Loading...
HomeMy Public PortalAbout12 - 2019-12 - WHISPERING WINDS PHASE 1 RESOLUTION 2019-12 A RESOLUTION AUTHORIZING ACCEPTANCE OF INFRASTRUCTURE IN WHISPERING WINDS PHASE I WHEREAS, the Final Plat for Whispering Winds Subdivision Phase I was approved by the Greencastle Plan Commission on May 29, 2016; and WHEREAS, the Plan Commission approved waiving the posting of surety for the subdivision at that time; and WHEREAS, the infrastructure has been inspected by city departments including the city engineer, utilities superintendent, director of public works and city planner; and WHEREAS, the infrastructure installed has passed inspections; and WHEREAS, the developer is in agreement to pay the city for infrastructure not yet installed as outlined in the attached letter; and WHEREAS, the attached letter acts as the equivalent of a Maintenance Bond; and WHEREAS, the Greencastle Board of Works has reviewed the information at their regular meeting on November 20, 2019; and WHEREAS, the Board of Works recommends approval of the arrangements outlined in the attached letter; and WHEREAS, the Greencastle Subdivision Ordinance Article 4.9 Completion/Acceptance of Improvements B3 states "the City Council shall approve a resolution, accepting the improvements;" and NOW THEREFORE, BE IT RESOLOVED that the Greencastle Common Council authorizes the acceptance of said infrastructure as outlined in that attached letter. PASSED AND RESOLVED by the Common Council of the City of Greencastle on this 12th day of December 2019. COMMON COUNCIL OF CITY OF GREENCASTLE /046-e"1-"-eAc27 Adam Cohen Mark ammer Tyler Wade Stacie Langdon .d t Steve Fields Gary Lemon 1 / aa.—_ ua Murray Approved and signed by me this /Zf'' day of Q 2018 at 1;;i5' o'clock p. .m. )11, illia A . Dory, Jr., ayor: Attest: nda Dunbar, Clerk-Treasurer City of Greencastle City Planner Greencastle Planning & Zoning Phone: (765) 653-7719 1 N. Locust Street Fax: (765) 653-8707 Greencastle, Indiana 46135 E-mail: szimmerman@cityofgreencastle.com November 19, 2019 Whispering Winds Phase I infrastructure final inspections After documenting inspections from 2017, contacting all other department heads and public utilities about any remaining concerns, and reviewing the infrastructure construction and site development with City Engineer Jeff Mahan, I recommend acceptance of the infrastructure based on the following findings and conditions: Since the infrastructure work was done more than 3 years ago and has proven to be of appropriate quality, no maintenance bond will be required. In lieu of a performance bond for the small percentage of sidewalk and curb work remaining (see list below),the developer has agreed to pay the city $_7,680.00_. If the work is accomplished and deemed acceptable prior to December 31, 2021, the money shall be returned. Trees for remaining undeveloped lots will be maintained by the developer. If lots remain undeveloped by May, 2020,the trees will be made available to existing property owners or Greencastle departments for planting in public spaces. Acceptance would be dependent on payment to the city in lieu of bonding and for the following work: • Installation of three (3) speed limit signs as shown on construction plan C2.1 • Correction of drainage between lots 70 & 71 to meet requirements of Storm Water Pollution Prevention Plan. • Removal or engineering approval of check dam behind lot 58. • Removal of temporary drainage baskets in storm water inlets Regards, Scott Zimmerman Lots requiring sidewalks and/or curb repair: sidewalks at 74, 75, 76, 78, 68, and curbing at 83 Trees remaining: 14