A RESOLUTION AUTHORIZING EXECUTION OF A CONSTRUCTION CONTRACT
FOR THE 2020 HAVENS ACRES ROADWAY REHABILITATION
WHEREAS, the City of Riverdale, Iowa ("City") is a Municipal Corporation, organized and
operating under the laws of the State of Iowa;
WHEREAS, the City Council has properly advertised for and accepted bids for the
Havens Acres Roadway Rehabilitation project; and;
WHEREAS, the City's Engineering Firm MSA and Engineer Chris Cooper have reviewed
the bids and found the four bidders to be qualified, responsible bidders, and;
WHEREAS, the City Council has determined it is in the best interest of the community to
approve the lowest bid from Brandt Construction in the amount of $223,881.
NOW THEREFORE, BE IT RESOLVED, that the City Council of the City of Riverdale, Iowa
authorizes the Mayor, Clerk and City Administrator to execute contract documents and
proceed to complete the Havens Acres Roadway Rehabilitation work with Brandt
Construction in the amount of $223,881.
Passed and approved this 28th day of January, 2020.
\ ....fiL---
Michael Bawd1 ayor
ATTEST:
7
Vii'///,1 1-C f7d i'La_ �lJ ,(e
Mary Fn ces Blevins, City Clerk-Treasurer
City of Riverdale,Iowa 110 Manor Drive, Riverdale, Iowa 52722•(563)355-2511 •www.riverdaleiowa.com
2117 State Street
Suite 200
Bettendorf, IA 52722
P (563) 445-3501
TF (866) 732-6321
F (563) 445-3503
January 23, 2020
Ms. Lisa Kotter
City Administrator
City of Riverdale
110 Manor Drive
Riverdale, IA 52722
Re: Havens Acres Roadway Rehabilitation
City of Riverdale
Dear Administrator Kotter:
Upon review of the bids received on 1/21/2020 for the above -referenced
project, it was found that they were submitted by qualified contractors. It is
our recommendation that the low responsive bidder listed below be accepted
and award made at your next meeting.
Brandt Construction Co.
700 4th Street West
Milan, IL 61264
Bid Amount $223,881.00
Please execute the enclosed Notice of Award in triplicate for the contract
and return two copies to our office and keep one for your files. After receiving
the executed copies, we will forward one copy of the Notice of Award and
the remaining contract package to the Contractor.
Sincerely,
MSA Professional Services, Inc.
Chris ian`R.- er P.E., CPESC
Senior Project Engineer
CC/dab
Enc.
www.msa-ps.com
G:\ G:\10N OB76\108760571Spec18idding and Contracting\Owner Award Letter
BID TABULATION
PROJECT NUMBER:
10876057
Brandt Constntceicrn
Tri City Blacktop, Inc.
aru uA I t:
Hawkeye Paving Corp.
1121/2020
Valley Construction Co.
ITEM
YO.
..... _.
ITEM
�, _. DESCRIPTION
ESTIMATED
QUANTITY
UNITS
OMIT
PRICE
TOTAL
PRICY;
UNIT
PRICE
TOTAL
UNIT
TOTAL
.:
PRICE
PRICE
PRICE
l
2
Traffic Maintenance-SUDAS 8030,104
TMaintenance-TC419
1
LS
3500
$ 3-500.00
$ 3,000.00
$ 3,000.00
$ 1.000.00
S 1 000.00
3-
raffle
Abandon Sanitary
1
LS
2000
$ 2,000.00
$ 3,000.00
$ 3,000"00
$ 1,000-00
$ 1.000.00
$ 2,165.00
$
$ 2,165,00 '
Cleanout
1
EA
1100
$ 1.10000
$ 3.140.00
$ 3.i40.00
$ 1.000.00
$ 2.408.00
1,985.00
S 3,100.00
$ 1,985.00;
$ 3.100.00
S
Sawcuk Breakout Line
S
5
and Gutter
R
and Gutter
L
tiveway Removal
P
Remos°a1, 4 dlmg - l 73
3 000
SY
3 5
$ 17. 00.00
1
$ 3.00
$ 15,000.00
$ 20.00
$ 5,720,00 1
Pavement Retnue3i, Mulling - 2"
$
$ 3,9 .0.00
$ 3,300.40
S 5.75
$ 7.50
S 28,750.00
$ 1.470.00 '
12
G
Grind 13utt is
Curb
+
. • t
20.00
$ 20.00
and Gutter, Special
PCC Driveway,
+
OD
$ 1,840.00$
150.00
$ 2,400.00
$ 8.00
$ 1,320.00
6"
16.120.00
$
$ 19,SU0.00
$ 6 400.00
$ 115.00
5 90.00
$ 1,840.013 U
$ 23,400.00
14
Famish Manhole Casrinns, SW-60I
E
Seal
Granular Subbase,l0"
1,400.00
$ 11.200+1
S 1,200.00
$ 9,600.00
$ 52 5.00
$
$ 4.�00.00
+
+
+
+
S
$ 3.000.00
1-400.00
$ 68.00
$ 11.200.00
$ 4,080.00
18.
19
Granular Subbase, 6"
Class 13 Excavation
50-00
$ 50.00
$ 5,050.00
$
Class 10 Excavation
113.9
0.00
$ 60.00
$ 1.380.0
50.00
$ c c
.0_0 00
V
Riser, 1"5.00
V
Box Adjustment Riser,4"
WaterMeter
400 00
145.00
$ 600.00
$ 600.00
$ 130.00
$
S 130.00
Box. Modified
4.500.00
1I
2 475.00
S 7f10.00
140100
$ 840.00
$ 50.00
5
S 140.00
$ 2,520.00
$ 10,300.00
S
Schedule 80 PVC, 6"
1
50.00
10 300.00
$ 50.00
$ 2.100.00
24,
25.
PVC.Assernbly
C
3+
00
$ 5.550.00
$ 500.00
S 1,500.00
I,3t10.00
$
5 3,900.00
Area Intake
27
with orate, 2' Dia
EA+t
. 1.500.00
$ 3.000 ++
000 00
$ 2,000.00
$ 2,000.00
1.850.00
$
S 5.550.00
Intake Top Removal
6
EA
t
S 300.00
2,850.00
$ 1.200.00
$ 7,200.00
3,000.00
5 3.000.01
29
I
Intake Tops
900.
++
1 00
$ 120.00
S 20,400,00
S 465.00
$ 2.790.00
Class 1 or Class II Backftlt
64
TON
15
9.111
11
40S
$ 70.00
$ 20.00
$ 11.900.00
$ 1,800.00
+
Asphalt Overlay Fabric
5.!
SY
4
20 000.00+
,00
$ 2.00
$ 2,560.00
$ 10.000.00
H
H1MA LT Surface, 1/2" PG 58-28S
64
TON1
$ 120.00
$ 77,400,00
$ 36
1
S
$ 6,800.00
Tackcoat150
GAL
1
+
5.060.00
$ 5.00
5 5,750,00
130.00
S 83,850.0t332
O
Offiiste Topsoils
031.25$
15-00
$ 1,875 00
$ 4-25
$ 4.887.50
T
Type I Seed Mixture
1 00
S 7.00:
+ t
5 2.00
5
$ 34.00
$
$ 4.250.00
$ 1,400.00
S 9.300.00
M
Mobilization
I
LS
17,500.00
1
$ 20,000.00
280.00
10.00
$ 9,300 00
TOTAL: Items 81 k35
S 20.000.00
S
253.991.00
S 268.43750
For updated bidding information visit us at www.lnsa-ps Qom
1 0f 1
/0676057 Engineer Est, Bid, Tab and Pay App1 _Quash
TABULATION
NOTICE OF AWARD
Date: January 23, 2020
Project:
Havens Acres Roadway Rehabilitation
Owner:
City of Riverdale
Contract:
Owner's Contract No.
Engineer's Project No.:
City of Riverdale - Havens Acres Roadway Rehabilitation 10876057
Bidder
Brandt Construction, Co.
Bidders Address:
700 4th Street West
Milan, IL 61264
You are notified that your Bid dated 1/21/2020 for the above Contract has been considered. You are the
Successful Bidder and are awarded a Contract for Havens Acres Roadway Rehabilitation
The Contract Price of your Contract is Two Hundred Twenty Three Thousand Eight Hundred Eighty One
and no/100 Dollars ($223,881.00).
3 copies of the proposed Contract Documents (except Drawings) accompany this Notice of Award.
3 sets of the Drawings will be delivered separately or otherwise made available to you immediately.
You must comply with the following conditions precedent within [15] days of the date you receive this Notice
of Award.
1. Deliver to the Owner [ 3 ] fully executed counterparts of the Contract Documents.
2. Deliver with the executed Contract Documents the Contract security [Bonds] as specified in the
Instructions to Bidders (Article 20), General Conditions (Paragraph 5.01), and Supplementary
Conditions (Paragraph SC-5.01).
3. Other conditions precedent:
Failure to comply with these conditions within the time specified will entitle Owner to consider you in default,
annul this Notice of Award, and declare your Bid security forfeited.
Within ten days after you comply with the above conditions, Owner will return to you one fully executed
counterpart of the Contract Documents.
Copy to Engineer
By:
City of Riverdale
Owner
Authorized Signature
Title
EJCDC C-510 (2007 Edition)
Prepared by the Engineers Joint Contract Documents Committee
and endorsed by the Construction Specifications Institute.
00 5100-1
G:11051087 \108760STSpe\Biddlo5 sad ContractingtNetice of Award
NOTICE OF AWARD
Date: January 23, 2020
Project:
Havens Acres Roadway Rehabilitation
Owner:
City of Riverdale
°wnnt's Contract No.:
Contract;
City of Riverdale - Havens Acres Roadway Rehabilitation
Bidder:
Brandt Construction, Co.
Engineer's Project No.:
10876057
Bidder's Address:
700 4th Street West
Milan, IL 61264
You are notified that your Bid dated 1/21/2020 for the above Contract has been considered. You are the
Successful Bidder and are awarded a Contract for Havens Acres Roadway Rehabilitation
The Contract Price of your Contract is Two Hundred Twenty Three Thousand Eight Hundred Eighty One
and no/100 Dollars ($223,881.00).
3 copies of the proposed Contract Documents (except Drawings) accompany this Notice of Award.
3 sets of the Drawings will be delivered separately or otherwise made available to you immediately.
You must comply with the following conditions precedent within [15] days of the date you receive this Notice
of Award.
1. Deliver to the Owner [ 3 ] fully executed counterparts of the Contract Documents.
2. Deliver with the executed Contract Documents the Contract security [Bonds] as specified in the
Instructions to Bidders (Article 20), General Conditions (Paragraph 5.01), and Supplementary
Conditions (Paragraph SC-5.01).
3. Other conditions precedent:
Failure to comply with these conditions within the time specified will entitle Owner to consider you in default,
annul this Notice of Award, and declare your Bid security forfeited.
Within ten days after you comply with the above conditions, Owner will return to you one fully executed
counterpart of the Contract Documents.
Copy to Engineer
City of Riverdale
Owner
By:
Authorized Signature
Title
EJCDC C-510 (2007 Edition)
Prepared by the Engineers Joint Contract Documents Committee
and endorsed by the Construction Specifications Institute.
00 5100-1
GAIOLLO07 INI76057 eelaiddiag sad CutrxUnggNetke of Award
Crm-rac-+-z�-
NOTICE OF AWARD
Date: January 23, 2020
Project:
Havens Acres Roadway Rehabilitation
Owner:
City of Riverdale
Owner's Contract No.:
Contract
City of Riverdale - Havens Acres Roadway Rehabilitation
Bidder.
Brandt Construction, Co.
Bidder's Address:
700 4th Street West
Engineer's Project No,.
10876057
Milan, IL 61264
You are notified that your Bid dated 1/21/2020 for the above Contract has been considered. You are the
Successful Bidder and are awarded a Contract for Havens Acres Roadway Rehabilitation
The Contract Price of your Contract is Two Hundred Twenty Three Thousand Eight Hundred Eighty One
and no/100 Dollars ($223.881.00).
3 copies of the proposed Contract Documents (except Drawings) accompany this Notice of Award.
3 sets of the Drawings will be delivered separately or otherwise made available to you immediately.
You must comply with the following conditions precedent within [15] days of the date you receive this Notice
of Award.
1. Deliver to the Owner [ 3 ] fully executed counterparts of the Contract Documents.
2. Deliver with the executed Contract Documents the Contract security [Bonds] as specified in the
Instructions to Bidders (Article 20), General Conditions (Paragraph 5.01), and Supplementary
Conditions (Paragraph SC-5.01).
3. Other conditions precedent:
Failure to comply with these conditions within the time specified will entitle Owner to consider you in default,
annul this Notice of Award, and declare your Bid security forfeited.
Within ten days after you comply with the above conditions, Owner will return to you one fully executed
counterpart of the Contract Documents.
Copy to Engineer
By:
City of Riverdale
Owner
Authorized Signature
Title
EJCDC C-510 (2007 Edition)
Prepared by the Engineers Joint Contract Documents Committee
and endorsed by the Construction Specifications institute.
00 5100-1
c:umtoa7svos76omspeuuddi.s and CorraetinglNoriee ar Award
NOTICE OF AWARD
Date: January 23, 2020
Project:
Havens Acres Roadway Rehabilitation
Owner:
City of Riverdale
Contract
City of Riverdale - Havens Acres Roadway Rehabilitation
Bidder:
Brandt Construction, Co.
Bidder's Address:
700 4th Street West
Owner's Contract No.:
Engineer's Project No.:
10876057
Milan, IL 61264
You are notified that your Bid dated 1/21/2020 for the above Contract has been considered. You are the
Successful Bidder and are awarded a Contract for Havens Acres Roadway Rehabilitation
[Indicate total Work, alternates, or sections of Work awarded.]
The Contract Price of your Contract is Two Hundred Twenty Three Thousand Eight Hundred Eighty One
and no/100 Dollars ($223,881.00).
[Insert appropriate data if unit prices are used. Change language for cost-plus contracts.]
3 copies of the proposed Contract Documents (except Drawings) accompany this Notice of Award.
3 sets of the Drawings will be delivered separately or otherwise made available to you immediately.
You must comply with the following conditions precedent within [15] days of the date you receive this Notice
of Award.
1. Deliver to the Owner [ 3 ] fully executed counterparts of the Contract Documents.
2. Deliver with the executed Contract Documents the Contract security [Bonds] as specified in the
Instructions to Bidders (Article 20), General Conditions (Paragraph 5.01), and Supplementary
Conditions (Paragraph SC-5.01).
3. Other conditions precedent:
Failure to comply with these conditions within the time specified will entitle Owner to consider you in default,
annul this Notice of Award, and declare your Bid security forfeited.
Within ten days after you comply with the above conditions, Owner will return to you one fully executed
counterpart of the Contract Documents.
City of Riverdale
Owner
By:
Authorized Signature
Title
Copy to Engineer