/Minor Major1 Major2 Minor1 Conflicting Flow All 0 0 872 0 1475 869 Stage 1 - - - - 869 - Stage 2 - - - - 606 - Critical Hdwy - - 4.23 - 6.4 6.25 Critical Hdwy Stg 1 - - - - 5.4 - Critical Hdwy Stg 2 - - - - 5.4 - Follow-up Hdwy - - 2.317 - 3.5 3.345 Pot Cap-1 Maneuver - - 729 - 141 347 Stage 1 - - - - 414 - Stage 2 - - - - 548 - Platoon blocked, % - - - Mov Cap-1 Maneuver - - 729 - 134 347 Mov Cap-2 Maneuver - - - - 134 - Stage 1 - - - - 414 - Stage 2 - - - - 520 - Approach EB WB NB HCM Control Delay, s 0 0.7 20.1 HCM LOS C Minor Lane/Major Mvmt NBLn1NBLn2 EBT EBR WBL WBT Capacity (veh/h) 134 347 - - 729 - HCM Lane V/C Ratio 0.08 0.177 - - 0.051 - HCM Control Delay (s) 34.2 17.6 - - 10.2 - HCM Lane LOS D C - - B - HCM 95th %tile Q(veh) 0.3 0.6 - - 0.2 - 303 Lanes, Volumes, Timings 1: Van Dyke Road & 127th Street 11/30/2021 21-272 Bronk Parcel Development Synchro 11 Report Proposed Weekday Evening Peak Hour Page 1 Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Volume (vph) 56 474 167 205 586 53 105 205 155 82 284 63 Future Volume (vph) 56 474 167 205 586 53 105 205 155 82 284 63 Ideal Flow (vphpl) 1900 2000 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Storage Length (ft) 180 180 250 0 280 0 145 0 Storage Lanes 1 1 1 0 1 0 1 0 Taper Length (ft) 205 210 190 155 Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.95 0.95 1.00 0.95 0.95 Frt 0.850 0.988 0.935 0.973 Flt Protected 0.950 0.950 0.950 0.950 Satd. Flow (prot) 1770 1980 1615 1787 1877 0 1805 3375 0 1805 3484 0 Flt Permitted 0.138 0.204 0.471 0.457 Satd. Flow (perm) 257 1980 1615 384 1877 0 895 3375 0 868 3484 0 Right Turn on Red Yes Yes Yes Yes Satd. Flow (RTOR) 178 7 165 31 Link Speed (mph) 40 35 45 45 Link Distance (ft) 1125 2135 1316 1535 Travel Time (s) 19.2 41.6 19.9 23.3 Peak Hour Factor 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 Heavy Vehicles (%) 2% 1% 0% 1% 0% 0% 0% 0% 0% 0% 1% 0% Shared Lane Traffic (%) Lane Group Flow (vph) 60 504 178 218 679 0 112 383 0 87 369 0 Turn Type pm+pt NA Perm pm+pt NA pm+pt NA pm+pt NA Protected Phases 7 4 3 8 5 2 1 6 Permitted Phases 4 4 8 2 6 Detector Phase 74438 52 16 Switch Phase Minimum Initial (s) 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 Minimum Split (s) 9.5 22.5 22.5 9.5 22.5 9.5 22.5 9.5 22.5 Total Split (s) 9.6 35.2 35.2 11.4 37.0 9.6 23.8 9.6 23.8 Total Split (%) 12.0% 44.0% 44.0% 14.3% 46.3% 12.0% 29.8% 12.0% 29.8% Yellow Time (s) 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 All-Red Time (s) 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 Lost Time Adjust (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Total Lost Time (s) 4.5 4.5 4.5 4.5 4.5 4.5 4.5 4.5 4.5 Lead/Lag Lead Lag Lag Lead Lag Lead Lag Lead Lag Lead-Lag Optimize? Yes Yes Yes Yes Yes Yes Yes Yes Yes Recall Mode None None None None None None C-Max None C-Max Act Effct Green (s) 33.1 28.0 28.0 37.2 31.7 28.0 23.8 28.0 23.8 Actuated g/C Ratio 0.41 0.35 0.35 0.46 0.40 0.35 0.30 0.35 0.30 v/c Ratio 0.30 0.73 0.26 0.73 0.91 0.30 0.34 0.24 0.35 Control Delay 13.6 29.0 3.9 27.6 40.8 19.9 14.8 19.0 23.2 Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Total Delay 13.6 29.0 3.9 27.6 40.8 19.9 14.8 19.0 23.2 LOS BCACD BB BC Approach Delay 21.8 37.6 16.0 22.4 Approach LOS C D B C Queue Length 50th (ft) 14 204 0 55 303 37 46 29 74 Queue Length 95th (ft) 31 310 37 #113 #515 73 84 59 114 304 Lanes, Volumes, Timings 1: Van Dyke Road & 127th Street 11/30/2021 21-272 Bronk Parcel Development Synchro 11 Report Proposed Weekday Evening Peak Hour Page 2 Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Internal Link Dist (ft) 1045 2055 1236 1455 Turn Bay Length (ft) 180 180 250 280 145 Base Capacity (vph) 202 759 729 299 766 375 1118 366 1056 Starvation Cap Reductn 00000 00 00 Spillback Cap Reductn 00000 00 00 Storage Cap Reductn 00000 00 00 Reduced v/c Ratio 0.30 0.66 0.24 0.73 0.89 0.30 0.34 0.24 0.35 Intersection Summary Area Type: Other Cycle Length: 80 Actuated Cycle Length: 80 Offset: 0 (0%), Referenced to phase 2:NBTL and 6:SBTL, Start of Green Natural Cycle: 80 Control Type: Actuated-Coordinated Maximum v/c Ratio: 0.91 Intersection Signal Delay: 26.3 Intersection LOS: C Intersection Capacity Utilization 68.9% ICU Level of Service C Analysis Period (min) 15 # 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles. Splits and Phases: 1: Van Dyke Road & 127th Street 305 Lanes, Volumes, Timings 2: Van Dyke Road & 135th Street 11/30/2021 21-272 Bronk Parcel Development Synchro 11 Report Proposed Weekday Evening Peak Hour Page 3 Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Volume (vph) 66 368 34 104 644 116 50 281 78 113 358 132 Future Volume (vph) 66 368 34 104 644 116 50 281 78 113 358 132 Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 2000 1900 Storage Length (ft) 155 0 190 0 250 0 145 0 Storage Lanes 1 0 1 0 1 0 1 1 Taper Length (ft) 145 110 150 220 Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Frt 0.987 0.977 0.967 0.850 Flt Protected 0.950 0.950 0.950 0.950 Satd. Flow (prot) 1805 1825 0 1805 1856 0 1805 1833 0 1805 1980 1615 Flt Permitted 0.092 0.333 0.258 0.214 Satd. Flow (perm) 175 1825 0 633 1856 0 490 1833 0 407 1980 1615 Right Turn on Red Yes Yes Yes Yes Satd. Flow (RTOR) 6 12 14 143 Link Speed (mph) 35 35 45 45 Link Distance (ft) 883 1887 980 2247 Travel Time (s) 17.2 36.8 14.8 34.0 Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 Heavy Vehicles (%) 0% 3% 0% 0% 0% 0% 0% 0% 1% 0% 1% 0% Shared Lane Traffic (%) Lane Group Flow (vph) 72 437 0 113 826 0 54 390 0 123 389 143 Turn Type pm+pt NA pm+pt NA pm+pt NA pm+pt NA Perm Protected Phases 7 4 3 8 5 2 1 6 Permitted Phases 48266 Detector Phase 7 4 3 8 5 2 1 6 6 Switch Phase Minimum Initial (s) 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 Minimum Split (s) 9.5 22.5 9.5 22.5 9.5 22.5 9.5 22.5 22.5 Total Split (s) 9.6 49.4 10.6 50.4 9.6 30.4 9.6 30.4 30.4 Total Split (%) 9.6% 49.4% 10.6% 50.4% 9.6% 30.4% 9.6% 30.4% 30.4% Yellow Time (s) 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 All-Red Time (s) 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 Lost Time Adjust (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Total Lost Time (s) 4.5 4.5 4.5 4.5 4.5 4.5 4.5 4.5 4.5 Lead/Lag Lead Lag Lead Lag Lead Lag Lead Lag Lag Lead-Lag Optimize? Yes Yes Yes Yes Yes Yes Yes Yes Yes Recall Mode None None None None None C-Max None C-Max C-Max Act Effct Green (s) 47.6 42.5 50.3 45.4 33.2 28.0 34.3 30.3 30.3 Actuated g/C Ratio 0.48 0.42 0.50 0.45 0.33 0.28 0.34 0.30 0.30 v/c Ratio 0.43 0.56 0.29 0.97 0.23 0.75 0.57 0.65 0.24 Control Delay 19.1 24.1 13.0 52.6 24.3 42.8 35.2 38.5 6.2 Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Total Delay 19.1 24.1 13.0 52.6 24.3 42.8 35.2 38.5 6.2 LOS BC BD CD DDA Approach Delay 23.4 47.8 40.5 30.9 Approach LOS CDDC Queue Length 50th (ft) 20 193 32 490 23 225 54 229 0 Queue Length 95th (ft) 41 286 59 #760 49 #373 #104 #360 46 306 Lanes, Volumes, Timings 2: Van Dyke Road & 135th Street 11/30/2021 21-272 Bronk Parcel Development Synchro 11 Report Proposed Weekday Evening Peak Hour Page 4 Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Internal Link Dist (ft) 803 1807 900 2167 Turn Bay Length (ft) 155 190 250 145 Base Capacity (vph) 166 822 389 858 230 523 215 598 588 Starvation Cap Reductn 0 0 0 0 0 0 0 0 0 Spillback Cap Reductn 0 0 0 0 0 0 0 0 0 Storage Cap Reductn 0 0 0 0 0 0 0 0 0 Reduced v/c Ratio 0.43 0.53 0.29 0.96 0.23 0.75 0.57 0.65 0.24 Intersection Summary Area Type: Other Cycle Length: 100 Actuated Cycle Length: 100 Offset: 0 (0%), Referenced to phase 2:NBTL and 6:SBTL, Start of Green Natural Cycle: 90 Control Type: Actuated-Coordinated Maximum v/c Ratio: 0.97 Intersection Signal Delay: 37.3 Intersection LOS: D Intersection Capacity Utilization 85.9% ICU Level of Service E Analysis Period (min) 15 # 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles. Splits and Phases: 2: Van Dyke Road & 135th Street 307 Lanes, Volumes, Timings 3: U.S. 30 & 135th Street 11/30/2021 21-272 Bronk Parcel Development Synchro 11 Report Proposed Weekday Evening Peak Hour Page 5 Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Volume (vph) 47 283 134 214 492 101 141 365 131 78 531 50 Future Volume (vph) 47 283 134 214 492 101 141 365 131 78 531 50 Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Storage Length (ft) 105 0 160 0 185 0 180 0 Storage Lanes 1 0 1 0 1 0 1 0 Taper Length (ft) 130 125 125 240 Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Frt 0.952 0.974 0.960 0.987 Flt Protected 0.950 0.950 0.950 0.950 Satd. Flow (prot) 1805 1785 0 1805 1844 0 1787 1714 0 1752 1806 0 Flt Permitted 0.079 0.167 0.136 0.262 Satd. Flow (perm) 150 1785 0 317 1844 0 256 1714 0 483 1806 0 Right Turn on Red No No No No Satd. Flow (RTOR) Link Speed (mph) 35 35 50 55 Link Distance (ft) 1073 1801 769 1118 Travel Time (s) 20.9 35.1 10.5 13.9 Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 Heavy Vehicles (%) 0% 2% 0% 0% 0% 2% 1% 8% 2% 3% 4% 2% Shared Lane Traffic (%) Lane Group Flow (vph) 51 454 0 233 645 0 153 539 0 85 631 0 Turn Type pm+pt NA pm+pt NA pm+pt NA pm+pt NA Protected Phases 7 4 3 8 5 2 1 6 Permitted Phases 4826 Detector Phase 7 4 3 8 5 2 1 6 Switch Phase Minimum Initial (s) 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 Minimum Split (s) 9.5 22.5 9.5 22.5 9.5 22.5 9.5 22.5 Total Split (s) 9.5 59.3 17.2 67.0 15.0 72.7 10.8 68.5 Total Split (%) 5.9% 37.1% 10.8% 41.9% 9.4% 45.4% 6.8% 42.8% Yellow Time (s) 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 All-Red Time (s) 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 Lost Time Adjust (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Total Lost Time (s) 4.5 4.5 4.5 4.5 4.5 4.5 4.5 4.5 Lead/Lag Lead Lag Lead Lag Lead Lag Lead Lag Lead-Lag Optimize? Yes Yes Yes Yes Yes Yes Yes Yes Recall Mode None None None None None C-Max None C-Max Act Effct Green (s) 54.9 49.9 67.1 59.5 83.0 72.6 75.7 68.9 Actuated g/C Ratio 0.34 0.31 0.42 0.37 0.52 0.45 0.47 0.43 v/c Ratio 0.50 0.82 0.93 0.94 0.66 0.69 0.30 0.81 Control Delay 43.0 62.8 74.1 70.7 35.7 42.0 24.1 51.0 Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Total Delay 43.0 62.8 74.1 70.7 35.7 42.0 24.1 51.0 LOS DE EE DD CD Approach Delay 60.8 71.6 40.6 47.8 Approach LOS E E D D Queue Length 50th (ft) 30 420 153 631 87 469 46 606 Queue Length 95th (ft) 58 559 #273 #864 134 621 80 #830 308 Lanes, Volumes, Timings 3: U.S. 30 & 135th Street 11/30/2021 21-272 Bronk Parcel Development Synchro 11 Report Proposed Weekday Evening Peak Hour Page 6 Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Internal Link Dist (ft) 993 1721 689 1038 Turn Bay Length (ft) 105 160 185 180 Base Capacity (vph) 103 611 251 720 236 777 282 777 Starvation Cap Reductn 0 0 0 0 0 0 0 0 Spillback Cap Reductn 0 0 0 0 0 0 0 0 Storage Cap Reductn 0 0 0 0 0 0 0 0 Reduced v/c Ratio 0.50 0.74 0.93 0.90 0.65 0.69 0.30 0.81 Intersection Summary Area Type: Other Cycle Length: 160 Actuated Cycle Length: 160 Offset: 0 (0%), Referenced to phase 2:NBTL and 6:SBTL, Start of Green Natural Cycle: 100 Control Type: Actuated-Coordinated Maximum v/c Ratio: 0.94 Intersection Signal Delay: 55.9 Intersection LOS: E Intersection Capacity Utilization 90.0% ICU Level of Service E Analysis Period (min) 15 # 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles. Splits and Phases: 3: U.S. 30 & 135th Street 309 Lanes, Volumes, Timings 4: U.S. 30 & 127th Street 11/30/2021 21-272 Bronk Parcel Development Synchro 11 Report Proposed Weekday Evening Peak Hour Page 7 Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Volume (vph) 12 325 56 162 510 112 30 359 117 137 441 8 Future Volume (vph) 12 325 56 162 510 112 30 359 117 137 441 8 Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 2000 1900 1900 1900 1900 Storage Length (ft) 225 0 285 0 225 220 255 0 Storage Lanes 1 0 1 0 1 1 1 0 Taper Length (ft) 175 175 250 300 Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Frt 0.978 0.973 0.850 0.997 Flt Protected 0.950 0.950 0.950 0.950 Satd. Flow (prot) 1805 1837 0 1787 1845 0 1805 1852 1615 1805 1806 0 Flt Permitted 0.950 0.950 0.950 0.950 Satd. Flow (perm) 1805 1837 0 1787 1845 0 1805 1852 1615 1805 1806 0 Right Turn on Red No No No No Satd. Flow (RTOR) Link Speed (mph) 45 45 55 55 Link Distance (ft) 1528 1614 4667 1415 Travel Time (s) 23.2 24.5 57.9 17.5 Peak Hour Factor 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 Heavy Vehicles (%) 0% 1% 2% 1% 0% 1% 0% 8% 0% 0% 5% 0% Shared Lane Traffic (%) Lane Group Flow (vph) 13 409 0 174 668 0 32 386 126 147 483 0 Turn Type Prot NA Prot NA Prot NA Perm Prot NA Protected Phases 7 4 3 8 5 2 1 6 Permitted Phases 2 Detector Phase 7 4 3 8 52216 Switch Phase Minimum Initial (s) 3.0 8.0 10.0 10.0 3.0 15.0 15.0 3.0 15.0 Minimum Split (s) 9.5 24.5 14.5 24.5 9.5 24.5 24.5 9.5 24.5 Total Split (s) 9.5 51.8 27.7 70.0 11.0 50.5 50.5 20.0 59.5 Total Split (%) 6.3% 34.5% 18.5% 46.7% 7.3% 33.7% 33.7% 13.3% 39.7% Yellow Time (s) 3.5 4.5 3.5 4.5 3.5 4.5 4.5 3.5 4.5 All-Red Time (s) 1.0 2.0 1.0 2.0 1.0 2.0 2.0 1.0 2.0 Lost Time Adjust (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Total Lost Time (s) 4.5 6.5 4.5 6.5 4.5 6.5 6.5 4.5 6.5 Lead/Lag Lead Lag Lead Lag Lead Lag Lag Lead Lag Lead-Lag Optimize? Yes Yes Yes Yes Yes Yes Yes Yes Yes Recall Mode None None None None None C-Max C-Max None C-Max Act Effct Green (s) 5.0 39.6 19.1 59.4 6.7 53.9 53.9 15.4 66.9 Actuated g/C Ratio 0.03 0.26 0.13 0.40 0.04 0.36 0.36 0.10 0.45 v/c Ratio 0.22 0.85 0.77 0.91 0.40 0.58 0.22 0.79 0.60 Control Delay 79.2 68.2 84.3 60.6 84.5 45.7 37.8 94.3 38.9 Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Total Delay 79.2 68.2 84.3 60.6 84.5 45.7 37.8 94.3 38.9 LOS E E F E F D D F D Approach Delay 68.6 65.5 46.2 51.8 Approach LOS E E D D Queue Length 50th (ft) 13 382 166 583 31 316 89 140 382 Queue Length 95th (ft) 38 491 246 #781 70 463 153 #259 560 310 Lanes, Volumes, Timings 4: U.S. 30 & 127th Street 11/30/2021 21-272 Bronk Parcel Development Synchro 11 Report Proposed Weekday Evening Peak Hour Page 8 Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Internal Link Dist (ft) 1448 1534 4587 1335 Turn Bay Length (ft) 225 285 225 220 255 Base Capacity (vph) 60 556 276 782 82 665 580 193 805 Starvation Cap Reductn 0 0 0 0 00000 Spillback Cap Reductn 0 0 0 0 00000 Storage Cap Reductn 0 0 0 0 00000 Reduced v/c Ratio 0.22 0.74 0.63 0.85 0.39 0.58 0.22 0.76 0.60 Intersection Summary Area Type: Other Cycle Length: 150 Actuated Cycle Length: 150 Offset: 0 (0%), Referenced to phase 2:NBT and 6:SBT, Start of Green Natural Cycle: 90 Control Type: Actuated-Coordinated Maximum v/c Ratio: 0.91 Intersection Signal Delay: 58.2 Intersection LOS: E Intersection Capacity Utilization 82.3% ICU Level of Service E Analysis Period (min) 15 # 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles. Splits and Phases: 4: U.S. 30 & 127th Street 311 Lanes, Volumes, Timings 5: 127th Street & 248th Avenue 11/30/2021 21-272 Bronk Parcel Development Synchro 11 Report Proposed Weekday Evening Peak Hour Page 9 Lane Group EBL EBT WBT WBR SBL SBR Lane Configurations Traffic Volume (vph) 160 437 562 208 237 257 Future Volume (vph) 160 437 562 208 237 257 Ideal Flow (vphpl) 1900 2000 2000 1900 1900 1900 Storage Length (ft) 90 205 200 0 Storage Lanes 1 1 1 1 Taper Length (ft) 100 195 Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 Frt 0.850 0.850 Flt Protected 0.950 0.950 Satd. Flow (prot) 1805 2000 2000 1615 1805 1599 Flt Permitted 0.092 0.950 Satd. Flow (perm) 175 2000 2000 1615 1805 1599 Right Turn on Red Yes Yes Satd. Flow (RTOR) 225 302 Link Speed (mph) 40 45 45 Link Distance (ft) 406 1540 1616 Travel Time (s) 6.9 23.3 24.5 Peak Hour Factor 0.85 0.85 0.85 0.85 0.85 0.85 Heavy Vehicles (%) 0% 0% 0% 0% 0% 1% Shared Lane Traffic (%) Lane Group Flow (vph) 188 514 661 245 279 302 Turn Type pm+pt NA NA Perm Prot Perm Protected Phases 7 4 8 6 Permitted Phases 4 8 6 Detector Phase 748866 Switch Phase Minimum Initial (s) 5.0 5.0 5.0 5.0 5.0 5.0 Minimum Split (s) 9.5 23.5 23.5 23.5 23.5 23.5 Total Split (s) 16.0 67.0 51.0 51.0 33.0 33.0 Total Split (%) 16.0% 67.0% 51.0% 51.0% 33.0% 33.0% Yellow Time (s) 3.5 3.5 3.5 3.5 3.5 3.5 All-Red Time (s) 1.0 2.0 2.0 2.0 2.0 2.0 Lost Time Adjust (s) 0.0 0.0 0.0 0.0 0.0 0.0 Total Lost Time (s) 4.5 5.5 5.5 5.5 5.5 5.5 Lead/Lag Lead Lag Lag Lead-Lag Optimize? Yes Yes Yes Recall Mode None None None None C-Max C-Max Act Effct Green (s) 55.5 54.5 39.0 39.0 34.5 34.5 Actuated g/C Ratio 0.56 0.54 0.39 0.39 0.34 0.34 v/c Ratio 0.68 0.47 0.85 0.32 0.45 0.40 Control Delay 29.9 14.8 38.4 4.2 30.3 5.2 Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 Total Delay 29.9 14.8 38.4 4.2 30.3 5.2 LOS CBDACA Approach Delay 18.8 29.2 17.2 Approach LOS B C B Queue Length 50th (ft) 58 183 371 8 140 0 Queue Length 95th (ft) 113 206 429 41 220 50 312 Lanes, Volumes, Timings 5: 127th Street & 248th Avenue 11/30/2021 21-272 Bronk Parcel Development Synchro 11 Report Proposed Weekday Evening Peak Hour Page 10 Lane Group EBL EBT WBT WBR SBL SBR Internal Link Dist (ft) 326 1460 1536 Turn Bay Length (ft) 90 205 200 Base Capacity (vph) 284 1230 910 857 621 749 Starvation Cap Reductn 000000 Spillback Cap Reductn 000000 Storage Cap Reductn 000000 Reduced v/c Ratio 0.66 0.42 0.73 0.29 0.45 0.40 Intersection Summary Area Type: Other Cycle Length: 100 Actuated Cycle Length: 100 Offset: 0 (0%), Referenced to phase 2: and 6:SBL, Start of Green Natural Cycle: 65 Control Type: Actuated-Coordinated Maximum v/c Ratio: 0.85 Intersection Signal Delay: 22.7 Intersection LOS: C Intersection Capacity Utilization 63.0% ICU Level of Service B Analysis Period (min) 15 Splits and Phases: 5: 127th Street & 248th Avenue 313 HCM 6th TWSC 6: Vicarage Drive/Edwards Elmhurst Access Drive & 127th Street 11/30/2021 21-272 Bronk Parcel Development Synchro 11 Report Proposed Weekday Evening Peak Hour Page 1 Intersection Int Delay, s/veh 6 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Vol, veh/h 16 606 52 30 688 36 33 0 30 61 0 49 Future Vol, veh/h 16 606 52 30 688 36 33 0 30 61 0 49 Conflicting Peds, #/hr 0 00000000000 Sign Control Free Free Free Free Free Free Stop Stop Stop Stop Stop Stop RT Channelized - - None - - None - - None - - None Storage Length 200 - 145 145 ----0--0 Veh in Median Storage, # - 0 - - 0 - - 1 - - 1 - Grade, % - 0 - - 0 - - 0 - - 0 - Peak Hour Factor 66 66 92 92 66 66 92 92 92 66 92 66 Heavy Vehicles, % 0 02200222020 Mvmt Flow 24 918 57 33 1042 55 36 0 33 92 0 74 Major/Minor Major1 Major2 Minor1 Minor2 Conflicting Flow All 1097 0 0 975 0 0 1553 2129 918 2147 2159 549 Stage 1 ------966966-1136 1136 - Stage 2 ------5871163 - 1011 1023 - Critical Hdwy 4.1 - - 4.13 - - 7.33 6.53 6.23 7.3 6.53 6.9 Critical Hdwy Stg 1 ------6.13 5.53 - 6.5 5.53 - Critical Hdwy Stg 2 ------6.53 5.53 - 6.1 5.53 - Follow-up Hdwy 2.2 - - 2.219 - - 3.519 4.019 3.319 3.5 4.019 3.3 Pot Cap-1 Maneuver 644 - - 705 - - 84 49 328 ~ 32 47 485 Stage 1 ------305332-218276- Stage 2 ------464268-291312- Platoon blocked, % - - - - Mov Cap-1 Maneuver 644 - - 705 - - 67 45 328 ~ 27 43 485 Mov Cap-2 Maneuver ------176142-110141- Stage 1 ------294320-210263- Stage 2 ------375255-252300- Approach EB WB NB SB HCM Control Delay, s 0.3 0.3 24.2 72 HCM LOS C F Minor Lane/Major Mvmt NBLn1NBLn2 EBL EBT EBR WBL WBT WBRSBLn1SBLn2 Capacity (veh/h) 176 328 644 - - 705 - - 110 485 HCM Lane V/C Ratio 0.204 0.099 0.038 - - 0.046 - - 0.84 0.153 HCM Control Delay (s) 30.6 17.2 10.8 - - 10.4 - - 118.7 13.8 HCM Lane LOS D C B - - B - - F B HCM 95th %tile Q(veh) 0.7 0.3 0.1 - - 0.1 - - 4.9 0.5 Notes ~: Volume exceeds capacity $: Delay exceeds 300s +: Computation Not Defined *: All major volume in platoon 314 HCM 6th TWSC 7: Van Dyke Road & Hamilton Lane 11/30/2021 21-272 Bronk Parcel Development Synchro 11 Report Proposed Weekday Evening Peak Hour Page 2 Intersection Int Delay, s/veh 2.3 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Vol, veh/h 15 0 33 13 0 31 48 419 8 27 588 41 Future Vol, veh/h 15 0 33 13 0 31 48 419 8 27 588 41 Conflicting Peds, #/hr 0 00000000000 Sign Control Stop Stop Stop Stop Stop Stop Free Free Free Free Free Free RT Channelized - - None - - None - - None - - None Storage Length - - - 0 - 0 145 - - 135 - - Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 - Grade, % - 0 - - 0 - - 0 - - 0 - Peak Hour Factor 74 74 74 74 74 74 74 74 74 74 74 74 Heavy Vehicles, % 0 00003000400 Mvmt Flow 20 0 45 18 0 42 65 566 11 36 795 55 Major/Minor Minor2 Minor1 Major1 Major2 Conflicting Flow All 1308 1602 425 1172 - 289 850 0 0 577 0 0 Stage 1 895 895 - 702 -------- Stage 2 413 707 - 470 -------- Critical Hdwy 7.5 6.5 6.9 7.5 - 6.96 4.1 - - 4.18 - - Critical Hdwy Stg 1 6.5 5.5 - 6.5 -------- Critical Hdwy Stg 2 6.5 5.5 - 6.5 -------- Follow-up Hdwy 3.5 4 3.3 3.5 - 3.33 2.2 - - 2.24 - - Pot Cap-1 Maneuver 119 107 583 150 0 705 797 - - 979 - - Stage 1 306 362 - 400 0 ------- Stage 2 592 441 - 548 0 ------- Platoon blocked, % - - - - Mov Cap-1 Maneuver 102 95 583 126 - 705 797 - - 979 - - Mov Cap-2 Maneuver 102 95 - 126 -------- Stage 1 281 349 - 367 -------- Stage 2 511 405 - 487 -------- Approach EB WB NB SB HCM Control Delay, s 25.9 18.6 1 0.4 HCM LOS D C Minor Lane/Major Mvmt NBL NBT NBREBLn1WBLn1WBLn2 SBL SBT SBR Capacity (veh/h) 797 - - 236 126 705 979 - - HCM Lane V/C Ratio 0.081 - - 0.275 0.139 0.059 0.037 - - HCM Control Delay (s) 9.9 - - 25.9 38.1 10.4 8.8 - - HCM Lane LOS A - - D E B A - - HCM 95th %tile Q(veh) 0.3 - - 1.1 0.5 0.2 0.1 - - 315 HCM 6th TWSC 8: Van Dyke Road & Norwood Drive 11/30/2021 21-272 Bronk Parcel Development Synchro 11 Report Proposed Weekday Evening Peak Hour Page 3 Intersection Int Delay, s/veh 2.4 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Vol, veh/h 47 5 27 15 10 16 17 412 12 18 539 77 Future Vol, veh/h 47 5 27 15 10 16 17 412 12 18 539 77 Conflicting Peds, #/hr 0 00000000000 Sign Control Stop Stop Stop Stop Stop Stop Free Free Free Free Free Free RT Channelized - - None - - None - - None - - None Storage Length -----0130--150-- Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 - Grade, % - 0 - - 0 - - 0 - - 0 - Peak Hour Factor 94 94 94 94 94 94 94 94 94 94 94 94 Heavy Vehicles, % 0 00000000000 Mvmt Flow 50 5 29 16 11 17 18 438 13 19 573 82 Major/Minor Minor2 Minor1 Major1 Major2 Conflicting Flow All 913 1139 328 808 1174 226 655 0 0 451 0 0 Stage 1 652 652 - 481 481 ------- Stage 2 261 487 - 327 693 ------- Critical Hdwy 7.5 6.5 6.9 7.5 6.5 6.9 4.1 - - 4.1 - - Critical Hdwy Stg 1 6.5 5.5 - 6.5 5.5 ------- Critical Hdwy Stg 2 6.5 5.5 - 6.5 5.5 ------- Follow-up Hdwy 3.5 4 3.3 3.5 4 3.3 2.2 - - 2.2 - - Pot Cap-1 Maneuver 232 203 674 276 193 783 942 - - 1120 - - Stage 1 428 467 - 540 557 ------- Stage 2 727 554 - 665 448 ------- Platoon blocked, % - - - - Mov Cap-1 Maneuver 211 196 674 252 186 783 942 - - 1120 - - Mov Cap-2 Maneuver 211 196 - 252 186 ------- Stage 1 420 459 - 530 546 ------- Stage 2 684 543 - 619 440 ------- Approach EB WB NB SB HCM Control Delay, s 23.8 18.1 0.3 0.2 HCM LOS C C Minor Lane/Major Mvmt NBL NBT NBREBLn1WBLn1WBLn2 SBL SBT SBR Capacity (veh/h) 942 - - 274 221 783 1120 - - HCM Lane V/C Ratio 0.019 - - 0.307 0.12 0.022 0.017 - - HCM Control Delay (s) 8.9 - - 23.8 23.5 9.7 8.3 - - HCM Lane LOS A - - C C A A - - HCM 95th %tile Q(veh) 0.1 - - 1.3 0.4 0.1 0.1 - - 316 HCM 6th TWSC 9: Vicarage Drive & 135th Street 11/30/2021 21-272 Bronk Parcel Development Synchro 11 Report Proposed Weekday Evening Peak Hour Page 4 Intersection Int Delay, s/veh 2.3 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Vol, veh/h 74 431 4 24 751 51 6 0 23 14 0 45 Future Vol, veh/h 74 431 4 24 751 51 6 0 23 14 0 45 Conflicting Peds, #/hr 0 00000000000 Sign Control Free Free Free Free Free Free Stop Stop Stop Stop Stop Stop RT Channelized - - None - - None - - None - - None Storage Length 135 - - 125 ----0--- Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 - Grade, % - 0 - - 0 - - 0 - - 0 - Peak Hour Factor 94 94 94 94 94 94 94 94 94 94 94 94 Heavy Vehicles, % 0 00400000008 Mvmt Flow 79 459 4 26 799 54 6 0 24 15 0 48 Major/Minor Major1 Major2 Minor1 Minor2 Conflicting Flow All 853 0 0 463 0 0 1521 1524 461 1509 1499 826 Stage 1 ------619619-878878- Stage 2 ------902905-631621- Critical Hdwy 4.1 - - 4.14 - - 7.1 6.5 6.2 7.1 6.5 6.28 Critical Hdwy Stg 1 ------6.15.5-6.15.5- Critical Hdwy Stg 2 ------6.15.5-6.15.5- Follow-up Hdwy 2.2 - - 2.236 - - 3.5 4 3.3 3.5 4 3.372 Pot Cap-1 Maneuver 795 - - 1088 - - 98 119 605 100 123 363 Stage 1 ------480483-345368- Stage 2 ------335358-472482- Platoon blocked, % - - - - Mov Cap-1 Maneuver 795 - - 1088 - - 77 105 605 87 108 363 Mov Cap-2 Maneuver ------77105-87108- Stage 1 ------432435-311359- Stage 2 ------284349-408434- Approach EB WB NB SB HCM Control Delay, s 1.5 0.2 20.4 29.8 HCM LOS C D Minor Lane/Major Mvmt NBLn1NBLn2 EBL EBT EBR WBL WBT WBRSBLn1 Capacity (veh/h) 77 605 795 - - 1088 - - 207 HCM Lane V/C Ratio 0.083 0.04 0.099 - - 0.023 - - 0.303 HCM Control Delay (s) 55.9 11.2 10 - - 8.4 - - 29.8 HCM Lane LOS F B B - - A - - D HCM 95th %tile Q(veh) 0.3 0.1 0.3 - - 0.1 - - 1.2 317 HCM 6th TWSC 10: Waterford Boulevard & 127th Street 11/30/2021 21-272 Bronk Parcel Development Synchro 11 Report Proposed Weekday Evening Peak Hour Page 5 Intersection Int Delay, s/veh 1.6 Movement EBT EBR WBL WBT NBL NBR Lane Configurations Traffic Vol, veh/h 558 21 47 772 12 39 Future Vol, veh/h 558 21 47 772 12 39 Conflicting Peds, #/hr 0 00000 Sign Control Free Free Free Free Stop Stop RT Channelized - None - None - None Storage Length - - 90 - 0 0 Veh in Median Storage, # 0 - - 0 0 - Grade, % 0 - - 0 0 - Peak Hour Factor 69 69 69 69 69 69 Heavy Vehicles, % 0 00003 Mvmt Flow 809 30 68 1119 17 57 Major/Minor Major1 Major2 Minor1 Conflicting Flow All 0 0 839 0 2079 824 Stage 1 - - - - 824 - Stage 2 - - - - 1255 - Critical Hdwy - - 4.1 - 6.4 6.23 Critical Hdwy Stg 1 - - - - 5.4 - Critical Hdwy Stg 2 - - - - 5.4 - Follow-up Hdwy - - 2.2 - 3.5 3.327 Pot Cap-1 Maneuver - - 804 - 59 371 Stage 1 - - - - 434 - Stage 2 - - - - 271 - Platoon blocked, % - - - Mov Cap-1 Maneuver - - 804 - 54 371 Mov Cap-2 Maneuver - - - - 54 - Stage 1 - - - - 434 - Stage 2 - - - - 248 - Approach EB WB NB HCM Control Delay, s 0 0.6 36.2 HCM LOS E Minor Lane/Major Mvmt NBLn1NBLn2 EBT EBR WBL WBT Capacity (veh/h) 54 371 - - 804 - HCM Lane V/C Ratio 0.322 0.152 - - 0.085 - HCM Control Delay (s) 100.6 16.4 - - 9.9 - HCM Lane LOS F C - - A - HCM 95th %tile Q(veh) 1.1 0.5 - - 0.3 - 318 8678 Ridgefield Road Crystal Lake, IL 60012 815.459.1260 815.455.0450 www.baxterwoodman.com info@baxterwoodman.com Memo To: Jon Proulx, AICP, Community Development Director Allen Persons, Public Works Director From: Steve Amann, P.E., CFM Date: December 1, 2021 Project No: 212160.80 Subject: Bronk Farm – King’s Crossing Drainage Improvements Background: During the construction of the house at 12933 Tipperary Lane in the King’s Crossing Subdivision, a heavy rainfall occurred. The native clay between an adjacent storm sewer trench and the house excavation gave way. This was replaced and repaired with bentonite clay in order to seal the foundation off from the storm sewer trench. The repair was not completely successful and as a result, storm water in the south detention pond runs through the backfill around the storm sewer and into the foundation excavation. When the south pond level rises during rainfall, this flow increases significantly. The sump pump in the house runs a significant amount of time, and has been replaced multiple times by the property owner, Mr. Kevin Kroll. Proposed Improvements: Pulte Homes proposes to mitigate this problem with their development of the adjacent Bronk Farm. CEMCON, Ltd. has prepared rough preliminary plans and a storm water management report outlining these improvements. A new storm sewer will drain the King’s Crossing pond into the Bronk Farm storm water detention ponds which will accommodate a portion of the existing detention volume at King’s Crossing. These modifications will lower the King’s Crossing south pond normal water level by 2.5 feet and reduce the drawdown time during the 100-year event from 190 hours (almost 8 days) to 88 hours (3-1/2 days). We believe these modifications will help with Mr. Kroll’s sump pump run time. His stated experience supports this: when the pond is at its current water level, his sump pump does not run as often. However, there is no guarantee the proposed improvements will reduce the pump run time. The pond will still rise to near its current high water level during a 100-year rainfall, and to lower levels during lesser rainfalls, so the sump pump will still be affected although to a lesser extent. King’s Crossing Pond Changes: Lowering the normal water level in the King’s Crossing south pond will expose about 10 feet of pond bank around the perimeter. This will reduce the size of the pond behind 6 lots on Tipperary Court and the south side of Tipperary Lane. The King’s Crossing plans show a 5-foot-wide ‘safety shelf’ which would be 6 inches below the new normal water level. The as- built elevation and width of this shelf are unknown so additional pond bank may be exposed. Although there will be more land above water as a result, the ground in this area is sloped at 4 horizontal to 1 vertical which is not usable for most passive recreation activities. 319 Jon Proulx, Allen Persons December 1, 2021 Village of Plainfield 212160.80 Page 2 Costs: Pulte Homes’ attorney has suggested that costs for these improvements be evaluated on the basis of average fee-in-lieu of detention costs under the DuPage County Stormwater Ordinance, which is $107,000 per acre-foot which includes land, construction and engineering costs. The CEMCON preliminary analysis indicates about 7.5 acre-feet of storage will be used for King’s Crossing, bringing the total cost to $802,500. He also indicates the cost of the additional storm sewers to be $125,000 which he suggests would be included in the $802,500. More detail is needed regarding the detention volume being shifted from King’s Crossing to the Bronk Farm. It is not clear that 7.5 acre-feet of storage is being used by King’s Crossing since the additional storage volume between the current and proposed normal water levels doesn’t appear to be accounted for. Additionally, the footprints of the Bronk Farm ponds were not enlarged to accommodate the additional runoff so the land costs should not be included. We suggest that a more appropriate basis for these improvement costs be the actual estimated construction costs. Using the full 7.5 acre-feet of storage, the costs to enlarge the detention ponds is estimated as follows: Adding the $125,000 for storm sewer pipe costs brings the total cost to $220,000. Additionally, reseeding of the exposed pond bank in King’s Crossing is estimated to be $2,500. Please let me know if you have any questions or need any additional information. C: Yuchen Ding, AICP, LEED AP ND, Associate Planner Scott Threewitt, P.E., Lead Engineer I:\Azure\PFLDV\212160-Bronk Farm PER\80-PlanReview\Work\20211201 Bronk Farm King's Crossing Drainage Memo.docx Earth Excavation 12,500 cu yds 5.00$ 62,500.00$ Topsoil Placement 550 cu yds 5.00$ 2,750.00$ Native Seeding 0.5 acres 5,000.00$ 2,500.00$ 67,750.00$ 20% 13,550.00$ 81,300.00$ 10,000.00$ 4,000.00$ 95,300.00$ Construction Total Design Engineering Review Engineering Project Total Detention Pond Enlargement Costs Construction Contingency Construction Subtotal 320 December 16, 2021 Mr. Christopher R. Morgart, P.E., LEED AP Vice President CEMCON, Ltd. 2280 White Oak Circle Suite 100 Aurora, IL 60502-9675 Subject: Village of Plainfield – Bronk Farm Development Dear Mr. Morgart: In accordance with instructions from the Village of Plainfield, we have completed a preliminary office review of your recent submittal for this project. The following documents were reviewed:  Existing Agricultural Drain Tile Investigation Plan prepared by Huddleston McBride dated October 6, 2021;  Preliminary Stormwater Management Analysis and Report dated October 7, 2021;  Preliminary Engineering Plan dated October 8, 2021;  Preliminary Landscape Plans prepared by Signature Design Group dated November 3, 2021; and  Traffic Impact Study prepared by KLOA, Inc. dated December 1, 2021. Unless otherwise noted, these items were prepared by CEMCON, Ltd. The following comments are preliminary in nature and intended only to provide guidance for future final plan preparations and submittals. An interim storm water management plan incorporating detention volume for the adjacent King’s Crossing Subdivision was received and reviewed separately. Since it is not known if the results of that analysis will be included in the plans for this development, this review does not reflect that interim plan. Stormwater Management 1. The discharge from the King’s Crossing Subdivision needs to be incorporated in the storm water management analysis and design. 2. In the report narrative, the receiving streams should be corrected. The east discharge (across Van Dyke Road) heads to the East Norman Drain but the southerly discharges end up in the West Norman Drain. 3. Flow paths need to be shown for the times of concentration calculations. 321 Mr. Christopher Morgart, P.E., LEED AP December 16, 2021 CEMCON, Ltd. 212160.80  Page 2 4. A blocked restrictor analysis is needed. This needs to demonstrate that, if the primary restrictors are blocked, the peak 100-year discharges in developed conditions do not exceed the peak 100-year discharges in existing conditions. 5. In Table 1: a. The top heading of the 7th column needs to be corrected to 18 hours; and b. The Total Proposed Peak Flows for the 2-year event need to be summed correctly. 6. The existing depressional storage in the southeast corner needs to be reflected in the analysis. The existing conditions analysis suggests the existing release rate is greater than the maximum allowable developed release, which would mean no additional storage is required. This needs to be demonstrated. Traffic Impact Study/Transportation 7. The traffic from this development will reduce the levels of service at several intersections in the area. Financial contributions from this development to the necessary upgrades at these intersections would be appropriate. 8. Signal warrants need to be analyzed at the intersection of 127 th Street and Edwards Elmhurst Access Drive. 9. On Figure 3, Existing Roadway Characteristics, travel lane arrows should be provided at Vicarage Drive and 135th Street. 10. In the existing conditions description, the intersection of Van Dyke Road and 135 th Street needs to be correctly described, i.e., an exclusive (not shared) southbound right turn lane. 11. The crash analysis description needs to include the 127th Street and 248th Avenue intersection. 12. In the Discussion and Recommendations: a. The U.S. Route 30 with 135th Street paragraph needs to address the 34- and 24-second delay increases in the westbound left turn movements during the AM and PM peak hours, respectively; and b. The 127th Street with Edward Elmhurst Access Road paragraph needs to provide documentation for the recommended storage and taper lengths. 13. The striped on-street parking stalls along Vicarage Drive will need a variance from Village Standards. 14. Village standard typical sections need to be used. Grading and Drainage 15. Overland flood routes are required by ordinance to be at least 10 feet horizontally from buildings. This will require larger sideyard easements in several locations, and greater spacing between several of the multi-family dwellings. 16. Overland flow routes need to be shown for all areas. Currently, none are shown for Vicarage across Outlots A through D or from Hamilton Lane. 17. Storm sewers in side yards require a minimum easement width of 10 feet each side beyond the outside of the pipe. This will require larger sideyard easements in several 322 Mr. Christopher Morgart, P.E., LEED AP December 16, 2021 CEMCON, Ltd. 212160.80  Page 3 locations. If the multi-family dwellings will have below-grade floors, greater spacing will be needed between them. 18. An outlet is needed for the storm sewers near Lots 34 and 35. 19. Several existing drainage tiles existing adjacent developments are shown as continuing to serve upland watersheds. Since these would normally be abandoned or rerouted in the course of those developments, further investigation should be pursued. 20. Greater detail is needed for the area around the south end of Vicarage Drive where internal overflows are directed into the detention pond and the pond will overflow in the same location. 21. Additional structures are needed where storm sewers cross roads since curb castings can’t provide maintenance access. 22. The detention pond setbacks required by the Illinois Highway Code need to be examined and applied where appropriate. Water Distribution System 23. Final water main sizing and required connections to the existing system are pending the results of an ongoing water system analysis. Sanitary Sewers 24. Calculations are needed to demonstrate the proposed 10-inch sewers will have self- cleansing velocities. Landscape Plan 25. We strongly recommend that rip-rap and mowed turf grass not be used for detention pond banks. 26. Species will need to be listed and apportioned for all ground covers and seed mixes. 27. Live plants and waterfowl exclusion netting will be needed for all zones below the normal water level. 28. The “under water land bridge” on Sheet L.105 needs to be described more fully (including its purpose) and shown to comply with Village requirements. 29. The Naturalized SWM Basin – Typical Section and the applicable engineering details need to match. 30. The final plans will need to include a detailed monitoring and maintenance plan for all native vegetation, including performance standards and a minimum 3-year duration. General 31. The Village’s recently-updated standard details should be used in the final plans. 323 Mr. Christopher Morgart, P.E., LEED AP December 16, 2021 CEMCON, Ltd. 212160.80  Page 4 Our review did not include field verification of existing conditions, elevations, grades and/or topography as shown on the plan, and we disclaim responsibility for any errors or omissions. This review also does not include any additional comments or issues that may be raised by other Village departments or reviewing entities. The developer and design engineers are not relieved of any responsibility for the correctness of the existing field conditions and the design of the project improvements because of our review and the subsequent approval of the plans and specifications by the Village. If you have any questions or need additional information, please contact us. Sincerely, BAXTER & WOODMAN, INC. CONSULTING ENGINEERS Stephen R. Amann, P.E., CFM Development Assistance Department Manager C: Jonathan Proulx, AICP, Community Development Director Yuchen Ding, AICP, LED AP ND, Associate Planner Scott Threewitt, P.E., Lead Engineer Mary Ludemann, Plainfield Fire Protection District Matt Brolley, P.E., Land Entitlement Manger – Illinois Division, Pulte Homes Russell G. Whitaker, III, Rosanova & Whitaker, Ltd. I:\Azure\PFLDV\212160-Bronk Farm PER\80-PlanReview\Work\20211216 Preliminary Review 1.docx 324