HomeMy Public PortalAboutORD15672 BILL NO. 2017-15
•
SPONSORED BY COUNCILMAN Graham
ORDINANCE NO. Za-/)—
AN ORDINANCE-OF THE CITY OF JEFFERSON; MISSOURI, AUTHORIZING THE MAYOR
AND CITY CLERK TO EXECUTE A $4,755,986.00 AGREEMENT WITH SENTINEL
EMERGENCY SOLUTIONS AND ROSENBAUER AMERICA, LLC FOR THE PURCHASE OF
SEVEN ROSENBAUER COMMANDER FIRE APPARATUS TO REPLACE THE CURRENT
FRONTLINE FLEET FOR THE JEFFERSON CITY FIRE DEPARTMENT.
BE IT ENACTED BY THE COUNCIL OF THE CITY OF JEFFERSON, MISSOURI, AS
FOLLOWS:
Section 1. The Mayor and City Clerk are hereby authorized and directed to execute an
agreement with Rosenbauer America, LLC through Sentinel Emergency Solutions via the H-
GAC cooperative purchase program
Section 2. The agreement shall be substantially the same in form and content as that
agreement attached hereto as Exhibit A.
Section 3. This Ordinance shall be in full force and effect from and after the date of its
passage and approval.
Passed: ! 41 17 Approved: reIMA.1. Co/ I 1
•
Presiding'officer^ ` - Mayor Carrie Tergin•
ealt/VC1:7;16((44
ATTEST: -7' APPROVED AS TO FORM:
ity 9* %///41 . -
Clerk / City C6unselbr
I`�
Exhibit A
1
FINANCE DEPARTMENT
PURCHASING DIVISION
SUBJECT: Cooperati ve Procurement, H-GAC
Purchase of Fire Apparatus
RECOMMENDATION:
Staff r ecomme nd s purchase of the seven unit s from Rosen ba ue r America thro ugh Senti ne l
Emergency So luti o ns at a total cost of $4 ,755,986.00.
BID VENDOR:
Rosenbauer America/Sentine l E merge ncy Solutions
FISCAL NOTE:
10-400-575004 Fire Appar atus
20 16-17 Budget
F ire Apparatu s
Balance
$4,755 .986 .00
$4.755.986.00
$ -0-
PAST PERFORMANCE:
$4,755,986.00
The City h as not awarded to thi s vendor in the pas t; however,staff feels the vendor will pro vide
the ap paratus as specifi ed and b id.
ATTACHMENTS -SUPPORTING DOCUMENTATION
Signatur e ~~t4eltt)
Pu has m g 'Age nt
To:
From:
Date:
Re:
T e r ry Stephenson, Purchasing Agent
Matthew Schofie ld, Fire Chief ~ -5/4/2017
Recommendation Contract for Fire Appa r a tu s Replacement
Afte r 14 month s of co n s id eration the Fire Department is recommending purchase
of r ep lacement apparatus from Rosen bauer Americ a through Sentinel Emergency
So lutions via the H-GAC cooperative purchase program.
The Fire Apparatus Specification committee consisted of the fo ll owing
members:
• A-Sh ift: Driver Kuster & FF Engleh a rdt
• 8-Sh ift: FF Trapani & Driver Le ivian
• C-Shift: Driver Hays & Capt. Muenks
• Assistant ChiefTim Grace
I have extensively reviewed and made minor adjustments to the ir recommended
specific atio n s and I a m forwarding their speci ficatio n s to you with my full endorsement.
You w ill r eca ll the city joined H-GAC in November of2016 for the specific purpose
of purchasing repl acement Fire Apparatus. During the specific ation process three
manufactu r es were examined. Early in the process KME (Rev Group) was excluded
because the apparatus did not meet the Fire Departments min imum requirements. The
two remaining vendo rs, Rosen bauer and Pierce, offe r ed final bids based on analogous
specifications developed by the department's apparatus committee and were evaluated
v igoro u s ly. Th e cost will be $4,755,986.00 for 3 Eng in es, 2 Re scue Pumper s, 1 Ladder
(109ft), a nd 1 Platform (101ft), 7 trucks total. Th e r emaining funds sec ured through
RFP 2908 w ill b e u sed to purchase l oose e quipment, essential to t h e successfu l
depl oyment of the apparatus.
Additionally, I am including pricing information from Pierce and Rosenbauer and
other recent purchases for similar apparatus by surrounding Departments. Also
included below are various features and a schematic drawing of each type of apparatus.
Cost Comparison after best and final
Pierce Rosen bauer Others Truck Orders
Engine $616,107.00 $556,472 $780,000 (Wentzville)
Sguad $641,435.00 $600,147 $800,000 (Roberson)
Ladder $957,544.00 $895,895 $1,260,000 (Maryland
Heights)
Platform $1,123,549.00 $990,381 $1,240,000 (Wentzville)
The Apparatus will include the following features and capabilities:
• 100,000psi cab crush standard for rollover protection
• Ladder accident prevention (auto bedding, short jacking, collision prevention)
• Front-Side Airbags, TPMS, & Electronic stability control
• Radio Headsets for hearing protection and improved interoperability
• Remote nozzles (Ladder and Engines) efficiency with limited personnel
• Additional Reach of Aerial Ladders 101/109ft stick vs. 100ft
• Higher cramp/approach/departure angles than previous trucks
• Ergonomics/ configuration improvements/ efficiency of layout
• Rust prevention: coated frame rails, extruded aluminium, galvanized ladders
• Refined emission technology & advanced diagnostics and troubleshooting
Pumper (Engine 1, Engine 3, Engi ne 4)
Squad (R esc ue Pumper) Squad 2 & Squad 5
109ft Straight La dd er (Stick) (Ladder 1)
-R K"U.CaiiJt.
to trfP It •'" ll tr Ill• , I
~.~ .. ;:.:-\ \
.,. :-1
1 00ft Ladde r Platform (Tower) (Ladder 3)
p er your reques tH GACb -asec h . &b aSS IS I d db I ox cost are 1nc u e eow b fi "fi t" e ore s_pec1 ca 1onan d t cus om1za ti on.
HGAC Link Rosenbauer Pierce KME Item ,,,y, .. "' ........... ,..,
Rosen bauer Commander, 4-Door Pierce Dash CF, 4-Door, Door, Full-Tilt,
Full-Tilt, Aluminum Pumper, Full-Tilt, Aluminum Cab, Aluminum cab, Alum
Engine/Pumper VC06 Extruded Aluminum Body, Single $ 433,454.00 TC07 Aluminum Body, Single $ 487,569.00 MC05 Body, Single Axle, $ 349,686.00
: Axle, 1500 GPM Pump, Rear-Axle, 1250 GPM Pump, 1250 GPM Pump,
Mounted Pumper PUC Body Pumper Rear-Mounted ..
Rosen bauer Commander, 4-Door Pierce Dash CF,4-Door,
1\IVII: \..U5l;Om1 £+-
Door, Full-Tilt,
Full-Tilt, Aluminum Pumper, Full-Tilt, Aluminum Cab, Aluminum Cab, Alum Rescue VC06 Extruded Aluminum Body, Single $ 433,454.00 TC07 Aluminum Body, Single $ 487,569.00 MC05 Body, Single Axle,
$ 349,686.00
Pumper/Squad: Axle, 1500 GPM Pump, Rear-Axle, 1250 GPM Pump, 1250 GPM Pump, Mounted Pumper PUC Body Pumper n lUI ......... ..a
KME, 4-Door Full-Tilt
Pierce Arrow Chassis, 4-Aluminum Cab,
-Rosen bauer Commander, 4-Door Door Full Tilt Aluminum Formed Aluminum
Ladder 100ft
VA05 Tilt Cab, Extruded Aluminum Body, $ 835,341.00 TA06 Cab, Formed Aluminum $ 935,278.00 MA06 Body, Tandem Axle, $ 917,006.00 aerial straight Tandem Axle, 100' Mid-Mount Steel Body, Tandem Axle, 100' 100' 1000# Mid-
stick: Ladder Mid-Mounted Telescoping Mounted
Ladder {#500) Telescoping Ladder
with Platform
Pierce Arrow Chassis, 4-
KME, 4-Door Full-Tilt
Aluminum Cab,
Rosenbauer Commander,4-Door Door Full Tilt Aluminum Formed Aluminum
Cab, Formed Aluminum Ladder 100ft VA08 Tilt Cab, Extruded Aluminum Body, $ 909,769.00 TA09 Body, Tandem Axle, 100' $1,001,872.00 MA07 Body, Single Axle, $ 980,642.00
platform tower: Tandem Axle, 100' Mid Mount Steel 100' 500# Tractor
Platform Rear-Mounted Telescoping {Mid-Mount),
Ladder with Platform
{750#) Telescoping Steel
Ladder
To:City of Jefferson City (Fire Department)
305 E Miller St
Jefferson City MO 65101
msenbauer
Date:5/10/2017
We hereby propose and agree to furnish, after your acceptance of this proposal and the proper execution by the
City of Jefferson City Fire Department,hereinafter called the BUYER and an officer of Rosenbauer Minnesota,LLC,hereinafter
called the COMPANY,the following apparatus and equipment:
(3)Rosenbauer Commander Pumpers with EXT Body @ $556,472.00 each
(2)Rosenbauer Commander Rescue Pumpers with EXT Body @ $600,147.00 each
(1)Rosenbauer Commander 109'Viper with EXT Body @ $895,895.00 each
(1)Rosenbauer Commander 101'Cobra with EXT Body @ $990,381.00 each
1,669,416.00
1,200,294.00
895,895.00
990,381.00
TOTAL ...$4,755,986.00
Four Million Seven Hundred Fifty-Five Thousand Nine Hundred Eighty-Six Dollars
All of which are to be built in accordance with the specifications,clarifications and exceptions attached,and which are made a part
of this agreement and contract.
Delivery:The estimated delivery time for the completed apparatus,is to be made 365 days after receipt of and approval of this
contract duly executed,subject to all causes beyond the Company's control.The parties agree that time is of the essence and that
liquated damages of $250.00 per day shall be imposed for each day beyond 395 days that the apparatus are not ready for a final
inspection.The quoted delivery period ends on the date established for the final inspection at the factory.Rosenbauer will notify
the customer of the established date for final inspection a minimum of two weeks prior to allow the fire department to make travel
plans to visit the factory. Additional days to mount loose equipment,install radios and apply graphics after the truck leaves the
factory are not included in the quoted delivery period.The quoted delivery time is based upon our receipt of the specified materials
required to produce the apparatus in a timely manner.Rosenbauer must receive complete and accurate sales configuration files
from the dealer/customer within 45 days of the signed contract.Delays in receiving these files beyond 45 days will cause for the
quoted delivery period to be extended.The Company cannot be held responsible for delays due to Acts of God,Labor Strikes,or
Changes in Governmental Regulations that result in delayed delivery to our manufacturing facilities of these specified materials.
This delivery estimate is based on the Company receiving complete and accurate paperwork from the Buyer and that no changes
take place during pre-construction,mid-point inspections or final inspections.Changes required or requested by the Buyer during
the construction process may be cause for an increase in the number of days required to build said apparatus as outlined in the
attached change order policy.
Payment Terms:Final payment for the apparatus shall be made at time of delivery or pick up of the completed vehicle.It is the
responsibility of the Buyer to have full payment ready when the apparatus is complete and ready to deliver. If payment is delayed
or delivery is delayed pending payment,a daily finance and storage fee may apply.Upon delivery of the apparatus or upon
pickup of the apparatus by the Buyer,Buyer agrees to provide all liability and physical damage insurance.It is further agreed that
if on delivery and test,any defects should develop,the Company shall be given reasonable time to correct same.Guarantee of
the chassis is subject to the guarantee of the chassis manufacturer.
Miscellaneous Provisions:This agreement shall be construed in accordance with the laws of the State of Missouri.The parties
agree that any litigation arising from or in connection with any dispute between the parties under this agreement shall be venued
in Missouri.The parties agree that this agreement bears a rational relationship to the State of Missouri,and they consent to the
personal jurisdiction of such state and further consent and stipulate to venue in the above described court.
www.rosenbaueramerica.com
ROSENBAUER SOUTH DAKOTA.LLC.
1CQ THIRD STREET
P.O.BOX 57
LYONS.SOUTH DAKOTA 57041
P:605.543.5591
ROSENBAUER MINNESOTA. LLC.
5181260TH STREET
P.0 BOX 549
WYOMING,MINNESOTA 55092
R 661.462.1000
info @ rosenbaueramerica.com
ROSENBAUER MOTORS.LLC.
5*90 26QTH STREET
P.O. BOX 549
WYOMING.MINNESOTA 55092
P.651.4621 COO
ROSENBAUER AERIALS. LLC.
570 SOUTH BROAD STREET
FREMONT. NEBRASKA 68025
P:4-02.721.7522
v
NOTE: CHASSIS & AERIAL INTEREST ARE REMOVED FROM THE AMOUNTS LISTED ABOVE. IF THE AERIAL AND CHASSIS ARE
NOT PAID FOR BY THE TIME THEY ARE COMPLETED, ADDITIONAL INTEREST AMOUNTS WILL APPLY.
The amount in this proposal shall remain firm for a period of 30 days from the date of same.
Respectfully submitted,
DEALER: SENTINEL EMERGENCY SOLUTIONS
SALES REP: a�/+
BRIAN F
BUYER:
We accept the above proposal and enter into contract with signature below.
7ft
10
Title ��q�/q1 ������------ ,AA�pD " � ��
Title �44-1 i
Date
APPROVED AS TO FORMS
After company receipt of this document signed by the Buyer, the document will be reviewed and upon approval,
countersigned by the Company thereby putting the document in force.
Title I 14004r
ju l4E Date
Page 2 of 2