RESOLUTION NO. 2009-063
ADOPTED May 27.2009
A RESOLUTION: APPROVING A REVISION TO THE SCOPE OF WORK FOR THE
NORTH KING STREET STORM DRAINAGE IMPROVEMENTS
PROJECT
WHEREAS, in 2004, residents living along the west side of North King Street between Union
Street and Union Cemetery requested the Town to consider the construction of storm drainage
improvements; and
WHEREAS, Town Council approved the FY 2005-2009 CIP to include funding for a storm
drainage study in this area; and
WHEREAS, the drainage study was completed in 2006 and the solution was to extend the
proposed North King Street Storm Drainage Improvements project from Union Street to Union
Cemetery; and
WHEREAS, Town Council approved the FY 2008-2012 CIP to include these improvements in
the list of "Potential Future Capital Projects"; and
WHEREAS, these improvements were not added to the scope of work for the North King
Street Storm Drainage Improvements project because of the necessity to remove two large specimen
ash trees in front of 307 North King Street which delineated the "gateway" to the historic district of
Town; and
WHEREAS, during the tree removal phase of the North King Street Storm Drainage
Improvements project, the Town's Urban Forester and the contractor's arborist determined that the
two large ash trees in front of 307 North King Street needed to be removed due to deterioration, impact
of root pruning necessary for waterline installation and the potential for emerald ash borer disease; and
- 2-
A RESOLUTION: APPROVING A REVISION TO THE SCOPE OF WORK FOR THE
NORTH KING STREET DRAINAGE IMPROVEMENTS PROJECT
WHEREAS, in light of the removal ofthese two trees, residents renewed their request that the
Town install a sidewalk and curb/gutter and construct a storm drain from Union Street to Ida Lee Park;
and
WHEREAS, the scope of work for the North King Street Storm Drainage Improvements
project must be revised and the project budget must be increased in the amount of $250,000; and
WHEREAS, the revised work would include curb and gutter from Union Street to the Ida Lee
Park trail that is immediately adjacent to Union Cemetery, storm drain pipe and inlets along North
King Street from Union Cemetery tying into the North King Street Storm Drainage Improvements
project at Union Street, brick sidewalk from Union Street (heading north) to just past the last house
(309) on North King Street and asphalt trail from the end of the brick sidewalk to the Ida Lee Park
trail.
THEREFORE, RESOLVED by the Council of the Town of Lees burg in Virginia that the
scope of work for the North King Street Storm Drainage Improvements project budget be increased by
$250,000 and the scope ofthe project be revised to include curb/gutter, storm drainage, brick sidewalk,
and asphalt trail from Union Street to the Ida Lee Park trail.
PASSED this 27th of May 2009.
~\~~r~~
Kristen C. Umstattd, Mayor '
Town of Leesburg