HomeMy Public PortalAbout2010_08_10_R118 - FY 2011 Street Resurfacing ProgramThe Town of
Leesburg,
Virginia
PRESENTED Aueust 10.2010
RESOLUTION NO. 2010-I18 ADOPTED Aueust 10, 2010
A RESOLUTION: AUTHORIZING A STREET RESURFACING PROGRAM FOR FY2011
WHEREAS, the FY2011 budget appropriated $975,500 for street milling, resurfacing, concrete
repairs, and handicap ramp installations; and
WHEREAS, in a memorandum dated July 28, 2010, the Director of Public Works has
recommended the following streets be included in the FY2011 Annual Street Resurfacing Program:
Name of Street and Limits
1. R[e. 15 By-Pass (Rte. 7 overpass to Edwazds Ferry Rd: NBL)
2. Rte. 15 By-Pass (Edwazds Ferry Rd. to Ft. Evans Rd: SBL)
3. Ft. Evans Rd. (Rte.15 By-Pass [o Potomac Station DrJ
4. Edwazds Ferry Rd. (Heritage Way to Rte. 15 By-Pass)
5. Heritage Way (Edwards Ferry Rd. North to End)
6. Cedaz Walk Cir. (Ft. Evans Rd. to Cedar Walk CirJ
7. Kincaid Blvd. (Battlefield Pkwy. to Tammy Terr.)
8. Kincaid Blvd. (Tammy Ters. [o Patrice Dr.)
9. Oakcrest Manor Dr. (Georgetown Ct. to Catoctin Cir.)
10. Daniels St. (Ayr St. to End)
11. Ayr St. (Daniels St. to Old Waterford RdJ
12. Meadows La. (Fort Evans Rd. [o End)
WHEREAS, if funding is available[he following streets shall also be included in the FY2011
Street Resurfacing program:
Name of Suee[ and Limits
1. Belmont PL (Belmont Dr. to Cul-de-sac)
2. Rock Spring Dr. (Dry Mill Rd. to End)
3. Catoctin Cic (S. King St. to Valley View Ave.)
4. S. King St (Fairfax St. to Catoctin Cir.)
5. W. Mazket St. (Ayr St. to Liberty StJ
6. Edwazds Ferry Rd. (Catoctin Cir. to Washington StJ*
7. Edwazds Ferry Rd. (Plaza St. to Heritage Way)
8. Appletree Dc (Plaza St. to Mazshall Dr.)
9. Battlefield Pkwy. (Kincaid Blvd. to Tavistock Dr. - WBL)
-2-
A RESOLUTION: AUTHORIZING A STREET RESURFACING PROGRAM FOR FY2011
10. Davis Ave. (S. King St. to Cul-de-sac)
11. Valley View Ave. (Davis Ave. to Cul-de-sac)
12. South St. (Trailer Pazk to Catoctin CirJ
13. Sycolin Rd. (E. Market St. [o End)
14. Fieldstone Dc (Battlefield Pkwy. to Ginger SqJ
15. Chadfield Way (Battlefield Pkwy to Whitney PL)
16. Amber Ct. (Stoneledge PI. to Cul-de-sac)
17. Forbes C[. (Heritage Way to Cul-de-sac)
18. Loudoun St. (Harrison St. to E. Market StJ*
19. Loudoun St. (Harrison St. to S. King StJ*
* Within limits of Town Capital Project
THEREFORE, RESOLVED by the Council of the Town of Leesburg in Virginia as follows:
The FY2011 Stree[ Resurfacing Program outlined in a memorandum to the Town Council dated
July 28, 2010, in the priority listed, is approved. P:\Resolutions\Resolutions 2010\0810 FY2011 SVeet
Milling Program.doc
PASSED [his 10'" day of Auelrst, 2010.
A ST:
C //
-~
Clerk of~o cil
P'.UtesolutionsUtesoWtions 2010\0810 FY20I1 Str«t Milling Pmgrem.doc