Loading...
HomeMy Public PortalAbout2002_05_29_r083The Town of Leesburg, ..__ lrglnla RESOLUTION NO. A RESOLUTION: 2002-83 PRESENTED May 29, 2002 ADOPTED May 29, 2002 REQUESTING THE VIRGINIA DEPARTMENT OF TRANSPORTATION TO RE-ESTABLISH THE ROUTE 7/15 BYPASS WIDENING PROJECT AND MAINTAIN BATTLEFIELD PARKWAY PROJECT CONSTRUCTION SCHEDULE IN THE VIRGINIA TRANSPORTATION DEVELOPMENT PLAN FOR FISCAL YEARS 2002-2003 THROUGH 2007-2008 WHEREAS, the Virginia Department of Transportation (VDOT) draft Virginia Transportation Development Plan for fiscal years 2002-2003 through 2007-2008 has dropped the Route 7/15 Bypass Widening Project and delayed construction of Battlefield Parkway; and WHEREAS, VDOT will be conducting its Final Annual Financial Planning and Programming Hearing in Richmond on June 5, 2002 to determine funding for primary and urban system projects in the Northern Virginia Construction District; and WHEREAS, Leesburg is a regional crossroads where 40,000 vehicles including commuters from western Virginia, West Virginia and Maryland travel the Route 7/15 Bypass on a daily basis; and WHEREAS, the Route 7/15 Bypass is part of the National Highway System; and WHEREAS, the completion of the interchange at Route 15 and the Route 7/15 Bypass and the widening of the 7/15 Bypass would greatly improve the flow of traffic around Leesburg; and WHEREAS, $2,135,000 in Regional Surface Transportation Funds have been approved by the Transportation Planning Board of the Metropolitan Washington Council of Governments for the preliminary engineering phase of the Route 7/15 Bypass Widening Project; and -2- A RESOLUTION: REQUESTING THE VIRGINIA DEPARTMENT OF TRANSPORTATION TO RE-ESTABLISH THE ROUTE 7/15 BYPASS WIDENING PROJECT AND MAINTAIN BATTIJEFIELD PARKWAY PROJECT CONSTRUCTION SCHEDULE IN THE VIRGINIA TRANSPORTATION DEVELOPMENT PLAN FOR FISCAL YEARS 2002-2003 THROUGH 2007-2008 WHEREAS, $600,000 in Regional Surface Transportation Funds have been approved by the Transportation Planning Board of the Metropolitan Washington Council of Governments for the preliminary engineering phase of the Battlefield Parkway Project. THEREFORE, RESOLVED by the Council of the Town of Leesburg in Virginia as follows: SECTION I. The Virginia Department of Transportation and the Commonwealth Transportation Board are requested to continue to include and fund a primary system project to widen the Route 7/15 Bypass from four lanes to six lanes and to complete the interchange at Route 15 and the Route 7/15 Bypass for the following reasons: 1. Current traffic volumes on the Route 7/15 Bypass exceed 40,000 vehicles per day. 2. Increasing traffic volumes are causing a decrease in safety and level of service along the Route 7/15 Bypass. 3. Current traffic volumes on the Dulles Greenway (Toll Road), which connects to the Route 7/15 Bypass, exceed 30,000 vehicles per day. 4. Traffic volumes are expected to exceed 70,000 vehicles per day by 2015. o The Northern Virginia Transportation Coordinating Council has determined the widening of the Route 7/15 Bypass is a needed regional transportation improvements project and has approved funding for preliminary engineering in FY 1997, 1998, 2000, 2001 and 2002. 6. The future of commerce and economic development in Leesburg depends a great deal on the ability of the Route 7/15 Bypass to function at an acceptable level of service. -3- A RESOLUTION: REQUESTING THE VIRGINIA DEPARTMENT OF TRANSPORTATION TO RE-ESTABLISH THE ROUTE 7/15 BYPASS WIDENING PROJECT AND MAINTAIN BATTLEFIELD PARKWAY PROJECT CONSTRUCTION SCHEDULE IN THE VIRGINIA TRANSPORTATION DEVELOPMENT PLAN FOR FISCAL YEARS 2002-2003 THROUGH 2007-2008 7. An overpass of Sycolin Road over the 7/15 Bypass is ultimately desired to close the current at-grade intersection. 8. Improvements to construct a grade separation/overpass at Sycolin Road are dependent on the completion of Battlefield Parkway between Kincaid Blvd. and Route 7. SECTION II. VDOT and CTB are requested to maintain the Battlefield Parkway construction schedule because the only access to the Leesburg Executive Airport is the Sycolin Road at Route 7/15 Bypass at grade intersection and the level of service is currently "F". PASSED this 29th day of May 2002. ATTEST: of Council Mayor Town of Leesburg R:VDOTFunding.doc