Loading...
HomeMy Public PortalAbout2010_09_14_R123 Battlefield Pkwy Rt. 15 to Greenway Project CO2 001The Toum of Leesburg, Virginia PRESENTED September 14. 2010 RESOLUTION NO. 2010-123 ADOPTED September 14.2010 A RESOLUTION: BATTLEFIELD PARKWAY -ROUTE 15 TO DULLES GREENWAY PROJECT CHANGE ORDER NO. 2 FOR DESIGN AND ENGINEERING SERVICES WHEREAS, the Battlefield Pazkway -Route 15 to Dulles Greenway Project is a funded capital project; and WHEREAS, the Town awarded a contract to Rinker Design Associates in February 2007 in the amount of $455,000 to provide design and engineering services for the design of Battlefield Parkway between Route 15 (South King Street) and Route 621 (Evergreen Mill Road); and WHEREAS, [he original design contract value has previously been increased to $553,877.00 due to extension of the project to include 4-laving the existing 2-lane section between Evergreen Mill Road and the Dulles Greenway and for other additional services requested by the Town; and WHEREAS, Change Order No. 2 in the amount of $94,090.00 is required in order [o modify the design to provide an initial 2-lane roadway between South King Street and Evergreen Mill Road and to coordinate with the proposed Leesburg South subdivision development; and WHEREAS, Change Order No. 2 increases the modified design contract amount by more than the allowable 25% or $50,000, whichever is greater, as allowed by [he Virginia Public Procurement Ac[ and the CIP Policies and Procedures Manual; and WHEREAS, the Departrnent of Capital Projects Management recommends that this design change order be approved. -2- A RESOLUTION: BATTLEFIELD PARKWAY -ROUTE 15 TO DULLES GREENWAY PROJECT CHANGE ORDER N0.2 FOR DESIGN AND ENGINEERING SERVICES THEREFORE, RESOLVED by the Counci] of the Town of Leesburg m Virginia that the Town Manager is authorized to execute Change Order No. 2 to the contract with Rinker Design Associates in the amount of $94,090.00 for providing the additional design and engineering services for the Battlefield Pazkway -Route 15 to Dulles Cneenway project for a revised design contract total of $647,967.00. PASSED this ]4'" day of September, 2010. his mstattd, Mayor Town of Leesburg A ST• Clerk of P:ViesoWtions\Resolutions 2010\0914 Benlefeld Rk IS b Greenwey Desi~ C02.dac