Loading...
HomeMy Public PortalAbout2012_02_14_R014 Authorizing Reimbursement for PMW Farms WaterlineThe Town of Leesburg, Virginia PRESENTED: February 14, 2012 RESOLUTION NO. 2012 -014 ADOPTED: February 14, 2012 A RESOLUTION: AUTHORIZING REIMBURSEMENT FOR WATER LINE UPSIZING AND INSTALLATION OF A CASING PIPE AT PMW FARMS DEVELOPMENT WHEREAS, the Town's water transmission main report of 2009 had identified the need for construction of a new 16" water line along River Creek Parkway and Fort Evans Road to the Carr tanks; and WHEREAS, Town staff became aware of the PMW Farms deveoper's intentions to build a new water line at approximately same location; and WHEREAS, developer also proposed a new roadway crossing the Town's existing effluent force main to Potomac River whereby a future second parallel pipe is propsed . This crossing would necessitate the need for a casing pipe to eliminate the need for closure of the roadway in future; and WHEREAS, developer has completed the construction and has submitted a reimbursement request to the town; and WHEREAS, the installation has been accepted by the Town and staff has reviewed the reimbursement request provided by developer and are in agreement with the requested amount; and WHEREAS, The adopted 2012 -2017 Capital Improvement Program (CIP) has allocated funds in FY -2012 in the amount of $400,000.00 for this project; and WHEREAS, The total negotiated cost for these improvements now totals $156,580.00, resulting in savings of $243,420.00 for the Town. -2- A RESOLUTION: AUTHORIZING REIMBURSEMENT FOR WATER LINE UPSIZING AND INSTALLATION OF A CASING PIPE AT PMW FARMS DEVELOPMENT THEREFORE, RESOLVED by the Council of the Town of Leesburg in Virginia that the Town manager is hereby authorized to reimburse the developer for the costs associated with this proposal. PASSED this 14th day of February, 2012. r C. mstattd, Mayor Town of Leesburg jv5 41 A, a � - o � — P:\Resolutions\2012 \0214 PMW Farms Reimbursement 2 14 2012.doc