Loading...
HomeMy Public PortalAboutGreenbriar Report PacketJohn F. Argoudelis PRESIDENT Michelle Gibas VILLAGE CLERK TRUSTEES Harry Benton Kevin M. Calkins Patricia T. Kalkanis Cally Larson Tom Ruane Brian Wojowski TO: PLAN COMMISSION FROM: RACHEL RIEMENSCHNEIDER, ASSOCIATE PLANNER MEETING DATE: MAY 2, 2023 SUBJECT: REPORT TO THE PLAN COMMISSION GREENBRIAR PHASE 2 FINAL PLAT CASE NO. 2006-042423.FP REQUEST: Final Plat LOCATION: South of 143rd Street, East of Steiner Road, North of Route 126 APPLICANT: D.R. Horton CURRENT ZONING: R-1 Low Density Single-Family Residential District with a Planned Unit Development COMP. PLAN: Medium Density Residential (2.1 to 3.0 du/ac) BACKGROUND The applicant is seeking approval of a final plat for Phase 2 of the Greenbriar residential subdivision, which encompasses 30.6 acres of the 98-acre site. The property was annexed by annexation agreement and the preliminary plat was approved in February 2021. Existing Conditions/Site Context The subject development incorporates 98.72 acres of land located north of Illinois Route 126 and east of Steiner Road, directly west of the Liberty Grove Subdivision. Phase 2 encompasses 73 lots, approximately 30 acres, north and east of Phase 1. The adjacent land-uses, zoning, and functional street classifications are identified below: North: Undeveloped Agricultural Land (Village R-1) East: Liberty Grove Subdivision (Village R-1, 2.51 du/acre) South: Agricultural Farmstead, A-1 (Will County) West: Steiner Road (Major Collector); Undeveloped Agricultural Land, A-1 (Will County) REPORT TO THE PLAN COMMISSION Page #2 of 4 1937-072021.FP 8/3/2021 GREENBRIAR PLANNED DEVELOPMENT – FINAL PLAT ANALYSIS The applicant is requesting approval of a final plat for Phase 2 of the Greenbriar subdivision. In total, three phases are anticipated to complete the subdivision. Phase 2 includes 30.6 acres of land, 73 single-family lots, right-of-way dedication, as well as outlots for common area open space, drainage and stormwater management. The preliminary plat separated the subdivision into three areas – recognized as A, B, and C. Phase 2 includes 40 lots located within Area B and 33 lots located within Area C. The lots proposed are consistent with the annexation agreement and special use approvals. The Greenbriar subdivision will have 278 single-family residential lots in total. Lot Composition Phase 2 consists of a total of 73 lots: 40 lots located within Area B (single- and two-story homes) and 33 lots located within Area C (single-story homes only). Please see below for a summary of lots provided and the associated standards: Area B – Lots 80-119 Number of Lots in Phase 2 40 Lot Size – Range 8,100 – 12,494 sq ft Lot Size – Average 9,205 sq ft Lot Standards per Annexation Agreement (Ord. 3498) Minimum Lot size 8,000 square feet Minimum Lot Width 60 feet Minimum Setback Front Yard 25 feet Interior Side Yard 6.5 minimum, 14 feet combined Corner Side Yard 25 feet Rear Yard 25 feet Rear Yard (Adjacent to open space) 20 feet Maximum Lot (Building) Coverage 37.50% Maximum Impervious Area Coverage 47.50% Area C – Lots 156-171, 199-206, 236-244 Number of Lots in Phase 2 33 Lot Size – Range 6,500 – 10,761 sq ft Lot Size – Average 7,015 sq ft Lot Standards per Annexation Agreement (Ord. 3498) Minimum Lot size 6,500 square feet Minimum Lot Width 52 feet Minimum Setback Front Yard 25 feet Interior Side Yard 6 feet, 12 feet combined Corner Side Yard 25 feet Rear Yard 25 feet Maximum Lot (Building) Coverage 37.50% Maximum Impervious Area Coverage 47.50% REPORT TO THE PLAN COMMISSION Page #3 of 4 1937-072021.FP 8/3/2021 GREENBRIAR PLANNED DEVELOPMENT – FINAL PLAT Street Alignment / Access / Circulation The 30-acre phase connects to existing streets within both Greenbriar and Liberty Grove. On the eastern side of the proposed phase, a connection to Liberty Grove Boulevard is provided. To the north, this phase extends Greenbriar Drive and Azalia Circle. The applicant is working with staff to select street names for Phase 2; most notable staff has asked that what is currently labeled as “Parkview Drive” be renamed to “Presidential Drive”, as it will ultimately connect to that stub in a future phase. The proposed street network in Phase 2 is consistent with the preliminary plat. Also, within Phase 2, the internal multi-use path system extends to Liberty Grove Boulevard through Outlot L and connects to sidewalks located within the subdivision. Future phases will provide pedestrian access to the multi-use trail within the 7- acre park site. Open Space & Landscaping A landscape plan has been included with the final plat submittal. It is generally in conformance with the Zoning Code and the Preliminary Landscaping Plan. Staff if working with the developer to ensure enough landscaping is provided in the open space areas. The landscape plan for Phase 2 incudes: - A landscaped boulevard on Liberty Grove Boulevard south of Outlot I - Parkway trees - Through lot landscaping adjacent to Steiner Road - Enhanced landscaping for Key Lots. For Phase 2, the following outlots are included: Area (Sq Ft) Area (Acres) Purpose Outlot G 16,694 0.38 Through Lot screening along Steiner Rd Outlot I 77,798 1.79 Park area dedicated to Plainfield Park District Outlot J 136,952 3.14 Trail Outlot K 259,715 5.96 Stormwater Outlot L 6,224 0.14 Pedestrian connection to Liberty Grove Outlot O 1,846 0.04 HOA-controlled outlot adjacent to park donation Total 499,229 11.46 Phase 2 incorporates 10 Key Lots which are primarily located at corner locations. These include Lots 80, 91, 92, 106, 107, 119, 156, 163, 164, and 171. Key Lots are subject to landscaping and architectural enhancements. Phase 2 also includes 7 Through Lots (Lots 199-206). Architectural treatments for Phase 2 include the following: • Standards for all new homes o 25% of all homes in Greenbriar must incorporate a hip roof or clipped gable roof o A window with 1” x 4” trim is required on all sides. o A frieze board must be used on the front elevation of all homes. o There shall be a 6” or 12” eave on all four sides. REPORT TO THE PLAN COMMISSION Page #4 of 4 1937-072021.FP 8/3/2021 GREENBRIAR PLANNED DEVELOPMENT – FINAL PLAT o Masonry returns will extend continuously into porches; there will be no small gaps between brick returns and continuation of wainscoting. • Key Lots o Frieze boards on all four sides. o All key lots shall incorporate 360-degree architecture which includes: ▪ Brick or stone trim continued on all four elevations. ▪ Enhanced window treatment, the same enhancement used on all elevations • Through Lots o Same window treatment on rear elevation as used on front elevation. Stormwater Management/Dormant Special Service Area Outlot K includes stormwater management and a naturalized detention pond. Final engineering is still under review. A Dormant Special Service Area (DSSA) has been established for the Greenbriar subdivision and the applicant has recorded covenants and restrictions. CONCLUSION/RECOMMENDATION In conclusion, staff finds that the proposed Final Plat of Phase 2 of the Greenbriar subdivision is consistent with the preliminary plat, annexation agreement, and substantially in conformance with Village requirements. Prior to discussion by the Plan Commission, staff recommends approval of the final plat. Should the Plan Commission concur, the following motion is offered for your consideration: I move that the Plan Commission recommends approval of the Final Plat for Phase 2 of the Greenbriar subdivision, subject to the following stipulations: 1. Compliance with the requirements of the Village Engineer; and 2. Compliance with the requirements of the Plainfield Fire Protection District. LOCKPORT STREET SUBJECTSITE S. STEINER ROADW. 143RD STREET WALLIN DRIVEVAN DYKE ROADLINE ROADCONSULTANTS: DESCRIPTION INDEX OF SHEETS SHEET NO. 0 COVER SHEET 1 OVERALL LANDSCAPE PLAN 2 LANDSCAPE PLAN 3 LANDSCAPE PLAN 4 LANDSCAPE PLAN 5 LANDSCAPE PLAN 6 LANDSCAPE DETAILS 7 LANDSCAPE DETAILS 8 MONUMENT DETAILS 9 MONUMENT DETAILS 10 TREE PRESERVATION PLAN 11 LANDSCAPE SPECIFICATIONS LOCATION MAP SCALE: 1"=800' LANDSCAPE ARCHITECT: GARY R. WEBER ASSOCIATES, INC 402 W. LIBERTY DRIVE WHEATON, ILLINOIS 60187 CIVIL ENGINEER: CEMCON, LTD. 2280 WHITE OAK CIRCLE, SUITE 100 AURORA, ILLINOIS 60502 Final Landscape Plan GREENBRIAR Plainfield, Illinois July 27, 2022 VIOLET DRIVESTARFLOWER DRIVEPARKVIEWPARKVIEWDRIVEACACIA DRIVE THICKET LANE SANDALWOOD LANE AZALIA LANE VERANIUM DRIVE BLOSSOM LANE BARBERRY DRIVE PETUNIA LANE GREENBRIAR DRIVEDRIVELIBERTY GROVE BOULEVARD STARFLOWER DRIVEGREENBRIAR DRIVESTEINER ROADLIBERTYGROVE BLVD PRESIDENTIAL AVE STEINER ROAD162 1 9 264 248 2 3 4 5 6 7 8 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 2526 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 4849505152 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80 81 82 83 84 85 86 87 88 89 90 91 92 93 94 95 96 97 98 99 100 101 102 103 104 105 106 107 108 109 110 111 112 113 114 115 116 117 118 119 OUTLOT M OUTLOT H OUTLOT J OUTLOT F OUTLOT BOUTLOT G256 257 258 259 260 261 262 263 265 266 267 268 269 270 271 272 273 274 275 276 277 229 228 230 231 232 233 234 235 237 236 238 240 239 241 242 243 244 245 246 247 249 250 251 252 253 254 255 134 135 136 137 138 139 140 141142143144145146147 131 132 133 198 199 200 201 202 203 204 205 206 207 208 209 210 211 212 213 214 215 216 217 218 219 220 221 222 223 224 225 226 227 189190191192193194195196197 180 181 182 183 184 185 186 187 188 164 165 166 167 168 169 170 171 172173174175176177178179 148 149 150 151 152 153 154 155 156157158159160161163 125 124 123 122 121 126 127 128 129 130 120 OUTLOT I OUTLOT K OUTLOT A OUTLOT L SHEET NO. REVISIONS DRAWN CHECKED DATE PROJECT NO.PLOT CONFIG:XREFS:OVERALL LANDSCAPE PLAN1 GREENBRIARPLAINFIELD, ILLINOIS7.20.2021 DR2197 CLE MGM OF 11 11.03.2021 11.23.2021 02.18.2022 07.27.2022 REV 1 REV 2 REV 3 REV 4 1750 EAST GOLF ROAD, SUITE 925SCHAUMBURG, IL 60173 CEMCON, LTD.2280 WHITE OAK CIRCLESUITE 100AURORA, ILLINOIS 60502-9675 CLIENT CIVIL ENGINEER Know what'sbelow.before you dig.Call R 0 100' 200' 400' 600'SCALE: 1"=200'NORTH GENERAL NOTES SHEET 2 SHEET 3 SHEET 4 SHEET 5 ‘’ ‘’ PLANT LIST NATIVE AREA SEED 162 OUTLOT M OUTLOT HOUTLOT G266 267 268 269 270 271 272 273 274 275 276 277 229 228 230 231 232 233 234 235 237 236 238 240 239 241 242 243200 201 202 203 204 205 206 207 208 209 210 211 212 213 214 215 216 217 218 219 220 221 222 223 224 225 226 227 189190191192193194195196197 180 181 182 183 184 185 186 187 188 164 165 166 167 168 169 170 171 172173174175176177178179 148 149 150 151 152 153 154 155 156157158159160161163VIOLET DRIVEPARKVIEWACACIA DRIVE THICKET LANE SANDALWOOD LANE GREENBRIAR DRIVEDRIVESTEINER ROADSHEET NO. REVISIONS DRAWN CHECKED DATE PROJECT NO.PLOT CONFIG:XREFS:LANDSCAPE PLAN2 GREENBRIARPLAINFIELD, ILLINOIS7.20.2021 DR2197 CLE MGM OF 11 11.03.2021 11.23.2021 02.18.2022 07.27.2022 REV 1 REV 2 REV 3 REV 4 1750 EAST GOLF ROAD, SUITE 925SCHAUMBURG, IL 60173 CEMCON, LTD.2280 WHITE OAK CIRCLESUITE 100AURORA, ILLINOIS 60502-9675 CLIENT CIVIL ENGINEER Know what'sbelow.before you dig.Call R0 25' 50' 100' 150'SCALE: 1"=50'NORTH MATCH LINE SHEET 3 MATCH LINE SHEET 3 SEE SEPARATEPARK PLANS LIBERTY GROVE BLVD 264 248 42 43 44 45 46 47 79 119 OUTLOT B 256 257 258 259 260 261 262 263 265 244 245 246 247 249 250 251 252 253 254 255 134 135 136 137 138 139 140 141142143144145 146147 131 132 133 198 199 125 124 123 122 121 126 127 128 129 130 120 OUTLOT I OUTLOT A AZALIA LANE VERANIUM DRIVE LIBERTY GROVE BOULEVARD PARKVIEWGREENBRIAR DRIVEDRIVESTEINER ROADSHEET NO. REVISIONS DRAWN CHECKED DATE PROJECT NO.PLOT CONFIG:XREFS:LANDSCAPE PLAN3 GREENBRIARPLAINFIELD, ILLINOIS7.20.2021 DR2197 CLE MGM OF 11 11.03.2021 11.23.2021 02.18.2022 07.27.2022 REV 1 REV 2 REV 3 REV 4 1750 EAST GOLF ROAD, SUITE 925SCHAUMBURG, IL 60173 CEMCON, LTD.2280 WHITE OAK CIRCLESUITE 100AURORA, ILLINOIS 60502-9675 CLIENT CIVIL ENGINEER Know what'sbelow.before you dig.Call R 0 25' 50' 100' 150'SCALE: 1"=50'NORTH NORTH ENTRANCESEE DETAIL SHEET 6 MATCH LINE SHEET 4 MATCH LINE SHEET 4 MATCH LINE SHEET 2 MATCH LINE SHEET 2 BOULEVARD LANDSCAPESEE DETAIL SHEET 7 PARK SEE SEPARATEPARK PLANS 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48495051 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80 81 82 83 84 85 86 87 88 89 90 91 106 107 108 109 110 111 112 113 114 115 116 117 118 119 OUTLOT J OUTLOT LPARKVIEWDRIVEBLOSSOM LANE BARBERRY DRIVESTARFLOWER DRIVEGREENBRIAR DRIVESTEINER ROADSHEET NO. REVISIONS DRAWN CHECKED DATE PROJECT NO.PLOT CONFIG:XREFS:LANDSCAPE PLAN4 GREENBRIARPLAINFIELD, ILLINOIS7.20.2021 DR2197 CLE MGM OF 11 11.03.2021 11.23.2021 02.18.2022 07.27.2022 REV 1 REV 2 REV 3 REV 4 1750 EAST GOLF ROAD, SUITE 925SCHAUMBURG, IL 60173 CEMCON, LTD.2280 WHITE OAK CIRCLESUITE 100AURORA, ILLINOIS 60502-9675 CLIENT CIVIL ENGINEER Know what'sbelow.before you dig.Call R 0 25' 50' 100' 150'SCALE: 1"=50'NORTH SOUTH ENTRANCESEE DETAIL SHEET 6 MATCH LINE SHEET 5 MATCH LINE SHEET 5 MATCH LINE SHEET 3 MATCH LINE SHEET 3 STEINER ROAD1 9 2 3 4 5 6 7 8 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 2526 27 28 29 30 92 93 94 95 96 97 98 99 100 101 102 103 104 105 106 OUTLOT F OUTLOT K PARKVIEW DRIVEPETUNIA LANESTARFLOWER DRIVEGREENBRIAR DRIVESTEINER ROADSHEET NO. REVISIONS DRAWN CHECKED DATE PROJECT NO.PLOT CONFIG:XREFS:LANDSCAPE PLAN5 GREENBRIARPLAINFIELD, ILLINOIS7.20.2021 DR2197 CLE MGM OF 11 11.03.2021 11.23.2021 02.18.2022 07.27.2022 REV 1 REV 2 REV 3 REV 4 1750 EAST GOLF ROAD, SUITE 925SCHAUMBURG, IL 60173 CEMCON, LTD.2280 WHITE OAK CIRCLESUITE 100AURORA, ILLINOIS 60502-9675 CLIENT CIVIL ENGINEER Know what'sbelow.before you dig.Call R 0 25' 50' 100' 150'SCALE: 1"=50'NORTH MATCH LINE SHEET 4 MATCH LINE SHEET 4 NATIVE LEGEND SOUTH ENTRANCESEE DETAIL SHEET 6 PLANT COMMUNITY SECTIONNOT TO SCALE VIOLET DRIVEVERANIUM DRIVE STEINER ROADAZALIA LANESTARFLOWERDRIVEBARBERRY DRIVE STEINER ROADSHEET NO. REVISIONS DRAWN CHECKED DATE PROJECT NO.PLOT CONFIG:XREFS:LANDSCAPE DETAILS6 GREENBRIARPLAINFIELD, ILLINOIS7.20.2021 DR2197 CLE MGM OF 11 11.03.2021 11.23.2021 02.18.2022 07.27.2022 REV 1 REV 2 REV 3 REV 4 1750 EAST GOLF ROAD, SUITE 925SCHAUMBURG, IL 60173 CEMCON, LTD.2280 WHITE OAK CIRCLESUITE 100AURORA, ILLINOIS 60502-9675 CLIENT CIVIL ENGINEER Know what'sbelow.before you dig.Call R 0 10' 20' 40' 60'SCALE: 1"=20'NORTH SOUTH ENTRANCE DETAILNORTH ENTRANCE DETAIL 0 10' 20' 40' 60'SCALE: 1"=20'NORTH 47 79 255 PARKVIEWDRIVELIBERTY GROVE BOULEVARDGREENBRIARDRIVE SHEET NO. REVISIONS DRAWN CHECKED DATE PROJECT NO.PLOT CONFIG:XREFS:LANDSCAPE DETAILS7 GREENBRIARPLAINFIELD, ILLINOIS7.20.2021 DR2197 CLE MGM OF 11 11.03.2021 11.23.2021 02.18.2022 07.27.2022 REV 1 REV 2 REV 3 REV 4 1750 EAST GOLF ROAD, SUITE 925SCHAUMBURG, IL 60173 CEMCON, LTD.2280 WHITE OAK CIRCLESUITE 100AURORA, ILLINOIS 60502-9675 CLIENT CIVIL ENGINEER Know what'sbelow.before you dig.Call R BOULEVARD LANDSCAPE DETAIL 0 10' 20' 40' 60'SCALE: 1"=20'NORTH LANDSCAPE PLAN 0 10 20 40 60SCALE: 1"=20' KEY LOT FOUNDATION SINGLE FAMILY PLANT SELECTION LIST PLANTING DETAILS PERENNIALS AND GROUNDCOVERS NOT TO SCALE NOT TO SCALE DECIDUOUS AND EVERGREEN SHRUBS DECIDUOUS TREES NOT TO SCALE EVERGREEN TREES NOT TO SCALE GREENBRIAR D D' GREENBRIAR A A' B B' C C' SHEET NO. REVISIONS DRAWN CHECKED DATE PROJECT NO.PLOT CONFIG:XREFS:MONUMENT DETAILS8 GREENBRIARPLAINFIELD, ILLINOIS7.20.2021 DR2197 CLE MGM OF 11 11.03.2021 11.23.2021 02.18.2022 07.27.2022 REV 1 REV 2 REV 3 REV 4 1750 EAST GOLF ROAD, SUITE 925SCHAUMBURG, IL 60173 CEMCON, LTD.2280 WHITE OAK CIRCLESUITE 100AURORA, ILLINOIS 60502-9675 CLIENT CIVIL ENGINEER Know what'sbelow.before you dig.Call R SCALE: 1/2"=1'-0"MONUMENT DETAIL SCALE: 1/2"=1'-0"SIGNAGE PANEL DETAIL SCALE: 1/2"=1'-0"MONUMENT/BRIDGE ELEVATION: SWALE SIDE VIEW SCALE: 1/2"=1'-0"MONUMENT/BRIDGE ELEVATION: STREET SIDE VIEW SECTION A-A'SECTION B-B'SECTION C-C' SECTION D-D' SCALE: 1/4"=1'-0"MONUMENT/BRIDGE PLAN VIEW PARKVIEWDRIVELIBERTY GROVE BOULEVARD BRIARGREEN A A' BRIARGREEN BARBERRY DRIVE STEINER ROADVERANIUM DRIVE STEINER ROADSHEET NO. REVISIONS DRAWN CHECKED DATE PROJECT NO.PLOT CONFIG:XREFS:MONUMENT DETAILS9 GREENBRIARPLAINFIELD, ILLINOIS7.20.2021 DR2197 CLE MGM OF 11 11.03.2021 11.23.2021 02.18.2022 07.27.2022 REV 1 REV 2 REV 3 REV 4 1750 EAST GOLF ROAD, SUITE 925SCHAUMBURG, IL 60173 CEMCON, LTD.2280 WHITE OAK CIRCLESUITE 100AURORA, ILLINOIS 60502-9675 CLIENT CIVIL ENGINEER Know what'sbelow.before you dig.Call R 0 10' 20' 40' 60'SCALE: 1"=20' EAST MONUMENT PIERLAYOUT PLAN SCALE: 1/2"=1'-0"MONUMENT PIER DETAIL SECTION A-A' SCALE: 1/2"=1'-0"BRIDGE ELEVATION: SWALE SIDE VIEW SCALE: 1"=1'-0"SIGN PANEL DETAIL 0 10' 20' 40' 60'SCALE: 1"=20' NORTH MONUMENT/BRIDGE LAYOUT PLAN 0 10' 20' 40' 60'SCALE: 1"=20' SOUTH MONUMENT/BRIDGE LAYOUT PLAN SCALE: 1/4"=1'-0"BRIDGE PLAN VIEW LIBERTY GROVE BLVD PRESIDENTIAL AVE STEINER ROAD162 264 248 37 38 39 40 41 42 43 44 45 46 47 4849505152 53 66 74 75 76 77 78 79 80 81 82 83 84 85 114 115 116 117 118 119 OUTLOT M OUTLOT H OUTLOT BOUTLOT G256 257 258 259 260 261 262 263 265 266 267 268 269 270 271 272 273 274 275 276 277 229 228 230 231 232 233 234 235 237 236 238 240 239 241 242 243 244 245 246 247 249 250 251 252 253 254 255 134 135 136 137 138 139 140 141142143144145146147 131 132 133 198 199 200 201 202 203 204 205 206 207 208 209 210 211 212 213 214 215 216 217 218 219 220 221 222 223 224 225 226 227 189190191192193194195196197 180 181 182 183 184 185 186 187 188 164 165 166 167 168 169 170 171 172173174175176177178179 148 149 150 151 152 153 154 155 156157158159160161163 125 124 123 122 121 126 127 128 129 130 120 OUTLOT I OUTLOT A VIOLET DRIVEPARKVIEWACACIA DRIVE THICKET LANE SANDALWOOD LANE AZALIA LANE VERANIUM DRIVE BLOSSOM LANE GREENBRIAR DRIVEDRIVELIBERTY GROVE BOULEVARD STARFLOWER DRIVESTEINER ROAD1 9 2 3 4 5 6 7 8 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 2526 27 28 29 30 31 32 33 34 35 36 37 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 85 86 87 88 89 90 91 92 93 94 95 96 97 98 99 100 101 102 103 104 105 106 107 108 109 110 111 112 113 114 OUTLOT J OUTLOT F OUTLOT K OUTLOT L STARFLOWER DRIVEPARKVIEWDRIVEBARBERRY DRIVE PETUNIA LANESTARFLOWER DRIVEGREENBRIAR DRIVESHEET NO. REVISIONS DRAWN CHECKED DATE PROJECT NO.PLOT CONFIG:XREFS:TREE PRESERVATION PLAN10 GREENBRIARPLAINFIELD, ILLINOIS7.20.2021 DR2197 CLE MGM OF 11 11.03.2021 11.23.2021 02.18.2022 07.27.2022 REV 1 REV 2 REV 3 REV 4 1750 EAST GOLF ROAD, SUITE 925SCHAUMBURG, IL 60173 CEMCON, LTD.2280 WHITE OAK CIRCLESUITE 100AURORA, ILLINOIS 60502-9675 CLIENT CIVIL ENGINEER Know what'sbelow.before you dig.Call R MATCH LINE THIS SHEET LEGEND TREE TO BE PRESERVED TREE TO BE REMOVED TREE PRESERVATION DETAIL NOTE: LOCATION OF TREE PROTECTION FENCE TO BE DETERMINED AT FINAL ENGINEERING. TREE INVENTORY TREE PRESERVATION NOTES TREE INVENTORY BASED ON GRWA SITE VISIT 3/24/2021SCALE: 1"=100'NORTH0 50' 100'200'300' SCALE: 1"=100'NORTH0 50' 100'200'300' SHEET NO. REVISIONS DRAWN CHECKED DATE PROJECT NO.PLOT CONFIG:XREFS:LANDSCAPE SPECIFICATIONS11 GREENBRIARPLAINFIELD, ILLINOIS7.20.2021 DR2197 CLE MGM OF 11 11.03.2021 11.23.2021 02.18.2022 07.27.2022 REV 1 REV 2 REV 3 REV 4 1750 EAST GOLF ROAD, SUITE 925SCHAUMBURG, IL 60173 CEMCON, LTD.2280 WHITE OAK CIRCLESUITE 100AURORA, ILLINOIS 60502-9675 CLIENT CIVIL ENGINEER Know what'sbelow.before you dig.Call R ” ” ” ”