Loading...
HomeMy Public PortalAbout2008_11_12_R174 Dominion Power The Town of Leesburg, Virginia PRESENTED November 12.2008 RESOLUTION NO. 2008-174 ADOPTED November 12.2008 A RESOLUTION: A. REQUIRING THAT DOMINION VIRGINIA POWER (DVP) BE HELD ACCOUNTABLE FOR ITS UNILATERAL DISREGARD OF IMPLEMENTATION OF THE SCC'S ORDER PUE 2005-00018 CONSTRUCTION OF THE POWER LINE IN THE TOWN OF LEESBURG B. REQUIRING THAT DOMINION POWER TAKE INTO CONSIDERATION THE SCC'S ORDER TO COMMUNICATE WITH THE TOWN'S RESIDENTS ABOUT THE CONSTRUCTION AND PLACEMENT OF THE POLES WHEREAS, on February 18,2008 the SCC ordered that a 230Kv transmission line be constructed throughout the Town of Leesburg. That pursuant to the terms of the order DVP was to communicate with the Town and its residents concerning the construction and the placement of the transmission line and poles within the Town. Further, DVP was to establish a point of contact from DVP so that information concerning the construction of the transmission line and pole placement could be properly communicated to the interested parties; and WHEREAS, that a portion of the transmission line and the placement of poles travels near a neighborhood commonly known as Wage Drive; and WHEREAS, DVP has purchased a residential lot in said area with the intent of demolishing a home in the neighborhood in order to obtain access to a pole that is to be placed in the Route 7 bypass VDOT right of way; and WHEREAS, DVP failed to notify the TOWN and the residents of the Wage Drive neighborhood as to the demolition of the home, placement of the pole, and any other information that the residents may have needed in order to offer a suggestion to minimize the impact of the pole; and -2- A RESOLUTION: DIRECTING DOMINION POWER TO ABIDE BY THE TERMS OF THE SCC ORDER PUE 2005-00018 IN BOTH ITS SPIRIT AND INTENT WHEREAS, this is but one of several instances whereby DVP has completely disregarded the terms of the SCC' s order and has not behaved in a manner that could minimize or mitigate the impact of the transmission line; and WHEREAS, subsequent to the purchase of the residence on Wage, DVP at the request of the Mayor and others agreed to participate in a community meeting with the residents of the Wage Drive neighborhood at which time alternate routes were suggested to DVP; and WHEREAS, an alternate route was proposed that would entail the transmission line to be relocated approximately 230 feet to the southeast of the present location as presently suggested by DVP, that said alternate would save over 200 feet (est.) of a mature tree line that acts as a visual buffer, noise barrier and also mitigates the damage to the view shed and the value of the surrounding properties; and WHEREAS, the Council strongly supports that repositioning of the pole; and WHEREAS, the Council has determined that U.S. Congressman Frank Wolf, State Senators Jill Vogel and Mark Herring and State Delegate Joe May have been supportive of the Town's position with respect to minimizing the impact of the transmission line within the Town of Leesburg and the relocation of the transmission line 230 feet to the southeast of the Wage Drive neighborhood. THEREFORE, RESOL VED that the Council of the Town of Leesburg in Virginia: 1. Request that U.S. Congressman Frank Wolf, Virginia State Governor Tim Kaine, State Senators Jill Vogel and Mark Herring and State Delegate Joe May use all means at their disposal to require that DVP cooperate with the Town and its' residents to minimize the impact of the transmission line and in this instance specifically in the Wage Drive neighborhood by moving the pole location approximately 230 feet -3- A RESOLUTION: DIRECTING DOMINION POWER TO ABIDE BY THE TERMS OF THE SCC ORDER PUE 2005-00018 IN BOTH ITS SPIRIT AND INTENT southeast of Dominion Virginia Power's initial proposal so that the pole is placed in close proximity to the Bypass thereby preserving all existing tree cover on the slope north of the Bypass. 2. Request that DVP abide by the terms of the SCC order and communicate with the Town and its' residents concerning the construction of the transmission line and the facilities that accompany the line. 3. Request that DVP provide necessary information to the Town concerning the construction of the transmission line for this project; specifically to include the costs of the transmission line (actual and estimates) for the overhead and underground sections that are included in the Modified D Route. 4. To pursue all legal remedies available to the Town should DVP continue to disregard the terms, spirit and intent of the SCC order PUE 2005-00018. PASSED this 1ih day of November. 2008. ~ Clerk of co\j ~l:~ ist . U stattd, Mayor Town of Lees burg