Loading...
HomeMy Public PortalAbout2003_06_10_r098The Town of Leesburg, rlrglnla RESOLUTION NO. A RESOLUTION: 2003-98 PRESENTED June 10 2003 ADOPTED June 10, 2003 APPROVING PERSHING AVENUE IMPROVEMENTS TO INCLUDE WDENING THE ROADWAY TO 36 FEET AND INSTALLING SIDEWALKS ON BOTH SIDES EXCEPT BETWEEN MARKET STREET AND THE ALLEY LOCATED AT APPROXIMATELY 650 FEET NORTH WHICH WILL BE 30 FEET WITH A SDEWALK ON THE WEST SIDE ONLY WHEREAS, Pershing Avenue is only 17 to 19 feet wide, without curb, gutter or sidewalk; and WHEREAS, the Wilson/Pershing Avenue Street Improvement Project is a funded street improvement capital project; and WHEREAS, the installation of curb and gutter, sidewalk, and drainage system improvements are necessary to better control stormwater runoff and to provide safe vehicular and pedestrian access; and WHEREAS, the Capital Projects Administrator and the Director of Engineering and Public Works recommend a 36-foot roadway width that will allow parking on both sides, or a 30 foot roadway width that will allow parking on one side only, in accordance with Design & Construction Standards Manual; and WHEREAS, the residents on both Wilson and Pershing Avenues have been kept informed of the status of this project and were invited to attend special neighborhood input meetings and Town Council meetings to learn about the project; and WHEREAS, comments from concerned neighbors and citizens have been received and reviewed by Town Council and town staff; and A RESOLUTION: -2- APPROVING PERSHING AVENUE IMPROVEMENTS TO INCLUDE WIDENING THE ROADWAY TO 36 FEET AND INSTALLING SIDEWALKS ON BOTH SIDES EXCEPT BETWEEN MARKET STREET AND'THE ALLEY LOCATED AT APPROXIMATELY 650 FEET NORTH WHICH WILL BE 30 FEET WITH A SIDEWALK ON THE WEST SIDE ONLY WHEREAS, a street width of 30 feet for Pershing Avenue from Market Street to to the alley approximately 650 feet north which will lessen the impact on existing trees, an old stone wall and homes. THEREFORE, RESOLVED by the CoUncil of the Town of Leesburg in Virginia as follows: Town Staff is directed to proceed with the following street widths and sidewalk locations for Pershing Avenue. From Market Street to the alley located at approximately 650 feet north of Market Street, widen the pavement to a consistent width of 30-feet, install concrete curb and gutter on both sides, install a concrete sidewalk on the west side only, and allow parking on the west side only. From the same alley north to the end of the street, widen the pavement to a consistent width of 36-feet, install concrete curb and gutter and concrete sidewalk on both sides, allow parking on both sides and install a cul-de-sac at the end. PASSED this l0th. day of June 2003. ATTEST: ff~l~k°fCo~ncil ~ Kristen C~. Um~stattd, Mayor ' C Town of Leesburg R03 :Pershing Avenue Street Improvements