Loading...
HomeMy Public PortalAbout2004_03_09_r029 Authorizing General Contractor Prequalification ProcessThe Town of Leesburg, Virginia RESOLUTION NO. 2004-29 PRESENTED: March 9, 2004 ADOPTED: March 9, 2004 A RESOLUTION: AUTHORIZING GENERAL CONTRACTOR PREQUALIFICATION PROCESS WHEREAS; the upgrade and expansion of the Water Pollution Control Facility (WPCF) from 4.85 MGD to 7.5 MGD will be advertised next month; and WHEREAS; the contractor for this expansion must be a well qualified contractor capable of performing this sophisticated, sensitive and delicate work; and WHEREAS; the Virginia Public Procurement Act (VPPA) allows municipalities to adopt prequalification process prior to implementation of such process; and WHEREAS; contractors be approved/denied at least thirty days prior to the date established for submission of bids; and WHEREAS; the bid opening date for the WPCF upgrade and expansion is currently scheduled for early May 2004. THEREFORE, RESOLVED by the Council of the Town of Leesburg in Virginia as follows: The Town Manager is hereby authorized to proceed with the attached procedures established by CH2M Hill, and Town Staff in compliance with VPPA documents attached herein for this prequalification. PASSED this 9_.~m day of March 2004. ff/~erk of Council 171415.DS.PQ ADVERTISEMENT FOR PREQUALIFICATION OF BIDDERS The Town of Leesburg, Virginia (OWNER) is conducting a prequalification process for the Upgrade and Expansion Project 7.5 at the Water Pollution Control Facility in Leesburg, Virginia and is accepting sealed Contractor's Prequalification Application Forms. The project will be bid separately. Sealed Contractor Prequalification Application Forms will be received at the following address: Town of Leesburg, 25 West Market Street, Leesburg, Virginia, 20178, Attention: Kathy S. Elgin, until ? ?, 2004, 2:00 p.m. local time. The forms will be opened and evaluated in accordance with the Virginia Public Procurement Act. Applications will be received and evaluated in private and a list of prequalified contractors will be made available to the public. Applications received after the specified date and time will be considered non-responsive. The Upgrade and Expansion Project 7.5 The estimated value of the Project is $25 to $30 million. It is anticipated that Invitations to Bid will be sent to prequalified bidders on or about March 22, 2004. The construction duration is expected to be 1000 days with a start in June of 2004. The work includes, but is not limited, to the following: 1. Influent Pump Station 2. Influent Receiving Box 3. Emergency Storage Tank 4. Two BNR Reactor Basins - E and F 5. Two Secondary Clarifiers - C and D 6. Diurnal Equalization Flow Splitter Structure 7. Modifications to the Existing BNR Reactor Basin Flow Splitter Structure 8. Modifications to the Existing BNR Reactor Basins A, B, C and D 9. Modifications to the Existing Secondary Clarifiers A and B 10.25 MGD Effluent Pump Station 11. Modifications to existing Effluent PS to become a W3 pumping station 12. Modifications to Solids Building to include a new Gravity Belt Thickener, replacement of existing Belt Filter Press Feed Pumps, and replacement of existing Grinders, addition of stairs at truck bay silo platform, addition of platform at pellet cooler 13. Odor Control Systems to include built-in-place biofilters for Primary Treatment Facilities and Influent Pump Station and prepackaged biofilter for Recycle Equalization Basin. Included with these systems are fiat aluminum covers on process basins and facilities and ductwork between process facilities and biofilters. 14. Regenerative Thermal Oxidizer (RTO) and ductwork at the existing Solids Processing Building 15. Solids Storage Pad Enclosure 16. WAS Receiving Station 171415.DS.PQ 00085 1 MARCH 1, 2004 ADVERTISEMENT FOR PREQUALIFICATION OF BIDDERS 171415.DS.PQ : ' 17. Five flow metering vaults 18. Electrical Substation, Transformers, etc. 19. Emergency backup generator and fuel storage and pumping system 20. Demolition of existing Influent Pump Station 21. Building and yard piping 22. Sitework, roads, piping and erosion control 23. Building and yard electrical work 24. Instrumentation and controls work Prequalification documents may be examined and downloaded from the Town of Leesburg Bid Board located at the web site www.leesburgva.org (under Town Services tab). For additional information regarding the proposed work, contact Bruce Mattheiss, CH2M HILL at 703-471-1441. Qualifications shall be submitted on Contractor's Prequalification Application Forms and in the manner specified in the Instructions for Prequalification. Only prime contract bidders who have been prequalified in accordance with the procedures indicated in the Instructions for Prequalification of Bidders will be allowed to submit bids for the project. Subcontractors are not required to be prequalified. Issuance of this Advertisement for Prequalification of Bidders does not commit the OWNER to award of any contract, to pay any costs incurred in preparation of a response, or to procure or contract for services or supplies. The OWNER reserves the right to waive any minor irregularities and informalities, to reject any and all responses, and to re-advertise. Dated this 9th day of March, 2004. Town of Leesburg, Virginia Robert S. Noe, Town Manager END OF SECTION 171415.DS.PQ 00085 MARCH 1, 2004 ADVERTISEMENT FOR PREQUALIFICATION OF BIDDERS 171415.DS.PQ CONTRACTOR'S PREQUALIFICATION APPLICATION FORM The OWNER requires a statement as to financial ability and experience to be completed and submitted by contractors who wish to be prequalified for bidding on this Work. No contractor is eligible to bid until the following form has been completely filled out and submitted in accordance with the Advertisement For Prequalification of Bidders and Instructions For Prequalification. Please place a check in the box if the information submitted on this form is to be regarded as a trade secret or as proprietary information. The Town of Leesburg Upgrade and Expansion Project 7.5 Submitted to: Address: Attention: By: Town of Leesburg (OWNER) 25 West Market Street, PO Box 88, Leesburg, Virginia 20178 Kathy S. Elgin A Corporation A Partnership Sole Proprietorship (CONTRACTOR) Type of Work: Principal Office: Contractor's Bonding Capacity: CONTRACTOR's Surety: Name Address Contact Contact's Phone Number Is the CONTRACTOR's Surety included on current U.S. Treasury Department list of acceptable surety corporations? YES NO 171415.DS.PQ 00040 1 MARCH 2, 2004 CONTRACTOR'S PREQUALIFICATION APPLICATION FORM QUESTIONNAIRE o 171415.DS.PQ How many years has your organization been in business as a contractor under your present business name? How many years' experience in the proposed type and size of construction work has your organization had as a general contractor: What is the construction experience of the principal individuals of your organization: Individual's Present Position Years of Magnitude & In What Name or Office Construction Type of Work Capacity Experience List below the individual(s) which your organization has committed to hold key management and supervisory positions on this work if your organization was awarded a contract. a. Name: Title: Total years of construction experience: Number of years experience in proposed position: Examples of magnitude and type of experience: Name of Owner Reference and Phone Number: Name: Organization: Telephone No.: 171415.DS.PQ 00040 2 MARCH 2, 2004 CONTRACTOR'S PREQUALIFICATION APPLICATION FORM bo Name: 171415.DS.PQ Title: Total years of construction experience: Number of years experience in proposed position: Examples of magnitude and type of experience: Name of Owner Reference and Phone Number: Name: Organization: Telephone No.: Name: Title: Total years of construction experience: Number of years experience in proposed position: Examples of magnitude and type of experience: Name of Owner Reference and Phone Number: Name: Organization: Telephone No.: 171415.DS.PQ 00040 3 MARCH 2, 2004 CONTRACTOR'S PREQUALIFICATION APPLICATION FORM do Name: 171415.DS.PQ Title: Total years of construction experience: Number of years experience in proposed position: Examples of magnitude and type of experience: Name of Owner Reference and Phone Number: Name: Organization: Telephone No.: Name: Title: eo Total years of construction experience: Number of years experience in proposed position: Examples of magnitude and type of experience: Name of Owner Reference and Phone Number: Name: Organization: Telephone No.: Using copies of the attached form show all low bid public wastewater and water projects greater than $5 million and less than $30 million which your organization has been contracted to perform work on in the last 10 years. Include only projects on which final payment has been received or which are substantially complete awaiting final payment. 171415.DS.PQ 00040 4 MARCH 2, 2004 CONTRACTOR'S PREQUALIFICATION APPLICATION FORM 171415.DS.PQ Virginia Class A Contractor's License Number , dated (If you do not currently hold a Virginia Class A Contractor's License, provide a detailed description of how you will obtain a license prior to the bid date.) o Has your organization or any of its officers, directors, or owners had judgement entered against him within the past 10 years for the breach of contracts for governmental or nongovernmental construction? YES NO If yes, give complete circumstances for each occurrence on a separate sheet(s) of paper. Attachment No. o Have any of your officers, directors, owner, project managers, procurement managers, or chief financial officers been convicted within the past 10 years of a crime related to governmental or nongovernmental construction or contracting? YES NO If yes, give complete circumstances for each occurrence on a separate sheet(s) of paper. Attachment No. Has your organization ever failed to complete a construction contract with a public body? YES NO If yes, give complete circumstances for each occurrence on a separate sheet(s) of paper. Attachment No. 10. Is your organization or any of your officers, directors, or owners currently debarred by any municipal, county, state, or federal agency? YES NO If yes, give complete circumstances for each occurrence on a separate sheet(s) of paper. Attachment No. 11. Has your organization ever been a party in any litigation of any type on work for which your organization was contracted by any municipal, county, state, or federal agency? YES NO If yes, give complete circumstances for each occurrence on a separate sheet(s) of paper. Attachment No. END OF SECTION 171415.DS.PQ 00040 5 MARCH 2, 2004 CONTRACTOR'S PREQUALIFICATION APPLICATION FORM CONTRACTOR'S Affidavit AFFIDAVIT FOR SOLE PROPRIETORSHIP 171415.DS.PQ STATE OF COUNTY OF I, SS being duly sworn, depose and say that the foregoing statements and answers to the interrogatories contained therein are correct and true as of the date of this affidavit. Subscribed and sworn to before me this My commission expires: (Applicant must also sign here) __ day of ,19__ Notary Public AFFIDAVIT FOR COPARTNERSHIP STATE OF COUNTY OF I, } } ss } partner of the firm of being duly sworn, depose and say that the foregoing statements and answers to the interrogatories contained therein are correct and true as of the date of this affidavit. Subscribed and sworn to before me this My commission expires: (Partner must also sign here) __ day of Notary Public 171415.DS.PQ 00040 6 MARCH 2, 2004 CONTRACTOR'S PREQUALIFICATION APPLICATION FORM STATE OF COUNTY OF I, AFFIDAVIT FOR CORPORATION } } ss } 171415.DS.PQ being duly sworn, depose and say that I am of the the corporation described herein and which executed the foregoing statement and that the foregoing statements and answers to the interrogatories contained therein are correct and true as of the date of this affidavit. Subscribed and sworn to before me this My commission expires: (Officer must also sign here) __ day of .,19 Notary Public END OF SECTION 171415.DS.PQ 00040 MARCH 2, 2004 CONTRACTOR'S PREQUALIFICATION APPLICATION FORM Project Name: Question 5, Response No. __ 171415.DS.PQ Contract or Project No. Original Completion Date Actual Completion Date Owner's Name: Value of Contract at Award Value of Contract at Completion Original Duration of Contract Owner's Contact Person's Name: Owner's Phone Number: Engineer's Name: Engineer's Contact Person's Name: Engineer's Phone Number: Your Organization's Project Manager's Name: Name of Bonding Company: Type of Bonds Furnished: MBE/WBE Requirement or Goal on Project? If yes, state requirement or goal and indicate if complied with. YES NO Any Litigation with Owner? __ YES If yes is answered for either litigation question, explain on separate sheet. Any other comments NO 171415.DS.PQ 00040 8 MARCH 2, 2004 CONTRACTOR'S PREQUALII~-'ICATION APPLICATION FORM 171415.DS.PQ INSTRUCTIONS FOR PREQUALIFICATION The Town of Leesburg Upgrade and Expansion Project 7.5 ° DEFINED TERMS. Terms used in the Prequalification Documents have the meanings indicated below which are applicable to both the singular and plural thereof. 1.1. Applicant--A Contractor who wishes to bid as a Prime Contractor and submits an application to the OWNER for prequalification. 1.2. Bidder--A prequalified Contractor who submits a Bid to OWNER on the prime contract, as distinct from a subbidder, who submits a Bid to a Bidder. 1.3. Final Completion--The point at which all contracted work is complete and the OWNER issues final payment. 1.4. Prime Contract--The Contract between the OWNER and the prequalified Contractor who is the low responsive bidder. 1.5. Responsible Contractor--All Contractors who wish to bid on the prime contract and have submitted a Contractor's Prequalification Application Form and meet the OWNER's minimum criteria for qualification to bid. 1.6. Substantially Complete--the point at which the OWNER has beneficial occupancy but all contracted work is not complete. PREQUALIFICATION DOCUMENTS. 2.1. Complete set of Prequalification Documents must be used in applying for prequalification. Neither OWNER nor ENGINEER assumes any responsibility for errors or misinterpretations resulting from use of incomplete sets of Prequalification Documents. 2.2. Prequalification Documents consist of the Advertisement For Prequalification Of Bidders, Instructions For Prequalification, and the Contractor's Prequalification Application Form. Prequalification Documents are available as noted in the Advertisement. 2.3. Prequalification Documents made available on the above terms are only for the purpose of establishing the Bidder's responsibility prior to requesting Bids for the Work and shall not be used for any other purpose. 171415.DS.PQ 00101 1 MARCH 1, 2004 INSTRUCTIONS FOR PREQUALIFICATION 171415.DS.PQ OWNER'S INTENT. 3.1. It is the intent of the OWNER to afford Contractors the ability to prove they are responsible prior to accruing the cost of preparing a bid. The OWNER also intends to prequalify only those Contractors who can show sufficient financial ability and appropriate experience to perform the construction work in question. QUALIFICATIONS OF APPLICANTS. 4.1. To demonstrate qualifications to perform the Work, each Applicant must prepare and submit to the OWNER written evidence of financial ability to perform the Work, past experience on projects similar in scope, duration, and volume, and other data called for in the Contractor's Prequalification Application Form. 4.2. The criteria used in examining Applicant's qualification shall include the following: 4.2.1. Applicant's financial ability to perform the Work. Applicant financial ability will be evaluated on the basis of its current capability to obtain all bonding necessary for the performance of Work guaranteed by an acceptable surety. Only sureties included on the current U. S Treasury Department list of acceptable surety corporations shall be deemed acceptable. 4.2.2. Applicant's experience to perform the Work 4.2.3. Existence of any judgements against the Applicant, Applicant's officer, director, or owner for breach of construction contracts within the last ten years 4.2.4. Applicant's substantial noncompliance with the terms and conditions of prior construction contracts with a public body without a good cause 4.2.5. Conviction of any Applicant's officer, director, owner, project manager, procurement manager, or chief financial official within the last ten years for crime related to construction or contracting 4.2.6. Debarment of any Applicant's officer, director, or owner from bidding or contracting by any municipal, state, or federal public body or agency within the United States 4.2.7. Timely response to the information requested in paragraphs 4.2.1-4.2.6 above. 4.3. The OWNER will examine and verify, in determining the qualifications of an Applicant, the information provided by the Applicant in the Contractor's Prequalification Application Form. The OWNER reserves the right to contact, as necessary, all concerned parties, including but not limited to owners, engineers, 171415.DS.PQ 00101 2 MARCH 1, 2004 INSTRUCTIONS FOR PREQUALIFICATION 171415.DS.PQ sureties, subcontractors, state and federal agencies, public bodies, and law enforcement agencies. 4.4. The OWNER expressly reserves the right to disqualify any Applicant if any data provided within the form indicates that the Applicant is not in compliance with requirements set forth in the Virginia Public Procurement Act, §2.2-4317 Prequalification Generally; Prequalification for Construction. 4.5. The Contractor's Prequalification Form is to be filled out in its entirety. Typewritten or legible black ink handwritten entries are acceptable. If it is found that information is omitted from the Application, the OWNER may reject the Application. 4.6. All information contained in the Contractor's Prequalification Application Form is considered confidential and shall not be shared with other Applicants. 4.7. The Town of Leesburg will evaluate each Applicant's Contractor's Prequalification Application Form. The Town will inform each Applicant of its prequalification status within 30 days prior to the bid due date, at which time a list of prequalified contractors will be made publicly available. 4.8. Nothing indicated herein will prejudice the OWNER's right to seek additional information necessary to determine Applicant's qualification. 5. EXAMINATION OF PREQUALIFICATION DOCUMENTS. 5.1. It is each Applicant's responsibility, before submitting an Application to promptly notify ENGINEER of all conflicts, errors, ambiguities, or discrepancies which Applicant has discovered in Prequalification Documents. 5.2. The submission of an Application will constitute an incontrovertible representation by the Applicant that Applicant has complied with every requirement of this article; that without exception the Application is premised upon furnishing the information required by the Prequalification Documents that Applicant has given ENGINEER written notice of all conflicts, errors, ambiguities, and discrepancies that Applicant has discovered in the Prequalification Documents, and the written resolution thereof by ENGINEER is acceptable to Applicant; and that the Prequalification Documents are generally sufficient to indicate and convey understanding of all terms and conditions for preparing the Application. 6. INTERPRETATIONS AND ADDENDA. 6.1. All questions about the meaning or intent of the Prequalification Documents are to be directed to ENGINEER. Interpretations or clarifications considered necessary by ENGINEER in response to such questions will be issued by Addendum mailed or delivered to all parties recorded by the office issuing documents as having received the Prequalification Documents. Questions received less than 5 days prior to the date 171415.DS.PQ 00101 3 MARCH 2, 2004 INSTRUCTIONS FOR PREQUALIFICATION 171415.DS.PQ for public acknowledgement of receipt of Applications may not be answered. Only questions answered by Addenda will be binding. Oral and other interpretations or clarifications will be without legal effect. 6.2. Addenda may also be issued to modify the Prequalification Documents as deemed advisable by OWNER or ENGINEER. CONTRACTOR'S PREQUALIFICATION APPLICATION FORM. 7.1. The Contractor's Prequalification Application Form and other attachments are included with the Prequalification Documents. Substitution of forms will be allowed only as noted. 7.2. All blanks on the Contractor's Prequalification Application Form must be completed by typing or printing with black ink. No changes shall be made in the phraseology of the forms. 7.3. Application by corporations must be executed in the corporate name by the president or a vice-president (or other corporate officer accompanied by evidence of authority to sign) and the corporate seal must be affixed and attested by the secretary or an assistant secretary. The corporate address and state of incorporation must be shown above the signature. 7.4. Applications by partnerships must be executed in the partnership name and signed by a partner, whose title must appear on the line below the signature. 7.5. All names must be typed or printed on the line with the signature. 7.6. The Application shall contain an acknowledgement of receipt of all Addenda. 7.7. The address and telephone number for communications regarding the Application must be shown. SUBMISSION OF APPLICATIONS. 8.1. Contractor's Prequalification Application Form and attachments may be photocopied for submission of Applications. 8.2. Submit Applications not later than the time prescribed, at the place, and in the manner set forth in the Advertisement. Enclose Applications in an opaque sealed envelope, marked with the Project title and name and address of Contractor and accompanied by the other required documents. If the Application is sent through the mail or other delivery system, the sealed envelope shall be enclosed in a separate envelope with the notation "CONTRACTOR'S PREQUALIFICATION APPLICATION FORM ENCLOSED" on the face of it. 171415.DS.PQ 00101 4 MARCH 1, 2004 INSTRUCTIONS FOR PREQUALIFICATION 171415.DS.PQ PUBLIC ACKNOWLEDGEMENT OF RECEIPT. 9.1. Application will be acknowledged publicly. A summary of the number of applications will be made available to all applicants within 7 days after the date of acknowledgement. END OF SECTION 171415.DS.PQ 00101 5 MARCH 1, 2004 INSTRUCTIONS FOR PREQUALIFICATION