HomeMy Public PortalAbout2004_12_14_r200The Town of
Leesburg,
Virginia
RESOLUTION NO.
A RESOLUTION:
2004-200
PRESENTED: December 14, 2004
ADOPTED: December 14, 2004
AUTHORIZING AN AMENDMENT TO THE CH2M HILL ENGINEERING
SERVICES CONTRACT #3130-FY03-01 (AMENDMENT NO. 4) FOR
EXPANSION OF THE KENNETH B. ROLLINS WATER TREATMENT
PLANT IN AN AMOUNT NOT TO EXCEED $1,712,900
WHEREAS, by Resolution No 2002-194 the Leesburg Town Council approved an engineering
services contract with CH2M Hill engineers identifying fourteen tasks, incorporating preliminary design,
final design, and construction services related to expansion of the Kenneth B. Rollins Water Treatment
Plant, to approximately 13 million gallons per day capacity; and
WHEREAS, CH2M Hill has completed the preliminary study and final design phases of the
contract, Task Nos. 1-8 and is prepared to proceed with Task Nos. 9-14 of Phase III, bidding and
construction services; and
WHEREAS, this amendment is within the Utility Fund project budget and contract limit; and
WHEREAS, the Director of Utilities recommends approval of this cost plus fixed fee contract
amendment in an amount not to exceed $1,712,900.
THEREFORE, RESOLVED by the Council of the Town of Leesburg in Virginia as follows:
The Town Manager is hereby authorized to execute contract Amendment No. 4 to the December
10, 2002 CH2M Hill Engineering Services Contract #3130-FY03-01 in an amount not to exceed
$1,712,900, in a form approved by the Town Attorney.
PASSED this 14th day of December 2004.
/~lerk of Council
~/R04Water Treatment Plant Amend No 4
~ C. U~'~st~tt~l,~
Town of Leesburg
CONTRACT AMENDMENT NO. 4
CONTRACT NO. 3130-FY03-01
Design and Construction Engineering Services
Kenneth B. Rollins Water Filtration Plant Upgrade and Expansion
This CONTRACT AMENDMENT NO. 4 is made and entered into by and between the
TOWN OF LEESBURG, VIRGINIA (the "Town") and CH2M HILL, INC. (the "Engineer") to
amend CONTRACT NO. 3130-FY03-01 (the "Contract") between the Town and Engineer
dated the 10~h day of December, 2002.
The parties hereby amend the Contract as follows:
Paragraph 1 - Provision of Services
Amend Attachment A - Scope of Services, Phase III - Services During Bidding and
Construction as follows:
Task 11 - On-Site Engineering Services
Delete the first paragraph and replace it with the following:
"The Engineer will provide full-time staffing for a project field office for a period
beginning with the notice to proceed with construction and ending after a duration
of 19.5 months. The project field staff will consist of the following personnel:
Resident Project Representative (RPR or Resident Engineer), Resident Inspector, and
project clerk. The RPR and clerk will serve the Town's wastewater treatment plant
project concurrent with this WFP project (half-time at each) and the Resident
Inspector will be assigned full-time to this WFP project. Following the 19.5 month
construction period, the RPR and clerk will provide half-time services for a period of
3 months to close out the project. The field staff will reside in field offices to be
provided and set-up by the Contractor in accordance with the terms of the contract
for construction. The Contractor will also bear all costs for the field office computers
and communication systems."
Task 12- Office Engineering Services
In the last paragraph, Record Drawings, delete the second sentence,
"in addition, show record information provided by the Town to show changes made
under previous construction contracts."
and replace it with the following:
"in addition, show record information from the Security System Improvements
Project (May 2002) and the Sludge Storage Tank Mixing Project (August 2002).
Record information from other previously completed projects will not be shown.
CH2M HILL will provide an additional 40 hours of drafting time to make other
Owner requested additions to our drawings, based on Owner marks made to our
drawings, or specific information and / or sketches furnished."
Task 13 - Startup and O&M Services
Subtask 13A, Prepare Process O&M Manual delete the first three sentences,
"Provide a comprehensive operation and maintenance (O&M) manual for the
upgraded and expanded WFP. The Town's existing WFP O&M manual will be used
as a basis for the new manual with revisions and additions made to incorporate the
upgrade project. Provide updates to the Town's Remote Sites O&M Manual to
incorporate any revisions or additions made at the remote sites under the upgrade
project."
and replace them with the following:
"The Town will provide the Engineer with an electronic copy of the current WFP
operation and maintenance (O&M) manual (prepared previously by Black &
Veatch). The Engineer will edit and add to the current manual to reflect the changes
made to the Manual under this WFP upgrade and expansion project. The Engineer
will make additional edits to the Manual based on mark-ups provided by the Town
to the Engineer. The Engineer will also provide update page(s) to be inserted into
the Town's Remote Sites O&M Manual to reflect the change from a leased line
communication system to a radio communication system."
Subtask 13B, Start-up Services, in the first sentence change 80 hours to 180 hours.
Task 14 - Application Software and PLC Programming (previously amended under Contract
Amendment No. 2)
Delete the first paragraph and replace it with the following:
"The Engineer will develop control system application software for the Project based
upon the Contract Documents and the existing plant conditions. The control logic
and system functions will be as show on the P&IDs and as further described in the
Loop Descriptions provided in the final Contract Documents. The Town will provide
the HMI hardware and system software. The construction Contractor will provide
the field instruments, wiring, radio telemetry system, and PLC hardware and system
software. A PLC development system with rack, power supply, software, etc., will
also be provided by the construction Contractor for use by the Engineer. The
following system software will be utilized for this project:
Version 2.6 of Concept for Modicon PLCs.
ObjectAutomation "OA Enterprise" software (current version) for HMI
screen development.
The Engineer will utilize and build upon the existing'applications software
previously developed by others for the existing portions of the plant and for the
remote SCADA sites. The Engineer will perform the following specific tasks:"
Delete Subtasks 14.A through 14.E and replace with the following:
"14.A Project Management: Provide project management, contractor coordination,
and quality control review during application software development. A maximum
of three software coordination meetings will be held with Town staff to ensure that
the software developed functions as desired and meets expectations. Prepare
software standards for PLC logic and HMI screen configuration. Software standards
will generally conform to those previously developed by the ENGINEER for the
Town's wastewater treatment facilities.
14.B Programmable Logic Controller (PLC) Programming: Provide programming
for one new PLC located in the new Chemical and Maintenance Building, and one
new Remote Input/Output unit located in the new Electrical Building. Also provide
minor program modifications to four existing PLCs throughout the plant (total of 50
new points added to existing PLCs). Total new I/O points for this project will not
exceed 400 points. A PLC development system will be provided by the Contractor
for use by the Engineer in developing the required applications software.
14.C Human Machine Interface (HMI) Programming: Provide Human Machine
Interface (HMI) programming for the new plant processes. The new screens will be
similar in style and format to the existing screens developed by others on previous
projects. A maximum of 20 new screens will be developed including process
graphics and trends. The existing HMI computers will remain in service.
14.D Modifications to Existing PLC Programs: Since the existing PLC ladder logic
programs throughout the plant and at remote facilities are not well documented, the
Engineer will provide analysis and reprogramming to bring the existing SCADA
system up to acceptable levels of documentation, standardization and reliability.
14.E Modifications to Existing HMI Screens: Provide HMI programming
necessary to accommodate process changes and upgrades implemented by this WFP
project. A maximum of 15 existing screens will be modified and linked to the new
and modified PLC programs."
Add the following subtasks:
"14.G SCADA Radio System Interface and Programming: Provide interface
coordination and programming for connection of the six existing remote PLCs to the
plant PLCs over a new SCADA Radio System. Update and modify applications
programs as required to maintain existing functionality with the new radio system.
14.H Testing and Documentation: Perform application software testing and
provide final documentation. Electronic files will be turned over to the Town along
with a single hard copy of all ladder logic and screen printouts at the end of the
project with all changes incorporated.
14.I Startup and Training: Provide apphcation software startup and training. A
maximum of 260 man-hours will be provided to load, debug, and startup the
software. A maximum of 40 man-hours will be provided for training of the Town's
operations staff. A maximum of 5 separate startup activities will be required to put
all facilities into service.
14.J - SCADA System Improvements and Enhancements: The Engineer will work
with Town staff to improve the existing SCADA system at the WFP and remote sites.
This work is anticipated to include providing the following system improvements:
Event logging for major equipment and processes including the
following:
- Startup of plant and time.
- Shutdown of plant and time.
- Change in raw water flow rate and time.
- Changes in all chemical dosages (i.e. parts per million)) and time.
(These pumps are anticipated to change because of the addition of
the new Chemical and Maintenance Building and new chemicals
and pumping systems):
· Ferric pumps 1 & 2.
· Caustic pumps 1 & 2.
· Lime feeders 1 & 2 (on/off).
· Carbon feeder (on/off).
· Fluoride pump.
· Hypochlorite pumps 1-6.
- Filters 1, 2, 3, & 4 online (any or all) and time.
- Filters 1, 2, 3, & 4 taken out of service (any or all) and time.
- Filter(s) being backwashed and time.
- Filter(s) in rewash and time.
Update the existing SCADA System O&M Manual including inserting
new Software Standards. The Town will provide the Engineer an
electronic copy of the current O&M Manual to edit and update.
Develop and provide an operator comment screen.
Design UPS units for all PLCs which do not have UPS power sources.
This will include remote station PLCs.
· Convert all existing PLC programs to Concept Version 2.6.
· Develop a warm backup OA server system for the plant.
· Correct OPC errors in existing system.
· Design and implement hard drive redundancy for OA server.
· Update SCADA system to latest version of OA software. This may
involve close coordination and assistance of Town IT staff and OA
representatives to implement new operating systems on HMI computers.
· Update all PLC wiring diagrams and provide as-built documentation.
· Recommend and implement a reporting software package that is easily
used and modified.
· Assist Town in updating existing security camera software for remote
police monitoring of the WFP.
· Assist Town with the purchase and installation of a new HMI computer
and OA operating license for the Control Building Lobby."
The Town and Engineer agree that this CONTRACT AMENDMENT NO. 4 is made part of
the CONTRACT between the Town and Engineer as wholly and completely as if same were
part of the original CONTRACT.
In witness whereof, the parties below execute this CONTRACT AMENDMENT NO. 4 this
__ day of ,2004:
TOWN OF LEESBURG
CH2M HILL, INC.
AUTHORIZED
WSIGNATURE
TN?j
Paragraph 4 - Contract Amount
The Engineer will perform the services for Task 9 - Contractor Pre-Qualification, Task 10 -
Bid Phase Services, Task 11 -On-Site Engineering Services, Task 12 -Office Engineering
Services, Task 13 - Startup and O&M Services, and Task 14 - Application Software and PLC
Programming (excluding Subtasks 14.F Control System Support Services and 14.J SCADA
System Improvements and Enhancements) on a Cost plus Fixed Fee basis. Costs are defined
in the CONTRACT. The Engineer will perform the services for Subtasks 14F Control
System Support Services and 14.J SCADA System Improvements and Enhancements on a
cost reimbursable/multiplier basis (i.e. time and expense) in accordance with Contract
Amendment No. 2.
The Cost Budget for Tasks 9, 10, 11, 12, 13 and 14 (excluding Subtasks 14Fand 14.]) services
represented by the sum of Direct Charges, Overhead, and Direct Expense Costs, shall not
exceed one million four hundred fifty five thousand five hundred forty five dollars
($1,455,545.00) including taxes, without a formal Amendment to the Contract. A change of
work scope is not a pre-requisite for said Amendment. The Fixed Fee for Tasks 9, 10, 11, 12,
13 and 14 (excluding Subtasks 14.F and 14.J)is one hundred fifty three thousand three
hundred fifty five dollars ($153,355.00). The Fixed Fee may not be increased, except in the
case of an Amendment to the CONTRACT that recognizes an increase in the scope of work,
cost budget, and related fixed fee.
The Total Cost Budget (time and expense) for Subtask 14.F shall not exceed sixty thousand
dollars ($60,000), $30,000 previously approved in Amendment no. 2, and the Cost Budget
for Subtask 14.J shall not exceed seventy-four thousand dollars ($74,000), including taxes,
without a formal Amendment to the Contract. A change of work scope is not a pre-requisite
for said Amendment.
The total amount for Contract Amendment No. 4 is $1,712,900.00
The following breakdown by task is provided solely as information for TOWN and
ENGINEER use:
Total Billable
Task Costs Fixed Fee Total
Original Contract
1 - Concept Study $51,140 $5,360 $56,500
2 - Pilot Study $44,590 $3,110 $47,700
Contract Amendment No. 1
3 - Pre-Design Development $181,500 $18,500 $200,000
4 - Vulnerability Assessment and $62,700 $6,300 $69,000
Emergency Response Plan
5 - Distribution System Modeling $27,500 $2,900 $30,400
Task
Contract Amendment No. 2
I Total Billable
Costs
Fixed Fee
Total
14.F - Control System Support $30,000 ] NA [ $30,000
Services
Contract Amendment No. 3
6 - Field Work $31,450 $1,650 $33,100
7 - Permitting $121,850 $3,150 $125,000
8 - Contract Document Preparation $525,900 $55,100 $581,000
Contract Amendment No. 4
9 - Contractor Pre- Qualification $5,965 $635 $6,600
10 - Bid Phase Services $36,900 $3,100 $40,000
11 - On-Site Engineering Services $746,830 $79,170 $826,000
12 - Office Engineering Services $460,000 $49,000 $509,000
13 - Startup and O&M Services $48,150 $5,150 $53,300
14 - Applications Software and PLC $157,700 $16,300 $174,000
Programming (excluding Subtasks
14.F and 14.J)
14.F - Control System Support $30,000a NA $30,000a
Services
14.J - SCADA System $74,000 NA $74,000
Improvements and Enhancements
Total Contract Amounts $2,636,175 $249,425 $2,885,600
a This amount is in addition to the amount shown under Contract Amendment No. 2