HomeMy Public PortalAbout2005_02_23_r032The Town of
Leesburg,
Virginia
PRESENTED February 23, 2005
RESOLUTION NO. 2005-32 ADOPTED February 23, 2005
A RESOLUTION: APPROPRIATING $150,000 FOR DESIGN AND CONSTRUCTION
OF A TRAFFIC SIGNAL AT THE INTERSECTION OF TOLBERT
LANE AND SYCOLIN ROAD.
WHEREAS, in the late summer of 2004, the Loudoun County park and ride facility was
relocated to the area of Miller Drive; and
WHEREAS, this relocation in addition to the residential construction occurring in the
Tavistock and Kincaid areas have led to increased traffic volumes on Sycolin Road. and at the
intersection of Tolbert Lane; and
WHEREAS, the intersection at Sycolin Road and Tolbert Lane satisfies the required
Manual on Uniform Traffic Control Devices (MUTCD) warrant for a traffic signal; and
WHEREAS, at the February l, 2005 meeting of the Loudoun County Board of
Supervisors, funding to the Town of Leesburg for design and construction of a traffic signal at
Tolbert Lane and Sycolin in the amount of $150,000 was approved from the Loudoun County
Gas Tax Fund.
THEREFORE, RESOLVED that the Town Council hereby appropriates $150,000 from
the Loudoun County Traffic Signal Contingency Account and the Gasoline Tax Fund for the
design and construction of a traffic signal at the intersection of Tolbert Lane and Sycolin Road.
PASSED this 23~ day of February 2005.
ATTEST:
(~lerk of Council
R05: Traffic Signal Tolbcrt/Sycolin Road
Town of Leesburg