HomeMy Public PortalAboutResolution 2020-45, Approving Final Payment McClintock Trucking & Excavating For Work Performed On Sanitary Sewer Rehabilitation Project (Phase11) -$6,800.00RESOLUTION 2020-45 A RESOLUTION APPROVING FINAL PAYMENT TO MCCLINTOCK TRUCKING & EXCAVATING FOR WORK PERFORMED ON THE SANITARY SEWER REHABILITATION PROJECT (PHASE II) FOR THE CITY OF RIVERDALE, IOWA WHEREAS, The City of Riverdale, Iowa ("City") is a Municipal Corporation, organized and operating under the laws of the State of Iowa, and; WHEREAS, On March 10, 2020, McClintock Trucking & Excavating was awarded a contract to clear scrub and other material away from the City's sanitary sewer line running through the Fieldcrest Drainage Way in the amount of $6,800.00 (ref. RESOLUTION 2020-27), and; WHEREAS, in late April of 2020, the required clearing was completed and the site was reviewed and approved by the City's engineering consultant, MSA Professional Services, allowing the City to consider the project complete, and; WHEREAS, McClintock Trucking & Excavating has submitted an invoice for services provided equaling $ 6,800.00, and; WHEREAS, the City's engineering consultant, MSA Professional Services, recommends making payment. NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF RIVERDALE, IOWA. Section 1. The City Council of Riverdale hereby authorizes the payment request. Passed and approved this 26th day of May 2020. APPROVED ATTEST ichael Bawde'W ayor Mary F ances Blevins, Clerk City of Riverdale, Iowa 110 Manor Drive, Riverdale, Iowa 52722 • (563) 355-2511 • www.riverdaleiowa.com 2117 State Street Suite 200 Bettendorf, IA 52722 P (563)445-3501 TF (888) 732-6321 F (563) 445-3503 www.msa-ps.com May 1, 2020 Mr. Michael Bawden Mayor City of Riverdale 110 Manor Drive Riverdale, Iowa 52722 Re: Sanitary Sewer Evaluation - Phase 2 Dear Mayor Bawden: JMSA RECEIVED lY�T 5 • e(va v The City of Riverdale entered into a Contract with McClintock Trucking and Excavating (Contractor) on March 18, 2020. The primary scope of work that the Contractor was to perform was to clear a 12-foot wide path to allow a trailer intended to haul televising equipment to enter and travel in this area. A secondary purpose was to provide a means for a future contractor to access this area for sanitary sewer repairs, cured in place lining, or sanitary manhole repairs that have to be performed. The extent of that work will not be known until MSA has completed the evaluation of the sanitary system in the programmed area. The amount of the Contract was $6,800.00. MSA evaluated the work completed by the Contractor on April 21, 2020. We found the work to be acceptable. Therefore, when invoiced, MSA recommends payment to the Contractor in full. Please contact us if you have any questions. Respectfully Yours, MSA Professional Services, Inc. Christian R. Cooper, P.E., CPESC. Project Engineer cc: Randy McClintock, McClintock Trucking and Excavating © 2020 MSA Professional Services G \10\10876\10876066\Correspondence\10876066 200501 Acceptance of McClintock Work.docx