Loading...
HomeMy Public PortalAbout03-13-2012 BFO report Town of Watertown Town Council Committee of the Budget and Fiscal Oversight Report of the Meetings of February 6, 13, 22, 27 and March 5, 2012 Report Date: March 13, 2012 The purpose of the meetings was to review the Town's FY2013-FY2017 Capital Improvement Program(CIP) as submitted by the Town Manager on January 11, 2012, and to make recommendations to the Town Council. (See http://www.watertown-ma.2ov/DocumentView.asnx?DID=4040 The Committee convened on February 6, 2012 at 7:00 pm. Present were Vincent Piccirilli, chair; Angie Kounelis,vice chair; Cecilia Lenk, secretary; Town Manager Michael Driscoll; Town Auditor Tom Tracy; and Treasurer/Collector Phyllis Marshall. The discussion included: • Mr. Driscoll gave an overview of the FY 2103-17 CIP program and FYI I and FY12 loan orders. • Ms. Marshall presented the CIP items for the Departments of Administration, Information Technology, Fire, Library, Police, Senior Center, and Skating Arena. • There was an initial discussion of the Energy Services Company(ESCO) audit by Johnson Controls and potential budget impact of executing the work. • Mr. Tracy presented an interest and principal cost analysis of the CIP. The meeting adjourned at 9:30 pm. The Committee reconvened on February 13 at 7:00 pm. Present were Mr. Piccirilli, Ms. Kounelis, Ms. Lenk, Mr. Driscoll, Mr. Tracy and Ms. Marshall. Also present were Vice President Stephen Corbett; Superintendent of Public Works Gerald Mee; and Recreation Director Peter Centola. Discussion included the following: • Councilor Corbett asked to present a funding request to the Committee for a project that was not included in the CIP. He presented the phased proposal by Friends of the Riverfront that was developed as part of the ongoing discussion with the State to allocate funding for the Watertown Riverfront Park Restoration Project(see attachment A). Councilor Corbett asked the Committee to consider recommending that the Town Council allocate up to $100,000 to fund a portion of the $1.635M riverfront restoration project. He noted that this commitment would assist in moving the State forward to funding the project. Importantly, he noted that any funding by the Town would need to be at least matched by other stakeholders. • Mr. Centola presented the parks and recreation CIP items, focusing on the 552 Main St and Casey Park renovations. The Committee asked for an informational presentation at the February 28th Town Council meeting about the plans for these two parks. • Mr. Mee presented the Public Works projects (see attachment B). He noted the use of MWRA funding to undertake a number of projects within the town to address potential problems related to water, drain and sewer systems. For the proposed local road projects for 2012, the Committee requested that the updated Roadway Management Study be referred to the Committee on Public Works before further discussion took place. Budget and Fiscal Oversight Committee Report—March 13, 2012 • Mr. Tracy presented a summary of the available balances in the DPW capital account (see attachment Q. The total as of 2/9/12 is $9,288,397 consisting of$5,699,014 in capital accounts, $484,755 in bonded funds, and$3,104,628 in non-bonded funds. Of the $9.3M, the summary shows 73.7% is sewer funds, 4.6%water funds, 10.1% streets and sidewalks, and 11.6% for buildings and equipment. The Committee adjourned at 9:30 pm. The Committee reconvened on February 22 at 5:30 pm. Present were Mr. Piccirilli, Ms. Kounelis, Ms. Lenk, Mr. Driscoll, Mr. Tracy and Ms. Marshall. Also present were President Mark Sideris; School Committee member and chair of Buildings and Grounds subcommittee Michael Shepard; Director of School Business Services Jack Loughran; Director of School Facilities Jay Francione; and Beth Greenblatt of Beacon Integrated Solutions. The discussion was to review the proposed ESCO agreement with Johnson Controls and the implications for Town and School budgets: • Councilor Piccirilli explained the overall goal of an ESCO agreement—to save energy and energy-related costs—is one of the Town's Budget priorities. In December 2011 Johnson Controls submitted a detailed baseline energy audit of all Town and School buildings to the Town; and outlined a proposal for capital investment in building updates/renovations and an ongoing management plan to achieve energy-savings. In the ESCO plan submitted by Johnson Controls,the Town would need to borrow $8M to implement the energy-related Town and School building updates and renovations. Money currently in the Town and School budgets for energy-related operating expenses that would be saved by the energy conservation upgrades would be redirected and applied to pay the debt service on this loan. Johnson Controls would manage the implementation of the updates/renovations and monitor energy usage. The contract would guarantee a certain level of energy-savings. • Ms. Greenblatt, a consultant who was recently engaged by the Town to oversee the analysis of the proposed agreement,presented an overview of her company's background and review of the required due diligence and risk management assessment necessary before committing to an ESCO agreement(see attachment D). Following Ms. Greenblatt's presentation of the Johnson Control proposal, the Committee agreed that because of the need to do a thorough due diligence, it was not possible to consider the ESCO agreement in developing the FY2013 budget. The Committee adjourned at 7:45 pm. The Committee reconvened on February 27 at 7:00 pm. Present were Mr. Piccirilli, Ms. Kounelis, Mr. Driscoll, Mr. Tracy and Ms. Marshall. (Ms. Lenk was out of town) Also present were Mr. Loughran; Mr. Francione; and Anne Hardiman, Principal of the Hosmer School. . The discussion was to review the school department CIP items: • The School subcommittee on Buildings and Grounds met on February 10 to develop the information presented this evening. • Mr. Francione presented a list of how the approximately $197,000 in capital fund balances will be spent before the end of this fiscal year(see attachment E). • Mr. Loughran will send an updated list of how the approximately $161,000 of the balance of$358,921 in capital funds was spent (see attachment F). Page 2 of 7 Budget and Fiscal Oversight Committee Report—March 13, 2012 • Mr. Francione presented the list of FY2013 projects to be done in the summer of 2012 (see attachment G). This work totals $442,300. • Ms. Hardiman discussed the $95,000 item for the Hosmer Connections/Autism Awareness program. The funds are to develop the architectural plans and a cost estimate, not for the actual construction work. • There was further discussion on CIP items in future years and it was noted that the School Committee needs to develop a long-term vision for programming to insure the capital spending is aligned with those needs. • It was noted that the work on the new phone system was about two-thirds done, and was expected to be complete by the end of the FY2012. The Committee adjourned at 9:10 pm. The Committee reconvened on March 5 at 7:00 pm. Present were Mr. Piccirilli, Ms. Kounelis, Ms. Lenk, Mr. Driscoll, Mr. Tracy and Ms. Marshall. Also present were Councilors Anthony Palomba and Ken Woodland; and Mr. Francione. First,there was follow-up discussion on CIP items from previous meetings: • As a follow up to the February 281h informational presentation on the proposed 552 Main Street park renovations, Councilor Woodland said that he would be holding a community meeting with neighbors and the Recreation Department to discuss the proposed plans prior to a final approval. The Committee felt that funding for the project should not be held up, but the concerns of the neighborhood should be addressed before the project is put out to bid. • Councilor Kounelis felt there may be safety issues with the chain link fencing surrounding the Casey Park ice rink, and asked Mr. Driscoll to provide some additional information to the Council on this. • Councilor Piccirilli noted that the DPW did not provide the updated list of pending road projects for which funding has not been identified, and asked that Mr. Mee provide this list when he returns. Next, the Committee voted unanimously to make the following conceptual recommendations to the Town Council regarding the FY2013 Capital Improvement Program: 1) The Comprehensive Master Plan will be funded from FYI reserve funds, with a transfer request to be brought forward in April or May 2012 for a vote of the Town Council. 2) In last year's recommendations, Ms. Marshall was asked to work with bond counsel to use bonded funds left over from the purchase of the new pumper in FYI to be allocated to the purchase of the new ambulance in FYI 1,but it turns out that this is not allowed because the FYI bond was for equipment with a 20 year life, and the ambulance has only a 10 year useful life. Therefore these leftover funds should be applied to the new pumper truck in the proposed FY12 loan order, upon a vote of the Town Council. Page 3 of 7 Budget and Fiscal Oversight Committee Report—March 13, 2012 3) For the 552 Main Street park renovations, the intention was to use the approximately $300,000 in funds left over from the construction of the new police station on the park along with a $200,000 loan order. However park renovations have only a 15 year useful life, so this is not permitted as the bond was for 20 years. Therefore approximately $300,000 in accrued FY10, FYI I and FY12 tax revenue recreation capital funds will be used instead to partially fund the renovations. In addition, the Recreation Department shall make an updated presentation to the Town Council to answer the concerns of the neighborhood about the 552 Main Street park renovations, prior to sending the project out to bid. 4) For the balance of the proposed FYI I loan order totaling $1,025,000 (top of page 3 of the CIP), the recommendation were to make the following changes to reduce the total to $862,000: a) Purchase the public works equipment swap loader and sidewalk tractor. b) Purchase the ambulance, $210,000 and the senior shuttle bus, $110,000. c) Proceed with the 552 Main St recreation improvements using $200,000 in bonded funds. d) Defer the fire building improvements of$138,000,pending architect's design review and issuance of specifications. e) Reduce the skating rink improvements to $25,000 based on a new estimate for cost of the compressors. 5) For the revised proposed FY 12 loan order totaling $730,000 (bottom of page 3 of the CIP), the recommendation were to make the following changes to reduce the total to $645,000: a) Move forward with the new fire pumper truck to replace a 1994 model, for $515,000 minus the leftover funds of approximately $70,000. b) Move forward with the $150,000 IT equipment consisting of a $40K MUNIS server, $60K for a network server, and$50K in GIS expansion to add assessors, DPW,police, fire, and census data from the clerk's office. c) Move forward with $50,000 police equipment consisting of$12,500 for tactical bullet-proof vests, $18,000 for an evidence photo validation system, and $19,500 for two new speed radar trailers to replace the two older units. d) Remove the $15,000 in fire equipment which was for a radio comparator transceiver. This will be funded from tax revenues, and the department has applied for grants. 6) Regarding the Energy Services Company(ESCO)project, the administration will not be able to complete the due diligence required to proceed with this project, prior to the April submission of the FYI budget. Therefore, the recommendation is for both the Town Manager and the School Committee to proceed with the development of their FYI budgets without the ESCO project, while continuing with the process to implement the ESCO project in the FY14 budget. Page 4 of 7 Budget and Fiscal Oversight Committee Report—March 13, 2012 7) For School Department projects: a) About$197,000 remains of the $358,921 unspent capital fund balance from a year ago, and school department will spend this on the remaining projects as presented,prior to June 30, 2012. b) Recommend proceeding with the borrowing and/or appropriation of$442,300 for FYI for the school department to use on the projects indicated in the revised FY2013-FY2017 Capital Improvements list, with work to be done in the summer 2012. 8) For street and sidewalk construction, recommend proceeding with the $2.5M borrowing for FYI to be used for summer 2012 projects as identified in the CIP Scenario A in the updated Pavement Management Program presented on February 21, 2012, with the final list of streets to be done using local funds to be referred to the Committee on Public Works for review and recommendations prior to the commencement of work. 9) For the police department shotgun replacement of$11,500, this item will be removed from the CIP as the department will seek other funding sources such as grants. 10)For the DPW parks division greens groomer/sweeper of$22,700, this item will be removed from the CIP as the department will use existing parks capital funds. 11)Regarding Vice President Corbett's proposal for the Town to provide up to $100,000 towards the overall $1.635M construction cost of the Watertown Riverfront Park Restoration Project, the Committee agreed in principle as follows: a) The concept has merit as a means to move the project up the priority list with the Department of Conservation and Recreation, because it is currently on hold due to lack of construction funding from the state. b) The potential contribution from the Town can be used to leverage donations from other stakeholders, and the amount of the Town's contribution may be dependent on what other stakeholders contribute. c) The funds should only be used for a phase of the project worth at least$500,000. d) The use of the funds would be contingent upon release of construction funds by the state for the entire phase. e) Any potential Town contribution should be allocated from available FY2012 reserve funds, with the transfer being made in FY2012. f) This issue should be placed on the agenda as a separate item for the Town Council to vote on. 12)The DPW shall provide this Committee with an updated list of all proposed or pending capital roadway projects, whether or not the funding sources have been identified, and the Committee recommends that such a list be include as part of the CIP package in future years. Page 5 of 7 Budget and Fiscal Oversight Committee Report—March 13, 2012 Finally, the Mr. Driscoll presented the following report on how the Committee's conceptual recommendations would affect the CIP line item and overall FY 2013 budget, if adopted by the Town Council: a) The assumptions in the November 9, 2011 Preliminary Budget Overview expenditure forecast were revised, first based on the CIP dated 1/11/12 on February 6 (see attachment H dated 2/6/12). The revised expenditure forecast for debt and interest for FY2013 (page 49 of the attachment)was reduced by $966,258 from $8,127,050 to $7,160,792,primarily by moving the $2.5M street and sidewalk borrowing from FY2012 to FY2013. FY2014 was reduced by $872,638 and FY2015 was reduced by $35,830. b) Debt and Interest payments in FY2013 would be reduced by $234,450, consisting of a reduction in principal of$28,000 and a reduction in interest of$206,450,per the difference between the two CIP cost analyses provided by Mr. Tracy. The original analysis (see attachment I) is per the CIP dated 1/11/12 and shows the items that would be deleted in red and the items that have been deferred in yellow. The revised analysis (see attachment J) is based on the Committee's recommendations. c) Total FY2013 debt and interest would be $6,926,342, consisting of revised November 9, 2011 estimate of$7,160,792 minus $234,450 in additional debt& interest reductions (see attachment K dated 3/5/12,page 49). d) Total FY2013 Capital Spending would be $7,830,767, consisting of$6,926,342 in debt and interest plus $904,425 on non-debt capital expenditures (see attachment K page 50). e) The $234,450 in additional debt and interest reductions will further reduce the FY2013 expenditure assumptions from$102,184,279 to $101,949,829 (see attachment K page 55). f) Based on the latest FY2013 expenditure assumptions of$101,949,829, the total FY2013 capital spending of$7,830,767 would be 7.69% of the budget. g) Based on the latest FY2013 revenue assumptions of$101,817,183, the total FY2013 capital spending of$7,830,767 would be 7.7 % of the budget. h) The Committee feels this meets the FY2013 Budget Policy Guideline that the Town should seek to make capital expenditures (including debt and exclusive of enterprise funds) equal to at least 7.5-8% of the operating budget. The meeting adjourned at 8:30 pm. Submitted by Cecilia Lenk, Secretary Page 6 of 7 Budget and Fiscal Oversight Committee Report— March 13, 2012 List of attachments: A. Watertown Riverfront Park Restoration Project Phased Costs B. Public Works Memo 2/13/12 Capital Expenditures (12 pages) C. Summary of DPW Capital Funds as of 2/9/12 (2 pages) D. Presentation by Beacon on Energy Saving Performance Contracting(5 pages) E. School Department Proposed Use of Existing Unspent Capital Funds from prior year F. School Department Expenditure of Existing Unspent Capital Funds from prior year G. School Proposed FY2013-2017 Capital Improvement Projects, revised 2/28/12 (6 pages) H. November 9, 2011 Preliminary Budget Expenditure Forecast page 49 revised 2/6/12 I. CIP Principal & Interest Analysis per original CIP dated 1/11/12 (2 pages) J. CIP Principal & Interest Analysis per recommendations 3/5/12 (2 pages) K. November 9, 2011 Preliminary Budget Expenditure Forecast revised 3/5/12 (3 pages) Page 7 of 7 SALTONSI ALL GATT.''. I7MING ST GATE GALL F'°F'.Y F kA)' P "RKINS MLL Entry $75 K Entry $150 K Demo Court $20 K Path $105 K Bank Stabilization $20 K Bank Stabilization $20 K Path $135 K Paul Street $40 K Granite Steps $25 K Wetland $55 K Road Improvement $55 K Hiking Trail $45 K Monument $40 K Path $165 K Bank Stabilization $15 K Deck $40 K Fishing Stone $10 K Deck $40 K Granite Overlook $35 K Granite Steps $35 K 1 $170 K Beach $25 K Gallery Forest $35 K Fishing Stone $10 K Granite Steps $35 K $295 K $275 K Braille Indicators $45 K Fishing Stone $20 K $566 K Children's Play $P05 K 5 500 K Signaled Crossing $135 K $690K Lj.`I�C,aY fro�r �..` " -m M ~` r M`ewe 1 l � S A S A K I �n iw xa Watertown Riverfront Park Restoration Project Jpper Charles River Basin, Nater tow n,Massachusetts ]B3� TOWN OF WATERTOWN DEPARTMENT OF PUBLIC WORKS (P)617-972-6420 124 ORCHARD STREET (F)617-972-6402 WATERTOWN MA 02472 Gerald S. Mee Jr. Superintendent TO: Michael J. Driscoll Town Manager FROM: Gerald S. Mee, Jr. Superintendent DATE: February 13, 2012 RE: Capital Expenditures As requested, below is a projection for Capital Expenditures of available balances. As you are aware we have long been wrestling with a number of potential problems related to water, drain and sewer systems. We have been fortunate with the availability of MWRA funding sources to move a number of projects forward and plan on continuing with the utilization of these funds. Attached you will find the next round of projects utilizing the MWRA local pipe line assistance program, as well as utilizing the MWRA Inflow and Infiltration funding. MWRA Funding Attachments Below is a list of current and ongoing projects utilizing local funding sources titled by project: Hovey Street As you will see with the MWRA funding sheets we are utilizing I&I funding to replace the Hovey Street sewer line which is in very poor condition and hinges on possible emergency action. This sewer line is approximately 15 to 20 feet deep and will require substantial excavation encumbancing almost the entire roadway after an excavation angle of repose is applied to the excavation. We anticipate the disruption and loss of the drain K:ITown ManageHCapitol BudgMCaptiol2-13-2012 Update.Doe -I- system and the related catch basin structures and catch basin lateral drain line connections. We also anticipate disruption to the existing water main requiring water main and service line replacement as well. As you can imagine with all these utilities affected from this extremely deep excavation, we will also be forced to perform road reconstruction. Therefore, I will be reserving two specific related accounts to perform the construction activities on Hovey Street. #5542 Sewer/ Road/ Improvements $1,179.924.30 #610058 Drain Improvements $ 671,000.00 Sewer/ Drain System Relining Various Locations Town-Wide Environmental Protection Agency Related As you are aware for a number of years we have been mandated by the EPA to locate and eliminate cross connections and or physical locations of the sewer system to the drain system. Over the years we have been very successful in addressing a number of locations, however, in the past two years the issues have dramatically changed from cross connections / physical connections to system communications. This is where the sewer and drain line run parallel in close proximity or cross each other allowing the sewer system to infiltrate into the drain system commonly referred to as communications. We have various locations where we are investigating this scenario and numerous other locations that hold a high potential for communication. We have determined that the most effective and efficient means to address this situation is through non excavation relining. Not only will this address the communication concerns but will also rejuvenate each and every pipe relined as well as preventing inflow and infiltration through ground water entering the sewer system through old open joints in the system. Therefore, we are committing funds to address a Town-Wide program. #610258 Sewer Improvements $ 600,000.00 This project is currently underway in the investigative phase devising a list of locations, bid documents have been requested and are being prepared by Stantec Engineering. K:ITown ManagerlCapitol BudgetlCaptiol2-13-2012 Update.Doc -2- Arsenal Street Sewer Line in the Watertown Mall Area As you are aware this department experienced the potential for a very serious sewer system collapse on Arsenal Street in front of the Watertown /Arsenal Malls. TV inspection of this line revealed a large portion of the pipe missing including multiple locations showing fatigue and misshaping of the 15 inch clay sewer line which is approximately 18 feet in depth below Arsenal Street. My department was successful in performing interim repairs to prevent the collapse. However, we must move forward with the rehabilitation and replacement of this line. Due to the depth of 18 feet this project will become extremely complex and require rehabilitation of many additional utilities which will be disrupted because of the excavation. Therefore, we have committed funds to address this Arsenal Street sewer replacement. #610258 Sewer Improvements $ 625,000.00 Carroll Street Road Reconstruction As you are aware it was the department's intention to move forward in FY12 with the renovation of Carroll Street utilizing water/sewer funds as utility construction on this street had adversely affected the road conditions. Carroll Street did not move forward as it is aligned and combined with the Waverley Avenue project which experienced numerous delays related to unforeseen drain conditions and unforeseen bid protests. Therefore, we had previously committed #610258 to $660,000.00 Waverley Avenue As you are aware it was the department's intention to move forward in FY12 with the renovation of Waverley Avenue utilizing water/sewer funds as utility construction on this street had adversely affected the road conditions. This project did not move forward due to numerous delays related to unforeseen drain conditions and unforeseen bid protests. Therefore, we have previously committed #610258 to $1,120,000.00 Sewer / Drain System Relining Various Locations Town-Wide K:Town ManagerlCapitol BudgMCaptiol2-13-2012 Update.Doc -3- Ehm(,'onmental Protection Agency RelatedtC- As you are are for a number of years we have been mandate0y the EPA to locate and eliminate c s connections and or physical locations oft sewer system to the drain system. Over the years we have been very successful in addressing a number of locations, however, in the past two years the issues have dramatically changed from cross connections / physical connections to-s�y stei�•r-oi-nmunications. This is where the sewer and drain line run parallel in close proxiTAy or cross each other allowing the sewer system to infiltrate into the drain systeMr com_mgonly referred to as communications. We have various locations where we are investigating this scenario and numerous other locations that hold a high,V-6,tential for commu ation. We have determined that the most effective and efficient means to address this shration is through non excavation relining. Not drily will this address the communica"n concerns but will also rejuvenate each and every pipe relined as well as preventing inf ow and infiltration through ground water entering the sewer system through old open joints in the system. i Therefore, are committing funds to address a Town-Wide program. #61jD258 Sewer Improvements _. $-6a0�00070d --a #610258 PY Sewer Improvements Balance Sheet Carroll Street Road Improvements $ 660,000.00 Waverley Avenue Road improvements $1,120,000.00 Sewer Lining Project $ 600,000.00 Arsenal Street Rehabilitation $ 625.000.00 $3,005,000.00 Giving consideration to unforeseen conditions, I will be carrying a $318,000.00 contingency. Balance Sheet Total including contingency $3,323,892.00 Pleasant Street Mitigation Funds K:7own ManagerlCapitol BudgetlCaptiol2-13-2012 Update.Doc -4- Prior to the start of construction of Pleasant Street, the town secured funds from the 555 Pleasant Street project which was used to enhance and rebuild the section of Pleasant Street in front of the referenced property, which included the installation of a traffic signal at the entrance to 555 Pleasant Street and across from what was proposed to be the main entrance to the Russo's Fruit property. This construction work was performed to align with the proposed Pleasant Street reconstruction administered by Mass Highway Department. Originally through discussion with the Department of Public Works, the Planning Department and the Traffic Commission Russo Fruit Company was required and agreed to pay for the traffic signal installation as referenced above; which was originally paid for through the 555 Pleasant Street mitigation monies. Currently the Repton mitigation fund has an available balance of$205,000 and the Russo mitigation fund has a balance of$80,000. These funds as they relate to Pleasant Street should be held to cover any unforeseen overages on the Pleasant Street project. If we are successful completing the project without overages, I believe these funds should be held and used on the Waltham Street road reconstruction, as it closely relates to Pleasant Street and the requirements for these dollars will have already been met through the Pleasant Street corridor funded utilizing state and federal transportation dollars. #5050 MWRA I&I MRAP5-36-355B shows an available balance of$49,324.41 This project is not fully closed out and should remain open until completion approved by the department and the consultant. #5061 Loan Order 08-38 MWRA Sewer Bid shows an available balance of $263,223.00 This project is not fully closed out and should remain open until completion approved by the department and the consultant. #5066 MWRA I&I Phase IV shows an available balance of$18,129.90 This project is not fully closed out and should remain open until completion approved by the department and the consultant. #5067 MWRA Local Pipe Line Assistance shows an available balance of $152,426.03 K:ITown ManageACapitol BudgetlCaptiol2-13-2012 Update.Doc -5- This project is not fully closed out and should remain open until completion approved by the department and the consultant. #5508 Cemetery Expansion The department has completed survey work for Ridgelawn Cemetery and is currently awaiting the installation of stone bounds between property lines after which time we will be installing chain link fence and bushes along the Waltham property line. We will be soliciting comments from the Public Works Sub Committee regarding how the cemetery expansion will move forward. This account#5508 is regarding cemetery expansion has an available balance of $231,323.01. #5515 DPW Renovations These funds are proposed to be used for expansion of the DPW garage area due to the loss of the Victory Field parks facility. This account#5515 has an available balance of$368,284.29 #5541 FY10 Water System Improvements This account will be used for replacement of water services on the portion of Waverley Avenue outside of the recent water main project, as well as fire hydrant replacement and potential interconnect of intermediate high water system to the normal water system in the area of Worcester Street and Fitchburg Street on Waverley Avenue. This project was delayed due to the drain system difficulties on Waverley Avenue at Orchard Street and difficulties securing the successful low bidder for sewer and drain improvements on Waverley Avenue at Fayette Street, including Fayette Street. Account#5541 has an available balance of$284,867.00 Crack Sealing and Reflective Pavement Markings Crack sealing is a critical component of pavement maintenance which has proved extremely beneficial in past years preventing further deterioration of asphalt surfaces that are in relatively good condition by preventing water infiltration between open joints and cracks in the road surfaces. The pavement markings proposed in this project are reflective markings which are epoxied to the asphalt surface providing clear direction for the location of drainage structures, as well as eluminating critical geometric changes in given roadways. Both K.ITown ManagerlCapitol BudgetlCaptiol2-13-2012 Update.Doc -6- the crack sealing and pavement markings although appear to be significantly different are actually performed by the same companies that provide both services. Therefore, we are committing funds for this program #5545 FY 11 Street and Sidewalk Improvements $167,594.00 Chapter 90 — Orchard and Main Street This is an on-gOong project related to the signal in front of the Police Station which includes Marion Road and Waverley at Orchard Street. On-going Project #5548 Chapter 90 / Main Street $107,860.75 This project is well underway and will continue through the spring and summer season. FY 12 Street and Sidewalk Project bid and ready to award to second bidder The department is currently preparing the next round of sidewalk improvements to be placed out to bid. Therefore, we are committing funds to address this program. #5551 FY12 Street and Sidewalk $ 400,000.00 FY12 Street and Sidewalk We will be utilizing the balance of this account for various asphalt repairs town wide. #5551 Street and Sidewalk $265,256.31 #5551 Streets and Sidewalk Starting Balance $665,256.31 K:ITown ManagerlCapitol BudgetlCaptiol2-13-2012 Update.Doc - 7- For clarification and descriptive purposes there are a few additional accounts listed below that having small dollar values. #600058 — 58040 Water Improvements $ 19,893.08 This account will be used to purchase copper pipe and tubing for the day to day operations and improvements to the system in general. We have held off on many purchases due to the inflated costs of copper. Currently we are experiencing a drop in pricing. #600258 — 580840 PY Water Improvements $ 63,045.51 This account will be used to fund an auto gate valve exerciser used by the water foreman in all contractor related projects for general system protection and general improvements by means of automatic gate valve exercising equipment. This vehicle is slated for purchase within the next three weeks, utilizing the state bid procurement system. #610058 — 580860 Sewer Additional Equipment $ 152,900.00 This account is used for purchase of emergency sewer by pass pumping equipment. This equipment can be purchased now; however, we normally try to achieve a comfort level with respect to potential equipment failures which may require purchase outside of our normal planning. #610258 — 580860 PY Sewer Additional Equipment $ 112,941.00 This account will be used for the purchase of Car 1 / Car 6 which will house additional equipment not currently housed on the existing equipment. The equipment will be related to spill equipment used for sewer and drain system protection. This equipment can be purchased now; however, we normally try to achieve a comfort level with respect to potential equipment failures which may require purchase outside of our normal planning. #610258 — 580870 PY Sewer Replacement Equipment $ 39,449.83 This account will be used for the purchase of a 185 CFM Air Compressor. We are currently looking for a state bid vendor for this purchase. K.-Town ManageHCapitol BudgMCaptiol 2-13-2012 Update.Doc -8- #610058 — 580870 Sewer Replacement of Equipment $ 67,640.00 This account will be used to purchase trench shields/trench shoring to address mandated trench and confined space / competent person procedures related to Jackie's Law. #0140558 — 580869 Central Motors Vehicle Replacement $ 30,000.00 This money is proposed to be used for the purchase of an "Administrative" Hybrid Vehicle. #0142358 — 580870 Snow & Ice Replacement of Equipment $ 50,475.00 This account is currently being used to purchase liquid calcium setup (direction application) #0142258 — 580870 Highway Replacement of Equipment $ 36,000.00 This account will be used by the Highway Division to replace a worn out Hydrostatic Skid Steer machine. #149558 — 580840 Parks Improvement $ 46,000.00 #149558 — 580860 Parks Additional Equipment $ 10,000.00 #149558 — 580870 Parks Replacement of Equipment $ 33,000.00 These three accounts have been held in abeyance for Victory Field overages or Recreation Department issues. The department has currently requested the Victory architect and the Recreation Director to investigate what equipment will be necessary for maintenance at Victory Field. We are told that part of the bid specifications included a Trailer Dresser, however, no device for towing such trailer. I believe that it was anticipated that we had a tractor capable of pulling such a trailer, currently, we do not. K:ITown ManagerlCapitol BudgetlCaptiol2-13-2012 Update.Doc -9- 1630 TOWN OF WA T`E RTOW lei ,:- DEPARTMENT OF PUBLIC WORKS y 124 ORCHARD STREET WATERTOWN, MASSACHUSETTS 02472 Tel: 617-972-6420 Fax: 617-972-6402 TO: Michael J. Driscoll f Town Manager FROM: Gerald S. Mee, Jr. Superintendent of Public Works DATE: 02 November 2011 RE: MWRA Inflow and Infiltration Local Financial Assistance Program The Department is in the process of filing an application for participation in the MWRA Inflow and Infiltration (1/1) Local Financial Assistance Program. The program provides funds for eligible work to reduce Infiltration and Inflow (1/1) into the sewer system. Backqround Infiltration and inflow consists of extraneous groundwater and stormwater that enters the sanitary sewer through various means such as pipe and manhole defects and sump pumps. 1/1 reduces the capacity of sewers to carry designated flows and drives up the annual sewer use charges paid by the town to the MWRA. 1/1 also contributes to surcharging of the system during severe weather events, which can result in flooding of basements. The town has previously applied for funds, and is now applying for funds for Phase 5 which has a Sunset Date of June 30, 2012. Proiect Description The project will include sewer and manhole replacementto fix defective pipes and manholes on Hovey Street. This work includes replacement of 1,342 linear feet of 10-inch gravity sewer. The sewer is 15 to 20 feet deep for approximately 950 linear feet and the remaining 400 linear feet is 8 to 15 feet deep. Work also includes replacement of four (4) sewer manholes and thirty(30) sewer services. A 12-inch drain runs parallel to the existing sewer. Depending on the condition of the existing drain, some drain replacement work may be required. The project schedule begins work in Fall 2011 and completes project closeout in February 2013. Fundinq Funding for Phase 5 of the program consists of a 45% grant and a 55% loan. The application will utilize funding of $ 540,000 and includes a $243,000 grant portion and a $297,000 loan portion. It is my hope you will support this important endeavor. Please let me know if you need any additional information. C:\Users\gmee.WATERTOWN\AppData\Local\Microsoft\Windows\Temporary Internet Files\Content.0utlool<\FSNJNWQL\MWRA I I LFAP Summary 11 02 11.doc 1630 TOWN OF WATERTOWN DEPARTMENT OF PUBLIC WORKS r x 124 ORCHARD STREET WATERTOWN, MASSACHUSETTS 02472 Tel: 617-972-6420 Fax: 617-972-6402 TO: Michael J. Driscoll Town Manager FROM: Gerald S. Mee, Jr. Superintendent of Public Works oj,--7 DATE: 02 November 2011 RE: MWRA Local Water Supply Assistance Program The Department is in the process of filing an application for participation in the MWRA Local Water Supply Assistance Program. The program provides funds for eligible work to replace unlined cast iron mains and construct water quality related system improvements. Backqround Installation of new water mains contributes to improved water quality and water system operation. Old mains are deteriorated and unlined and often suffer from leaks and frequent repairs. The town has previously applied for funds, and is now applying for additional funds available under an interest free loan program. Protect Description The project will include several areas throughout Watertown as Follows. Edenfield Road — Warren to Main Street. This improvement replaces approximately 850 linear feet of existing 6-inch unlined cast iron water main with a new 8-inch main. Hudson Street — Cushman to Whites Avenue, This improvement involves installing approximately 525 linear feet of 8-inch water main to replace an existing 6-inch unlined cast iron main. Cushman Street—Summer to End, This improvement involves installing approximately 375 linear feet of 8-inch water main to replace an existing 6-inch unlined cast iron main. N. Irving park/S. Irving Park—Irving to Royal. This new 650 linear foot section of new 2-inch main and blowoff or 6-inch main and hydrant will replace an existing 2-inch dead end main that currently cannot be flushed. Midland Road. This new 200 linear foot section of new 2-inch main and blowoff or 6-inch main and hydrant will replace an existing 2-inch dead end main that currently cannot be flushed. C:\Users\gmee.WATERTOWN\Desktop\MWRA LWSAP Summary 11 02 11.doc Mr. Michael J. Driscoll - 02 November 2011 Ladd Place. This new 225 linear foot section of new 2-inch main and blowoff or 6-inch main and hydrant will replace an existing 2-inch dead end main that currently cannot be flushed. Lincoln Street. This improvement involves installing approximately 1,100 linear feet of 8-inch water main to replace an existing 6-inch unlined cast iron main. Grenville Road. This improvement involves installing approximately 850 linear feet of 10- inch water main to replace an existing 10-inch asbestos cement(AC)main. The existing 10- inch AC main will be abandoned in place. Chester Road/Bates Road/Bates Road East. This improvement involves installing approximately 1,000 linear feet of 6-inch water main to replace an existing 6-inch unlined cast iron main. Katherine Road. This improvement involves installing approximately 375 linearfeet of 6-inch i water main and new hydrant to replace an existing 2-inch main that presently cannot be flushed. The project schedule begins work in Fall 2011 and completes construction in November 2012. Funding Funding required for construction of the above improvements is $1,704,656. The amount borrowed will be determined by MWRA based on community allocations at the time of funding distribution. Sianificance As stated regarding previous applications, this program affords the Town several excellent opportunities. • As an enterprise system, all work performed on our water supply system directly impacts the rate. Interest free loans enable the Town to perform necessary work with little or minimal impact on the rate payers. It is my hope you will support this important endeavor. Please let me know if you need any additional information. C:\Users\gmee.WATERTOWN\DesktopNMWRA LWSAP Summary 11 02 11.doc DPW OPERATING CAPITAL ACCOUNTS AS OF 219112 FY 12 BUDGET AVAILABLE ORG CODE 49J CODE ACCOUNT DESCRIPTION AMOUNT CARRYOVER EXPENDED ENCUMBRANCES BALANCE 0140558 580860 CEN MOTORS ADD'L EQUIP $ 4,060.00 $ 8,000.00 is 4,000.00 $ 4,000.00 $ 4,000.00 0140558 580869 CEN MOTORS VEHICLE REPLCMNT $ 30,000.00 $ 30,000.00 Is - $ 30,000.00 $ 30,OD0A0 0142258 580860 HIGHWAY ADDIL EQUIP $ 4,600.00 $ 6,600.00 $ 6,600.00 $ _ $ 4,600.00 0142258 580870 'HIGHWAY REPLACE OF EQUIPMNT $ 36,000.00 $ 38,150.47 $ 30.554.13 $ 7,696.34 ` $ 36,000.00 0142358 580870 SNOW&ICE REPLACE OF EQUIPMNT 1 $ 60,000.00 $ 45,393.00 $ 45,393.00 : $ 9,525.00 $ 50,475.00 ---0149158 580840 CEMETERY IMPROVEMENTS $ - $ 30,200.00 $ 10,700.00 $ 19,500.00 $ - 0149258 j 680870 PROP&BLDG REPLACE OF EQUIPMNT l $ 15,000.00 $ 20,685.00 $ 17,901.77 $ 2,826.03 $ _ 14,957.20 0149558 580840 PARK IMPROVEMENTS - - $ 46-000.00 $ 40,000.00 ' $ -- -j $ 40,000.00 $ 46,000.00 01495588 580860 PARK ADDITIONAL EQUIPMENT i $ 10,000.00 $ 3,000.00 '; $ - $ 3,000.00 S 10,000.00 0149558 560870 PARK REPLACE OF EQUIPMENT $ 33,000.00 S 11,511.00 is - $ 11,511.00 S 33,000.00 0249558 580840 PY PARK IMPROVEMENTS ; $ - $ 36,880.50 1 $ 575.00 $ 36,305-50 , $ - T&ALGENERAL FU1+f�" 1 $ 238,600.00 $ 270,419.97 $ 115,723,90 $ 164,263.87 $ 229,032.20 ' f 600058 580840 WATER IMPROVEMENTS $ 175,000.00 $ 111,086.99 -$ 178,475.01 $ - 87,718.90 , $ 19,89_3.08 58 6000 1- .580870 WATER REPLACEMENT OF EQUIPMENT i $ 32,000.00 $ 22,074.00 ! $ 49,782.09 $ 3,898.08 $ 393.83 600258 680840 PY WATER IMPROVEMENTS $ 122,170-98 . $ 21,751.18 $ 37,374.29 $ 63,045.5- 600258 580870 PY WATER REPLACEMENT OF EQUIPMENT $ 2,444.00 ' $ - j $ 1,492.77 $ - j $ 951.23 TOTAL WATER FUNDS - $ 331,614.98 1 $ 133,160.99 1 $ 251,501.06 $ 128,991.27 $ 84,283.65 I 610058 580840 SEWER IMPROVEMENTS $ 715,000.00 1 $ 727,341.00 $ 28,535.46 $ 742,589.46 $ 671,216.08 610058 580860 SEWER ADDITIONAL EQUIPMENT $ 152,900.00 j $ 152,892.68 1 $ 34,963.63 $ 117,929.05 $ 152,900.00 610058 580870 SEWER REPLACEMENT OF EQUIPMENT ti $ 75,000.00 I $ 67,236.32 $ 72,176.32 $ 2,420.00 $ 67,540.00 32 610258 580840 PY SEWER IMPROVEMENTS $ 3, 3,8W-00 1 $ 28,926.65 -$-..--..23,566.56 $ 5,380.39 $ 3,323,892.70 610258 580860 PY SEWER ADDITIONAL EQUIPMENT $ 112,941.00 1 $ - $ - $ - $ 112,941.00 610258 680870 PY SEWER REPLACEMENT OF EQUIPMENT $ 39,449.83 1 $ - $ - $ 39,449.83 j TOTAL SEWER FUNDS $ 4,419,183.831 $ 976,396.65 $ 159,241.97 $ 868,298.90 $ 4,368,039.61 TOTAL WATER AND SEWER FUNDS $ 4,750,798.81 $ 1,109,557.64 $ 410,743,02 : $ 997,290.17 1 $ 4,452,323.26 - --------- _.- i BLANKET PO'S WATER(6000) ; $ (53,647.82) $ 53,647.82 1 SEWER{6100y $ (812,609.05) $ 812,609.05 GENERAL FUN $ (151,401.84) $ 151,401.84 i $ 143,895.33 1 $1 5,699,014.17 , DPW CAPITAL PROJECT FUNDS AS OF 219112 FUND FUNQ CASH AVAILABLE NUMBER- DESCRIPTION A!LOUNT ENCUMBRANCES BALANCE 5 PY 03 EQUIP $ 1.651.00 $- 1,651.00 5665 FRONT END LOADER $ 7,500.00 $ 7,600.00 - TOTAL EQUIPMENT BONDED FUNDS $ 9,151.00 $ 7,600.00 1.651to 5062 STREET,SIDEWALK,&DUCT $ 112,777.81 $ 112,777.81 f - -TOTAL STREET&SIDEWALK BONDED FUNDS 112,777.81 112,777.81 - _ 5050 MW_RA I_&1_S _- - --- - $ f6,3 49,324AI 4 $ 424.41 - 6661 IViWRA MWER $ 412,001.03 $ i48JH 23 1 $ 263.223.80 5665 1&I PHASE 4 $ 525 7, 17.14 .$ 507,587.24' $ 18,129.90 6067 MWRA PIPE $ 199,079A5 $ 46,653.02 ' $ 152,426.03 _ TOTAL SEWER SONDm f=UN6$ - $ 1,186,121.63 $ 703,01T49 $ 483.104.14, TOTAL BONDED FU?fDS $ 1,308,050.44 $ 823,295.3p $ 484,T55.i4 ` 5508 CEMETERY EXPANS16N - - $ 231,323.09 5512 PLEASANT ST RUSSO MITIGATION $ 80,000.00 $ - NO BUDGET_ 6515 DPW RENOVATION $ 369,746.26 $ 1,461.97 $ 36804.29 5518 INCINERATOR $ 31,500.00 1 $ 31,600.00 5517 PARKEQUiP11MPROV -- 53.198,32 $ - -95,179.SZ 4- 5_8_.0_18.5Q - 5527 555 PLE ASANT ST $ 205,000.00 $ - NO BUDGET 5534 STOP&SHOP TREES $ 26,000.00 $ - NO BUDGE TOT.ERUIPJSLDOJOTH€R NON-BONDED FUNDS , $ 1,026,767.59 S 46,641.79 3 699.125.80 f 5501 CHAPTER 90 $ 50,E_57.93 $ 50,657.93 $ - 5535 CHAPTER9F1 T $ 91,592.73 $ 97,592.73 $ - W39 FY 09 STREET&SIDEWALK $ 182,275.00 $ 182,275.00 $ - - 5540 FY 10 STREET&SIDEWALK $ 276,049.27 $ 276,049.27 $ - - 5545 FY 11 STREET&SIDEWALK $ 359,145.06 $ 191,551.08 $ �167,694.00 5548 CH90 ORCH 5T&MAIN ST _s (803,433.70 $ -- 317,705.55 $ 107,860.75 -- -- 5549 CH90 PAV fl0 M_GMT TRFC SIGN M MT_ _ $ [87, 0.00) $ - $ 5551 FY 12 STREET&SIDEWALK $ 565,256.31 $ 665,256.31 TOTAL STREET&SIDEWALK NON-BONDED FUNDS $ 734,642.62 $ 1,109,831.56 $ 940.711.06 5541 FY 10 WATER IMPROVEMENTS $ 4W,235.41 $ 181,358.32 $ 284,867.09 TOTAL.WATER NON-BONDED FUNDS $ 466,235.41 $ 181,368.32 $ 284,867.09 6542 FY 10 SEWER iMPROVFMENTS $ 1,460,639.42 $ 280.715.12 $ 1,179,924.30 TOTAL SEWER NON•BONDED FUNDS j $ 1,460,639-42 $ 280,715.12 $ 1,179,924.30 TOTAL NOWBONDED FUNDS $ 3,688,105.04 $ 1,588,556.79 3,704,828.26 SUMMARY OP ALL DPW CAPITAL RELATED ACCOUNTS/FUNDS AS OF 2-9-12 TOTAL EQUIPMENT BONDED FUNDS 9,161.00 $ 7,600.00 $ 9,651.00 70T.EQUIP.1131-DG.IOTHER NON-BONDED FUNDS 1,026,767.69 $ 16,641.79 $ 699,128.80 TOT.EQUIPJSLDGJOTHER OPERATING FUNDS $ 393.296.07 $ 12,862.03 $ 3W,434,04 _ TOTAL EQUIPJBLDGJOTHERALL FUNDS $ 1,429,214.66 $ 37,0018- 1,0$1, 10.84 11.6% TOTAL STREET&SIDEWALK BONDED FUNDS $ 112,77T.81 _ 112,777.81 $ - �^ TOTAL STREET&8IDEWALK NOH-80NRf D_FTfN_ B W 734,642.62 $ 1,7b9,834.56' $ 9 -0.7-11.06 _ TOTAL STREET&SIDEWALK ALL FUNDS $ 847,320.43 $ 1,222,609.37 $ 940,711.06 10.1% TOTAL! EE_WERBONDEDF -ha— - _-_--.I 5,f6B,i21.63 ------703,017.49 $ 483,1Q4.14 - __...__ TOTAL SEWER NON-BONDED FUNDS $ 1.460,639,42 $ 280,715.12 $ 1,179,924.30 --- TOTAL SCR OPERATING FUNDS $ 5,236,338.51 $ 56,689.65 _$ 6,180,648.66 _._ TOTAL SEWER ALL FUNDS $ 7,883,099.56 $ 1,039,422.46 $ 6,843,677.10 73.796 TOTQ7AL WATER OPERATING FUNDS S � 1$ 2118,274.92 $ 176,343.46 $ 137,931.47 - — TAL.WATER ALL FUNDS ~v- $ 679,510.33 $ 258,711.77 $ 422,708.88 f - 4.6°k 'TOTAL ALL DPW CAPITAL ITEMS ALL FUN68 I $ 10,839,144.98 $ 2,555,74T42 $ 9,288,397.513 100%, Lw _qr� tC� Town of Watertown Energy Saving Performance Contracting 1� B E A C a N February 22,2012 Beacon Integrated Solutions 20 Year Veteran of Energy Efficiency and Renewable Energy: Market leaders specializing in energy efficiency,renewable energy,performance contracting, energy management and commodity advisory and procurement services. We Sit on Your Side of the Table: Manage the procurement process, optimize project value and ensure energy savings and production sustainability. Optimize energy economics through improved price certainty, energy efficiency, renewable energy, supply reliability and optimized energy infrastructure. We Provide Certainty of Process. Itl• ac .sue Town W Watertown Shik2 1 Beacon's Recent Client Success Performance Contracting Town of Reading/Reading Public Schools :• Town of Dedham/Dedham Public Schools Canton Public Schools :• City of Northampton/Northampton Public Schools City of Worcester/Worcester Public Schools :• Minuteman Regional School District Town of Medway/Medway Public Schools Department of Energy Resources(20 municipalities) :• Franklin Regional Council of Governments(23 municipalities and 5 regional school districts) :• Pioneer Valley Planning Commission(15 municipalities and 3 regional school districts) �3 r_A C c 3 n Town of Wafermwn Slide 3 Performance Contracting Overview General Approach Design-build energy efficiency project that leverages existing operating and energy budgets to implement turnkey energy efficiency and renewable energy solutions: Upgrade building infrastructure and increase building efficiency Reduce operating and maintenance costs Enhance operating staff productivity - Implement renewable energy strategies Improve indoor air quality Enhance core curriculum by integrating innovative technologies with educational objectives Igo,. Y ii1,zACX3r TouruofWafeefown Performance Contracting Overview Financing Options General Obligation Bonds Tax Exempt Municipal Lease State House Serial Notes Capital or Operating Budgets Third-Party Funding Options I s Ac c)1� Town of Walerlown SSde 5 Establishing the Parameters Confirming Project Objectives and Goals Solidify stakeholder goals Maximum investment or maximum savings Cross subsidization—Town,Schools and Enterprise Funds Key capital investments Environmental upgrades Renewable energy goals Define risk tolerance in terms of project size, term and cashflow Project size/limit Borrowing term Interest rate assumption Escalators for energy and operational savings Annual financial obligations for performance guarantee and incremental operations and maintenance � t3rAcc�1� Town of Walerlown S[Wfl..5 3 Critical Success Factors Project Leadership and Control Form a multi-disciplinary team of stakeholders Financial Operational Administration Legal Assign a"project champion" to provide leadership and logistics support from program inception through implementation and evaluation BF Ac C>Tom' Town of Watertown _11hk I r� Risk Management and Due Diligence Balance ofRisk and Cost Develop Sound Baseline Measure vs.estimate ❖ Confirm Key Project Economic Drivers Energy Pricing-Unit energy prices and escalators ❑ Interest rates and borrowing term Vendor markups and pricing Determine Reasonableness of Energy Savings Calculations Modeling,measurement and interaction ❖ Construction Provisions E. Retainage Liquidated damages Pay for performance vs.payment schedule Performance Assurances Stipulate,Measure,Analyze or Model r F r_acc)N� Town atWalartown Pages 4 Project Status Where are we? Beacon engaged on February 16th ❑ Kick off meeting on February 10th Areas of Beacon's Focus: ❑ Baseline assumptions and applications ❑ Reasonableness of energy savings calculations ❑ Project pricing discovery and review ❑ Project optimization to ensure goal adherence ❑ Measurement and verification review of final program ❑ Contract support Next Steps: ❑ Review documentation Meet with Johnson Controls i tl]F AC Ca P: Town of Watertown Page 9 r� Thank You Beacon Integrated Solutions P.O.Box 320325 Boston,MA 02132 bgreenblatt@beacon-llc.com www.beacon-llc.com LTown of Watertown !ode tp 5 �!a -7 /1;2. WATERTOWN PUBLIC SCHOOLS CAPEX FUND BALANCES 2/2112012 Fund Code 'Description BALANCE DISBURSEMENT PLANSIRECOMMENDATIONS .32 HSMER5100 29,429.65 $23,554 WILL BE USED FOR SOUND SYSTEM AND TO CORRECT DEFICIENCIES IN SOUND SYSTEM 50 BALANCE TO BE USED TO CORRECT DEFICIENCIES IN SOUND SYSTEMS IN ELEMENTARY SCHOOLS_ 5037 WHS FYOb 1,529,86 PURCHASE NEW MAINTENANCE EQUIPMENT FOR SCHOOLS _ 5040 SC)AYlf§fGF 10,491,40 CORRECT DEFICIENCES IN HOSMER PA SYSTEM;POSSIBLY ALSO IN LOWELL PA SYSTEM 5 6-8 SCH CAP 1 D _ $_9_141-65 S40K CHAIR LIFT TO ENABLE ACCESS TO FITNESS CENTER; COMPLETE HOSMER SECURITY SYSTEM 5520 _ SCH CAP 06 193.99 PURCHASE NEW MAINTENANCE EQUIPMENT FOR SCHOOLS 5538 __0_8 SCH CAP 68,057.34 INSTALLATION OF BIKE RACKS AT SCHOOLS HIGH SCHOOL REAR SECURITY CAMERA _ CUNNIFF FIRE DOOR CLOSERS _ PURCHASE NEW MAINTENANCE EQUIPMENT FOR SCHOOLS - - 190,843.89 23,500 HOSMER AUDITORIU SOU M ND SYSTEM 40,000 �WHS CHAIR LIFT _- 20,000 HOSMERILOWELL/CUNNIFF PA SYSTEMS 5.000 BIKE RAGKS 8,200 HIGH SCHOOL SECURITY _ — 4,200 (CUNNIFF FIRE DOOR CLOSERS — 12,800 MIDDLE SCHOOL CARPETS_ 8,000 CUNNIFF CAFETERIA HEATING COIL 2,500 (6)AMSAN SPOTTERS 12,000 (1)COMBO BOOST MACHINE 30,000 (5)20"BOOST MACHINES 4,800 (12)WALK BEHIND VACUUMS 20,000 _ (5)WALK BEHIND CARPET EXTRACTORS 69,300 iEOUIPMENT 191,000 11 Plus S5 3� G K Otsic_J 19-1 joco LA-v fl—e,+ pn'vr Cst(,• Fc.4,.cA S WPS Long-Term Capex Forecast @ 2012-02-27.x1s WPS OPEN CAPEX FUND BALANCES WATERTOWN PUBLIC SCHOOL CAPEX EXPENDITURE ANALYSIS Balance Balance Reported Reported In in February February Fund Code Fund Name 2011 Expenditures 2012 5032 HOSMER 5/OF- 29 0 29 5037 WHS FY04 2 0 2 5040 SCH DESIGN 10 0 10 5060 SCH CAP 07 11 (11) 0 SECURITY CAMERASIEQUIPMENT 11 5068 SCH CAP 10 177 (96) 81 MIDDLE SCHOOL CAFETERIA HOO 42 FURNITURE 11 HOSMER HOT WATER SYSTEM 39 SECURITY CAMERASIEQUIPMENT 4 5520 SCH CAP D6 23 (23) 0 SNOWBLOWERS 6 DISTRICT SERVER ROOM A/C 10 SECURITY CAMERASIEQUIPMENT 7 5536 SCH CAP 06 86 (18) 68 MAINTENANCE VEHICLE 11 3rd Year of lease for Chevrolet Traverse SECURITY CAMERASIEQUIPMENT 7 5537 SCH TECH 20 (13) 7 DISTRICT COMPUTER EQUIPMENT 13 358 (161) 197 161 WATERTOWN PUBLIC SCHOOLS ��� Zf ZD I Z PROPOSED CAPITAL IMPROVEMENTS FY2013-FY2017 ` o COST ESTIMATE(in FY2010- LOCATION 0001 2011 FY2012 FY2013 FY2014 FY 2016 FY2016 BEYOND WATERTOWN HIGH SCHOOL(BUILT 19JO:LAST ENO ATION 204) 1 Remove and replace all corridor doors with liqht weiqht safety doors 150.5 150.5 2 Repair windows and screens 200 20.0 ESCO? 3 Replace Courtyard and 2nd floor window 62.0 62.0 4 Replace tile near Tech Services&install carpet 10.0 10.0 DONE 5 Install security cameras in gym,all remaining hallways and cafeteria 70.0 35.0 DONE 35.0 6 Aeplace glass panels and glaze AD office. 18.0 18.0 7 Repoint brick near teachers'cafeteria& auditorium. 15.0 15.0 8 Paint auditorium ceiling 35.0 35.0 9 Interior paint classrooms and hallway 185.0 185.0 10 Re-pave parking lot&replace wood guard rail 39.5 39.5 11 Replace classroom furniture 250.0 30.0 DONE 300 30.0 30.0 30.0 100.0 12 Replace carpet in library&auditorium 67.2 67.2 13 Auditorium screen 200 20.0 DONE 14 Correct greasg trap installation 10.0 10.0 DONE 15 Replace circulator pumps 50 50 16 Replace emergency generator 200.0 200.0 17 Renovate/update main entry plaza 100.0 100.0 18 Replace hot water heaters 60.0 60.0 19 Science labs 70.0 70.0 20 Robotics,Tech Services&SPED classrooms 38.2 38.2 DONE WHS TOTAL 1,425.4 143.2 0.0 48.0 205.0 90.0 477.6 461.7 COST ESTIMATE(in FY2010- 000s 2011 FY2012 FY2013 FY2014 FY 2015 FY2016 BEYOND WATERTOWN MIDDLE SCHOOL(BUILT 922; LAST RENOVATION 1998) 1 Remodel old building bathrooms& basement looker rooms. 150.0 150.0 2 Replace heatinq valves 9.0 9.0 3 Repair main office A/C&re-pipe sprinkler lines 21.0 21.0 DONE 4 Repair remainder of windows along court yard area&repoint old building 35.0 35.0 DONE 5 Install steel main entrance& replace aluminum 45.0 45.0 6 Replace gym lightinq 35.0 35.0 ESCO? WPS Long-Terre Capex Forecast Q 2012-02-28.xls FY13-17 CAPEX FORECAST WATERTOWN PUBLIC SCHOOLS PROPOSED CAPITAL IMPROVEMENTS FY2013-FY2017 COST ESTIMATE(in FY2010- LOCATION 0005) 2011 FY2012 FY2013 FY2014 FY 2016 FY2016 BEYOND 7 Kitchen fire s+suppress}on system 17.0 17.0 DONE 8 Replace sasement hallway doors 35.0 35.0 9 Replace basement classroom floors 50.0 50.0 10 Replace/update classroom furniture 150.0 20.0 DONE 15.0 15.0 15.0 15.0 70.0 11 Renovate new fitness center area(flooring and walls) 15.0 15.0 12 Remodel cafeteria similar to WHS& replace existing tables 75.0 75.0 13 Instal!new projector and screen in auditorium 20.0 20.0 DONE 14 Replace bumers 60.0 60.0 ESCO? 15 Install cafeteria air conditioning 8.2 8.2 16 Install cameras in all hallways,cafeteria and auditorium 20.0 20.0 DONE 17 Install security door openers on all remaining exterior doors 16.0 16.0 18 Move building main entrance to Bemis Street ???? 19 Paint gym 25.0 25.0 20 Interior paint 175.0 175.0 1 21 Seal and stripe parking lot. 13.0 13.0 22 Replace building windows 303.0 303-0 23 Repair auditorium seating ???? 24 Replace cafeteria floor 35.0 35.0 25 Replace carpets in auditorium library and main office 67.2 67.2 26 Replace heating system pumps 20.0 20.0 ESCO? 27 Replace emergency light batteries 26.0 28.0 28 Install emergency generator 200.0 200 0 29 Replace flooring in 2nd and 3rd floors of old building 240.0 2400 30 Renovate Science tabs 150.0 150.0 WMS TOTAL 2.017.4 133.0 0.0 67.2 326.0 783.0 190,0 518.2 COST ESTIMATE(in FY2010- 0008) 2011 FY2012 FY2013 FY2014 FY 2015 FY2016 BEYOND LOWELL SCHOOL(BUILT 1927; LAST RENOVATION 19961 1 Soundproof cafeteria 15.0 15.0 DONE 2 Heating system pumps 8.0 8.0 ESCO? 3 Cafeteria&gym lights 18.0 18.0 ESCO? 4 Interior paint 170.0 170.0 5 Replace building carpet 270.0 270.0 6 Replace and update classroom furniture 150.0 20.0 DONE 20.0 20.0 20.0 20.0 50.0 WPS Long-Term Capex Forecast C 2012-02-28.xis FY13-17 CAPEX FORECAST 2 WATERTOWN PUBLIC SCHOOLS PROPOSED CAPITAL IMPROVEMENTS FY2013-FY2017 COST ESTIMATE(in FY2010- LOCATION 000s) 2011 FY2012 FY2013 FY2014 FY 2016 FY2016 BEYOND 7 Replace boilers 600.0 600.0 ESCO? 8 Install new emergency light batteries 28.8 28.8 9 Seal and stripe parking lot 8.5 8.5 E10 Replace cafeteria windows 25-0 25.0 11 Replace roof over library bay window 60 5.0 12 Install security doors 9.6 9-6 13 Install A/C in cafeteria 12.0 12.0 14 Replace door hardware 35.0 35.0 15 Replace cafeteria ceiling tiles 5.6 5.6 16 Replace heating system mixing valve 15.0 15.0 19 PA system LOWELL TOTAL 1,375.6 35.0 0.0 80.6 20.0 82.3 20.0 1.137.6 COST ESTIMATE(in FY2010- 0003) 2011 FY2012 FY2013 FY2014 FY 2015 FY2016 BEYOND CUNNIFF SCHOOL(BUILT 1954,LAST R 3NOVATION 19=7) 1 Repoint brick in original building areas 12.0 120 2 Lights 15.0 15-0 ESCO? 3 Replace classroom furniture 150.0 10.0 DONE 10.0 10.0 10.0 10.0 100.0 E4 Replace emergency light batteries 18-0 18.0 5 Sand and repaint gym and cafeteria floor 25.0 25-0 6 Replace 3 way heat control valve 15.0 15.0 DONE 7 New cafeteria tables 25.0 25.0 8 Replace carpet in library 17.0 17.0 9 Re-pave Parkino lot 19.0 19.0 10 Install exterior cameras 14.0 14.0 11 Interior paint 104.0 104.0 12 Remove basketball court&install parkin 10.0 %0 13 Replace boilers 600.0 600.0 ESCO? 14 Expansion feasibility study CUNNIFF TOTAL 1.024.0 25.0 0.0 36.0 22.0 10.0 71.0 861.0 COST ESTIMATE(in FY2010- 0003) 2011 FY2012 FY2013 FY2014 FY 2015 FY2016 BEYOND HOSMER SCHOOL(BUILT 1967;LAST R E-NOVATION 20)2] 1 Remove carpet preschool lobby and intervention rooms& replace with new flooring 25.0 25.0 2 Soundproof cafeteria and room 153 Connections program 20.0 20.0 WPS Long-Term Capex Forecast @ 2012-02-28.xls FYI 3-17 CAPEX FORECAST 3 WATERTOWN PUBLIC SCHOOLS PROPOSED CAPITAL IMPROVEMENTS FY2013-FY2017 COST ESTIMATE(in FY2010- LOCATION 0008) 2011 FY2012 FY2013 FY2014 FY 2016 FY2016 BEYOND 3 Planning for and renovation of pre-school for Connections/Autism Awareness program(create new classroom space) 100.0 5.0 DONE 95.0 4 Replace/repair unit ventilators throughout the school 150.0 150.0 5 Secure gym area with door on entrance from hall or gym to girl's locker room and hardware for existingMm doors 15.0 15.0 6 Update building furniture(room partitions 150.0 200 DONE 20.0 200 20.0 20.0 50.0 7 Install exterior cameras 9.0 9.0 8 Install security openers in remaining doors 10.3 10.3 9 Interior paint 165.0 165.0 10 Install rubber surface on Stemetakis playground 90.0 90.0 11 Repair and paint panels under windows and over entrances 12 Gym lights 20.0 20.0 ESCO? 13 Sidewalk replacement/repair around the building(main entrance priority)/repair stairs to lower parking lot 75.0 75.0 14 Install A/C auditorium 32.0 32.0 15 Install A/C in conference room 147 D 5.0 5.0 16 Replace carpet in auditorium, library& offices 106.0 106.0 17 Resurface qym floors 14.0 14.0 18 Replace 4"and 6"zone valves 8.5 8.5 19 Replace existina main zone circulators 52 5.2 ESCO? 20 Seal and stripe Darkina lot 15.0 15.0 21 Replace chain link fence on Boylston Street side 7.2 7.2 22 Replace hot water circulator pumps 21.4 21.4 23 Upgrade liqhtinq system in auditorium 20.5 20.5 ESCO? 24 Replace emergency generator 200.0 200.0 25 Purchase new boost machine 15.5 15.5 26 Enclose dumpsters by cafeteria and playqround 8.5 8.5 27 Repair or replace ceiling in overhang outside old main entrance(Concord Road) 80 8.0 28 Close off stage area of small gym to secure a storaqe area for furniture. 30.0 30.0 29 Replace or repair door hardware 30 Install A/C cafeteria 10.6 10.6 WPS Long-Term Capex Forecast @ 2012-02-28.xls FY13-17 CAPEX FORECAST 4 WATERTOWN PUBLIC SCHOOLS PROPOSED CAPITAL IMPROVEMENTS FY2013-FY2017 COST ESTIMATE(In FY2010- LOCATION 0008) 2011 FY2012 FY2013 FY2014 FY 2016 FY2016 BEYOND 31 Repair/replace broken and racked floor tiles throuqhout building 32 Enlarge entrance door to receiving area 33 Repair water bubbler on second floor 12.0 12.0 DONE HOSMER TOTAL 1.348.7 37.0 0.0 163.0 199.0 40.0 57.7 852.0 COST ESTIMATE(in I FY2010- 0008 2011 FY2012 FY2013 FY2014 FY 2015 FY2016 BEYOND PHILLIPS SCHOOL(BUILT 1937;LAST RENOVATION 2001) 1 Seal and stripe parkinq lot 20.0 20.0 DONE 2 Install central air 3rd floor offices 150 160 3 Condensate tank 25.0 250 DONE 4 Interior paint 45.0 45.0 5 Repair concrete over Supt office 8.5 85 6 Replace gyalights 15.0 15.0 ESCO? 7 Replace boilers 600.0 600.0 ESCO? 8 Replace carpets in Central Office area 24.0 24.0 9 Sand and re-stripe qym floor 18.0 180 10 Purchase new boost machine 15.0 150 11 First floor family center renovations 34.8 34.8 DONE PHILLIPS TOTAL 820.3 79.8 0.0 23.5 15.0 18.0 45.0 639.0 C05T ESTIMATE(in FY2010- 0008) 2011 FY2012 FY2013 FY2014 FY 2015 FY2016 BEYOND DISTRICT 1 Replace Vehicles 512, 112,412 105.0 35.0 35.0 35.0 2 Scissor Lift 25.0 25.0 3 Building use/feasibility study DISTRICT TOTAL 130.0 0.0 0.0 25.0 35.0 36.0 0.0 36.0 TOTAL $8,141.3 1 $453.0 1 $0.0 [ $442.3 1 $822.0 1 $1,068.3 1 $861.2 1 $4,504.6 ESCO 2.036.7 REMOVEDFROM CAPEX FORECAST PREVIOUSLY SUBMITTED TO TOWN: IWATERTOWN HIGH SCHOOL(BUILT 1930: LAST RENOVATION 2004) I I 15.5 Purchase new boost machine 1 15.51 1 ! i WATERTchaseOWNew MIDDLE SCHOOL(BUILT 1922;LASTRENOVATION f OVATION 1998) I 15.51 I WPS Long-Tenn Capex Forecast @ 2012-02-26.xls FYI 317 CAPEX FORECAST WATERTOWN PUBLIC SCHOOLS PROPOSED CAPITAL IMPROVEMENTS FY2013-FY2017 COST ESTIMATE(in FY2010- LOCATION 000E 2011 FY2012 FY2013 FY2014 FY 2016 FY2016 BEYOND LOWELL SCHOOL(BUILT 1927: LAST R NOVATIO is is) Purchase new boost machine 1 15.51 15.5 DISTRICT System wide custodial equipment upgrades 25.0 25.0 ORIGINAL FORECAST 490.1 LESS: REMOVAL OF BOOST MACHINES&SYSTEM WIDE CUSTODIAL EQUIPMENT (56.0) ADD: MIDDLE SCHOOL CAFETERIA AIR CONDITIONING 8.2 REVISED FORECAST AS PER ABOVE 442.3 WPS Long-Term Capex Forecast @ 2012-02-28.xis FY13-17 CAPEX FORECAST 6 xpenditure orecast Debt and Interest Source FY2012 FY2013 FY2014 FY2015 Permanent Debt/Interest $6,539,020 $6,219,667 $4,648,476 $4,493,871 Authorized & Planned Debt/Interest $594,575 $1,877,383 $3,777,588 $4,721,145 Planned Debt/Interest Streets & Sidewalks $0 . $825,000 $1,959,500 $2,556,500 Other $594,575 $1,052,383 $1,818,088 $2,164,645 Cost of Bond ' Certification $30,000 $30,000 $30,000 $30,000 TOTAL $7,163,595 $8,127,050 $8,456,064 $9,245,016 49 TOWN OF WATERTOWN 3 CIP FY 13 TO FY 17 COST ANALYSIS original Per C=P l-I I-- (.a- Yt Row= De-Eerred , f4d.= O.e-6-+-e.ck FY 13 FY 14 FY15 FY16 FY17 I-Y COST PRINCIPAL INTEREST PRINCIPAL INTEREST PRINCIPAL INTEREST PRINCIPAL INTEREST PRINCIPAL INTEREST MAIN FIRE BR 11 $ 85,000 $ 10,000 $ 4,250 $ 10,000 $ 3,750 $ 10,000 $ 3,250 $ 10,000 $ 2,750 $ 10,000 $ 2,250 NORTH FIRE BR 11 $ 43,000 $ 8.000 $ 2,400 $ 5,000 $ 2,000 $ 5,000 $ 1,750 $ 5,000 $ 1,500 $ 5,000 $ 1,250 EAST FIRE BR 11 $ 10,000 $ 5,000 $ 500 $ 5,000 $ 250 AMBULANCE BE 11 $ 210,000 $ 21,000 $ 10,500 $ 21,000 $ 9,450 $ 21,000 $ 8,400 $ 21,000 $ 7,350 $ 21,000 $ 6,300 SWAP LOADER BE 11 $ 160,000 $ 35,000 $ 8,000 $ 35,000 $ 6,250 $ 30,000 $ 4,500 $ 30,000 $ 3,000 $ 30,000 $ 1,500 SIDEWALK TRACTOR BE 11 $ 157,000 $ 32,000 $ 7,850 $ 35,000 $ 6,250 $ 30,000 $ 4,500 $ 30.000 $ 3,000 $ 30,000 $ 1,500 PARK RENOVATIONS BR 11 $ 200,000 $ 15,000 $ 10,000 $ 15,000 $ 9,250 $ 15,000 $ 8,500 $ 15,000 $ 7,750 $ 15,000 $ 7,000 RINK IMPROVEMENTS 11 $ 50,000 $ 5.000 $ 2,500 $ 5,000 $ 2,250 $ 5,000 $ 2,000 $ 5,000 $ 1,750 $ 5.000 $ 1,500 SENIOR SHUTTLE BUS BE 11 $ 110,000 $ 25,000 $ 5,500 $ 25,000 $ 4,250 $ 20,000 $ 3,000 $ 20,000 $ 2,000 $ 20,000 $ 1,000 $ 1.025.000 $ 156,000 $ 51,500 $ 156,000 $ 43,700 $ 136,000 $ 35,900 $ 136,000 $ 29,100 $ 136,000 S 22,300 GIS BE 12 $ 50,000 $ 10,000 $ 2,500 $ 10,000 $ 2,000 $ 10,000 $ 1,500 $ 10,000 $ 1,000 $ 10,000 $ 500 NETWORK STORAGE/SERV BE 12 $ 60,000 $ 15,000 $ 3,000 $ 15,000 $ 2,250 $ 10,000 $ 1,500 $ 10,000 $ 1,000 $ 10,000 $ 500 INFRASTR. MUNIS SERVER BE 12 $ 40,000 $ 10,000 $ 2,000 $ 10,000 $ 1,500 $ 10,000 $ 1,000 $ 5,000 $ 500 $ 5,000 $ 250 PUMPER TRUCK REPLACE BE 12 $ 515,00D $ 35,000 S 25,750 S 35,000 $ 24,000 $ 35,000 $ 22,250 $ 35.000 $ 20,500 $ 35.000 $ 18.750 BULLET PROOF VESTS BE 12 $ 12,000 $ 7,000 $ 600 $ 5,000 $ 250 SPEED FEEDBACK TRAILER BE 12 $ 20,000 $ 5,000 $ 1,000 $ 5,000 S 750 $ 5,000 $ 600 $ 51000 $ 250 DIGITAL ASSET MGMT SYST BE 12 $ 18,000 $ 8,000 $ 900 $ 5,000 $ 500 $ 5,000 $ 250 $ 730,00D $ 95,00U $ 36,500 $ 90,000 $ 31.750 S 80,000 5 27,250 $ 65,000 $ 23,250 $ 60,000]S 7.0,000 SCHOOL BR 13 $ 490,100 $ 35,100 $ 24,505 $ 35,000 $ 22,750 $ 35,000 $ 21,000 $ 35,000 $ 19.250 $ 490,100 $ - $ - $ 35,100 $ 24,505 $ 35,000 $ 22,750 $ 35,000 $ 21,000 $ 35,000 $ 19,250 HIGHWAY RECONSTR STB 13 $ 2,000,000 $ 50,000 $ 400,000 $ 90,000 $ 400,000 $ 70,000 $ 400,000 $ 50,000 $ 400,000 $ 30,000 FIRE ALARM DUCT BR 13 $ 300,000 $ 7.500 $ 60,000 $ 13,500 $ 60.000 $ 10,500 $ 60,000 $ 7,500 $ 60.000 $ 4,500 SIDEWALK RECONSTR SWB 13 $ 500,000 $ 12,500 $ 100,000 $ 22,500 $ 100,000 $ 17.500 $ 100.000 $ 12,500 $ 100,000 $ 7,500 -S 2.800,000 s - $ 70,000 $ 560,000 $ 126,000 $ 560,000 $ 28.000 $ 560,000 $ 70,000 5 560.000 $ 42,000 ESCO BR 13 $ 8,033,000 S 200,875 $ 170,000 $ 397,500 $ 175,000 $ 388,875 $ 185,000 $ 379,875 S 196.000 $ 370,375 $ 8,033,000 $ - 5 200,875 $ 170,000 S 397,500 5 175,000 $ 388,875 $ 185,000 $ 379,875 $ 195,000 $ 370,375 EMERGENCY GENERATOR BE 13 $ 75,000 $ 10,000 $ 3,750 $ 10,000 $ 3,250 $ 10,000 $ 2,750 $ 10,000 $ 2,250 GIS BE 13 $ 50,000 $ 10,000 $ 2,500 $ 10,000 $ 2,000 $ 10,000 $ 1,500 $ 10,000 $ 1,000 LIBRARY SLATE ROOF BR 13 $ 325,000 $ 25,000 $ 16,250 $ 25,000 $ 15,000 $ 25,000 $ 13,750 $ 25,000 $ 12,500 LIBRARY BLDG UPDATES BR 13 $ 100,000 $ 10,000 $ 5,000 8 10,000 $ 4.500 $ 10,000 $ 4,000 $ 10,000 $ 3,500 MICROWAVE LINK POL&FIRE BE 13 $ 43,700 $ 8,700 $ Z185 $ 5,000 $ 1,750 $ 5,000 $ 1,500 $ 5,000 $ 1,250 TRUCK DUMP 55000 GVW BE 13 $ 160,000 $ 35,000 '$ 8,000 $ 35,000 $ 6,250 $ 30,000 $ 4,500 $ 30,000 $ 3,000 NOW.r OURTS&LIGHTS BR 13 $ 550,000 $ 40,000 $ 27,500 $ 40,000 $ 25,500 $ 40,000 $ 23,500 $ 40,000 $ 21,500 LIGHTS FOR LINEAR PARK WLKW BR 13 $ 30,000 $ 5,000 $ 1,500 $ 5,000 $ 1,250 $ 5,000 $ 1,000 $ 5,000 $ 750 MOXLEY COURTS RENO&LIGHTS BR 13 $ 250,000 $ 20,000 $ 12,500 $ 20,000 $ 11,500 $ 20,000 $ 10,500 $ 20,000 $ 9,500 VICTORY FH RENOV&EXPANSN BR 13 $ 1,500.000 $ 100,000 $ 75,000 $ 100,000 $ 70,000 $ 100,000 $ 65,000 $ 100,000 $ 60,000 FILLIPELLO PARK GROVE ST BR 13 $ 300,000 $ 30,000 $ 15,000 $ 30,000 $ 13,500 $ 30,000 $ 12,000 $ 30,000 $ 10,500 RINK BLDG RENOV BR 13 $ 775.000 $ 40,000 $ 38,750 $ 40,000 S 38,750 $ 40,000 $ 34.750 $ 40.000 $ 32,750 5 4,192,900 3 - $ - $ 346,900 $ 209,595 $ 340,000 $ 192,250 $ 330,000 $ 175,250 $ 330,000 $ 158,750 GIS BE 14 $ 50,000 $ 10,000 $ 2,500 $ 10,000 $ 2,000 $ 10,000 $ 1,500 LIBRARY BLDG UPDATES BR 14 $ 100,000 $ 10,000 $ 5,000 $ 10,000 $ 4,500 $ 10,000 $ 4,000 IN CRUISER VIDEO SYSTEM BE 14 $ 54,300 $ 14,300 $ 2,715 $ 10,000 $ 2,000 $ 10,000 $ 1,500 APPLICATION SERVER BE 14 $ 60,000 $ 15,000 $ 3,000 $ 15,000 $ 2,250 $ 10,000 $ 1,500 TRUCK DUMP 41000 GVW BE 14 $ 152,000 $ 32,000 $ 7,600 $ 30.000 $ 6.000 $ 30,000 $ 4.500 VIC.FLD TRACK&FIELD HOC BR 14 $ 2,500,00D $ 250,000 $ 125,000 $ 250,000 $ 112.500 $ 250,000 $ 100,000 $ 2,916,300 $ $ - $ - $ - $ 331,300 $ 145,815 $ 325,000 5 120.250 S 320,000 $ 113,000 SCHOOL BR 14 $ 837,500 $ 62,500 $ 41,875 $ 60,000 $ 38,750 $ 55,000 $ 35,750 $ 8a7,500 5 - $ - $ - $ 62,500 $ 41,875 $ 60,000 $ 38,750 5 55,000 $ 35,750 TOWN OF WATERTOWN CIP FY 13 TO FY 17 COST ANALYSIS original FY 13 FY 14 FY 15 FY 16 FY 17 FY COST PRINCIPAL INTEREST PRINCIPAL INTEREST PRINCIPAL INTEREST PRINCIPAL INTEREST PRINCIPAL INTEREST HIGHWAY RECONSTR STB 14 $ 4,000,000 $ 800,000 $ 200,000 $ 800,000 $ 160,000 $ 800,000 $ 120,000 FIRE ALARM DUCT BR 14 $ 300,000 $ 60,000 $ 15,000 $ 60,000 $ 12,000 $ 60,000 $ 9,000 SIDEWALK RECONSTR SWB 14 $ 1,000,0fl0 $ 200,000 $ 50,000 $ 200,000 $ 40,000 $ 200,000 $ 30,000 $ 5,300,000 W s - $ - $1.060.000 5 265,000 $ 1,060,000 $ 212,000 $ 1.060,000 3 159,000 SCHOOL BR 15 $ 1,058,300 $ 78,300 $ 52,915 S 70,000 $ 49,000 $ 1,058,300 $ - $ S $ - $ - $ - $ 78,300 $ 52,915 S 70,000 $ 49,000 HIGHWAY RECONSTR STB 15 $ 2,000,000 $ 400,000 $ 100,000 $ 400,000 $ 80,000 SIDEWALK RECONSTR SWB 15 $ 500,300 $ 100.000 $ 25,000 $ 100,000 5 20,000 $ 2,500,000 $ $ $ - $ - $ - $ 500,000 $ 125,000 $ 500,000 s 100,000 LIBRARY BLDG UPDATES BR 15 $ 50,000 $ 5,000 $ 2,500 $ 5,000 $ 2,250 TRACTOR/LOADER BE 15 $ 34,000 $ 9,000 $ 1,700 $ 10,000 $ 1,250 CUNNIFF SCHOOL FIELD BR 15 $ 300,000 $ 30,000 $ 15,000 $ 30,000 $ 13,500 SKATING ARENA LOBBY BR 15 $ 100,000 $ 5.000 $ 5,000 $ 5,000 $ 4,750 $ 484,Z00 $ - $ - $ - $ - $ - $ - $ 49.000 $ 24,200 $ 50,000 S 21,750 SCHOOL BR 16 $ 861,200 $ 61,200 S 43,060 3 861,200 $ $ - $ - $ - $ - $ - $ - $ - $ 61,200 $ 43,060 LIBRARY BLDG UPDATES BR 16 $ 50,000 $ 5,000 $ 2,500 OCONNELLARTIFICAL TURF BR 16 $ 2.500,000 $ 250,000 $ 125,000 3 2.550,000 $ - $ - $ - $ $ - $ - $ - $ - $ 255,000 $ 127,500 HIGHWAY RECONSTR STB 16 $ 4,000,000 $ 800,000 $ 200,000 SIDEWALK RECONSTR SWB 16 $ 1,000,000 $ 200.000 $ 50,000 $ 5.000.000 $ - $ - $ - $ $ - $ $ $ - $ 1,000,000 $ 250,000 LIBRARY BLDG UPDATES BR 17 $ 50,000 FILLIPELLO PARK LIGHTING BR 17 $ 250.000 RENOV HOWE PARK COURT BR 17 $ 150,000 $ 450,000 $ - $ - $ - $ - $ - $ $ $ $ $ - SCHOOL BR 17 $ 4,512,700 $ 4.512,700 $ - $ - $ - S - $ - $ $ $ 3 S - TOTAL $ 43,741,000 $ 251,000 $ 358,875 $1,358,000 $ 833,050 $2,779,800 $ 1,217,715 $ 3,383.300 $ 1,280.590 $ 4,687,200 $ 1,531,735 $ 600.875 $2,191.050 $3,997.515 $ 4,663,890 $ 6,218,935 FY 13 FY 14 FY 15 FY 16 FY 17 PRINCIPAL INTEREST PRINCIPAL INTEREST PRINCIPAL INTEREST PRINCIPAL INTEREST PRINCIPAL INTEREST PERMANENT $ 5,018,000 $ 1,201,667 $3,574,000 $ 1,074,476 $3,524,000 $ 969,871 $ 3,315,000 $ 858,413 $ 3,028,000 $ 753,857 AUTHORIZED $ 147,000 $ 154,250 $ 522,000 $ 191,900 $ 522.000 $ 165,800 $ 522,000 $ 139,700 $ 522,000 $ 113,600 CIP FY13-FY17 $ 251,000 $ 358,875 $1.358,000 $ 833,050 $2,779,800 $ 1,217,715 $ 3,383,300 $ 1,280,590 $ 4,687.200 $ 1,531,735 TOTAL S 5,416,000 $ 1,714.792 $5,454,000 $ 2,099,426 $6,825,800 $ 2,353,386 $ 7.220,300 $ 2,278,703 $ 0.237,200 $ 2,399.192 $7,130,T92 $7.553,426 $9,179,186 $ 9.499,003 $ 10.636,392 TOWN OF WATERTOWN 3 -S Iz CIP FY 13 TO FY 17 COST ANALYSIS-revised 3-5-12 W i-�k C�w►m,�cC'� rc c n++l+tiu4Rc�a�i t FY 13 FY 14 FY 15 FY 16 FY 17 FY COST PRINCIPAL INTEREST PRINCIPAL INTEREST PRINCIPAL INTEREST PRINCIPAL INTEREST PRINCIPAL INTEREST AMBULANCE BE 11 $ 210,000 $ 21,000 $ 10,500 $ 21,000 $ 9,450 $ 21,000 $ 8,400 $ 21,000 $ 7,350 $ 21,000 $ 6,300 SWAP LOADER BE 11 $ 160,000 $ 35,000 $ 8,000 $ 35,000 $ 6,250 $ 30,000 $ 4,500 $ 30,000 $ 3,000 $ 30,000 $ 1,500 SIDEWALKTRACTOR BE 11 $ 157,000 $ 32,000 $ 7,850 $ 35,000 $ 6,250 $ 30,000 $ 4,500 $ 30,000 $ 3,000 $ 30,000 $ 1,500 PARK RENOVATIONS BR 11 $ 200.000 $ 15,000 $ 10,000 $ 15,000 $ 9,250 $ 15,000 $ 8,500 $ 15,000 $ 7,750 $ 15,000 $ 7,000 RINK IMPROVEMENTS 11 $ 25,000 $ 5,000 $ 1,250 $ 5,000 $ 1,000 $ 5.000 $ 750 $ 5,000 $ 500 $ 5,000 $ 250 SENIOR SHUTTLE BUS BE 11 $ 110,000 $ 25,000 $ 5,500 $ 25,000 $ 4,250 $ 20,000 $ 3,000 $ 20,000 $ 2,000 $ 20,000 $ 1,000 $ 862,000 $ 133,000 $ 43,100 $ 136,000 $ 36,450 $ 121,000 $ 29,650 $ 121,000 $ 23,600 $ 121,000 $ 17,550 GIS BE 12 $ 50,000 $ 10,000 $ 2,500 $ 10,000 $ 2,000 $ 10,000 $ 1,500 $ 10,000 $ 1,000 $ 10,000 $ 500 NETWORK STORAGE/SERV BE 12 $ 60,000 $ 15,000 $ 3,000 $ 15,000 $ 2,250 $ 10,000 $ 1,500 $ 10,000 $ 1,000 $ 10,000 $ 500 INFRASTR. MUNIS SERVER BE 12 $ 40,000 $ 10,000 $ 2,000 $ 10,000 $ 1,500 $ 10,000 $ 1,000 $ 5,000 $ 500 $ 5,000 $ 250 PUMPER TRUCK REPLACE BE 12 $ 515,000 $ 35,000 $ 25,750 $ 35,000 $ 24,000 $ 35,000 $ 22,250 $ 35,000 $ 20,500 $ 35,000 $ 18,750 BULLET PROOF VESTS BE 12 $ 12,000 $ 7,000 $ 600 $ 5,000 $ 250 SPEED FEEDBACK TRAILER BE 12 $ 20,000 $ 5,000 $ 1,000 $ 5,000 $ 750 $ 5,000 $ 500 $ 5,000 $ 250 DIGITAL ASSET MGMT SYST BE 12 $ 18,000 $ 8,000 $ 900 $ 5,000 $ 500 $ 5,000 $ 250 $ 715,000 $ 90,000 $ 35,750 $ 85,000 $ 31,250 $ 75,000 S 27,000 $ 65,000 $ 23.250 $ 60,000 is 20,000 SCHOOL BR 13 $ 442,300 $ 35,100 $ 22.115 $ 35,000 $ 20,360 $ 35,000 $ 18,610 $ 35,000 $ 16,860 $ 442,300 $ - S - $ 35,100 S 22,115 $ 35,000 $ 20,360 $ 35.000 $ 18,610 $ 35,000 $ 16,860 MAIN FIRE BR 13 $ 85,000 5 - $ 2,125 $ 10,000 $ 4,250 $ 10,000 $ 3,750 $ 10,000 $ 3,250 $ 10,000 $ 2,750 NORTH FIRE BR 13 $ 43,000 $ - $ 1,200 $ 5,000 $ 2,400 $ 5,000 $ 2,150 $ 5,000 $ 1,900 $ 5,000 $ 1,650 EAST FIRE BR 13 $ 10,000 $ - $ 250 $ 5,000 $ 500 $ 5,000 $ 250 $ 138,000 S $ 3,575 $ 20,000 $ 7,150 $ 20.000 $ 6,150 $ 15.000 $ 5,150 $ I5,GO" 71 4,400 HIGHWAY RECONSTR STB 13 $ 2,000,000 $ 50,000 $ 400,000 $ 90,000 $ 400,000 $ 70,000 S 400,000 $ 50,000 $ 400,000 $ 30,000 FIRE ALARM DUCT BR 13 $ 300,000 $ 7,500 $ 60,000 $ 13,500 $ 60,000 $ 10,500 $ 60.000 $ 7,500 $ 60,000 $ 4,500 SIDEWALK RECONSTR SWB 13 $ 500,000 $ 12.500 $ 100,000 $ 22.500 $ 100,000 $ 17.500 $ 100,000 $ 12,500 $ 100,000 $ 7,500 $ 2,800.000 $ - $ 70,000 $ 560,000 $ 126,000 $ 560,000 $ 98.000 $ 960,000 $ 70,000 $ 560,000 S 42,000 ESCO BR 13 $ 8,033,000 $ 170.000 $ 397,500 $ 175,000 $ 388.875 $ 185.000 $ 379,875 $ 195,000 $ 370,375 $ 8,033,000 $ - $ - $ 170,000 $ 397,500 $ 175,000 $ 388,875 $ 185,000 $ 379,875 $ 195,000 $ 370,375 EMERGENCY GENERATOR BE 13 $ 75,000 $ 10,000 $ 3,750 $ 10,000 $ 3,250 $ 10,000 $ 2,750 $ 10,000 $ 2,250 GIS BE 13 $ 50,000 $ 10,000 $ 2,500 $ 10,000 $ 2,000 $ 10,000 $ 1,500 $ 10.000 $ 1,000 LIBRARY SLATE ROOF BR 13 $ 325,000 $ 25,000 $ 16,250 $ 25,000 $ 15,000 $ 25,000 $ 13,750 $ 25,000 $ 12,500 LIBRARY BLDG UPDATES BR 13 $ 100,000 $ 10,000 $ 5,000 $ 10,000 $ 4,500 $ 10,000 $ 4,000 $ 10,000 $ 3,500 MICROWAVE LINK POL&FIRE BE 13 $ 43,700 $ 8,700 $ 2,185 $ 5,000 $ 1,750 $ 5,000 $ 1,500 $ 5,000 $ 1,250 TRUCK DUMP 55000 GVW BE 13 $ 160,000 $ 35,000 $ 8,000 $ 35,000 $ 6,250 $ 30,000 $ 4,500 $ 30,000 $ 3,000 RENOV.CASEY COURTS&LIGHTS BR 13 $ 550,000 $ 40,000 $ 27,500 $ 40,000 $ 25,500 $ 40,000 $ 23,500 $ 40,000 $ 21,500 LIGHTS FOR LINEAR PARK WLKW BR 13 $ 30,000 $ 5,000 $ 1,500 $ 5,000 $ 1,250 $ 5,000 $ 1,000 $ 5,000 $ 750 MOXLEY COURTS RENO&LIGHTS BR 13 $ 250,000 $ 20,000 $ 12,500 $ 20,000 $ 11,500 $ 20,000 $ 10,500 $ 20,000 $ 9,500 VICTORY FH RENOV&EXPANSN BR 13 $ 1,500,000 $ 100,000 $ 75,000 $ 100,000 $ 70,000 $ 100,000 $ 65,000 $ 100,000 $ 60,000 FILLIPELLO PARK GROVE ST BR 13 $ 300,000 $ 30,000 $ 15,000 $ 30,000 $ 13,500 $ 30,000 $ 12.000 $ 30,000 $ 10,500 RINK BLDG RENOV BR 13 $ 775,000 $ 40,000 $ 38,750 $ 40,000 $ 36.750 $ 40,000 $ 34,750 $ 40,000 $ 32,750 $ 4,158.700 S - $ - $ 333,700 $ 207,935 $ 330,000 $ 191,250 $ 325,000 $ 174,750 $ 325,000 $ 158,500 GIS BE 14 $ 50,000 $ 10,000 $ 2,500 $ 10,000 $ 2,000 $ 10,000 $ 1,500 LIBRARY BLDG UPDATES BR 14 $ 100,000 $ 10,000 $ 5,000 $ 10,000 $ 4,500 $ 10,000 $ 4,000 IN CRUISER VIDEO SYSTEM BE 14 $ 54,300 $ 14,300 $ 2,715 $ 10,000 $ 2,000 $ 10,000 $ 1,500 APPLICATION SERVER BE 14 $ 60,000 $ 15,000 $ 3,000 $ 15,000 $ 2,250 $ 10,000 $ 1,500 TRUCK DUMP 41000 GVW BE 14 $ 152.000 $ 32,000 $ 7,600 $ 30,000 $ 6,000 $ 30,000 $ 4,500 VIC.FLD TRACK&FIELD HOC BR 14 $ 2,500,000 $ 250,000 $ 125,000 $ 250,000 $ 112,500 $ 250,000 $ 100,000 $ 21916,300 $ - $ S - $ - $ 331,300 $ 145,815 $ 325.000 $ 129.250 $ 320,000 5 113.000 SCHOOL BR 14 $ 837,500 $ 62.500 $ 41,875 $ 60,000 $ 38.750 $ 55,000 S 35,750 $ 837.500 $ $ - $ - $ - $ 62,500 $ 41,875 $ 60,000 $ 38,750 $ 55,000 $ 35,750 TOWN OF WATERTOWN CIP FY 13 TO FY 17 COST ANALYSIS-revised 3-5-12 FY13 FY 14 FY 15 FY 16 FY 17 FY COST PRINCIPAL. INTEREST PRINCIPAL INTEREST PRINCIPAL INTEREST PRINCIPAL INTEREST PRINCIPAL INTEREST HIGHWAY RECONSTR STB 14 $ 4,000,000 $ 800,000 $ 200,000 $ 800,000 $ 160,000 $ 800,000 $ 120,000 FIRE ALARM DUCT BR 14 $ 300,000 $ 60,000 $ 15,000 $ 60,000 $ 12,000 $ 60,000 $ 9,000 SIDEWALK RECONSTR SWB 14 $ 1,000,000 $ 200,000 $ 50,000 $ 200,000 $ 40,000 5 200.000 $ 30,000 $ 5,300,000 $ - $ - 5 $ - $1,060,000 $ 265,000 $ 1,060,000 $ 212,000 $ 1,060,000 $ 159,000 SCHOOL BR 15 $ 1,058,300 $ 78,300 $ 52,915 5 70,000 $ 49,000 $ 1,058,300 $ - $ $ $ - $ - $ - 5 78,300 $ 52,915 $ 70,000 5 49,000 HIGHWAY RECONSTR STB 15 $ 2,000,000 $ 400,000 $ 100,000 $ 400,000 S 80,000 SIDEWALK RECONSTR SWB 15 $ 500,000 $ 100,000 $ 25,000 $ 100,000 S 20,000 $ 2.500,000 $ - $ 5 S - $ - $ - $ 500,000 $ 125,000 $ 500,000 $ 100,000 LIBRARY BLDG UPDATES BR 15 $ 50,000 $ 5,000 $ 2,500 $ 5,000 $ 2,250 TRACTOR/LOADER BE 15 $ 34,000 $ 9,000 $ 1,700 $ 10,000 $ 1,250 CUNNIFF SCHOOL FIELD BR 15 $ 300,000 $ 30,000 $ 15,000 $ 30,000 $ 13,500 SKATING ARENA LOBBY BR 15 $ 100,000 $ 5,000 $ 5,000 $ 5,000 $ 4,750 $ 484,000 $ - $ $ - $ - $ - $ $ 49,000 $ 24,200 $ 50,000 $ 21,750 SCHOOL BR 16 $ 861.200 $ 81,200 $ 43,060 $ 861,200 $ - $ - $ - 5 - $ - 5 $ - $ $ 61,200 $ 43,060 LIBRARY BLDG UPDATES BR 16 $ 50,000 $ 5,000 $ 2,500 OCONNELL ARTIFICAL TURF BR 16 $ 2,500,000 $ 250,000 $ 125,000 $ 2,650.000 5 $ $ $ - $ - $ $ $ - $ 255,000 S 127,500 HIGHWAY RECONSTR STB 16 $ 4,000,000 $ 800,000 S 200,000 SIDEWALK RECONSTR SWB 16 $ 1,000,000 S 200,000 S 50,000 $ 5,000,000 $ - $ - $ $ - $ $ $ $ $ 1,000,000 $ 250,000 LIBRARY BLDG UPDATES BR 17 $ 50,000 FILLIPELLO PARK LIGHTING BR 17 $ 250,000 RENOV HOWE PARK COURT BR 17 $ 150.000 $ 450,000 5 - $ $ $ - $ - $ $ - $ - $ SCHOOL BR 17 $ 4,512,700 $ 4,512,700 $ - $ - $ - $ - $ - $ - $ - S - $ - $ - TOTAL $ 43,619,000 5 223;000 $ 152,425 $1,339,800 $ 826,400 $2,769,600 $ 1,213,975 $ 3,378,300 $ 1,277;350 $ 4,682,200 $ 1,528,745 $ 375,425 $2,168,200 $3,983,775 $ 4,655,650 $ 6,210,945 FY 13 FY 14 FY 15 FY 16 FY 17 PRINCIPAL INTEREST PRINCIPAL INTEREST PRINCIPAL INTEREST PRINCIPAL INTEREST PRINCIPAL INTEREST PERMANENT $ 5,018,000 $ 1,201,667 $3,574,000 $ 1,074,476 $3,524,000 $ 969,871 $ 3,315,000 $ 858,413 $ 3,028,000 $ 753,857 AUTHORIZED $ 147,000 $ 154,250 $ 522.000 $ 191.900 $ 522,000 $ 165,800 $ 522,000 $ 139.700 $ 522,000 $ 113,600 C I P FY13-FY17 $ 223,000 $ 152,425 $1,339,800 $ 82B,400 $2,769,600 $ 1,213,975 $ 3,378,300 $ 1,277,350 $ 4.682.200 $ 1,528,745 TOTAL $ LaB4O00 $ 1,508,342 $5,435,800 $ 2.094,776 $6,915.800 $ 2,349,646 $ 7,215,300 $ 2,275,463 5 6.232,200 $ 2,396,202 $6,896,342 $7.530,576 $9,155.446 $ 9,490,783 $ 10.628,402 ~-- - Expenditure Forecast Debt and Interest Source FY2012 FY2013 FY2014 FY2015 Permanent Debt/Interest $6,539,020 $6,219,667 $4,648,476 $4,493,871 Authorized & Planned Debt/Interest $594,575 $1,877,383 $3,777,588 $4,721,145 Planned Debt/Interest Streets & Sidewalks $0 $825,000 $1,959,500 $2,556,500 Other $594,575 $1,052,383 $1,818,088 $2,164,645 Cost of Bond Certification $30,000 $30,000 $30,000 $30,000 TOTAL $7,163,595 $8,127,050 $8,456,064 $9,245,016 49 r Expenditure Forecast Capital Projects Source FY2012 FY2013 FY2014 FY2015 Town $145,000 $150,000 $155,000 $160,000 Street & Sidewalk Improvements $718,500 $754,425 $792,146 $831,754 TOTAL $863,500 $904,425 $947,146 $991,754 50 y ��r rojected Comparison FY2012 FY2013 Variance Taxes $74,139,035 $77,062,433 $2,923,398 State Aid $9,587,202 $9,240,242 ($346,960) Local Receipts $11,182,500 $10,261,346 ($921,154) Other Financing $5,287,263 $5,253,163 ($34,100) Total Revenue $100,196,000 $101,817,183 $1,621,183 Education Appropriation $34,140,000 $34,993,500 $853,500 Town Depts. Approp. $27,292,659 $27,974,976 $682,317 Waste Disposal $3,236,940 $3,334,048 $97,108 Snow & Ice Removal $882,000 $973,000 $91,000 State Assessments $2,211,377 $2,271,651 $60,274 Pension Costs $8,822,766 $9,178,382 $355,616 Insurance $13,281,474 $14,249,224 $967,750 Debt & Interest $7,163,595 $8,127,050 $963,455 Capital Projects & OFU $3,165,189 $2,048,705 ($1,116,484) Total Expenditures $100,196,000 .$103,150,537 $2,954,537 Projected Surplus/(Deficit) $0 ($1,333,353) ($1,333,353) Projected Surplus/(Deficit) No Departmental Growth 5�;53 $202,464 $202,464 55 d3.i .