Loading...
HomeMy Public PortalAboutWalnut St TDM app. and summary approved TOWN OF WATFRTOWN 0 Department of _: • Community Development and Planning PLANNING OFFICE Administration Building 149 Main Street Watertown, MA 02472 Steve Magoon Phone:617.972.6417 Director Fax:617.972.6484 smagoon ri„vatcrtown•ma.gov www.%vatertown•ma.gnv TRANSPORTATION DEMAND MANAGEMENT APPLICATION To be filled out by Applicant, for DCDP Approval. Please attach full TDM Plan, or submit when available. PROJECT INFORMATION 1. Project Name: Proposed Office/Research and Development Buildina 2. Project Street Address: 85 Walnut Street—Watertown - MA - 02472 3. Petitioner/Applicant Name(s): 10-85 Walnut Owner. LLC 4. Contact Person(s): Westbrook Properties 5. Contact Address: 211 Conoress Street. Suite 920— Boston. MA 02110 6. Contact Phone: (617) 532-7155 7. Contact Email: PROJECT DESCRIPTION/TDM THRESHOLDS 1. Project Description: Proposed Office/Research and Development Buildina 2. TDM Plan Type: ❑ Basic ■ Comprehensive I 3. Number of Proposed New Full-Time Equivalent Employees (if applicable)- 610-712 4. Number of New Residential Units (if applicable): Not applicable 5. Total Gross Square Feet of Development: 213.500 sf 6. Total Square Footage of Site: 4.9 AC 7. Total Number of Average Daily Car Trips projected: 1.696 8. Total Number of Peak Hour Trips: 164 Vehicle trios Peak Hour AM 169 Vehicle trips Peak Hour PM Project Name:Proposed Office/Research and Development Building -85 Walnut Street PROJECT TRANSPORTATION AND PARKING DATA 1. Number of proposed Employee Parking spaces: 566 spaces (including 102 Shadow Spaces) 2. Employee Trip Origin Data (if known): Residence % Watertown town 17.39% Boston city 15.93% Waltham city 7.50% Newton city 4.20% Cambridge city 4.15% Belmont town 2.48% Bverett city 2.08% Arlington town 1.95% Framingham town 1.76% Medford city 1.75% Brookline town 1.66% Somerville city 1.55% Natick town 1.52% Malden city 1.33% Woburn city 1.08% Source:USCensusjor nalerlorn-2013-2017ALner9mu Communlo,SmTey 3—)war Able:7be rema/n 33%orlglu locallons am below 0.9% , 3. Employee Transportation Mode(s) (if known): Mode Split Average , , Single Occupancy Vehicle(SOV) 65.0 High Occupancy Vehicle(HOV) 7.0 Transit 17 ' Pedestrian 3 Bicycle 8 TOTAL 100 Source:US Censusfor ll ale7ouw-2013-2017American Connuorip,Sumev S-year 4. Number of proposed Residential Parking spaces (if applicable): N&ADDlicable 1 5. Number of Bicycle Parking Spaces: 96 spaces II l I a i 1 1 0CDP APPROVAL Of PROJECT TOM PLAN i Page 2 of 3 ' I TRANSPORTATION DEMAND MANAGEMENT MEASURES SELECTED List below the measures selected from the Transportation Demand Management Regulations, with point values: • Improve Walking Conditions—1 Point • Bicycle Parking—4 Points • Showers and Lockers—1 Point • Bike Repair Station—1 Point • Promote Location-efficient—1 Point • Cross-Site Connectivity— 1 Point • Or-Site Employee r sportation Coordinator-5 Points • The Proponent ree to join Watertown Transportation Management Association (TMA) Printed Na e a Signature of Applicant thorize Representative Date Diego Rlge Vice President DCDP REVIEW/APPROVAL 1. DCDP Reviewer's Name:dOA 4,k t Date 2. Determination: TDM Plan is Approved ❑ TDM Plan Requires Adjustment Adjustments Required: ❑ TDM Plan is NOT Approved Reasons: i DCDP APPROVAL OF PROJECT TOM PLAN Page 3 of 3